SlideShare a Scribd company logo
Page 1 of 4
Curriculum Vitae
KIRAN HASAN KORAMADDI
Contact No.: +919913395246
E-Mail: kiran.koramaddi@gmail.com / khkoramaddi@outlook.com
Objective Statement – “To work in a progressive organization which contributes in utilizing and
enhancing my skills towards achieving the organizational mission, while further augmenting my
professional and personal competencies”
SYNOPSIS
 A seasoned professional with 3 years 10 Month of experience in Project Management, Construction Activities,
Contract Management, Resource Management and Quantity Surveying.
 Presently associated with Larsen & Toubro Limited, Construction Division as Assistant Manager
(Planning).
 Adept in planning, executing and spearheading construction projects involving Method Engineering,
Development, Resource Planning with a flair for adopting modern construction methodologies in compliance
with quality standards.
 Deft in handling all procedures related to Contract Administration as well as Client billing and Claims.
 Adept at managing the operations of quality related operations as well as the progress monitoring of the
projects.
 Exemplary relationship management, communication skills with the ability to network with project members,
consultants, sub contractors and statutory agencies with consummate ease.
 Strong mentor and coach, skilled at inspiring confidence, leading by example and building loyal, high-
performance teams that exceed expectations.
CORE COMPETENCIES
Project Management
 Ensuring the operations to be within approved Baseline schedules.
 Monitoring & controlling the projects with respect to physical & financial progress, time, cost, resource
deployment & utilisation, contract compliance.
 Identifying, quantifying critical and non-critical risk areas, mitigating & suggesting measures to minimize the
impact of risk, monitoring status of risk throughout the project.
 Inspecting project sites to review progress and identifying critical areas. Suggesting corrective actions to
facilitate smooth & fast progress.
Site & Construction Management
 Anchoring on-site construction activities as per the given drawings to ensure completion of project within the
time & cost parameters, effective resource utilisation to maximize output.
 Inspecting field sites to observe and evaluate condition and operability of facilities and structures.
Contract Administration & Management
 Interpreting contractual obligations & rights as well as evaluating Technical / Financial problems for
Management reporting.
 Ensuring compliance with the concession agreement, applicable standards (MORT&H, IS and IRC) and legal
requirements.
 Contractual Risk identification and mitigation plan for the project.
Quantity Survey
 Evaluating changes for time extension and variation costs and be able to assess requirements before
commencement of work.
 Preparing measurement and cost estimates / detailed breakdowns for changed / additional works, monthly
progress measurement of all areas of the work.
 Preparing Engineering proposals for unforeseen conditions
 Escalation monitoring and timely approval of client invoicing.
Page 2 of 4
CAREER CONTOUR
Since May’16 to present with Larsen & Toubro Limited, Construction Division (India)
Position: - Assistant Manager (Planning).
Project (Present) –Design and Construction of Roads and Services of Activation Area in Dholera
Special Investment Region Area, Dholera, Gujarat, India of contract value 1734.04 Cr. INR.
Client: Dholera Industrial City Development Limited (DICDL)
Consultant: Aecom
The scope of work consist of construction of approximately 71 km of dual carriageway roads of different width
(Grid pattern of approximately 22 Sq.km in Area), 6 bridges, storm water drain, outfall structure, weir structure,
unlined canal, Potable and recycle water supply system, sewerage, industrial effluent network, power duct, street
light, Gas line and ICT duct.
 Presently involved in the planning team for monitoring and control of Dholera Smart City Project of contract
value of 1734.04 Cr. INR on Engineering Procurement and Construction (EPC) basis.
 Preparation of detailed construction program using appropriate work sequence in accordance with contract
requirements using Primavera P6
 Calculation of Accepted Cost Estimate (ACE) immediately after the award of project to calculate the
approximate cost and margin of the project.
 Provide guidance in the identification, development and implementation of opportunities for project cost
savings.
 Preparation of proposal for various Activity/Material to get the approval from management (High Power
Committee) by comparing with ACE and JCR.
 Identification of risk, analysis, impact, monitoring and mitigation plan of the same has to be submit to
management.
 Participating in weekly and monthly progress meetings.
---------------------------------------------------------------------------------------------------------------------------------
From Jan’16 to Apr’16 with Larsen & Toubro Limited, Construction Division (India)
Position: - Assistant Manager (Planning).
Project – Construction of 4 laning of Kandla-Mundra Port Section of NH-8A in the State of Gujarat,
India of contract value of approx 675 Cr. INR.
Client: National Highway Authority of India (NHAI)
Concessionaire: K.M. Toll Road Pvt. Ltd.
EPC Contractor: Reliance Infrastructure Ltd.
The scope of work is the design, engineering, procurement and construction of 4/6 laning of Gandhidham (Kandla)
- Mundra Port Section of NH-8A (Approx Length- 71.4 km 4 lane) in the State of Gujarat, India. The project
consist of 8 major bridges, 18 minor bridges, 1 Rail over bridge, 12 Vehicular underpasses, 2 Pedestrian
underpasses, 26 box culvert and 124 pipe culvert.
 Previously involved in the planning team for monitoring and control of Kandla Mundra Road Project of contract
value (EPC) of 675 Cr. INR on Design, Build, Finance Operate and Transfer (DBFOT) basis.
 Preparation of 'S' curves, bar charts and earned value analysis reports on weekly and monthly basis.
 Preparation of detailed construction program using appropriate work sequence in accordance with contract
requirements using Primavera P6 Professional R 8.2.
 Calculate SOI and COI to provide management clear understanding of the performance of the project.
 Preparation of Daily, Weekly and Monthly Progress reports and submission of the same to Client.
 Progress Monitoring, Controlling and Reporting ongoing activities on Weekly and Monthly basis
 Preparation and updating of cash flow statements for the project.
 Plan resource requirements, monitor manpower deployment schedules and assist in forecast.
 Prepare and Submit Delay and Impact analysis and report the effects of the same to the management.
 Participating in project review meetings for evaluating project progress.
Page 3 of 4
 Familiar with retrospective claiming of Extension of Time (EOT)
 Ensuring compliance with the concession agreement, applicable standards (MOR&TH, IS and IRC) and legal
pronouncements.
 Preparation of monthly invoices (Interim payment certificate), claims due to variation in project scope (change
of scope) and Coordinating with clients & consultants.
 Design and drawing coordination of the project with client and consultant.
 Reconciliation of bulk material on monthly basis.
 Correspondences with Client as a part of contract management.
-------------------------------------------------------------------------------------------------------------------------------
From Aug’13 to Dec’15 with Larsen & Toubro Limited, Construction Division (India)
Position: - Senior Engineer (Planning).
Project – Construction of 4 laning of Kandla-Mundra Port Section of NH-8A in the State of Gujarat,
India of contract value of approx 675 Cr. INR
Client: National Highway Authority of India (NHAI)
Concessionaire: K.M. Toll Road Pvt. Ltd.
EPC Contractor: Reliance Infrastructure Ltd.
The scope of work is the design, engineering, procurement and construction of 4/6 laning of Gandhidham (Kandla)
- Mundra Port Section of NH-8A (Approx Length- 71.4 km 4 lane) in the State of Gujarat, India. The project
consist of 8 major bridges, 18 minor bridges, 1 Rail over bridge, 12 Vehicular underpasses, 2 Pedestrian
underpasses, 26 box culvert and 124 pipe culvert.
 Previously involved in the planning team for monitoring and control of Kandla Mundra Road Project of contract
value (EPC) of 675 Cr. INR on Design, Build, Finance Operate and Transfer (DBFOT) basis.
 Preparation of 'S' curves, bar charts and earned value analysis reports on weekly and monthly basis.
 Preparation of detailed construction program using appropriate work sequence in accordance with contract
requirements using Primavera P6 Professional R 8.2.
 Calculate SOI and COI to provide management clear understanding of the performance of the project.
 Preparation of Daily, Weekly and Monthly Progress reports and submission of the same to Client.
 Progress Monitoring, Controlling and Reporting ongoing activities on Weekly and Monthly basis
 Preparation and updating of cash flow statements for the project.
 Plan resource requirements, monitor manpower deployment schedules and assist in forecast.
 Prepare and Submit Delay and Impact analysis and report the effects of the same to the management.
 Participating in project review meetings for evaluating project progress.
 Involved in finalization of project Bill of Quantities (BOQ) and quantity calculation of various structure and
highway elements.
 Ensuring compliance with the concession agreement, applicable standards (MOR&TH, IS and IRC) and legal
pronouncements.
 Preparation of monthly invoices (Interim payment certificate), claims due to variation in project scope (change
of scope) and Coordinating with clients & consultants.
 Design and drawing coordination of the project with client and consultant.
 Reconciliation of bulk material on monthly basis.
 Correspondences with Client as a part of contract management.
----------------------------------------------------------------------------------------------------------------------------------
From Aug’12 to Jul’13 with Larsen & Toubro Limited, Construction Division (India)
Position: - Graduate Engineer Trainee
Project – Construction of 4 laning of Kandla-Mundra Port Section of NH-8A in the State of Gujarat,
India of contract value of approx 675 Cr. INR
Client: National Highway Authority of India (NHAI)
Concessionaire: K.M. Toll Road Pvt. Ltd.
EPC Contractor: Reliance Infrastructure Ltd.
Page 4 of 4
The scope of work is the design, engineering, procurement and construction of 4/6 laning of Gandhidham (Kandla)
- Mundra Port Section of NH-8A (Approx Length- 71.4 km 4 lane) in the State of Gujarat, India. The project
consist of 8 major bridges, 18 minor bridges, 1 Rail over bridge, 12 Vehicular underpasses, 2 Pedestrian
underpasses, 26 box culvert and 124 pipe culvert.
 Self was a part of Quality Assurance/Quality Control team and was involved in conducting various tests,
finalization of mix designs, monitoring the results & proper documentation as per the Project Quality Plan (3
months duration)
 Preparation of Environment Management plan, Environmental Impact Assessment reports, various HSE
compliances as a part of the training schedule at EHS department. (1 month duration)
 Undergone training in site execution activities (4 months duration)
 Undergone training in planning department, involved in client billing, design and drawing coordination and
preparation and monitoring of progress reports on daily, weekly and monthly basis. (3 months duration)
ACADEMIA
2012 Bachelor of Engineering in Civil Engineering, Visvesvaraya Technological University,
Belgaum-Karnataka. (Basaveshwar Engineering College, Bagalkot-Karnataka)
Secured 9.18 CGPA on a scale of 10 CGPA.
2009 Diploma in Civil Engineering, Department of Technical Education, Bangalore-
Karnataka. (T.S.I.T, Hubli-Karnataka) Secured 64.89% aggregate.
2006 10th
Class, Karnataka Secondary Education Examination Board, Karnataka State-
Secured 65.76%.
IT FORTE
 AutoCAD 2008/2010
 Staad pro
 Microsoft Office 2007/2011
 Microsoft Office Project 2010
 Primavera P6 Professional R 8.2
PROFESSIONAL ENHANCEMENTS
 Graduation Project on “Effect of Coconut Fibre on Properties of Concrete - A case study “ under the
guidance of Dr. R.B.Khadirinaikar
PERSONAL DOSSIER
Date of Birth : 1st
June, 1990
Address : At-Daddi kamalapur, Alnavar road, Post-Mugad, Tq-Dharwad, Dist-Dharwad, Karnataka,
India-580007
Linguistics : English, Hindi, Kannada
Passport : M0372850 / Date of Issue: 30/07/2014 / Date of Expiry: 29/07/2024
Marital Status : Single
No. Dependents: Parents
Nationality : Indian
Interests : Travelling
References : Available on request
DECLARATION
I hereby affirm that the information furnished in this form is true and correct
Date: 17th
Jun, 2016
Place: Ahmedabad, Gujarat. Signature

More Related Content

What's hot

Samir Patil 16 YRs EXP
Samir Patil 16 YRs EXPSamir Patil 16 YRs EXP
Samir Patil 16 YRs EXPSamir Patil
 
Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016L Douglas Sargent Jr
 
Project Planning & Control Engineer
Project Planning & Control EngineerProject Planning & Control Engineer
Project Planning & Control Engineer
Moshir Shabbir Moshir
 
160929 SS CV in WB and ADB Format
160929 SS CV in WB and ADB Format160929 SS CV in WB and ADB Format
160929 SS CV in WB and ADB FormatSanjay Suda
 
Hamid Darvish C.V summary
Hamid Darvish C.V summaryHamid Darvish C.V summary
Hamid Darvish C.V summaryHamid Darvish
 
J.S. Daniel paper for practical checklist of schedule
J.S. Daniel paper for practical checklist of scheduleJ.S. Daniel paper for practical checklist of schedule
J.S. Daniel paper for practical checklist of scheduleJ.S. Daniel
 
Abdul basit resume
Abdul basit resumeAbdul basit resume
Abdul basit resume
Abdul Basit
 
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CVSajith Nair
 
Construction Project Process Flow
Construction Project Process FlowConstruction Project Process Flow
Construction Project Process Flow
Rajasekar M
 
4. offer tendering - site
4. offer   tendering - site4. offer   tendering - site
4. offer tendering - siteAbdulaziz Kaya
 

What's hot (20)

CV Shreenivash Chandra
CV Shreenivash ChandraCV Shreenivash Chandra
CV Shreenivash Chandra
 
cv 2015
cv 2015cv 2015
cv 2015
 
RRV CV
RRV CVRRV CV
RRV CV
 
Samir Patil 16 YRs EXP
Samir Patil 16 YRs EXPSamir Patil 16 YRs EXP
Samir Patil 16 YRs EXP
 
Samrat Khanorkar_Resume
Samrat Khanorkar_ResumeSamrat Khanorkar_Resume
Samrat Khanorkar_Resume
 
Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016
 
Project Planning & Control Engineer
Project Planning & Control EngineerProject Planning & Control Engineer
Project Planning & Control Engineer
 
CV Sujit pdf
CV Sujit pdfCV Sujit pdf
CV Sujit pdf
 
Raman Rezaei Infographic
Raman Rezaei InfographicRaman Rezaei Infographic
Raman Rezaei Infographic
 
CURRICULUM VITAE World Bank Format V3
CURRICULUM VITAE World Bank Format V3CURRICULUM VITAE World Bank Format V3
CURRICULUM VITAE World Bank Format V3
 
160929 SS CV in WB and ADB Format
160929 SS CV in WB and ADB Format160929 SS CV in WB and ADB Format
160929 SS CV in WB and ADB Format
 
cv_rajesh_kachhawah
cv_rajesh_kachhawahcv_rajesh_kachhawah
cv_rajesh_kachhawah
 
Mohannad Al Twait-CV1
Mohannad Al Twait-CV1Mohannad Al Twait-CV1
Mohannad Al Twait-CV1
 
Hamid Darvish C.V summary
Hamid Darvish C.V summaryHamid Darvish C.V summary
Hamid Darvish C.V summary
 
Resume
ResumeResume
Resume
 
J.S. Daniel paper for practical checklist of schedule
J.S. Daniel paper for practical checklist of scheduleJ.S. Daniel paper for practical checklist of schedule
J.S. Daniel paper for practical checklist of schedule
 
Abdul basit resume
Abdul basit resumeAbdul basit resume
Abdul basit resume
 
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CV
 
Construction Project Process Flow
Construction Project Process FlowConstruction Project Process Flow
Construction Project Process Flow
 
4. offer tendering - site
4. offer   tendering - site4. offer   tendering - site
4. offer tendering - site
 

Viewers also liked

Multi Conveyor Upgrade Manual
Multi  Conveyor Upgrade ManualMulti  Conveyor Upgrade Manual
Multi Conveyor Upgrade ManualNeil Kane
 
상상프로젝트
상상프로젝트상상프로젝트
상상프로젝트
정호 양
 
Nathalie Nasser_Curriculum Vitae
Nathalie Nasser_Curriculum VitaeNathalie Nasser_Curriculum Vitae
Nathalie Nasser_Curriculum VitaeNathalie Nasser
 
брошюра по анализаторам
брошюра по анализаторамброшюра по анализаторам
брошюра по анализаторамElena Roman
 
Presentasi NESIA Terbaru 31 Januari 2016 www.dream4freedom.co
Presentasi NESIA Terbaru 31 Januari 2016 www.dream4freedom.coPresentasi NESIA Terbaru 31 Januari 2016 www.dream4freedom.co
Presentasi NESIA Terbaru 31 Januari 2016 www.dream4freedom.co
deniarya
 
20160708 Jeroen Ketting BIO
20160708 Jeroen Ketting BIO20160708 Jeroen Ketting BIO
20160708 Jeroen Ketting BIOJeroen Ketting
 
Historia de la cirujìa
Historia de la cirujìaHistoria de la cirujìa
Historia de la cirujìa
geyygaby
 
My chinese picture pictionary
My chinese picture pictionaryMy chinese picture pictionary
My chinese picture pictionary
Trung Nguyen
 
Self-Organizing Logical-Clustering Topology for Managing Distributed Context ...
Self-Organizing Logical-Clustering Topology for Managing Distributed Context ...Self-Organizing Logical-Clustering Topology for Managing Distributed Context ...
Self-Organizing Logical-Clustering Topology for Managing Distributed Context ...
Hasib ur Rahman, PhD
 
Om0017 advanced production and planning control
Om0017 advanced production and planning controlOm0017 advanced production and planning control
Om0017 advanced production and planning control
consult4solutions
 
Luis penal slideshare
Luis penal slideshareLuis penal slideshare
Luis penal slideshare
luisaul
 
Studio Redesign - Conference Presentation
Studio Redesign - Conference PresentationStudio Redesign - Conference Presentation
Studio Redesign - Conference Presentation
James Hall
 
The Thought Leader Interview: Douglas Conant
The Thought Leader Interview: Douglas ConantThe Thought Leader Interview: Douglas Conant
The Thought Leader Interview: Douglas Conant
Deloris Davis
 
Risk assessment 2
Risk assessment 2Risk assessment 2
Risk assessment 2
Methembedarikwa5
 
Explorer of Taxon Concepts (ETC). From description to matrix and beyond in a ...
Explorer of Taxon Concepts (ETC). From description to matrix and beyond in a ...Explorer of Taxon Concepts (ETC). From description to matrix and beyond in a ...
Explorer of Taxon Concepts (ETC). From description to matrix and beyond in a ...
Thomas Rodenhausen
 
De què fa gust la lluna
De què fa gust la llunaDe què fa gust la lluna
De què fa gust la lluna
aurisaopaolo
 

Viewers also liked (16)

Multi Conveyor Upgrade Manual
Multi  Conveyor Upgrade ManualMulti  Conveyor Upgrade Manual
Multi Conveyor Upgrade Manual
 
상상프로젝트
상상프로젝트상상프로젝트
상상프로젝트
 
Nathalie Nasser_Curriculum Vitae
Nathalie Nasser_Curriculum VitaeNathalie Nasser_Curriculum Vitae
Nathalie Nasser_Curriculum Vitae
 
брошюра по анализаторам
брошюра по анализаторамброшюра по анализаторам
брошюра по анализаторам
 
Presentasi NESIA Terbaru 31 Januari 2016 www.dream4freedom.co
Presentasi NESIA Terbaru 31 Januari 2016 www.dream4freedom.coPresentasi NESIA Terbaru 31 Januari 2016 www.dream4freedom.co
Presentasi NESIA Terbaru 31 Januari 2016 www.dream4freedom.co
 
20160708 Jeroen Ketting BIO
20160708 Jeroen Ketting BIO20160708 Jeroen Ketting BIO
20160708 Jeroen Ketting BIO
 
Historia de la cirujìa
Historia de la cirujìaHistoria de la cirujìa
Historia de la cirujìa
 
My chinese picture pictionary
My chinese picture pictionaryMy chinese picture pictionary
My chinese picture pictionary
 
Self-Organizing Logical-Clustering Topology for Managing Distributed Context ...
Self-Organizing Logical-Clustering Topology for Managing Distributed Context ...Self-Organizing Logical-Clustering Topology for Managing Distributed Context ...
Self-Organizing Logical-Clustering Topology for Managing Distributed Context ...
 
Om0017 advanced production and planning control
Om0017 advanced production and planning controlOm0017 advanced production and planning control
Om0017 advanced production and planning control
 
Luis penal slideshare
Luis penal slideshareLuis penal slideshare
Luis penal slideshare
 
Studio Redesign - Conference Presentation
Studio Redesign - Conference PresentationStudio Redesign - Conference Presentation
Studio Redesign - Conference Presentation
 
The Thought Leader Interview: Douglas Conant
The Thought Leader Interview: Douglas ConantThe Thought Leader Interview: Douglas Conant
The Thought Leader Interview: Douglas Conant
 
Risk assessment 2
Risk assessment 2Risk assessment 2
Risk assessment 2
 
Explorer of Taxon Concepts (ETC). From description to matrix and beyond in a ...
Explorer of Taxon Concepts (ETC). From description to matrix and beyond in a ...Explorer of Taxon Concepts (ETC). From description to matrix and beyond in a ...
Explorer of Taxon Concepts (ETC). From description to matrix and beyond in a ...
 
De què fa gust la lluna
De què fa gust la llunaDe què fa gust la lluna
De què fa gust la lluna
 

Similar to Kiran H K 17-06-2016

Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanMohideen Sheik Asan
 
Resume-Naresh.B (1).pdf
Resume-Naresh.B (1).pdfResume-Naresh.B (1).pdf
Resume-Naresh.B (1).pdf
ssuser9237b9
 
kiran Planning sche engineer CV
kiran Planning sche engineer CVkiran Planning sche engineer CV
kiran Planning sche engineer CVkiran kumar Reddy
 
Resume - Nermeen Atef sam
Resume - Nermeen Atef samResume - Nermeen Atef sam
Resume - Nermeen Atef samNermeen gerges
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2mahmood mansor
 
Van herrera cv
Van herrera   cvVan herrera   cv
Van herrera cv
VanHerrera2
 
Resume
ResumeResume
Resume
Vijay Babu
 
Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Aew Sanmai
 
CV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarALPESH CONTRACTOR
 
Anand resume scm
Anand resume scmAnand resume scm
Anand resume scm
Anandapadmanabhan Rajamani
 
Brian Nicholls resume 2016-08-11
Brian Nicholls resume   2016-08-11Brian Nicholls resume   2016-08-11
Brian Nicholls resume 2016-08-11
Brian Nicholls
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas
Rushi Pru Dhvi
 
Resume- 4 years exp
Resume- 4 years expResume- 4 years exp
Resume- 4 years expNaren Logi
 

Similar to Kiran H K 17-06-2016 (20)

resume
resumeresume
resume
 
CV SHIRISH 1-1-2015
CV SHIRISH 1-1-2015CV SHIRISH 1-1-2015
CV SHIRISH 1-1-2015
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik Asan
 
Resume-Naresh.B (1).pdf
Resume-Naresh.B (1).pdfResume-Naresh.B (1).pdf
Resume-Naresh.B (1).pdf
 
kiran Planning sche engineer CV
kiran Planning sche engineer CVkiran Planning sche engineer CV
kiran Planning sche engineer CV
 
C.V. as on Date
C.V. as on DateC.V. as on Date
C.V. as on Date
 
Resume - Nermeen Atef sam
Resume - Nermeen Atef samResume - Nermeen Atef sam
Resume - Nermeen Atef sam
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated Resume
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2
 
Van herrera cv
Van herrera   cvVan herrera   cv
Van herrera cv
 
Resume
ResumeResume
Resume
 
RESUME.1
RESUME.1RESUME.1
RESUME.1
 
Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16
 
CV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh Parmar
 
Anand resume scm
Anand resume scmAnand resume scm
Anand resume scm
 
Brian Nicholls resume 2016-08-11
Brian Nicholls resume   2016-08-11Brian Nicholls resume   2016-08-11
Brian Nicholls resume 2016-08-11
 
Gaurav Shukla_CV
Gaurav Shukla_CVGaurav Shukla_CV
Gaurav Shukla_CV
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas
 
Prudhivi__Rushi_CV
Prudhivi__Rushi_CVPrudhivi__Rushi_CV
Prudhivi__Rushi_CV
 
Resume- 4 years exp
Resume- 4 years expResume- 4 years exp
Resume- 4 years exp
 

Kiran H K 17-06-2016

  • 1. Page 1 of 4 Curriculum Vitae KIRAN HASAN KORAMADDI Contact No.: +919913395246 E-Mail: kiran.koramaddi@gmail.com / khkoramaddi@outlook.com Objective Statement – “To work in a progressive organization which contributes in utilizing and enhancing my skills towards achieving the organizational mission, while further augmenting my professional and personal competencies” SYNOPSIS  A seasoned professional with 3 years 10 Month of experience in Project Management, Construction Activities, Contract Management, Resource Management and Quantity Surveying.  Presently associated with Larsen & Toubro Limited, Construction Division as Assistant Manager (Planning).  Adept in planning, executing and spearheading construction projects involving Method Engineering, Development, Resource Planning with a flair for adopting modern construction methodologies in compliance with quality standards.  Deft in handling all procedures related to Contract Administration as well as Client billing and Claims.  Adept at managing the operations of quality related operations as well as the progress monitoring of the projects.  Exemplary relationship management, communication skills with the ability to network with project members, consultants, sub contractors and statutory agencies with consummate ease.  Strong mentor and coach, skilled at inspiring confidence, leading by example and building loyal, high- performance teams that exceed expectations. CORE COMPETENCIES Project Management  Ensuring the operations to be within approved Baseline schedules.  Monitoring & controlling the projects with respect to physical & financial progress, time, cost, resource deployment & utilisation, contract compliance.  Identifying, quantifying critical and non-critical risk areas, mitigating & suggesting measures to minimize the impact of risk, monitoring status of risk throughout the project.  Inspecting project sites to review progress and identifying critical areas. Suggesting corrective actions to facilitate smooth & fast progress. Site & Construction Management  Anchoring on-site construction activities as per the given drawings to ensure completion of project within the time & cost parameters, effective resource utilisation to maximize output.  Inspecting field sites to observe and evaluate condition and operability of facilities and structures. Contract Administration & Management  Interpreting contractual obligations & rights as well as evaluating Technical / Financial problems for Management reporting.  Ensuring compliance with the concession agreement, applicable standards (MORT&H, IS and IRC) and legal requirements.  Contractual Risk identification and mitigation plan for the project. Quantity Survey  Evaluating changes for time extension and variation costs and be able to assess requirements before commencement of work.  Preparing measurement and cost estimates / detailed breakdowns for changed / additional works, monthly progress measurement of all areas of the work.  Preparing Engineering proposals for unforeseen conditions  Escalation monitoring and timely approval of client invoicing.
  • 2. Page 2 of 4 CAREER CONTOUR Since May’16 to present with Larsen & Toubro Limited, Construction Division (India) Position: - Assistant Manager (Planning). Project (Present) –Design and Construction of Roads and Services of Activation Area in Dholera Special Investment Region Area, Dholera, Gujarat, India of contract value 1734.04 Cr. INR. Client: Dholera Industrial City Development Limited (DICDL) Consultant: Aecom The scope of work consist of construction of approximately 71 km of dual carriageway roads of different width (Grid pattern of approximately 22 Sq.km in Area), 6 bridges, storm water drain, outfall structure, weir structure, unlined canal, Potable and recycle water supply system, sewerage, industrial effluent network, power duct, street light, Gas line and ICT duct.  Presently involved in the planning team for monitoring and control of Dholera Smart City Project of contract value of 1734.04 Cr. INR on Engineering Procurement and Construction (EPC) basis.  Preparation of detailed construction program using appropriate work sequence in accordance with contract requirements using Primavera P6  Calculation of Accepted Cost Estimate (ACE) immediately after the award of project to calculate the approximate cost and margin of the project.  Provide guidance in the identification, development and implementation of opportunities for project cost savings.  Preparation of proposal for various Activity/Material to get the approval from management (High Power Committee) by comparing with ACE and JCR.  Identification of risk, analysis, impact, monitoring and mitigation plan of the same has to be submit to management.  Participating in weekly and monthly progress meetings. --------------------------------------------------------------------------------------------------------------------------------- From Jan’16 to Apr’16 with Larsen & Toubro Limited, Construction Division (India) Position: - Assistant Manager (Planning). Project – Construction of 4 laning of Kandla-Mundra Port Section of NH-8A in the State of Gujarat, India of contract value of approx 675 Cr. INR. Client: National Highway Authority of India (NHAI) Concessionaire: K.M. Toll Road Pvt. Ltd. EPC Contractor: Reliance Infrastructure Ltd. The scope of work is the design, engineering, procurement and construction of 4/6 laning of Gandhidham (Kandla) - Mundra Port Section of NH-8A (Approx Length- 71.4 km 4 lane) in the State of Gujarat, India. The project consist of 8 major bridges, 18 minor bridges, 1 Rail over bridge, 12 Vehicular underpasses, 2 Pedestrian underpasses, 26 box culvert and 124 pipe culvert.  Previously involved in the planning team for monitoring and control of Kandla Mundra Road Project of contract value (EPC) of 675 Cr. INR on Design, Build, Finance Operate and Transfer (DBFOT) basis.  Preparation of 'S' curves, bar charts and earned value analysis reports on weekly and monthly basis.  Preparation of detailed construction program using appropriate work sequence in accordance with contract requirements using Primavera P6 Professional R 8.2.  Calculate SOI and COI to provide management clear understanding of the performance of the project.  Preparation of Daily, Weekly and Monthly Progress reports and submission of the same to Client.  Progress Monitoring, Controlling and Reporting ongoing activities on Weekly and Monthly basis  Preparation and updating of cash flow statements for the project.  Plan resource requirements, monitor manpower deployment schedules and assist in forecast.  Prepare and Submit Delay and Impact analysis and report the effects of the same to the management.  Participating in project review meetings for evaluating project progress.
  • 3. Page 3 of 4  Familiar with retrospective claiming of Extension of Time (EOT)  Ensuring compliance with the concession agreement, applicable standards (MOR&TH, IS and IRC) and legal pronouncements.  Preparation of monthly invoices (Interim payment certificate), claims due to variation in project scope (change of scope) and Coordinating with clients & consultants.  Design and drawing coordination of the project with client and consultant.  Reconciliation of bulk material on monthly basis.  Correspondences with Client as a part of contract management. ------------------------------------------------------------------------------------------------------------------------------- From Aug’13 to Dec’15 with Larsen & Toubro Limited, Construction Division (India) Position: - Senior Engineer (Planning). Project – Construction of 4 laning of Kandla-Mundra Port Section of NH-8A in the State of Gujarat, India of contract value of approx 675 Cr. INR Client: National Highway Authority of India (NHAI) Concessionaire: K.M. Toll Road Pvt. Ltd. EPC Contractor: Reliance Infrastructure Ltd. The scope of work is the design, engineering, procurement and construction of 4/6 laning of Gandhidham (Kandla) - Mundra Port Section of NH-8A (Approx Length- 71.4 km 4 lane) in the State of Gujarat, India. The project consist of 8 major bridges, 18 minor bridges, 1 Rail over bridge, 12 Vehicular underpasses, 2 Pedestrian underpasses, 26 box culvert and 124 pipe culvert.  Previously involved in the planning team for monitoring and control of Kandla Mundra Road Project of contract value (EPC) of 675 Cr. INR on Design, Build, Finance Operate and Transfer (DBFOT) basis.  Preparation of 'S' curves, bar charts and earned value analysis reports on weekly and monthly basis.  Preparation of detailed construction program using appropriate work sequence in accordance with contract requirements using Primavera P6 Professional R 8.2.  Calculate SOI and COI to provide management clear understanding of the performance of the project.  Preparation of Daily, Weekly and Monthly Progress reports and submission of the same to Client.  Progress Monitoring, Controlling and Reporting ongoing activities on Weekly and Monthly basis  Preparation and updating of cash flow statements for the project.  Plan resource requirements, monitor manpower deployment schedules and assist in forecast.  Prepare and Submit Delay and Impact analysis and report the effects of the same to the management.  Participating in project review meetings for evaluating project progress.  Involved in finalization of project Bill of Quantities (BOQ) and quantity calculation of various structure and highway elements.  Ensuring compliance with the concession agreement, applicable standards (MOR&TH, IS and IRC) and legal pronouncements.  Preparation of monthly invoices (Interim payment certificate), claims due to variation in project scope (change of scope) and Coordinating with clients & consultants.  Design and drawing coordination of the project with client and consultant.  Reconciliation of bulk material on monthly basis.  Correspondences with Client as a part of contract management. ---------------------------------------------------------------------------------------------------------------------------------- From Aug’12 to Jul’13 with Larsen & Toubro Limited, Construction Division (India) Position: - Graduate Engineer Trainee Project – Construction of 4 laning of Kandla-Mundra Port Section of NH-8A in the State of Gujarat, India of contract value of approx 675 Cr. INR Client: National Highway Authority of India (NHAI) Concessionaire: K.M. Toll Road Pvt. Ltd. EPC Contractor: Reliance Infrastructure Ltd.
  • 4. Page 4 of 4 The scope of work is the design, engineering, procurement and construction of 4/6 laning of Gandhidham (Kandla) - Mundra Port Section of NH-8A (Approx Length- 71.4 km 4 lane) in the State of Gujarat, India. The project consist of 8 major bridges, 18 minor bridges, 1 Rail over bridge, 12 Vehicular underpasses, 2 Pedestrian underpasses, 26 box culvert and 124 pipe culvert.  Self was a part of Quality Assurance/Quality Control team and was involved in conducting various tests, finalization of mix designs, monitoring the results & proper documentation as per the Project Quality Plan (3 months duration)  Preparation of Environment Management plan, Environmental Impact Assessment reports, various HSE compliances as a part of the training schedule at EHS department. (1 month duration)  Undergone training in site execution activities (4 months duration)  Undergone training in planning department, involved in client billing, design and drawing coordination and preparation and monitoring of progress reports on daily, weekly and monthly basis. (3 months duration) ACADEMIA 2012 Bachelor of Engineering in Civil Engineering, Visvesvaraya Technological University, Belgaum-Karnataka. (Basaveshwar Engineering College, Bagalkot-Karnataka) Secured 9.18 CGPA on a scale of 10 CGPA. 2009 Diploma in Civil Engineering, Department of Technical Education, Bangalore- Karnataka. (T.S.I.T, Hubli-Karnataka) Secured 64.89% aggregate. 2006 10th Class, Karnataka Secondary Education Examination Board, Karnataka State- Secured 65.76%. IT FORTE  AutoCAD 2008/2010  Staad pro  Microsoft Office 2007/2011  Microsoft Office Project 2010  Primavera P6 Professional R 8.2 PROFESSIONAL ENHANCEMENTS  Graduation Project on “Effect of Coconut Fibre on Properties of Concrete - A case study “ under the guidance of Dr. R.B.Khadirinaikar PERSONAL DOSSIER Date of Birth : 1st June, 1990 Address : At-Daddi kamalapur, Alnavar road, Post-Mugad, Tq-Dharwad, Dist-Dharwad, Karnataka, India-580007 Linguistics : English, Hindi, Kannada Passport : M0372850 / Date of Issue: 30/07/2014 / Date of Expiry: 29/07/2024 Marital Status : Single No. Dependents: Parents Nationality : Indian Interests : Travelling References : Available on request DECLARATION I hereby affirm that the information furnished in this form is true and correct Date: 17th Jun, 2016 Place: Ahmedabad, Gujarat. Signature