WHAT IS AN LFA?
Logical framework analysis is an analytical tool which is used in all
stages in the project cycle, planning, implementation, monitoring
and evaluation.
An outcome of using the LFA is the production of a 4X4 matrix
(commonly known as the ‘‘log frame’’) which is a tool for
analyzing and presenting project strategies.
THE LOGICAL FRAMEWORK MATRIX
THE CASE:
The textile and ready-made garments (RMG) industry is a major driver of the Bangladesh
economy, accounting for nearly 80% of export earnings and contributing more than 12% of
national GDP. ‘Made in-Bangladesh’ is an internationally recognized badge of quality and has
bolstered the country’s image worldwide. Annual turnover of nearly 23 billion USD is predicted
to more than double to 50 billion USD by 2021. About 95% of the factories are Bangladeshi
owned and about 80% of the 4.4 million employees are women.
Textiles contributes around 40% of this sector’s value and comprises about 1,700 washing dyeing
and finishing (WDF) factories manufacturing fabrics for export or as sub-contractors.
However, the textile industry plays a contradictory role in the socio-economic and environmental
development of Bangladesh. On the plus side, textile firms are major employers that contribute to
wealth and prosperity. On the debit side, they are destroying the surrounding environment on
which marginal farmers and others depend for their livelihoods. The worker of these garments are
also affected by the results.
THE CASE
Recently, environmentalist organizations ( BAPA, BELA) have also joined
the bandwagon, highlighting the environmental consequences of
garments industries and its impact on livelihoods and aquatic flora and
fauna in the electronic and print asking the government to take care of the
issue of both the workers and the environment .
The government is holding a workshop with all the stakeholders to resolve
the quandary.
CASE STUDY OF LFA
The very first step of the LFA is to conduct a workshop/roundtable
discussion to find the parties involved and identify the cause of the
problem.
A ‘context’ analysis of the project environment, (in this case garments
located near the rivers) and observation of factors important to
achieve given objective (greater cooperation between stakeholders),
followed by a SWOT analysis.
SWOT ANALYSIS
• Negative Externality:
Harmful impact on the
environment and peoples
livelihood
• Inability to ensure labor
safety
Introduce effluent treatment
plan technology which will
decrease environmental
pollution
Indigenous migration
problem
• Employment Creation
and Contribution to GDP
• Positive Externality:
Facilitates other
subsidiary industries
STAKEHOLDER ANALYSIS
Stakeholder analysis in project management is the process of
identifying the impact of a decision on relevant parties. This
information is used to assess how the interests of those
stakeholders should be addressed in a project plan, policy,
program, or other action.
STAKEHOLDERS
Primary
• Labor
• Proprietors of
garments industry
• Residents and external
workers of that area
Secondary
• Ministry of
Environment/Department of
Environment
• Ministry of Labor and
Employment
External
• International Labor
Organization (ILO)
• Environmentalist
organization
(BELA/BAPA)
PRIMARY STAKEHOLDERS
Primary Stakeholder Problems Interest Potential Linkages
Labor • Health hazard
• No financial
protection in any
adverse occurrence
• Loss of job
• Ensured maximum
safety at work
• Provision for
compensation/
insurance
• Trade/ labor union
• Increased
productivity if non
pecuniary benefits
are provided
They might leave the
job and move to a
better job
Proprietors of garments
industry
• Loss of labor
• Rising labor cost
• Reduced profit
margin
• Environment
friendly process
leads to reduction of
ill will.
Cartel or alliance has
direct access to
government
Labor intensive
industry leads to high
dependency workers
SECONDARY STAKEHOLDER
Secondary
Stakeholder
Problem Interest Potential Linkages
Ministry of Labor
and Employment
Negligence towards
workers
exploitation.
Ensuring worker’s
welfare to maintain
good public image
Ability to directly
influence the
problem
They can take
necessary legal
steps for violating
any regulations
Ministry of
Environment
Negligence towards
workers
exploitation.
Mitigating and
controlling
pollution
Ability to impose
restrictions on
garments owners
Requires
cooperation from
ministry of labor as
well as external
stakeholders.
(environmentalist)
EXTERNAL STAKEHOLDERS
External
Stakeholders
Problem Interest Potential Linkages
ILO Global organization
raising voice for
worker’s protection
Raise public awareness Internationally they can
pressurize the
government
Environmentalist
organizations
(BELA/BAPA)
They have been
criticized in society for
their inactivity
Promote environmental
sustainability
Raise public awareness
through seminars,
workshops
They can take help
from the media for their
advocacy
PROBLEM ANALYSIS
 To decide whether the high number of health hazards of both the
internal and external workers or environmental impacts should be
considered as the focal problem
 The following problem tree of substantive and direct causes and effect
can be established
PROBLEM TREE ILO pressure
No job
security
Little
Income
Violation of
worker's rights
No proper guidelines for
labor employment
Lack of proper labor
awareness
Power of
garments owner
Little Educational
qualification
Unskilled labor
supply
Effect
Cause
Weakness of
legal framework
PROBLEM TREE (CONTD.)
BAPA movement
Reduced income
Serious health
hazards of Workers
Fishermen’s
livelihood affected
Adverse environmental impact
Pollutants
discharged Effluents
residuals
Toxic fume
produced by the
Garments
Effect
Cause
No Effluent
Treatment
Plant (ETP)
Reduced
productivity
OBJECTIVE ANALYSIS
Through the objective analysis the desirable future situation, which the
project hopes to contribute is described. Long-term social and or
economic benefits, to which the project will contribute are defined
OBJECTIVE TREE:
Increased contribution to GDP
Government praised for role
Satisfied ILOSatisfied workers
Worker’s rights are
protected
Provision of medical
facilities
Formal Job
contract
Better pay and working
conditions
Better health of
workers
Attracts more
workers
Effect
Cause
Increased
productivity
OBJECTIVE TREE (CONTD.)
Risk to aquatic
life reduced
ETP to treat
pollution
Environment
friendly technology
Strict rules &
Regulations
Effect
Cause
Mitigate the harmful
impact on environment
Environmental
pollution
decreased
Reduced water
pollution
ALTERNATIVE ANALYSIS
 Objectives which can not be achieved should be eliminated. The workshop
should decide whether the demands of environmentalist are pragmatic
 Bearing in mind the result of the participation analysis, alternative options are
identified from the objective tree. In this case there are three obvious
alternatives.
 Option 1: Introduce environment friendly methods
 Option 2: PPE for workers
 Option 3: Option1+Option 2
ALTERNATIVE ANALYSIS
Selection criteria Option 1:
Environment
Sensitive
measures (ETP)
Option 2 :
PPE for workers
Option3=1+2
combined
Cost High High High
Chance of success High High High
Cost/Benefit High High High
Time horizon Long Short Long
Social risk Small Small Small
OBJECTIVELY VERIFIABLE INDICATORS
(OVI)
 Goal
 Measures (direct or indirect) to verify to what extent the goal is fulfilled.
 Purpose
 Measures (direct or indirect) to verify to what extent the purpose is fulfilled.
 Outputs
 Measures (direct or indirect) to verify to what extent the outputs are produced.
 Activities (Inputs)
 Goods, people and services necessary to undertake the activities
SOURCES OF VERIFICATION (SOV)
 Goal
 The sources of data necessary to verify status of goal level
indicators.
 Purpose
 The sources of data necessary to verify status of purpose level
indicators.
 Outputs
 The sources of data necessary to verify status of output level
indicators.
 Activities
 The sources of data necessary to verify status of activity level
indicators.
ASSUMPTION ANALYSIS
Sets of assumptions (concerning conditions required for the desired
project story to happen, and about factors external to the project) are
specified in the final column of the LF matrix.
The levels of objectives and the linking assumptions should be coherently
connected, in a vertical logic.
At each level the objectives and indicators should be coherently
connected too, as the horizontal logic.
Development Indicators
• Better and healthy working
conditions
• Less pollution
OVI (objectively verified indicators)
• Grievances among workers
addressed
• Productivity of workers will be
increased
SOV (Sources of verification)
• KII (Key Informants Interview)
• EIA
• Number of people being sick
among workers
• Water Quality Monitoring
Assumption/External factor/Risk
• Regular Monitoring required by
experienced expert from BCSIR
• Transparency while preparing
reports
Purpose
• Reduced health risks
• Restored livelihood
OVI
Environment pollution reduced 50%
SOV
• Monthly medical check up at
local health center
• Health surveys
Assumption/External factor/Risk
• Workers may be manipulated/
threatened by owner group
• Availability of good doctors
• Difficult to quantify the economic
cost of pollution
Output
• Health insurance for workers
• PPE
• ETP
OVI
• Increased costs for garments
owners
• ETP will significantly reduce
pollution by 40-45%
SOV
• Selected Bank or financial
institution providing security
• Regulatory body observing
whether ETP are properly
functioning
Assumption/External factor/Risk
• Owners may be reluctant to
purchase PPE or provide inferior
quality gloves, goggles, masks
• Government will have to subsidize
import of ETP machinery which
are expensive
Activity
• Government enforcement
• Tax imposition
Input
• Safety precautions will have to
be circulated
cost
• . Safety pamphlets
Assumption/External factor/Risk
• Corruption within NBR
• If taxes are too low and does not
affect production cost significantly
pollution may continue
POWERED BY :
DEVIANT

Logical Framework Analysis

  • 1.
    LOGICAL FRAMEWORK ANALYSIS Mohammad KawsarAhammed Habib Khan Zarin Tasneem Shahriaz Ahmmed
  • 2.
    WHAT IS ANLFA? Logical framework analysis is an analytical tool which is used in all stages in the project cycle, planning, implementation, monitoring and evaluation. An outcome of using the LFA is the production of a 4X4 matrix (commonly known as the ‘‘log frame’’) which is a tool for analyzing and presenting project strategies.
  • 3.
  • 4.
    THE CASE: The textileand ready-made garments (RMG) industry is a major driver of the Bangladesh economy, accounting for nearly 80% of export earnings and contributing more than 12% of national GDP. ‘Made in-Bangladesh’ is an internationally recognized badge of quality and has bolstered the country’s image worldwide. Annual turnover of nearly 23 billion USD is predicted to more than double to 50 billion USD by 2021. About 95% of the factories are Bangladeshi owned and about 80% of the 4.4 million employees are women. Textiles contributes around 40% of this sector’s value and comprises about 1,700 washing dyeing and finishing (WDF) factories manufacturing fabrics for export or as sub-contractors. However, the textile industry plays a contradictory role in the socio-economic and environmental development of Bangladesh. On the plus side, textile firms are major employers that contribute to wealth and prosperity. On the debit side, they are destroying the surrounding environment on which marginal farmers and others depend for their livelihoods. The worker of these garments are also affected by the results.
  • 5.
    THE CASE Recently, environmentalistorganizations ( BAPA, BELA) have also joined the bandwagon, highlighting the environmental consequences of garments industries and its impact on livelihoods and aquatic flora and fauna in the electronic and print asking the government to take care of the issue of both the workers and the environment . The government is holding a workshop with all the stakeholders to resolve the quandary.
  • 6.
    CASE STUDY OFLFA The very first step of the LFA is to conduct a workshop/roundtable discussion to find the parties involved and identify the cause of the problem. A ‘context’ analysis of the project environment, (in this case garments located near the rivers) and observation of factors important to achieve given objective (greater cooperation between stakeholders), followed by a SWOT analysis.
  • 7.
    SWOT ANALYSIS • NegativeExternality: Harmful impact on the environment and peoples livelihood • Inability to ensure labor safety Introduce effluent treatment plan technology which will decrease environmental pollution Indigenous migration problem • Employment Creation and Contribution to GDP • Positive Externality: Facilitates other subsidiary industries
  • 8.
    STAKEHOLDER ANALYSIS Stakeholder analysisin project management is the process of identifying the impact of a decision on relevant parties. This information is used to assess how the interests of those stakeholders should be addressed in a project plan, policy, program, or other action.
  • 9.
    STAKEHOLDERS Primary • Labor • Proprietorsof garments industry • Residents and external workers of that area Secondary • Ministry of Environment/Department of Environment • Ministry of Labor and Employment External • International Labor Organization (ILO) • Environmentalist organization (BELA/BAPA)
  • 10.
    PRIMARY STAKEHOLDERS Primary StakeholderProblems Interest Potential Linkages Labor • Health hazard • No financial protection in any adverse occurrence • Loss of job • Ensured maximum safety at work • Provision for compensation/ insurance • Trade/ labor union • Increased productivity if non pecuniary benefits are provided They might leave the job and move to a better job Proprietors of garments industry • Loss of labor • Rising labor cost • Reduced profit margin • Environment friendly process leads to reduction of ill will. Cartel or alliance has direct access to government Labor intensive industry leads to high dependency workers
  • 11.
    SECONDARY STAKEHOLDER Secondary Stakeholder Problem InterestPotential Linkages Ministry of Labor and Employment Negligence towards workers exploitation. Ensuring worker’s welfare to maintain good public image Ability to directly influence the problem They can take necessary legal steps for violating any regulations Ministry of Environment Negligence towards workers exploitation. Mitigating and controlling pollution Ability to impose restrictions on garments owners Requires cooperation from ministry of labor as well as external stakeholders. (environmentalist)
  • 12.
    EXTERNAL STAKEHOLDERS External Stakeholders Problem InterestPotential Linkages ILO Global organization raising voice for worker’s protection Raise public awareness Internationally they can pressurize the government Environmentalist organizations (BELA/BAPA) They have been criticized in society for their inactivity Promote environmental sustainability Raise public awareness through seminars, workshops They can take help from the media for their advocacy
  • 13.
    PROBLEM ANALYSIS  Todecide whether the high number of health hazards of both the internal and external workers or environmental impacts should be considered as the focal problem  The following problem tree of substantive and direct causes and effect can be established
  • 14.
    PROBLEM TREE ILOpressure No job security Little Income Violation of worker's rights No proper guidelines for labor employment Lack of proper labor awareness Power of garments owner Little Educational qualification Unskilled labor supply Effect Cause Weakness of legal framework
  • 15.
    PROBLEM TREE (CONTD.) BAPAmovement Reduced income Serious health hazards of Workers Fishermen’s livelihood affected Adverse environmental impact Pollutants discharged Effluents residuals Toxic fume produced by the Garments Effect Cause No Effluent Treatment Plant (ETP) Reduced productivity
  • 16.
    OBJECTIVE ANALYSIS Through theobjective analysis the desirable future situation, which the project hopes to contribute is described. Long-term social and or economic benefits, to which the project will contribute are defined
  • 17.
    OBJECTIVE TREE: Increased contributionto GDP Government praised for role Satisfied ILOSatisfied workers Worker’s rights are protected Provision of medical facilities Formal Job contract Better pay and working conditions Better health of workers Attracts more workers Effect Cause Increased productivity
  • 18.
    OBJECTIVE TREE (CONTD.) Riskto aquatic life reduced ETP to treat pollution Environment friendly technology Strict rules & Regulations Effect Cause Mitigate the harmful impact on environment Environmental pollution decreased Reduced water pollution
  • 19.
    ALTERNATIVE ANALYSIS  Objectiveswhich can not be achieved should be eliminated. The workshop should decide whether the demands of environmentalist are pragmatic  Bearing in mind the result of the participation analysis, alternative options are identified from the objective tree. In this case there are three obvious alternatives.  Option 1: Introduce environment friendly methods  Option 2: PPE for workers  Option 3: Option1+Option 2
  • 20.
    ALTERNATIVE ANALYSIS Selection criteriaOption 1: Environment Sensitive measures (ETP) Option 2 : PPE for workers Option3=1+2 combined Cost High High High Chance of success High High High Cost/Benefit High High High Time horizon Long Short Long Social risk Small Small Small
  • 21.
    OBJECTIVELY VERIFIABLE INDICATORS (OVI) Goal  Measures (direct or indirect) to verify to what extent the goal is fulfilled.  Purpose  Measures (direct or indirect) to verify to what extent the purpose is fulfilled.  Outputs  Measures (direct or indirect) to verify to what extent the outputs are produced.  Activities (Inputs)  Goods, people and services necessary to undertake the activities
  • 22.
    SOURCES OF VERIFICATION(SOV)  Goal  The sources of data necessary to verify status of goal level indicators.  Purpose  The sources of data necessary to verify status of purpose level indicators.  Outputs  The sources of data necessary to verify status of output level indicators.  Activities  The sources of data necessary to verify status of activity level indicators.
  • 23.
    ASSUMPTION ANALYSIS Sets ofassumptions (concerning conditions required for the desired project story to happen, and about factors external to the project) are specified in the final column of the LF matrix. The levels of objectives and the linking assumptions should be coherently connected, in a vertical logic. At each level the objectives and indicators should be coherently connected too, as the horizontal logic.
  • 24.
    Development Indicators • Betterand healthy working conditions • Less pollution OVI (objectively verified indicators) • Grievances among workers addressed • Productivity of workers will be increased SOV (Sources of verification) • KII (Key Informants Interview) • EIA • Number of people being sick among workers • Water Quality Monitoring Assumption/External factor/Risk • Regular Monitoring required by experienced expert from BCSIR • Transparency while preparing reports Purpose • Reduced health risks • Restored livelihood OVI Environment pollution reduced 50% SOV • Monthly medical check up at local health center • Health surveys Assumption/External factor/Risk • Workers may be manipulated/ threatened by owner group • Availability of good doctors • Difficult to quantify the economic cost of pollution Output • Health insurance for workers • PPE • ETP OVI • Increased costs for garments owners • ETP will significantly reduce pollution by 40-45% SOV • Selected Bank or financial institution providing security • Regulatory body observing whether ETP are properly functioning Assumption/External factor/Risk • Owners may be reluctant to purchase PPE or provide inferior quality gloves, goggles, masks • Government will have to subsidize import of ETP machinery which are expensive Activity • Government enforcement • Tax imposition Input • Safety precautions will have to be circulated cost • . Safety pamphlets Assumption/External factor/Risk • Corruption within NBR • If taxes are too low and does not affect production cost significantly pollution may continue
  • 25.