KSTPS Looking at space
INTRODUCTION
•At present total installed capacity of KSTPS is 1240 MW.
• KSTPS has received Meritories productivity awards
during 1984, 1987, 1989, 1981 and every year since 1992
onwards.
•finally stage fifth Unit #7 costed approximately Rs. 961 Crores
•Kota Super Thermal Power Station is the first coal based
Electricity Generating station in rajasthan.
K.S.T.P.S. IS DESIGNED IN FIVE
STAGES
STAGE
I
2x110
MW
STAGE
Il
2x210
MW
STAGE
Ill
1x210
MW
STAGE
IV
1x195
MW
STAGE
V
1x195
MW
K.S.T.P.S. IS DESISIGNED IN
FOLLOWING STAGES:-
Stage Unit number
Installed capacity
(MW)
Date of
commissioning
Status
Stage I 1 110 January 1983 Running
Stage I 2 110 July, 1983 Running
Stage II 3 210 September 1988 Running
Stage II 4 210 May, 1989 Running
Stage III 5 210 March 1994 Running
Stage IV 6 195 July, 2003 Running
Stage V 7 195 May 2009
Running
Installed capacity
WATER:-
The source of water for power station is
reservoir formed by Kota Barrage on the
Chambal River.
General Layout & Basic Idea
•The Kota Thermal Power Station is divided into four
main circuits :
1.Fuel and Ash Circuit.
2 .Air and Gas Circuit.
3.Feed water and Steam Circuit.
4.Cooling Water Circuit.
• A control system of station basically works on
Rankin Cycle.
Coal
Storage
Coal Handling
Plant
Ash
Storage
Ash Handling
Plant Boiler Super
Heater
Economizer
Air
Pre-heater
Turbine
Chi
mn
ey
Feed Water
Heater
Deaerator
Cooling
Tower
Make up
Water
Air
Coal
Ash
COAL
ASH
STEAM
WATER
FLUE GASES
Gener-
ator
Condenser
Exciter
COAL HANDLING PLANT
It can be called the heart of thermal power plant because it
provided the fuel for combustion in boiler.
1.Northern Coal Fields Limited(NCL),
2.South Eastern Coal Fields Limited(SECL)
• Coal India limited is supply coal from its coal mines of coal
producing subsidiaries SECL & NCL to KSTPS through
railway wagons.
• Everyday 6 to 7 trains of coal are unloaded at KSTPS.
• The approximate per day consumption at KSTPS is about
18000 metric tones.
The pulverized coal
is fed to the
boiler
by conveyor belts
From the coal storage
plant, coal is delivered
to the coal
handling
plant where it is
pulverized
Unload the
coal from
wagon to
hopper with
the help of
wagon
Tripler.
Belt are used to convey
coal from coal handling
plant to furnace.
(b) ASH HANDLING PLANT
• This plant can be divided into 3 sub plants as follows:-
1)Fuel and Ash Plant.
2)Air and Gas Plant.
3)Ash Disposal and & Dust Collection Plant
USES ASH:
1.Manufacturing of building materials.
2.Making of concrete.
3.Manufacturing of pozzuolana cement.
4. Road construction
(C). ELECTRO-STATIC PRECIPITATOR
•As far as air pollution is concerned now a days various
flue gases filter are there in service.
•
•These filters are E.S.P. Fabric filter high efficiency
cyclone separations and sitelling room.
•where the particle size vary from 0.75 microns to 100
micron use gradually use E.S.P. to purify the flue gases
due to its higher efficiency & low running cost etc.
STEAM TURBINE
.
TECHNICAL DATA OF TURBINES :-
The main technical data of 110 MW turbine is given below:-
Rated output. : 110 MW.
Economic output : 95 MW.
Rated speed. : 3000 rpm
Direction of rotation viewing from : Clockwise
Rated steam pressure before : 130 atm
stop valve.
Maximum steam pressure before : 146 atm
stop valve.
Rated temperature of steam before : 535oC
the stop valve.
Maximum temperature of steam before : 545oC
the stop valve.
Rated pressure of steam : 31.6 atm
MP Casing.
Rated pressure of steam before : 35 atm
Steam Flow
HP Turbine
IP Turbine
LP Turbine
 It convert heat
energy of steam into
mechanical energy
and drive generator.
 It uses the principle
the steam when
issuing from a small
opening attains a
high velocity.
6.TURBO GENERATOR
THEORY :-
•TURBO GENERATOR manufactured by B.H.E.L.
• The generator stator is a tight construction, supporting &
enclosing the stator windings, core and hydrogen coolers.
• The generator is driven by directly coupled steam turbine
at a speed of 3000 r. p. m. the Generator is designed for
continuous operation at the rated output.
• The source of excitation of rotor windings is thyristor
controlled D.C. supply.
TECHNICAL DATA:-
Generator (110 MW):-
Type : t.g.p. 2,34,602
Continuous apparent power : 1,37,500 KVA.
Active power : 7,10,000 KW.
Power factor : 0.8 (lagging).
Rated voltage : 1000 + 5% rated.
Current : 7,220 A
Critical speed : 3000 r. p. m. at
frequency : 50 Hz.
Phase connection : double star.
No. of terminals : 6.
Main diameter of slip rings : 420 mm.
Voltage regulation : 39%.
Reactance : Infor
TURBO GENERATOR PICTURE
TRANSFORMER
•Transformer is a static device which is used to change
the voltage level keeping the power and frequency
same.
•In the plant transformer is one of the most important
equipment.
•It is located in between the main plant and the
switchyard.
•GENERATOR TRANSFORMER (GT – A):-
It steps up the voltage from 16.5 KV to 220 KV. It connects the plant with the 220 KV
switchyard.
•GENERATOR TRANSFORMER (GT – B):-
It steps up the voltage from 16.5 KV to 400 KV. It connects the plant with the 400 KV
switchyard.
•STATION TRANSFORMER (ST):-
It is a step down transformer with 50 MVA capacities. It is used to step down 220 KV
from the grid to 6.9 KV.
•AUXILIARY TRANSFORMER (UAT):-
It is a step down transformer with 20 MVA capacities. It steps down the voltage from
16.5 KV to 6.9 KV.
• STATION SERVICE TRANSFORMER (SST):-
It is a step down transformer with 2MVA capacity. It is used to step down from 6.6 KV to
0.4333 KV.
• UNIT SERVICE TRANSFORMER (UST):-
It is a step down transformer with 2 MVA capacity. It is used to step down from 6.6 kV to
0.4333 KV.
CONTROL ROOM
Kstps  ppt  niet alwer
Kstps  ppt  niet alwer

More Related Content

What's hot

Ntpc badarpur summer training
Ntpc badarpur summer trainingNtpc badarpur summer training
Ntpc badarpur summer trainingShivam Jain
 
Turboexpander - Gear - Generator
Turboexpander - Gear - GeneratorTurboexpander - Gear - Generator
Turboexpander - Gear - GeneratorRoss Rhyme
 
Offshore equipment & services The and units p CMM-G CMM-GL erform three stage...
Offshore equipment & services The and units p CMM-G CMM-GL erform three stage...Offshore equipment & services The and units p CMM-G CMM-GL erform three stage...
Offshore equipment & services The and units p CMM-G CMM-GL erform three stage...GlobeCore
 
NTPC training
NTPC trainingNTPC training
NTPC trainingManav Mittal
 
NTPC faridabad nd badarpur
NTPC faridabad nd badarpurNTPC faridabad nd badarpur
NTPC faridabad nd badarpurShrey Dhasmana
 
gopi recent
gopi recentgopi recent
gopi recentGopi Nath
 
My gtc presentation
My gtc presentationMy gtc presentation
My gtc presentationmdosmankabir
 
Power plants in bangladesh
Power plants in bangladeshPower plants in bangladesh
Power plants in bangladeshImran Hossain
 
Hartwick National Rresearch Ccouncil of Canada Dec. 2009 ReGen-X Generator Te...
Hartwick National Rresearch Ccouncil of Canada Dec. 2009 ReGen-X Generator Te...Hartwick National Rresearch Ccouncil of Canada Dec. 2009 ReGen-X Generator Te...
Hartwick National Rresearch Ccouncil of Canada Dec. 2009 ReGen-X Generator Te...Potential Difference Inc.
 
Ampair 6kW - sales brochure
Ampair 6kW - sales brochureAmpair 6kW - sales brochure
Ampair 6kW - sales brochureDaniel Coelho
 
Control of parallel multiple converters for direct drive permanent magnet win...
Control of parallel multiple converters for direct drive permanent magnet win...Control of parallel multiple converters for direct drive permanent magnet win...
Control of parallel multiple converters for direct drive permanent magnet win...Asoka Technologies
 

What's hot (16)

Ntpc badarpur summer training
Ntpc badarpur summer trainingNtpc badarpur summer training
Ntpc badarpur summer training
 
Turboexpander - Gear - Generator
Turboexpander - Gear - GeneratorTurboexpander - Gear - Generator
Turboexpander - Gear - Generator
 
Offshore equipment & services The and units p CMM-G CMM-GL erform three stage...
Offshore equipment & services The and units p CMM-G CMM-GL erform three stage...Offshore equipment & services The and units p CMM-G CMM-GL erform three stage...
Offshore equipment & services The and units p CMM-G CMM-GL erform three stage...
 
NTPC training
NTPC trainingNTPC training
NTPC training
 
NTPC faridabad nd badarpur
NTPC faridabad nd badarpurNTPC faridabad nd badarpur
NTPC faridabad nd badarpur
 
gopi recent
gopi recentgopi recent
gopi recent
 
My gtc presentation
My gtc presentationMy gtc presentation
My gtc presentation
 
Power plants in bangladesh
Power plants in bangladeshPower plants in bangladesh
Power plants in bangladesh
 
NTPC Singrauli
NTPC SingrauliNTPC Singrauli
NTPC Singrauli
 
Design 1st & Hillcrest Petroleum Advanced Energy - Generator Testing FTC Report
Design 1st & Hillcrest Petroleum Advanced Energy - Generator Testing FTC ReportDesign 1st & Hillcrest Petroleum Advanced Energy - Generator Testing FTC Report
Design 1st & Hillcrest Petroleum Advanced Energy - Generator Testing FTC Report
 
NTPC Seminar
NTPC SeminarNTPC Seminar
NTPC Seminar
 
Hartwick National Rresearch Ccouncil of Canada Dec. 2009 ReGen-X Generator Te...
Hartwick National Rresearch Ccouncil of Canada Dec. 2009 ReGen-X Generator Te...Hartwick National Rresearch Ccouncil of Canada Dec. 2009 ReGen-X Generator Te...
Hartwick National Rresearch Ccouncil of Canada Dec. 2009 ReGen-X Generator Te...
 
ReGenX EV Generator Prototype No. 1 Operating Beyond Infinite Efficiency
ReGenX EV Generator Prototype No. 1 Operating Beyond Infinite EfficiencyReGenX EV Generator Prototype No. 1 Operating Beyond Infinite Efficiency
ReGenX EV Generator Prototype No. 1 Operating Beyond Infinite Efficiency
 
3 Prototype #3 EV Regenerative Acceleration (ReGenX) eBike Integration Protot...
3 Prototype #3 EV Regenerative Acceleration (ReGenX) eBike Integration Protot...3 Prototype #3 EV Regenerative Acceleration (ReGenX) eBike Integration Protot...
3 Prototype #3 EV Regenerative Acceleration (ReGenX) eBike Integration Protot...
 
Ampair 6kW - sales brochure
Ampair 6kW - sales brochureAmpair 6kW - sales brochure
Ampair 6kW - sales brochure
 
Control of parallel multiple converters for direct drive permanent magnet win...
Control of parallel multiple converters for direct drive permanent magnet win...Control of parallel multiple converters for direct drive permanent magnet win...
Control of parallel multiple converters for direct drive permanent magnet win...
 

Similar to Kstps ppt niet alwer

FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING Om Prakash
 
kota super thermal poer plant
kota super thermal poer plantkota super thermal poer plant
kota super thermal poer plantNiranjan kumar sah
 
GANESH KUMAR RAM PPT ON TTPS LALPANIA
GANESH KUMAR RAM PPT ON TTPS LALPANIAGANESH KUMAR RAM PPT ON TTPS LALPANIA
GANESH KUMAR RAM PPT ON TTPS LALPANIA1996kuldeep
 
A best ppt on kota super thermal power station
A best ppt on kota super thermal power stationA best ppt on kota super thermal power station
A best ppt on kota super thermal power stationNaveen Kumar
 
A Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power StationA Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power StationLekhraJ Meena
 
Ramendra summer training presentation
Ramendra summer training presentationRamendra summer training presentation
Ramendra summer training presentationRamendra Dhiman
 
Durgapur Projects Limited: Vocational training presentation
Durgapur Projects Limited: Vocational training presentationDurgapur Projects Limited: Vocational training presentation
Durgapur Projects Limited: Vocational training presentationSaumyadip Moitra
 
obra thermal power plant ppt
obra thermal power plant pptobra thermal power plant ppt
obra thermal power plant pptAshish Singh
 
IPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationShubhra Dhyani
 
Ppt on tenughat thermal power plant
Ppt on tenughat thermal power plantPpt on tenughat thermal power plant
Ppt on tenughat thermal power plantAbhinaw kapoor
 
Summer Training Presentation Kota Super Thermal Power Station
Summer Training Presentation Kota Super Thermal Power StationSummer Training Presentation Kota Super Thermal Power Station
Summer Training Presentation Kota Super Thermal Power StationFellowBuddy.com
 
Abhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd Unchahar
Abhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd UnchaharAbhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd Unchahar
Abhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd UnchaharABHINAV KUMAR
 
Vocational training at mejia thermal power plant
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plantNipak Banerjee
 
NARENDRA MEENA REPORT AND PPT
NARENDRA MEENA  REPORT AND PPT NARENDRA MEENA  REPORT AND PPT
NARENDRA MEENA REPORT AND PPT NarendraMeena41
 
Kota super thermal power station ppt, rtu
Kota super thermal power station ppt, rtuKota super thermal power station ppt, rtu
Kota super thermal power station ppt, rtuRaghav Chittora
 
GSECL Electrical branch Training Report
GSECL Electrical branch Training ReportGSECL Electrical branch Training Report
GSECL Electrical branch Training ReportUtsav Yagnik
 
Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC KantiTarun Kumar
 
kota super thermal power station
kota super thermal power station kota super thermal power station
kota super thermal power station aryanmewara2
 

Similar to Kstps ppt niet alwer (20)

FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
 
ntpc khalgaon
ntpc khalgaonntpc khalgaon
ntpc khalgaon
 
kota super thermal poer plant
kota super thermal poer plantkota super thermal poer plant
kota super thermal poer plant
 
GANESH KUMAR RAM PPT ON TTPS LALPANIA
GANESH KUMAR RAM PPT ON TTPS LALPANIAGANESH KUMAR RAM PPT ON TTPS LALPANIA
GANESH KUMAR RAM PPT ON TTPS LALPANIA
 
A best ppt on kota super thermal power station
A best ppt on kota super thermal power stationA best ppt on kota super thermal power station
A best ppt on kota super thermal power station
 
A Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power StationA Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power Station
 
Ramendra summer training presentation
Ramendra summer training presentationRamendra summer training presentation
Ramendra summer training presentation
 
Durgapur Projects Limited: Vocational training presentation
Durgapur Projects Limited: Vocational training presentationDurgapur Projects Limited: Vocational training presentation
Durgapur Projects Limited: Vocational training presentation
 
obra thermal power plant ppt
obra thermal power plant pptobra thermal power plant ppt
obra thermal power plant ppt
 
IPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentation
 
Ppt on tenughat thermal power plant
Ppt on tenughat thermal power plantPpt on tenughat thermal power plant
Ppt on tenughat thermal power plant
 
Summer Training Presentation Kota Super Thermal Power Station
Summer Training Presentation Kota Super Thermal Power StationSummer Training Presentation Kota Super Thermal Power Station
Summer Training Presentation Kota Super Thermal Power Station
 
Abhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd Unchahar
Abhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd UnchaharAbhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd Unchahar
Abhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd Unchahar
 
Vocational training at mejia thermal power plant
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plant
 
NARENDRA MEENA REPORT AND PPT
NARENDRA MEENA  REPORT AND PPT NARENDRA MEENA  REPORT AND PPT
NARENDRA MEENA REPORT AND PPT
 
Kota super thermal power station ppt, rtu
Kota super thermal power station ppt, rtuKota super thermal power station ppt, rtu
Kota super thermal power station ppt, rtu
 
GSECL Electrical branch Training Report
GSECL Electrical branch Training ReportGSECL Electrical branch Training Report
GSECL Electrical branch Training Report
 
Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC Kanti
 
ppt.pptx
ppt.pptxppt.pptx
ppt.pptx
 
kota super thermal power station
kota super thermal power station kota super thermal power station
kota super thermal power station
 

More from Avdhesh kumar NIET

Smart Home Appliance Control Niet Alwar
Smart Home  Appliance Control Niet AlwarSmart Home  Appliance Control Niet Alwar
Smart Home Appliance Control Niet AlwarAvdhesh kumar NIET
 
Smart home appliance Control Niet Alwar
Smart home appliance Control Niet AlwarSmart home appliance Control Niet Alwar
Smart home appliance Control Niet AlwarAvdhesh kumar NIET
 
Presentation instrument transformerr
Presentation instrument transformerrPresentation instrument transformerr
Presentation instrument transformerrAvdhesh kumar NIET
 
Presentation Instrument Transformer NIET
Presentation Instrument Transformer  NIET Presentation Instrument Transformer  NIET
Presentation Instrument Transformer NIET Avdhesh kumar NIET
 

More from Avdhesh kumar NIET (10)

Smart Home Appliance Control Niet Alwar
Smart Home  Appliance Control Niet AlwarSmart Home  Appliance Control Niet Alwar
Smart Home Appliance Control Niet Alwar
 
Smart home appliance Control Niet Alwar
Smart home appliance Control Niet AlwarSmart home appliance Control Niet Alwar
Smart home appliance Control Niet Alwar
 
Presentation instrument transformerr
Presentation instrument transformerrPresentation instrument transformerr
Presentation instrument transformerr
 
Presentation Instrument Transformer NIET
Presentation Instrument Transformer  NIET Presentation Instrument Transformer  NIET
Presentation Instrument Transformer NIET
 
Kstps ppt
Kstps  pptKstps  ppt
Kstps ppt
 
Transmission network
Transmission  networkTransmission  network
Transmission network
 
Kstps ppt niet alwar
Kstps  ppt  niet alwarKstps  ppt  niet alwar
Kstps ppt niet alwar
 
Transmission network
Transmission  networkTransmission  network
Transmission network
 
Kstps ppt niet alwar
Kstps  ppt  niet alwarKstps  ppt  niet alwar
Kstps ppt niet alwar
 
Kstps ppt niet alwar
Kstps  ppt  niet alwarKstps  ppt  niet alwar
Kstps ppt niet alwar
 

Recently uploaded

BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...Pooja Nehwal
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 

Recently uploaded (20)

BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
CĂłdigo Creativo y Arte de Software | Unidad 1
CĂłdigo Creativo y Arte de Software | Unidad 1CĂłdigo Creativo y Arte de Software | Unidad 1
CĂłdigo Creativo y Arte de Software | Unidad 1
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 

Kstps ppt niet alwer

  • 1. Presentation on kstps By Avdhesh kumar meena B.Tech 4th Year Electrical Branch NIET Alwar Rajasthan avdheshkumarmeena10@gmail.com
  • 3.
  • 4. INTRODUCTION •At present total installed capacity of KSTPS is 1240 MW. • KSTPS has received Meritories productivity awards during 1984, 1987, 1989, 1981 and every year since 1992 onwards. •finally stage fifth Unit #7 costed approximately Rs. 961 Crores •Kota Super Thermal Power Station is the first coal based Electricity Generating station in rajasthan.
  • 5. K.S.T.P.S. IS DESIGNED IN FIVE STAGES STAGE I 2x110 MW STAGE Il 2x210 MW STAGE Ill 1x210 MW STAGE IV 1x195 MW STAGE V 1x195 MW K.S.T.P.S. IS DESISIGNED IN FOLLOWING STAGES:-
  • 6. Stage Unit number Installed capacity (MW) Date of commissioning Status Stage I 1 110 January 1983 Running Stage I 2 110 July, 1983 Running Stage II 3 210 September 1988 Running Stage II 4 210 May, 1989 Running Stage III 5 210 March 1994 Running Stage IV 6 195 July, 2003 Running Stage V 7 195 May 2009 Running Installed capacity
  • 7. WATER:- The source of water for power station is reservoir formed by Kota Barrage on the Chambal River.
  • 8. General Layout & Basic Idea •The Kota Thermal Power Station is divided into four main circuits : 1.Fuel and Ash Circuit. 2 .Air and Gas Circuit. 3.Feed water and Steam Circuit. 4.Cooling Water Circuit. • A control system of station basically works on Rankin Cycle.
  • 9. Coal Storage Coal Handling Plant Ash Storage Ash Handling Plant Boiler Super Heater Economizer Air Pre-heater Turbine Chi mn ey Feed Water Heater Deaerator Cooling Tower Make up Water Air Coal Ash COAL ASH STEAM WATER FLUE GASES Gener- ator Condenser Exciter
  • 10.
  • 11. COAL HANDLING PLANT It can be called the heart of thermal power plant because it provided the fuel for combustion in boiler. 1.Northern Coal Fields Limited(NCL), 2.South Eastern Coal Fields Limited(SECL) • Coal India limited is supply coal from its coal mines of coal producing subsidiaries SECL & NCL to KSTPS through railway wagons. • Everyday 6 to 7 trains of coal are unloaded at KSTPS. • The approximate per day consumption at KSTPS is about 18000 metric tones.
  • 12. The pulverized coal is fed to the boiler by conveyor belts From the coal storage plant, coal is delivered to the coal handling plant where it is pulverized
  • 13. Unload the coal from wagon to hopper with the help of wagon Tripler.
  • 14. Belt are used to convey coal from coal handling plant to furnace.
  • 15. (b) ASH HANDLING PLANT • This plant can be divided into 3 sub plants as follows:- 1)Fuel and Ash Plant. 2)Air and Gas Plant. 3)Ash Disposal and & Dust Collection Plant USES ASH: 1.Manufacturing of building materials. 2.Making of concrete. 3.Manufacturing of pozzuolana cement. 4. Road construction
  • 16. (C). ELECTRO-STATIC PRECIPITATOR •As far as air pollution is concerned now a days various flue gases filter are there in service. • •These filters are E.S.P. Fabric filter high efficiency cyclone separations and sitelling room. •where the particle size vary from 0.75 microns to 100 micron use gradually use E.S.P. to purify the flue gases due to its higher efficiency & low running cost etc.
  • 18. . TECHNICAL DATA OF TURBINES :- The main technical data of 110 MW turbine is given below:- Rated output. : 110 MW. Economic output : 95 MW. Rated speed. : 3000 rpm Direction of rotation viewing from : Clockwise Rated steam pressure before : 130 atm stop valve. Maximum steam pressure before : 146 atm stop valve. Rated temperature of steam before : 535oC the stop valve. Maximum temperature of steam before : 545oC the stop valve. Rated pressure of steam : 31.6 atm MP Casing. Rated pressure of steam before : 35 atm
  • 19. Steam Flow HP Turbine IP Turbine LP Turbine  It convert heat energy of steam into mechanical energy and drive generator.  It uses the principle the steam when issuing from a small opening attains a high velocity.
  • 20. 6.TURBO GENERATOR THEORY :- •TURBO GENERATOR manufactured by B.H.E.L. • The generator stator is a tight construction, supporting & enclosing the stator windings, core and hydrogen coolers. • The generator is driven by directly coupled steam turbine at a speed of 3000 r. p. m. the Generator is designed for continuous operation at the rated output. • The source of excitation of rotor windings is thyristor controlled D.C. supply.
  • 21.
  • 22.
  • 23. TECHNICAL DATA:- Generator (110 MW):- Type : t.g.p. 2,34,602 Continuous apparent power : 1,37,500 KVA. Active power : 7,10,000 KW. Power factor : 0.8 (lagging). Rated voltage : 1000 + 5% rated. Current : 7,220 A Critical speed : 3000 r. p. m. at frequency : 50 Hz. Phase connection : double star. No. of terminals : 6. Main diameter of slip rings : 420 mm. Voltage regulation : 39%. Reactance : Infor
  • 25. TRANSFORMER •Transformer is a static device which is used to change the voltage level keeping the power and frequency same. •In the plant transformer is one of the most important equipment. •It is located in between the main plant and the switchyard.
  • 26. •GENERATOR TRANSFORMER (GT – A):- It steps up the voltage from 16.5 KV to 220 KV. It connects the plant with the 220 KV switchyard. •GENERATOR TRANSFORMER (GT – B):- It steps up the voltage from 16.5 KV to 400 KV. It connects the plant with the 400 KV switchyard. •STATION TRANSFORMER (ST):- It is a step down transformer with 50 MVA capacities. It is used to step down 220 KV from the grid to 6.9 KV. •AUXILIARY TRANSFORMER (UAT):- It is a step down transformer with 20 MVA capacities. It steps down the voltage from 16.5 KV to 6.9 KV. • STATION SERVICE TRANSFORMER (SST):- It is a step down transformer with 2MVA capacity. It is used to step down from 6.6 KV to 0.4333 KV. • UNIT SERVICE TRANSFORMER (UST):- It is a step down transformer with 2 MVA capacity. It is used to step down from 6.6 kV to 0.4333 KV.