QA/QC E & I ENGINEER Kader Meeran Sahib M.A.K
(Petrochemicals- Site Engineer Electrical & Instrumentation. — Procurement, construction /
commission / Documentation — field of Electrical, Instrumentation & Analytical systems,)
Work as Site Engineer in Sabic(Petrochemical) Affiliate as Projects Contractor for Petrokemya, Saudi
Kayan, Al-Bayroni, Safco, Ibn zahr, Ibn-Sina, Sharq & Tasnee
Objectives/Aim:
Excellent technical knowledge and rich experience in petrochemicals plant & wants to utilize my entire
skills and my talents in the field of SABIC QA/QC
Responsibilities:
Site Engineer in Construction & Pre-Commissioning Activity
(a) Monitor Daily Construction details activities and daily Progress.
(b) Monitoring and review of approved documents(AFC).
(c) Ensure project SABIC standards, procedures and schedules are adhered during
construction phase.
(d)Strong Technical Knowledge like Voltage drop calculation,Transformer selection, SLD
preparation , Power Cable selection, Instrument cables etc,
(e) Ensuring the site is supplied with the correct drawings and materials
(f) Resolve and respond to technical queries from site and contractors.
(g) Preparation of Detail Engineer Package (DEP),PQP,QA/QC Dossier Documents.
(h) Ability to prepare inspection documents like Request for inspection, technical data sheet.
(i) Familiar with testing procedure like Insulation resistance checking (Megger),Loop checking
(Simulation),Leak test(Tubing & Piping) & Continuity checking .
(j) Ensures that the tests, controls, inspections & other activities are carried out according
to schedule, Specification & approved Quality Plan in compliance with required HSE standards
(k) To witness & perform pre-commissioning and commissioning activities to ensure that the
equipment / systems installation / performance are in accordance with the project specifications.
(l) Closely monitor the project schedule and complete the project as given commitment date
Personal Details
Name: Kader Meeran Sahib
Experience: 4 years
Permanent Address:
13.A Aliyar Street,Kayalpatnam,Tuticorin dist, Tamilnadu - INDIA
E-mail: makkader@yahoo.com .
Passport No.: J6938981 Expiry Date: July, 2021
Date of Birth: 08 October 1989
Marital Status: Single
Educational Qualifications
01. BE Engineering (Electrical & Electronic), April'2012
02. H. S.C. (Maths Subject), May'2008.
Work Experience & Skills (Total Experience – 4 years)
I.Project: SABIC - Saudi Arabia (Sub-Contractor : SPEETECH)
Affiliate: Ibn Zahr,Ibn Sina,Petro kemya, Saudi Kayan, Al-Bayroni, Safco,Tasnee & Sharq.
Projects(I):
Up gradation of 7 GC @ PP Plant (Ibn Zahr)
Duration : Oct-2014 to May-2015 (8 Months)
Position: Electrical & Instrument Engineer
Responsibilities:
(a) )Preparation of Detail engineer package,Project Quality plan,Quality assurance dossier & As built
(b)Ensure & monitor the project with SABIC EHSS & SABIC Quality standard
(c) Preparation & follow of control documents like Quality check Procedure,Quality check list & ITP
(d) Ensure approved materials received @ site
(f)Ensure all the testing equipments are inspected & calibrated before requesting inspection
(g)Ensure the project should progress with approved documents(AFC)
(h)Ensure all the activities should adhere with SABIC Check list procedure before final RFI raised
(i) Ensure all the inspection comments close if any.
(j)Ensure & monitor all the Sabic QC comments need to be close before submitting final documents
(k) Update As built drawings for final submission and approval.
Projects(II):
Installation of DIB Overhead NC4 Analyzer @ Ibn Sina Plant
Duration: Feb-2014 to Sept-2014 (8 Months)
Position: Electrical & Instrument Engineer
Responsibilities:
(a) Preparation of Detail engineer package,Project Quality plan,Quality assurance dossier & As built
(b)Ensure & monitor the project with SABIC EHSS & SABIC Quality standard
(c)Overall project execute activities in site
(d)Ensure the project should progress with approved documents(AFC)
(e)Ensure the Approved materials received at site
(f) Preparation & follow of control documents like Quality check procedure,Quality check list & ITP
(g) Closing of project punch points as per given target date
(h) Update as built drawings for final submission and approval
Projects(III):
Installation of O2 Analyzer @ Saudi Kayan Plant
Duration: Aug-2013 to Feb-2014 (7 Months)
Position: Electrical & Instrument Engineer
Responsibilities:
(a) )Preparation of Detail engineer package,Project Quality plan,Quality assurance dossier & As built
(b)Ensure & monitor the project with SABIC EHSS & SABIC Quality standard
(c) Preparation & follow of control documents like Quality check Procedure,Quality check list & ITP
(d) Ensure approved materials received @ site
(f)Ensure all the testing equipments are inspected & calibrated before requesting inspection
(g)Ensure the project should progress with approved documents(AFC)
(h)Ensure all the activities should adhere with SABIC Check list procedure before final RFI raised
(i) Ensure all the inspection comments close if any.
(j)Ensure & monitor all the Sabic QC comments need to be close before submitting final documents
(k) Update As built drawings for final submission and approval.
Projects(IV):
Installation of EFSOP & IEAF System @ Hadeed Plant
Duration: Aug-2014 to Nov-2014 (4 Months)
II.Project: TASNEE – Petrochemical KSA (Main-Contractor : SPEETECH)
Projects(I):
Installation of Gas chromatography @ Tasnee Cracker Plant
Duration : Dec-2012 to Aug-2013 (10 Months)
Position: Electrical & Instrument QA/QC Engineer
Responsibilities:
(a)Perform QA/QC Engineer activity
(b)Preparation of QA documents like PQP/QA & QC Dossier documents
(c)Ensure Construction Quality Assurance before raising Inspection.
(d)Ensure the project progress as per inspection test plan (ITP)
(e) Familiar with test equipment like megger/Simulator
(f) Ensure the project progress with correct approved drawings
(g) Monitor the punch list if any during the inspection & close the same as per target date.
(h)Submitting final QA/QC documents to client
(i)Attending project quality index & PSSR meeting .
III. Company: Avalon Technologies Pvt Ltd,- (MEPZ)- India(Tamil Nadu)
Client:(I) Johnson Mathey,ALP,Systec,Emerson
Position: QA/QC (Cable Harnessing)
Duration: 10 May 2012 To 11 Oct 2012
Job Description:
Project Management Activities –
(a) Executive the project & Deliver the cables as per the commitment Date.
(b) Review the customer order & acknowledge the order within 5 days.
(c) Review the Risk Assessment for each & every project & Deliver as per the schedule date.
(d) Cable Harnessing –Execute by follow up from Purchasing, Production, Quality & Delivery
Department
Technical Query Clearance -
(a) During Sourcing /Quoting cable data sheet shall be send to customer with highlighting specific data.
(b) Review & Clear - Customer comments if any.
(c) Provide Clear pricing details & Delivery date with proper explanation
(d) Support Incoming Inspection department by providing cable spec sheet...
(e) If any discrepancy that should be clear by us on on time.
(f) Support our production department by handling risk management during production.
(g) Provide the delivery status as a day to day activities.
(h) Customer feedback has to be noted & recorded in monthly basis
(I) If any deviation in revision level or customer drawing proper approval has been taken from customer.
Job Description:
(a) Overall project execute activities.
(b) Overall looking/Follow up with purchasing, production, planning, quality department
(c) Able to handling risk during cable production & delivery time.
(d) To review and maintain updated Customer feedback.
(e) Provide necessary documents to customer at first production lot & Change order lot.
(g) Review customer order & Drawing with latest version.
(h) Schedule day to day project progress & met customer commitment date
(I) Run MRP/PCMRP & send open order status to customer at daily basis/Weekly basis
Rewards & Satisfaction:
(a) Played as a District football player on 2006.
(b) Most well marathon player award 2006-2010.
(c) Scored centum in Maths (10th
) –no one got that since before in my school time.
(d) Reward for getting customer maintain customer satisfaction 100% for continues 2 years
(e) Reward for Complete the Electrical project as per the schedule during plant shutdown time
(f) Reward for maintain EHSS proper way
(g) Reward for project executing with commitment date
(h) Reward for clear site status & client equerry clarification
Yours Sincerely
E-mail: makkader@yahoo.com Kader Meeran Sahib
Mob# 00966 571678342
Declaration:
I hereby declare that the information furnished above is true to the best of my knowledge.

QC Engineer Oil Gas

  • 1.
    QA/QC E &I ENGINEER Kader Meeran Sahib M.A.K (Petrochemicals- Site Engineer Electrical & Instrumentation. — Procurement, construction / commission / Documentation — field of Electrical, Instrumentation & Analytical systems,) Work as Site Engineer in Sabic(Petrochemical) Affiliate as Projects Contractor for Petrokemya, Saudi Kayan, Al-Bayroni, Safco, Ibn zahr, Ibn-Sina, Sharq & Tasnee Objectives/Aim: Excellent technical knowledge and rich experience in petrochemicals plant & wants to utilize my entire skills and my talents in the field of SABIC QA/QC Responsibilities: Site Engineer in Construction & Pre-Commissioning Activity (a) Monitor Daily Construction details activities and daily Progress. (b) Monitoring and review of approved documents(AFC). (c) Ensure project SABIC standards, procedures and schedules are adhered during construction phase. (d)Strong Technical Knowledge like Voltage drop calculation,Transformer selection, SLD preparation , Power Cable selection, Instrument cables etc, (e) Ensuring the site is supplied with the correct drawings and materials (f) Resolve and respond to technical queries from site and contractors. (g) Preparation of Detail Engineer Package (DEP),PQP,QA/QC Dossier Documents. (h) Ability to prepare inspection documents like Request for inspection, technical data sheet. (i) Familiar with testing procedure like Insulation resistance checking (Megger),Loop checking (Simulation),Leak test(Tubing & Piping) & Continuity checking . (j) Ensures that the tests, controls, inspections & other activities are carried out according to schedule, Specification & approved Quality Plan in compliance with required HSE standards (k) To witness & perform pre-commissioning and commissioning activities to ensure that the equipment / systems installation / performance are in accordance with the project specifications. (l) Closely monitor the project schedule and complete the project as given commitment date Personal Details Name: Kader Meeran Sahib Experience: 4 years Permanent Address: 13.A Aliyar Street,Kayalpatnam,Tuticorin dist, Tamilnadu - INDIA E-mail: makkader@yahoo.com . Passport No.: J6938981 Expiry Date: July, 2021 Date of Birth: 08 October 1989 Marital Status: Single
  • 2.
    Educational Qualifications 01. BEEngineering (Electrical & Electronic), April'2012 02. H. S.C. (Maths Subject), May'2008. Work Experience & Skills (Total Experience – 4 years) I.Project: SABIC - Saudi Arabia (Sub-Contractor : SPEETECH) Affiliate: Ibn Zahr,Ibn Sina,Petro kemya, Saudi Kayan, Al-Bayroni, Safco,Tasnee & Sharq. Projects(I): Up gradation of 7 GC @ PP Plant (Ibn Zahr) Duration : Oct-2014 to May-2015 (8 Months) Position: Electrical & Instrument Engineer Responsibilities: (a) )Preparation of Detail engineer package,Project Quality plan,Quality assurance dossier & As built (b)Ensure & monitor the project with SABIC EHSS & SABIC Quality standard (c) Preparation & follow of control documents like Quality check Procedure,Quality check list & ITP (d) Ensure approved materials received @ site (f)Ensure all the testing equipments are inspected & calibrated before requesting inspection (g)Ensure the project should progress with approved documents(AFC) (h)Ensure all the activities should adhere with SABIC Check list procedure before final RFI raised (i) Ensure all the inspection comments close if any. (j)Ensure & monitor all the Sabic QC comments need to be close before submitting final documents (k) Update As built drawings for final submission and approval. Projects(II): Installation of DIB Overhead NC4 Analyzer @ Ibn Sina Plant Duration: Feb-2014 to Sept-2014 (8 Months) Position: Electrical & Instrument Engineer Responsibilities: (a) Preparation of Detail engineer package,Project Quality plan,Quality assurance dossier & As built (b)Ensure & monitor the project with SABIC EHSS & SABIC Quality standard (c)Overall project execute activities in site (d)Ensure the project should progress with approved documents(AFC) (e)Ensure the Approved materials received at site (f) Preparation & follow of control documents like Quality check procedure,Quality check list & ITP (g) Closing of project punch points as per given target date (h) Update as built drawings for final submission and approval Projects(III): Installation of O2 Analyzer @ Saudi Kayan Plant Duration: Aug-2013 to Feb-2014 (7 Months) Position: Electrical & Instrument Engineer
  • 3.
    Responsibilities: (a) )Preparation ofDetail engineer package,Project Quality plan,Quality assurance dossier & As built (b)Ensure & monitor the project with SABIC EHSS & SABIC Quality standard (c) Preparation & follow of control documents like Quality check Procedure,Quality check list & ITP (d) Ensure approved materials received @ site (f)Ensure all the testing equipments are inspected & calibrated before requesting inspection (g)Ensure the project should progress with approved documents(AFC) (h)Ensure all the activities should adhere with SABIC Check list procedure before final RFI raised (i) Ensure all the inspection comments close if any. (j)Ensure & monitor all the Sabic QC comments need to be close before submitting final documents (k) Update As built drawings for final submission and approval. Projects(IV): Installation of EFSOP & IEAF System @ Hadeed Plant Duration: Aug-2014 to Nov-2014 (4 Months) II.Project: TASNEE – Petrochemical KSA (Main-Contractor : SPEETECH) Projects(I): Installation of Gas chromatography @ Tasnee Cracker Plant Duration : Dec-2012 to Aug-2013 (10 Months) Position: Electrical & Instrument QA/QC Engineer Responsibilities: (a)Perform QA/QC Engineer activity (b)Preparation of QA documents like PQP/QA & QC Dossier documents (c)Ensure Construction Quality Assurance before raising Inspection. (d)Ensure the project progress as per inspection test plan (ITP) (e) Familiar with test equipment like megger/Simulator (f) Ensure the project progress with correct approved drawings (g) Monitor the punch list if any during the inspection & close the same as per target date. (h)Submitting final QA/QC documents to client (i)Attending project quality index & PSSR meeting . III. Company: Avalon Technologies Pvt Ltd,- (MEPZ)- India(Tamil Nadu) Client:(I) Johnson Mathey,ALP,Systec,Emerson Position: QA/QC (Cable Harnessing) Duration: 10 May 2012 To 11 Oct 2012 Job Description: Project Management Activities – (a) Executive the project & Deliver the cables as per the commitment Date. (b) Review the customer order & acknowledge the order within 5 days. (c) Review the Risk Assessment for each & every project & Deliver as per the schedule date. (d) Cable Harnessing –Execute by follow up from Purchasing, Production, Quality & Delivery Department
  • 4.
    Technical Query Clearance- (a) During Sourcing /Quoting cable data sheet shall be send to customer with highlighting specific data. (b) Review & Clear - Customer comments if any. (c) Provide Clear pricing details & Delivery date with proper explanation (d) Support Incoming Inspection department by providing cable spec sheet... (e) If any discrepancy that should be clear by us on on time. (f) Support our production department by handling risk management during production. (g) Provide the delivery status as a day to day activities. (h) Customer feedback has to be noted & recorded in monthly basis (I) If any deviation in revision level or customer drawing proper approval has been taken from customer. Job Description: (a) Overall project execute activities. (b) Overall looking/Follow up with purchasing, production, planning, quality department (c) Able to handling risk during cable production & delivery time. (d) To review and maintain updated Customer feedback. (e) Provide necessary documents to customer at first production lot & Change order lot. (g) Review customer order & Drawing with latest version. (h) Schedule day to day project progress & met customer commitment date (I) Run MRP/PCMRP & send open order status to customer at daily basis/Weekly basis Rewards & Satisfaction: (a) Played as a District football player on 2006. (b) Most well marathon player award 2006-2010. (c) Scored centum in Maths (10th ) –no one got that since before in my school time. (d) Reward for getting customer maintain customer satisfaction 100% for continues 2 years (e) Reward for Complete the Electrical project as per the schedule during plant shutdown time (f) Reward for maintain EHSS proper way (g) Reward for project executing with commitment date (h) Reward for clear site status & client equerry clarification Yours Sincerely E-mail: makkader@yahoo.com Kader Meeran Sahib Mob# 00966 571678342 Declaration: I hereby declare that the information furnished above is true to the best of my knowledge.