Palisades Recreation Center - Palisades Citizens Association Meeting (April 4, 2017)

  1. 1. architectscox graae + spackPalisades Recreation Center Cover April 4th 2017 copyright © cox graae + spack ar chitects 2017 scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT Palisades Recreation Center PalisadesCitizensAssociation Meeting April 4th,2017 5200 Sherier Place NW Washington,DC 20016 April 4th 2017
  2. 2. April 4th 2017
  3. 3. April 4th 2017
  4. 4. architectscox graae + spackPalisadesRecreation Center Proposed First Floor Plan March 6th,2017 copyright © cox graae + spack ar chitects 2017 scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT 30 8' 16' 32' UP UP UPUP UP UP UP UP DN DN Court Size 48'x40' Spaces Office/Control Office Storage Staff Restroom Subtotal Public Entr.Lobby and Reception Multi-Purpose Room Multi-Purpose Room Storage Classroom Senior Lounge Family Restroom Subtotal Gynmasuim Gymnasium Storage FitnessRoom FitnessRoom Storage Subtotal Men'sRestroom WomensRestroom Warming/Demonstration Kitchen Outdoor Storage Kitchen Storage FollowingAreasLocated at Lower Level or Elsewhere on Site General Build.Equip.and Stor. Janitor'sClosets/Mop Sink Trash /Recycling Server/MDFRoom Mechanical / Electrical Rooms Subtotal Total Area 200 incl.abv. 175 420 1,670 130 incl.abv. 1,030 250 0 60 50 8,580 4,350 150 170 100 120 3,200 220 930 incl.abv. 310 370 55 2,825 incl.abv. 375 1/16" = 1' 3 4 6 5 12 11 9 8 1 7 10 13 14 15 Overlook/Terrace 1 34 5 6 7 8 9 10 11 12 13 14 15 Classroom Lounge2 2 12 April 4th 2017
  5. 5. April 4th 2017
  6. 6. architectscox graae + spackPalisadesRecreation Center BuildingElevations March 6th,2017 copyright © cox graae + spack ar chitects 2017 scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT 5 0 8' 16' 24' 1st Floor ±0' 0" 2nd Floor +10' 8" New Roof +22' 6" Existing Ridge +27' 6" 1st Floor ±0' 0" 2nd Floor +10' 8" New Roof +22' 6" Existing Ridge +27' 6" East Elevation North Elevation 3/32" = 1' Notes(Proposed) 1. Repair paint,wood structure 2. Repair,paint wood dormer 3. Repair metal roofing 4. New wood shutter to match original,typ. 5. Repl.windowsto closely match original.Repair,paint wood trim 6. Wood trim repair,repaint 7. Repair guttersand downspouts 8. New entry doors 9. New Stair 10. Clean,repair,repaint brick 11. Not Used 12. Not Used Notes(Existing) 1. Not Used 2. Brick 3. Rusticated brick 4. Slat mechanical equip.screen 5. Metal copingcolor matched to slate wall 6. Slate wall cladding 7. Horiz.Aluminum louverscolor matched to storefront 8. Aluminum storefront 9. Concrete wall 10. Not Used 11. New ramp 12. Metal awningover entry doors 13. Pre-finished metal wall panel 3 4 65 2 98 1 7 10 11 1 6 2 8 82 35 6 9 13 8 7 April 4th 2017
  7. 7. architectscox graae + spackPalisadesRecreation Center BuildingElevations March 6th,2017 copyright © cox graae + spack ar chitects 2017 scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT 6 1st Floor ±0' 0" 1st Floor ±0' 0" 2nd Floor +10' 8" New Roof +22' 6" 0 8' 16' 24' Existing Ridge +27' 6" 2nd Floor +10' 8" New Roof +22' 6" Existing Ridge +27' 6" South Elevation West Elevation 3/32" = 1' Notes(Proposed) 1. Repair paint,wood structure 2. Repair,paint wood dormer 3. Repair metal roofing 4. New wood shutter to match original,typ. 5. Repl.windowsto closely match original.Repair,paint wood trim 6. Wood trim repair,repaint 7. Repair guttersand downspouts 8. New entry doors 9. New Stair 10. Clean,repair,repaint brick 11. Not Used 12. Not Used 13. New ramp Notes(Existing) 1. Scupper and Downspout 2. Brick 3. Rusticated brick 4. Slat mechanical equip.screen 5. Metal copingcolor matched to slate wall 6. Slate wall cladding 7. Horiz.Aluminum louverscolor matched to storefront 8. Aluminum storefront 9. Concrete wall 10. Not Used 11. New Ramp 12. Metal awningover entry doors 13. Pre-finished metal wall panel 9 8 12 16 7 2 34 5 612 12 13 13 13 8 23 56 9 88 84 1 1111 April 4th 2017
  8. 8. April 4th 2017
  9. 9. April 4th 2017
  10. 10. April 4th 2017
  11. 11. April 4th 2017
  12. 12. April 4th 2017
  13. 13. April 4th 2017
  14. 14. April 4th 2017 architectscox graae + spackPalisadesRecreation Center Title Block January 5th,2017 copyright © cox graae + spack ar chitects 2016 scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT 22 MARCH 2017 E X I ST IN G   PH OTOS
  15. 15. April 4th 2017 architectscox graae + spackPalisadesRecreation Center Title Block January 5th,2017 copyright © cox graae + spack ar chitects 2016 scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT 22 MARCH 2017 E X I ST IN G   PH OTOS
  16. 16. April 4th 2017 architectscox graae + spackPalisadesRecreation Center Title Block January 5th,2017 copyright © cox graae + spack ar chitects 2016 scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT 22 MARCH 2017 EX ISTIN G  P HOTOS
  17. 17. April 4th 2017 architectscox graae + spackPalisadesRecreation Center Title Block January 5th,2017 copyright © cox graae + spack ar chitects 2016 scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT 22 MARCH 2017 P RO PO S E D  SIT E   P L A N N TERRACE BIKE RACKS/ TRASH RECEPTACLE CONCRETE WALL WITH  WOOD SEATING FLAG POLE ENTRANCE PLAZAEXISTING PATH BIORETENTION  PLANTING BIORETENTION  PLANTING BENCH RAINWATER STORAGE RIVER ROCK STRIP AT  BUILDING EDGE EX. BASKETBALL  COURT EXISTING  PLAYGROUND  AND SPLASHPAD RAMP SEAT WALL SLOT DRAIN  ACCENT PLANTING PORCH COM M UNITY  GARDENS EXISTING LARGE  CANOPY TREE EXISTING FLOWERING TREES COM M UNITY  GARDENS 1 " = 2 0 '‐ 0 "
  18. 18. April 4th 2017
  19. 19. April 4th 2017 architectscox graae + spackPalisadesRecreation Center Title Block January 5th,2017 copyright © cox graae + spack ar chitects 2016 scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT 22 MARCH 2017 P L A N T   MATE RI ALS River Birch Flowering Dogwood Yoshino Cherry Crabapple Bioretention planting Bioretention planting Accent planting
  20. 20. April 4th 2017 architectscox graae + spackPalisades Recreation Center TRAFFIC CONDITIONS March 6th,2017 copyright © cox graae + spack ar chitects 2017 scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT N 0 20' 40'10' 1"=20' SHERIER PL NW STOP 1 2 2 2 2 3 34 5 6 7 77 109 EXISTING PARK ENTRANCE 5 4 3 2 EXISTING SIDEWALK EXISTING ADA PEDESTRIAN RAMP EXISTING CROSSWALK EXISTING LAWN PROPOSED TRAFFIC HUMP PER DDOT STANDARD 605.15 6 EXISTING BRICK PATH 7 EXISTING PARKING LANE PROPOSED RAISED PEDESTRIAN CROSSWALK PER DDOT STANDARD 605.16 9 1 KEY NOTES 10 EXISTING ON-SITE PARKING LOT8
  21. 21. April 4th 2017 architectscox graae + spackPalisades Recreation Center TRAFFIC CONDITIONS March 6th,2017 copyright © cox graae + spack ar chitects 2017 scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT N/A
  22. 22. April 4th 2017
  23. 23. Next Steps Pre Construction / Site Investigations April 2017 to June 2017 Interior Demolition / Abatement May 2017 to June 2017 Site Construction / Expansion July 2017 to March 2018
  24. 24. Department of General Services (DGS) Jackie Stanley, Community Outreach Specialist Jackie.Stanley@dc.gov Department of Parks & Recreation (DPR) Brent Sisco, Landscape Architect Brent.Sisco@dc.gov Contact Information

×