Bioprocess Engineeringand Biofactotories(Processes, Facility Design and Regulations)12-23 July 2010CEPP, UTM Skudai, Johor, MalaysiaProf. Dr. Shang Tian Yang  (Ohio State Unviersoty, OH, USA)Prof. Dr. Hesham A. El Enshasy (UniversitiTeknologi Malaysia, Johor, Malaysia)
Course Objectives This course was designed in integrated structure to give broad overview on topics that govern both science and technology in bioprocess research and industries. It will includes the technical and professional information required to start up, establish and grow this type of research and industry
Two weeks Program1- Bioprocess: Design, operation and scaling up2- Facility design: requirements and regulations
Time Schedule for summer course (Bioprocess Engineering and Biofactories)1st. week (12-16 July, 2010)
2nd. Week (19-23 July, 2010)
Practical part1- Inoculum preparation and shake flask culture2- Bioreactor set-up , calibration and operation3- Fed-batch cultivation design for recombinant     protein production in high cell density culture4- Sampling, data collection and data analysis
Thank You

Lecture 1 module introduction

  • 1.
    Bioprocess Engineeringand Biofactotories(Processes,Facility Design and Regulations)12-23 July 2010CEPP, UTM Skudai, Johor, MalaysiaProf. Dr. Shang Tian Yang (Ohio State Unviersoty, OH, USA)Prof. Dr. Hesham A. El Enshasy (UniversitiTeknologi Malaysia, Johor, Malaysia)
  • 2.
    Course Objectives Thiscourse was designed in integrated structure to give broad overview on topics that govern both science and technology in bioprocess research and industries. It will includes the technical and professional information required to start up, establish and grow this type of research and industry
  • 3.
    Two weeks Program1-Bioprocess: Design, operation and scaling up2- Facility design: requirements and regulations
  • 4.
    Time Schedule forsummer course (Bioprocess Engineering and Biofactories)1st. week (12-16 July, 2010)
  • 5.
    2nd. Week (19-23July, 2010)
  • 6.
    Practical part1- Inoculumpreparation and shake flask culture2- Bioreactor set-up , calibration and operation3- Fed-batch cultivation design for recombinant protein production in high cell density culture4- Sampling, data collection and data analysis
  • 7.