SlideShare a Scribd company logo
http://www.flickr.com/photos/basheertome/5557362895
on design in a time of disruption
Letting go...
http://creativecommons.org/licenses/by/2.0
http://www.flickr.com/photos/ghewgill/5046616680
been on a quest for perfection + control...
for much of human history, we have
napoleon bonaparte
started with this...
much of it
http://www.flickr.com/photos/purdman1/2875431305
movable lead type
http://www.flickr.com/photos/jmwk/3517373312
gutenberg parenthesis
there were as many as 10-12 million"
printed his bible...less than 50 years later
in all of Europe before Gutenberg
“...there were perhaps 30,000 books
“Gutenberg’s Legacy”, University of Texas
http://www.flickr.com/photos/humblog/452238876
nothing short of revolutionary
the knock-on effects were
standardisationof
spelling
spreadofknowledgein
locallanguages
developmentofformal
grammar
wideraccesstoknowledgefor
womenandthepoor
fewerbooksprintedin
Latin
democratisationof
knowledgev.1
http://www.flickr.com/photos/whiteafrican/2938685296
might be a finite thing...
also led us to believe that knowledge
store, and constrain knowledge,
but our ability to capture,
http://www.flickr.com/photos/smithsonian/4127624763
"the truth" about all sorts of things...
long enough, we could discover
...that if we experimented
http://www.flickr.com/photos/bigbirdz/4507266406
to do just about everything...
...and "the best way"
iso certified
http://www.google.com/patents
claimed them as our own...
we protected ideas, and
google patents
http://www.flickr.com/photos/siliconbeachtraining/3925458997
duplicate what we'd learned...
we created processes, enabling us to
six sigma
design thinking
http://www.flickr.com/photos/fungleo/4771589650
globalisation further amplified this...
industrialisation, automation and
chongqing china
http://www.flickr.com/photos/scobleizer/3009516045
something you can scale it
...once you can duplicate
http://www.flickr.com/photos/daverugby83/4478007023
you can make money
...and if you can scale it,
http://www.flickr.com/photos/chadmagiera/265752353
much of this is starting to unravel...
thanks to the Internet,
bruce mau massive change
http://www.flickr.com/photos/jurvetson/5129303018
important than that of any
the network are now more
but the knowledge + power in
...scale is still important,
one group or individual...
http://www.flickr.com/photos/28misguidedsouls/5522310921
spreading messages and ideas...
social networks act as "amplifiers"
http://www.flickr.com/photos/ricardoalvarez/229045487
and it's likely to grow...
let a product, or idea loose online,
crazy frog
http://www.flickr.com/photos/ricardoalvarez/229046257
they self-replicate and evolve...
but ideas don't just grow,
the annoying thing
http://www.flickr.com/photos/eneas/3479302322
is normally associated with viruses...
often at a pace and intensity that
swine flu mexico
http://www.flickr.com/photos/ricephotos/2679758872
the network sets in...
once the power of
it's impossible to contain ideas
and while viruses can be contained,
thisisactually
bacteria...
http://www.flickr.com/photos/altemark/39593706
http://www.flickr.com/photos/misbehave/2352753067
have only amplified this
always connected devices
portable, always on,
http://www.flickr.com/photos/nebraskasc/3659328702
you have the perfect storm...
combine all these things and
http://www.flickr.com/photos/randysonofrobert/311744213
feedback loop...
an endless, often over-connected
http://www.flickr.com/photos/yghelloworld/4965465016
ideas to greatness...
propelling unexpected
angry birds
http://www.youtube.com/watch?v=7IcVyvg2Qlo
enabling new voices...
it gets better
http://www.flickr.com/photos/ahmadhammoudphotography/5410375058
...accelerating change
egyptian revolution
http://www.flickr.com/photos/mccun934/2899155411
on a global scale
...or causing chaos
market crash 2011
economic crisis 2008
http://www.flickr.com/photos/jmv/3371886
create entirely new situations..."
converging and influencing each other to
at us faster or with less predictability; they are
"events, threats and opportunities aren't just coming
require unprecedented degrees of creativity"
"...these first-of-their-kind developments
Capitalising on Complexity - 2010 IBM CEO Study
http://www.flickr.com/photos/z_wenjie/5602616401
with some decidedly unique challenges...
designers, (or anyone who makes products)
this new environment presents engineers,
nathan road hong kong
http://www.flickr.com/photos/jenny-pics/5661879987
the balance of power
is shifting...
http://www.flickr.com/photos/jurvetson/3275235423/
program our consumption is becoming
“The idea that someone can
obsolete, and fast.” - Seth Godin
“The extraordinary revolution of media choice”
http://www.flickr.com/photos/arenamontanus/3496433929
to interact with our creations
we can no longer expect customers
in a linear, exclusive, or
predictable manner...
http://www.flickr.com/photos/ncanup/3526550845
to create experiences for them...
users no longer have to wait for us
http://www.flickr.com/photos/jessehull/163703252
if something doesn't suit them...
http://www.flickr.com/photos/24763767@N03/3907937027
...they can change it
kindle teleprompter
http://www.flickr.com/photos/bramus/5222185714
...enhance it
http://twitter.com/#!/joindiaspora
...even compete with it
Shopping mallapp
store
Curation&tech
support
Socialdiscovery
Serendipity...(andfun!)
http://www.flickr.com/photos/faircompanies/4955025544
be able to go much further
...very soon, they will
3D printing
makerbot thing-o-matic
http://www.flickr.com/photos/salty_soul/4737350118
necessarily a bad thing
...this is not
http://www.flickr.com/photos/tiseb/13541804
people don't necessarily want the perfect product..."
counterintuitive but there is growing evidence that
incomplete, and possibly even substandard seems
"Issuing your customers with something that is rough,
http://www.flickr.com/photos/emerson12/2682480262
around the edges that they can adapt or improve."
"...they prefer to deal with something ragged
Loose, Martin Thomas
the end result is
behaviours such as this...
https://www.flickr.com/photos/bombardier/5456285991
“…if you have an Instagram account, you can slap a tag
on anything, take a picture of it, and sell it...”
– Fatima Al Qadiri, Mousse magazine
you know--hacked products.”
She sells dried fruit. A friend’s cousin is selling
weird potted plants...people are creating,
– Fatima Al Qadiri, Mousse magazine
“...even my grandmother has an Instagram business.
https://www.flickr.com/photos/qilin/3923289556
it’s also worth noting the
companies that have succeeded
designing products with a pragmatic mix
of beautiful, and “good enough”
IKEA
https://www.flickr.com/photos/yto/4923423098/
¥799 (£83/$130)
basic but fun plastic case
stock MediaTek MT6589T chipset
8 Mp camera
dual SIM w/ dual standby
highly customized MIUI ROM
Xiaomi Hongmi
fancy Gorilla Glass
https://www.flickr.com/photos/52526343@N05/4843218498
“We want to give customers
the kind of satisfaction that comes
out as ‘This will do,’ not ‘This is what I want’.
It’s not appetite, but acceptance.”
Kenya Hara, Designer
http://www.flickr.com/photos/carbonnyc/2206470413
behave in a generally homogenous way...
we've often tended to presume users
in our quest to create perfection,
caricature
personas
scenarios
http://www.flickr.com/photos/pagedooley/3832910201
far from the truth
...this is increasingly
complex vs. complicated
http://www.flickr.com/photos/alexnormand/5913845927
of a product into society...
of 50 million to mark the "penetration"
marketers often use an audience
http://www.flickr.com/photos/tigerzombie/5173624489
(which was usually a good thing)
historically, market penetration took time,
traffic 1963
http://www.flickr.com/photos/highwaysagency/4542411761
of how a product might fit into our lives...
development of social norms and an understanding
with time came stronger mental models,
traffic 2011
http://www.flickr.com/photos/anachronism_uk/853247355
those embarrassing mistakes...
time also enabled us to work out
sinclair c5
http://www.flickr.com/photos/vvvracer/4436798901
time is now a luxury...
forbetterorworse
http://www.flickr.com/photos/vvvracer/4436798901
stability
creation of new
infrastructural
technology
followed by
rapid
disruption
years
S curve - stable over decades
stability
Source: The Big Shift by John Hagel, John Seely Brown and Lang Davison
as coined by John Seely Brown
...the big shift
http://www.flickr.com/photos/vvvracer/4436798901
stability
creation of new
infrastructural
technology
followed by
rapid
disruption
years years
S curve - stable over decades the present (and likely future)
many new infrastructural
technologies
frequent disruption
smaller periods of stability
stability
Source: The Big Shift by John Hagel, John Seely Brown and Lang Davison
as coined by John Seely Brown
...the big shift
http://www.flickr.com/photos/houseofsims/5510707992
a market penetration of 50 million...
it took radio 40 years to reach
Source: ReWired, Larry D. Rosen
http://www.flickr.com/photos/sarahreido/4566354684
10 years to 'adapt' to television...
by comparison, we had only
Source: ReWired, Larry D. Rosen
while the iPod took only 5 years...
iconic
Source: ReWired, Larry D. Rosen
http://www.youtube.com/watch?v=HPPj6viIBmU
less than 6 months...
and YouTube,
Source: ReWired, Larry D. Rosen
star wars kid
http://googleblog.blogspot.com/2011/06/introducing-google-project-real-life.html
in less than half this time...
Google+ reached that milestone
Google+infactreachedthismilestonein
about3months...tothetuneof2million
newusersaday!
http://www.flickr.com/photos/wwworks/3156948184
at a pace that was once unheard of...
technology adoption is creating 'generation gaps'
researchers are discovering that our rapid
http://www.flickr.com/photos/tocaboca/5523598823
Lee Rainie, Pew Research Center, Internet and American Life Project
experiences with technology."
are having completely different
"People two, three or four years apart
http://www.flickr.com/photos/57123627@N04/5818687047
...but this is different.
tastes than our siblings
we've always had different
http://www.flickr.com/photos/rafaelrobles/4791344184
She was holding my Kindle e-reader."
recently with two words: "Daddy's book."
"My 2-year-old daughter surprised me
The Children of Cyberspace: Old Fogies by Their 20s, NY Times
http://www.flickr.com/photos/smaedli/5953114412/
limited to our children...
these changes are not
- @aral
and looked for the search box."
"I just opened my Moleskine
- @rossmonstr
a Kindle as a bookmark?"
"Can we all take a moment
to appreciate my mother using
http://en.wikipedia.org/wiki/Blind_men_and_an_elephant
really had it easy...
and those blind men with that elephant
add to this the global nature of the Internet,
information deficit
different perspectives
http://www.flickr.com/photos/studiobeerhorst/5929704093
in a slightly different way...
and engaging with products
each of us experiencing, understanding
interpretations
http://www.flickr.com/photos/sparker/460227098
interdependent systems of experience...
designing multi-layered and tightly
while companies such as Apple are successfully
still
apple store
http://www.flickr.com/photos/cdharrison/2407640646
most touch points and interactions...
their ability to control and contain
their success relies in great part on
magic kingdom
http://www.flickr.com/photos/tanj/4432327487
have this luxury...
most products will not
android china
rubber ducks lost at sea
http://www.flickr.com/photos/tim_and_selena/5051157647/
be the first to fail...
orchestrated products may in fact
today the most perfectly
OLPC
design by committee
mental models
http://www.flickr.com/photos/magnus_d/3162046451
nespresso coffee
for each layer of experience
there will be trade-offs
in complexity
actors in the ecosystem...
and an increasing reliance on other
http://www.flickr.com/photos/flavouz/3137171590
recycle nespresso capsules
george clooney nespresso
nespresso vs
cost of aluminium
fair trade ethics
http://www.flickr.com/photos/zyphbear/446780548
that have become all too common
to the abrupt changes in environment
...reducing a product's ability to react
fuel costs
union UPS handbook
carbon costs
volcano UPS delivery
http://www.flickr.com/photos/hendry/3053419265
are not exempt from this challenge
products with
a software component
internet connected fridge
meet Samsung’s
(including 8” LCD and Android apps)
Samsung RF4289HARS
Source: Unknown (please advise if it’s you)
http://www.theconnectivist.com/2013/04/how-smart-do-we-need-our-homes-to-be/
the but of design jokes
“smart” fridges have long been
$3400 (£2700) price tag,
yet despite its
http://www.flickr.com/photos/andrewmalone/2355592191
consumers seem to genuinely
“...the wife loves cooking...she looks up recipes and listens to
Pandora while cooking. Wi-fi was easily connected. I particularly
like the calendar feature so we can view each others schedules.”
“My wife and I love the refrigerator,
having the weather displayed on
the LCD screen is great.”
“The touchscreen control panel is nice and we
look forward to really enjoying the features,
which are perfect for this household.”
“...the 8" LCD screen absolutely sealed the deal. It was
easy to connect to my wifi and is very fun. All my
friends and guests love it.”
love it...
but when they do complain, it’s usually
http://www.flickr.com/photos/andrewmalone/2355592191
“[why can’t I] send the Pandora sound out via aspeaker jack on top of the refrigerator...or [you could]add Bluetooth or DLNA playback to transmit toanother device. Give it that feature in the next model!!!
about a lack of interoperability between the fridge
and other services or devices
“...Samsung needs to incorporate the ability to "print" shopping
lists from the software on the fridge via the wireless router, or at
least send it in an email to print...what is the use of adding great
features if you can't utilize them...”
“...speaking of apps, though- I don't really like
the Pandora radio. I think iHeart radio would
have been a better choice.’
http://www.flickr.com/photos/22179048@N05/5211091279
in fact be the simplest–or most flexible...
the most successful products may
in an increasingly complex world,
bodum
french press
bialetti
http://www.flickr.com/photos/tocaboca/5523734441
experiences they create for themselves...
meaning and enrich their lives, through
enabling pathways for users to find
toca boca
http://www.flickr.com/photos/hodac/2243470147
stop short of fully defining the experience."
"the best designs will set the stage, but
Adam Silver, Frog Design
cardboard box play
http://www.guardian.co.uk/open-platform
they were originally intended for...
beyond the device, context or technology
the most valued products may be designed to live
http://www.flickr.com/photos/dalbera/3151369718
with no primary context at all...
they may even be designed
http://www.flickr.com/photos/carbonnyc/466394182
should not absolve us of responsibility...
but letting go of 'experience' as we once knew it
domino falling
http://www.flickr.com/photos/seier/2455551478
responsibility than ever before...
in fact, as designers we now have more
anddevelopers
Video Games and the Human Condition, Jonathan Blow
with every product we create."
to the number of people we may affect
"...a responsibility that is directly proportional
http://www.flickr.com/photos/peterkaminski/181721075
to consider the implications of our work...
our lives, the more important it will be for us
the more technology weave their way through
andtheInternet
segway
http://www.flickr.com/photos/jaykayess/4294959440
Douglas Rushkoff
–a design for our collective future."
"We are creating a blueprint together
http://www.flickr.com/photos/ghewgill/5046616680
and API becomes a part of that future...
each design, meme, pattern, metaphor
minority report interface
natural ui
twitter URLs
http://www.flickr.com/photos/clickflashphotos/3393880262
wish to create?
...what future do we
http://www.flickr.com/photos/stickwithjosh/5288115744
we do will have an impact...
there's no guarantee that the work
http://www.flickr.com/photos/carbonnyc/3543419506
that it may...
but there's the very real risk
http://www.flickr.com/photos/ghewgill/5046616680
Marshall McLuhan
thereafter our tools shape us."
"We shape our tools and
http://www.flickr.com/photos/tinou/453593446
hello@yiibu.com thank you
http://www.slideshare.net/yiibu/letting-go-9109114
many thanksto the
amazing photographerson
http://creativecommons.org/licenses/by/2.0
http://www.flickr.com/creativecommons/by-2.0
licensed under
available on
@yiibu
contactus
at

More Related Content

What's hot

Vortraglift120215sde 120222182845-phpapp02
Vortraglift120215sde 120222182845-phpapp02Vortraglift120215sde 120222182845-phpapp02
Vortraglift120215sde 120222182845-phpapp02
Ishansanctus Das
 
Design Analysis
Design AnalysisDesign Analysis
Design Analysis
R. Sosa
 
The Impact of Innovation
The Impact of InnovationThe Impact of Innovation
The Impact of Innovation
Paul Papadimitriou
 
Spotting
SpottingSpotting
Spotting
Keith Lyons
 
Understanding UX: Designing for multiple devices - GA London, 18 Jan 2013
Understanding UX: Designing for multiple devices - GA London, 18 Jan 2013Understanding UX: Designing for multiple devices - GA London, 18 Jan 2013
Understanding UX: Designing for multiple devices - GA London, 18 Jan 2013
Anna Dahlström
 
Innovation Starts w "I"
Innovation Starts w "I" Innovation Starts w "I"
Innovation Starts w "I"
hblowers
 
Emerging practices 2019 week 6 design analysis
Emerging practices 2019 week 6 design analysisEmerging practices 2019 week 6 design analysis
Emerging practices 2019 week 6 design analysis
R. Sosa
 
Beyond the hamburger menu - Digital Doughnut, London 25 Nov 2014
Beyond the hamburger menu - Digital Doughnut, London 25 Nov 2014Beyond the hamburger menu - Digital Doughnut, London 25 Nov 2014
Beyond the hamburger menu - Digital Doughnut, London 25 Nov 2014
Anna Dahlström
 
Jeugdvantegenwoordig 2008 12 4 Khlim
Jeugdvantegenwoordig 2008 12 4 KhlimJeugdvantegenwoordig 2008 12 4 Khlim
Jeugdvantegenwoordig 2008 12 4 Khlim
Maarten Cannaerts
 
Tales of Virality—Automattic
Tales of Virality—AutomatticTales of Virality—Automattic
Tales of Virality—Automattic
terry chay
 
Join the Secret Revolution
Join the Secret RevolutionJoin the Secret Revolution
Join the Secret Revolution
Alan Levine
 
Beyond The Hamburger Menu, UX Ireland, 10 Nov 2016
Beyond The Hamburger Menu, UX Ireland, 10 Nov 2016Beyond The Hamburger Menu, UX Ireland, 10 Nov 2016
Beyond The Hamburger Menu, UX Ireland, 10 Nov 2016
Anna Dahlström
 
The Secret Revolution (Keene State College)
The Secret Revolution (Keene State College)The Secret Revolution (Keene State College)
The Secret Revolution (Keene State College)
Alan Levine
 
Beyond The Hamburger Menu - MOBX, 13 Sep 2014
Beyond The Hamburger Menu - MOBX, 13 Sep 2014Beyond The Hamburger Menu - MOBX, 13 Sep 2014
Beyond The Hamburger Menu - MOBX, 13 Sep 2014
Anna Dahlström
 
What the numbers tell us - Dublin Web Summit, 18 Oct 2012
What the numbers tell us - Dublin Web Summit, 18 Oct 2012What the numbers tell us - Dublin Web Summit, 18 Oct 2012
What the numbers tell us - Dublin Web Summit, 18 Oct 2012
Anna Dahlström
 
Libraries to Lifebraries
Libraries to LifebrariesLibraries to Lifebraries
Libraries to Lifebraries
hblowers
 
Introduction to Social Media for business
Introduction to Social Media for businessIntroduction to Social Media for business
Introduction to Social Media for business
Katie Laird
 
Create Cross Channel Experiences - Managing Experience 2011
Create Cross Channel Experiences - Managing Experience 2011Create Cross Channel Experiences - Managing Experience 2011
Create Cross Channel Experiences - Managing Experience 2011
Samantha Starmer
 
Maker Boot Camp
Maker Boot CampMaker Boot Camp
Maker Boot Camp
St. Petersburg College
 
Affluenza Project- Jordan Boerger
Affluenza Project- Jordan BoergerAffluenza Project- Jordan Boerger
Affluenza Project- Jordan Boerger
BoergerJW
 

What's hot (20)

Vortraglift120215sde 120222182845-phpapp02
Vortraglift120215sde 120222182845-phpapp02Vortraglift120215sde 120222182845-phpapp02
Vortraglift120215sde 120222182845-phpapp02
 
Design Analysis
Design AnalysisDesign Analysis
Design Analysis
 
The Impact of Innovation
The Impact of InnovationThe Impact of Innovation
The Impact of Innovation
 
Spotting
SpottingSpotting
Spotting
 
Understanding UX: Designing for multiple devices - GA London, 18 Jan 2013
Understanding UX: Designing for multiple devices - GA London, 18 Jan 2013Understanding UX: Designing for multiple devices - GA London, 18 Jan 2013
Understanding UX: Designing for multiple devices - GA London, 18 Jan 2013
 
Innovation Starts w "I"
Innovation Starts w "I" Innovation Starts w "I"
Innovation Starts w "I"
 
Emerging practices 2019 week 6 design analysis
Emerging practices 2019 week 6 design analysisEmerging practices 2019 week 6 design analysis
Emerging practices 2019 week 6 design analysis
 
Beyond the hamburger menu - Digital Doughnut, London 25 Nov 2014
Beyond the hamburger menu - Digital Doughnut, London 25 Nov 2014Beyond the hamburger menu - Digital Doughnut, London 25 Nov 2014
Beyond the hamburger menu - Digital Doughnut, London 25 Nov 2014
 
Jeugdvantegenwoordig 2008 12 4 Khlim
Jeugdvantegenwoordig 2008 12 4 KhlimJeugdvantegenwoordig 2008 12 4 Khlim
Jeugdvantegenwoordig 2008 12 4 Khlim
 
Tales of Virality—Automattic
Tales of Virality—AutomatticTales of Virality—Automattic
Tales of Virality—Automattic
 
Join the Secret Revolution
Join the Secret RevolutionJoin the Secret Revolution
Join the Secret Revolution
 
Beyond The Hamburger Menu, UX Ireland, 10 Nov 2016
Beyond The Hamburger Menu, UX Ireland, 10 Nov 2016Beyond The Hamburger Menu, UX Ireland, 10 Nov 2016
Beyond The Hamburger Menu, UX Ireland, 10 Nov 2016
 
The Secret Revolution (Keene State College)
The Secret Revolution (Keene State College)The Secret Revolution (Keene State College)
The Secret Revolution (Keene State College)
 
Beyond The Hamburger Menu - MOBX, 13 Sep 2014
Beyond The Hamburger Menu - MOBX, 13 Sep 2014Beyond The Hamburger Menu - MOBX, 13 Sep 2014
Beyond The Hamburger Menu - MOBX, 13 Sep 2014
 
What the numbers tell us - Dublin Web Summit, 18 Oct 2012
What the numbers tell us - Dublin Web Summit, 18 Oct 2012What the numbers tell us - Dublin Web Summit, 18 Oct 2012
What the numbers tell us - Dublin Web Summit, 18 Oct 2012
 
Libraries to Lifebraries
Libraries to LifebrariesLibraries to Lifebraries
Libraries to Lifebraries
 
Introduction to Social Media for business
Introduction to Social Media for businessIntroduction to Social Media for business
Introduction to Social Media for business
 
Create Cross Channel Experiences - Managing Experience 2011
Create Cross Channel Experiences - Managing Experience 2011Create Cross Channel Experiences - Managing Experience 2011
Create Cross Channel Experiences - Managing Experience 2011
 
Maker Boot Camp
Maker Boot CampMaker Boot Camp
Maker Boot Camp
 
Affluenza Project- Jordan Boerger
Affluenza Project- Jordan BoergerAffluenza Project- Jordan Boerger
Affluenza Project- Jordan Boerger
 

Viewers also liked

Letting Go: 10 Encouraging Quotes
Letting Go: 10 Encouraging QuotesLetting Go: 10 Encouraging Quotes
Letting Go: 10 Encouraging Quotes
Alex Blackwell
 
The internet of things is for people
The internet of things is for peopleThe internet of things is for people
The internet of things is for people
yiibu
 
Designing for conversation
Designing for conversationDesigning for conversation
Designing for conversation
yiibu
 
The Emerging Global Web
The Emerging Global WebThe Emerging Global Web
The Emerging Global Web
yiibu
 
Multi-Device User Experience
Multi-Device User ExperienceMulti-Device User Experience
Multi-Device User Experience
Gabriel White
 
Proxy
ProxyProxy
Bedrijfspresentatie Crea en Artiva Nederland B.V.
Bedrijfspresentatie Crea en Artiva Nederland B.V.Bedrijfspresentatie Crea en Artiva Nederland B.V.
Bedrijfspresentatie Crea en Artiva Nederland B.V.
tomravenstein
 
Anxiety Explained
Anxiety Explained Anxiety Explained
Anxiety Explained
Martita Robinson
 
Letting Go And Moving On
Letting Go And Moving OnLetting Go And Moving On
Letting Go And Moving On
ultimatelifestyleproject
 
Revista de SOCIEDAD PERUANA DE RADIOLOGIA 2013
Revista de SOCIEDAD PERUANA DE RADIOLOGIA 2013Revista de SOCIEDAD PERUANA DE RADIOLOGIA 2013
Revista de SOCIEDAD PERUANA DE RADIOLOGIA 2013
Manuel Jesús Sotelo Muñoz
 
Creative Mornings PHX November
Creative Mornings PHX NovemberCreative Mornings PHX November
Creative Mornings PHX November
Michael Duah
 
Creative Mornings talk: Risk
Creative Mornings talk: RiskCreative Mornings talk: Risk
Creative Mornings talk: Risk
Shahab Zargari
 
Assembly • Creative Mornings
Assembly • Creative MorningsAssembly • Creative Mornings
Assembly • Creative Mornings
Tack Mobile
 
Thieme, Atlas of Anatomy
Thieme, Atlas of AnatomyThieme, Atlas of Anatomy
Thieme, Atlas of Anatomy
Aurelio Lavega
 
Mobiles Can Make Your Business Fly
Mobiles Can Make Your Business FlyMobiles Can Make Your Business Fly
Mobiles Can Make Your Business Fly
Rob Manson
 
Your browser can see and hear and ...
Your browser can see and hear and ...Your browser can see and hear and ...
Your browser can see and hear and ...
Rob Manson
 
e is for everywhere - Interactive Mobile Web Presentation
e is for everywhere - Interactive Mobile Web Presentatione is for everywhere - Interactive Mobile Web Presentation
e is for everywhere - Interactive Mobile Web Presentation
Rob Manson
 
Adaptation: Why responsive design actually begins on the server
Adaptation: Why responsive design actually begins on the serverAdaptation: Why responsive design actually begins on the server
Adaptation: Why responsive design actually begins on the server
yiibu
 
IXDC BEIJING 2015
IXDC BEIJING 2015IXDC BEIJING 2015
IXDC BEIJING 2015
Henk Haaima
 
Love, Anger and Forgiveness
Love, Anger and ForgivenessLove, Anger and Forgiveness
Love, Anger and Forgiveness
William DeFoore
 

Viewers also liked (20)

Letting Go: 10 Encouraging Quotes
Letting Go: 10 Encouraging QuotesLetting Go: 10 Encouraging Quotes
Letting Go: 10 Encouraging Quotes
 
The internet of things is for people
The internet of things is for peopleThe internet of things is for people
The internet of things is for people
 
Designing for conversation
Designing for conversationDesigning for conversation
Designing for conversation
 
The Emerging Global Web
The Emerging Global WebThe Emerging Global Web
The Emerging Global Web
 
Multi-Device User Experience
Multi-Device User ExperienceMulti-Device User Experience
Multi-Device User Experience
 
Proxy
ProxyProxy
Proxy
 
Bedrijfspresentatie Crea en Artiva Nederland B.V.
Bedrijfspresentatie Crea en Artiva Nederland B.V.Bedrijfspresentatie Crea en Artiva Nederland B.V.
Bedrijfspresentatie Crea en Artiva Nederland B.V.
 
Anxiety Explained
Anxiety Explained Anxiety Explained
Anxiety Explained
 
Letting Go And Moving On
Letting Go And Moving OnLetting Go And Moving On
Letting Go And Moving On
 
Revista de SOCIEDAD PERUANA DE RADIOLOGIA 2013
Revista de SOCIEDAD PERUANA DE RADIOLOGIA 2013Revista de SOCIEDAD PERUANA DE RADIOLOGIA 2013
Revista de SOCIEDAD PERUANA DE RADIOLOGIA 2013
 
Creative Mornings PHX November
Creative Mornings PHX NovemberCreative Mornings PHX November
Creative Mornings PHX November
 
Creative Mornings talk: Risk
Creative Mornings talk: RiskCreative Mornings talk: Risk
Creative Mornings talk: Risk
 
Assembly • Creative Mornings
Assembly • Creative MorningsAssembly • Creative Mornings
Assembly • Creative Mornings
 
Thieme, Atlas of Anatomy
Thieme, Atlas of AnatomyThieme, Atlas of Anatomy
Thieme, Atlas of Anatomy
 
Mobiles Can Make Your Business Fly
Mobiles Can Make Your Business FlyMobiles Can Make Your Business Fly
Mobiles Can Make Your Business Fly
 
Your browser can see and hear and ...
Your browser can see and hear and ...Your browser can see and hear and ...
Your browser can see and hear and ...
 
e is for everywhere - Interactive Mobile Web Presentation
e is for everywhere - Interactive Mobile Web Presentatione is for everywhere - Interactive Mobile Web Presentation
e is for everywhere - Interactive Mobile Web Presentation
 
Adaptation: Why responsive design actually begins on the server
Adaptation: Why responsive design actually begins on the serverAdaptation: Why responsive design actually begins on the server
Adaptation: Why responsive design actually begins on the server
 
IXDC BEIJING 2015
IXDC BEIJING 2015IXDC BEIJING 2015
IXDC BEIJING 2015
 
Love, Anger and Forgiveness
Love, Anger and ForgivenessLove, Anger and Forgiveness
Love, Anger and Forgiveness
 

Similar to Letting Go

Letting Go
Letting GoLetting Go
Letting Go
Ishraq Dhaly
 
Letting go
Letting goLetting go
Letting go
Alexander Anikin
 
Science in the Open
Science in the OpenScience in the Open
Science in the Open
Cameron Neylon
 
Open Data: How, why, and is there any point?
Open Data: How, why, and is there any point?Open Data: How, why, and is there any point?
Open Data: How, why, and is there any point?
Cameron Neylon
 
Co Creating Thrivability
Co Creating ThrivabilityCo Creating Thrivability
Co Creating Thrivability
Jean Russell
 
NESTA - Science in Society
NESTA - Science in SocietyNESTA - Science in Society
NESTA - Science in Society
Cameron Neylon
 
Being There
Being ThereBeing There
Being There
Alan Levine
 
Ecological Intelligence for Designers
Ecological Intelligence for DesignersEcological Intelligence for Designers
Ecological Intelligence for Designers
R. Sosa
 
Library 2.0: Melbourne Workshop #6
Library 2.0: Melbourne Workshop #6Library 2.0: Melbourne Workshop #6
Library 2.0: Melbourne Workshop #6
hblowers
 
"Where good ideas come from"
"Where good ideas come from""Where good ideas come from"
"Where good ideas come from"
R. Sosa
 
Grab a bucket! It's raining data!
Grab a bucket! It's raining data!Grab a bucket! It's raining data!
Grab a bucket! It's raining data!
Dorothea Salo
 
If you love something, set it free
If you love something, set it freeIf you love something, set it free
If you love something, set it free
Mike Ellis
 
Beyond Progressive Enhancement by yiibu
Beyond Progressive Enhancement by yiibuBeyond Progressive Enhancement by yiibu
Beyond Progressive Enhancement by yiibu
AdRoll
 
Building our Future
Building our FutureBuilding our Future
Building our Future
SalesChannel International
 
What has the public ever done for us...?
What has the public ever done for us...?What has the public ever done for us...?
What has the public ever done for us...?
Cameron Neylon
 
Innovation Start with "I"
Innovation Start with "I"Innovation Start with "I"
Innovation Start with "I"
hblowers
 
Holiday Science Lecture: Art, Life and Programming
Holiday Science Lecture: Art, Life and ProgrammingHoliday Science Lecture: Art, Life and Programming
Holiday Science Lecture: Art, Life and Programming
Cate Huston
 
The Value of Leadership, the Leadership of Value: Remaining Relevant in times...
The Value of Leadership, the Leadership of Value: Remaining Relevant in times...The Value of Leadership, the Leadership of Value: Remaining Relevant in times...
The Value of Leadership, the Leadership of Value: Remaining Relevant in times...
Peter Bromberg
 
MW2010: A. Straup Cope: Buckets and Vessels
MW2010: A. Straup Cope: Buckets and VesselsMW2010: A. Straup Cope: Buckets and Vessels
MW2010: A. Straup Cope: Buckets and Vessels
museums and the web
 
Buckets and Vessels
Buckets and VesselsBuckets and Vessels
Buckets and Vessels
Aaron Cope
 

Similar to Letting Go (20)

Letting Go
Letting GoLetting Go
Letting Go
 
Letting go
Letting goLetting go
Letting go
 
Science in the Open
Science in the OpenScience in the Open
Science in the Open
 
Open Data: How, why, and is there any point?
Open Data: How, why, and is there any point?Open Data: How, why, and is there any point?
Open Data: How, why, and is there any point?
 
Co Creating Thrivability
Co Creating ThrivabilityCo Creating Thrivability
Co Creating Thrivability
 
NESTA - Science in Society
NESTA - Science in SocietyNESTA - Science in Society
NESTA - Science in Society
 
Being There
Being ThereBeing There
Being There
 
Ecological Intelligence for Designers
Ecological Intelligence for DesignersEcological Intelligence for Designers
Ecological Intelligence for Designers
 
Library 2.0: Melbourne Workshop #6
Library 2.0: Melbourne Workshop #6Library 2.0: Melbourne Workshop #6
Library 2.0: Melbourne Workshop #6
 
"Where good ideas come from"
"Where good ideas come from""Where good ideas come from"
"Where good ideas come from"
 
Grab a bucket! It's raining data!
Grab a bucket! It's raining data!Grab a bucket! It's raining data!
Grab a bucket! It's raining data!
 
If you love something, set it free
If you love something, set it freeIf you love something, set it free
If you love something, set it free
 
Beyond Progressive Enhancement by yiibu
Beyond Progressive Enhancement by yiibuBeyond Progressive Enhancement by yiibu
Beyond Progressive Enhancement by yiibu
 
Building our Future
Building our FutureBuilding our Future
Building our Future
 
What has the public ever done for us...?
What has the public ever done for us...?What has the public ever done for us...?
What has the public ever done for us...?
 
Innovation Start with "I"
Innovation Start with "I"Innovation Start with "I"
Innovation Start with "I"
 
Holiday Science Lecture: Art, Life and Programming
Holiday Science Lecture: Art, Life and ProgrammingHoliday Science Lecture: Art, Life and Programming
Holiday Science Lecture: Art, Life and Programming
 
The Value of Leadership, the Leadership of Value: Remaining Relevant in times...
The Value of Leadership, the Leadership of Value: Remaining Relevant in times...The Value of Leadership, the Leadership of Value: Remaining Relevant in times...
The Value of Leadership, the Leadership of Value: Remaining Relevant in times...
 
MW2010: A. Straup Cope: Buckets and Vessels
MW2010: A. Straup Cope: Buckets and VesselsMW2010: A. Straup Cope: Buckets and Vessels
MW2010: A. Straup Cope: Buckets and Vessels
 
Buckets and Vessels
Buckets and VesselsBuckets and Vessels
Buckets and Vessels
 

More from yiibu

Exploring the physical web
Exploring the physical webExploring the physical web
Exploring the physical web
yiibu
 
The future of media queries?
The future of media queries?The future of media queries?
The future of media queries?
yiibu
 
Designing for diversity - how to stop worrying and embrace the Android revol...
Designing for diversity -  how to stop worrying and embrace the Android revol...Designing for diversity -  how to stop worrying and embrace the Android revol...
Designing for diversity - how to stop worrying and embrace the Android revol...
yiibu
 
Everything old is new again
Everything old is new againEverything old is new again
Everything old is new again
yiibu
 
It's about people, not devices...
It's about people, not devices...It's about people, not devices...
It's about people, not devices...
yiibu
 
Developing an Interface for the Future of Mass Market Software Distribution (...
Developing an Interface for the Future of Mass Market Software Distribution (...Developing an Interface for the Future of Mass Market Software Distribution (...
Developing an Interface for the Future of Mass Market Software Distribution (...
yiibu
 

More from yiibu (6)

Exploring the physical web
Exploring the physical webExploring the physical web
Exploring the physical web
 
The future of media queries?
The future of media queries?The future of media queries?
The future of media queries?
 
Designing for diversity - how to stop worrying and embrace the Android revol...
Designing for diversity -  how to stop worrying and embrace the Android revol...Designing for diversity -  how to stop worrying and embrace the Android revol...
Designing for diversity - how to stop worrying and embrace the Android revol...
 
Everything old is new again
Everything old is new againEverything old is new again
Everything old is new again
 
It's about people, not devices...
It's about people, not devices...It's about people, not devices...
It's about people, not devices...
 
Developing an Interface for the Future of Mass Market Software Distribution (...
Developing an Interface for the Future of Mass Market Software Distribution (...Developing an Interface for the Future of Mass Market Software Distribution (...
Developing an Interface for the Future of Mass Market Software Distribution (...
 

Recently uploaded

UXpert_Report (UALR Mapping Renewal 2022).pdf
UXpert_Report (UALR Mapping Renewal 2022).pdfUXpert_Report (UALR Mapping Renewal 2022).pdf
UXpert_Report (UALR Mapping Renewal 2022).pdf
anthonylin333
 
欧洲杯买球-欧洲杯买球买球网好的网站-欧洲杯买球哪里有正规的买球网站|【​网址​🎉ac123.net🎉​】
欧洲杯买球-欧洲杯买球买球网好的网站-欧洲杯买球哪里有正规的买球网站|【​网址​🎉ac123.net🎉​】欧洲杯买球-欧洲杯买球买球网好的网站-欧洲杯买球哪里有正规的买球网站|【​网址​🎉ac123.net🎉​】
欧洲杯买球-欧洲杯买球买球网好的网站-欧洲杯买球哪里有正规的买球网站|【​网址​🎉ac123.net🎉​】
jafiradnan336
 
一比一原版(UW毕业证书)华盛顿大学毕业证如何办理
一比一原版(UW毕业证书)华盛顿大学毕业证如何办理一比一原版(UW毕业证书)华盛顿大学毕业证如何办理
一比一原版(UW毕业证书)华盛顿大学毕业证如何办理
i990go7o
 
一比一原版(爱大毕业证)美国爱荷华大学毕业证如何办理
一比一原版(爱大毕业证)美国爱荷华大学毕业证如何办理一比一原版(爱大毕业证)美国爱荷华大学毕业证如何办理
一比一原版(爱大毕业证)美国爱荷华大学毕业证如何办理
ynrtjotp
 
一比一原版(Deakin毕业证书)澳洲迪肯大学毕业证文凭如何办理
一比一原版(Deakin毕业证书)澳洲迪肯大学毕业证文凭如何办理一比一原版(Deakin毕业证书)澳洲迪肯大学毕业证文凭如何办理
一比一原版(Deakin毕业证书)澳洲迪肯大学毕业证文凭如何办理
k4krdgxx
 
一比一原版(UoN毕业证书)纽卡斯尔大学毕业证如何办理
一比一原版(UoN毕业证书)纽卡斯尔大学毕业证如何办理一比一原版(UoN毕业证书)纽卡斯尔大学毕业证如何办理
一比一原版(UoN毕业证书)纽卡斯尔大学毕业证如何办理
f22b6g9c
 
一比一原版(CSUEB毕业证)美国加州州立大学东湾分校毕业证如何办理
一比一原版(CSUEB毕业证)美国加州州立大学东湾分校毕业证如何办理一比一原版(CSUEB毕业证)美国加州州立大学东湾分校毕业证如何办理
一比一原版(CSUEB毕业证)美国加州州立大学东湾分校毕业证如何办理
stgq9v39
 
一比一原版英国伦敦政治经济学院毕业证(LSE学位证)如何办理
一比一原版英国伦敦政治经济学院毕业证(LSE学位证)如何办理一比一原版英国伦敦政治经济学院毕业证(LSE学位证)如何办理
一比一原版英国伦敦政治经济学院毕业证(LSE学位证)如何办理
k4krdgxx
 
一比一原版(UoB毕业证)英国伯明翰大学毕业证如何办理
一比一原版(UoB毕业证)英国伯明翰大学毕业证如何办理一比一原版(UoB毕业证)英国伯明翰大学毕业证如何办理
一比一原版(UoB毕业证)英国伯明翰大学毕业证如何办理
zv943dhb
 
一比一原版(McGill毕业证)加拿大麦吉尔大学毕业证如何办理
一比一原版(McGill毕业证)加拿大麦吉尔大学毕业证如何办理一比一原版(McGill毕业证)加拿大麦吉尔大学毕业证如何办理
一比一原版(McGill毕业证)加拿大麦吉尔大学毕业证如何办理
w26izoeb
 
一比一原版美国加州大学欧文分校毕业证(UCI学位证)如何办理
一比一原版美国加州大学欧文分校毕业证(UCI学位证)如何办理一比一原版美国加州大学欧文分校毕业证(UCI学位证)如何办理
一比一原版美国加州大学欧文分校毕业证(UCI学位证)如何办理
02tygie
 
一比一原版(brunel毕业证书)布鲁内尔大学毕业证如何办理
一比一原版(brunel毕业证书)布鲁内尔大学毕业证如何办理一比一原版(brunel毕业证书)布鲁内尔大学毕业证如何办理
一比一原版(brunel毕业证书)布鲁内尔大学毕业证如何办理
aprhf21y
 
欧洲杯足彩-欧洲杯足彩比赛投注-欧洲杯足彩比赛投注官网|【​网址​🎉ac10.net🎉​】
欧洲杯足彩-欧洲杯足彩比赛投注-欧洲杯足彩比赛投注官网|【​网址​🎉ac10.net🎉​】欧洲杯足彩-欧洲杯足彩比赛投注-欧洲杯足彩比赛投注官网|【​网址​🎉ac10.net🎉​】
欧洲杯足彩-欧洲杯足彩比赛投注-欧洲杯足彩比赛投注官网|【​网址​🎉ac10.net🎉​】
bljeremy734
 
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
881evgn0
 
一比一原版(KPU毕业证)加拿大昆特兰理工大学毕业证如何办理
一比一原版(KPU毕业证)加拿大昆特兰理工大学毕业证如何办理一比一原版(KPU毕业证)加拿大昆特兰理工大学毕业证如何办理
一比一原版(KPU毕业证)加拿大昆特兰理工大学毕业证如何办理
kmzsy4kn
 
一比一原版(Rice毕业证)美国莱斯大学毕业证如何办理
一比一原版(Rice毕业证)美国莱斯大学毕业证如何办理一比一原版(Rice毕业证)美国莱斯大学毕业证如何办理
一比一原版(Rice毕业证)美国莱斯大学毕业证如何办理
oabn3692
 
一比一原版美国明尼苏达大学双城分校毕业证(UMTC学位证)如何办理
一比一原版美国明尼苏达大学双城分校毕业证(UMTC学位证)如何办理一比一原版美国明尼苏达大学双城分校毕业证(UMTC学位证)如何办理
一比一原版美国明尼苏达大学双城分校毕业证(UMTC学位证)如何办理
sf3cfttw
 
一比一原版(lu毕业证书)英国拉夫堡大学毕业证如何办理
一比一原版(lu毕业证书)英国拉夫堡大学毕业证如何办理一比一原版(lu毕业证书)英国拉夫堡大学毕业证如何办理
一比一原版(lu毕业证书)英国拉夫堡大学毕业证如何办理
ubogumo
 
一比一原版(OU毕业证)美国俄克拉荷马大学毕业证如何办理
一比一原版(OU毕业证)美国俄克拉荷马大学毕业证如何办理一比一原版(OU毕业证)美国俄克拉荷马大学毕业证如何办理
一比一原版(OU毕业证)美国俄克拉荷马大学毕业证如何办理
67n7f53
 
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
3vgr39kx
 

Recently uploaded (20)

UXpert_Report (UALR Mapping Renewal 2022).pdf
UXpert_Report (UALR Mapping Renewal 2022).pdfUXpert_Report (UALR Mapping Renewal 2022).pdf
UXpert_Report (UALR Mapping Renewal 2022).pdf
 
欧洲杯买球-欧洲杯买球买球网好的网站-欧洲杯买球哪里有正规的买球网站|【​网址​🎉ac123.net🎉​】
欧洲杯买球-欧洲杯买球买球网好的网站-欧洲杯买球哪里有正规的买球网站|【​网址​🎉ac123.net🎉​】欧洲杯买球-欧洲杯买球买球网好的网站-欧洲杯买球哪里有正规的买球网站|【​网址​🎉ac123.net🎉​】
欧洲杯买球-欧洲杯买球买球网好的网站-欧洲杯买球哪里有正规的买球网站|【​网址​🎉ac123.net🎉​】
 
一比一原版(UW毕业证书)华盛顿大学毕业证如何办理
一比一原版(UW毕业证书)华盛顿大学毕业证如何办理一比一原版(UW毕业证书)华盛顿大学毕业证如何办理
一比一原版(UW毕业证书)华盛顿大学毕业证如何办理
 
一比一原版(爱大毕业证)美国爱荷华大学毕业证如何办理
一比一原版(爱大毕业证)美国爱荷华大学毕业证如何办理一比一原版(爱大毕业证)美国爱荷华大学毕业证如何办理
一比一原版(爱大毕业证)美国爱荷华大学毕业证如何办理
 
一比一原版(Deakin毕业证书)澳洲迪肯大学毕业证文凭如何办理
一比一原版(Deakin毕业证书)澳洲迪肯大学毕业证文凭如何办理一比一原版(Deakin毕业证书)澳洲迪肯大学毕业证文凭如何办理
一比一原版(Deakin毕业证书)澳洲迪肯大学毕业证文凭如何办理
 
一比一原版(UoN毕业证书)纽卡斯尔大学毕业证如何办理
一比一原版(UoN毕业证书)纽卡斯尔大学毕业证如何办理一比一原版(UoN毕业证书)纽卡斯尔大学毕业证如何办理
一比一原版(UoN毕业证书)纽卡斯尔大学毕业证如何办理
 
一比一原版(CSUEB毕业证)美国加州州立大学东湾分校毕业证如何办理
一比一原版(CSUEB毕业证)美国加州州立大学东湾分校毕业证如何办理一比一原版(CSUEB毕业证)美国加州州立大学东湾分校毕业证如何办理
一比一原版(CSUEB毕业证)美国加州州立大学东湾分校毕业证如何办理
 
一比一原版英国伦敦政治经济学院毕业证(LSE学位证)如何办理
一比一原版英国伦敦政治经济学院毕业证(LSE学位证)如何办理一比一原版英国伦敦政治经济学院毕业证(LSE学位证)如何办理
一比一原版英国伦敦政治经济学院毕业证(LSE学位证)如何办理
 
一比一原版(UoB毕业证)英国伯明翰大学毕业证如何办理
一比一原版(UoB毕业证)英国伯明翰大学毕业证如何办理一比一原版(UoB毕业证)英国伯明翰大学毕业证如何办理
一比一原版(UoB毕业证)英国伯明翰大学毕业证如何办理
 
一比一原版(McGill毕业证)加拿大麦吉尔大学毕业证如何办理
一比一原版(McGill毕业证)加拿大麦吉尔大学毕业证如何办理一比一原版(McGill毕业证)加拿大麦吉尔大学毕业证如何办理
一比一原版(McGill毕业证)加拿大麦吉尔大学毕业证如何办理
 
一比一原版美国加州大学欧文分校毕业证(UCI学位证)如何办理
一比一原版美国加州大学欧文分校毕业证(UCI学位证)如何办理一比一原版美国加州大学欧文分校毕业证(UCI学位证)如何办理
一比一原版美国加州大学欧文分校毕业证(UCI学位证)如何办理
 
一比一原版(brunel毕业证书)布鲁内尔大学毕业证如何办理
一比一原版(brunel毕业证书)布鲁内尔大学毕业证如何办理一比一原版(brunel毕业证书)布鲁内尔大学毕业证如何办理
一比一原版(brunel毕业证书)布鲁内尔大学毕业证如何办理
 
欧洲杯足彩-欧洲杯足彩比赛投注-欧洲杯足彩比赛投注官网|【​网址​🎉ac10.net🎉​】
欧洲杯足彩-欧洲杯足彩比赛投注-欧洲杯足彩比赛投注官网|【​网址​🎉ac10.net🎉​】欧洲杯足彩-欧洲杯足彩比赛投注-欧洲杯足彩比赛投注官网|【​网址​🎉ac10.net🎉​】
欧洲杯足彩-欧洲杯足彩比赛投注-欧洲杯足彩比赛投注官网|【​网址​🎉ac10.net🎉​】
 
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
 
一比一原版(KPU毕业证)加拿大昆特兰理工大学毕业证如何办理
一比一原版(KPU毕业证)加拿大昆特兰理工大学毕业证如何办理一比一原版(KPU毕业证)加拿大昆特兰理工大学毕业证如何办理
一比一原版(KPU毕业证)加拿大昆特兰理工大学毕业证如何办理
 
一比一原版(Rice毕业证)美国莱斯大学毕业证如何办理
一比一原版(Rice毕业证)美国莱斯大学毕业证如何办理一比一原版(Rice毕业证)美国莱斯大学毕业证如何办理
一比一原版(Rice毕业证)美国莱斯大学毕业证如何办理
 
一比一原版美国明尼苏达大学双城分校毕业证(UMTC学位证)如何办理
一比一原版美国明尼苏达大学双城分校毕业证(UMTC学位证)如何办理一比一原版美国明尼苏达大学双城分校毕业证(UMTC学位证)如何办理
一比一原版美国明尼苏达大学双城分校毕业证(UMTC学位证)如何办理
 
一比一原版(lu毕业证书)英国拉夫堡大学毕业证如何办理
一比一原版(lu毕业证书)英国拉夫堡大学毕业证如何办理一比一原版(lu毕业证书)英国拉夫堡大学毕业证如何办理
一比一原版(lu毕业证书)英国拉夫堡大学毕业证如何办理
 
一比一原版(OU毕业证)美国俄克拉荷马大学毕业证如何办理
一比一原版(OU毕业证)美国俄克拉荷马大学毕业证如何办理一比一原版(OU毕业证)美国俄克拉荷马大学毕业证如何办理
一比一原版(OU毕业证)美国俄克拉荷马大学毕业证如何办理
 
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
 

Letting Go