Introduction –kstps
By Avdhesh kumar meena
B.Tech 4th Year Electrical Branch
NIET Alwar Rajasthan
INDEX
0. KSTPS PICTURES
1.INTRODUCTION
2. GENERAL LAYOUT AND BASIC IDEA
3.TURBO GENERATOR
4.COOLING SYSTEM
5.TRANSFORMERS
Looking at surface
1. INTRODUCTION
•Kota Super Thermal Power Station is the
first coal based Electricity Generating station
in rajasthan.
•At present the total installedcapacity of
KSTPS is 1240 MW.
• KSTPS has received Meritories
productivity awards during 1984, 1987,
1989, 1981 and every year since 1992
onwards.
K.S.T.P.S. IS DESISIGNED IN
FOLLOWING STAGES:-
STAGE I - 2x110 MW
STAGE II - 2X210 MW
STAGE III - 1X210 MW
STAGE IV - 1X195 MW
STAGE V - 1X195MW
Stage Unit number
Installed capacity
(MW)
Date of
commissioning
Status
Stage I 1 110 January 1983 Running
Stage I 2 110 July, 1983 Running
Stage II 3 210 September 1988 Running
Stage II 4 210 May, 1989 Running
Stage III 5 210 March 1994 Running
Stage IV 6 195 July, 2003 Running
Stage V 7 195 May 2009
Running
Installed capacity
•The planning commission cleared the
project report in Sept., 1976 for
installation of two units each of 110 MW
in first estimated cost of Rs. 143 Crores .
•And finally stage fifth Unit #7 costed
approximately Rs. 961 Crores.
COAL:
1.Northern Coal Fields Limited(NCL),
2.South Eastern Coal Fields
Limited(SECL)
• Coal India limited is supply coal from
its coal mines of coal producing
subsidiaries SECL & NCL to Kota
Thermal Power Station through
railway wagons.
• The average distances of SECL, NCL are
800, 950 Kms. respectively.
WATER:-
•The source of water for power station is
reservoir formed by Kota Barrage on the
Chambal River.
• In case of large capacity plants huge
quantities of coal and water is required.
2. General Layout & Basic Idea
•The Kota Thermal Power Station is divided into four
main circuits :
1.Fuel and Ash Circuit.
2 .Air and Gas Circuit.
3.Feed water and Steam Circuit.
4.Cooling Water Circuit.
• A control system of station basically works on Rankin
Cycle.
(a).COAL HANDLING PLANT
•It can be called the heart of thermal power plant because it
provided the fuel for combustion in boiler.
•Everyday 6 to 7 trains of coal are unloaded at KSTPS.
• Each train consists of 58 wagons and each wagons consists of
50 tones of coal.
• The approximate per day consumption at KSTPS is about
18000 metric tones.
• The whole transportation of coal is through
conveyor belt operated by 3-Ø Induction motor.
• It costs approximate 4.5 crores of rupees per day
including transportation expenses.
•The coal handling plant can broadly be divided into
thre sections.
1) Wagon Unloading system.
2) Crushing System.
3) Conveying System.
(b) ASH HANDLING PLANT
• This plant can be divided into 3 sub plants as follows:-
1)Fuel and Ash Plant.
2)Air and Gas Plant.
3)Ash Disposal and & Dust Collection Plant
USES ASH:
1.Manufacturing of building materials.
2.Making of concrete.
3.Manufacturing of pozzuolana cement.
4. Road construction
(C). ELECTRO-STATIC PRECIPITATOR
•As far as air pollution is concerned now a days various
flue gases filter are there in service.
•
•These filters are E.S.P. Fabric filter high efficiency
cyclone separations and sitelling room.
•where the particle size vary from 0.75 microns to 100
micron use gradually use E.S.P. to purify the flue gases
due to its higher efficiency & low running cost etc.
6.TURBO GENERATOR
THEORY :-
•TURBO GENERATOR manufactured by B.H.E.L.
• The generator stator is a tight construction, supporting &
enclosing the stator windings, core and hydrogen coolers.
• The generator is driven by directly coupled steam turbine
at a speed of 3000 r. p. m. the Generator is designed for
continuous operation at the rated output.
• The source of excitation of rotor windings is thyristor
controlled D.C. supply.
TECHNICAL DATA:-
Generator (110 MW):-
Type : t.g.p. 2,34,602
Continuous apparent power : 1,37,500 KVA.
Active power : 7,10,000 KW.
Power factor : 0.8 (lagging).
Rated voltage : 1000 + 5% rated.
Current : 7,220 A
Critical speed : 3000 r. p. m. at
frequency : 50 Hz.
Phase connection : double star.
No. of terminals : 6.
Main diameter of slip rings : 420 mm.
Voltage regulation : 39%.
Reactance : Infor
Main parts of generator:-
(a)STATOR:-
STATOR FRAME:-
The stator frame of welded steel frame construction.
STATOR CORE:-
•It is built up of special sheet laminations and whose assembly is supported by a special
guide bass.
STATOR BARS:-
•Stator bars are manufactured as half bars, For an equal length along the bar.
STATOR WINDINGS:-
•Stator windings are double star layers , lap wound, three phase, short pitch type.
• Phases are connected to form a double star winding.
TERMINAL BUSHINGS:-
• The conductor of Generator terminal bushing having hollow copper tubes with Copper
brazed at the ends to avoid leakage of hydrogen.
BEARINGS:-
Generator bearings have electrical seats of consists of steel bodies with removable steel
pads.
HYDROGEN COOLERS:-
•Three Hydrogen Coolers each comprising of two individual units are mounted inside the
stator frame.
VIBRATION OF ROTOR:
-
4.COOLING SYSTEM
a) GENERAL:-
•In KSTPS hydrogen cooling system is employed for generator cooling.
• Hydrogen is used for cooling medium primarily because of its superior cooling
properties & low density.
• Thermal conductivity of hydrogen 7.3 times of air.
• Its ability to transfer heat through forced convection is about 75% better than air.
b)HYDROGEN DRYERS:-
•Moisture in this gas is absorbed by silica gel in the dryer as the absorbed gas passes
through it.
•The silica gel is reactivated by heating.
10.TRANSFORMER
•Transformer is a static device which is used to change the voltage level keeping the power and frequency same.
•In the plant transformer is one of the most important equipment.
•It is located in between the main plant and the switchyard. The main transformers installed in the transformer yard are:
•GENERATOR TRANSFORMER (GT – A):-
It steps up the voltage from 16.5 KV to 220 KV. It connects the plant with the 220 KV switchyard.
•GENERATOR TRANSFORMER (GT – B):-
It steps up the voltage from 16.5 KV to 400 KV. It connects the plant with the 400 KV switchyard.
•STATION TRANSFORMER (ST):-
It is a step down transformer with 50 MVA capacities. It is used to step down 220 KV from the grid to 6.9 KV.
•AUXILIARY TRANSFORMER (UAT):-
It is a step down transformer with 20 MVA capacities. It steps down the voltage from 16.5 KV to 6.9 KV.
• STATION SERVICE TRANSFORMER (SST):-
It is a step down transformer with 2MVA capacity. It is used to step down from 6.6 KV to 0.4333 KV.
• UNIT SERVICE TRANSFORMER (UST):-
It is a step down transformer with 2 MVA capacity. It is used to step down from 6.6 kV to 0.4333 KV.
Thanks

More Related Content

What's hot

Ntpc kahalgaon project by bhanu kishan
Ntpc kahalgaon project by bhanu kishanNtpc kahalgaon project by bhanu kishan
Ntpc kahalgaon project by bhanu kishanBHANUKISHAN1
 
KBUNL - NTPC KANTI MUZAFFARPUR BIHAR
KBUNL - NTPC KANTI MUZAFFARPUR BIHARKBUNL - NTPC KANTI MUZAFFARPUR BIHAR
KBUNL - NTPC KANTI MUZAFFARPUR BIHARVIMAL VAIBHAV
 
Indraprastha power
Indraprastha powerIndraprastha power
Indraprastha powerAnish Ansari
 
IPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationShubhra Dhyani
 
Ranjan NTPC KAHALGAON ppt
Ranjan  NTPC KAHALGAON pptRanjan  NTPC KAHALGAON ppt
Ranjan NTPC KAHALGAON pptRanjan kumar
 
Bangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants OverviewBangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants OverviewRidwanul Hoque
 
Summer Training Report Ntpc barh (ajeet)
Summer Training Report Ntpc barh (ajeet)Summer Training Report Ntpc barh (ajeet)
Summer Training Report Ntpc barh (ajeet)Ajeet Chaurasia
 
Basics of Diesel Generator System
Basics of Diesel Generator SystemBasics of Diesel Generator System
Basics of Diesel Generator Systemprabakaran G
 

What's hot (18)

NTPC BARH, BIHAR
NTPC BARH, BIHARNTPC BARH, BIHAR
NTPC BARH, BIHAR
 
Ntpc kahalgaon project by bhanu kishan
Ntpc kahalgaon project by bhanu kishanNtpc kahalgaon project by bhanu kishan
Ntpc kahalgaon project by bhanu kishan
 
KBUNL - NTPC KANTI MUZAFFARPUR BIHAR
KBUNL - NTPC KANTI MUZAFFARPUR BIHARKBUNL - NTPC KANTI MUZAFFARPUR BIHAR
KBUNL - NTPC KANTI MUZAFFARPUR BIHAR
 
Lovely Amit
Lovely AmitLovely Amit
Lovely Amit
 
thermal power station
thermal power stationthermal power station
thermal power station
 
Shivesh ntpc ppt
Shivesh ntpc pptShivesh ntpc ppt
Shivesh ntpc ppt
 
Indraprastha power
Indraprastha powerIndraprastha power
Indraprastha power
 
Pintu raj
Pintu rajPintu raj
Pintu raj
 
Dev
DevDev
Dev
 
IPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentation
 
K.s.t.p.s. ppt
K.s.t.p.s.  pptK.s.t.p.s.  ppt
K.s.t.p.s. ppt
 
Ranjan NTPC KAHALGAON ppt
Ranjan  NTPC KAHALGAON pptRanjan  NTPC KAHALGAON ppt
Ranjan NTPC KAHALGAON ppt
 
Bangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants OverviewBangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants Overview
 
ntpc ppt
ntpc pptntpc ppt
ntpc ppt
 
project -2
project -2project -2
project -2
 
NTPC Singrauli
NTPC SingrauliNTPC Singrauli
NTPC Singrauli
 
Summer Training Report Ntpc barh (ajeet)
Summer Training Report Ntpc barh (ajeet)Summer Training Report Ntpc barh (ajeet)
Summer Training Report Ntpc barh (ajeet)
 
Basics of Diesel Generator System
Basics of Diesel Generator SystemBasics of Diesel Generator System
Basics of Diesel Generator System
 

Similar to Avdhehs kumar presention kstps kota

FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING Om Prakash
 
Vocational training at mejia thermal power plant
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plantNipak Banerjee
 
Kota super thermal power plant training report
Kota super thermal power plant training reportKota super thermal power plant training report
Kota super thermal power plant training reportAvinash Kumawat
 
Power plants in bangladesh
Power plants in bangladeshPower plants in bangladesh
Power plants in bangladeshImran Hossain
 
A Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power StationA Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power StationLekhraJ Meena
 
NARENDRA MEENA REPORT AND PPT
NARENDRA MEENA  REPORT AND PPT NARENDRA MEENA  REPORT AND PPT
NARENDRA MEENA REPORT AND PPT NarendraMeena41
 
C ktps training-report
C ktps training-reportC ktps training-report
C ktps training-reportAnil Saharan
 
Thermal Power Simulator Training
Thermal Power Simulator TrainingThermal Power Simulator Training
Thermal Power Simulator TrainingVedant Sumaria
 
Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant pptPrakash Jarotia
 
Internship PPT final.pptx on ukai thermal power station
Internship PPT final.pptx on ukai thermal power stationInternship PPT final.pptx on ukai thermal power station
Internship PPT final.pptx on ukai thermal power stationmalikavita731
 
Internship PPT ukai thermal power station .pptx
Internship PPT ukai thermal power station .pptxInternship PPT ukai thermal power station .pptx
Internship PPT ukai thermal power station .pptxmalikavita731
 
Internship PPT final ukai thermal power station
Internship PPT final ukai thermal power stationInternship PPT final ukai thermal power station
Internship PPT final ukai thermal power stationmalikavita731
 

Similar to Avdhehs kumar presention kstps kota (20)

Kstps ppt niet alwar
Kstps  ppt  niet alwarKstps  ppt  niet alwar
Kstps ppt niet alwar
 
Kstps ppt niet alwar
Kstps  ppt  niet alwarKstps  ppt  niet alwar
Kstps ppt niet alwar
 
Kstps ppt niet alwar
Kstps  ppt  niet alwarKstps  ppt  niet alwar
Kstps ppt niet alwar
 
Kstps ppt
Kstps  pptKstps  ppt
Kstps ppt
 
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
 
Vocational training at mejia thermal power plant
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plant
 
ntpc khalgaon
ntpc khalgaonntpc khalgaon
ntpc khalgaon
 
kota super thermal poer plant
kota super thermal poer plantkota super thermal poer plant
kota super thermal poer plant
 
Kota super thermal power plant training report
Kota super thermal power plant training reportKota super thermal power plant training report
Kota super thermal power plant training report
 
Power plants in bangladesh
Power plants in bangladeshPower plants in bangladesh
Power plants in bangladesh
 
kstps training report
kstps training reportkstps training report
kstps training report
 
A Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power StationA Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power Station
 
Naps
Naps Naps
Naps
 
NARENDRA MEENA REPORT AND PPT
NARENDRA MEENA  REPORT AND PPT NARENDRA MEENA  REPORT AND PPT
NARENDRA MEENA REPORT AND PPT
 
C ktps training-report
C ktps training-reportC ktps training-report
C ktps training-report
 
Thermal Power Simulator Training
Thermal Power Simulator TrainingThermal Power Simulator Training
Thermal Power Simulator Training
 
Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant ppt
 
Internship PPT final.pptx on ukai thermal power station
Internship PPT final.pptx on ukai thermal power stationInternship PPT final.pptx on ukai thermal power station
Internship PPT final.pptx on ukai thermal power station
 
Internship PPT ukai thermal power station .pptx
Internship PPT ukai thermal power station .pptxInternship PPT ukai thermal power station .pptx
Internship PPT ukai thermal power station .pptx
 
Internship PPT final ukai thermal power station
Internship PPT final ukai thermal power stationInternship PPT final ukai thermal power station
Internship PPT final ukai thermal power station
 

More from Avdhesh kumar NIET

Smart Home Appliance Control Niet Alwar
Smart Home  Appliance Control Niet AlwarSmart Home  Appliance Control Niet Alwar
Smart Home Appliance Control Niet AlwarAvdhesh kumar NIET
 
Smart home appliance Control Niet Alwar
Smart home appliance Control Niet AlwarSmart home appliance Control Niet Alwar
Smart home appliance Control Niet AlwarAvdhesh kumar NIET
 
Presentation instrument transformerr
Presentation instrument transformerrPresentation instrument transformerr
Presentation instrument transformerrAvdhesh kumar NIET
 
Presentation Instrument Transformer NIET
Presentation Instrument Transformer  NIET Presentation Instrument Transformer  NIET
Presentation Instrument Transformer NIET Avdhesh kumar NIET
 

More from Avdhesh kumar NIET (6)

Smart Home Appliance Control Niet Alwar
Smart Home  Appliance Control Niet AlwarSmart Home  Appliance Control Niet Alwar
Smart Home Appliance Control Niet Alwar
 
Smart home appliance Control Niet Alwar
Smart home appliance Control Niet AlwarSmart home appliance Control Niet Alwar
Smart home appliance Control Niet Alwar
 
Presentation instrument transformerr
Presentation instrument transformerrPresentation instrument transformerr
Presentation instrument transformerr
 
Presentation Instrument Transformer NIET
Presentation Instrument Transformer  NIET Presentation Instrument Transformer  NIET
Presentation Instrument Transformer NIET
 
Transmission network
Transmission  networkTransmission  network
Transmission network
 
Transmission network
Transmission  networkTransmission  network
Transmission network
 

Recently uploaded

Govindpuri Call Girls : ☎ 8527673949, Low rate Call Girls
Govindpuri Call Girls : ☎ 8527673949, Low rate Call GirlsGovindpuri Call Girls : ☎ 8527673949, Low rate Call Girls
Govindpuri Call Girls : ☎ 8527673949, Low rate Call Girlsashishs7044
 
FULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | DelhiFULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | DelhiMalviyaNagarCallGirl
 
FULL ENJOY - 9953040155 Call Girls in Paschim Vihar | Delhi
FULL ENJOY - 9953040155 Call Girls in Paschim Vihar | DelhiFULL ENJOY - 9953040155 Call Girls in Paschim Vihar | Delhi
FULL ENJOY - 9953040155 Call Girls in Paschim Vihar | DelhiMalviyaNagarCallGirl
 
MinSheng Gaofeng Estate commercial storyboard
MinSheng Gaofeng Estate commercial storyboardMinSheng Gaofeng Estate commercial storyboard
MinSheng Gaofeng Estate commercial storyboardjessica288382
 
San Jon Motel, Motel/Residence, San Jon NM
San Jon Motel, Motel/Residence, San Jon NMSan Jon Motel, Motel/Residence, San Jon NM
San Jon Motel, Motel/Residence, San Jon NMroute66connected
 
Kishangarh Call Girls : ☎ 8527673949, Low rate Call Girls
Kishangarh Call Girls : ☎ 8527673949, Low rate Call GirlsKishangarh Call Girls : ☎ 8527673949, Low rate Call Girls
Kishangarh Call Girls : ☎ 8527673949, Low rate Call Girlsashishs7044
 
FULL ENJOY - 9953040155 Call Girls in Uttam Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in Uttam Nagar | DelhiFULL ENJOY - 9953040155 Call Girls in Uttam Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in Uttam Nagar | DelhiMalviyaNagarCallGirl
 
Pragati Maidan Call Girls : ☎ 8527673949, Low rate Call Girls
Pragati Maidan Call Girls : ☎ 8527673949, Low rate Call GirlsPragati Maidan Call Girls : ☎ 8527673949, Low rate Call Girls
Pragati Maidan Call Girls : ☎ 8527673949, Low rate Call Girlsashishs7044
 
Call Girls in Islamabad | 03274100048 | Call Girl Service
Call Girls in Islamabad | 03274100048 | Call Girl ServiceCall Girls in Islamabad | 03274100048 | Call Girl Service
Call Girls in Islamabad | 03274100048 | Call Girl ServiceAyesha Khan
 
How Can You Get Dubai Call Girls +971564860409 Call Girls Dubai?
How Can You Get Dubai Call Girls +971564860409 Call Girls Dubai?How Can You Get Dubai Call Girls +971564860409 Call Girls Dubai?
How Can You Get Dubai Call Girls +971564860409 Call Girls Dubai?kexey39068
 
Call Girl in Bur Dubai O5286O4116 Indian Call Girls in Bur Dubai By VIP Bur D...
Call Girl in Bur Dubai O5286O4116 Indian Call Girls in Bur Dubai By VIP Bur D...Call Girl in Bur Dubai O5286O4116 Indian Call Girls in Bur Dubai By VIP Bur D...
Call Girl in Bur Dubai O5286O4116 Indian Call Girls in Bur Dubai By VIP Bur D...dajasot375
 
Jagat Puri Call Girls : ☎ 8527673949, Low rate Call Girls
Jagat Puri Call Girls : ☎ 8527673949, Low rate Call GirlsJagat Puri Call Girls : ☎ 8527673949, Low rate Call Girls
Jagat Puri Call Girls : ☎ 8527673949, Low rate Call Girlsashishs7044
 
Faridabad Call Girls : ☎ 8527673949, Low rate Call Girls
Faridabad Call Girls : ☎ 8527673949, Low rate Call GirlsFaridabad Call Girls : ☎ 8527673949, Low rate Call Girls
Faridabad Call Girls : ☎ 8527673949, Low rate Call Girlsashishs7044
 
Retail Store Scavanger Hunt - Foundation College Park
Retail Store Scavanger Hunt - Foundation College ParkRetail Store Scavanger Hunt - Foundation College Park
Retail Store Scavanger Hunt - Foundation College Parkjosebenzaquen
 
FULL ENJOY - 9953040155 Call Girls in Gandhi Vihar | Delhi
FULL ENJOY - 9953040155 Call Girls in Gandhi Vihar | DelhiFULL ENJOY - 9953040155 Call Girls in Gandhi Vihar | Delhi
FULL ENJOY - 9953040155 Call Girls in Gandhi Vihar | DelhiMalviyaNagarCallGirl
 
9654467111 Full Enjoy @24/7 Call Girls In Saket Delhi Ncr
9654467111 Full Enjoy @24/7 Call Girls In Saket Delhi Ncr9654467111 Full Enjoy @24/7 Call Girls In Saket Delhi Ncr
9654467111 Full Enjoy @24/7 Call Girls In Saket Delhi NcrSapana Sha
 
Roadrunner Lodge, Motel/Residence, Tucumcari NM
Roadrunner Lodge, Motel/Residence, Tucumcari NMRoadrunner Lodge, Motel/Residence, Tucumcari NM
Roadrunner Lodge, Motel/Residence, Tucumcari NMroute66connected
 
Bare And Wild Creation, Curio Shop, Tucumcari NM
Bare And Wild Creation, Curio Shop, Tucumcari NMBare And Wild Creation, Curio Shop, Tucumcari NM
Bare And Wild Creation, Curio Shop, Tucumcari NMroute66connected
 
Downtown Call Girls O5O91O128O Pakistani Call Girls in Downtown
Downtown Call Girls O5O91O128O Pakistani Call Girls in DowntownDowntown Call Girls O5O91O128O Pakistani Call Girls in Downtown
Downtown Call Girls O5O91O128O Pakistani Call Girls in Downtowndajasot375
 

Recently uploaded (20)

Govindpuri Call Girls : ☎ 8527673949, Low rate Call Girls
Govindpuri Call Girls : ☎ 8527673949, Low rate Call GirlsGovindpuri Call Girls : ☎ 8527673949, Low rate Call Girls
Govindpuri Call Girls : ☎ 8527673949, Low rate Call Girls
 
FULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | DelhiFULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | Delhi
 
FULL ENJOY - 9953040155 Call Girls in Paschim Vihar | Delhi
FULL ENJOY - 9953040155 Call Girls in Paschim Vihar | DelhiFULL ENJOY - 9953040155 Call Girls in Paschim Vihar | Delhi
FULL ENJOY - 9953040155 Call Girls in Paschim Vihar | Delhi
 
MinSheng Gaofeng Estate commercial storyboard
MinSheng Gaofeng Estate commercial storyboardMinSheng Gaofeng Estate commercial storyboard
MinSheng Gaofeng Estate commercial storyboard
 
San Jon Motel, Motel/Residence, San Jon NM
San Jon Motel, Motel/Residence, San Jon NMSan Jon Motel, Motel/Residence, San Jon NM
San Jon Motel, Motel/Residence, San Jon NM
 
Kishangarh Call Girls : ☎ 8527673949, Low rate Call Girls
Kishangarh Call Girls : ☎ 8527673949, Low rate Call GirlsKishangarh Call Girls : ☎ 8527673949, Low rate Call Girls
Kishangarh Call Girls : ☎ 8527673949, Low rate Call Girls
 
FULL ENJOY - 9953040155 Call Girls in Uttam Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in Uttam Nagar | DelhiFULL ENJOY - 9953040155 Call Girls in Uttam Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in Uttam Nagar | Delhi
 
Dxb Call Girls # +971529501107 # Call Girls In Dxb Dubai || (UAE)
Dxb Call Girls # +971529501107 # Call Girls In Dxb Dubai || (UAE)Dxb Call Girls # +971529501107 # Call Girls In Dxb Dubai || (UAE)
Dxb Call Girls # +971529501107 # Call Girls In Dxb Dubai || (UAE)
 
Pragati Maidan Call Girls : ☎ 8527673949, Low rate Call Girls
Pragati Maidan Call Girls : ☎ 8527673949, Low rate Call GirlsPragati Maidan Call Girls : ☎ 8527673949, Low rate Call Girls
Pragati Maidan Call Girls : ☎ 8527673949, Low rate Call Girls
 
Call Girls in Islamabad | 03274100048 | Call Girl Service
Call Girls in Islamabad | 03274100048 | Call Girl ServiceCall Girls in Islamabad | 03274100048 | Call Girl Service
Call Girls in Islamabad | 03274100048 | Call Girl Service
 
How Can You Get Dubai Call Girls +971564860409 Call Girls Dubai?
How Can You Get Dubai Call Girls +971564860409 Call Girls Dubai?How Can You Get Dubai Call Girls +971564860409 Call Girls Dubai?
How Can You Get Dubai Call Girls +971564860409 Call Girls Dubai?
 
Call Girl in Bur Dubai O5286O4116 Indian Call Girls in Bur Dubai By VIP Bur D...
Call Girl in Bur Dubai O5286O4116 Indian Call Girls in Bur Dubai By VIP Bur D...Call Girl in Bur Dubai O5286O4116 Indian Call Girls in Bur Dubai By VIP Bur D...
Call Girl in Bur Dubai O5286O4116 Indian Call Girls in Bur Dubai By VIP Bur D...
 
Jagat Puri Call Girls : ☎ 8527673949, Low rate Call Girls
Jagat Puri Call Girls : ☎ 8527673949, Low rate Call GirlsJagat Puri Call Girls : ☎ 8527673949, Low rate Call Girls
Jagat Puri Call Girls : ☎ 8527673949, Low rate Call Girls
 
Faridabad Call Girls : ☎ 8527673949, Low rate Call Girls
Faridabad Call Girls : ☎ 8527673949, Low rate Call GirlsFaridabad Call Girls : ☎ 8527673949, Low rate Call Girls
Faridabad Call Girls : ☎ 8527673949, Low rate Call Girls
 
Retail Store Scavanger Hunt - Foundation College Park
Retail Store Scavanger Hunt - Foundation College ParkRetail Store Scavanger Hunt - Foundation College Park
Retail Store Scavanger Hunt - Foundation College Park
 
FULL ENJOY - 9953040155 Call Girls in Gandhi Vihar | Delhi
FULL ENJOY - 9953040155 Call Girls in Gandhi Vihar | DelhiFULL ENJOY - 9953040155 Call Girls in Gandhi Vihar | Delhi
FULL ENJOY - 9953040155 Call Girls in Gandhi Vihar | Delhi
 
9654467111 Full Enjoy @24/7 Call Girls In Saket Delhi Ncr
9654467111 Full Enjoy @24/7 Call Girls In Saket Delhi Ncr9654467111 Full Enjoy @24/7 Call Girls In Saket Delhi Ncr
9654467111 Full Enjoy @24/7 Call Girls In Saket Delhi Ncr
 
Roadrunner Lodge, Motel/Residence, Tucumcari NM
Roadrunner Lodge, Motel/Residence, Tucumcari NMRoadrunner Lodge, Motel/Residence, Tucumcari NM
Roadrunner Lodge, Motel/Residence, Tucumcari NM
 
Bare And Wild Creation, Curio Shop, Tucumcari NM
Bare And Wild Creation, Curio Shop, Tucumcari NMBare And Wild Creation, Curio Shop, Tucumcari NM
Bare And Wild Creation, Curio Shop, Tucumcari NM
 
Downtown Call Girls O5O91O128O Pakistani Call Girls in Downtown
Downtown Call Girls O5O91O128O Pakistani Call Girls in DowntownDowntown Call Girls O5O91O128O Pakistani Call Girls in Downtown
Downtown Call Girls O5O91O128O Pakistani Call Girls in Downtown
 

Avdhehs kumar presention kstps kota

  • 1. Introduction –kstps By Avdhesh kumar meena B.Tech 4th Year Electrical Branch NIET Alwar Rajasthan
  • 2. INDEX 0. KSTPS PICTURES 1.INTRODUCTION 2. GENERAL LAYOUT AND BASIC IDEA 3.TURBO GENERATOR 4.COOLING SYSTEM 5.TRANSFORMERS
  • 3.
  • 5. 1. INTRODUCTION •Kota Super Thermal Power Station is the first coal based Electricity Generating station in rajasthan. •At present the total installedcapacity of KSTPS is 1240 MW. • KSTPS has received Meritories productivity awards during 1984, 1987, 1989, 1981 and every year since 1992 onwards.
  • 6. K.S.T.P.S. IS DESISIGNED IN FOLLOWING STAGES:- STAGE I - 2x110 MW STAGE II - 2X210 MW STAGE III - 1X210 MW STAGE IV - 1X195 MW STAGE V - 1X195MW
  • 7. Stage Unit number Installed capacity (MW) Date of commissioning Status Stage I 1 110 January 1983 Running Stage I 2 110 July, 1983 Running Stage II 3 210 September 1988 Running Stage II 4 210 May, 1989 Running Stage III 5 210 March 1994 Running Stage IV 6 195 July, 2003 Running Stage V 7 195 May 2009 Running Installed capacity
  • 8. •The planning commission cleared the project report in Sept., 1976 for installation of two units each of 110 MW in first estimated cost of Rs. 143 Crores . •And finally stage fifth Unit #7 costed approximately Rs. 961 Crores.
  • 9. COAL: 1.Northern Coal Fields Limited(NCL), 2.South Eastern Coal Fields Limited(SECL) • Coal India limited is supply coal from its coal mines of coal producing subsidiaries SECL & NCL to Kota Thermal Power Station through railway wagons. • The average distances of SECL, NCL are 800, 950 Kms. respectively.
  • 10. WATER:- •The source of water for power station is reservoir formed by Kota Barrage on the Chambal River. • In case of large capacity plants huge quantities of coal and water is required.
  • 11. 2. General Layout & Basic Idea •The Kota Thermal Power Station is divided into four main circuits : 1.Fuel and Ash Circuit. 2 .Air and Gas Circuit. 3.Feed water and Steam Circuit. 4.Cooling Water Circuit. • A control system of station basically works on Rankin Cycle.
  • 12.
  • 13. (a).COAL HANDLING PLANT •It can be called the heart of thermal power plant because it provided the fuel for combustion in boiler. •Everyday 6 to 7 trains of coal are unloaded at KSTPS. • Each train consists of 58 wagons and each wagons consists of 50 tones of coal. • The approximate per day consumption at KSTPS is about 18000 metric tones.
  • 14. • The whole transportation of coal is through conveyor belt operated by 3-Ø Induction motor. • It costs approximate 4.5 crores of rupees per day including transportation expenses. •The coal handling plant can broadly be divided into thre sections. 1) Wagon Unloading system. 2) Crushing System. 3) Conveying System.
  • 15. (b) ASH HANDLING PLANT • This plant can be divided into 3 sub plants as follows:- 1)Fuel and Ash Plant. 2)Air and Gas Plant. 3)Ash Disposal and & Dust Collection Plant USES ASH: 1.Manufacturing of building materials. 2.Making of concrete. 3.Manufacturing of pozzuolana cement. 4. Road construction
  • 16. (C). ELECTRO-STATIC PRECIPITATOR •As far as air pollution is concerned now a days various flue gases filter are there in service. • •These filters are E.S.P. Fabric filter high efficiency cyclone separations and sitelling room. •where the particle size vary from 0.75 microns to 100 micron use gradually use E.S.P. to purify the flue gases due to its higher efficiency & low running cost etc.
  • 17. 6.TURBO GENERATOR THEORY :- •TURBO GENERATOR manufactured by B.H.E.L. • The generator stator is a tight construction, supporting & enclosing the stator windings, core and hydrogen coolers. • The generator is driven by directly coupled steam turbine at a speed of 3000 r. p. m. the Generator is designed for continuous operation at the rated output. • The source of excitation of rotor windings is thyristor controlled D.C. supply.
  • 18. TECHNICAL DATA:- Generator (110 MW):- Type : t.g.p. 2,34,602 Continuous apparent power : 1,37,500 KVA. Active power : 7,10,000 KW. Power factor : 0.8 (lagging). Rated voltage : 1000 + 5% rated. Current : 7,220 A Critical speed : 3000 r. p. m. at frequency : 50 Hz. Phase connection : double star. No. of terminals : 6. Main diameter of slip rings : 420 mm. Voltage regulation : 39%. Reactance : Infor
  • 19. Main parts of generator:- (a)STATOR:- STATOR FRAME:- The stator frame of welded steel frame construction. STATOR CORE:- •It is built up of special sheet laminations and whose assembly is supported by a special guide bass. STATOR BARS:- •Stator bars are manufactured as half bars, For an equal length along the bar. STATOR WINDINGS:- •Stator windings are double star layers , lap wound, three phase, short pitch type. • Phases are connected to form a double star winding. TERMINAL BUSHINGS:- • The conductor of Generator terminal bushing having hollow copper tubes with Copper brazed at the ends to avoid leakage of hydrogen. BEARINGS:- Generator bearings have electrical seats of consists of steel bodies with removable steel pads. HYDROGEN COOLERS:- •Three Hydrogen Coolers each comprising of two individual units are mounted inside the stator frame.
  • 21. 4.COOLING SYSTEM a) GENERAL:- •In KSTPS hydrogen cooling system is employed for generator cooling. • Hydrogen is used for cooling medium primarily because of its superior cooling properties & low density. • Thermal conductivity of hydrogen 7.3 times of air. • Its ability to transfer heat through forced convection is about 75% better than air. b)HYDROGEN DRYERS:- •Moisture in this gas is absorbed by silica gel in the dryer as the absorbed gas passes through it. •The silica gel is reactivated by heating.
  • 22. 10.TRANSFORMER •Transformer is a static device which is used to change the voltage level keeping the power and frequency same. •In the plant transformer is one of the most important equipment. •It is located in between the main plant and the switchyard. The main transformers installed in the transformer yard are: •GENERATOR TRANSFORMER (GT – A):- It steps up the voltage from 16.5 KV to 220 KV. It connects the plant with the 220 KV switchyard. •GENERATOR TRANSFORMER (GT – B):- It steps up the voltage from 16.5 KV to 400 KV. It connects the plant with the 400 KV switchyard. •STATION TRANSFORMER (ST):- It is a step down transformer with 50 MVA capacities. It is used to step down 220 KV from the grid to 6.9 KV. •AUXILIARY TRANSFORMER (UAT):- It is a step down transformer with 20 MVA capacities. It steps down the voltage from 16.5 KV to 6.9 KV. • STATION SERVICE TRANSFORMER (SST):- It is a step down transformer with 2MVA capacity. It is used to step down from 6.6 KV to 0.4333 KV. • UNIT SERVICE TRANSFORMER (UST):- It is a step down transformer with 2 MVA capacity. It is used to step down from 6.6 kV to 0.4333 KV.

Editor's Notes

  1. Picture by satelite