                              OBJECTIVE
               To qualify the students in the project financial and budgets
               management and to assess the interface between the financial
               and others project’s areas.
               To provide the students the possibilities to understand the cost
               estimates, financial quantification, etc. The course will also define
               and present the projects investment concepts and the project
               selection criteria.




           TRAINING CONTENT
               At the end of the course the student will be able to:


               ✓✓Compose the project’s financial structure
               ✓✓Distinguish different types of project costs
               ✓✓Determine the cost implications in the project scope and
                 schedule changes

               ✓✓Make the direct project cost / benefit calculation
               ✓✓Buy different projects through the Net Present Value
               ✓✓Determine the project Breakeven through the project
                 schedule and budget

               ✓✓Do a pre-project analysis and determine the investment’s
                 financial viability

                                                  © Macrosolutions SA. All rights reserved.   2/14
[
TRAINING




                         FACT SHEET
                                                                                DESCRIPTION

                                                           Course number of hours. The number of days depends
           COURSE DURATION
                                                           on the daily number of hours dedicated in each course.
           16 Hours.

                                                           The minimum number of students suggested to ensure
           NUMBER OF PARTICIPANTS
                                                           the training economic viability.
           Minimum 20 students per class.

           TARGET AUDIENCE
           Project managers, project team members, sponsors and others stakeholders interested in the
           project management process.

           REQUIREMENTS
           Desirable project management knowledge.

                                                           The language in which the training is ministered.
           LANGUAGE(S)
           Portuguese, English and Spanish.

           LOCAL
           Provided by the contractor. Worldwide attendance.

                                                           Closed classes are hired by a particular organization
           CLOSED CLASSES
                                                           or group. In this case all the participants are selected/
           (IN COMPANY)?                                   chosen by the contracting organization.
           Yes.

                                                           Open classes offer public access in which the
           OPEN CLASSES?
                                                           registration is done by each participant, individually.
           No.

                                                           Professional Development Units are the measuring
           CERTIFICATION AND PDU
                                                           units issued by the Project Management Institute for
           All training participants will receive a        the credential holders. With these units the credential
           participation certificate with 16 PMI’s PDUs.   holders can maintain their certifications.
           (PMI R.E.P. activity number: Macro006)



                                                                            © Macrosolutions SA. All rights reserved.   3/14
[
TRAINING




STANDARDS AND
METHODOLOGIES
                                              Project management standards and methodologies discussed
                                              and addressed in the training.


               Project Management Institute (PMI)                   UK Office of Government Commerce (OGC)

    PMBOK Guide                                              PRINCE2 (Projects in Controlled Environments)

    PMI Practice Standard for Estimating                     MSP (Managing Successful Programmes)                      —

    PMI Practice Standard for Earned Value Management        M_O_R (Management of Risks)                               —

    PMI Practice Standard for Configuration                  P3M3 (Portfolio, Programme, and Project
                                                         —                                                             —
    Management                                               Management Maturity Model)

    PMI Practice Standard for Risk Management            —   P3O (Portfolio, Programme and Project Offices)            —

    PMI Practice Standard for Work Breakdown Structure       MoP (Management of Portfolios)                            —

    PMI Practice Standard for Scheduling                     MoV (Management of Value)                                 —

    PMI Standard for Portfolio Management                —
                                                                                  Scrum Alliance
    PMI Standard for Program Management                  —
                                                             Scrum Methodology                                         —
    PMI Project Manager Development Competency
                                                         —
    Framework
                                                               International Project Management Association (IPMA)
    Organizational Project Management Maturity Model
                                                         —   ICB® IPMA Competence Baseline
    (OPM3®)                                                                                                            —



                                                                                 © Macrosolutions SA. All rights reserved.   4/14
[
TRAINING




                  BASIC
               PROGRAM
    [
    COURSE OPENING


    [
    THE CONTEXT OF PROJECT FINANCIAL MANAGEMENT
    ›› Presentation
    ›› The different types of costs
    ›› Income
    ›› Price formation
    ›› Operating profit

                                                  © Macrosolutions SA. All rights reserved.   5/14
[
TRAINING
BASIC PROGRAM




    [
    THE RELATIONSHIP BETWEEN QUALITY X COSTS X SCHEDULE
    ›› Direct relationship
    ›› Priority differences among projects
    ›› Cost x Time relationship
    ›› Cost x Performance relationship


    [
    THE PROJECT PHASES
    ›› The 5 project phases
    ›› The 5 project phases
    ›› The overlapping of phases in the PMBOK
    ›› The interference of the phases in the project cost management
    ›› The 42 processes that constitute the PMBOK – 4th Edition


    [
    THE PROJECT COST MANAGEMENT PROCESSES
    ›› Cost estimating
    ›› Budgeting
    ›› Cost Control


    [
    COST ESTIMATING
    ›› Detailed estimating
    ›› Analogy
    ›› Parametric
    ›› Monetary adjustments


    [
    QUALITATIVE FINANCIAL MANAGEMENT TOOLS AND PROJECT SELECTION TOOLS
    ›› Project selection
    ›› Present value
    ›› Benefit cost analysis
    ›› Net present value
    ›› Break-even point
    ›› Fast tracking


    [
    COST CONTROL, IN INVESTMENT PROJECTS
    ›› Definition
    ›› Order of magnitude control
    ›› Pre-project analysis
    ›› Price formation in investment projects


    [
    COURSE CLOSE-OUT

                                                                       © Macrosolutions SA. All rights reserved.   6/14
[
TRAINING




    MY COOKING
       PROJECT                                                                 ®


       EXERCISE
           Ricardo Vargas had the opportunity to learn very interesting
           dynamics that show the project management importance
           while studying in the Strategy and Innovation program at the
           Massachusetts Institute of Technology (MIT).
           During the classes, he developed a simple dynamic based on
           the elaboration of a quick dinner for guests to demonstrate
           the importance of establishing the appropriate strategies for
           managing the project and the inherent risks to every decision
           making and also to the manager risk profile.

                                          © Macrosolutions SA. All rights reserved.   7/14
[
TRAINING
MY COOKING PROJECT EXERCISE




                                                                                                                                                                                                                                                                                                            The dynamics is are performed in two hours with all participants.
                                                                                                                                                                                                                                                                                                            They were divided into groups, competing for the best performance
                                                                                                                                                                                                                                                                                                            seeking to understand the risks associated with each decision.


                                                                                                         Features                                                                                                                                                                                           1- Shows the influence of the RISK PROFILE of
                                                                                                                                                                                                                                                                                                            the project decision maker.
                                                                                                                                                                                                                                                                                                            2- Promotes TEAMWORK in the decision-
                                                                                                                                                                                                                                                                                                            making
                                                                                                                                                                                                                                                                                                            3- Evaluate the effectiveness of the duration
                                                                                                                                                                                                                                                                                                            COMPRESSION mechanisms.


                                                                                                                                                                                                                                                                                                                                           [     MY COOKING PROJECT®
                                                                                                                                                                                                                                                                                                                                                 MAPA DE RISCOS



      [     MY COOKING PROJECT®
            GRÁFICO DE GANTT
                                                                                                                                                                                                                                                                                                                                                                          CENÁRIO 01

                                                                                                                                  CENÁRIO 01                                                                                                        Tempo Total:
                                                                                                                                                                                                                                                                                                                                               ALTA




    0-2   2-4   4-6   6-8   8 - 10   10 - 12   12 - 14   14 - 16   16 - 18   18 - 20 20 - 22 22 - 24 24 - 26 26 - 28 28 - 30 30 - 32 32 - 34 34 - 36 36 - 38 38 - 40 40 - 42 42 - 44 44 - 46 46 - 48 48 - 50 50 - 52 52 - 54 54 - 56 56 - 58 58 - 60 62 - 64 64 - 66 66 - 68 68 - 70 70 - 72 72 - 74   74 - 76 76 - 78 78 - 80 80 - 82
                                                                                                                                                                                                                                                                                                                                         PROBABILIDADE
                                                                                                                                                                                                                                                                                                                                             MÉDIA
                                                                                                                                                                                                                                                                                                                                               BAIXA




                                                                                                                                                                                                                                                                                                                                                           BAIXO              MÉDIO                                   ALTO
                                                                                                                                                                                                                                                                                                                                                                             IMPACTO
    0-2   2-4   4-6   6-8   8 - 10   10 - 12   12 - 14   14 - 16   16 - 18   18 - 20 20 - 22 22 - 24 24 - 26 26 - 28 28 - 30 30 - 32 32 - 34 34 - 36 36 - 38 38 - 40 40 - 42 42 - 44 44 - 46 46 - 48 48 - 50 50 - 52 52 - 54 54 - 56 56 - 58 58 - 60 62 - 64 64 - 66 66 - 68 68 - 70 70 - 72 72 - 74   74 - 76 76 - 78 78 - 80 80 - 82




    0-2   2-4   4-6   6-8   8 - 10   10 - 12   12 - 14   14 - 16   16 - 18
                                                                                                                                 CENÁRIO 02                                                                                                         Tempo Total:
                                                                             18 - 20 20 - 22 22 - 24 24 - 26 26 - 28 28 - 30 30 - 32 32 - 34 34 - 36 36 - 38 38 - 40 40 - 42 42 - 44 44 - 46 46 - 48 48 - 50 50 - 52 52 - 54 54 - 56 56 - 58 58 - 60 62 - 64 64 - 66 66 - 68 68 - 70 70 - 72 72 - 74   74 - 76 76 - 78 78 - 80 80 - 82
                                                                                                                                                                                                                                                                                                                                                                          CENÁRIO 02
                                                                                                                                                                                                                                                                                                                                               ALTA
                                                                                                                                                                                                                                                                                                                                         PROBABILIDADE
                                                                                                                                                                                                                                                                                                                                             MÉDIA
                                                                                                                                                                                                                                                                                                                                               BAIXA




    0-2   2-4   4-6   6-8   8 - 10   10 - 12   12 - 14   14 - 16   16 - 18   18 - 20 20 - 22 22 - 24 24 - 26 26 - 28 28 - 30 30 - 32 32 - 34 34 - 36 36 - 38 38 - 40 40 - 42 42 - 44 44 - 46 46 - 48 48 - 50 50 - 52 52 - 54 54 - 56 56 - 58 58 - 60 62 - 64 64 - 66 66 - 68 68 - 70 70 - 72 72 - 74   74 - 76 76 - 78 78 - 80 80 - 82


                                                                                                                                                                                                                                           © 2010 Ricardo Viana Vargas. Todos direitos reservados. Reprodução Proibida.




                                                                                                                                                                                                                                                                                                                                                           BAIXO              MÉDIO                                   ALTO
                                                                                                                                                                                                                                                                                                                                                                             IMPACTO
                                                                                                                                                                                                                                                                                                                                                                                          © 2010 Ricardo Viana Vargas. Todos direitos reservados. Reprodução Proibida.




                                                                                                                                                                                                                                                                                                                                                                       © Macrosolutions SA. All rights reserved.                                                         8/14
[
TRAINING




    PMCOASTER                                                                    ®


      DYNAMIC
                       It is a dynamics developed to simulate the real
                       projects environment.
                       Divided into teams, the participants will plan and
                       execute the construction of a functional high speed
                       roller coaster prototype for a theme park.
                        Students will define the work, evaluate the project
           feasible budget and time in order to execute it. They will do so
           concerning the time and costs constraints. Then, students will
           execute and monitor the project to demonstrate the effectiveness
           of the plan in adverse conditions.
           The approximate duration of the dynamics is 2 hours and its main
           objective is to show the interrelationship between the scope
           required, deadlines and available budget. In addition, the aspects
           related to the teamwork quality are directly addressed.

                                            © Macrosolutions SA. All rights reserved.   9/14
[
TRAINING
PMCOASTER DYNAMIC




       Features     1- Shows the direct relationship between
                    project SCOPE, TIME and COSTS.
                    2- It highlights the importance of the
                    DECISION MAKING in resource-limited
                    settings.
                    3- Enables participants to understand the
                    mechanisms directly related to the creation of
                    the project schedule.




                                           © Macrosolutions SA. All rights reserved.   10/14
[
TRAINING




                                ADDITIONAL
                                 DYNAMICS
                                    As part of our methodology, in this course the following dynamics
                                    will be used:




    [
    CASE STUDIES
    › Ricardo Vargas and the Macrosolutions’ team have selected a relevant set of case studies and
      exercises that allow the participants to associate real and fictional cases the to daily work.
    › All case studies are appropriate to the nature of the client and the training audience.


    [
    VIDEOS SELECTION
    › In order to facilitate the student learning, videos that cover various parts of movies,
      commercials, home videos, etc. are used in the classroom environment to fix concepts and
      associate technical issues with the reality of work and also to introduce new concepts.
    › They are short videos with direct focus on specific topics, tools and cases.


    [
    GROUP WORK
    › Several studies and exercises will be proposed by the instructor in order to present a particular
      topic or discuss a particular approach to project management.
    › Throughout the training the teamwork will be encouraged and strengthened as a mean for the
      group to learn.


    [
    SIMULATORS
    › To discuss some mathematical and statistical approaches, the instructor will perform specific
      mathematical simulations to estimate the expected results for the risks, schedules, costs,
      among others. They are computational methods that use mathematical concepts, operational
      research and statistics as a conceptual basis.


    [
    LEARNING EXERCISES
    › During the training, students perform concepts retaining quick exercises. Usually the exercises
      are quick and direct and involve some kind of mathematical calculation.

                                                                      © Macrosolutions SA. All rights reserved.   11/14
[
TRAINING




EXCLUSIVE STUDENT
     ACCESS AREA
                                                          In addition to the exclusive printed material,
                                                          all participants will have access to the
                                                          courseware’s electronic version, to the files
                                                          of exercises and to the work done in the
                                                          classroom.
                                                          The access is given through the restricted
                                                          site that is available and prepared by the
                                                          Macrosolutions team considering each
                                                          course that we provide. This initiative is a
                                                          pioneer in the educational market and also
                                                          anticipates trends related to the documents’
                                                          electronic management
    Student Area’s on the website macrosolutions.com.br

                                                                       © Macrosolutions SA. All rights reserved.   12/14
[
TRAINING




            REQUIRED
           EQUIPMENT
            The equipment required for the proper realization of the course is:




           [ HIGH RESOLUTION PROJECTOR (1024X768)


           [ SOUND SYSTEM FOR VIDEO DISPLAY


           [ INTERNET ACCESS


           [ VARIABLE ILLUMINATION INSIDE THE CLASSROOM


           [ 01 TABLE FOR EACH GROUP OF FIVE STUDENTS


           [ 01 FLIP CHART FOR EACH GROUP OF FIVE STUDENTS

                                              © Macrosolutions SA. All rights reserved.   13/14
[
TRAINING




         FURTHER
     INFORMATION
           For further information about this course, please contact:


           Phone: +55 31 3024-3003
           Fax: +55 31 3024-3005
           email: info@macrosolutions.com.br

                                            © Macrosolutions SA. All rights reserved.   14/14

More Related Content

What's hot

Macrosolutions Training: Managing Complex Projects and Projects in Crisis
Macrosolutions Training: Managing Complex Projects and Projects in CrisisMacrosolutions Training: Managing Complex Projects and Projects in Crisis
Macrosolutions Training: Managing Complex Projects and Projects in Crisis
Macrosolutions SA
 
Macrosolutions Training: Risk Management
Macrosolutions Training: Risk ManagementMacrosolutions Training: Risk Management
Macrosolutions Training: Risk Management
Macrosolutions SA
 
Macrosolutions Training: Negotiation Techniques for Project Managers
Macrosolutions Training: Negotiation Techniques for Project ManagersMacrosolutions Training: Negotiation Techniques for Project Managers
Macrosolutions Training: Negotiation Techniques for Project Managers
Macrosolutions SA
 
Macrosolutions Training: Project Human Resource Management and Project Leader...
Macrosolutions Training: Project Human Resource Management and Project Leader...Macrosolutions Training: Project Human Resource Management and Project Leader...
Macrosolutions Training: Project Human Resource Management and Project Leader...
Macrosolutions SA
 
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
Macrosolutions SA
 
Certification brochure uk_v2
Certification brochure uk_v2Certification brochure uk_v2
Certification brochure uk_v2johnlucy
 
Repositioning The Project Management Profession 2 2
Repositioning The Project Management Profession 2 2Repositioning The Project Management Profession 2 2
Repositioning The Project Management Profession 2 2
Brian Phillips
 
netmind - Mejores prácticas en Gestión de Proyectos, Programas y Portfolios-t…
netmind - Mejores prácticas en Gestión de Proyectos, Programas y Portfolios-t…netmind - Mejores prácticas en Gestión de Proyectos, Programas y Portfolios-t…
netmind - Mejores prácticas en Gestión de Proyectos, Programas y Portfolios-t…
netmind
 
F&A training project March 9, 2012
F&A training project March 9, 2012F&A training project March 9, 2012
F&A training project March 9, 2012
DBA-DEC
 
Intl. pm standards prince2, pmi & co. - potifob 2011
Intl. pm standards   prince2, pmi & co. - potifob 2011Intl. pm standards   prince2, pmi & co. - potifob 2011
Intl. pm standards prince2, pmi & co. - potifob 2011
POTIFOB
 
Prince2 2009 & its benefits potifob stefan ondek
Prince2 2009 & its benefits   potifob stefan ondekPrince2 2009 & its benefits   potifob stefan ondek
Prince2 2009 & its benefits potifob stefan ondekLucie Budíková
 
Career development maria curran
Career development maria curranCareer development maria curran
Career development maria currancampone
 
Mo v overview presentation 1.0
Mo v overview presentation 1.0Mo v overview presentation 1.0
Mo v overview presentation 1.0
Robert Peopall
 
Prospectus
ProspectusProspectus
Prospectus
arpitmist
 
Pdc capmhandbook
Pdc capmhandbookPdc capmhandbook
Pdc capmhandbookjohnlucy
 
Pdc pmphandbook
Pdc pmphandbookPdc pmphandbook
Pdc pmphandbookjohnlucy
 
Prince2 2009 & its benefits
Prince2 2009 & its benefitsPrince2 2009 & its benefits
Prince2 2009 & its benefits
POTIFOB1
 
Template Search Solutions 03 19 09
Template Search Solutions   03 19 09Template Search Solutions   03 19 09
Template Search Solutions 03 19 09DavidpaulGomez
 
Service Offerings Of Varnaaz
Service Offerings Of VarnaazService Offerings Of Varnaaz
Service Offerings Of VarnaazDinesh Badagandi
 

What's hot (20)

Macrosolutions Training: Managing Complex Projects and Projects in Crisis
Macrosolutions Training: Managing Complex Projects and Projects in CrisisMacrosolutions Training: Managing Complex Projects and Projects in Crisis
Macrosolutions Training: Managing Complex Projects and Projects in Crisis
 
Macrosolutions Training: Risk Management
Macrosolutions Training: Risk ManagementMacrosolutions Training: Risk Management
Macrosolutions Training: Risk Management
 
Macrosolutions Training: Negotiation Techniques for Project Managers
Macrosolutions Training: Negotiation Techniques for Project ManagersMacrosolutions Training: Negotiation Techniques for Project Managers
Macrosolutions Training: Negotiation Techniques for Project Managers
 
Macrosolutions Training: Project Human Resource Management and Project Leader...
Macrosolutions Training: Project Human Resource Management and Project Leader...Macrosolutions Training: Project Human Resource Management and Project Leader...
Macrosolutions Training: Project Human Resource Management and Project Leader...
 
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
 
Certification brochure uk_v2
Certification brochure uk_v2Certification brochure uk_v2
Certification brochure uk_v2
 
Repositioning The Project Management Profession 2 2
Repositioning The Project Management Profession 2 2Repositioning The Project Management Profession 2 2
Repositioning The Project Management Profession 2 2
 
netmind - Mejores prácticas en Gestión de Proyectos, Programas y Portfolios-t…
netmind - Mejores prácticas en Gestión de Proyectos, Programas y Portfolios-t…netmind - Mejores prácticas en Gestión de Proyectos, Programas y Portfolios-t…
netmind - Mejores prácticas en Gestión de Proyectos, Programas y Portfolios-t…
 
F&A training project March 9, 2012
F&A training project March 9, 2012F&A training project March 9, 2012
F&A training project March 9, 2012
 
Intl. pm standards prince2, pmi & co. - potifob 2011
Intl. pm standards   prince2, pmi & co. - potifob 2011Intl. pm standards   prince2, pmi & co. - potifob 2011
Intl. pm standards prince2, pmi & co. - potifob 2011
 
Prince2 2009 & its benefits potifob stefan ondek
Prince2 2009 & its benefits   potifob stefan ondekPrince2 2009 & its benefits   potifob stefan ondek
Prince2 2009 & its benefits potifob stefan ondek
 
Career development maria curran
Career development maria curranCareer development maria curran
Career development maria curran
 
Mo v overview presentation 1.0
Mo v overview presentation 1.0Mo v overview presentation 1.0
Mo v overview presentation 1.0
 
Prospectus
ProspectusProspectus
Prospectus
 
Pdc capmhandbook
Pdc capmhandbookPdc capmhandbook
Pdc capmhandbook
 
Pdc pmphandbook
Pdc pmphandbookPdc pmphandbook
Pdc pmphandbook
 
Nmp brochure 2009
Nmp brochure  2009Nmp brochure  2009
Nmp brochure 2009
 
Prince2 2009 & its benefits
Prince2 2009 & its benefitsPrince2 2009 & its benefits
Prince2 2009 & its benefits
 
Template Search Solutions 03 19 09
Template Search Solutions   03 19 09Template Search Solutions   03 19 09
Template Search Solutions 03 19 09
 
Service Offerings Of Varnaaz
Service Offerings Of VarnaazService Offerings Of Varnaaz
Service Offerings Of Varnaaz
 

Similar to Macrosolutions Training: Cost and Financial Management in projects

Macrosolutions Training: PMO – Project Management Office
Macrosolutions Training: PMO – Project Management OfficeMacrosolutions Training: PMO – Project Management Office
Macrosolutions Training: PMO – Project Management Office
Macrosolutions SA
 
Macrosolutions Training: Project Management for Executives
Macrosolutions Training: Project Management for ExecutivesMacrosolutions Training: Project Management for Executives
Macrosolutions Training: Project Management for Executives
Macrosolutions SA
 
Macrosolutions Training: Earned Value Analysis in projects
Macrosolutions Training: Earned Value Analysis in projectsMacrosolutions Training: Earned Value Analysis in projects
Macrosolutions Training: Earned Value Analysis in projects
Macrosolutions SA
 
Macrosolutions Training: Project Communications Management
Macrosolutions Training: Project Communications ManagementMacrosolutions Training: Project Communications Management
Macrosolutions Training: Project Communications Management
Macrosolutions SA
 
Macrosolutions PMDome Workshop (en)
Macrosolutions PMDome Workshop (en)Macrosolutions PMDome Workshop (en)
Macrosolutions PMDome Workshop (en)
Macrosolutions SA
 
Training Catalog 0710
Training Catalog 0710Training Catalog 0710
Training Catalog 0710
olivierlazar
 
Macrosolutions Consulting Service: Resources and Investment Optimization thro...
Macrosolutions Consulting Service: Resources and Investment Optimization thro...Macrosolutions Consulting Service: Resources and Investment Optimization thro...
Macrosolutions Consulting Service: Resources and Investment Optimization thro...
Macrosolutions SA
 
Macrosolutions Consulting Service: Coaching and Mentoring in Project Management
Macrosolutions Consulting Service: Coaching and Mentoring in Project ManagementMacrosolutions Consulting Service: Coaching and Mentoring in Project Management
Macrosolutions Consulting Service: Coaching and Mentoring in Project Management
Macrosolutions SA
 
Macrosolutions Consulting Service: Development of Project Management Career Plan
Macrosolutions Consulting Service: Development of Project Management Career PlanMacrosolutions Consulting Service: Development of Project Management Career Plan
Macrosolutions Consulting Service: Development of Project Management Career Plan
Macrosolutions SA
 
Project Management Credentials
Project Management CredentialsProject Management Credentials
Project Management Credentials
David Khaw, MBA, MPM, PMP, CPT, NS-NLP, CTC
 
Project Management, Pmi Perspective
Project Management, Pmi PerspectiveProject Management, Pmi Perspective
Project Management, Pmi Perspective
Urooj Muhammad khan, PMP, ITIL, CSM
 
Macrosolutions Consulting Service: Project Maturity Assessment and Diagnosis
Macrosolutions Consulting Service: Project Maturity Assessment and DiagnosisMacrosolutions Consulting Service: Project Maturity Assessment and Diagnosis
Macrosolutions Consulting Service: Project Maturity Assessment and Diagnosis
Macrosolutions SA
 
Macrosolutions Consulting Service: Support and Consulting for Specific Projec...
Macrosolutions Consulting Service: Support and Consulting for Specific Projec...Macrosolutions Consulting Service: Support and Consulting for Specific Projec...
Macrosolutions Consulting Service: Support and Consulting for Specific Projec...
Macrosolutions SA
 
Prince2 & PMBOK Comparison Demystified
Prince2 & PMBOK Comparison DemystifiedPrince2 & PMBOK Comparison Demystified
Prince2 & PMBOK Comparison Demystified
CTE Solutions Inc.
 
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
Stefan Ondek, PMP, CSPM
 
Pmo
PmoPmo
Pmo
ammody
 
Macrosolutions Consulting Service: Project Management Office (PMO) Implementa...
Macrosolutions Consulting Service: Project Management Office (PMO) Implementa...Macrosolutions Consulting Service: Project Management Office (PMO) Implementa...
Macrosolutions Consulting Service: Project Management Office (PMO) Implementa...
Macrosolutions SA
 
Macrosolutions Consulting Service: Structuring the Risks Management Processes
Macrosolutions Consulting Service: Structuring the Risks Management ProcessesMacrosolutions Consulting Service: Structuring the Risks Management Processes
Macrosolutions Consulting Service: Structuring the Risks Management Processes
Macrosolutions SA
 
Macrosolutions Consulting Service: Portfolio and Investment Management
Macrosolutions Consulting Service: Portfolio and Investment ManagementMacrosolutions Consulting Service: Portfolio and Investment Management
Macrosolutions Consulting Service: Portfolio and Investment Management
Macrosolutions SA
 
Project mgmt services brochure 2013
Project mgmt services brochure 2013Project mgmt services brochure 2013
Project mgmt services brochure 2013Nidhi Gupta
 

Similar to Macrosolutions Training: Cost and Financial Management in projects (20)

Macrosolutions Training: PMO – Project Management Office
Macrosolutions Training: PMO – Project Management OfficeMacrosolutions Training: PMO – Project Management Office
Macrosolutions Training: PMO – Project Management Office
 
Macrosolutions Training: Project Management for Executives
Macrosolutions Training: Project Management for ExecutivesMacrosolutions Training: Project Management for Executives
Macrosolutions Training: Project Management for Executives
 
Macrosolutions Training: Earned Value Analysis in projects
Macrosolutions Training: Earned Value Analysis in projectsMacrosolutions Training: Earned Value Analysis in projects
Macrosolutions Training: Earned Value Analysis in projects
 
Macrosolutions Training: Project Communications Management
Macrosolutions Training: Project Communications ManagementMacrosolutions Training: Project Communications Management
Macrosolutions Training: Project Communications Management
 
Macrosolutions PMDome Workshop (en)
Macrosolutions PMDome Workshop (en)Macrosolutions PMDome Workshop (en)
Macrosolutions PMDome Workshop (en)
 
Training Catalog 0710
Training Catalog 0710Training Catalog 0710
Training Catalog 0710
 
Macrosolutions Consulting Service: Resources and Investment Optimization thro...
Macrosolutions Consulting Service: Resources and Investment Optimization thro...Macrosolutions Consulting Service: Resources and Investment Optimization thro...
Macrosolutions Consulting Service: Resources and Investment Optimization thro...
 
Macrosolutions Consulting Service: Coaching and Mentoring in Project Management
Macrosolutions Consulting Service: Coaching and Mentoring in Project ManagementMacrosolutions Consulting Service: Coaching and Mentoring in Project Management
Macrosolutions Consulting Service: Coaching and Mentoring in Project Management
 
Macrosolutions Consulting Service: Development of Project Management Career Plan
Macrosolutions Consulting Service: Development of Project Management Career PlanMacrosolutions Consulting Service: Development of Project Management Career Plan
Macrosolutions Consulting Service: Development of Project Management Career Plan
 
Project Management Credentials
Project Management CredentialsProject Management Credentials
Project Management Credentials
 
Project Management, Pmi Perspective
Project Management, Pmi PerspectiveProject Management, Pmi Perspective
Project Management, Pmi Perspective
 
Macrosolutions Consulting Service: Project Maturity Assessment and Diagnosis
Macrosolutions Consulting Service: Project Maturity Assessment and DiagnosisMacrosolutions Consulting Service: Project Maturity Assessment and Diagnosis
Macrosolutions Consulting Service: Project Maturity Assessment and Diagnosis
 
Macrosolutions Consulting Service: Support and Consulting for Specific Projec...
Macrosolutions Consulting Service: Support and Consulting for Specific Projec...Macrosolutions Consulting Service: Support and Consulting for Specific Projec...
Macrosolutions Consulting Service: Support and Consulting for Specific Projec...
 
Prince2 & PMBOK Comparison Demystified
Prince2 & PMBOK Comparison DemystifiedPrince2 & PMBOK Comparison Demystified
Prince2 & PMBOK Comparison Demystified
 
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
 
Pmo
PmoPmo
Pmo
 
Macrosolutions Consulting Service: Project Management Office (PMO) Implementa...
Macrosolutions Consulting Service: Project Management Office (PMO) Implementa...Macrosolutions Consulting Service: Project Management Office (PMO) Implementa...
Macrosolutions Consulting Service: Project Management Office (PMO) Implementa...
 
Macrosolutions Consulting Service: Structuring the Risks Management Processes
Macrosolutions Consulting Service: Structuring the Risks Management ProcessesMacrosolutions Consulting Service: Structuring the Risks Management Processes
Macrosolutions Consulting Service: Structuring the Risks Management Processes
 
Macrosolutions Consulting Service: Portfolio and Investment Management
Macrosolutions Consulting Service: Portfolio and Investment ManagementMacrosolutions Consulting Service: Portfolio and Investment Management
Macrosolutions Consulting Service: Portfolio and Investment Management
 
Project mgmt services brochure 2013
Project mgmt services brochure 2013Project mgmt services brochure 2013
Project mgmt services brochure 2013
 

More from Macrosolutions SA

Portfólio Macrosolutions
Portfólio MacrosolutionsPortfólio Macrosolutions
Portfólio Macrosolutions
Macrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Tempo em Projetos
Macrosolutions Treinamento: Gerenciamento de Tempo em ProjetosMacrosolutions Treinamento: Gerenciamento de Tempo em Projetos
Macrosolutions Treinamento: Gerenciamento de Tempo em Projetos
Macrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Recursos Humanos em Projetos e L...
Macrosolutions Treinamento: Gerenciamento de Recursos Humanos em Projetos e L...Macrosolutions Treinamento: Gerenciamento de Recursos Humanos em Projetos e L...
Macrosolutions Treinamento: Gerenciamento de Recursos Humanos em Projetos e L...
Macrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento da Qualidade em Projetos
Macrosolutions Treinamento: Gerenciamento da Qualidade em ProjetosMacrosolutions Treinamento: Gerenciamento da Qualidade em Projetos
Macrosolutions Treinamento: Gerenciamento da Qualidade em Projetos
Macrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Projetos Complexos e Crises em P...
Macrosolutions Treinamento: Gerenciamento de Projetos Complexos e Crises em P...Macrosolutions Treinamento: Gerenciamento de Projetos Complexos e Crises em P...
Macrosolutions Treinamento: Gerenciamento de Projetos Complexos e Crises em P...
Macrosolutions SA
 
Macrosolutions Treinamento: PMO – Project Management Office
Macrosolutions Treinamento: PMO – Project Management OfficeMacrosolutions Treinamento: PMO – Project Management Office
Macrosolutions Treinamento: PMO – Project Management Office
Macrosolutions SA
 
Macrosolutions Treinamento: Técnicas de Negociação para Gerentes de Projeto
Macrosolutions Treinamento: Técnicas de Negociação para Gerentes de ProjetoMacrosolutions Treinamento: Técnicas de Negociação para Gerentes de Projeto
Macrosolutions Treinamento: Técnicas de Negociação para Gerentes de Projeto
Macrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Projetos para Executivos
Macrosolutions Treinamento: Gerenciamento de Projetos para ExecutivosMacrosolutions Treinamento: Gerenciamento de Projetos para Executivos
Macrosolutions Treinamento: Gerenciamento de Projetos para Executivos
Macrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Riscos
Macrosolutions Treinamento: Gerenciamento de RiscosMacrosolutions Treinamento: Gerenciamento de Riscos
Macrosolutions Treinamento: Gerenciamento de Riscos
Macrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Projetos: Estabelecendo Diferenc...
Macrosolutions Treinamento: Gerenciamento de Projetos: Estabelecendo Diferenc...Macrosolutions Treinamento: Gerenciamento de Projetos: Estabelecendo Diferenc...
Macrosolutions Treinamento: Gerenciamento de Projetos: Estabelecendo Diferenc...
Macrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Programas
Macrosolutions Treinamento: Gerenciamento de ProgramasMacrosolutions Treinamento: Gerenciamento de Programas
Macrosolutions Treinamento: Gerenciamento de Programas
Macrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Portfólio
Macrosolutions Treinamento: Gerenciamento de PortfólioMacrosolutions Treinamento: Gerenciamento de Portfólio
Macrosolutions Treinamento: Gerenciamento de Portfólio
Macrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento e Controle de Mudanças em projetos
Macrosolutions Treinamento: Gerenciamento e Controle de Mudanças em projetosMacrosolutions Treinamento: Gerenciamento e Controle de Mudanças em projetos
Macrosolutions Treinamento: Gerenciamento e Controle de Mudanças em projetos
Macrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Escopo em Projetos
Macrosolutions Treinamento: Gerenciamento de Escopo em ProjetosMacrosolutions Treinamento: Gerenciamento de Escopo em Projetos
Macrosolutions Treinamento: Gerenciamento de Escopo em Projetos
Macrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Custos e Gestão Financeira em pr...
Macrosolutions Treinamento: Gerenciamento de Custos e Gestão Financeira em pr...Macrosolutions Treinamento: Gerenciamento de Custos e Gestão Financeira em pr...
Macrosolutions Treinamento: Gerenciamento de Custos e Gestão Financeira em pr...
Macrosolutions SA
 

More from Macrosolutions SA (15)

Portfólio Macrosolutions
Portfólio MacrosolutionsPortfólio Macrosolutions
Portfólio Macrosolutions
 
Macrosolutions Treinamento: Gerenciamento de Tempo em Projetos
Macrosolutions Treinamento: Gerenciamento de Tempo em ProjetosMacrosolutions Treinamento: Gerenciamento de Tempo em Projetos
Macrosolutions Treinamento: Gerenciamento de Tempo em Projetos
 
Macrosolutions Treinamento: Gerenciamento de Recursos Humanos em Projetos e L...
Macrosolutions Treinamento: Gerenciamento de Recursos Humanos em Projetos e L...Macrosolutions Treinamento: Gerenciamento de Recursos Humanos em Projetos e L...
Macrosolutions Treinamento: Gerenciamento de Recursos Humanos em Projetos e L...
 
Macrosolutions Treinamento: Gerenciamento da Qualidade em Projetos
Macrosolutions Treinamento: Gerenciamento da Qualidade em ProjetosMacrosolutions Treinamento: Gerenciamento da Qualidade em Projetos
Macrosolutions Treinamento: Gerenciamento da Qualidade em Projetos
 
Macrosolutions Treinamento: Gerenciamento de Projetos Complexos e Crises em P...
Macrosolutions Treinamento: Gerenciamento de Projetos Complexos e Crises em P...Macrosolutions Treinamento: Gerenciamento de Projetos Complexos e Crises em P...
Macrosolutions Treinamento: Gerenciamento de Projetos Complexos e Crises em P...
 
Macrosolutions Treinamento: PMO – Project Management Office
Macrosolutions Treinamento: PMO – Project Management OfficeMacrosolutions Treinamento: PMO – Project Management Office
Macrosolutions Treinamento: PMO – Project Management Office
 
Macrosolutions Treinamento: Técnicas de Negociação para Gerentes de Projeto
Macrosolutions Treinamento: Técnicas de Negociação para Gerentes de ProjetoMacrosolutions Treinamento: Técnicas de Negociação para Gerentes de Projeto
Macrosolutions Treinamento: Técnicas de Negociação para Gerentes de Projeto
 
Macrosolutions Treinamento: Gerenciamento de Projetos para Executivos
Macrosolutions Treinamento: Gerenciamento de Projetos para ExecutivosMacrosolutions Treinamento: Gerenciamento de Projetos para Executivos
Macrosolutions Treinamento: Gerenciamento de Projetos para Executivos
 
Macrosolutions Treinamento: Gerenciamento de Riscos
Macrosolutions Treinamento: Gerenciamento de RiscosMacrosolutions Treinamento: Gerenciamento de Riscos
Macrosolutions Treinamento: Gerenciamento de Riscos
 
Macrosolutions Treinamento: Gerenciamento de Projetos: Estabelecendo Diferenc...
Macrosolutions Treinamento: Gerenciamento de Projetos: Estabelecendo Diferenc...Macrosolutions Treinamento: Gerenciamento de Projetos: Estabelecendo Diferenc...
Macrosolutions Treinamento: Gerenciamento de Projetos: Estabelecendo Diferenc...
 
Macrosolutions Treinamento: Gerenciamento de Programas
Macrosolutions Treinamento: Gerenciamento de ProgramasMacrosolutions Treinamento: Gerenciamento de Programas
Macrosolutions Treinamento: Gerenciamento de Programas
 
Macrosolutions Treinamento: Gerenciamento de Portfólio
Macrosolutions Treinamento: Gerenciamento de PortfólioMacrosolutions Treinamento: Gerenciamento de Portfólio
Macrosolutions Treinamento: Gerenciamento de Portfólio
 
Macrosolutions Treinamento: Gerenciamento e Controle de Mudanças em projetos
Macrosolutions Treinamento: Gerenciamento e Controle de Mudanças em projetosMacrosolutions Treinamento: Gerenciamento e Controle de Mudanças em projetos
Macrosolutions Treinamento: Gerenciamento e Controle de Mudanças em projetos
 
Macrosolutions Treinamento: Gerenciamento de Escopo em Projetos
Macrosolutions Treinamento: Gerenciamento de Escopo em ProjetosMacrosolutions Treinamento: Gerenciamento de Escopo em Projetos
Macrosolutions Treinamento: Gerenciamento de Escopo em Projetos
 
Macrosolutions Treinamento: Gerenciamento de Custos e Gestão Financeira em pr...
Macrosolutions Treinamento: Gerenciamento de Custos e Gestão Financeira em pr...Macrosolutions Treinamento: Gerenciamento de Custos e Gestão Financeira em pr...
Macrosolutions Treinamento: Gerenciamento de Custos e Gestão Financeira em pr...
 

Recently uploaded

Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
marketingjdass
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
SynapseIndia
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
 
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
PaulBryant58
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
seri bangash
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
BBPMedia1
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdfDigital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Jos Voskuil
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
 

Recently uploaded (20)

Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdfDigital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 

Macrosolutions Training: Cost and Financial Management in projects

  • 1. COST AND FINANCIAL MANAGEMENT IN PROJECTS TRAINING
  • 2. [ TRAINING OBJECTIVE To qualify the students in the project financial and budgets management and to assess the interface between the financial and others project’s areas. To provide the students the possibilities to understand the cost estimates, financial quantification, etc. The course will also define and present the projects investment concepts and the project selection criteria. TRAINING CONTENT At the end of the course the student will be able to: ✓✓Compose the project’s financial structure ✓✓Distinguish different types of project costs ✓✓Determine the cost implications in the project scope and schedule changes ✓✓Make the direct project cost / benefit calculation ✓✓Buy different projects through the Net Present Value ✓✓Determine the project Breakeven through the project schedule and budget ✓✓Do a pre-project analysis and determine the investment’s financial viability © Macrosolutions SA. All rights reserved. 2/14
  • 3. [ TRAINING FACT SHEET DESCRIPTION Course number of hours. The number of days depends COURSE DURATION on the daily number of hours dedicated in each course. 16 Hours. The minimum number of students suggested to ensure NUMBER OF PARTICIPANTS the training economic viability. Minimum 20 students per class. TARGET AUDIENCE Project managers, project team members, sponsors and others stakeholders interested in the project management process. REQUIREMENTS Desirable project management knowledge. The language in which the training is ministered. LANGUAGE(S) Portuguese, English and Spanish. LOCAL Provided by the contractor. Worldwide attendance. Closed classes are hired by a particular organization CLOSED CLASSES or group. In this case all the participants are selected/ (IN COMPANY)? chosen by the contracting organization. Yes. Open classes offer public access in which the OPEN CLASSES? registration is done by each participant, individually. No. Professional Development Units are the measuring CERTIFICATION AND PDU units issued by the Project Management Institute for All training participants will receive a the credential holders. With these units the credential participation certificate with 16 PMI’s PDUs. holders can maintain their certifications. (PMI R.E.P. activity number: Macro006) © Macrosolutions SA. All rights reserved. 3/14
  • 4. [ TRAINING STANDARDS AND METHODOLOGIES Project management standards and methodologies discussed and addressed in the training. Project Management Institute (PMI) UK Office of Government Commerce (OGC) PMBOK Guide PRINCE2 (Projects in Controlled Environments) PMI Practice Standard for Estimating MSP (Managing Successful Programmes) — PMI Practice Standard for Earned Value Management M_O_R (Management of Risks) — PMI Practice Standard for Configuration P3M3 (Portfolio, Programme, and Project — — Management Management Maturity Model) PMI Practice Standard for Risk Management — P3O (Portfolio, Programme and Project Offices) — PMI Practice Standard for Work Breakdown Structure MoP (Management of Portfolios) — PMI Practice Standard for Scheduling MoV (Management of Value) — PMI Standard for Portfolio Management — Scrum Alliance PMI Standard for Program Management — Scrum Methodology — PMI Project Manager Development Competency — Framework International Project Management Association (IPMA) Organizational Project Management Maturity Model — ICB® IPMA Competence Baseline (OPM3®) — © Macrosolutions SA. All rights reserved. 4/14
  • 5. [ TRAINING BASIC PROGRAM [ COURSE OPENING [ THE CONTEXT OF PROJECT FINANCIAL MANAGEMENT ›› Presentation ›› The different types of costs ›› Income ›› Price formation ›› Operating profit © Macrosolutions SA. All rights reserved. 5/14
  • 6. [ TRAINING BASIC PROGRAM [ THE RELATIONSHIP BETWEEN QUALITY X COSTS X SCHEDULE ›› Direct relationship ›› Priority differences among projects ›› Cost x Time relationship ›› Cost x Performance relationship [ THE PROJECT PHASES ›› The 5 project phases ›› The 5 project phases ›› The overlapping of phases in the PMBOK ›› The interference of the phases in the project cost management ›› The 42 processes that constitute the PMBOK – 4th Edition [ THE PROJECT COST MANAGEMENT PROCESSES ›› Cost estimating ›› Budgeting ›› Cost Control [ COST ESTIMATING ›› Detailed estimating ›› Analogy ›› Parametric ›› Monetary adjustments [ QUALITATIVE FINANCIAL MANAGEMENT TOOLS AND PROJECT SELECTION TOOLS ›› Project selection ›› Present value ›› Benefit cost analysis ›› Net present value ›› Break-even point ›› Fast tracking [ COST CONTROL, IN INVESTMENT PROJECTS ›› Definition ›› Order of magnitude control ›› Pre-project analysis ›› Price formation in investment projects [ COURSE CLOSE-OUT © Macrosolutions SA. All rights reserved. 6/14
  • 7. [ TRAINING MY COOKING PROJECT ® EXERCISE Ricardo Vargas had the opportunity to learn very interesting dynamics that show the project management importance while studying in the Strategy and Innovation program at the Massachusetts Institute of Technology (MIT). During the classes, he developed a simple dynamic based on the elaboration of a quick dinner for guests to demonstrate the importance of establishing the appropriate strategies for managing the project and the inherent risks to every decision making and also to the manager risk profile. © Macrosolutions SA. All rights reserved. 7/14
  • 8. [ TRAINING MY COOKING PROJECT EXERCISE The dynamics is are performed in two hours with all participants. They were divided into groups, competing for the best performance seeking to understand the risks associated with each decision. Features 1- Shows the influence of the RISK PROFILE of the project decision maker. 2- Promotes TEAMWORK in the decision- making 3- Evaluate the effectiveness of the duration COMPRESSION mechanisms. [ MY COOKING PROJECT® MAPA DE RISCOS [ MY COOKING PROJECT® GRÁFICO DE GANTT CENÁRIO 01 CENÁRIO 01 Tempo Total: ALTA 0-2 2-4 4-6 6-8 8 - 10 10 - 12 12 - 14 14 - 16 16 - 18 18 - 20 20 - 22 22 - 24 24 - 26 26 - 28 28 - 30 30 - 32 32 - 34 34 - 36 36 - 38 38 - 40 40 - 42 42 - 44 44 - 46 46 - 48 48 - 50 50 - 52 52 - 54 54 - 56 56 - 58 58 - 60 62 - 64 64 - 66 66 - 68 68 - 70 70 - 72 72 - 74 74 - 76 76 - 78 78 - 80 80 - 82 PROBABILIDADE MÉDIA BAIXA BAIXO MÉDIO ALTO IMPACTO 0-2 2-4 4-6 6-8 8 - 10 10 - 12 12 - 14 14 - 16 16 - 18 18 - 20 20 - 22 22 - 24 24 - 26 26 - 28 28 - 30 30 - 32 32 - 34 34 - 36 36 - 38 38 - 40 40 - 42 42 - 44 44 - 46 46 - 48 48 - 50 50 - 52 52 - 54 54 - 56 56 - 58 58 - 60 62 - 64 64 - 66 66 - 68 68 - 70 70 - 72 72 - 74 74 - 76 76 - 78 78 - 80 80 - 82 0-2 2-4 4-6 6-8 8 - 10 10 - 12 12 - 14 14 - 16 16 - 18 CENÁRIO 02 Tempo Total: 18 - 20 20 - 22 22 - 24 24 - 26 26 - 28 28 - 30 30 - 32 32 - 34 34 - 36 36 - 38 38 - 40 40 - 42 42 - 44 44 - 46 46 - 48 48 - 50 50 - 52 52 - 54 54 - 56 56 - 58 58 - 60 62 - 64 64 - 66 66 - 68 68 - 70 70 - 72 72 - 74 74 - 76 76 - 78 78 - 80 80 - 82 CENÁRIO 02 ALTA PROBABILIDADE MÉDIA BAIXA 0-2 2-4 4-6 6-8 8 - 10 10 - 12 12 - 14 14 - 16 16 - 18 18 - 20 20 - 22 22 - 24 24 - 26 26 - 28 28 - 30 30 - 32 32 - 34 34 - 36 36 - 38 38 - 40 40 - 42 42 - 44 44 - 46 46 - 48 48 - 50 50 - 52 52 - 54 54 - 56 56 - 58 58 - 60 62 - 64 64 - 66 66 - 68 68 - 70 70 - 72 72 - 74 74 - 76 76 - 78 78 - 80 80 - 82 © 2010 Ricardo Viana Vargas. Todos direitos reservados. Reprodução Proibida. BAIXO MÉDIO ALTO IMPACTO © 2010 Ricardo Viana Vargas. Todos direitos reservados. Reprodução Proibida. © Macrosolutions SA. All rights reserved. 8/14
  • 9. [ TRAINING PMCOASTER ® DYNAMIC It is a dynamics developed to simulate the real projects environment. Divided into teams, the participants will plan and execute the construction of a functional high speed roller coaster prototype for a theme park. Students will define the work, evaluate the project feasible budget and time in order to execute it. They will do so concerning the time and costs constraints. Then, students will execute and monitor the project to demonstrate the effectiveness of the plan in adverse conditions. The approximate duration of the dynamics is 2 hours and its main objective is to show the interrelationship between the scope required, deadlines and available budget. In addition, the aspects related to the teamwork quality are directly addressed. © Macrosolutions SA. All rights reserved. 9/14
  • 10. [ TRAINING PMCOASTER DYNAMIC Features 1- Shows the direct relationship between project SCOPE, TIME and COSTS. 2- It highlights the importance of the DECISION MAKING in resource-limited settings. 3- Enables participants to understand the mechanisms directly related to the creation of the project schedule. © Macrosolutions SA. All rights reserved. 10/14
  • 11. [ TRAINING ADDITIONAL DYNAMICS As part of our methodology, in this course the following dynamics will be used: [ CASE STUDIES › Ricardo Vargas and the Macrosolutions’ team have selected a relevant set of case studies and exercises that allow the participants to associate real and fictional cases the to daily work. › All case studies are appropriate to the nature of the client and the training audience. [ VIDEOS SELECTION › In order to facilitate the student learning, videos that cover various parts of movies, commercials, home videos, etc. are used in the classroom environment to fix concepts and associate technical issues with the reality of work and also to introduce new concepts. › They are short videos with direct focus on specific topics, tools and cases. [ GROUP WORK › Several studies and exercises will be proposed by the instructor in order to present a particular topic or discuss a particular approach to project management. › Throughout the training the teamwork will be encouraged and strengthened as a mean for the group to learn. [ SIMULATORS › To discuss some mathematical and statistical approaches, the instructor will perform specific mathematical simulations to estimate the expected results for the risks, schedules, costs, among others. They are computational methods that use mathematical concepts, operational research and statistics as a conceptual basis. [ LEARNING EXERCISES › During the training, students perform concepts retaining quick exercises. Usually the exercises are quick and direct and involve some kind of mathematical calculation. © Macrosolutions SA. All rights reserved. 11/14
  • 12. [ TRAINING EXCLUSIVE STUDENT ACCESS AREA In addition to the exclusive printed material, all participants will have access to the courseware’s electronic version, to the files of exercises and to the work done in the classroom. The access is given through the restricted site that is available and prepared by the Macrosolutions team considering each course that we provide. This initiative is a pioneer in the educational market and also anticipates trends related to the documents’ electronic management Student Area’s on the website macrosolutions.com.br © Macrosolutions SA. All rights reserved. 12/14
  • 13. [ TRAINING REQUIRED EQUIPMENT The equipment required for the proper realization of the course is: [ HIGH RESOLUTION PROJECTOR (1024X768) [ SOUND SYSTEM FOR VIDEO DISPLAY [ INTERNET ACCESS [ VARIABLE ILLUMINATION INSIDE THE CLASSROOM [ 01 TABLE FOR EACH GROUP OF FIVE STUDENTS [ 01 FLIP CHART FOR EACH GROUP OF FIVE STUDENTS © Macrosolutions SA. All rights reserved. 13/14
  • 14. [ TRAINING FURTHER INFORMATION For further information about this course, please contact: Phone: +55 31 3024-3003 Fax: +55 31 3024-3005 email: info@macrosolutions.com.br © Macrosolutions SA. All rights reserved. 14/14