Online Business Management Software
By: Muz Karabaev, Founder of kpi.com | muz@kpi.com
Introduction
Introduction – who we are
kpi.com – part of Finnet Limited, Software Company
Started/Founded in 2005 by Muzaffar Karabaev in London, United
Kingdom.
MobileCloud DMCC is a sister company in Dubai, and became GCC
Sales and Support Headquarters for kpi.com-Finnet Limited from
2014.
120+ employees spread over three Regions:
Central Asia, GCC (UAE) & UK, Plus our Partner Network (KSA and
Oman).
30+ partners/resellers working and providing support for kpi.com in
more than 10 Countries. GCC is a major focus NOW
What is kpi.com/Business Management Software?
Cloud SaaS Software
SME’s Business Processes
Affordable
Built in Workflows
Keep it simple
Ease of Processes
Single Platform
5 Modules
With kpi.com you get:
Ease of adoptability
Five core modules in one
application
Cloud and Central
System
Focus on quality
and working method
Multiple layers of
support, including
trainings and
migration
Principles of kpi.com
The kpi.com is built around the following principles:
Customizable
Affordable
Available on
mobile
Easy to Use
Integrated
Kpi.com Reporting Principles
The software should be able to provide the
Financial information quickly
Kpi.com Upgrading Principles
The cloud business software should provide
automatic regular upgrades for free. For all
customers.
Kpi.com Customer Service Principles
Customers should get full assistance from
support team until they are fully on-boarded.
KPI.com: End Users Geographic Spread
28%
North America
13%
UK
21% Other parts of
Europe
5%
Australia
20%
Middle East
4%
South America
2%
Africa
Rest of the world – 7%
3000+ Companies, 15000+ User Base and Growing
Kpi.com modules and
processes
What is kpi.com software?
It incorporates all key business functions of your business
Manage cash/money
Keep track of products
Manage Customers
Produce or Implement
Sell
Keep Track of Employees
Accounting and
Finance
Inventory
Management
Warehouse
Management
CRM
Project
Management
Manufacturing
Storefront
Sales Force
Automation
HRMS
Case management
Payroll
Bookkeeping
Even a small business is complicated
Kpi.com makes it easy to manage
ESS, Attendance Tracking, Payroll, Recruitment, On
boarding, Performance Appraisals, Reporting,
Project Management
CRM
HRMS and Payroll
Accounting and Inventory
Add-Ons and Settings
Benefits and Engagement
Contents
Reporting Management
HRMS
Why is there a need for HRMS?
Too much paperwork?
No payroll history?
Too much trivial tasks?
Complaints not addressed?
What is in HRMS?
https://www.youtube.com/watch?v=swYk62gTCwA
Manage Employees
Run Payroll
Track Attendance
Review Performance
Recruitment
Group Pay-run Taxes, Reports
Leave Requests
Simple Appraisals Annual Reviews
In-out hours
ESS
HRMS Default Access Levels
Roles What they can see in HR?
Administrators Everything
HR Managers Everything
Department Leaders, Project Managers Limited HR View (only data related to their
own department/project)
Accountants Limited HR View
Employees Their own data only
Setup your own permission settings
Settings -> Permission Management -> HRMS
Employee Self Service
ESS concept allows HRs to ease their workload
Our employees can see and
modify their own HR Data
Employees can see a lot of their stuff
Employees can see
their own related
features
Employees can claim their company expenses
2 level of Approvals
can be enabled for
your company upon
request
ESS: HR can setup reminders for employees
Reminders can be
set to Employees or
to managers
You can trigger your
own events
Settings -> Recurrence Settings -> HR reminders
Organizational Structure
Your new employees can see the
organizational structure when they
login firstly
Setup positions and departments
and supervisors
Attendance Tracking –In/Outs
Biometric/fingerprint device integration
Actual hours when employees
came to the office
Attendance tracking
Reporting -> HRMS -> Late Employees
John wants to know top late
employees of the week
Attendance Tracking –Settings
HR manager can set different schedules
Employees have different
schedules, some of them
are outsourced from
freelance
Attendance Tracking –
Leave Requests
John views active leave requests
Let us see if she deserves
leave request
John can view leave status of employee before approval
All good
Approve leave requests
Approved, go
You can add 2 levels of approvals
We can enable 2 level
approvals for your company
Payroll Software
Our payroll is simple and yet functional
Payroll is fully tailored for UAE and Australia legislations
Contact us at support@kpi.com for payroll customizations at your own country
Issue salaries
I want to issue salary to all
employees at once
Initiate a group
payrun
Timesheet/Payroll Integration
1. Make sure employees fill out timesheet
2. Specify rates per project
3. PMs Approve Timesheets
4. Run payroll as regular
We want to pay
employees on an
hourly rate
End of Service Gratuity
Calculate end of service gratuity
for resigning employees if
available
View WPS and Pension Contribution Reports
Recruitment
Recruitment
https://www.youtube.com/watch?v=swYk62gTCwA
You can receive
candidates from
a web form
Publish
vacancies to
your website
Recruitment Workflow
Publish
Vacancies
Receive
candidates
Schedule an
interview
Prepare a
shortlist
Candidate
hired
Web form in your website
Publish to job sites
Coming Soon!
Candidate added
as employee
Calendar helps to plan daily interviews
The calendar is
fully compatible
with Google
It shows
everything
Email right in kpi.com
Recruitment@jamesmorris.com
Recruitment@jamesmorris.com
Email candidates
directly at
kpi.com
On-boarding
On-boarding
We can track passport, visa,
government related forms,
entry permits and set renewal
reminders for HR managers
On-boarding
How on-boarding works in kpi.com:
HR Manager/Admin builds
periods, steps with custom forms
and custom fields with on-
boarding steps
Employee sees their own on-
boarding data in My On-boarding
Checklist(if HR manager enabled
for employees to them)
On-boarding period:
1. Add on-
boarding period
An on-boarding
period is a period
when certain on
boarding steps
need to be
completed
On-boarding steps:
2. Add on-boarding step
This will create a
custom form
When checked, it
will be visible for
employee
An on-boarding
step is the step
which employee
should pass in
when they are
hired
On-boarding steps:
3. Build an on boarding form in Settings
If you build a custom
form, it will appear here
1. Go to Settings – Custom Field
Settings
1. Go to Settings – Custom Field Settings
On-boarding custom fields
Add as many custom fields as needed:
Make on boarding form user friendly
Drag and
drop fields
How employees see on-boarding data
Performance Appraisals
Our Performance Review Template
Employee’s
name
Competencies – Weight
Competency 1 – Score X
Competency 2 – Score Y
Goals – Weight
Goal 1 – Score X
Goal 2 – Score Y
Total Employee’s Score = XYZ
Total Goals x Weight + Competencies x
Weight
Total of weights should equal
100%
Note: We can implement your own template upon request
Our Performance Review Workflow
Manager’s
Initiative
Employee
Self-Review
Manger
Review and
Rating
Manager’s
Approval
This step can be totally
omitted
Manager can be HR,
Department leader, or a
Project Manager
John Conducts Performance Review
I need to review my team
members
He sets competencies and goals
Review or send to employee first
You can set your own goals in
Goal Management Section
Manager Review
Rates can be customized
PA trends we want to follow in the future
At the end of the day, we want
better results from employees as
a company
We will be providing options for
simple and more frequent
feedback goal-measurement
processes in the system
In other words, we will make it simple
to measure performance and
compare it over time
HRMS Reporting
Custom reporting tool helps to create your own reports
We want to stay flexible by
creating our own reports
Step 1:Create your own report
here
Custom reporting tool helps to create your own reports
2. Select the template
Contact us at support@kpi.com for more hrms templates
Custom reporting tool helps to create your own reports
Build your own report here
Custom reporting tool helps to create your own reports
You can build your own chart
Select chart type
Select columns
Accounting and Inventory
Accounting and Inventory Workflow
Sales Order
Create
Approve
Get from Storefront
Purchase Order
Request
Approval
The following workflow can be utilized by retailers:
Receive Goods
Warehousing
Purchase
Invoice
Ship Items
Pick
Pack
Ship
Convert to Invoice
Handle
Returns
Receive Payment
Sales Receipt
Statement
charges
Make Payment
Match
Payment
w/ Invoice
View Reports
Balance Sheet
P&L Statements
Sales Reports
Accounting and Inventory Workflow
Sales Order
Create
Approve
Get from Storefront
Purchase Order
Request
Approval
Manufacturing industries can utilize the following workflow:
Receive Goods
Warehousing
Purchase
Invoice
Make Payment
Match
Payment
w/ Invoice
Receive Payment
Sales Receipt
Statement
charges
Convert to Invoice
Handle
Returns
Ship Items
Pick
Pack
Ship
View Reports
Balance Sheet
P&L Statements
Sales Reports
Build Assembly
Inventory
Product
Warehouse
Accounting and Project Workflow
Create Sales Quote
Client Approval
Request for Quote
Timesheet
Task Timer
Entries
Professional Services Industry:
Timesheet Approval
Planned vs. Actual
Task duration
View Reports
Balance Sheet
P&L Statements
Sales Reports
Timesheet Invoice
Totals by tasks
Totals by
employees
Add Project
Project Details
Budget and Estimates CRM Won
Opportunity
Project
Management
Receive Payment
Sales Receipt
Statement
charges
Accounting
Invoicing
Invoicing
You can create
your own
templates
Invoicing features:
Multiple currencies
Custom templates
Custom fields
Billable expenses
Product/service types
Recurring invoice
Credit notes
Different types of invoicing
We want to create recurring
invoice and credit notes
Sales Quotes with Progress Invoicing
We want to charge our
customers partially
Import your own invoice templates
Contact us at support@kpi.com for importing your own invoice templates
Invoice documents can
be sent as PDF in your
own template
Purchase Order and Invoice
Suppliers center
75
Manage your
suppliers right here
You can manage your suppliers right here
View how much you
own the suppliers
Purchase Orders
76
Manage your
suppliers right here
Purchase order listing shows active purchase orders
You can copy PO
details to a Sales
Quote
Add New Purchase Order
Add New Purchase Order
Purchase Invoice Listing
Manage your
suppliers right here
Purchase invoice listing shows active purchase invoices
Purchase Invoice Listing
Pay your purchase bill
View Purchase Invoice
Inventory Management
Why kpi.com Inventory Management?
Our Inventory Management Software Has a Number of Benefits:
Lower Amount of ReturnsFaster Shipping Transparent Tracking
Improved Customer
Service
Automatic Bookkeeping Availability on Mobile
Let’s start with the basics
84
Know how much stock is
available in real time
Don’t be afraid of shortage
85
If you setup reorder quantities, the
system will automatically order the
product when you are running short of
item
You will not be left without any stock
Easily Manage Sales Orders
86
You can create projects from
sales orders
Go to pick list in order to mark
items as shipped One click does it all for you
Streamline Your Operations
87
Pick, pack and ship inventory items
Transfer Stock Between the Warehouses
88
Make Better Decisions
89
View the current value of products
Stay Flexible As You Grow
90
Create custom reports and add them to your favorites
You can manage your inventory in a mobile app
91
Bookkeeping and Reports
Accounting and Bookkeeping
You can create other
accounting transactions
Sales charts
You can analyze your
top customers and
products
View Accounting Reports
You can provide access
to your accountants or
advisors to analyze the
figures
CRM
CRM Features
CRM software has a number of benefits:
Web formsSales Management
Improved Customer
Service
Mass Mailing and Message
Center
Transparent Reports
Available on Mobile
CRM Workflow
Marketing Sales Support Delivery
Campaigns Leads Cases Projects
OpportunitiesMass Mailing
Web Forms
Emails
Solutions
Tasks
TimesheetSales Quotes
CRM Workflow
Marketing Sales Support Delivery
Campaigns Leads Cases Projects
OpportunitiesMass Mailing
Web Forms
Emails
Solutions
Tasks
TimesheetSales Quotes
Most CRM solutions stop here
CRM Workflow
Marketing Sales Support Delivery
Campaigns Leads Cases Projects
OpportunitiesMass Mailing
Web Forms
Emails
Solutions
Tasks
TimesheetSales Quotes
Most CRM solutions stop here
With kpi.com, you get this step,
you don’t need to buy another
project management software
CRM Workflow
Marketing Sales Support Delivery
Campaigns Leads Cases Projects
OpportunitiesMass Mailing
Web Forms
Emails
Solutions
Tasks
TimesheetSales Quotes
There is more in one software
With kpi.com, you get this step,
you don’t need to buy another
project management software
Reporting Accounting
CRM Default Access Levels
Roles What they can see in PM?
Administrators Everything within the CRM section
Sales Managers Everything within the CRM section
Sales Rep Only their own data
Accountants All sales quotes, sales orders, sales invoice
documents. All opportunities.
Directors All sales reports
CRM Permission Management
Sales
CRM-Sales Workflow
Lead Capture
Lead
Qualification Opportunity
Opportunity
Won
Lost
Reports and
Dashboards
Project
Sales Order
No Leaky funnel + Complete Visibility
= Integrated sales, project management and accounting process
Sales: Just Work With Leads, No Data Entry Required
Easily embed a web form to your main website
And start working with leads in kpi.com
All activities automatically appear in
calendar
Working with leads
View planned tasks in calendar
Calendar shows projects,
tasks, and leave requests
Sync with Google
CRM Opportunities
You can create your own
sequence in Settings –
Reference settings
View how your team is
performing
It indicates that there are not
enough sales at the top of the
pipeline
Total sales this
month
Find out how you are performing monthly
Export your report to excel and view there
Sales Manager’s Dashboard
Coming
Soon!
We want to see some
important highlights in
dashboard
Mass Mailing
Create a mailing list
We want to send emails
to our leads
1. Create mailing list first: Go to contacts – Add new - Mailing list
You can send emails to your customers and leads in Email marketing –
mailing list
Send mass mail to your leads and clients
You can send mail message or sms message to your contacts
Configure sms settings before
using it
Case Management
Manage issues and requests in case management
You can configure color
coding important tickets
when you need
Assign cases(tickets) right
there
Email customers right from kpi.com
Reply right
here
Need to email more? There is a message center
You can connect it to
your Google apps
account
Everything is connected
You can convert opportunities to project, and manage it from
project management section
OR
Manage any issues appearing in company from one
place. You can relate cases (tickets) to anything. You
can track even purchasing issues from suppliers
No need to integrate
different apps with each other
Project Management
Project Management Workflow
Simple Project Management Workflow:
Add Project
Add from template
Convert from
CRM Opportunity
Import
Add Task
Add task
Add multi-task
Timesheet
Task Timer
Timesheet Approval
Monthly
By Project
By Employee
Close the project
Archive the
project
View the allocation
Resource
Utilization
Dashboard
Setup Reminders
Project
Management
Settings
View who is too busy,
and who is sitting
without tasks
Project Management Workflow
Construction Project Management Workflow:
Add Project Prepare a budget
Start the project
Add TasksAdd Workstreams Timesheet Timesheet
Approval
Payroll
Bill the client
Approve budget Purchase Order
Receive goods
Workflows can be
customized easily
Analyze requirements
Create Estimates
Approve the timeline
PM Workflow
Or you can utilize the following workflow if you operate in Professional Services Industry:
Add Project
Add from template
Convert from
CRM Opportunity
Add Task
Add task
Add multi-task
Timesheet
Task Timer
Timesheet Approval
Monthly
By Project
By Employee
Bill the client
Partial Billing
Recurring
Invoice
Payroll
Group Pay-run
Close the project
Archive the
project
Most of our customers are professional service
companies
Project Management -
Planning
Getting Started
Add Project
Add Task
https://www.youtube.com/watch?v=_hLNlEVsqho
Add
Project
Add Task
PM Default Access Levels
Roles What they can see in PM?
Administrators All projects, all tasks, all issues, all timesheets
Project Managers All projects which they own. Full project view.
All tasks and all issues which they manage
Department Leaders Limited project view, their own timesheet,
tasks of the department, timesheet approval
Accountants Limited project view, all invoice, purchase
orders, sales quotes, sales orders of all
projects, their own tasks
Employees Limited project view, their own timesheet,
their own tasks
Setup your own permission settings
Settings -> Permission Management -> Project Management
Project View
This is what you can
do in PM section
Accounting
documents
Analyze the
workload
Budgeting
Planning
duration
The visibility of these
sections is controlled by
permission management
Project Gantt Chart
Import your own MS Project File
We want to import our own
MS Project files
Resource Utilization
See if employees have enough
tasks
Project Budget/PNL
Write down budgeted figures
just here
Project Invoicing
You can generate invoice in
Accounting section
PM Settings
We have so many projects,
that we get confused
Create automatic
numbering properties for
new projects
Timesheet
Introduction to Timesheet
Timesheets are great for 3 reasons:
They make costs visible
They help to automate billing/invoicing
They help to automate Payroll processes
Time tracking can increase revenue through automating billing, which tends to make it easier for a
company to get correct invoices out for all hours worked by consulting staff
They help in project planning and tracking
Timesheet
Employees fill out timesheet and submit for
approval
Timesheet Settings
We need to validate
timesheet, and it’s not
required for everyone
Setup employees who
need to use timesheet
Setup timesheet
validations
Timesheet Approval
Timesheet/Payroll
1. Make sure employees fill out timesheet
2. Specify rates per project
3. PMs Approve Timesheets
4. Run payroll as regular
We want to pay
employees on an
hourly rate
Timesheet Invoice
We want to bill all timesheet
hours to the client
Change the template here
Back to Contents
Booking Items
Booking Items
See if the item is
currently available
Reserve an item
Contracts and Monthly
Timesheet
Our employees need to fill
out monthly timesheet
Monthly timesheet contracts
Monthly timesheet contracts
Monthly timesheet works with contracts
Setup contracts for each
position employees
Reporting
Introduction to reporting tool
Add-Ons
Kpi.com Plugins
There are a number of add-ons which you can enable:
Excel Plugin
Storefront
Storefront Management Plug-in
Manage products inside
Kpi.com
LeBazar.ae – Our customer who built storefront in kpi.com
Storefront Management Plug-in
Manage products inside
Kpi.com
LeBazar.ae – Our customer who built storefront in kpi.com
All storefront purchases are
processed from accounting
(sales orders)
Consignment add-on
Your clients/customers will
appear here
You can send items to your
clients or subsidiaries for
consignment
When your subsidiaries the
sales of consignment items
trigger bookkeeping
transactions automatically
Need more?
You can customize kpi.com under your own requirements:
Your own functionality/feature
Your own tabs/fields/entities
Your own rules
Hide/Add additional tabs
Workflow rules/reminders
Custom sharing/access controls
Custom Fields,
2-level Workflows
Colors/Logo/Templates
Level 1
Level 2
Level 3
Rules
Settings
Workflows,tabs,
sharing
Invoice
Colors Logo
Core kpi.com
Settings
Set up each company
and financial settings
Set up permission levels
Set up workflows
Set up each module
Set up profile and how
you should get an email
Custom Fields
Workflow Automation Settings
Define workflows for
certain rules in the
system
Workflow Automation Settings
Following activities can
be triggered when
workflow rule is true
Example: send email
customer every 2 weeks
once the subscription is
active
Reference Settings
You can change the default values in our lists
2-Level Workflows
2-Level approvals can
be easily be enabled
Add Leave
Request
Approve Leave
Request
Employee Manager
Approve Leave
Request
Manager-2
Purchase
Order Request
Approve
Purchase
Order
Employee Manager
Approve
Purchase
Order
Manager-2
Contact us at support@kpi.com for enabling 2-level approvals for your company
Why kpi.com?
Benefits of kpi.com
162
By adopting kpi.com, you will be able to enjoy the following benefits:
Transparency of processesLower Operational Costs Ease of Sharing
Improved Customer Service Better Reporting Increased Efficiency
Kpi.com is Safe and Secure
163
Physical security
It is hosted on
Amazon cloud
Network security
HTTPS protocol is
used to encrypt data
People and processes
Employees have no
access to customer
data
Our backup policy
164
DB
Backups
You can request one of
these backups from the
beginning of your
subscription period
You will get this when you
decide to quit kpi.com
Our engagement model with clients
165
You will be assigned a relationship manager
who will work with you from the beginning
Relationship manager will help you to setup the
system and get running until the end of on-
boarding period
On-boarding period is typically 3 months, but it
can be extended
You will be able to call your own relationship
manager any time in case of any issues
When you are fully on boarded, our generic
support team will take care of you, but you will
have an access to your own relationship
manager too.
How will we work with you?
We Offer Lot’s of Training Materials for Free
166
Project Management overview: http://www.youtube.com/watch?v=_hLNlEVsqho
CRM: http://www.youtube.com/watch?v=2qFEjSawfCU
HR: http://www.youtube.com/watch?v=swYk62gTCwA
Accounting Videos:
http://www.youtube.com/playlist?list=PLa7P0Qa2jO2X9tYQ9aVPV4NJ3F4C9sScW
Our video trainings:
Our help center:Our guidebooks:
Our Support Team is There For You 24 Hours
167
We love our customers and they love us too!
These Companies Trust Kpi.com in Running Their Business:
12,000,000+ Projects
1,550,452+ Timesheet entries
4,458,263+ Invoice Documents
526+ Active Companies, 3000+
users from partners
Our References
You can contact these companies in for reference:
Company Contact Person Email/Phone:
Signup For a Free Trial
170
It’s takes less than 60 seconds

Kpi.com Cloud ERP for Small Businesses

  • 1.
    Online Business ManagementSoftware By: Muz Karabaev, Founder of kpi.com | muz@kpi.com
  • 2.
  • 3.
    Introduction – whowe are kpi.com – part of Finnet Limited, Software Company Started/Founded in 2005 by Muzaffar Karabaev in London, United Kingdom. MobileCloud DMCC is a sister company in Dubai, and became GCC Sales and Support Headquarters for kpi.com-Finnet Limited from 2014. 120+ employees spread over three Regions: Central Asia, GCC (UAE) & UK, Plus our Partner Network (KSA and Oman). 30+ partners/resellers working and providing support for kpi.com in more than 10 Countries. GCC is a major focus NOW
  • 4.
    What is kpi.com/BusinessManagement Software? Cloud SaaS Software SME’s Business Processes Affordable Built in Workflows Keep it simple Ease of Processes Single Platform 5 Modules With kpi.com you get: Ease of adoptability Five core modules in one application Cloud and Central System Focus on quality and working method Multiple layers of support, including trainings and migration
  • 5.
    Principles of kpi.com Thekpi.com is built around the following principles: Customizable Affordable Available on mobile Easy to Use Integrated Kpi.com Reporting Principles The software should be able to provide the Financial information quickly Kpi.com Upgrading Principles The cloud business software should provide automatic regular upgrades for free. For all customers. Kpi.com Customer Service Principles Customers should get full assistance from support team until they are fully on-boarded.
  • 6.
    KPI.com: End UsersGeographic Spread 28% North America 13% UK 21% Other parts of Europe 5% Australia 20% Middle East 4% South America 2% Africa Rest of the world – 7% 3000+ Companies, 15000+ User Base and Growing
  • 7.
  • 8.
    What is kpi.comsoftware? It incorporates all key business functions of your business Manage cash/money Keep track of products Manage Customers Produce or Implement Sell Keep Track of Employees Accounting and Finance Inventory Management Warehouse Management CRM Project Management Manufacturing Storefront Sales Force Automation HRMS Case management Payroll Bookkeeping
  • 9.
    Even a smallbusiness is complicated Kpi.com makes it easy to manage
  • 10.
    ESS, Attendance Tracking,Payroll, Recruitment, On boarding, Performance Appraisals, Reporting, Project Management CRM HRMS and Payroll Accounting and Inventory Add-Ons and Settings Benefits and Engagement Contents Reporting Management
  • 11.
  • 12.
    Why is therea need for HRMS? Too much paperwork? No payroll history? Too much trivial tasks? Complaints not addressed?
  • 13.
    What is inHRMS? https://www.youtube.com/watch?v=swYk62gTCwA Manage Employees Run Payroll Track Attendance Review Performance Recruitment Group Pay-run Taxes, Reports Leave Requests Simple Appraisals Annual Reviews In-out hours ESS
  • 14.
    HRMS Default AccessLevels Roles What they can see in HR? Administrators Everything HR Managers Everything Department Leaders, Project Managers Limited HR View (only data related to their own department/project) Accountants Limited HR View Employees Their own data only
  • 15.
    Setup your ownpermission settings Settings -> Permission Management -> HRMS
  • 16.
  • 17.
    ESS concept allowsHRs to ease their workload Our employees can see and modify their own HR Data
  • 18.
    Employees can seea lot of their stuff Employees can see their own related features
  • 19.
    Employees can claimtheir company expenses 2 level of Approvals can be enabled for your company upon request
  • 20.
    ESS: HR cansetup reminders for employees Reminders can be set to Employees or to managers You can trigger your own events Settings -> Recurrence Settings -> HR reminders
  • 21.
    Organizational Structure Your newemployees can see the organizational structure when they login firstly Setup positions and departments and supervisors
  • 22.
  • 23.
    Biometric/fingerprint device integration Actualhours when employees came to the office
  • 24.
    Attendance tracking Reporting ->HRMS -> Late Employees John wants to know top late employees of the week
  • 25.
  • 26.
    HR manager canset different schedules Employees have different schedules, some of them are outsourced from freelance
  • 27.
  • 28.
    John views activeleave requests Let us see if she deserves leave request
  • 29.
    John can viewleave status of employee before approval All good
  • 30.
  • 31.
    You can add2 levels of approvals We can enable 2 level approvals for your company
  • 32.
  • 33.
    Our payroll issimple and yet functional Payroll is fully tailored for UAE and Australia legislations Contact us at support@kpi.com for payroll customizations at your own country
  • 34.
    Issue salaries I wantto issue salary to all employees at once Initiate a group payrun
  • 35.
    Timesheet/Payroll Integration 1. Makesure employees fill out timesheet 2. Specify rates per project 3. PMs Approve Timesheets 4. Run payroll as regular We want to pay employees on an hourly rate
  • 36.
    End of ServiceGratuity Calculate end of service gratuity for resigning employees if available
  • 37.
    View WPS andPension Contribution Reports
  • 38.
  • 39.
  • 40.
    Recruitment Workflow Publish Vacancies Receive candidates Schedule an interview Preparea shortlist Candidate hired Web form in your website Publish to job sites Coming Soon! Candidate added as employee
  • 41.
    Calendar helps toplan daily interviews The calendar is fully compatible with Google It shows everything
  • 42.
    Email right inkpi.com Recruitment@jamesmorris.com Recruitment@jamesmorris.com Email candidates directly at kpi.com
  • 43.
  • 44.
    On-boarding We can trackpassport, visa, government related forms, entry permits and set renewal reminders for HR managers
  • 45.
    On-boarding How on-boarding worksin kpi.com: HR Manager/Admin builds periods, steps with custom forms and custom fields with on- boarding steps Employee sees their own on- boarding data in My On-boarding Checklist(if HR manager enabled for employees to them)
  • 46.
    On-boarding period: 1. Addon- boarding period An on-boarding period is a period when certain on boarding steps need to be completed
  • 47.
    On-boarding steps: 2. Addon-boarding step This will create a custom form When checked, it will be visible for employee An on-boarding step is the step which employee should pass in when they are hired
  • 48.
    On-boarding steps: 3. Buildan on boarding form in Settings If you build a custom form, it will appear here 1. Go to Settings – Custom Field Settings 1. Go to Settings – Custom Field Settings
  • 49.
    On-boarding custom fields Addas many custom fields as needed:
  • 50.
    Make on boardingform user friendly Drag and drop fields
  • 51.
    How employees seeon-boarding data
  • 52.
  • 53.
    Our Performance ReviewTemplate Employee’s name Competencies – Weight Competency 1 – Score X Competency 2 – Score Y Goals – Weight Goal 1 – Score X Goal 2 – Score Y Total Employee’s Score = XYZ Total Goals x Weight + Competencies x Weight Total of weights should equal 100% Note: We can implement your own template upon request
  • 54.
    Our Performance ReviewWorkflow Manager’s Initiative Employee Self-Review Manger Review and Rating Manager’s Approval This step can be totally omitted Manager can be HR, Department leader, or a Project Manager
  • 55.
    John Conducts PerformanceReview I need to review my team members
  • 56.
  • 57.
    Review or sendto employee first You can set your own goals in Goal Management Section
  • 58.
  • 59.
    PA trends wewant to follow in the future At the end of the day, we want better results from employees as a company We will be providing options for simple and more frequent feedback goal-measurement processes in the system In other words, we will make it simple to measure performance and compare it over time
  • 60.
  • 61.
    Custom reporting toolhelps to create your own reports We want to stay flexible by creating our own reports Step 1:Create your own report here
  • 62.
    Custom reporting toolhelps to create your own reports 2. Select the template Contact us at support@kpi.com for more hrms templates
  • 63.
    Custom reporting toolhelps to create your own reports Build your own report here
  • 64.
    Custom reporting toolhelps to create your own reports You can build your own chart Select chart type Select columns
  • 65.
  • 66.
    Accounting and InventoryWorkflow Sales Order Create Approve Get from Storefront Purchase Order Request Approval The following workflow can be utilized by retailers: Receive Goods Warehousing Purchase Invoice Ship Items Pick Pack Ship Convert to Invoice Handle Returns Receive Payment Sales Receipt Statement charges Make Payment Match Payment w/ Invoice View Reports Balance Sheet P&L Statements Sales Reports
  • 67.
    Accounting and InventoryWorkflow Sales Order Create Approve Get from Storefront Purchase Order Request Approval Manufacturing industries can utilize the following workflow: Receive Goods Warehousing Purchase Invoice Make Payment Match Payment w/ Invoice Receive Payment Sales Receipt Statement charges Convert to Invoice Handle Returns Ship Items Pick Pack Ship View Reports Balance Sheet P&L Statements Sales Reports Build Assembly Inventory Product Warehouse
  • 68.
    Accounting and ProjectWorkflow Create Sales Quote Client Approval Request for Quote Timesheet Task Timer Entries Professional Services Industry: Timesheet Approval Planned vs. Actual Task duration View Reports Balance Sheet P&L Statements Sales Reports Timesheet Invoice Totals by tasks Totals by employees Add Project Project Details Budget and Estimates CRM Won Opportunity Project Management Receive Payment Sales Receipt Statement charges Accounting
  • 69.
  • 70.
    Invoicing You can create yourown templates Invoicing features: Multiple currencies Custom templates Custom fields Billable expenses Product/service types Recurring invoice Credit notes
  • 71.
    Different types ofinvoicing We want to create recurring invoice and credit notes
  • 72.
    Sales Quotes withProgress Invoicing We want to charge our customers partially
  • 73.
    Import your owninvoice templates Contact us at support@kpi.com for importing your own invoice templates Invoice documents can be sent as PDF in your own template
  • 74.
  • 75.
    Suppliers center 75 Manage your suppliersright here You can manage your suppliers right here View how much you own the suppliers
  • 76.
    Purchase Orders 76 Manage your suppliersright here Purchase order listing shows active purchase orders You can copy PO details to a Sales Quote
  • 77.
  • 78.
  • 79.
    Purchase Invoice Listing Manageyour suppliers right here Purchase invoice listing shows active purchase invoices
  • 80.
    Purchase Invoice Listing Payyour purchase bill
  • 81.
  • 82.
  • 83.
    Why kpi.com InventoryManagement? Our Inventory Management Software Has a Number of Benefits: Lower Amount of ReturnsFaster Shipping Transparent Tracking Improved Customer Service Automatic Bookkeeping Availability on Mobile
  • 84.
    Let’s start withthe basics 84 Know how much stock is available in real time
  • 85.
    Don’t be afraidof shortage 85 If you setup reorder quantities, the system will automatically order the product when you are running short of item You will not be left without any stock
  • 86.
    Easily Manage SalesOrders 86 You can create projects from sales orders Go to pick list in order to mark items as shipped One click does it all for you
  • 87.
    Streamline Your Operations 87 Pick,pack and ship inventory items
  • 88.
    Transfer Stock Betweenthe Warehouses 88
  • 89.
    Make Better Decisions 89 Viewthe current value of products
  • 90.
    Stay Flexible AsYou Grow 90 Create custom reports and add them to your favorites
  • 91.
    You can manageyour inventory in a mobile app 91
  • 92.
  • 93.
    Accounting and Bookkeeping Youcan create other accounting transactions
  • 94.
    Sales charts You cananalyze your top customers and products
  • 95.
    View Accounting Reports Youcan provide access to your accountants or advisors to analyze the figures
  • 96.
  • 97.
    CRM Features CRM softwarehas a number of benefits: Web formsSales Management Improved Customer Service Mass Mailing and Message Center Transparent Reports Available on Mobile
  • 98.
    CRM Workflow Marketing SalesSupport Delivery Campaigns Leads Cases Projects OpportunitiesMass Mailing Web Forms Emails Solutions Tasks TimesheetSales Quotes
  • 99.
    CRM Workflow Marketing SalesSupport Delivery Campaigns Leads Cases Projects OpportunitiesMass Mailing Web Forms Emails Solutions Tasks TimesheetSales Quotes Most CRM solutions stop here
  • 100.
    CRM Workflow Marketing SalesSupport Delivery Campaigns Leads Cases Projects OpportunitiesMass Mailing Web Forms Emails Solutions Tasks TimesheetSales Quotes Most CRM solutions stop here With kpi.com, you get this step, you don’t need to buy another project management software
  • 101.
    CRM Workflow Marketing SalesSupport Delivery Campaigns Leads Cases Projects OpportunitiesMass Mailing Web Forms Emails Solutions Tasks TimesheetSales Quotes There is more in one software With kpi.com, you get this step, you don’t need to buy another project management software Reporting Accounting
  • 102.
    CRM Default AccessLevels Roles What they can see in PM? Administrators Everything within the CRM section Sales Managers Everything within the CRM section Sales Rep Only their own data Accountants All sales quotes, sales orders, sales invoice documents. All opportunities. Directors All sales reports
  • 103.
  • 104.
  • 105.
    CRM-Sales Workflow Lead Capture Lead QualificationOpportunity Opportunity Won Lost Reports and Dashboards Project Sales Order No Leaky funnel + Complete Visibility = Integrated sales, project management and accounting process
  • 106.
    Sales: Just WorkWith Leads, No Data Entry Required Easily embed a web form to your main website And start working with leads in kpi.com
  • 107.
    All activities automaticallyappear in calendar Working with leads
  • 108.
    View planned tasksin calendar Calendar shows projects, tasks, and leave requests Sync with Google
  • 109.
    CRM Opportunities You cancreate your own sequence in Settings – Reference settings View how your team is performing
  • 110.
    It indicates thatthere are not enough sales at the top of the pipeline Total sales this month Find out how you are performing monthly
  • 111.
    Export your reportto excel and view there
  • 112.
    Sales Manager’s Dashboard Coming Soon! Wewant to see some important highlights in dashboard
  • 113.
  • 114.
    Create a mailinglist We want to send emails to our leads 1. Create mailing list first: Go to contacts – Add new - Mailing list You can send emails to your customers and leads in Email marketing – mailing list
  • 115.
    Send mass mailto your leads and clients You can send mail message or sms message to your contacts Configure sms settings before using it
  • 116.
  • 117.
    Manage issues andrequests in case management You can configure color coding important tickets when you need Assign cases(tickets) right there
  • 118.
    Email customers rightfrom kpi.com Reply right here
  • 119.
    Need to emailmore? There is a message center You can connect it to your Google apps account
  • 120.
    Everything is connected Youcan convert opportunities to project, and manage it from project management section OR Manage any issues appearing in company from one place. You can relate cases (tickets) to anything. You can track even purchasing issues from suppliers No need to integrate different apps with each other
  • 121.
  • 122.
    Project Management Workflow SimpleProject Management Workflow: Add Project Add from template Convert from CRM Opportunity Import Add Task Add task Add multi-task Timesheet Task Timer Timesheet Approval Monthly By Project By Employee Close the project Archive the project View the allocation Resource Utilization Dashboard Setup Reminders Project Management Settings View who is too busy, and who is sitting without tasks
  • 123.
    Project Management Workflow ConstructionProject Management Workflow: Add Project Prepare a budget Start the project Add TasksAdd Workstreams Timesheet Timesheet Approval Payroll Bill the client Approve budget Purchase Order Receive goods Workflows can be customized easily Analyze requirements Create Estimates Approve the timeline
  • 124.
    PM Workflow Or youcan utilize the following workflow if you operate in Professional Services Industry: Add Project Add from template Convert from CRM Opportunity Add Task Add task Add multi-task Timesheet Task Timer Timesheet Approval Monthly By Project By Employee Bill the client Partial Billing Recurring Invoice Payroll Group Pay-run Close the project Archive the project Most of our customers are professional service companies
  • 125.
  • 126.
    Getting Started Add Project AddTask https://www.youtube.com/watch?v=_hLNlEVsqho Add Project Add Task
  • 127.
    PM Default AccessLevels Roles What they can see in PM? Administrators All projects, all tasks, all issues, all timesheets Project Managers All projects which they own. Full project view. All tasks and all issues which they manage Department Leaders Limited project view, their own timesheet, tasks of the department, timesheet approval Accountants Limited project view, all invoice, purchase orders, sales quotes, sales orders of all projects, their own tasks Employees Limited project view, their own timesheet, their own tasks
  • 128.
    Setup your ownpermission settings Settings -> Permission Management -> Project Management
  • 129.
    Project View This iswhat you can do in PM section Accounting documents Analyze the workload Budgeting Planning duration The visibility of these sections is controlled by permission management
  • 130.
  • 131.
    Import your ownMS Project File We want to import our own MS Project files
  • 132.
    Resource Utilization See ifemployees have enough tasks
  • 133.
    Project Budget/PNL Write downbudgeted figures just here
  • 134.
    Project Invoicing You cangenerate invoice in Accounting section
  • 135.
    PM Settings We haveso many projects, that we get confused Create automatic numbering properties for new projects
  • 136.
  • 137.
    Introduction to Timesheet Timesheetsare great for 3 reasons: They make costs visible They help to automate billing/invoicing They help to automate Payroll processes Time tracking can increase revenue through automating billing, which tends to make it easier for a company to get correct invoices out for all hours worked by consulting staff They help in project planning and tracking
  • 138.
    Timesheet Employees fill outtimesheet and submit for approval
  • 139.
    Timesheet Settings We needto validate timesheet, and it’s not required for everyone Setup employees who need to use timesheet Setup timesheet validations
  • 140.
  • 141.
    Timesheet/Payroll 1. Make sureemployees fill out timesheet 2. Specify rates per project 3. PMs Approve Timesheets 4. Run payroll as regular We want to pay employees on an hourly rate
  • 142.
    Timesheet Invoice We wantto bill all timesheet hours to the client Change the template here Back to Contents
  • 143.
  • 144.
    Booking Items See ifthe item is currently available Reserve an item
  • 145.
  • 146.
    Our employees needto fill out monthly timesheet Monthly timesheet contracts
  • 147.
    Monthly timesheet contracts Monthlytimesheet works with contracts Setup contracts for each position employees
  • 148.
  • 149.
  • 150.
  • 151.
    Kpi.com Plugins There area number of add-ons which you can enable: Excel Plugin Storefront
  • 152.
    Storefront Management Plug-in Manageproducts inside Kpi.com LeBazar.ae – Our customer who built storefront in kpi.com
  • 153.
    Storefront Management Plug-in Manageproducts inside Kpi.com LeBazar.ae – Our customer who built storefront in kpi.com All storefront purchases are processed from accounting (sales orders)
  • 154.
    Consignment add-on Your clients/customerswill appear here You can send items to your clients or subsidiaries for consignment When your subsidiaries the sales of consignment items trigger bookkeeping transactions automatically
  • 155.
    Need more? You cancustomize kpi.com under your own requirements: Your own functionality/feature Your own tabs/fields/entities Your own rules Hide/Add additional tabs Workflow rules/reminders Custom sharing/access controls Custom Fields, 2-level Workflows Colors/Logo/Templates Level 1 Level 2 Level 3 Rules Settings Workflows,tabs, sharing Invoice Colors Logo Core kpi.com
  • 156.
    Settings Set up eachcompany and financial settings Set up permission levels Set up workflows Set up each module Set up profile and how you should get an email Custom Fields
  • 157.
    Workflow Automation Settings Defineworkflows for certain rules in the system
  • 158.
    Workflow Automation Settings Followingactivities can be triggered when workflow rule is true Example: send email customer every 2 weeks once the subscription is active
  • 159.
    Reference Settings You canchange the default values in our lists
  • 160.
    2-Level Workflows 2-Level approvalscan be easily be enabled Add Leave Request Approve Leave Request Employee Manager Approve Leave Request Manager-2 Purchase Order Request Approve Purchase Order Employee Manager Approve Purchase Order Manager-2 Contact us at support@kpi.com for enabling 2-level approvals for your company
  • 161.
  • 162.
    Benefits of kpi.com 162 Byadopting kpi.com, you will be able to enjoy the following benefits: Transparency of processesLower Operational Costs Ease of Sharing Improved Customer Service Better Reporting Increased Efficiency
  • 163.
    Kpi.com is Safeand Secure 163 Physical security It is hosted on Amazon cloud Network security HTTPS protocol is used to encrypt data People and processes Employees have no access to customer data
  • 164.
    Our backup policy 164 DB Backups Youcan request one of these backups from the beginning of your subscription period You will get this when you decide to quit kpi.com
  • 165.
    Our engagement modelwith clients 165 You will be assigned a relationship manager who will work with you from the beginning Relationship manager will help you to setup the system and get running until the end of on- boarding period On-boarding period is typically 3 months, but it can be extended You will be able to call your own relationship manager any time in case of any issues When you are fully on boarded, our generic support team will take care of you, but you will have an access to your own relationship manager too. How will we work with you?
  • 166.
    We Offer Lot’sof Training Materials for Free 166 Project Management overview: http://www.youtube.com/watch?v=_hLNlEVsqho CRM: http://www.youtube.com/watch?v=2qFEjSawfCU HR: http://www.youtube.com/watch?v=swYk62gTCwA Accounting Videos: http://www.youtube.com/playlist?list=PLa7P0Qa2jO2X9tYQ9aVPV4NJ3F4C9sScW Our video trainings: Our help center:Our guidebooks:
  • 167.
    Our Support Teamis There For You 24 Hours 167
  • 168.
    We love ourcustomers and they love us too! These Companies Trust Kpi.com in Running Their Business: 12,000,000+ Projects 1,550,452+ Timesheet entries 4,458,263+ Invoice Documents 526+ Active Companies, 3000+ users from partners
  • 169.
    Our References You cancontact these companies in for reference: Company Contact Person Email/Phone:
  • 170.
    Signup For aFree Trial 170 It’s takes less than 60 seconds