One of the biggest HDPE Plant in Indonesia located at Cilegon, Banten Indonesia
experienced failures on two extruder screw shafts of 1-X-840 (extruder shaft #1) and
2-X-840 (extruder shaft #2).
Extruder Process Design Data
1. Feed Materials : HDPE or LLDPE
2. Feed Mat’l Melt Index: 0.1 to 50 (LLDPE 0.1 – 30; HDPE 5 to 50)
3. Feed Mat’l Water content: less than 700 ppm
4. Process Temperature: <240 C for LLDPE or <260 C for HDPE
5. Machine Capacity : 17.4 ton/h
6. Screw Speed : 224/156 rpm
7. Screw and Barrel : - Feed and Mixing Section 300 mm dia.
- Discharge Section 226 mm dia.
- Slot Clearance Adjustment 8 to 70 mm
- Operating Pressure : hopper cylinder 5 barg, others 4 barg
- Design Pressure: hopper cylinder 9 barg, others 6 barg
Extruder Zone
Broken Area at
Kneading zone
Fracture
surface
2
• Multiple crack origins
• Initiation 1 created a
stable crack
• Initiation 2 did not
create a stable crack
2
Extruder screw shaft #1 Extruder screw shaft #2
Extruder Operational Data and Failure History
1. Installation date : 1991
2. Both extruder were used to extrude Polyethylene with similar operational data history.
3. Processing temp. : Below 240 C
4. 1991 – 1998 : 15 - 16 ton/hour operating capacity
5. 1998 : Modification on kneading screw
6. 1998 – 2002 : Low operating capacity
7. 2003 – 2006 : Idle, not operated
8. 2006 – current : 21 ton/hour operating capacity
9. 2008 – 2009 : Barrel temp. inverter was in troubled
10. 2009 : Indication of vibration increased, Gland packing leakage
11. 2009 : Shaft gear pump coupling was broken (extruder #1)
12. 2010 : The temperature inverter problem was solved.
13. 2010 : Trial of HMW-PE on both extruder, very low MFI (0.02 up to 0.05)
14. 9 April 2010 : Extruder shaft #1 was failed, Broken shafts were on the right side of the
extruder (from motor view), After replacement, the gear box was broken
15. 2010 : The original screw was re-installed after the extruder shaft #1 was broken.
16. 9 Mei 2011 : Extruder shaft #2 was failed, Broken shafts were on the right side of the
extruder (from motor view)
 The failure point of the two extruder shaft #1 and #2 was located
before kneading/mixing zone, where the high pressure of
polyethylene melt was built up and high bending moment on shaft
was exist.
 Visual examination and SEM data strongly indicates a strong
contribution of fatigue bending moment failure with large
propagation area and minor contribution of torsion fatigue.
 Crack initiation sites on both extruder shafts have multiple crack
origins, although only one crack origin developed a stable crack and
propagated through shaft cross section and developed large
propagation area.
 Large propagation area indicated the applied stress after crack
initiation was considerably low. The crack initiation was likely
occurred when the loading was not distributed evenly to all
hexagonal surfaces and during overload period.
Physical Cause :
• The concentrated load was only possible when the fitness between shaft
surface to inner hexagonal surface of the screw is not zero clearance.
Non zero clearance will cause inhomogeneity contact between both surfaces;
the torsion moment has not been transmitted homogeneously to all
hexagonal surfaces but only been transmitted through the hexagonal shaft
corner.
Human Cause :
• The root cause of 1-X-840 and 2-X-840 extruder shaft failure was due to
fatigue failure initiated by domination of concentrated load on hexagonal shaft
surface during overload period.
Design Machine Capacity 17.4 ton/h
Historical, Machine in could be running at 21 ton/h
• Start and stop operation mode of this machine might contributed to increase
fatigue cycle.
Latent Cause :
• Inadequate procedure that allows operation of the machine above design
capacity & excessive start-stop mode.
Thank You

More Related Content

What's hot

Lab 5 measurement of gel strength of drilling mud by viscometer.
Lab 5 measurement of gel strength of drilling mud by viscometer.Lab 5 measurement of gel strength of drilling mud by viscometer.
Lab 5 measurement of gel strength of drilling mud by viscometer.
Awais Qureshi
 
Liner hanger design and operations
Liner hanger design and operationsLiner hanger design and operations
Liner hanger design and operations
Abdulkadir Tekin
 
Rocker arm for vertical mill
Rocker arm for vertical millRocker arm for vertical mill
Rocker arm for vertical mill
Iris Han
 
ACT Tools
ACT Tools ACT Tools
Plug & Abandonment
Plug & AbandonmentPlug & Abandonment
Plug & AbandonmentStatoil
 
Well completion
Well completionWell completion
Completion equipment packer part #1
Completion equipment packer part #1Completion equipment packer part #1
Completion equipment packer part #1
Elsayed Amer
 
Packers
PackersPackers
Planetary Mixer, High Shear Mixer Granulator, Plough Shear Mixer
Planetary Mixer, High Shear Mixer Granulator, Plough Shear MixerPlanetary Mixer, High Shear Mixer Granulator, Plough Shear Mixer
Planetary Mixer, High Shear Mixer Granulator, Plough Shear Mixer
VM Sethi
 
Tubing string
Tubing stringTubing string
Tubing string
Elsayed Amer
 
Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1
Elsayed Amer
 
Impact crusher used in the coal industry
Impact crusher used in the coal industryImpact crusher used in the coal industry
Impact crusher used in the coal industry
smilewei005
 
perforated joint, flow coupling and blast joint
perforated joint, flow coupling and blast jointperforated joint, flow coupling and blast joint
perforated joint, flow coupling and blast joint
Elsayed Amer
 
Production packer
Production packerProduction packer
Production packer
Elsayed Amer
 
10 Well Abandonment Presentation Jan 29
10 Well Abandonment Presentation Jan 2910 Well Abandonment Presentation Jan 29
10 Well Abandonment Presentation Jan 29Will Butler, P.Eng
 
02 wireline
02 wireline02 wireline
02 wirelineJohan RC
 
Well completion techniques
Well completion techniquesWell completion techniques
Well completion techniques
velMurugan260
 

What's hot (19)

IntegraLine Brochure
IntegraLine BrochureIntegraLine Brochure
IntegraLine Brochure
 
Lab 5 measurement of gel strength of drilling mud by viscometer.
Lab 5 measurement of gel strength of drilling mud by viscometer.Lab 5 measurement of gel strength of drilling mud by viscometer.
Lab 5 measurement of gel strength of drilling mud by viscometer.
 
Liner hanger design and operations
Liner hanger design and operationsLiner hanger design and operations
Liner hanger design and operations
 
Rocker arm for vertical mill
Rocker arm for vertical millRocker arm for vertical mill
Rocker arm for vertical mill
 
ACT Tools
ACT Tools ACT Tools
ACT Tools
 
Plug & Abandonment
Plug & AbandonmentPlug & Abandonment
Plug & Abandonment
 
Well completion
Well completionWell completion
Well completion
 
Completion equipment packer part #1
Completion equipment packer part #1Completion equipment packer part #1
Completion equipment packer part #1
 
Packers
PackersPackers
Packers
 
intoduction
intoductionintoduction
intoduction
 
Planetary Mixer, High Shear Mixer Granulator, Plough Shear Mixer
Planetary Mixer, High Shear Mixer Granulator, Plough Shear MixerPlanetary Mixer, High Shear Mixer Granulator, Plough Shear Mixer
Planetary Mixer, High Shear Mixer Granulator, Plough Shear Mixer
 
Tubing string
Tubing stringTubing string
Tubing string
 
Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1
 
Impact crusher used in the coal industry
Impact crusher used in the coal industryImpact crusher used in the coal industry
Impact crusher used in the coal industry
 
perforated joint, flow coupling and blast joint
perforated joint, flow coupling and blast jointperforated joint, flow coupling and blast joint
perforated joint, flow coupling and blast joint
 
Production packer
Production packerProduction packer
Production packer
 
10 Well Abandonment Presentation Jan 29
10 Well Abandonment Presentation Jan 2910 Well Abandonment Presentation Jan 29
10 Well Abandonment Presentation Jan 29
 
02 wireline
02 wireline02 wireline
02 wireline
 
Well completion techniques
Well completion techniquesWell completion techniques
Well completion techniques
 

Similar to Lesson learn from_petrochemical_plant rev1

Bhel presentation
 Bhel presentation Bhel presentation
Bhel presentation
Ishant Gautam.
 
Turbine design need of the hour
Turbine design need of the hourTurbine design need of the hour
Turbine design need of the hour
Udhayakumar Venkataraman
 
The general tyre and rubber company
The general tyre and rubber companyThe general tyre and rubber company
The general tyre and rubber company
Raza Jahangir
 
IRJET- Development and Analysis of Special Purpose Machine (Peck Drilling Mac...
IRJET- Development and Analysis of Special Purpose Machine (Peck Drilling Mac...IRJET- Development and Analysis of Special Purpose Machine (Peck Drilling Mac...
IRJET- Development and Analysis of Special Purpose Machine (Peck Drilling Mac...
IRJET Journal
 
Development of Process for Replacement of Mill Roller
Development of Process for Replacement of Mill RollerDevelopment of Process for Replacement of Mill Roller
Development of Process for Replacement of Mill Roller
IRJET Journal
 
BWEL Project Report
BWEL Project ReportBWEL Project Report
BWEL Project ReportASHISH KUMAR
 
Faults Analysis and Reliability Improvement of Pot Motor
Faults Analysis and Reliability Improvement of Pot MotorFaults Analysis and Reliability Improvement of Pot Motor
Faults Analysis and Reliability Improvement of Pot Motor
IRJET Journal
 
small-hole-edm-manual.pdf
small-hole-edm-manual.pdfsmall-hole-edm-manual.pdf
small-hole-edm-manual.pdf
Robin Yu
 
Core plugging test
Core plugging test   Core plugging test
Core plugging test
Bakhtiar Mahmood
 
Field Failure Analysis of DTH Hammer Bit
Field Failure Analysis of DTH Hammer BitField Failure Analysis of DTH Hammer Bit
Field Failure Analysis of DTH Hammer Bit
IRJET Journal
 
Report about the repairation of the Raw mill Slide Ring and shell (Modificat...
Report about the repairation of the Raw mill Slide Ring and  shell (Modificat...Report about the repairation of the Raw mill Slide Ring and  shell (Modificat...
Report about the repairation of the Raw mill Slide Ring and shell (Modificat...Moaz Emad gaber
 
Design and development of a tool
Design and development of a toolDesign and development of a tool
Design and development of a tool
PurushothamPulivarth
 
Intelligent PdM Horizontal Vibration Centrifuge-ALPHA
Intelligent PdM Horizontal Vibration Centrifuge-ALPHAIntelligent PdM Horizontal Vibration Centrifuge-ALPHA
Intelligent PdM Horizontal Vibration Centrifuge-ALPHA
Kyle Lee
 
Superbolt Applications for Power Plants
Superbolt Applications for Power PlantsSuperbolt Applications for Power Plants
Superbolt Applications for Power Plants
Cliff Fong
 
Report steffones
Report steffonesReport steffones
Report steffones
Steffones K
 
Failure Mode Analysis Of Torsion Shaft In Garrett-5 Engine Using Two Test Pieces
Failure Mode Analysis Of Torsion Shaft In Garrett-5 Engine Using Two Test PiecesFailure Mode Analysis Of Torsion Shaft In Garrett-5 Engine Using Two Test Pieces
Failure Mode Analysis Of Torsion Shaft In Garrett-5 Engine Using Two Test Pieces
IJERA Editor
 
Mizztech slurry pump profile in English
Mizztech slurry pump profile in EnglishMizztech slurry pump profile in English
Mizztech slurry pump profile in English
Charles Cheng
 

Similar to Lesson learn from_petrochemical_plant rev1 (20)

Bhel presentation
 Bhel presentation Bhel presentation
Bhel presentation
 
Turbine design need of the hour
Turbine design need of the hourTurbine design need of the hour
Turbine design need of the hour
 
The general tyre and rubber company
The general tyre and rubber companyThe general tyre and rubber company
The general tyre and rubber company
 
SPE 147856
SPE 147856SPE 147856
SPE 147856
 
IRJET- Development and Analysis of Special Purpose Machine (Peck Drilling Mac...
IRJET- Development and Analysis of Special Purpose Machine (Peck Drilling Mac...IRJET- Development and Analysis of Special Purpose Machine (Peck Drilling Mac...
IRJET- Development and Analysis of Special Purpose Machine (Peck Drilling Mac...
 
SPE 134239
SPE 134239SPE 134239
SPE 134239
 
Development of Process for Replacement of Mill Roller
Development of Process for Replacement of Mill RollerDevelopment of Process for Replacement of Mill Roller
Development of Process for Replacement of Mill Roller
 
BWEL Project Report
BWEL Project ReportBWEL Project Report
BWEL Project Report
 
Faults Analysis and Reliability Improvement of Pot Motor
Faults Analysis and Reliability Improvement of Pot MotorFaults Analysis and Reliability Improvement of Pot Motor
Faults Analysis and Reliability Improvement of Pot Motor
 
small-hole-edm-manual.pdf
small-hole-edm-manual.pdfsmall-hole-edm-manual.pdf
small-hole-edm-manual.pdf
 
Core plugging test
Core plugging test   Core plugging test
Core plugging test
 
Field Failure Analysis of DTH Hammer Bit
Field Failure Analysis of DTH Hammer BitField Failure Analysis of DTH Hammer Bit
Field Failure Analysis of DTH Hammer Bit
 
Report about the repairation of the Raw mill Slide Ring and shell (Modificat...
Report about the repairation of the Raw mill Slide Ring and  shell (Modificat...Report about the repairation of the Raw mill Slide Ring and  shell (Modificat...
Report about the repairation of the Raw mill Slide Ring and shell (Modificat...
 
Design and development of a tool
Design and development of a toolDesign and development of a tool
Design and development of a tool
 
Intelligent PdM Horizontal Vibration Centrifuge-ALPHA
Intelligent PdM Horizontal Vibration Centrifuge-ALPHAIntelligent PdM Horizontal Vibration Centrifuge-ALPHA
Intelligent PdM Horizontal Vibration Centrifuge-ALPHA
 
Superbolt Applications for Power Plants
Superbolt Applications for Power PlantsSuperbolt Applications for Power Plants
Superbolt Applications for Power Plants
 
Report steffones
Report steffonesReport steffones
Report steffones
 
R4805114117
R4805114117R4805114117
R4805114117
 
Failure Mode Analysis Of Torsion Shaft In Garrett-5 Engine Using Two Test Pieces
Failure Mode Analysis Of Torsion Shaft In Garrett-5 Engine Using Two Test PiecesFailure Mode Analysis Of Torsion Shaft In Garrett-5 Engine Using Two Test Pieces
Failure Mode Analysis Of Torsion Shaft In Garrett-5 Engine Using Two Test Pieces
 
Mizztech slurry pump profile in English
Mizztech slurry pump profile in EnglishMizztech slurry pump profile in English
Mizztech slurry pump profile in English
 

Recently uploaded

bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
Divyam548318
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
AIR POLLUTION lecture EnE203 updated.pdf
AIR POLLUTION lecture EnE203 updated.pdfAIR POLLUTION lecture EnE203 updated.pdf
AIR POLLUTION lecture EnE203 updated.pdf
RicletoEspinosa1
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
obonagu
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
heavyhaig
 
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.pptPROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
bhadouriyakaku
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
Mukeshwaran Balu
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
ssuser7dcef0
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
Kamal Acharya
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 

Recently uploaded (20)

bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
AIR POLLUTION lecture EnE203 updated.pdf
AIR POLLUTION lecture EnE203 updated.pdfAIR POLLUTION lecture EnE203 updated.pdf
AIR POLLUTION lecture EnE203 updated.pdf
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
 
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.pptPROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 

Lesson learn from_petrochemical_plant rev1

  • 2. One of the biggest HDPE Plant in Indonesia located at Cilegon, Banten Indonesia experienced failures on two extruder screw shafts of 1-X-840 (extruder shaft #1) and 2-X-840 (extruder shaft #2).
  • 3. Extruder Process Design Data 1. Feed Materials : HDPE or LLDPE 2. Feed Mat’l Melt Index: 0.1 to 50 (LLDPE 0.1 – 30; HDPE 5 to 50) 3. Feed Mat’l Water content: less than 700 ppm 4. Process Temperature: <240 C for LLDPE or <260 C for HDPE 5. Machine Capacity : 17.4 ton/h 6. Screw Speed : 224/156 rpm 7. Screw and Barrel : - Feed and Mixing Section 300 mm dia. - Discharge Section 226 mm dia. - Slot Clearance Adjustment 8 to 70 mm - Operating Pressure : hopper cylinder 5 barg, others 4 barg - Design Pressure: hopper cylinder 9 barg, others 6 barg
  • 4. Extruder Zone Broken Area at Kneading zone
  • 5. Fracture surface 2 • Multiple crack origins • Initiation 1 created a stable crack • Initiation 2 did not create a stable crack 2
  • 6. Extruder screw shaft #1 Extruder screw shaft #2
  • 7. Extruder Operational Data and Failure History 1. Installation date : 1991 2. Both extruder were used to extrude Polyethylene with similar operational data history. 3. Processing temp. : Below 240 C 4. 1991 – 1998 : 15 - 16 ton/hour operating capacity 5. 1998 : Modification on kneading screw 6. 1998 – 2002 : Low operating capacity 7. 2003 – 2006 : Idle, not operated 8. 2006 – current : 21 ton/hour operating capacity 9. 2008 – 2009 : Barrel temp. inverter was in troubled 10. 2009 : Indication of vibration increased, Gland packing leakage 11. 2009 : Shaft gear pump coupling was broken (extruder #1) 12. 2010 : The temperature inverter problem was solved. 13. 2010 : Trial of HMW-PE on both extruder, very low MFI (0.02 up to 0.05) 14. 9 April 2010 : Extruder shaft #1 was failed, Broken shafts were on the right side of the extruder (from motor view), After replacement, the gear box was broken 15. 2010 : The original screw was re-installed after the extruder shaft #1 was broken. 16. 9 Mei 2011 : Extruder shaft #2 was failed, Broken shafts were on the right side of the extruder (from motor view)
  • 8.  The failure point of the two extruder shaft #1 and #2 was located before kneading/mixing zone, where the high pressure of polyethylene melt was built up and high bending moment on shaft was exist.  Visual examination and SEM data strongly indicates a strong contribution of fatigue bending moment failure with large propagation area and minor contribution of torsion fatigue.  Crack initiation sites on both extruder shafts have multiple crack origins, although only one crack origin developed a stable crack and propagated through shaft cross section and developed large propagation area.  Large propagation area indicated the applied stress after crack initiation was considerably low. The crack initiation was likely occurred when the loading was not distributed evenly to all hexagonal surfaces and during overload period.
  • 9. Physical Cause : • The concentrated load was only possible when the fitness between shaft surface to inner hexagonal surface of the screw is not zero clearance. Non zero clearance will cause inhomogeneity contact between both surfaces; the torsion moment has not been transmitted homogeneously to all hexagonal surfaces but only been transmitted through the hexagonal shaft corner. Human Cause : • The root cause of 1-X-840 and 2-X-840 extruder shaft failure was due to fatigue failure initiated by domination of concentrated load on hexagonal shaft surface during overload period. Design Machine Capacity 17.4 ton/h Historical, Machine in could be running at 21 ton/h • Start and stop operation mode of this machine might contributed to increase fatigue cycle. Latent Cause : • Inadequate procedure that allows operation of the machine above design capacity & excessive start-stop mode.