SlideShare a Scribd company logo
1 of 52
Download to read offline
Elevating the Quality of Life in the District
LAFAYETTE PLAYGROUND COMMUNITY MEETING
MONDAY, JUNE 9, 2014
Elevating the Quality of Life in the District
AGENDA
• Introductions
• Rules of the Road
• Site Overview
• Playground Concept Plans
• Playground Equipment Options
• Next Steps
• Questions & Answers
Elevating the Quality of Life in the District
Elevating the Quality of Life in the District
Project Budget
 Current budget is $1.5 Million
 Proposed Renovations and Amenities
 Restored natural grass
 Safety lights
 New playground equipment and surfacing
 Resurfacing, repair of basketball and tennis courts
 Repaired walkways and ADA accessibility
Elevating the Quality of Life in the District
SITE ANALYSIS
REVIEW
Elevating the Quality of Life in the District
Elevating the Quality of Life in the District
Site Overview
Site Analysis
•Existing trees
provide great benefit
and in overall good
condition, could
benefit from modest
pruning
•Lush planting beds
at park edge are
unique feature to be
maintained
•Upper field has
“bald” spot, needs
renovating
•Pathways in poor
condition, many are
not accessible
•Play areas well
used, need updating
for accessibility
Community Input- what we heard:
•Nature theme, Rock Creek theme, incorporate natural materials
•Adventurous play elements
•Maintain openness of park
•Multigenerational
•Renovate and freshen existing features
CONCEPT PLANS
NATIVE MEADOW
CONCEPT
RENOVATED IN PLACE
Native Meadow Concept
Renovated Spaces
Splash Pad
Open Field, Open Play Area
2-5 yr
5-12 yr
Upper
Field
2-5 yr Play Area
5-12 yr Play Area Rec Center
Activity Area
•Play areas and splash
pad are renovated in
current locations
•Maintains separation of
age groups and
proximity of 2-5 area to
entrance and Rec. Center
•Existing trees are saved,
new trees and
landscaping are added
•Upper field remains and
is renovated
Renovated Spaces
•2-5 yr area remains in
current area
•Provides maximum
separation from older
children
•Play areas are ringed by
landscaping and natural
play areas
•5-12 play area remains
open to upper field for
fluid play space but with
landscape buffer
•Previous 2-5 space is
converted to open lawn
for Rec. Center activities,
outdoor classes, and
events
•New pavilion is central
to play spaces for
events, shade, family
picnics
•Existing gazebo
renovated and
incorporated by
pathways and landscape
2-5 yr play area
renovated, natural
play areas added
Splash pad
renovated in place
5-12 yr play area renovated as
two areas, ex tree protected
2-5 yr
5-12 yr
Upper
Field
Central
Gathering Spaces
•Existing gazebo is
renovated and encircled
by landscape to create a
garden setting
•New pavilion is central
to play spaces for
events, shade, family
picnics
•An existing tree is
celebrated and utilized
for shaded outdoor
classroom and
performance space
Play court
reconfigured to
maximize open space
New Pavilion for picnics,
events, and shade
Existing tree is celebrated, provides
shade for classroom or performance
2-5 yr
5-12 yr
Upper
Field
Existing gazebo renovated
and incorporated
Boulders in landscape
Meadow Theme
•Stormwater runoff is captured in
rain gardens ringing the play areas
•Overflow water in heavy events
feeds into “meadow” swale
adjacent entry walk
•Mounds and boulders add accents
in the landscape, stepping stones
provide informal connections and
nature-based play space
•Native plants provide wildlife
benefits, educational
opportunities, low maintenance
requirements and stormwater
cleansing
Stormwater overflows into
“dry creek bed” feature
Stepping stones are fun paths
for added nature experience
Native plants in landscape and rain gardens
Resurfaced sport courts
Rec. Center Activity Area
•Rec. Center area renovated to
improve usability and flexibility
•Sport courts resurfaced/repaired
•Play court is redesigned to
maximize play opportunities and
flexibility
•Painted games maximize play
without sacrificing open space
•Chess tables located between
trees
•Tennis practice backboard added
•Trees are added for shade
Practice backboard
Painted games
New trees
provide shade
Painted games
Chess tables relocated
Painted trike
track
Multigenerational
•Adult exercise equipment located
across from 5-12 year play area
•Sized to accommodate multiple
users at once
•Could be used as starting point of
“boot camp” class
Consolidated
equipment area
Signage provides fitness training ideas
2-5 Year Play Area
•Playground is renovated in place
for maximum separation from
older children
•Landscape beds of native plants
add unique play areas and
opportunities, provide shade
•Playhouse in natural play area
provides space for quiet play and
pretend play
Plants with texture Semi-open playhouse
Birdhouses
Plants
with fun shapes
Explore nature
together
Unique pathways offer
special play spaces
Shaded benches for caregivers
Stepping stones
through natural
areas
Natural edging
5-12 Year Play Area
•Area shape provides unique play
spaces
•Existing trees area saved and
celebrated; new trees located to
provide maximum shade
•Concrete seat walls
•Stepping stone path through
planted area
•Rain garden rings outer edge,
bringing nature and native
plantings close to play areas
•Existing gazebo is renovated and
incorporated into play area
pathways
Plants with
seasonal
interest
Bridge entrance
over rain garden
Stepping stones
through natural
areas
Rain garden rings play area
Existing trees saved, shelters
outdoor classroom
Existing berms relocated and sculpted
for play and landscape interest
ROCK CREEK
CONCEPT
CONSOLIDATED
PLAY AREAS
Consolidated Play Areas
Consolidated Spaces
•Like areas are
consolidated for
maximum usability
1. Playgrounds
2. Rec Center Activities
3. Open Field
•Splash pad and 5-12 yr
play area remain in
existing location
•2-5 yr play area is
relocated onto hill
•Rec. Center activity area
is enlarged
•Existing trees are saved,
new trees and
landscaping is added
•Upper field remains and
is renovated
Rec Center
Activity Area
2-5 yr Play Area
Open Field, Open Play Area
2-5 yr
5-12 yr
Upper
Field
Splash Pad
5-12 yr Play Area
Consolidated Play
•2-5 yr area is moved
uphill to consolidate
major play areas
•Allows for easier
supervision of age
groups
•Age groups are
separated by landscape
and splash pad for safety
•Open to upper field for
fluid play spaces
•Previous 2-5 space is
converted to open lawn
for Rec. Center activities,
outdoor classes, and
events
•New pavilion is central
to play spaces for
events, shade, family
picnics
•Existing gazebo
renovated and
incorporated by
pathways and landscape
Converted to lawn
for Rec Center
activities, events
Play areas consolidated
around splash pad
Terraced steps
amphitheater space
2-5 yr
5-12 yr
Upper
Field
Central
Gathering Spaces
•Existing gazebo
renovated and
incorporated by
pathways and landscape
•New pavilion is central
to play spaces for
events, shade, family
picnics
•An existing tree is
celebrated and utilized
for picnic and gathering
space
Converted to lawn
for activities, events
New Pavilion for picnics,
events, and shade
Existing tree celebrated,
provides shade for picnic
2-5 yr
5-12 yr
Upper
Field
Existing gazebo renovated
and incorporated
Boulders in landscape
Rock Creek Theme
•Stormwater runoff is captured in
rain gardens ringing the play areas
•Overflow water in heavy events
feeds into “dry creek” swale
adjacent entry walk
•Boulders add accents in the
landscape, stepping stones provide
informal connections and nature-
based play space
•Native plants provide wildlife
benefits, educational
opportunities, low maintenance
requirements and stormwater
cleansing
Log steppers can serve as play elements or
seats for classroom space
Stormwater overflows into
“dry creek bed” feature
Stepping stones are fun paths
for added nature experience
Native plants in landscape and rain gardens
Resurfaced sport courts
Rec. Center Activity Area
•Rec. Center area renovated to
improve usability and flexibility
•Sport courts resurfaced/repaired
•Practice backboard and ping pong
tables added to area between
courts, chess tables rearranged for
improved circulation
•Trees are added for shade
•Terraced steps create outdoor
amphitheater for outdoor classes
and open circulation to activity
lawn
•Lawn provides space for endless
activities and exercise classes
Practice backboard
Rec Center activities
New outdoor ping pong tables
Classic lawn games
Outdoor
yoga class
Multigenerational
•Adult exercise equipment spread
out in multiple stations
•Stations located around outer
pathway around upper field and
play areas, creating a “fitness trail”
Fitness stations
Fitness trail
2-5 Year Play Area
•Playground is located close to
other playground features for ease
of oversight by caregivers
•Pavilion, splash pad, and
landscape beds of native plants
help define space and separate
from older play area
•Proximity to splash pad and
pavilion create central play area
•Careful landscape design enriches
play experiences and provides
shade
•Playhouse in natural area allows
for quiet play and pretend play
Plants with texture Semi-open playhouse
Birdhouses
Plants
with fun shapes
Plants with seasonal
interest
Explore nature
together
Changes in topography
Shaded benches for caregivers
Stepping stones
through natural
areas
Open to field
5-12 Year Play Area
•Area shape provides unique play
spaces
•Existing trees area saved and
celebrated; new trees located to
provide maximum shade
•Concrete seat walls
•Stepping stone path through
planted area
•Rain garden rings outer edge,
bringing nature and native
plantings close to play areas
•Existing gazebo is renovated and
incorporated into play area
pathways
Plants with seasonal
interest
Bridge entrance over rain garden
Boulders in
landscape on hillside Concrete seat walls
Stepping stones through natural areas
Rain garden rings play area Existing trees saved
PLAY EQUIPMENT
OPTIONS
1. Compliance with DPR requirements
a) Durability and maintenance considerations (no wood)
b) Made in USA
2. Two manufacturers to choose from
a) Kompan
b) Miracle
Playground Equipment Options
KOMPAN
2-5 yr Playground:
KOMPAN
•Ship with slide
•Playhouse
•Daisy spring feature
•Toddler Arc Tunnel
Rock Creek Concept
Native Meadow ConceptExample Layout
KOMPAN
Playhouse
Ship with slide
Toddler Arc Tunnel
Daisy spring feature
5-12 yr Playground :
KOMPAN
•Spinner bowls
•Vertical spider’s web
•Twisted quadrangle
amusement net with sky
walk, swaying bridge, and
rope screw
•Zip line
Rock Creek Concept
Native Meadow ConceptExample Layout
KOMPAN
Rope screw
Central climbing feature
Swaying bridge
Climbing ramp
KOMPAN
Vertical spider’s webZip line
Spinner bowls
MIRACLE
2-5 yr Playground:
MIRACLE
•Swings
•Log tunnel
•Spinners
•Playhouse
Rock Creek Concept
Native Meadow ConceptExample Layout
Log tunnel and playhouse
SwingsAerial view
MIRACLE
5-12 yr Playground:
MIRACLE
•Climbing/slide feature
•Swings
•Wobbly wood
•Outdoor classroom
Rock Creek Concept
Native Meadow ConceptExample Layout
Climbing/slide feature
Climbing/slide feature
Climbing/slide featureSwings
Swings and outdoor classroom
Wobbly logs and outdoor classroom
Aerial view
SPLASH PAD
OPTIONS
1. Compliance with DPR requirements
a) Durability and maintenance considerations (no wood)
b) Made in USA
2. Two manufacturers to choose from
a) RainDrop
b) Water Play Solutions
Playground Equipment Options
RAINDROP
Splash Pad:
RAINDROP
•Boulder mound slide
•Water curtain
•Stepped water channels
•Water jets
•Spinning waterfall
•Animal sculptures
Rock Creek Concept
Native Meadow Concept
WATERPLAY
SOLUTIONS
Splash Pad:
WATERPLAY
SOLUTIONS
•Water channel
•Water jets
•Spray features
Rock Creek Concept
Native Meadow Concept
MOVING
FORWARD
NEXT STEPS
Elevating the Quality of Life in the District
 Landscape Architect procured for Concept Design April 2014
 Community Input Meeting April 30, 2014
 Concept Design May- June 2014
 Concept Design Presentation June 9, 2014
 Permits and Construction Summer 2014
Elevating the Quality of Life in the District
Elevating the Quality of Life in the District

More Related Content

What's hot

Landscape roof terrace
Landscape roof terraceLandscape roof terrace
Landscape roof terracePeishann97
 
Biju mathew residence
Biju mathew residenceBiju mathew residence
Biju mathew residencesoumyapugal
 
Montès-en
Montès-enMontès-en
Montès-enlibnam
 
Furzedon-en
Furzedon-enFurzedon-en
Furzedon-enlibnam
 
Case Study of Shukla Villa
Case Study of Shukla VillaCase Study of Shukla Villa
Case Study of Shukla VillaGeetika Singla
 
Child care center case study
Child care center case studyChild care center case study
Child care center case studySumaiya Islam
 
Au Dormitory, Sra Pou vocational school, sos children village, econef childre...
Au Dormitory, Sra Pou vocational school, sos children village, econef childre...Au Dormitory, Sra Pou vocational school, sos children village, econef childre...
Au Dormitory, Sra Pou vocational school, sos children village, econef childre...Sumaiya Islam
 
Vernacular bikaner and iran case study (2)
Vernacular bikaner and iran case study (2)Vernacular bikaner and iran case study (2)
Vernacular bikaner and iran case study (2)PrateekSharma525
 
Oasis Brochure
Oasis BrochureOasis Brochure
Oasis BrochureJenjt11
 
Project Spotlight_PR0415
Project Spotlight_PR0415Project Spotlight_PR0415
Project Spotlight_PR0415Ingrid Bush
 
Updating a Treasure
Updating a TreasureUpdating a Treasure
Updating a TreasureTommy Ewasko
 

What's hot (20)

Landscape roof terrace
Landscape roof terraceLandscape roof terrace
Landscape roof terrace
 
LANDSCAPE CASE STUDY
LANDSCAPE CASE STUDYLANDSCAPE CASE STUDY
LANDSCAPE CASE STUDY
 
LANDSCAPE DESIGN- beautifully landscaped,eco friendly neighborhood-WHISPERIN...
 LANDSCAPE DESIGN- beautifully landscaped,eco friendly neighborhood-WHISPERIN... LANDSCAPE DESIGN- beautifully landscaped,eco friendly neighborhood-WHISPERIN...
LANDSCAPE DESIGN- beautifully landscaped,eco friendly neighborhood-WHISPERIN...
 
Beeler thc case_study
Beeler thc case_studyBeeler thc case_study
Beeler thc case_study
 
Vernacular hill
Vernacular hillVernacular hill
Vernacular hill
 
Biju mathew residence
Biju mathew residenceBiju mathew residence
Biju mathew residence
 
Montès-en
Montès-enMontès-en
Montès-en
 
Furzedon-en
Furzedon-enFurzedon-en
Furzedon-en
 
Case Study of Shukla Villa
Case Study of Shukla VillaCase Study of Shukla Villa
Case Study of Shukla Villa
 
Vernacular architecture
Vernacular architectureVernacular architecture
Vernacular architecture
 
Child care center case study
Child care center case studyChild care center case study
Child care center case study
 
Hsva rajasthan
Hsva rajasthanHsva rajasthan
Hsva rajasthan
 
Au Dormitory, Sra Pou vocational school, sos children village, econef childre...
Au Dormitory, Sra Pou vocational school, sos children village, econef childre...Au Dormitory, Sra Pou vocational school, sos children village, econef childre...
Au Dormitory, Sra Pou vocational school, sos children village, econef childre...
 
East Hill Infill Presentation
East Hill Infill  PresentationEast Hill Infill  Presentation
East Hill Infill Presentation
 
Vernacular bikaner and iran case study (2)
Vernacular bikaner and iran case study (2)Vernacular bikaner and iran case study (2)
Vernacular bikaner and iran case study (2)
 
Oasis Brochure
Oasis BrochureOasis Brochure
Oasis Brochure
 
Project Spotlight_PR0415
Project Spotlight_PR0415Project Spotlight_PR0415
Project Spotlight_PR0415
 
Updating a Treasure
Updating a TreasureUpdating a Treasure
Updating a Treasure
 
Front Yard Landscaping
Front Yard LandscapingFront Yard Landscaping
Front Yard Landscaping
 
Karnataka & andhra pradesh
Karnataka & andhra pradeshKarnataka & andhra pradesh
Karnataka & andhra pradesh
 

Similar to Lafayette Park Community Meeting (June 9, 2014)

Dubois county park master plan final
Dubois county park master plan   finalDubois county park master plan   final
Dubois county park master plan finalMatthew Crane
 
Dubois county park master plan final
Dubois county park master plan   finalDubois county park master plan   final
Dubois county park master plan finalMatthew Crane
 
Project Presentation.pptx
Project Presentation.pptxProject Presentation.pptx
Project Presentation.pptxCescSummers
 
Constructed landscape - landscape roof terrace
Constructed landscape - landscape roof terraceConstructed landscape - landscape roof terrace
Constructed landscape - landscape roof terraceDoreen Yeo
 
151019_Shaftesbury%20Ave_Hydrozone
151019_Shaftesbury%20Ave_Hydrozone151019_Shaftesbury%20Ave_Hydrozone
151019_Shaftesbury%20Ave_HydrozoneMark Jumeaux
 
Lora's th land_use_presentation
Lora's th land_use_presentationLora's th land_use_presentation
Lora's th land_use_presentationRobert Emanuel
 
Godrej three parks ashok vihar delhi brochure
Godrej three parks ashok vihar delhi brochureGodrej three parks ashok vihar delhi brochure
Godrej three parks ashok vihar delhi brochuremonikasharma630
 
Localscapes 101
Localscapes 101 Localscapes 101
Localscapes 101 Cynthia Bee
 
human environments student work sample 2
human environments student work sample 2human environments student work sample 2
human environments student work sample 2Rob Marchetto
 
Sustainable Garden at Oakes Childrens Center
Sustainable Garden at Oakes Childrens CenterSustainable Garden at Oakes Childrens Center
Sustainable Garden at Oakes Childrens CenterTaralb14
 
Presentation 2 2 copy (1)
Presentation 2 2 copy (1)Presentation 2 2 copy (1)
Presentation 2 2 copy (1)ricahrdss2014
 
Presentation 2 2 copy (1)
Presentation 2 2 copy (1)Presentation 2 2 copy (1)
Presentation 2 2 copy (1)ricahrdss2014
 
Kalpataru Jade Residences Pune | A Deep Connection To Nature
Kalpataru Jade Residences Pune | A Deep Connection To NatureKalpataru Jade Residences Pune | A Deep Connection To Nature
Kalpataru Jade Residences Pune | A Deep Connection To Natureaidasheikh47
 
George park 2nd community outreach
George park 2nd community outreachGeorge park 2nd community outreach
George park 2nd community outreachcsd15
 
Sequoyah member involvement
Sequoyah member involvementSequoyah member involvement
Sequoyah member involvementDan Koehn
 
Oasis-park-outreach
Oasis-park-outreachOasis-park-outreach
Oasis-park-outreachjeffphom
 
2015 07-09 community-outreach
2015 07-09 community-outreach2015 07-09 community-outreach
2015 07-09 community-outreachjeffphom
 

Similar to Lafayette Park Community Meeting (June 9, 2014) (20)

Lafayette Park & School Community Meeting (July 8, 2014)
Lafayette Park & School Community Meeting (July 8, 2014)Lafayette Park & School Community Meeting (July 8, 2014)
Lafayette Park & School Community Meeting (July 8, 2014)
 
Dubois county park master plan final
Dubois county park master plan   finalDubois county park master plan   final
Dubois county park master plan final
 
Dubois county park master plan final
Dubois county park master plan   finalDubois county park master plan   final
Dubois county park master plan final
 
Landscape
LandscapeLandscape
Landscape
 
Project Presentation.pptx
Project Presentation.pptxProject Presentation.pptx
Project Presentation.pptx
 
Constructed landscape - landscape roof terrace
Constructed landscape - landscape roof terraceConstructed landscape - landscape roof terrace
Constructed landscape - landscape roof terrace
 
Friendship Community Meeting Presentation (Dec. 18, 2013)
Friendship Community Meeting Presentation (Dec. 18, 2013)Friendship Community Meeting Presentation (Dec. 18, 2013)
Friendship Community Meeting Presentation (Dec. 18, 2013)
 
151019_Shaftesbury%20Ave_Hydrozone
151019_Shaftesbury%20Ave_Hydrozone151019_Shaftesbury%20Ave_Hydrozone
151019_Shaftesbury%20Ave_Hydrozone
 
Lora's th land_use_presentation
Lora's th land_use_presentationLora's th land_use_presentation
Lora's th land_use_presentation
 
Godrej three parks ashok vihar delhi brochure
Godrej three parks ashok vihar delhi brochureGodrej three parks ashok vihar delhi brochure
Godrej three parks ashok vihar delhi brochure
 
Localscapes 101
Localscapes 101 Localscapes 101
Localscapes 101
 
human environments student work sample 2
human environments student work sample 2human environments student work sample 2
human environments student work sample 2
 
Sustainable Garden at Oakes Childrens Center
Sustainable Garden at Oakes Childrens CenterSustainable Garden at Oakes Childrens Center
Sustainable Garden at Oakes Childrens Center
 
Presentation 2 2 copy (1)
Presentation 2 2 copy (1)Presentation 2 2 copy (1)
Presentation 2 2 copy (1)
 
Presentation 2 2 copy (1)
Presentation 2 2 copy (1)Presentation 2 2 copy (1)
Presentation 2 2 copy (1)
 
Kalpataru Jade Residences Pune | A Deep Connection To Nature
Kalpataru Jade Residences Pune | A Deep Connection To NatureKalpataru Jade Residences Pune | A Deep Connection To Nature
Kalpataru Jade Residences Pune | A Deep Connection To Nature
 
George park 2nd community outreach
George park 2nd community outreachGeorge park 2nd community outreach
George park 2nd community outreach
 
Sequoyah member involvement
Sequoyah member involvementSequoyah member involvement
Sequoyah member involvement
 
Oasis-park-outreach
Oasis-park-outreachOasis-park-outreach
Oasis-park-outreach
 
2015 07-09 community-outreach
2015 07-09 community-outreach2015 07-09 community-outreach
2015 07-09 community-outreach
 

More from DC Department of General Services

Marie Reed School Construction Project Update (April 21, 2017)
Marie Reed School Construction Project Update (April 21, 2017)Marie Reed School Construction Project Update (April 21, 2017)
Marie Reed School Construction Project Update (April 21, 2017)DC Department of General Services
 
Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...
Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...
Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...DC Department of General Services
 
Garrison Elementary School Community Update (March 24, 2017)
Garrison Elementary School Community Update (March 24, 2017)Garrison Elementary School Community Update (March 24, 2017)
Garrison Elementary School Community Update (March 24, 2017)DC Department of General Services
 
Marie Reed Elementary School Construction Project Update (March 24, 2017)
Marie Reed Elementary School Construction Project Update (March 24, 2017)Marie Reed Elementary School Construction Project Update (March 24, 2017)
Marie Reed Elementary School Construction Project Update (March 24, 2017)DC Department of General Services
 
Benning Park Recreation Center Community Meeting (March 2017)
Benning Park Recreation Center Community Meeting (March 2017)Benning Park Recreation Center Community Meeting (March 2017)
Benning Park Recreation Center Community Meeting (March 2017)DC Department of General Services
 
Hearst Park & Pool Project Community Meeting (February 15, 2017)
Hearst Park & Pool Project Community Meeting (February 15, 2017)Hearst Park & Pool Project Community Meeting (February 15, 2017)
Hearst Park & Pool Project Community Meeting (February 15, 2017)DC Department of General Services
 
McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)
McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)
McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)DC Department of General Services
 
Hearst Park & Pool Community Survey Presentation (January 2017)
Hearst Park & Pool Community Survey Presentation (January 2017)Hearst Park & Pool Community Survey Presentation (January 2017)
Hearst Park & Pool Community Survey Presentation (January 2017)DC Department of General Services
 
Friendship Recreation Center - ANC Presentation (January 12, 2017)
Friendship Recreation Center - ANC Presentation (January 12, 2017)Friendship Recreation Center - ANC Presentation (January 12, 2017)
Friendship Recreation Center - ANC Presentation (January 12, 2017)DC Department of General Services
 
Edgewood Recreation Center Community Meeting (December 12, 2016)
Edgewood Recreation Center Community Meeting (December 12, 2016)Edgewood Recreation Center Community Meeting (December 12, 2016)
Edgewood Recreation Center Community Meeting (December 12, 2016)DC Department of General Services
 
Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)
Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)
Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)DC Department of General Services
 
Edgewood Recreation Center Community Meeting (November 1, 2016)
Edgewood Recreation Center Community Meeting (November 1, 2016)Edgewood Recreation Center Community Meeting (November 1, 2016)
Edgewood Recreation Center Community Meeting (November 1, 2016)DC Department of General Services
 
Lafayette Elementary School SIT Meeting Presentation (October 26, 2016)
Lafayette Elementary School SIT Meeting Presentation (October 26, 2016)Lafayette Elementary School SIT Meeting Presentation (October 26, 2016)
Lafayette Elementary School SIT Meeting Presentation (October 26, 2016)DC Department of General Services
 
Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...
Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...
Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...DC Department of General Services
 
Bancroft School Community Meeting Presentation (July 9, 2016)
Bancroft School Community Meeting Presentation (July 9, 2016)Bancroft School Community Meeting Presentation (July 9, 2016)
Bancroft School Community Meeting Presentation (July 9, 2016)DC Department of General Services
 
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)DC Department of General Services
 
Lafayette Elementary School Playground Design Presentation (July 27, 2016)
Lafayette Elementary School Playground Design Presentation (July 27, 2016)Lafayette Elementary School Playground Design Presentation (July 27, 2016)
Lafayette Elementary School Playground Design Presentation (July 27, 2016)DC Department of General Services
 

More from DC Department of General Services (20)

Hearst community meeting 11.16.2017 430pm final
Hearst community meeting 11.16.2017 430pm finalHearst community meeting 11.16.2017 430pm final
Hearst community meeting 11.16.2017 430pm final
 
Marie Reed Construction Project Update (May 5, 2017)
Marie Reed Construction Project Update (May 5, 2017)Marie Reed Construction Project Update (May 5, 2017)
Marie Reed Construction Project Update (May 5, 2017)
 
Marie Reed School Construction Project Update (April 21, 2017)
Marie Reed School Construction Project Update (April 21, 2017)Marie Reed School Construction Project Update (April 21, 2017)
Marie Reed School Construction Project Update (April 21, 2017)
 
Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...
Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...
Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...
 
Garrison Elementary School Community Update (March 24, 2017)
Garrison Elementary School Community Update (March 24, 2017)Garrison Elementary School Community Update (March 24, 2017)
Garrison Elementary School Community Update (March 24, 2017)
 
Marie Reed Elementary School Construction Project Update (March 24, 2017)
Marie Reed Elementary School Construction Project Update (March 24, 2017)Marie Reed Elementary School Construction Project Update (March 24, 2017)
Marie Reed Elementary School Construction Project Update (March 24, 2017)
 
Benning Park Recreation Center Community Meeting (March 2017)
Benning Park Recreation Center Community Meeting (March 2017)Benning Park Recreation Center Community Meeting (March 2017)
Benning Park Recreation Center Community Meeting (March 2017)
 
Marie Reed Project Update (February 24, 2017)
Marie Reed Project Update (February 24, 2017)Marie Reed Project Update (February 24, 2017)
Marie Reed Project Update (February 24, 2017)
 
Hearst Park & Pool Project Community Meeting (February 15, 2017)
Hearst Park & Pool Project Community Meeting (February 15, 2017)Hearst Park & Pool Project Community Meeting (February 15, 2017)
Hearst Park & Pool Project Community Meeting (February 15, 2017)
 
McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)
McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)
McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)
 
Hearst Park & Pool Community Survey Presentation (January 2017)
Hearst Park & Pool Community Survey Presentation (January 2017)Hearst Park & Pool Community Survey Presentation (January 2017)
Hearst Park & Pool Community Survey Presentation (January 2017)
 
Friendship Recreation Center - ANC Presentation (January 12, 2017)
Friendship Recreation Center - ANC Presentation (January 12, 2017)Friendship Recreation Center - ANC Presentation (January 12, 2017)
Friendship Recreation Center - ANC Presentation (January 12, 2017)
 
Edgewood Recreation Center Community Meeting (December 12, 2016)
Edgewood Recreation Center Community Meeting (December 12, 2016)Edgewood Recreation Center Community Meeting (December 12, 2016)
Edgewood Recreation Center Community Meeting (December 12, 2016)
 
Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)
Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)
Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)
 
Edgewood Recreation Center Community Meeting (November 1, 2016)
Edgewood Recreation Center Community Meeting (November 1, 2016)Edgewood Recreation Center Community Meeting (November 1, 2016)
Edgewood Recreation Center Community Meeting (November 1, 2016)
 
Lafayette Elementary School SIT Meeting Presentation (October 26, 2016)
Lafayette Elementary School SIT Meeting Presentation (October 26, 2016)Lafayette Elementary School SIT Meeting Presentation (October 26, 2016)
Lafayette Elementary School SIT Meeting Presentation (October 26, 2016)
 
Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...
Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...
Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...
 
Bancroft School Community Meeting Presentation (July 9, 2016)
Bancroft School Community Meeting Presentation (July 9, 2016)Bancroft School Community Meeting Presentation (July 9, 2016)
Bancroft School Community Meeting Presentation (July 9, 2016)
 
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
 
Lafayette Elementary School Playground Design Presentation (July 27, 2016)
Lafayette Elementary School Playground Design Presentation (July 27, 2016)Lafayette Elementary School Playground Design Presentation (July 27, 2016)
Lafayette Elementary School Playground Design Presentation (July 27, 2016)
 

Recently uploaded

2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docxkfjstone13
 
Different Frontiers of Social Media War in Indonesia Elections 2024
Different Frontiers of Social Media War in Indonesia Elections 2024Different Frontiers of Social Media War in Indonesia Elections 2024
Different Frontiers of Social Media War in Indonesia Elections 2024Ismail Fahmi
 
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...Axel Bruns
 
25042024_First India Newspaper Jaipur.pdf
25042024_First India Newspaper Jaipur.pdf25042024_First India Newspaper Jaipur.pdf
25042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
College Call Girls Kolhapur Aanya 8617697112 Independent Escort Service Kolhapur
College Call Girls Kolhapur Aanya 8617697112 Independent Escort Service KolhapurCollege Call Girls Kolhapur Aanya 8617697112 Independent Escort Service Kolhapur
College Call Girls Kolhapur Aanya 8617697112 Independent Escort Service KolhapurCall girls in Ahmedabad High profile
 
Referendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoReferendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoSABC News
 
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxKAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxjohnandrewcarlos
 
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...AlexisTorres963861
 
How Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdfHow Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdfLorenzo Lemes
 
26042024_First India Newspaper Jaipur.pdf
26042024_First India Newspaper Jaipur.pdf26042024_First India Newspaper Jaipur.pdf
26042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...Pooja Nehwal
 
Beyond Afrocentrism: Prerequisites for Somalia to lead African de-colonizatio...
Beyond Afrocentrism: Prerequisites for Somalia to lead African de-colonizatio...Beyond Afrocentrism: Prerequisites for Somalia to lead African de-colonizatio...
Beyond Afrocentrism: Prerequisites for Somalia to lead African de-colonizatio...Muhammad Shamsaddin Megalommatis
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKISHAN REDDY OFFICE
 
30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceDelhi Call girls
 
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s LeadershipTDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadershipanjanibaddipudi1
 
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...Ismail Fahmi
 
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...Diya Sharma
 
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docxkfjstone13
 
Minto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptxMinto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptxAwaiskhalid96
 

Recently uploaded (20)

2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
 
Different Frontiers of Social Media War in Indonesia Elections 2024
Different Frontiers of Social Media War in Indonesia Elections 2024Different Frontiers of Social Media War in Indonesia Elections 2024
Different Frontiers of Social Media War in Indonesia Elections 2024
 
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
 
25042024_First India Newspaper Jaipur.pdf
25042024_First India Newspaper Jaipur.pdf25042024_First India Newspaper Jaipur.pdf
25042024_First India Newspaper Jaipur.pdf
 
College Call Girls Kolhapur Aanya 8617697112 Independent Escort Service Kolhapur
College Call Girls Kolhapur Aanya 8617697112 Independent Escort Service KolhapurCollege Call Girls Kolhapur Aanya 8617697112 Independent Escort Service Kolhapur
College Call Girls Kolhapur Aanya 8617697112 Independent Escort Service Kolhapur
 
Referendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoReferendum Party 2024 Election Manifesto
Referendum Party 2024 Election Manifesto
 
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxKAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
 
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
 
How Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdfHow Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdf
 
26042024_First India Newspaper Jaipur.pdf
26042024_First India Newspaper Jaipur.pdf26042024_First India Newspaper Jaipur.pdf
26042024_First India Newspaper Jaipur.pdf
 
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
 
Beyond Afrocentrism: Prerequisites for Somalia to lead African de-colonizatio...
Beyond Afrocentrism: Prerequisites for Somalia to lead African de-colonizatio...Beyond Afrocentrism: Prerequisites for Somalia to lead African de-colonizatio...
Beyond Afrocentrism: Prerequisites for Somalia to lead African de-colonizatio...
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdf
 
30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf
 
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
 
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s LeadershipTDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
 
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
 
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
 
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
 
Minto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptxMinto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptx
 

Lafayette Park Community Meeting (June 9, 2014)

  • 1. Elevating the Quality of Life in the District LAFAYETTE PLAYGROUND COMMUNITY MEETING MONDAY, JUNE 9, 2014
  • 2. Elevating the Quality of Life in the District AGENDA • Introductions • Rules of the Road • Site Overview • Playground Concept Plans • Playground Equipment Options • Next Steps • Questions & Answers Elevating the Quality of Life in the District
  • 3. Elevating the Quality of Life in the District Project Budget  Current budget is $1.5 Million  Proposed Renovations and Amenities  Restored natural grass  Safety lights  New playground equipment and surfacing  Resurfacing, repair of basketball and tennis courts  Repaired walkways and ADA accessibility Elevating the Quality of Life in the District
  • 5. Elevating the Quality of Life in the District Elevating the Quality of Life in the District Site Overview Site Analysis •Existing trees provide great benefit and in overall good condition, could benefit from modest pruning •Lush planting beds at park edge are unique feature to be maintained •Upper field has “bald” spot, needs renovating •Pathways in poor condition, many are not accessible •Play areas well used, need updating for accessibility
  • 6. Community Input- what we heard: •Nature theme, Rock Creek theme, incorporate natural materials •Adventurous play elements •Maintain openness of park •Multigenerational •Renovate and freshen existing features
  • 10. Renovated Spaces Splash Pad Open Field, Open Play Area 2-5 yr 5-12 yr Upper Field 2-5 yr Play Area 5-12 yr Play Area Rec Center Activity Area •Play areas and splash pad are renovated in current locations •Maintains separation of age groups and proximity of 2-5 area to entrance and Rec. Center •Existing trees are saved, new trees and landscaping are added •Upper field remains and is renovated
  • 11. Renovated Spaces •2-5 yr area remains in current area •Provides maximum separation from older children •Play areas are ringed by landscaping and natural play areas •5-12 play area remains open to upper field for fluid play space but with landscape buffer •Previous 2-5 space is converted to open lawn for Rec. Center activities, outdoor classes, and events •New pavilion is central to play spaces for events, shade, family picnics •Existing gazebo renovated and incorporated by pathways and landscape 2-5 yr play area renovated, natural play areas added Splash pad renovated in place 5-12 yr play area renovated as two areas, ex tree protected 2-5 yr 5-12 yr Upper Field
  • 12. Central Gathering Spaces •Existing gazebo is renovated and encircled by landscape to create a garden setting •New pavilion is central to play spaces for events, shade, family picnics •An existing tree is celebrated and utilized for shaded outdoor classroom and performance space Play court reconfigured to maximize open space New Pavilion for picnics, events, and shade Existing tree is celebrated, provides shade for classroom or performance 2-5 yr 5-12 yr Upper Field Existing gazebo renovated and incorporated
  • 13. Boulders in landscape Meadow Theme •Stormwater runoff is captured in rain gardens ringing the play areas •Overflow water in heavy events feeds into “meadow” swale adjacent entry walk •Mounds and boulders add accents in the landscape, stepping stones provide informal connections and nature-based play space •Native plants provide wildlife benefits, educational opportunities, low maintenance requirements and stormwater cleansing Stormwater overflows into “dry creek bed” feature Stepping stones are fun paths for added nature experience Native plants in landscape and rain gardens
  • 14. Resurfaced sport courts Rec. Center Activity Area •Rec. Center area renovated to improve usability and flexibility •Sport courts resurfaced/repaired •Play court is redesigned to maximize play opportunities and flexibility •Painted games maximize play without sacrificing open space •Chess tables located between trees •Tennis practice backboard added •Trees are added for shade Practice backboard Painted games New trees provide shade Painted games Chess tables relocated Painted trike track
  • 15. Multigenerational •Adult exercise equipment located across from 5-12 year play area •Sized to accommodate multiple users at once •Could be used as starting point of “boot camp” class Consolidated equipment area Signage provides fitness training ideas
  • 16. 2-5 Year Play Area •Playground is renovated in place for maximum separation from older children •Landscape beds of native plants add unique play areas and opportunities, provide shade •Playhouse in natural play area provides space for quiet play and pretend play Plants with texture Semi-open playhouse Birdhouses Plants with fun shapes Explore nature together Unique pathways offer special play spaces Shaded benches for caregivers Stepping stones through natural areas Natural edging
  • 17. 5-12 Year Play Area •Area shape provides unique play spaces •Existing trees area saved and celebrated; new trees located to provide maximum shade •Concrete seat walls •Stepping stone path through planted area •Rain garden rings outer edge, bringing nature and native plantings close to play areas •Existing gazebo is renovated and incorporated into play area pathways Plants with seasonal interest Bridge entrance over rain garden Stepping stones through natural areas Rain garden rings play area Existing trees saved, shelters outdoor classroom Existing berms relocated and sculpted for play and landscape interest
  • 20. Consolidated Spaces •Like areas are consolidated for maximum usability 1. Playgrounds 2. Rec Center Activities 3. Open Field •Splash pad and 5-12 yr play area remain in existing location •2-5 yr play area is relocated onto hill •Rec. Center activity area is enlarged •Existing trees are saved, new trees and landscaping is added •Upper field remains and is renovated Rec Center Activity Area 2-5 yr Play Area Open Field, Open Play Area 2-5 yr 5-12 yr Upper Field Splash Pad 5-12 yr Play Area
  • 21. Consolidated Play •2-5 yr area is moved uphill to consolidate major play areas •Allows for easier supervision of age groups •Age groups are separated by landscape and splash pad for safety •Open to upper field for fluid play spaces •Previous 2-5 space is converted to open lawn for Rec. Center activities, outdoor classes, and events •New pavilion is central to play spaces for events, shade, family picnics •Existing gazebo renovated and incorporated by pathways and landscape Converted to lawn for Rec Center activities, events Play areas consolidated around splash pad Terraced steps amphitheater space 2-5 yr 5-12 yr Upper Field
  • 22. Central Gathering Spaces •Existing gazebo renovated and incorporated by pathways and landscape •New pavilion is central to play spaces for events, shade, family picnics •An existing tree is celebrated and utilized for picnic and gathering space Converted to lawn for activities, events New Pavilion for picnics, events, and shade Existing tree celebrated, provides shade for picnic 2-5 yr 5-12 yr Upper Field Existing gazebo renovated and incorporated
  • 23. Boulders in landscape Rock Creek Theme •Stormwater runoff is captured in rain gardens ringing the play areas •Overflow water in heavy events feeds into “dry creek” swale adjacent entry walk •Boulders add accents in the landscape, stepping stones provide informal connections and nature- based play space •Native plants provide wildlife benefits, educational opportunities, low maintenance requirements and stormwater cleansing Log steppers can serve as play elements or seats for classroom space Stormwater overflows into “dry creek bed” feature Stepping stones are fun paths for added nature experience Native plants in landscape and rain gardens
  • 24. Resurfaced sport courts Rec. Center Activity Area •Rec. Center area renovated to improve usability and flexibility •Sport courts resurfaced/repaired •Practice backboard and ping pong tables added to area between courts, chess tables rearranged for improved circulation •Trees are added for shade •Terraced steps create outdoor amphitheater for outdoor classes and open circulation to activity lawn •Lawn provides space for endless activities and exercise classes Practice backboard Rec Center activities New outdoor ping pong tables Classic lawn games Outdoor yoga class
  • 25. Multigenerational •Adult exercise equipment spread out in multiple stations •Stations located around outer pathway around upper field and play areas, creating a “fitness trail” Fitness stations Fitness trail
  • 26. 2-5 Year Play Area •Playground is located close to other playground features for ease of oversight by caregivers •Pavilion, splash pad, and landscape beds of native plants help define space and separate from older play area •Proximity to splash pad and pavilion create central play area •Careful landscape design enriches play experiences and provides shade •Playhouse in natural area allows for quiet play and pretend play Plants with texture Semi-open playhouse Birdhouses Plants with fun shapes Plants with seasonal interest Explore nature together Changes in topography Shaded benches for caregivers Stepping stones through natural areas Open to field
  • 27. 5-12 Year Play Area •Area shape provides unique play spaces •Existing trees area saved and celebrated; new trees located to provide maximum shade •Concrete seat walls •Stepping stone path through planted area •Rain garden rings outer edge, bringing nature and native plantings close to play areas •Existing gazebo is renovated and incorporated into play area pathways Plants with seasonal interest Bridge entrance over rain garden Boulders in landscape on hillside Concrete seat walls Stepping stones through natural areas Rain garden rings play area Existing trees saved
  • 29. 1. Compliance with DPR requirements a) Durability and maintenance considerations (no wood) b) Made in USA 2. Two manufacturers to choose from a) Kompan b) Miracle Playground Equipment Options
  • 31. 2-5 yr Playground: KOMPAN •Ship with slide •Playhouse •Daisy spring feature •Toddler Arc Tunnel Rock Creek Concept Native Meadow ConceptExample Layout
  • 32. KOMPAN Playhouse Ship with slide Toddler Arc Tunnel Daisy spring feature
  • 33. 5-12 yr Playground : KOMPAN •Spinner bowls •Vertical spider’s web •Twisted quadrangle amusement net with sky walk, swaying bridge, and rope screw •Zip line Rock Creek Concept Native Meadow ConceptExample Layout
  • 34. KOMPAN Rope screw Central climbing feature Swaying bridge Climbing ramp
  • 35. KOMPAN Vertical spider’s webZip line Spinner bowls
  • 37. 2-5 yr Playground: MIRACLE •Swings •Log tunnel •Spinners •Playhouse Rock Creek Concept Native Meadow ConceptExample Layout
  • 38. Log tunnel and playhouse SwingsAerial view MIRACLE
  • 39. 5-12 yr Playground: MIRACLE •Climbing/slide feature •Swings •Wobbly wood •Outdoor classroom Rock Creek Concept Native Meadow ConceptExample Layout
  • 41. Swings and outdoor classroom Wobbly logs and outdoor classroom Aerial view
  • 43. 1. Compliance with DPR requirements a) Durability and maintenance considerations (no wood) b) Made in USA 2. Two manufacturers to choose from a) RainDrop b) Water Play Solutions Playground Equipment Options
  • 45. Splash Pad: RAINDROP •Boulder mound slide •Water curtain •Stepped water channels •Water jets •Spinning waterfall •Animal sculptures Rock Creek Concept Native Meadow Concept
  • 46.
  • 47.
  • 49. Splash Pad: WATERPLAY SOLUTIONS •Water channel •Water jets •Spray features Rock Creek Concept Native Meadow Concept
  • 51. NEXT STEPS Elevating the Quality of Life in the District  Landscape Architect procured for Concept Design April 2014  Community Input Meeting April 30, 2014  Concept Design May- June 2014  Concept Design Presentation June 9, 2014  Permits and Construction Summer 2014 Elevating the Quality of Life in the District
  • 52. Elevating the Quality of Life in the District