Rig #: BENNEVIS PIC Signature Approving JSA:
Work Activity (Job): MA 038 PAINTING ON DERRICK SET
Work Team (Crew Members):
Sequence of Basic Job Steps Potential Accidents or Hazards
Recommendation to Eliminate or Reduce Potential
Hazards
Who?
Initials
- Inform Drlr
- Clean area prior to painting
- NETTOYER LA SURFACE AVANT
DE PEINDRE
- INFORMER LE DRILLER
- Dirt enter eyes
- Wire from wire brush enters fingers / eye
- SALETE DANS LES YEUX
- DENT DE LA BROSE METALLIQUE DANS LES
DOIGTS / L’OEIL
- Wear all the correct PPE
- Wear gloves and goggles
- Wear dust mask
- METTRE LES PPES ADEQUATS
- PORTER DES GANTS ET DES LUNETTES
PROTECTRICE
- PORTER UN MASQUE ANTI-POUSSIERE
- Paint at height
- Paint areas that have been
cleaned
- FAIRE DE LA PEINTURE EN
HAUTEUR
- PEINDRE LES ZONES QUI ETE
NETTOYEES
- Falling
- Paint on hands
- Hoses burst
- CHUTE
- PEINTURE SUR LES MAINS
- RUPTURE DE FLEXIBLE
- If ladder used, ensure it is secured
- Wear safety harness
- Wear gloves
- Wear dust mask
- Do not work in the mud hose vicinity
- SI ON UTILISE UNE ECHELLE, LA SECURISEE
- PORTAIS LES HARNAIS DE SECURITE
- PORTER DES GANTS
- PORTER UN MASQUE ANT-POUSSIERE
- NE PAS TRAVAILLER PRES DE FLEXIBLE DE
BOUE
- Clean up area after painting
- FAIRE LE NETTOYAGE APRES
AVOIR FINI
- Tripping hazards
- Rags lying around
- RISQUE DE TREBUCHEMENT
- CHIFFONS TRAINANT
- Remove all old paint cans
- Ensure good housekeeping
- ENLEVER TOUS LES ANCIENS POTS DE
PEINTURE
- ASSURER UN BON NETTOYAGE
Safety Equipment To Do This Job
Hard Hats ( Cotton Gloves ( Face Shield ( Fire Extinguishers (
Safety Boots ( Work Vest ( Goggles ( Lockout/Tagout (
Uncontrolled When Printed Page 1
Pyramid Drilling S.A
Manual Title: Personnel Safety Manual
Form Name: Job Safety Analysis
Issue Date
02-Sept-07
Revision No.
2
Revision Date
04-MAR 08
Prepared By
QA/HSE
Approved By
HM
Level No.
2
Safety Glasses ( Safety Harness ( Barricades ( Work Permit Required (
Uncontrolled When Printed Page 2
Pyramid Drilling S.A
Manual Title: Personnel Safety Manual
Form Name: Job Safety Analysis
Issue Date
02-Sept-07
Revision No.
2
Revision Date
04-MAR 08
Prepared By
QA/HSE
Approved By
HM
Level No.
2

More Related Content

What's hot

APR - SERVIÇOS DE APLICAÇÃO E LANÇAMENTO DE FORMAS ESTRUTURAIS DE MADEIRA
APR - SERVIÇOS DE APLICAÇÃO E LANÇAMENTO DE FORMAS ESTRUTURAIS DE MADEIRAAPR - SERVIÇOS DE APLICAÇÃO E LANÇAMENTO DE FORMAS ESTRUTURAIS DE MADEIRA
APR - SERVIÇOS DE APLICAÇÃO E LANÇAMENTO DE FORMAS ESTRUTURAIS DE MADEIRA
NRFACIL www.nrfacil.com.br
 
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Gaurav Singh Rajput
 
HEIGHT WORK SAFETY REPORT
HEIGHT WORK SAFETY REPORTHEIGHT WORK SAFETY REPORT
HEIGHT WORK SAFETY REPORT
Er Abhishek Kumar
 
mock drill demonstrating first aid management of snake bite
mock drill demonstrating first aid management of snake bitemock drill demonstrating first aid management of snake bite
mock drill demonstrating first aid management of snake bite
Harish Yalal
 
Hot Work
Hot WorkHot Work
Hot Work
JulieMaeuser
 
03-hira-for-welding-work-_compress.pdf
03-hira-for-welding-work-_compress.pdf03-hira-for-welding-work-_compress.pdf
03-hira-for-welding-work-_compress.pdf
RajkumarArikumar
 
Section C, Exhibit 3 - General Work JHA.pdf
Section C, Exhibit 3 - General Work JHA.pdfSection C, Exhibit 3 - General Work JHA.pdf
Section C, Exhibit 3 - General Work JHA.pdf
Piyush Borkar
 
22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templates22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templates
Dwarika Bhushan Sharma
 
ADIS Study notes.pdf
ADIS Study notes.pdfADIS Study notes.pdf
ADIS Study notes.pdf
santosh51116
 
Scissor lift 2 daily inspection log
Scissor lift 2 daily inspection logScissor lift 2 daily inspection log
Scissor lift 2 daily inspection log
Azmeel Contracting Company
 
lifting operation
lifting operationlifting operation
lifting operation
Salwa Samsudin
 
Staff safety hand book
Staff   safety hand bookStaff   safety hand book
Staff safety hand book
Mumtaz A. Khan CMIOSH, IDipNEBOSH
 
Crane Operation - Lifting
Crane Operation -  LiftingCrane Operation -  Lifting
Crane Operation - Lifting
hafiz abdul majid
 
JSA For Work at Height.docx
JSA For Work at Height.docxJSA For Work at Height.docx
JSA For Work at Height.docx
FESTUS RICHARD SIAME
 
Ses safety induction
Ses safety inductionSes safety induction
Ses safety induction
adam-de
 
Overhead crane risk assessment
Overhead crane risk assessmentOverhead crane risk assessment
Overhead crane risk assessment
Simba Zhao
 
Step 3 duties and fire watch
Step 3 duties and fire watchStep 3 duties and fire watch
Step 3 duties and fire watch
fqf383
 
3 emergency management risk assessment templates
3 emergency management risk assessment templates3 emergency management risk assessment templates
3 emergency management risk assessment templates
Dwarika Bhushan Sharma
 
Welding and Cutting | Gaurav Singh Rajput
Welding and Cutting | Gaurav Singh RajputWelding and Cutting | Gaurav Singh Rajput
Welding and Cutting | Gaurav Singh Rajput
Gaurav Singh Rajput
 
2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templates2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templates
Dwarika Bhushan Sharma
 

What's hot (20)

APR - SERVIÇOS DE APLICAÇÃO E LANÇAMENTO DE FORMAS ESTRUTURAIS DE MADEIRA
APR - SERVIÇOS DE APLICAÇÃO E LANÇAMENTO DE FORMAS ESTRUTURAIS DE MADEIRAAPR - SERVIÇOS DE APLICAÇÃO E LANÇAMENTO DE FORMAS ESTRUTURAIS DE MADEIRA
APR - SERVIÇOS DE APLICAÇÃO E LANÇAMENTO DE FORMAS ESTRUTURAIS DE MADEIRA
 
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
 
HEIGHT WORK SAFETY REPORT
HEIGHT WORK SAFETY REPORTHEIGHT WORK SAFETY REPORT
HEIGHT WORK SAFETY REPORT
 
mock drill demonstrating first aid management of snake bite
mock drill demonstrating first aid management of snake bitemock drill demonstrating first aid management of snake bite
mock drill demonstrating first aid management of snake bite
 
Hot Work
Hot WorkHot Work
Hot Work
 
03-hira-for-welding-work-_compress.pdf
03-hira-for-welding-work-_compress.pdf03-hira-for-welding-work-_compress.pdf
03-hira-for-welding-work-_compress.pdf
 
Section C, Exhibit 3 - General Work JHA.pdf
Section C, Exhibit 3 - General Work JHA.pdfSection C, Exhibit 3 - General Work JHA.pdf
Section C, Exhibit 3 - General Work JHA.pdf
 
22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templates22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templates
 
ADIS Study notes.pdf
ADIS Study notes.pdfADIS Study notes.pdf
ADIS Study notes.pdf
 
Scissor lift 2 daily inspection log
Scissor lift 2 daily inspection logScissor lift 2 daily inspection log
Scissor lift 2 daily inspection log
 
lifting operation
lifting operationlifting operation
lifting operation
 
Staff safety hand book
Staff   safety hand bookStaff   safety hand book
Staff safety hand book
 
Crane Operation - Lifting
Crane Operation -  LiftingCrane Operation -  Lifting
Crane Operation - Lifting
 
JSA For Work at Height.docx
JSA For Work at Height.docxJSA For Work at Height.docx
JSA For Work at Height.docx
 
Ses safety induction
Ses safety inductionSes safety induction
Ses safety induction
 
Overhead crane risk assessment
Overhead crane risk assessmentOverhead crane risk assessment
Overhead crane risk assessment
 
Step 3 duties and fire watch
Step 3 duties and fire watchStep 3 duties and fire watch
Step 3 duties and fire watch
 
3 emergency management risk assessment templates
3 emergency management risk assessment templates3 emergency management risk assessment templates
3 emergency management risk assessment templates
 
Welding and Cutting | Gaurav Singh Rajput
Welding and Cutting | Gaurav Singh RajputWelding and Cutting | Gaurav Singh Rajput
Welding and Cutting | Gaurav Singh Rajput
 
2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templates2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templates
 

Viewers also liked

Ma 001 tanks & preloads visual inspection
Ma 001  tanks & preloads visual inspectionMa 001  tanks & preloads visual inspection
Ma 001 tanks & preloads visual inspection
Yousif Fikry
 
Ma 115 boom crane cable tray repair
Ma 115  boom crane cable tray repairMa 115  boom crane cable tray repair
Ma 115 boom crane cable tray repair
Yousif Fikry
 
Ma 025 transfer casing
Ma 025 transfer casingMa 025 transfer casing
Ma 025 transfer casing
Yousif Fikry
 
Ma 037 cleaning with air brush
Ma 037 cleaning with air brushMa 037 cleaning with air brush
Ma 037 cleaning with air brush
Yousif Fikry
 
Ma 020 launching lifeboats to sea
Ma 020 launching lifeboats to seaMa 020 launching lifeboats to sea
Ma 020 launching lifeboats to sea
Yousif Fikry
 
Ma 023 change out butter fly valve for bulk system
Ma 023  change out butter fly valve for bulk systemMa 023  change out butter fly valve for bulk system
Ma 023 change out butter fly valve for bulk system
Yousif Fikry
 
Ma 031 transfer brine from or to supply boat
Ma 031 transfer brine from or to supply boatMa 031 transfer brine from or to supply boat
Ma 031 transfer brine from or to supply boat
Yousif Fikry
 
Ma 035 jsa open seachest
Ma 035   jsa open seachestMa 035   jsa open seachest
Ma 035 jsa open seachest
Yousif Fikry
 
Ma 029 loading & offloading tubulars from a supply boat
Ma 029 loading & offloading tubulars from a supply boatMa 029 loading & offloading tubulars from a supply boat
Ma 029 loading & offloading tubulars from a supply boat
Yousif Fikry
 
Ma 027 jsa general lifting on the deck
Ma 027  jsa general lifting on the deckMa 027  jsa general lifting on the deck
Ma 027 jsa general lifting on the deck
Yousif Fikry
 
Ma 030 cleaning oil in 100 t crane
Ma 030 cleaning oil in 100 t craneMa 030 cleaning oil in 100 t crane
Ma 030 cleaning oil in 100 t crane
Yousif Fikry
 
Ma 028 jsa open seachest
Ma 028    jsa open seachestMa 028    jsa open seachest
Ma 028 jsa open seachest
Yousif Fikry
 
Ma 032 transfer water from or to supply boat
Ma 032 transfer water from or to supply boatMa 032 transfer water from or to supply boat
Ma 032 transfer water from or to supply boat
Yousif Fikry
 
Ma 034 jsa general lifting on the deck
Ma 034   jsa general lifting on the deckMa 034   jsa general lifting on the deck
Ma 034 jsa general lifting on the deck
Yousif Fikry
 
Ma 036 jsa check ballast 5p loading valve
Ma 036 jsa check ballast 5p loading valveMa 036 jsa check ballast 5p loading valve
Ma 036 jsa check ballast 5p loading valve
Yousif Fikry
 
Ma 024 working on ladder
Ma 024 working on ladderMa 024 working on ladder
Ma 024 working on ladder
Yousif Fikry
 
Ma 026 offloading or backloading fuel, base oil, obm
Ma 026 offloading or backloading fuel, base oil, obmMa 026 offloading or backloading fuel, base oil, obm
Ma 026 offloading or backloading fuel, base oil, obm
Yousif Fikry
 
Welding operation
Welding operationWelding operation
Welding operation
Yousif Fikry
 
Ma 033 jsa rack pup joint in the stb rack
Ma 033 jsa rack pup joint in the stb rackMa 033 jsa rack pup joint in the stb rack
Ma 033 jsa rack pup joint in the stb rack
Yousif Fikry
 
Ma 039 jsa emergency load lowering
Ma 039 jsa emergency load loweringMa 039 jsa emergency load lowering
Ma 039 jsa emergency load lowering
Yousif Fikry
 

Viewers also liked (20)

Ma 001 tanks & preloads visual inspection
Ma 001  tanks & preloads visual inspectionMa 001  tanks & preloads visual inspection
Ma 001 tanks & preloads visual inspection
 
Ma 115 boom crane cable tray repair
Ma 115  boom crane cable tray repairMa 115  boom crane cable tray repair
Ma 115 boom crane cable tray repair
 
Ma 025 transfer casing
Ma 025 transfer casingMa 025 transfer casing
Ma 025 transfer casing
 
Ma 037 cleaning with air brush
Ma 037 cleaning with air brushMa 037 cleaning with air brush
Ma 037 cleaning with air brush
 
Ma 020 launching lifeboats to sea
Ma 020 launching lifeboats to seaMa 020 launching lifeboats to sea
Ma 020 launching lifeboats to sea
 
Ma 023 change out butter fly valve for bulk system
Ma 023  change out butter fly valve for bulk systemMa 023  change out butter fly valve for bulk system
Ma 023 change out butter fly valve for bulk system
 
Ma 031 transfer brine from or to supply boat
Ma 031 transfer brine from or to supply boatMa 031 transfer brine from or to supply boat
Ma 031 transfer brine from or to supply boat
 
Ma 035 jsa open seachest
Ma 035   jsa open seachestMa 035   jsa open seachest
Ma 035 jsa open seachest
 
Ma 029 loading & offloading tubulars from a supply boat
Ma 029 loading & offloading tubulars from a supply boatMa 029 loading & offloading tubulars from a supply boat
Ma 029 loading & offloading tubulars from a supply boat
 
Ma 027 jsa general lifting on the deck
Ma 027  jsa general lifting on the deckMa 027  jsa general lifting on the deck
Ma 027 jsa general lifting on the deck
 
Ma 030 cleaning oil in 100 t crane
Ma 030 cleaning oil in 100 t craneMa 030 cleaning oil in 100 t crane
Ma 030 cleaning oil in 100 t crane
 
Ma 028 jsa open seachest
Ma 028    jsa open seachestMa 028    jsa open seachest
Ma 028 jsa open seachest
 
Ma 032 transfer water from or to supply boat
Ma 032 transfer water from or to supply boatMa 032 transfer water from or to supply boat
Ma 032 transfer water from or to supply boat
 
Ma 034 jsa general lifting on the deck
Ma 034   jsa general lifting on the deckMa 034   jsa general lifting on the deck
Ma 034 jsa general lifting on the deck
 
Ma 036 jsa check ballast 5p loading valve
Ma 036 jsa check ballast 5p loading valveMa 036 jsa check ballast 5p loading valve
Ma 036 jsa check ballast 5p loading valve
 
Ma 024 working on ladder
Ma 024 working on ladderMa 024 working on ladder
Ma 024 working on ladder
 
Ma 026 offloading or backloading fuel, base oil, obm
Ma 026 offloading or backloading fuel, base oil, obmMa 026 offloading or backloading fuel, base oil, obm
Ma 026 offloading or backloading fuel, base oil, obm
 
Welding operation
Welding operationWelding operation
Welding operation
 
Ma 033 jsa rack pup joint in the stb rack
Ma 033 jsa rack pup joint in the stb rackMa 033 jsa rack pup joint in the stb rack
Ma 033 jsa rack pup joint in the stb rack
 
Ma 039 jsa emergency load lowering
Ma 039 jsa emergency load loweringMa 039 jsa emergency load lowering
Ma 039 jsa emergency load lowering
 

More from Yousif Fikry

Ma 022 preloading
Ma 022 preloadingMa 022 preloading
Ma 022 preloading
Yousif Fikry
 
Ma 021 backload flare boom on supply-boat
Ma 021 backload flare boom on supply-boatMa 021 backload flare boom on supply-boat
Ma 021 backload flare boom on supply-boat
Yousif Fikry
 
Ma 019 preloads dump valves maintenance
Ma 019  preloads dump valves maintenanceMa 019  preloads dump valves maintenance
Ma 019 preloads dump valves maintenance
Yousif Fikry
 
Ma 018 changing lifeboats wires
Ma 018 changing lifeboats wiresMa 018 changing lifeboats wires
Ma 018 changing lifeboats wires
Yousif Fikry
 
Ma 017 backloading coiled tubing real on boat
Ma 017  backloading coiled tubing real on boatMa 017  backloading coiled tubing real on boat
Ma 017 backloading coiled tubing real on boat
Yousif Fikry
 
Ma 016 unloading coiled tubing real from boat & install it on cantilever deck
Ma 016  unloading coiled tubing real from boat & install it on cantilever deckMa 016  unloading coiled tubing real from boat & install it on cantilever deck
Ma 016 unloading coiled tubing real from boat & install it on cantilever deck
Yousif Fikry
 
Ma 015 boom crane paint maintenance
Ma 015  boom crane paint maintenanceMa 015  boom crane paint maintenance
Ma 015 boom crane paint maintenance
Yousif Fikry
 
Ma 014 changing boom pendants on both cranes
Ma 014  changing boom pendants on both cranesMa 014  changing boom pendants on both cranes
Ma 014 changing boom pendants on both cranes
Yousif Fikry
 
Ma 013 testing lifeboats capsules
Ma 013  testing  lifeboats  capsulesMa 013  testing  lifeboats  capsules
Ma 013 testing lifeboats capsules
Yousif Fikry
 
Ma 012 using working personnel basket
Ma 012 using working personnel basketMa 012 using working personnel basket
Ma 012 using working personnel basket
Yousif Fikry
 
Ma 011 crane wire replacement ( main hook line )
Ma 011  crane wire replacement ( main hook line )Ma 011  crane wire replacement ( main hook line )
Ma 011 crane wire replacement ( main hook line )
Yousif Fikry
 

More from Yousif Fikry (11)

Ma 022 preloading
Ma 022 preloadingMa 022 preloading
Ma 022 preloading
 
Ma 021 backload flare boom on supply-boat
Ma 021 backload flare boom on supply-boatMa 021 backload flare boom on supply-boat
Ma 021 backload flare boom on supply-boat
 
Ma 019 preloads dump valves maintenance
Ma 019  preloads dump valves maintenanceMa 019  preloads dump valves maintenance
Ma 019 preloads dump valves maintenance
 
Ma 018 changing lifeboats wires
Ma 018 changing lifeboats wiresMa 018 changing lifeboats wires
Ma 018 changing lifeboats wires
 
Ma 017 backloading coiled tubing real on boat
Ma 017  backloading coiled tubing real on boatMa 017  backloading coiled tubing real on boat
Ma 017 backloading coiled tubing real on boat
 
Ma 016 unloading coiled tubing real from boat & install it on cantilever deck
Ma 016  unloading coiled tubing real from boat & install it on cantilever deckMa 016  unloading coiled tubing real from boat & install it on cantilever deck
Ma 016 unloading coiled tubing real from boat & install it on cantilever deck
 
Ma 015 boom crane paint maintenance
Ma 015  boom crane paint maintenanceMa 015  boom crane paint maintenance
Ma 015 boom crane paint maintenance
 
Ma 014 changing boom pendants on both cranes
Ma 014  changing boom pendants on both cranesMa 014  changing boom pendants on both cranes
Ma 014 changing boom pendants on both cranes
 
Ma 013 testing lifeboats capsules
Ma 013  testing  lifeboats  capsulesMa 013  testing  lifeboats  capsules
Ma 013 testing lifeboats capsules
 
Ma 012 using working personnel basket
Ma 012 using working personnel basketMa 012 using working personnel basket
Ma 012 using working personnel basket
 
Ma 011 crane wire replacement ( main hook line )
Ma 011  crane wire replacement ( main hook line )Ma 011  crane wire replacement ( main hook line )
Ma 011 crane wire replacement ( main hook line )
 

Ma 038 painting on derrick set

  • 1. Rig #: BENNEVIS PIC Signature Approving JSA: Work Activity (Job): MA 038 PAINTING ON DERRICK SET Work Team (Crew Members): Sequence of Basic Job Steps Potential Accidents or Hazards Recommendation to Eliminate or Reduce Potential Hazards Who? Initials - Inform Drlr - Clean area prior to painting - NETTOYER LA SURFACE AVANT DE PEINDRE - INFORMER LE DRILLER - Dirt enter eyes - Wire from wire brush enters fingers / eye - SALETE DANS LES YEUX - DENT DE LA BROSE METALLIQUE DANS LES DOIGTS / L’OEIL - Wear all the correct PPE - Wear gloves and goggles - Wear dust mask - METTRE LES PPES ADEQUATS - PORTER DES GANTS ET DES LUNETTES PROTECTRICE - PORTER UN MASQUE ANTI-POUSSIERE - Paint at height - Paint areas that have been cleaned - FAIRE DE LA PEINTURE EN HAUTEUR - PEINDRE LES ZONES QUI ETE NETTOYEES - Falling - Paint on hands - Hoses burst - CHUTE - PEINTURE SUR LES MAINS - RUPTURE DE FLEXIBLE - If ladder used, ensure it is secured - Wear safety harness - Wear gloves - Wear dust mask - Do not work in the mud hose vicinity - SI ON UTILISE UNE ECHELLE, LA SECURISEE - PORTAIS LES HARNAIS DE SECURITE - PORTER DES GANTS - PORTER UN MASQUE ANT-POUSSIERE - NE PAS TRAVAILLER PRES DE FLEXIBLE DE BOUE - Clean up area after painting - FAIRE LE NETTOYAGE APRES AVOIR FINI - Tripping hazards - Rags lying around - RISQUE DE TREBUCHEMENT - CHIFFONS TRAINANT - Remove all old paint cans - Ensure good housekeeping - ENLEVER TOUS LES ANCIENS POTS DE PEINTURE - ASSURER UN BON NETTOYAGE Safety Equipment To Do This Job Hard Hats ( Cotton Gloves ( Face Shield ( Fire Extinguishers ( Safety Boots ( Work Vest ( Goggles ( Lockout/Tagout ( Uncontrolled When Printed Page 1 Pyramid Drilling S.A Manual Title: Personnel Safety Manual Form Name: Job Safety Analysis Issue Date 02-Sept-07 Revision No. 2 Revision Date 04-MAR 08 Prepared By QA/HSE Approved By HM Level No. 2
  • 2. Safety Glasses ( Safety Harness ( Barricades ( Work Permit Required ( Uncontrolled When Printed Page 2 Pyramid Drilling S.A Manual Title: Personnel Safety Manual Form Name: Job Safety Analysis Issue Date 02-Sept-07 Revision No. 2 Revision Date 04-MAR 08 Prepared By QA/HSE Approved By HM Level No. 2