LOCKOOUT/TAGOUT
THE ULTIMATE GOAL IS: To implement
policies and procedures to prevent, as
necessary, the release of hazardous energy
from power sources--or from a stored
source in machines, equipment or
processes.
WHAT IS LOCKOUT/TAGOUT?
 Lockoutis the placement of a lock device on an
energy-isolating device to ensure the equipment
cannot be operated during equipment
maintenance or repair.
 Tagoutis the placement of a tag device on an
energy-isolating device to warn of the danger of
operating, and TO NOT start, the equipment until
the tag is properly removed.
Terms and Definitions
AFFECTED EMPLOYEE: One whose job
requires them to operate/use or be in the
area of machinery or equipment on which
service/maintenance is being performed.
AUTHORIZED EMPLOYEE: One who is
responsible for the lockout/tagout of
machinery or equipment..
TERMS AND DEFINITIONS Cont.
LOCKOUT DEVICE: A device such as a lock
(key or combination) that holds/secures an
energy-isolating device, thus preventing an
energy source from operating.
TAGOUT DEVICE: A prominent warning
device, such as a tag with a means of
attachment, which can be securely
fastened to an energy-isolating device.
TERMS AND DEFINITIONS Cont.
 CAPABLE OF BEING LOCKED OUT: An energy- isolating
device (switch, lever, etc.) able to be locked out via a hasp
or other means, to which a lock can be affixed.
 FULL EMPLOYEE PROTECTION: When a tagout device is
used on an energy-isolating device which is able to be
locked out, it MUST be attached at the SAME location as
the LO device would be, AND demonstrate equivalent level
of safety to the lockout program.
ENERGY CONTROL PROCEDURES
MUST BE WRITTEN AND INCLUDE:
•Scope
•Purpose
•Authorization
ENERGY CONTROL PROCEDURES
MUST BE WRITTEN AND INCLUDE:
•Rules
•Techniques
•Enforcement
ENERGY CONTROL PROCEDURES Cont.
 Stored energy sources, following the
placement of lockout or tagout devices,
shall be restrained, disconnected, relieved,
and otherwise rendered safe.
HAZARDOUS ENERGY SOURCES
ENERGY SOURCES CAN BE:
ELECTRICAL
MECHANICAL
PNEUMATIC
HYDRAULIC
Release from Lockout/Tagout
 The work area shall be inspected to
ensure that nonessential items have
been removed and the equipment
components are intact.
 The work area shall be checked to
ensure that all employees have been
safely positioned or removed.
Release from Lockout/Tagout Cont.
 Lockout/Tagout devices shall be removed
by the employee who placed the device, or
under the direction of the employer, if the
authorized employee is unavailable.
LOCKOUT/TAGOUT-HARDWARE
Lockout tagout
devices shall be
provided by the
employer and must
meet the minimum
industry standard.
EQUIPMENT INSPECTIONS
The employer shall conduct an
annual inspection and certify that
the LO/TO policies and procedures
are being complied with.
Training & Communication
 The employer must provide training :
1. To all employee’s on the current
procedures.
2. Whenever LO/TO procedures are used.
3. Whenever there are changes in Job
assignments, machinery/equipment, or
processes that present any new hazards.
PROGRAM REQUIREMENTS
Your agency should require
contractors to have a
Lockout/Tagout program that
complies with the agency
standards.
LOCKOUT/TAGOUT
IT’S A MATER OF LIFE AND DEATH
TEST
1. Name the four energy sources LO/TO
addresses?
2. To use Tagout instead of Lockout, what
must be demonstrated?
3. Who may remove a Lockout device?
TEST CONT.
4. Define “affected person” ?
5. After a Lockout device is installed, what
must take place?
6. Must employers conduct an inspection?
lockout-tagout-training.ppt

More Related Content

Similar to lockout-tagout-training.ppt

The complete procedure of Logout & tagout
The complete procedure of Logout & tagoutThe complete procedure of Logout & tagout
The complete procedure of Logout & tagout
Saqib Mansoor Ahmed
 
Lockout tagout standard
Lockout tagout standardLockout tagout standard
Lockout tagout standardAnbr Cama
 
Lock Out-Tag Out Training by Ryko
Lock Out-Tag Out Training by RykoLock Out-Tag Out Training by Ryko
Lock Out-Tag Out Training by Ryko
Atlantic Training, LLC.
 
Lockout/Tagout
Lockout/TagoutLockout/Tagout
Lockout/Tagout
Arkansas STEPS Network
 
Lockout Tag Out
Lockout Tag OutLockout Tag Out
Lockout Tag Outsspuent
 
Loto presentation
Loto presentationLoto presentation
Loto presentation
LalitSharma508
 
Lock Out / Tag Out
Lock Out / Tag OutLock Out / Tag Out
Lock Out / Tag Out
Bruce A. DelGrasso
 
LOTO & ENERGY ISOLATION.pptx
LOTO & ENERGY ISOLATION.pptxLOTO & ENERGY ISOLATION.pptx
LOTO & ENERGY ISOLATION.pptx
Syed Neyaz Ahmad
 
Lockout tagout
Lockout tagoutLockout tagout
Lockout tagout
Mary Helen
 
Lockout Tagout by Snohomish County
Lockout Tagout by Snohomish CountyLockout Tagout by Snohomish County
Lockout Tagout by Snohomish County
Atlantic Training, LLC.
 
Overcoming The Challenges of Implementing a Lockout Program
Overcoming The Challenges of Implementing a Lockout ProgramOvercoming The Challenges of Implementing a Lockout Program
Overcoming The Challenges of Implementing a Lockout Program
TENAQUIP
 
Lock Out Tag Out (LOTO)
Lock Out Tag Out (LOTO)Lock Out Tag Out (LOTO)
Lock Out Tag Out (LOTO)
JulieMaeuser
 
Energy Control Program by MCIEAST
Energy Control Program by MCIEASTEnergy Control Program by MCIEAST
Energy Control Program by MCIEAST
Atlantic Training, LLC.
 
Live wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureLive wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedure
Julian Kalac P.Eng
 
LOTO 2022 - Energy Isolation Process .pptx
LOTO 2022 - Energy Isolation Process .pptxLOTO 2022 - Energy Isolation Process .pptx
LOTO 2022 - Energy Isolation Process .pptx
Nigel Brown
 
Are you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
Are you at Risk? The Role of Lockout/Tagout in Pneumatic SafetyAre you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
Are you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
Design World
 

Similar to lockout-tagout-training.ppt (20)

The complete procedure of Logout & tagout
The complete procedure of Logout & tagoutThe complete procedure of Logout & tagout
The complete procedure of Logout & tagout
 
Lockout tagout standard
Lockout tagout standardLockout tagout standard
Lockout tagout standard
 
Lock Out-Tag Out Training by Ryko
Lock Out-Tag Out Training by RykoLock Out-Tag Out Training by Ryko
Lock Out-Tag Out Training by Ryko
 
Lockout/Tagout
Lockout/TagoutLockout/Tagout
Lockout/Tagout
 
Lockout Tag Out
Lockout Tag OutLockout Tag Out
Lockout Tag Out
 
LOTO 2
LOTO 2LOTO 2
LOTO 2
 
Loto presentation
Loto presentationLoto presentation
Loto presentation
 
Lock Out / Tag Out
Lock Out / Tag OutLock Out / Tag Out
Lock Out / Tag Out
 
LOTO & ENERGY ISOLATION.pptx
LOTO & ENERGY ISOLATION.pptxLOTO & ENERGY ISOLATION.pptx
LOTO & ENERGY ISOLATION.pptx
 
Lockout tagout
Lockout tagoutLockout tagout
Lockout tagout
 
Lockout &tagout
Lockout &tagoutLockout &tagout
Lockout &tagout
 
Procedure 1
Procedure 1Procedure 1
Procedure 1
 
Lockout Tagout by Snohomish County
Lockout Tagout by Snohomish CountyLockout Tagout by Snohomish County
Lockout Tagout by Snohomish County
 
Overcoming The Challenges of Implementing a Lockout Program
Overcoming The Challenges of Implementing a Lockout ProgramOvercoming The Challenges of Implementing a Lockout Program
Overcoming The Challenges of Implementing a Lockout Program
 
Lock Out Tag Out (LOTO)
Lock Out Tag Out (LOTO)Lock Out Tag Out (LOTO)
Lock Out Tag Out (LOTO)
 
Energy Control Program by MCIEAST
Energy Control Program by MCIEASTEnergy Control Program by MCIEAST
Energy Control Program by MCIEAST
 
shock_arc_flash
shock_arc_flashshock_arc_flash
shock_arc_flash
 
Live wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureLive wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedure
 
LOTO 2022 - Energy Isolation Process .pptx
LOTO 2022 - Energy Isolation Process .pptxLOTO 2022 - Energy Isolation Process .pptx
LOTO 2022 - Energy Isolation Process .pptx
 
Are you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
Are you at Risk? The Role of Lockout/Tagout in Pneumatic SafetyAre you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
Are you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
 

Recently uploaded

Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 

Recently uploaded (20)

Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 

lockout-tagout-training.ppt

  • 1. LOCKOOUT/TAGOUT THE ULTIMATE GOAL IS: To implement policies and procedures to prevent, as necessary, the release of hazardous energy from power sources--or from a stored source in machines, equipment or processes.
  • 2. WHAT IS LOCKOUT/TAGOUT?  Lockoutis the placement of a lock device on an energy-isolating device to ensure the equipment cannot be operated during equipment maintenance or repair.  Tagoutis the placement of a tag device on an energy-isolating device to warn of the danger of operating, and TO NOT start, the equipment until the tag is properly removed.
  • 3. Terms and Definitions AFFECTED EMPLOYEE: One whose job requires them to operate/use or be in the area of machinery or equipment on which service/maintenance is being performed. AUTHORIZED EMPLOYEE: One who is responsible for the lockout/tagout of machinery or equipment..
  • 4. TERMS AND DEFINITIONS Cont. LOCKOUT DEVICE: A device such as a lock (key or combination) that holds/secures an energy-isolating device, thus preventing an energy source from operating. TAGOUT DEVICE: A prominent warning device, such as a tag with a means of attachment, which can be securely fastened to an energy-isolating device.
  • 5. TERMS AND DEFINITIONS Cont.  CAPABLE OF BEING LOCKED OUT: An energy- isolating device (switch, lever, etc.) able to be locked out via a hasp or other means, to which a lock can be affixed.  FULL EMPLOYEE PROTECTION: When a tagout device is used on an energy-isolating device which is able to be locked out, it MUST be attached at the SAME location as the LO device would be, AND demonstrate equivalent level of safety to the lockout program.
  • 6. ENERGY CONTROL PROCEDURES MUST BE WRITTEN AND INCLUDE: •Scope •Purpose •Authorization
  • 7. ENERGY CONTROL PROCEDURES MUST BE WRITTEN AND INCLUDE: •Rules •Techniques •Enforcement
  • 8. ENERGY CONTROL PROCEDURES Cont.  Stored energy sources, following the placement of lockout or tagout devices, shall be restrained, disconnected, relieved, and otherwise rendered safe.
  • 9. HAZARDOUS ENERGY SOURCES ENERGY SOURCES CAN BE: ELECTRICAL MECHANICAL PNEUMATIC HYDRAULIC
  • 10. Release from Lockout/Tagout  The work area shall be inspected to ensure that nonessential items have been removed and the equipment components are intact.  The work area shall be checked to ensure that all employees have been safely positioned or removed.
  • 11. Release from Lockout/Tagout Cont.  Lockout/Tagout devices shall be removed by the employee who placed the device, or under the direction of the employer, if the authorized employee is unavailable.
  • 12. LOCKOUT/TAGOUT-HARDWARE Lockout tagout devices shall be provided by the employer and must meet the minimum industry standard.
  • 13. EQUIPMENT INSPECTIONS The employer shall conduct an annual inspection and certify that the LO/TO policies and procedures are being complied with.
  • 14. Training & Communication  The employer must provide training : 1. To all employee’s on the current procedures. 2. Whenever LO/TO procedures are used. 3. Whenever there are changes in Job assignments, machinery/equipment, or processes that present any new hazards.
  • 15. PROGRAM REQUIREMENTS Your agency should require contractors to have a Lockout/Tagout program that complies with the agency standards.
  • 16. LOCKOUT/TAGOUT IT’S A MATER OF LIFE AND DEATH
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28. TEST 1. Name the four energy sources LO/TO addresses? 2. To use Tagout instead of Lockout, what must be demonstrated? 3. Who may remove a Lockout device?
  • 29. TEST CONT. 4. Define “affected person” ? 5. After a Lockout device is installed, what must take place? 6. Must employers conduct an inspection?