The document outlines a capital project proposal for the Lake Placid CSD. It proposes improvements to maintain infrastructure, enhance safety and security, and modestly improve programs across the district's facilities. Specific infrastructure upgrades are identified for the elementary school, middle/high school, and other sites. Safety and security measures like security vestibules and impact-resistant windows are suggested. Modest enhancements like signage, storage areas, and auditorium upgrades are also included. Financing details indicate the $21 million project would be around $15 million after state building aid, costing approximately $1 million annually.
2. Why a Capital Project?
• Maintain the Infrastructure of our Facilities
• Improve Safety & Security for Students and Staff
• Provide Modest Enhancements to improve programs & services
2015 BCS - High School | Mosaic Associates Architects
5. 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Replace original 1975 windows and doors
6. 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Reconstruct exterior masonry columns near
Cafeteria
7. 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Replace elevator cab, reuse existing shaft
8. 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Reconstruct asphalt paving from Boiler Room to parking lot (regrade)
9. 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Reconstruct loading dock columns and main beam/concrete slab
Photo of
existing sign
Picture or
drawing of a
digital sign
10. 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Add DDC control to all UVs
Photo of UV
11. 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Upgrade main electrical service
12. 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Roofing – overlay existing (approx. 30,000 sf)
13. 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Exterior lighting – building mounted, full perimeter
14. 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Replace original air handler
21. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Reconstruct existing roofing, skylights, and roof access hatch over
original 1920’s portion of building
22. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Reconstruct concrete retaining wall at School Street and adjacent to Olympic Oval
23. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Replace 1970’s wing windows/insulation
24. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Upgrade distribution (hallway panels 6ft AFF) and main distribution in basement
25. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Reconstruct/overlay exterior stairs (front of building – south side)
26. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Replace elevator cab (bay state),
reuse existing shaft
27. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Reconstruct stairs from Cummings Road to front of building (North Side)
28. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Reconstruct ramp at 1970 entrance, add canopy & walls to enclose
29. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Reconstruct concrete retaining/fencing adjacent to south entrance & loading dock
30. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Reconstruct sloping retaining wall under 1970 addition
31. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Replace original exhaust fans and roof vents
32. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Roofing- re seam/overlay existing (approx. 34,400 sf)
33. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Exterior lighting – building mounted, full perimeter
34. 2016 Pre-Referendum Study – Horse Show Grounds | Mosaic Associates Architects
Resurface track at Horse Show Grounds.
37. 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Provide security vestibule (add roof and wall at elevated walk)
38. 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Provide impact resistant film on non-tempered
doors/windows – building wide interior
39. 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Provide bullet resistant film on first floor exterior glass
41. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Provide security vestibule addition (rear)
42. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Provide impact resistant film on non-tempered
doors/windows – building wide interior
43. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Provide bullet resistant film on first floor exterior glass
44. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Provide aisle lighting for auditorium (SED required)
45. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Auditorium - Replace railing at balcony
46. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Provide stairs at side of District Office
57. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Signage and landscaping (location to be determined)
Lake Placid
Middle/High School
58. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Auditorium - Seating (includes ADA requirements)
59. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Auditorium - Ceilings/lighting
60. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Auditorium - Wings/storage area below
62. 2016 Pre-Referendum Study – Shipman Youth Center | Mosaic Associates Architects
Provide (2) tennis courts at Shipman Site.
63. 2015 BCS - High School | Mosaic Associates Architects
Finances
49 Separate Items ≈ $21 Million
NYS Building Aid of 30% ≈ $6 Million
Total Cost after Building Aid ≈ $15 Million
Annual Cost of Bonded Debt ≈ $1 Million
Total Change to the Annual
Budget After 2001 Bond Payoff ≈ $ 0
64. 2015 BCS - High School | Mosaic Associates Architects
65. 2015 BCS - High School | Mosaic Associates Architects
We Want Your ….
66. 2015 BCS - High School | Mosaic Associates Architects
Questions ?