Why? Existing buildings approach end of natural life span Buildings not fit for purpose, libraries have ‘made do’ Wider college newbuild programme Larger student numbers Need for more cost-effective use of space IT to enable rather than control learning Accommodate varied ways of learning Collaborative personalisation
In context major academic newbuild programme  Building schools for the future LSC funding for Further Education HE investment in newbuild & expansion Designing for 21 st  century learning
Which means spaces that are Flexible Future-proofed Creative Supportive
Repositioning the library? Teaching Spaces Library Social spaces The current scenario – the library as a neutral, multi-use space?
Add digital technologies & social networks to the mix … ref:  Michael  Habib
Flexibile learning space   Glasgow Saltire Centre   Flexible space   Technology rich   Moveable overhead    lighting   Electricity points in    furnishings and floor  More on the  Saltire  Centre
Study centre approach   Worcester College   Distributed study   centres   Self contained space   Specific to each  curriculum area   More on Worcester’s study centres
Public Library influence Branding Social spaces Zoning Book shop cafes Multimedia Public sector in turn High St influence
Public libraries - Peckham 1999 Alsop Architects Stirling Prize winner Regeneration  Pod spaces Zoned areas Plaza Description
and Tower Hamlets 4 Idea Stores 2002 – 2006 Adjaye architects Library service Lifelong learning Description
JISC materials Designing spaces for effective learning JISC Video case studies JISC Infonet toolkit JISC Infonet Flickr photo collection Search by aspect of design institution type of space
JISC Infonet photos
Other materials What if… re-imagining learning spaces Futurelab Designing Libraries public library database Designing Libraries Design excellence in FE awards RIBA / LSC Learning spaces Educause Good School libraries Ofsted CoFHE Mid West Spaced out presentations CoFHE
RSC South East support Sharing regional case studies Strategic advice Technical infrastructure advice Training in digital tools & technologies [email_address]

Library Newbuild - trends in academic library design

  • 1.
  • 2.
    Why? Existing buildingsapproach end of natural life span Buildings not fit for purpose, libraries have ‘made do’ Wider college newbuild programme Larger student numbers Need for more cost-effective use of space IT to enable rather than control learning Accommodate varied ways of learning Collaborative personalisation
  • 3.
    In context majoracademic newbuild programme Building schools for the future LSC funding for Further Education HE investment in newbuild & expansion Designing for 21 st century learning
  • 4.
    Which means spacesthat are Flexible Future-proofed Creative Supportive
  • 5.
    Repositioning the library?Teaching Spaces Library Social spaces The current scenario – the library as a neutral, multi-use space?
  • 6.
    Add digital technologies& social networks to the mix … ref: Michael Habib
  • 7.
    Flexibile learning space Glasgow Saltire Centre Flexible space Technology rich Moveable overhead lighting Electricity points in furnishings and floor More on the Saltire Centre
  • 8.
    Study centre approach Worcester College Distributed study centres Self contained space Specific to each curriculum area More on Worcester’s study centres
  • 9.
    Public Library influenceBranding Social spaces Zoning Book shop cafes Multimedia Public sector in turn High St influence
  • 10.
    Public libraries -Peckham 1999 Alsop Architects Stirling Prize winner Regeneration Pod spaces Zoned areas Plaza Description
  • 11.
    and Tower Hamlets4 Idea Stores 2002 – 2006 Adjaye architects Library service Lifelong learning Description
  • 12.
    JISC materials Designingspaces for effective learning JISC Video case studies JISC Infonet toolkit JISC Infonet Flickr photo collection Search by aspect of design institution type of space
  • 13.
  • 14.
    Other materials Whatif… re-imagining learning spaces Futurelab Designing Libraries public library database Designing Libraries Design excellence in FE awards RIBA / LSC Learning spaces Educause Good School libraries Ofsted CoFHE Mid West Spaced out presentations CoFHE
  • 15.
    RSC South Eastsupport Sharing regional case studies Strategic advice Technical infrastructure advice Training in digital tools & technologies [email_address]