SlideShare a Scribd company logo
Rig #: BENNEVIS PIC Signature Approving JSA:
Work Activity (Job): MA 034 GENERAL LIFTING ON DECK
Work Team (Crew Members): Roustabouts Supervisor: Deck Leader / Tool Pusher
Sequence of Basic Job Steps Potential Accidents or Hazards
Recommendation to Eliminate or Reduce Potential
Hazards
Who?
Initials
1 – Lifting load from the deck 1.1 Load fall (broken sling)
1.2 Load swings
Lifting equipments to be checked prior to use
1.1 Slings checked prior to use
1.2a Tag lines attached to the load
1.2b Personnel to stand clear
1.2c Deck leader in charge order to crane operator
1.2d Good communication to be established w/ crane op.
2 – Lower the load on the deck 2.1 Person hit by the load
2.2 Person trapped between wall and load
2.1 Tag lines attached to the load
2.2a personnel to stand clear
2.2b Deck access to be restricted during transfer load
2.2c Deck leader to give signal to the crane operator
3 – Load storage on the deck 3.1 Load rolls 3.1 If the load is round shaped block wedges to be used to
secure the load (eg. Tubular goods..)
Safety Equipment To Do This Job
Hard Hats ( Cotton Gloves ( Face Shield ( Fire Extinguishers (
Safety Boots ( Work Vest ( Goggles ( Lockout/Tagout (
Safety Glasses ( Safety Harness ( Barricades ( Work Permit Required (
Uncontrolled When Printed Page 1
Pyramid Drilling S.A
Manual Title: Personnel Safety Manual
Form Name: Job Safety Analysis
Issue Date
02-Sept-07
Revision No.
2
Revision Date
04-MAR 08
Prepared By
QA/HSE
Approved By
HM
Level No.
2
Uncontrolled When Printed Page 2
Pyramid Drilling S.A
Manual Title: Personnel Safety Manual
Form Name: Job Safety Analysis
Issue Date
02-Sept-07
Revision No.
2
Revision Date
04-MAR 08
Prepared By
QA/HSE
Approved By
HM
Level No.
2

More Related Content

What's hot

Lifting plan
Lifting planLifting plan
Lifting plan
tnsv22
 
Crane Safety Awareness by University of Texas Arlington
Crane Safety Awareness by University of Texas ArlingtonCrane Safety Awareness by University of Texas Arlington
Crane Safety Awareness by University of Texas Arlington
Atlantic Training, LLC.
 
Job safety Analysis
Job safety Analysis Job safety Analysis
Job safety Analysis
Deepu Rajan
 
Rigging
RiggingRigging
Crane operator safety procedure
Crane operator safety procedureCrane operator safety procedure
Crane operator safety procedure
Abdul Shukur
 
10. lifting-plan-checklist-and-method-statement-2
10. lifting-plan-checklist-and-method-statement-210. lifting-plan-checklist-and-method-statement-2
10. lifting-plan-checklist-and-method-statement-2
Sergio Augusto Esteves
 
CRANE SAFETY HANDBOOK
CRANE SAFETY HANDBOOK CRANE SAFETY HANDBOOK
CRANE SAFETY HANDBOOK
shahriermahmud13
 
Basic load out methodologies introduction
Basic load out methodologies introductionBasic load out methodologies introduction
Basic load out methodologies introduction
Bruce nguyen
 
Crane | Crane Safety | Crane Safety Parts | Gaurav Singh Rajput
Crane | Crane Safety | Crane Safety Parts | Gaurav Singh RajputCrane | Crane Safety | Crane Safety Parts | Gaurav Singh Rajput
Crane | Crane Safety | Crane Safety Parts | Gaurav Singh Rajput
Gaurav Singh Rajput
 
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Gaurav Singh Rajput
 
Jha rock drill use and maintenance romo
Jha rock drill use and maintenance romoJha rock drill use and maintenance romo
Jha rock drill use and maintenance romo
nafable
 
Safe use of Mobile Cranes
Safe use of Mobile CranesSafe use of Mobile Cranes
Safe use of Mobile Cranes
Mihajlo Stupar
 
Overhead crane risk assessment
Overhead crane risk assessmentOverhead crane risk assessment
Overhead crane risk assessment
Simba Zhao
 
Crane safety
Crane safetyCrane safety
Crane safety
Prem kumar
 
SDV-20253 VALVE MOD 9 lift plan 1
SDV-20253 VALVE MOD 9 lift plan 1SDV-20253 VALVE MOD 9 lift plan 1
SDV-20253 VALVE MOD 9 lift plan 1
Darren.w. Halliman Rigging supervisor/loler/APML
 
Overhead Crane Manual
Overhead Crane ManualOverhead Crane Manual
Overhead Crane Manual
scojetinc
 
Ma 029 loading & offloading tubulars from a supply boat
Ma 029 loading & offloading tubulars from a supply boatMa 029 loading & offloading tubulars from a supply boat
Ma 029 loading & offloading tubulars from a supply boat
Yousif Fikry
 
LIFTING OPERATIONS BEST PRACTICES - SEMINAR 1
LIFTING OPERATIONS BEST PRACTICES - SEMINAR 1LIFTING OPERATIONS BEST PRACTICES - SEMINAR 1
LIFTING OPERATIONS BEST PRACTICES - SEMINAR 1
Sreenath Pokkadavath
 
Crane Incident Handbook
Crane Incident Handbook Crane Incident Handbook
Crane Incident Handbook
Warren Forensics
 
MOVING FALLING OBJECTS SAFETY
MOVING FALLING OBJECTS SAFETYMOVING FALLING OBJECTS SAFETY
MOVING FALLING OBJECTS SAFETY
Dwarika Bhushan Sharma
 

What's hot (20)

Lifting plan
Lifting planLifting plan
Lifting plan
 
Crane Safety Awareness by University of Texas Arlington
Crane Safety Awareness by University of Texas ArlingtonCrane Safety Awareness by University of Texas Arlington
Crane Safety Awareness by University of Texas Arlington
 
Job safety Analysis
Job safety Analysis Job safety Analysis
Job safety Analysis
 
Rigging
RiggingRigging
Rigging
 
Crane operator safety procedure
Crane operator safety procedureCrane operator safety procedure
Crane operator safety procedure
 
10. lifting-plan-checklist-and-method-statement-2
10. lifting-plan-checklist-and-method-statement-210. lifting-plan-checklist-and-method-statement-2
10. lifting-plan-checklist-and-method-statement-2
 
CRANE SAFETY HANDBOOK
CRANE SAFETY HANDBOOK CRANE SAFETY HANDBOOK
CRANE SAFETY HANDBOOK
 
Basic load out methodologies introduction
Basic load out methodologies introductionBasic load out methodologies introduction
Basic load out methodologies introduction
 
Crane | Crane Safety | Crane Safety Parts | Gaurav Singh Rajput
Crane | Crane Safety | Crane Safety Parts | Gaurav Singh RajputCrane | Crane Safety | Crane Safety Parts | Gaurav Singh Rajput
Crane | Crane Safety | Crane Safety Parts | Gaurav Singh Rajput
 
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
 
Jha rock drill use and maintenance romo
Jha rock drill use and maintenance romoJha rock drill use and maintenance romo
Jha rock drill use and maintenance romo
 
Safe use of Mobile Cranes
Safe use of Mobile CranesSafe use of Mobile Cranes
Safe use of Mobile Cranes
 
Overhead crane risk assessment
Overhead crane risk assessmentOverhead crane risk assessment
Overhead crane risk assessment
 
Crane safety
Crane safetyCrane safety
Crane safety
 
SDV-20253 VALVE MOD 9 lift plan 1
SDV-20253 VALVE MOD 9 lift plan 1SDV-20253 VALVE MOD 9 lift plan 1
SDV-20253 VALVE MOD 9 lift plan 1
 
Overhead Crane Manual
Overhead Crane ManualOverhead Crane Manual
Overhead Crane Manual
 
Ma 029 loading & offloading tubulars from a supply boat
Ma 029 loading & offloading tubulars from a supply boatMa 029 loading & offloading tubulars from a supply boat
Ma 029 loading & offloading tubulars from a supply boat
 
LIFTING OPERATIONS BEST PRACTICES - SEMINAR 1
LIFTING OPERATIONS BEST PRACTICES - SEMINAR 1LIFTING OPERATIONS BEST PRACTICES - SEMINAR 1
LIFTING OPERATIONS BEST PRACTICES - SEMINAR 1
 
Crane Incident Handbook
Crane Incident Handbook Crane Incident Handbook
Crane Incident Handbook
 
MOVING FALLING OBJECTS SAFETY
MOVING FALLING OBJECTS SAFETYMOVING FALLING OBJECTS SAFETY
MOVING FALLING OBJECTS SAFETY
 

Viewers also liked

Ma 001 tanks & preloads visual inspection
Ma 001  tanks & preloads visual inspectionMa 001  tanks & preloads visual inspection
Ma 001 tanks & preloads visual inspection
Yousif Fikry
 
Ma 037 cleaning with air brush
Ma 037 cleaning with air brushMa 037 cleaning with air brush
Ma 037 cleaning with air brush
Yousif Fikry
 
Ma 025 transfer casing
Ma 025 transfer casingMa 025 transfer casing
Ma 025 transfer casing
Yousif Fikry
 
Ma 023 change out butter fly valve for bulk system
Ma 023  change out butter fly valve for bulk systemMa 023  change out butter fly valve for bulk system
Ma 023 change out butter fly valve for bulk system
Yousif Fikry
 
Ma 115 boom crane cable tray repair
Ma 115  boom crane cable tray repairMa 115  boom crane cable tray repair
Ma 115 boom crane cable tray repair
Yousif Fikry
 
Ma 020 launching lifeboats to sea
Ma 020 launching lifeboats to seaMa 020 launching lifeboats to sea
Ma 020 launching lifeboats to sea
Yousif Fikry
 
Ma 026 offloading or backloading fuel, base oil, obm
Ma 026 offloading or backloading fuel, base oil, obmMa 026 offloading or backloading fuel, base oil, obm
Ma 026 offloading or backloading fuel, base oil, obm
Yousif Fikry
 
Ma 030 cleaning oil in 100 t crane
Ma 030 cleaning oil in 100 t craneMa 030 cleaning oil in 100 t crane
Ma 030 cleaning oil in 100 t crane
Yousif Fikry
 
Ma 038 painting on derrick set
Ma 038 painting on derrick setMa 038 painting on derrick set
Ma 038 painting on derrick set
Yousif Fikry
 
Ma 024 working on ladder
Ma 024 working on ladderMa 024 working on ladder
Ma 024 working on ladder
Yousif Fikry
 
Ma 028 jsa open seachest
Ma 028    jsa open seachestMa 028    jsa open seachest
Ma 028 jsa open seachest
Yousif Fikry
 
Ma 035 jsa open seachest
Ma 035   jsa open seachestMa 035   jsa open seachest
Ma 035 jsa open seachest
Yousif Fikry
 
Ma 036 jsa check ballast 5p loading valve
Ma 036 jsa check ballast 5p loading valveMa 036 jsa check ballast 5p loading valve
Ma 036 jsa check ballast 5p loading valve
Yousif Fikry
 
Welding operation
Welding operationWelding operation
Welding operation
Yousif Fikry
 
Ma 032 transfer water from or to supply boat
Ma 032 transfer water from or to supply boatMa 032 transfer water from or to supply boat
Ma 032 transfer water from or to supply boat
Yousif Fikry
 
Ma 031 transfer brine from or to supply boat
Ma 031 transfer brine from or to supply boatMa 031 transfer brine from or to supply boat
Ma 031 transfer brine from or to supply boat
Yousif Fikry
 

Viewers also liked (16)

Ma 001 tanks & preloads visual inspection
Ma 001  tanks & preloads visual inspectionMa 001  tanks & preloads visual inspection
Ma 001 tanks & preloads visual inspection
 
Ma 037 cleaning with air brush
Ma 037 cleaning with air brushMa 037 cleaning with air brush
Ma 037 cleaning with air brush
 
Ma 025 transfer casing
Ma 025 transfer casingMa 025 transfer casing
Ma 025 transfer casing
 
Ma 023 change out butter fly valve for bulk system
Ma 023  change out butter fly valve for bulk systemMa 023  change out butter fly valve for bulk system
Ma 023 change out butter fly valve for bulk system
 
Ma 115 boom crane cable tray repair
Ma 115  boom crane cable tray repairMa 115  boom crane cable tray repair
Ma 115 boom crane cable tray repair
 
Ma 020 launching lifeboats to sea
Ma 020 launching lifeboats to seaMa 020 launching lifeboats to sea
Ma 020 launching lifeboats to sea
 
Ma 026 offloading or backloading fuel, base oil, obm
Ma 026 offloading or backloading fuel, base oil, obmMa 026 offloading or backloading fuel, base oil, obm
Ma 026 offloading or backloading fuel, base oil, obm
 
Ma 030 cleaning oil in 100 t crane
Ma 030 cleaning oil in 100 t craneMa 030 cleaning oil in 100 t crane
Ma 030 cleaning oil in 100 t crane
 
Ma 038 painting on derrick set
Ma 038 painting on derrick setMa 038 painting on derrick set
Ma 038 painting on derrick set
 
Ma 024 working on ladder
Ma 024 working on ladderMa 024 working on ladder
Ma 024 working on ladder
 
Ma 028 jsa open seachest
Ma 028    jsa open seachestMa 028    jsa open seachest
Ma 028 jsa open seachest
 
Ma 035 jsa open seachest
Ma 035   jsa open seachestMa 035   jsa open seachest
Ma 035 jsa open seachest
 
Ma 036 jsa check ballast 5p loading valve
Ma 036 jsa check ballast 5p loading valveMa 036 jsa check ballast 5p loading valve
Ma 036 jsa check ballast 5p loading valve
 
Welding operation
Welding operationWelding operation
Welding operation
 
Ma 032 transfer water from or to supply boat
Ma 032 transfer water from or to supply boatMa 032 transfer water from or to supply boat
Ma 032 transfer water from or to supply boat
 
Ma 031 transfer brine from or to supply boat
Ma 031 transfer brine from or to supply boatMa 031 transfer brine from or to supply boat
Ma 031 transfer brine from or to supply boat
 

More from Yousif Fikry

Ma 022 preloading
Ma 022 preloadingMa 022 preloading
Ma 022 preloading
Yousif Fikry
 
Ma 021 backload flare boom on supply-boat
Ma 021 backload flare boom on supply-boatMa 021 backload flare boom on supply-boat
Ma 021 backload flare boom on supply-boat
Yousif Fikry
 
Ma 019 preloads dump valves maintenance
Ma 019  preloads dump valves maintenanceMa 019  preloads dump valves maintenance
Ma 019 preloads dump valves maintenance
Yousif Fikry
 
Ma 018 changing lifeboats wires
Ma 018 changing lifeboats wiresMa 018 changing lifeboats wires
Ma 018 changing lifeboats wires
Yousif Fikry
 
Ma 017 backloading coiled tubing real on boat
Ma 017  backloading coiled tubing real on boatMa 017  backloading coiled tubing real on boat
Ma 017 backloading coiled tubing real on boat
Yousif Fikry
 
Ma 016 unloading coiled tubing real from boat & install it on cantilever deck
Ma 016  unloading coiled tubing real from boat & install it on cantilever deckMa 016  unloading coiled tubing real from boat & install it on cantilever deck
Ma 016 unloading coiled tubing real from boat & install it on cantilever deck
Yousif Fikry
 
Ma 015 boom crane paint maintenance
Ma 015  boom crane paint maintenanceMa 015  boom crane paint maintenance
Ma 015 boom crane paint maintenance
Yousif Fikry
 
Ma 014 changing boom pendants on both cranes
Ma 014  changing boom pendants on both cranesMa 014  changing boom pendants on both cranes
Ma 014 changing boom pendants on both cranes
Yousif Fikry
 
Ma 013 testing lifeboats capsules
Ma 013  testing  lifeboats  capsulesMa 013  testing  lifeboats  capsules
Ma 013 testing lifeboats capsules
Yousif Fikry
 
Ma 012 using working personnel basket
Ma 012 using working personnel basketMa 012 using working personnel basket
Ma 012 using working personnel basket
Yousif Fikry
 
Ma 011 crane wire replacement ( main hook line )
Ma 011  crane wire replacement ( main hook line )Ma 011  crane wire replacement ( main hook line )
Ma 011 crane wire replacement ( main hook line )
Yousif Fikry
 

More from Yousif Fikry (11)

Ma 022 preloading
Ma 022 preloadingMa 022 preloading
Ma 022 preloading
 
Ma 021 backload flare boom on supply-boat
Ma 021 backload flare boom on supply-boatMa 021 backload flare boom on supply-boat
Ma 021 backload flare boom on supply-boat
 
Ma 019 preloads dump valves maintenance
Ma 019  preloads dump valves maintenanceMa 019  preloads dump valves maintenance
Ma 019 preloads dump valves maintenance
 
Ma 018 changing lifeboats wires
Ma 018 changing lifeboats wiresMa 018 changing lifeboats wires
Ma 018 changing lifeboats wires
 
Ma 017 backloading coiled tubing real on boat
Ma 017  backloading coiled tubing real on boatMa 017  backloading coiled tubing real on boat
Ma 017 backloading coiled tubing real on boat
 
Ma 016 unloading coiled tubing real from boat & install it on cantilever deck
Ma 016  unloading coiled tubing real from boat & install it on cantilever deckMa 016  unloading coiled tubing real from boat & install it on cantilever deck
Ma 016 unloading coiled tubing real from boat & install it on cantilever deck
 
Ma 015 boom crane paint maintenance
Ma 015  boom crane paint maintenanceMa 015  boom crane paint maintenance
Ma 015 boom crane paint maintenance
 
Ma 014 changing boom pendants on both cranes
Ma 014  changing boom pendants on both cranesMa 014  changing boom pendants on both cranes
Ma 014 changing boom pendants on both cranes
 
Ma 013 testing lifeboats capsules
Ma 013  testing  lifeboats  capsulesMa 013  testing  lifeboats  capsules
Ma 013 testing lifeboats capsules
 
Ma 012 using working personnel basket
Ma 012 using working personnel basketMa 012 using working personnel basket
Ma 012 using working personnel basket
 
Ma 011 crane wire replacement ( main hook line )
Ma 011  crane wire replacement ( main hook line )Ma 011  crane wire replacement ( main hook line )
Ma 011 crane wire replacement ( main hook line )
 

Ma 034 jsa general lifting on the deck

  • 1. Rig #: BENNEVIS PIC Signature Approving JSA: Work Activity (Job): MA 034 GENERAL LIFTING ON DECK Work Team (Crew Members): Roustabouts Supervisor: Deck Leader / Tool Pusher Sequence of Basic Job Steps Potential Accidents or Hazards Recommendation to Eliminate or Reduce Potential Hazards Who? Initials 1 – Lifting load from the deck 1.1 Load fall (broken sling) 1.2 Load swings Lifting equipments to be checked prior to use 1.1 Slings checked prior to use 1.2a Tag lines attached to the load 1.2b Personnel to stand clear 1.2c Deck leader in charge order to crane operator 1.2d Good communication to be established w/ crane op. 2 – Lower the load on the deck 2.1 Person hit by the load 2.2 Person trapped between wall and load 2.1 Tag lines attached to the load 2.2a personnel to stand clear 2.2b Deck access to be restricted during transfer load 2.2c Deck leader to give signal to the crane operator 3 – Load storage on the deck 3.1 Load rolls 3.1 If the load is round shaped block wedges to be used to secure the load (eg. Tubular goods..) Safety Equipment To Do This Job Hard Hats ( Cotton Gloves ( Face Shield ( Fire Extinguishers ( Safety Boots ( Work Vest ( Goggles ( Lockout/Tagout ( Safety Glasses ( Safety Harness ( Barricades ( Work Permit Required ( Uncontrolled When Printed Page 1 Pyramid Drilling S.A Manual Title: Personnel Safety Manual Form Name: Job Safety Analysis Issue Date 02-Sept-07 Revision No. 2 Revision Date 04-MAR 08 Prepared By QA/HSE Approved By HM Level No. 2
  • 2. Uncontrolled When Printed Page 2 Pyramid Drilling S.A Manual Title: Personnel Safety Manual Form Name: Job Safety Analysis Issue Date 02-Sept-07 Revision No. 2 Revision Date 04-MAR 08 Prepared By QA/HSE Approved By HM Level No. 2