Topic list
  Choosing a project
  Developing research questions
  Writing the proposal
  Promoting your proposal
  Quantitative and Qualitative Methods
  Research Design



                                                                            2
             College of Computer Science & Engineering, Taibah University




                                                                                1
Choosing a Project
 Establish a good rationale for the project.
 Make sure the key variables are in the
 proposal.
 Does the project answer the proposed
 questions
 Are the research objectives feasible?
 Are the questions novel? Interesting?
 Useful?
 Is the scope of the study well focused?
 Is it ethical to ask these research
 questions?
                                                                         3
          College of Computer Science & Engineering, Taibah University




Writing the Proposal

 Background
 Objectives (research questions)
 Research Plan (inclusion/exclusion)
 Methodology
 Scope of research




                                                                         4
          College of Computer Science & Engineering, Taibah University




                                                                             2
Project Background
Managing relationships for project success is
acknowledged as being as important as the ‘hard’ skills
of managing schedules and budgets
The Project Manager’s accountabilities include
relationship management (Stakeholder Management)
A project’s stakeholder set does not remain static
throughout the project and needs to be identified,
tracked and managed appropriately throughout the
project lifecycle
 In large organisations today, many projects have team
members from many different organisations. Teams
consist of staff, contractors, and staff of other
organisations
                                                                          5
           College of Computer Science & Engineering, Taibah University




 The Problem

 How can a project manager ensure all
 stakeholders are identified and assessed for
 importance to the project
 How can the Project Manager fulfil
 responsibilities in:
    Inspired leadership
    Relationship (stakeholder) management
    Knowledge management
    Human Resource management
                                                                          6
           College of Computer Science & Engineering, Taibah University




                                                                              3
Objectives
 Main objective:
    To identify ways to improve the building
    and maintaining of sustainable project
    relationships for project success.
 Sub-objectives:
    To determine the effectiveness of a
    visualisation tool for stakeholder
    management.


                                                                        7
         College of Computer Science & Engineering, Taibah University




Preliminary Questions
 What is the specific question? Is the idea
 novel?
 Do your resources (i.e. facilities,
 equipment personnel, patient population,
 time, motivation) make this a realistic
 project for your centre at this time?
 Is the answer of sufficient importance?
 Is the funding appropriate?

                                                                        8
         College of Computer Science & Engineering, Taibah University




                                                                            4
Initial Steps
  Do a thorough literature search
  Enlist support of Supervisor / Mentor and
  Collaborators
  Meet to devise a research protocol
  When you approach prospective
  collaborators remember that their
  enthusiasm will be proportional to their
  anticipated gain (mentorship, authorship,
  equipment, resources)
                                                                          9
           College of Computer Science & Engineering, Taibah University




The Mentor
  Role Model
  Support and Encouragement moral –
     financial
    resources
  Your Mentor’s Rewards
  Your successes
  For any aspect of the proposal that you
  can not accomplish by yourself you must
  establish the fact that you have the
  necessary collaborations to succeed
                                                                          10
           College of Computer Science & Engineering, Taibah University




                                                                               5
Collaborators
Role:
 Share work
 Provide essential
    Knowledge
    Skills
    Resources
  Collaborators’ Rewards
    Funding or equipment
    Co-authorship
  You must convince the reviewers that
    your research is important!

                                                                           11
            College of Computer Science & Engineering, Taibah University




Promoting your proposal
  The Title: Make it specific and captivating
  Hypothesis: Should be clearly stated in
  one or two sentences. Do not make
  reviewers look for it.
  Objective:
    Define one or two specific objectives
    Do not try to answer too many questions
    (most important problems are answered one
    question at a time)

                                                                           12
            College of Computer Science & Engineering, Taibah University




                                                                                6
Proposal Evaluation Criteria
  How well does the Title introduce the study?
  This criterion is not formally rated, but it is
  considered in the overall evaluation process.
  How well does the Abstract describe the
  research study?
  Are the Research Questions adequately
  defined?
  Does the Rationale justify the purpose for the
  study and/or place it within the context of current
  theory and practice?


                                                                           13
            College of Computer Science & Engineering, Taibah University




Evaluation Criteria (cont…)
  Is the Methodology clearly described and well
  matched to the research questions?
  Is the Analysis of Data adequately described, or
  a plan of analysis is presented, if the study is in
  progress.
  Are the Findings clearly identified?
  Are the Implications for future research,
  classroom practices, or policy discussed?
  The methodology used should be appropriate for
  the research identified questions; inappropriate
  methodology often results in the rejection of the
  proposal.

                                                                           14
            College of Computer Science & Engineering, Taibah University




                                                                                7
Factors to Consider cont.

  In the methodology section, carefully describe
  the sample characteristics, the measures
  employed in the study, and the relevant
  procedures.
  The proposal must make sense to the
  reviewers.
  If your research is “in progress” make sure
  that you state this and provide a brief timeline
  for completion.



                                                                          15
           College of Computer Science & Engineering, Taibah University




Background
 Your opportunity to convince the reviewers that
 you are up-to-date and conversant in your field
 of enquiry
 Concise, thorough, well referenced review
 Preliminary data may strengthen your proposal
 Should lead to the logical conclusion that your
 proposed question needs to be answered
 Preliminary data often allow you to take a little
 idea and get funding to turn it into a big project


                                                                          16
           College of Computer Science & Engineering, Taibah University




                                                                               8
Research Methods
  Deductive Approach
     testing theory through observation and data
  Exploratory Study
     Purposive, self-selection sampling
  Longitudinal
      projects must be around 6 months in length
  In-depth interviews at beginning and end with PM
  Group interviews with key team members
  Self-completion diaries
     to track issues and changes in stakeholder
     relationships with project

                                                                          17
           College of Computer Science & Engineering, Taibah University




Full References
 Include full reference - Author, title, vol.,
 pages, year
 Chosen for their critical thinking ability
 and will seldom accept a statement
 contrary to their own perception without
 determining your source of information




                                                                          18
           College of Computer Science & Engineering, Taibah University




                                                                               9
Research Design
 Describe
 Facilities and resources
 Methodology
 Data management
 Statistical analysis




                                                                                 19
            College of Computer Science & Engineering, Taibah University




Quantitative and Qualitative Methods
 Quantitative Methods                                  Qualitative Methods
 Preference for statistical                           Preference for narrative
 summary of results.                                  summary of results.
 Preference for breaking                              Preference for holistic
 down of complex                                      description of complex
 phenomena into specific                              phenomena.
 parts for analysis.                                  Unwillingness to tamper
 Willingness to manipulate                            with naturally occurring
 aspects, situations, or                              phenomena.
 conditions in studying
 complex phenomena.



                                                                                 20
            College of Computer Science & Engineering, Taibah University




                                                                                      10
Quantitative and Qualitative Methods
  Quantitative Methods                                  Qualitative Methods
 Preferences for precise                               Preference for
 hypotheses and                                        hypotheses and
 definitions stated at the                             definitions that emerge as
 outset.                                               study develops.
 Data reduced to                                       Data are typically
 numerical scores.                                     narrative descriptions.
 Major focus on assessing                              Reliability of inferences is
 and improving reliability                             often assumed to be
 of scores obtained from                               adequate.
 instruments.                                          Validity is assessed
 Assessment of validity                                through cross-checking
 with reliance on statistical                          sources of information
 indices.                                              (triangulation).
                                                                                  21
              College of Computer Science & Engineering, Taibah University




Quantitative and Qualitative Methods (cont….)
  Quantitative Methods                                 Qualitative Methods
 Preference for random                              Preference for expert
 techniques for obtaining                           informant (purposive)
 meaningful samples.                                sample.
 Preference for precise                             Preference for
                                                    narrative/literary
 descriptions of procedures.                        descriptions of procedures.
 Preference for design or                           Preference for logical
 statistical control of                             analysis in controlling or
 extraneous variables.                              accounting for extraneous
 Preference for specific                            variables.
 design control for                                 Primary reliance on
 procedural bias                                    researcher to deal with
 (procedural and                                    procedural bias (yet,
                                                    integrity checks are still
 measurement integrity                              critical).
 checks).
                                                                                  22
              College of Computer Science & Engineering, Taibah University




                                                                                       11
Ethical issues
  Privacy
  Intellectual Property
  Confidentiality
  Reference - Author, title, vol., pages, year
  Other issues




                                                                                 23
                  College of Computer Science & Engineering, Taibah University




Research Method Timeframe example

                                     Day 1

 Research Project

 Develop Research Proposal
 and obtain approval
 Develop and test questions
 Develop and test tool
 Obtain participants
 Administer instrument(s)
 Ongoing data collection and analysis

 Final collection of data


 Research Report

                                                                                 24
                  College of Computer Science & Engineering, Taibah University




                                                                                      12
Reference
 J. Fraenkel & N. Wallen (1996), How to design and
 evaluate research in education (3rd Ed.). New York:
 McGraw-Hill, Inc., p. 442.
 N. J. Salkind, Exploring Research, 1998, Pearson
 Education, UK.
 BPP, Information Systems, Study Text, Paper 2.1,
 BPP Professional Education, United Kingdom
 Mohammad Alsuraihi, Technical Writing, CS212
 Course notes, Taibah University, Madinah, KSA
 Abdisalam Issa-Salwe, Teaching Course Notes,
 Taibah University, Madinah, KSA


                                                                          25
           College of Computer Science & Engineering, Taibah University




                                                                               13

Lecture4 (cs351) (research proposal)

  • 1.
    Lecture 4 Research Proposal (Technical Writing CS212) Abdisalam Issa-Salwe Taibah University College of Computer Science & Engineering Computer Science Department 1 Topic list Choosing a project Developing research questions Writing the proposal Promoting your proposal Quantitative and Qualitative Methods Research Design 2 College of Computer Science & Engineering, Taibah University 1
  • 2.
    Choosing a Project Establish a good rationale for the project. Make sure the key variables are in the proposal. Does the project answer the proposed questions Are the research objectives feasible? Are the questions novel? Interesting? Useful? Is the scope of the study well focused? Is it ethical to ask these research questions? 3 College of Computer Science & Engineering, Taibah University Writing the Proposal Background Objectives (research questions) Research Plan (inclusion/exclusion) Methodology Scope of research 4 College of Computer Science & Engineering, Taibah University 2
  • 3.
    Project Background Managing relationshipsfor project success is acknowledged as being as important as the ‘hard’ skills of managing schedules and budgets The Project Manager’s accountabilities include relationship management (Stakeholder Management) A project’s stakeholder set does not remain static throughout the project and needs to be identified, tracked and managed appropriately throughout the project lifecycle In large organisations today, many projects have team members from many different organisations. Teams consist of staff, contractors, and staff of other organisations 5 College of Computer Science & Engineering, Taibah University The Problem How can a project manager ensure all stakeholders are identified and assessed for importance to the project How can the Project Manager fulfil responsibilities in: Inspired leadership Relationship (stakeholder) management Knowledge management Human Resource management 6 College of Computer Science & Engineering, Taibah University 3
  • 4.
    Objectives Main objective: To identify ways to improve the building and maintaining of sustainable project relationships for project success. Sub-objectives: To determine the effectiveness of a visualisation tool for stakeholder management. 7 College of Computer Science & Engineering, Taibah University Preliminary Questions What is the specific question? Is the idea novel? Do your resources (i.e. facilities, equipment personnel, patient population, time, motivation) make this a realistic project for your centre at this time? Is the answer of sufficient importance? Is the funding appropriate? 8 College of Computer Science & Engineering, Taibah University 4
  • 5.
    Initial Steps Do a thorough literature search Enlist support of Supervisor / Mentor and Collaborators Meet to devise a research protocol When you approach prospective collaborators remember that their enthusiasm will be proportional to their anticipated gain (mentorship, authorship, equipment, resources) 9 College of Computer Science & Engineering, Taibah University The Mentor Role Model Support and Encouragement moral – financial resources Your Mentor’s Rewards Your successes For any aspect of the proposal that you can not accomplish by yourself you must establish the fact that you have the necessary collaborations to succeed 10 College of Computer Science & Engineering, Taibah University 5
  • 6.
    Collaborators Role: Share work Provide essential Knowledge Skills Resources Collaborators’ Rewards Funding or equipment Co-authorship You must convince the reviewers that your research is important! 11 College of Computer Science & Engineering, Taibah University Promoting your proposal The Title: Make it specific and captivating Hypothesis: Should be clearly stated in one or two sentences. Do not make reviewers look for it. Objective: Define one or two specific objectives Do not try to answer too many questions (most important problems are answered one question at a time) 12 College of Computer Science & Engineering, Taibah University 6
  • 7.
    Proposal Evaluation Criteria How well does the Title introduce the study? This criterion is not formally rated, but it is considered in the overall evaluation process. How well does the Abstract describe the research study? Are the Research Questions adequately defined? Does the Rationale justify the purpose for the study and/or place it within the context of current theory and practice? 13 College of Computer Science & Engineering, Taibah University Evaluation Criteria (cont…) Is the Methodology clearly described and well matched to the research questions? Is the Analysis of Data adequately described, or a plan of analysis is presented, if the study is in progress. Are the Findings clearly identified? Are the Implications for future research, classroom practices, or policy discussed? The methodology used should be appropriate for the research identified questions; inappropriate methodology often results in the rejection of the proposal. 14 College of Computer Science & Engineering, Taibah University 7
  • 8.
    Factors to Considercont. In the methodology section, carefully describe the sample characteristics, the measures employed in the study, and the relevant procedures. The proposal must make sense to the reviewers. If your research is “in progress” make sure that you state this and provide a brief timeline for completion. 15 College of Computer Science & Engineering, Taibah University Background Your opportunity to convince the reviewers that you are up-to-date and conversant in your field of enquiry Concise, thorough, well referenced review Preliminary data may strengthen your proposal Should lead to the logical conclusion that your proposed question needs to be answered Preliminary data often allow you to take a little idea and get funding to turn it into a big project 16 College of Computer Science & Engineering, Taibah University 8
  • 9.
    Research Methods Deductive Approach testing theory through observation and data Exploratory Study Purposive, self-selection sampling Longitudinal projects must be around 6 months in length In-depth interviews at beginning and end with PM Group interviews with key team members Self-completion diaries to track issues and changes in stakeholder relationships with project 17 College of Computer Science & Engineering, Taibah University Full References Include full reference - Author, title, vol., pages, year Chosen for their critical thinking ability and will seldom accept a statement contrary to their own perception without determining your source of information 18 College of Computer Science & Engineering, Taibah University 9
  • 10.
    Research Design Describe Facilities and resources Methodology Data management Statistical analysis 19 College of Computer Science & Engineering, Taibah University Quantitative and Qualitative Methods Quantitative Methods Qualitative Methods Preference for statistical Preference for narrative summary of results. summary of results. Preference for breaking Preference for holistic down of complex description of complex phenomena into specific phenomena. parts for analysis. Unwillingness to tamper Willingness to manipulate with naturally occurring aspects, situations, or phenomena. conditions in studying complex phenomena. 20 College of Computer Science & Engineering, Taibah University 10
  • 11.
    Quantitative and QualitativeMethods Quantitative Methods Qualitative Methods Preferences for precise Preference for hypotheses and hypotheses and definitions stated at the definitions that emerge as outset. study develops. Data reduced to Data are typically numerical scores. narrative descriptions. Major focus on assessing Reliability of inferences is and improving reliability often assumed to be of scores obtained from adequate. instruments. Validity is assessed Assessment of validity through cross-checking with reliance on statistical sources of information indices. (triangulation). 21 College of Computer Science & Engineering, Taibah University Quantitative and Qualitative Methods (cont….) Quantitative Methods Qualitative Methods Preference for random Preference for expert techniques for obtaining informant (purposive) meaningful samples. sample. Preference for precise Preference for narrative/literary descriptions of procedures. descriptions of procedures. Preference for design or Preference for logical statistical control of analysis in controlling or extraneous variables. accounting for extraneous Preference for specific variables. design control for Primary reliance on procedural bias researcher to deal with (procedural and procedural bias (yet, integrity checks are still measurement integrity critical). checks). 22 College of Computer Science & Engineering, Taibah University 11
  • 12.
    Ethical issues Privacy Intellectual Property Confidentiality Reference - Author, title, vol., pages, year Other issues 23 College of Computer Science & Engineering, Taibah University Research Method Timeframe example Day 1 Research Project Develop Research Proposal and obtain approval Develop and test questions Develop and test tool Obtain participants Administer instrument(s) Ongoing data collection and analysis Final collection of data Research Report 24 College of Computer Science & Engineering, Taibah University 12
  • 13.
    Reference J. Fraenkel& N. Wallen (1996), How to design and evaluate research in education (3rd Ed.). New York: McGraw-Hill, Inc., p. 442. N. J. Salkind, Exploring Research, 1998, Pearson Education, UK. BPP, Information Systems, Study Text, Paper 2.1, BPP Professional Education, United Kingdom Mohammad Alsuraihi, Technical Writing, CS212 Course notes, Taibah University, Madinah, KSA Abdisalam Issa-Salwe, Teaching Course Notes, Taibah University, Madinah, KSA 25 College of Computer Science & Engineering, Taibah University 13