Vision
 Contribute to Indian industry and economy
through technology transfer, human resource
development and vehicles that meet global
standards at competitive price.
 Contribute to the well-being and stability of team
members.
 Contribute to the overall growth for our business
associates and the automobile industry.
www.a2zmba.com
Mission
 Our mission is to design, manufacture and market
automobiles in India and overseas while
maintaining the high quality that meets global
Toyota quality standards, to offer superior value and
excellent after-sales service. We are dedicated to
providing the highest possible level of value to
customers, team members, communities and
investors in India.
www.a2zmba.com
7 Principles of Toyota
Production System
 Reduced setup time
 Small-lot production
 Employee Involvement and Empowerment
 Quality at the source
 Equipment maintenance
 Pull Production
 Supplier involvement
www.a2zmba.com
TOYOTA PRODUCTION SYSTEM
www.a2zmba.com
Production System
www.a2zmba.com
JUST-IN-TIME
Produced according to what needed, when needed and
how much needed.
Strategy to improve return on investment by reducing
inventory and associated cost.
The process is driven by Kanban concept.
www.a2zmba.com
www.a2zmba.com
KANBAN CONCEPT
Meaning- Sign, Index Card
It is the most important Japanese concept opted by
Toyota.
Kanban systems combined with unique scheduling
tools, dramatically reduces inventory levels.
Enhances supplier/customer relationships and
improves the accuracy of manufacturing schedules.
A signal is sent to produce and deliver a new shipment
when material is consumed.
These signals are tracked through the refill cycle and
bring extraordinary visibility to suppliers and buyers.
www.a2zmba.com
www.a2zmba.com
Just-in-time --- Benefits
Set up times are significantly reduced in the
warehouse.
The flows of goods from warehouse to shelves are
improved.
Employees who possess multiple skills are utilized
more efficiently.
Better consistency of scheduling and consistency of
employee work hours.
Increased emphasis on supplier relationships
www.a2zmba.com
JIDOKA
Jidoka (meaning ‘autonomation’)-a term used in Lean
manufacturing meaning "automation with a human
touch."
It is a quality control process used in the Toyota
Production System which applies the following four
principles:
 Detect the abnormality.
 Stop.
 Fix or correct the immediate condition.
 Investigate the root cause and install a countermeasure.
www.a2zmba.com
www.a2zmba.com
Jidoka
www.a2zmba.com
Lean Manufacturing
Most important concept of Toyota Production System
A management philosophy focusing on reduction of
the seven wastes to improve overall customer value.
www.a2zmba.com
www.a2zmba.com
Key Principles
 Pull processing products are pulled from the consumer end
(demand), not pushed from the production end (Supply)
 Perfect first-time quality  quest for zero defects, revealing &
solving problems at the source
 Waste minimization  eliminating all activities that do not add
value & safety nets, maximize use of scarce resources (capital,
people and land)
 Continuous improvement  reducing costs, improving quality,
increasing productivity and information sharing
 Flexibility  producing different mixes or greater diversity of
products quickly, without sacrificing efficiency at lower volumes
of production
 Building and maintaining a long term relationship with
suppliers through collaborative risk sharing, cost sharing and
information sharing arrangements.
www.a2zmba.com
seven wastes to improve overall customer
value [ MUDA ]
Transportation
Inventory
Motion
Waiting time
Over-production
Processing Itself
Defective Product (Scrap in manufactured
products or any type of business.)
www.a2zmba.com
Other Toyota Production
Concepts
 Heijunka (Production Smoothing)
 Kaizen (Continuous Improvement)
 Poke-Yoke (to avoid inadvertent errors)
 Andon (Signboard)
 Mura,Muri
www.a2zmba.com
Heijunka
(Production Smoothing)
Heijunka is Japanese term that refers to a system of
production smoothing designed to achieve a more even
and consistent flow of work.
Heijunka as a concept is closely related to lean
production and just in time manufacturing.
A related visual scheduling board known as a heijunka
box is often used in achieving heijunka style
efficiencies.
The use of heijunka as well as broader lean production
techniques helped Toyota massively reduce vehicle
production times as well as inventory levels during the
1980s.
www.a2zmba.com
Kaizen
Meaning- Continuous Improvement
Kaizen refers to a workplace 'quality' strategy and related to
various quality-control systems.
It aims to eliminate waste (defined as "activities that add
cost but do not add value").
Kaizen is a daily activity whose purpose goes beyond
improvement. It is also a process that, when done correctly,
humanizes the workplace, eliminates overly hard work
(both mental and physical.
It teaches people how to perform experiments using the
scientific method and how to learn to spot and eliminate
waste in business processes.
www.a2zmba.com
Poke-Yoke
 Poka-yoke (means "fail-safing" or "mistake-proofing"
—
 avoiding (yokeru) inadvertent errors (poka)) is a
behavior-shaping constraint, or a method of
preventing errors by putting limits on how an
operation can be performed in order to force the
correct completion of the operation.
www.a2zmba.com
Andon (Signboard) Andon is a manufacturing term referring to a signboard incorporating
signal lights, audio alarms, and text or other displays installed at a
workstation to notify management and other workers of a quality or
process problem.
 The alert can be activated manually by a worker, or may be activated
automatically by the production equipment itself. Typically, it will
incorporate both a visual indicator and an audible alarm.
 An Andon system is one of the principle elements of the Jidoka
quality-control method pioneered by Toyota and now part of the Lean
methodology.
 It gives the worker the ability to stop production when a defect is
found, and immediately call for assistance.
 Work is stopped until a solution has been found out. The alerts may be
logged to a database so that they can be studied as part of a
continuous-improvement program.
 The system will typically indicate where the alert was generated, and
may also provide a description of the trouble.
 Modern Andon systems can include text, graphics, or audio elements.
 Audio alerts may be done with coded tones, music with different tunes
corresponding to the various alerts, or pre-recorded verbal messages.
www.a2zmba.com
Mura , Muri
Mura
 Mura is a Japanese term for unevenness.
 It is also a key concept in the Toyota Production System and is one of
the three types of waste (Muda, Mura, Muri) it identifies. Waste
reduction is an effective way to increase profitability.
Muri
 Muri is a Japanese term for overburden or unreasonableness.
 It is also a key concept in the Toyota Production System and is one of
the three types of waste (Muda, Mura, Muri) it identifies. Waste
reduction is an effective way to increase profitability.
 Muri can be avoided through standardised work.
www.a2zmba.com
Conclusion
A Production System that is steeped in the philosophy
of the complete elimination of all wastes and that
penetrates all aspects of production with this
philosophy in pursuit of the most efficient production
method.
www.a2zmba.com

More Related Content

What's hot

Toyota production system
Toyota production systemToyota production system
Toyota production systemParitosh Singh
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production Systemshekhar67
 
JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)
JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)
JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)Abdul Qadir Master
 
Toyota production system
Toyota production systemToyota production system
Toyota production systemAkshay Jain
 
BASIC OF TOYOTA PRODUCTION SYSTEM
BASIC OF TOYOTA PRODUCTION SYSTEMBASIC OF TOYOTA PRODUCTION SYSTEM
BASIC OF TOYOTA PRODUCTION SYSTEMPrashant thakur
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production SystemUdit Jain
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production SystemSIVA PRIYA
 
Toyota Production System (brief)
Toyota Production System (brief)Toyota Production System (brief)
Toyota Production System (brief)Aysel Muradlı
 
Toyota production system
Toyota production systemToyota production system
Toyota production systemDeepak25
 
What is TPS - Toyota Production System
What is TPS - Toyota Production SystemWhat is TPS - Toyota Production System
What is TPS - Toyota Production SystemW3 Group Canada Inc.
 
Toyota Production System (Bussiness Case Studies & Plan)
Toyota Production System (Bussiness Case Studies & Plan)Toyota Production System (Bussiness Case Studies & Plan)
Toyota Production System (Bussiness Case Studies & Plan)Nurhazman Abdul Aziz
 
Toyota Supply chain Management
Toyota Supply chain Management Toyota Supply chain Management
Toyota Supply chain Management Siddhi Suthar
 
Lean Management explained to CEOs & Others
Lean Management explained to CEOs & OthersLean Management explained to CEOs & Others
Lean Management explained to CEOs & OthersEquable
 
Lean manufacturing system
Lean manufacturing systemLean manufacturing system
Lean manufacturing systemHammaduddin
 
Toyota Production System Brochure
Toyota Production System BrochureToyota Production System Brochure
Toyota Production System BrochureMauricio Veliz
 

What's hot (20)

Toyota production system
Toyota production systemToyota production system
Toyota production system
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production System
 
JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)
JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)
JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
BASIC OF TOYOTA PRODUCTION SYSTEM
BASIC OF TOYOTA PRODUCTION SYSTEMBASIC OF TOYOTA PRODUCTION SYSTEM
BASIC OF TOYOTA PRODUCTION SYSTEM
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production System
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production System
 
Lean manufacturing
Lean manufacturing Lean manufacturing
Lean manufacturing
 
Toyota Production System (brief)
Toyota Production System (brief)Toyota Production System (brief)
Toyota Production System (brief)
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
What is TPS - Toyota Production System
What is TPS - Toyota Production SystemWhat is TPS - Toyota Production System
What is TPS - Toyota Production System
 
Toyota Production System (Bussiness Case Studies & Plan)
Toyota Production System (Bussiness Case Studies & Plan)Toyota Production System (Bussiness Case Studies & Plan)
Toyota Production System (Bussiness Case Studies & Plan)
 
Lean manufacturing SOHEL KHAN
Lean manufacturing SOHEL KHANLean manufacturing SOHEL KHAN
Lean manufacturing SOHEL KHAN
 
Toyota Supply chain Management
Toyota Supply chain Management Toyota Supply chain Management
Toyota Supply chain Management
 
Lean Management explained to CEOs & Others
Lean Management explained to CEOs & OthersLean Management explained to CEOs & Others
Lean Management explained to CEOs & Others
 
Hesham Saad
Hesham SaadHesham Saad
Hesham Saad
 
Toyota Scm
Toyota ScmToyota Scm
Toyota Scm
 
Lean manufacturing system
Lean manufacturing systemLean manufacturing system
Lean manufacturing system
 
Toyota Production System Brochure
Toyota Production System BrochureToyota Production System Brochure
Toyota Production System Brochure
 

Similar to Lean production toyota production system

Lean manufacturing
Lean manufacturing Lean manufacturing
Lean manufacturing Yash Bhatt
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)Ashima Kandari
 
The Toyota Company is the biggest auto-manufacture in the world. T.docx
The Toyota Company is the biggest auto-manufacture in the world. T.docxThe Toyota Company is the biggest auto-manufacture in the world. T.docx
The Toyota Company is the biggest auto-manufacture in the world. T.docxssusera34210
 
Shigeo Shingo - The Master Of Lean
Shigeo Shingo - The Master Of LeanShigeo Shingo - The Master Of Lean
Shigeo Shingo - The Master Of LeanMohamed Helmy
 
Lean, The And Beverage Industry
Lean, The And Beverage IndustryLean, The And Beverage Industry
Lean, The And Beverage IndustryBrenda Higgins
 
Lean production in Toyota and Boeing
Lean production in Toyota and BoeingLean production in Toyota and Boeing
Lean production in Toyota and BoeingMutunga David
 
#Guide-Lean_Manufacturing guide teaches ability to transform workplaces
#Guide-Lean_Manufacturing guide teaches ability to transform workplaces#Guide-Lean_Manufacturing guide teaches ability to transform workplaces
#Guide-Lean_Manufacturing guide teaches ability to transform workplacesIslamAbdouAbbas1
 
Production management.. ppt
Production management.. pptProduction management.. ppt
Production management.. pptKusum Parmar
 
Role of IT in Lean Manufacturing: A brief Scenario
Role of IT in Lean Manufacturing: A brief ScenarioRole of IT in Lean Manufacturing: A brief Scenario
Role of IT in Lean Manufacturing: A brief ScenarioIJMER
 
Quality engineering and management
Quality engineering and managementQuality engineering and management
Quality engineering and managementKushal Shah
 
PROJECT SUBJECT IMPLEMENTATING LEAN MANUFACTURING CONCEPTS WITH EMP.docx
PROJECT SUBJECT IMPLEMENTATING LEAN MANUFACTURING CONCEPTS WITH EMP.docxPROJECT SUBJECT IMPLEMENTATING LEAN MANUFACTURING CONCEPTS WITH EMP.docx
PROJECT SUBJECT IMPLEMENTATING LEAN MANUFACTURING CONCEPTS WITH EMP.docxbfingarjcmc
 
IRJET- Applications of Lean Six Sigma
IRJET-  	  Applications of Lean Six SigmaIRJET-  	  Applications of Lean Six Sigma
IRJET- Applications of Lean Six SigmaIRJET Journal
 
Productivity and Quality Management
Productivity and Quality ManagementProductivity and Quality Management
Productivity and Quality ManagementSameer Omles
 

Similar to Lean production toyota production system (18)

Lean manufacturing
Lean manufacturing Lean manufacturing
Lean manufacturing
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)
 
Autoliv
AutolivAutoliv
Autoliv
 
The Toyota Company is the biggest auto-manufacture in the world. T.docx
The Toyota Company is the biggest auto-manufacture in the world. T.docxThe Toyota Company is the biggest auto-manufacture in the world. T.docx
The Toyota Company is the biggest auto-manufacture in the world. T.docx
 
Tos
TosTos
Tos
 
Shigeo Shingo - The Master Of Lean
Shigeo Shingo - The Master Of LeanShigeo Shingo - The Master Of Lean
Shigeo Shingo - The Master Of Lean
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production System
 
The Toyota Way
The Toyota WayThe Toyota Way
The Toyota Way
 
Lean, The And Beverage Industry
Lean, The And Beverage IndustryLean, The And Beverage Industry
Lean, The And Beverage Industry
 
Lean production in Toyota and Boeing
Lean production in Toyota and BoeingLean production in Toyota and Boeing
Lean production in Toyota and Boeing
 
#Guide-Lean_Manufacturing guide teaches ability to transform workplaces
#Guide-Lean_Manufacturing guide teaches ability to transform workplaces#Guide-Lean_Manufacturing guide teaches ability to transform workplaces
#Guide-Lean_Manufacturing guide teaches ability to transform workplaces
 
Production management.. ppt
Production management.. pptProduction management.. ppt
Production management.. ppt
 
Role of IT in Lean Manufacturing: A brief Scenario
Role of IT in Lean Manufacturing: A brief ScenarioRole of IT in Lean Manufacturing: A brief Scenario
Role of IT in Lean Manufacturing: A brief Scenario
 
Quality engineering and management
Quality engineering and managementQuality engineering and management
Quality engineering and management
 
PROJECT SUBJECT IMPLEMENTATING LEAN MANUFACTURING CONCEPTS WITH EMP.docx
PROJECT SUBJECT IMPLEMENTATING LEAN MANUFACTURING CONCEPTS WITH EMP.docxPROJECT SUBJECT IMPLEMENTATING LEAN MANUFACTURING CONCEPTS WITH EMP.docx
PROJECT SUBJECT IMPLEMENTATING LEAN MANUFACTURING CONCEPTS WITH EMP.docx
 
Lean Flow Seminar
Lean Flow SeminarLean Flow Seminar
Lean Flow Seminar
 
IRJET- Applications of Lean Six Sigma
IRJET-  	  Applications of Lean Six SigmaIRJET-  	  Applications of Lean Six Sigma
IRJET- Applications of Lean Six Sigma
 
Productivity and Quality Management
Productivity and Quality ManagementProductivity and Quality Management
Productivity and Quality Management
 

More from Marcelo Augusto A. Cosgayon

0104 report ethics and accountability in the government
0104 report ethics and accountability in the government0104 report ethics and accountability in the government
0104 report ethics and accountability in the governmentMarcelo Augusto A. Cosgayon
 
Final term paper management information systems styled
Final term paper management information systems styledFinal term paper management information systems styled
Final term paper management information systems styledMarcelo Augusto A. Cosgayon
 
Final term paper management information systems cosgayon batch ii
Final term paper management information systems cosgayon batch iiFinal term paper management information systems cosgayon batch ii
Final term paper management information systems cosgayon batch iiMarcelo Augusto A. Cosgayon
 
01020 final examinations human resource management 2016
01020 final examinations human resource management 201601020 final examinations human resource management 2016
01020 final examinations human resource management 2016Marcelo Augusto A. Cosgayon
 
Economic analysis of annulment of marriage cosgayon new
Economic analysis of annulment of marriage cosgayon newEconomic analysis of annulment of marriage cosgayon new
Economic analysis of annulment of marriage cosgayon newMarcelo Augusto A. Cosgayon
 
0103 b assignment 2 history and advancements of management science and operat...
0103 b assignment 2 history and advancements of management science and operat...0103 b assignment 2 history and advancements of management science and operat...
0103 b assignment 2 history and advancements of management science and operat...Marcelo Augusto A. Cosgayon
 
Group 2 marketing plan the premiere business hotel new
Group 2 marketing plan the premiere business hotel newGroup 2 marketing plan the premiere business hotel new
Group 2 marketing plan the premiere business hotel newMarcelo Augusto A. Cosgayon
 

More from Marcelo Augusto A. Cosgayon (20)

MRWD Water Production Proposals Comparison
MRWD Water Production Proposals ComparisonMRWD Water Production Proposals Comparison
MRWD Water Production Proposals Comparison
 
0104 report ethics and accountability in the government
0104 report ethics and accountability in the government0104 report ethics and accountability in the government
0104 report ethics and accountability in the government
 
Data Analysis
Data AnalysisData Analysis
Data Analysis
 
Wages
WagesWages
Wages
 
Collective Bargaining Agreements
Collective Bargaining AgreementsCollective Bargaining Agreements
Collective Bargaining Agreements
 
Case Study Research
Case Study ResearchCase Study Research
Case Study Research
 
Laws against violence against women new
Laws against violence against women newLaws against violence against women new
Laws against violence against women new
 
Graceville subdivision drainage problem
Graceville subdivision drainage problemGraceville subdivision drainage problem
Graceville subdivision drainage problem
 
Ethical privacy and security issues
Ethical privacy and security issuesEthical privacy and security issues
Ethical privacy and security issues
 
0201B Aggregate Resource Planning
0201B Aggregate Resource Planning0201B Aggregate Resource Planning
0201B Aggregate Resource Planning
 
0201B Lean Production
0201B Lean Production0201B Lean Production
0201B Lean Production
 
0103B Pegasus Airlines Case Study
0103B Pegasus Airlines Case Study0103B Pegasus Airlines Case Study
0103B Pegasus Airlines Case Study
 
Final term paper management information systems styled
Final term paper management information systems styledFinal term paper management information systems styled
Final term paper management information systems styled
 
Final term paper management information systems cosgayon batch ii
Final term paper management information systems cosgayon batch iiFinal term paper management information systems cosgayon batch ii
Final term paper management information systems cosgayon batch ii
 
01020 final examinations human resource management 2016
01020 final examinations human resource management 201601020 final examinations human resource management 2016
01020 final examinations human resource management 2016
 
Economic analysis of annulment of marriage cosgayon new
Economic analysis of annulment of marriage cosgayon newEconomic analysis of annulment of marriage cosgayon new
Economic analysis of annulment of marriage cosgayon new
 
0102 final term paper human resource management
0102 final term paper human resource management0102 final term paper human resource management
0102 final term paper human resource management
 
0103 b assignment 1 operations manager
0103 b assignment 1 operations manager0103 b assignment 1 operations manager
0103 b assignment 1 operations manager
 
0103 b assignment 2 history and advancements of management science and operat...
0103 b assignment 2 history and advancements of management science and operat...0103 b assignment 2 history and advancements of management science and operat...
0103 b assignment 2 history and advancements of management science and operat...
 
Group 2 marketing plan the premiere business hotel new
Group 2 marketing plan the premiere business hotel newGroup 2 marketing plan the premiere business hotel new
Group 2 marketing plan the premiere business hotel new
 

Recently uploaded

VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 

Recently uploaded (20)

VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 

Lean production toyota production system

  • 2. Vision  Contribute to Indian industry and economy through technology transfer, human resource development and vehicles that meet global standards at competitive price.  Contribute to the well-being and stability of team members.  Contribute to the overall growth for our business associates and the automobile industry. www.a2zmba.com
  • 3. Mission  Our mission is to design, manufacture and market automobiles in India and overseas while maintaining the high quality that meets global Toyota quality standards, to offer superior value and excellent after-sales service. We are dedicated to providing the highest possible level of value to customers, team members, communities and investors in India. www.a2zmba.com
  • 4. 7 Principles of Toyota Production System  Reduced setup time  Small-lot production  Employee Involvement and Empowerment  Quality at the source  Equipment maintenance  Pull Production  Supplier involvement www.a2zmba.com
  • 7. JUST-IN-TIME Produced according to what needed, when needed and how much needed. Strategy to improve return on investment by reducing inventory and associated cost. The process is driven by Kanban concept. www.a2zmba.com
  • 9. KANBAN CONCEPT Meaning- Sign, Index Card It is the most important Japanese concept opted by Toyota. Kanban systems combined with unique scheduling tools, dramatically reduces inventory levels. Enhances supplier/customer relationships and improves the accuracy of manufacturing schedules. A signal is sent to produce and deliver a new shipment when material is consumed. These signals are tracked through the refill cycle and bring extraordinary visibility to suppliers and buyers. www.a2zmba.com
  • 11. Just-in-time --- Benefits Set up times are significantly reduced in the warehouse. The flows of goods from warehouse to shelves are improved. Employees who possess multiple skills are utilized more efficiently. Better consistency of scheduling and consistency of employee work hours. Increased emphasis on supplier relationships www.a2zmba.com
  • 12. JIDOKA Jidoka (meaning ‘autonomation’)-a term used in Lean manufacturing meaning "automation with a human touch." It is a quality control process used in the Toyota Production System which applies the following four principles:  Detect the abnormality.  Stop.  Fix or correct the immediate condition.  Investigate the root cause and install a countermeasure. www.a2zmba.com
  • 15. Lean Manufacturing Most important concept of Toyota Production System A management philosophy focusing on reduction of the seven wastes to improve overall customer value. www.a2zmba.com
  • 17. Key Principles  Pull processing products are pulled from the consumer end (demand), not pushed from the production end (Supply)  Perfect first-time quality  quest for zero defects, revealing & solving problems at the source  Waste minimization  eliminating all activities that do not add value & safety nets, maximize use of scarce resources (capital, people and land)  Continuous improvement  reducing costs, improving quality, increasing productivity and information sharing  Flexibility  producing different mixes or greater diversity of products quickly, without sacrificing efficiency at lower volumes of production  Building and maintaining a long term relationship with suppliers through collaborative risk sharing, cost sharing and information sharing arrangements. www.a2zmba.com
  • 18. seven wastes to improve overall customer value [ MUDA ] Transportation Inventory Motion Waiting time Over-production Processing Itself Defective Product (Scrap in manufactured products or any type of business.) www.a2zmba.com
  • 19. Other Toyota Production Concepts  Heijunka (Production Smoothing)  Kaizen (Continuous Improvement)  Poke-Yoke (to avoid inadvertent errors)  Andon (Signboard)  Mura,Muri www.a2zmba.com
  • 20. Heijunka (Production Smoothing) Heijunka is Japanese term that refers to a system of production smoothing designed to achieve a more even and consistent flow of work. Heijunka as a concept is closely related to lean production and just in time manufacturing. A related visual scheduling board known as a heijunka box is often used in achieving heijunka style efficiencies. The use of heijunka as well as broader lean production techniques helped Toyota massively reduce vehicle production times as well as inventory levels during the 1980s. www.a2zmba.com
  • 21. Kaizen Meaning- Continuous Improvement Kaizen refers to a workplace 'quality' strategy and related to various quality-control systems. It aims to eliminate waste (defined as "activities that add cost but do not add value"). Kaizen is a daily activity whose purpose goes beyond improvement. It is also a process that, when done correctly, humanizes the workplace, eliminates overly hard work (both mental and physical. It teaches people how to perform experiments using the scientific method and how to learn to spot and eliminate waste in business processes. www.a2zmba.com
  • 22. Poke-Yoke  Poka-yoke (means "fail-safing" or "mistake-proofing" —  avoiding (yokeru) inadvertent errors (poka)) is a behavior-shaping constraint, or a method of preventing errors by putting limits on how an operation can be performed in order to force the correct completion of the operation. www.a2zmba.com
  • 23. Andon (Signboard) Andon is a manufacturing term referring to a signboard incorporating signal lights, audio alarms, and text or other displays installed at a workstation to notify management and other workers of a quality or process problem.  The alert can be activated manually by a worker, or may be activated automatically by the production equipment itself. Typically, it will incorporate both a visual indicator and an audible alarm.  An Andon system is one of the principle elements of the Jidoka quality-control method pioneered by Toyota and now part of the Lean methodology.  It gives the worker the ability to stop production when a defect is found, and immediately call for assistance.  Work is stopped until a solution has been found out. The alerts may be logged to a database so that they can be studied as part of a continuous-improvement program.  The system will typically indicate where the alert was generated, and may also provide a description of the trouble.  Modern Andon systems can include text, graphics, or audio elements.  Audio alerts may be done with coded tones, music with different tunes corresponding to the various alerts, or pre-recorded verbal messages. www.a2zmba.com
  • 24. Mura , Muri Mura  Mura is a Japanese term for unevenness.  It is also a key concept in the Toyota Production System and is one of the three types of waste (Muda, Mura, Muri) it identifies. Waste reduction is an effective way to increase profitability. Muri  Muri is a Japanese term for overburden or unreasonableness.  It is also a key concept in the Toyota Production System and is one of the three types of waste (Muda, Mura, Muri) it identifies. Waste reduction is an effective way to increase profitability.  Muri can be avoided through standardised work. www.a2zmba.com
  • 25. Conclusion A Production System that is steeped in the philosophy of the complete elimination of all wastes and that penetrates all aspects of production with this philosophy in pursuit of the most efficient production method. www.a2zmba.com