RAM ROOP VISHWAKARMA Contact: 09717555034 ~ E-Mail: rrv1985@gmail.com
JOB OBJECTIVE
Seeking middle level assignments in Project Management, Planning, Scheduling, Resource Mobilisation, Monitoring,
Estimation & Cost Controlling, MIS Reporting to higher Management, Rate Analysis, Negotiation, Customer / Vendor Billing
with a reputed organization.
PROFILE SUMMARY
 Currently associated with L&T – ECC, Project Planning In-charge, as Assistant Construction Manager (Planning Dept.)
 A dynamic individual with 11.5 years of experience in Project Management, Planning, Scheduling, Resource
Mobilisation, Monitoring, Estimation & Cost Controlling, MIS Reporting to higher Management, Rate Analysis,
Negotiation, Customer / Vendor Billing in Various Electrical & Instrumentation projects like Refineries, Power
Distribution, Metros which involves Electrical & Instrumentation works for Refineries & Nuclear Power Projects, LV
Power Distribution, Fire Fighting system ,Plumbing & drainage system for Metros.
 Ability to handle multiple tasks simultaneously with my good planning, scheduling and time management skills.
 Preparation of Management information system (MIS) reports, Management Planning & Control Schedules (MPCS),
Project Cost Estimation, & monitoring through various System compliance Reports, Job Cost Reports (JCR),
Performance Reports.
 Meeting with Client and consultant for approval of Variations, Change Orders, and Extra Item Rate Proposal &
Approvals.
 Coordinating with Execution team, purchase team, sub-contractor and client for proper execution of project with
quality, time and budget.
 Monitoring project budgetary parameters & project health with ratio analysis parameters like PBIT, EVA, ROCE, Net
Earnings etc. and projecting the same to management.
 Documentation as per company standard manuals.
 Handling Techno-commercial side of Management among technical team, Top Management, Finance & Accountings
.
 Deft at commercial parts, Various Taxes & Duties, Legal formalities & Co-Ordinating with Accounts, Tax Department for
timely reimbursement of taxes as per contractual parameters.
 Good communicator with excellent planning & interpersonal skills.
 Led, guided & mentored the team at Planning & Project Management to ensure timely & smooth running of Project
CORE COMPETENCIES
 Looking after end to end project management from planning to site mapping to monitoring on-site activities &
final execution of projects.
 Preparation of sub-contractor Rates, terms & conditions,
 Ratios analysis of project (like Working capital Management ratios, ROA, ROTE, breakeven point analysis etc)
enhancing their fiscal performance.
 Analysing various processes / applications and recommending process modifications to enhance efficiency.
 Identifying scope for
o Planning and implementing technological changes to enhance the operational efficiency &
effectiveness.
o Modifications in equipment’s, process flow, working practices, consumables, etc. for controlling
& reducing conversion cost per unit produced.
 Good price negotiator with having knowledge of commercial terms, tax & duties.
 Understanding of various norms & standard such as IS, BS.
 Reviewing vendor Commercial Offers & Price break ups & Costing Details.
 Cost analysis , cost control, Cost monitoring & contribution in margin improvement by various optimisation
technique, Excel solver.
KNOWLEDGE PURVIEW
 Well versed with the following subjects:
o Project Planning & Scheduling & monitoring.
o Price Negotiation
o Cost analysis & Controlling
o Project Monitoring
ORGANISATIONAL EXPERIENCE
Since Jul’2004 L&T-ECC, Power Transmission & Distribution, Industrial Electrification as Assistant
Construction Manager (Project Planning & Cordination)
Growth Path:
Jul’04 – Jul’06 Diploma Engineering Trainee through campus interview –
(Worked in MSQ Upgradation Project in IOCL Mathura Refinery as a Instrumentation Engineer)
Jul’06 – Jul’09 Engineer(Planning)–AssistingtoPlanningIncharge
(AREPProjectinLakhimpurDistrict underRGGVY Phase-1forM/s MVVNL)
Jul’09 - Sep’12 Sr. Engineer(ProjectPlanningIncharge)
(E&I Worksin GGS RefineryBathinda(Pb.)forM/sHPCL-Mittal EnergyLimited)
Oct’12 – Mar’13 Sr. Engineer(Project PlanningIncharge)
(InstrumentationWorksatNPCIL,KakaraparAtomicPowerProject)
Apr’13 – Till Now Asst.ConstructionManager(ProjectPlanning InCharge)
(CE09 (Lot-2) E&M Worksfor UndergroundMetroProjectof Delhi MRTSProjectPh-3)
Performance Evaluation by HR: 2 year (2012, 2013) Outstanding Performer in Annual Evaluation
5 Year (2009, 2010, 2011, 2014, 2015)Top Performer in Annual Evaluation
Highlights:
Deftly administered :
 Currently Handling DMRC Phase-3, CE-09 project as Project Planning Incharge which includes design verification, detail
engineering, manufacture, supply, installation, testing and commissioning of electrical and mechanical system including
fire and hydraulic systems for 10 underground stations of Delhi mass rapid transport system project.
 Looking after end to end project management from planning to site mapping to monitoring on-site activities & final
execution of projects.
 Ratios analysis of project (like Working capital management ratios, ROA, ROTE, breakeven point analysis etc) enhancing
their fiscal performance.
 Analysing various processes / applications and recommending process modifications & equipment calibration to
enhance efficiency.
 Identifying scope for
 Planning and implementing technological changes to enhance the operational efficiency.
 Modifications in equipment’s, process flow, working practices, consumables, etc. for controlling & reducing conversion
cost per unit produced.
 Implementing innovative concepts for cycle time / cost reduction, entailing identification of opportunities, analysis of
data, conducting tests, cost benefit analysis and implementation.
 Recruiting, directing, leading & motivating workforce; imparting continuous on job training for accomplishing greater
operational effectiveness / efficiency.
 Working on succession planning of the workforce, rendering technical guidance to the staff, shift management activities,
appraising the member’s performance & providing feedback.
 Managing the instrumentation activities and conducting tests / inspections to ensure operational effectiveness of plant
& utilities.
 Handling the instrumentation related operations for a wide range of control systems & instruments.
CERTIFICATION
 Certificate course in Primavera from CADD Centre, Bathinda (Punjab).
 Internal Auditor Certification in L&T for ISO 9001:2008
IT SKILLS
 Expert in :
o MS Office (Word, Excel & PowerPoint)
 Conversant with:
o PRIMAVERA
o MS Access
o MS Project
EDUCATION
 2014- BS in Engineering Technology with CGPA 6.75 from Birla Institute of Technology and Sciences, Pilani (Rajesthan
–INDIA) under Work Integrated Learning Program
 2004-Diploma in Instrumentation & Control Engineering with 80.5% from Institute of Engineering & Rural Technology,
Allahabad.
 2001-10+2 from with 60.8 % from F.C.I. Inter College, Gorakhpur -273007(Uttar Pradesh)
SOCIAL ENGAGEMENTS
 Actively involved in donating blood.
PERSONAL DETAILS
Date of Birth: 02nd July 1985
Present Address: First Floor , B-278, Lado Sarai, New Delhi-110030
Permanent Address: H. No. 105, Indraprasth Awasiya Colony, Rapti Nagar Ph-4, Gorakhpur (U.P.) PIN Code: 273013
Languages Known: English and Hindi
Passport No. G8509040 (Valid up to April 2018)
Marital Status Single
Blood Group O (+ve)
Notice Period 45 days
Location Preference in INDIA : Delhi / Noida / Gurgaon / Faridabad/ Ghaziabad / Lucknow
Location Preference in ABROAD : U.S./U.K./Malaysia/Europe/Singapore/Dubai/Abu Dhabi/Qatar
Current CTC : INR 14 Lakhs per Annum
Expected CTC : INR 20 Lakhs per Annum (in India)
Expected CTC : INR 30 Lakhs per Annum ( in Aborad)
ANNEXURE
Project Handled
 Title : E&M Works for CE-09 (Lot-2) Delhi MRTS Project Phase-3
Client : Delhi Metro Rail Corporation limited
Value : INR 238 Crores
Tenure : Apr’2013 to till Now
Role : As Planning In-charge for E&M Works for CE-09 (Lot-2), involved in:
- Executing EIP Company’s in-house developed software for Construction
Management; working across various modules of EIP like Customer Relation
Module, Work Order Module, Project Management Module and Job Costing Module.
- Preparing accepted cost estimate, management planning construction schedule,
management information system reports & monitoring the job through various
management tools like Job Performance Reports, Job Cost Report & Cost over
Invoice, Economic Value Addition, ROCE and other schedules at regular intervals.
- Progress Monitoring & Controlling, Graphical Representation of S Curve, Cash Flow,
Bar Charts, etc.
- Identifying contractual ambiguities and clearing the same with client along with the
obligations for successful execution & discharge of the contract.
- Client’s billing as per contract & budgetary parameters.
- Generating S/C rates, work orders & amendments for sub-contract works and
executing their Monthly RA bills.
- Reconciliation through sub ordinate: Client Material, Sub Contractor Material, Client
Bill Vs Sub Contractor Bill (Qty & Value), and Issue vs. Consumption.
- Reducing the time and effort required for reconciliation’s through the preparation of
customized formats.
- Effective and timely fulfillment of various contractual requirements and statutory
obligations like WCT, Service Tax and Systems Compliance Reports.
- Implementing project quality plans for effective control of documents and records
related to contractual & ISO requirements.
- Performing manpower productivity analysis for sub-contractor to lift up the
individual contractor’s performance.
Project Handled
 Title : Field Instrumentation Package for Unit 3 & 4 of Kakarpar Atomic Power Project
Client : Nuclear Power Corporation of India Limited
Value : INR 194.34 Crores
Tenure : Oct’2012 to Mar’2013
Role : As Planning In-charge for Field Instrumentation Pkg of KAPP 3 & 4, involved in:
- Executing EIP Company’s in-house developed software for Construction
Management; working across various modules of EIP like Customer Relation
Module, Work Order Module, Project Management Module and Job Costing Module.
- Preparing accepted cost estimate, management planning construction schedule,
management information system reports & monitoring the job through various
management tools like Job Performance Reports, Job Cost Report & Cost over
Invoice, Economic Value Addition, ROCE and other schedules at regular intervals.
- Resource mobilization & de-mobilization as per Plan, Project Health and Site
Condition, Risk Assessment for the Project, Progress Monitoring & Controlling,
Graphical Representation of S Curve, Cash Flow, Bar Charts, etc.
- Identifying contractual ambiguities and clearing the same with client along with the
obligations for successful execution & discharge of the contract.
- Client’s billing as per contract & budgetary parameters.
- Generating S/C rates, work orders & amendments for sub-contract works and
executing their Monthly RA bills.
- Reconciliation through sub ordinate: Client Material, Sub Contractor Material, Client
Bill Vs Sub Contractor Bill (Qty & Value), and Issue vs. Consumption.
- Reducing the time and effort required for reconciliation’s through the preparation of
customized formats.
- Effective and timely fulfillment of various contractual requirements and statutory
obligations like WCT, Service Tax and Systems Compliance Reports.
- Preparing monthly financial forecasts and provisions for Sub contractors / Vendors
and Overheads.
- Implementing project quality plans for effective control of documents and records
related to contractual & ISO requirements.
- Performing manpower productivity analysis for sub-contractor to lift up the
individual contractor’s performance.
 Title : Composite Package of Guru Gobind Singh Refinery Project
Client : HPCL – Mittal Energy Limited, Bathinda District, Punjab
Value : INR 95.00 Crores
Tenure : Aug’2009 to Sep’2012
Role : As Planning In-charge (E&I), involved in:
- Executing EIP Company’s in-house developed software for Construction
Management; working across various modules of EIP like Customer Relation
Module, Work Order Module, Project Management Module and Job Costing Module.
- Preparing accepted cost estimate, management planning construction schedule,
management information system reports & monitoring the job through various
management tools like Job Performance Reports, Job Cost Report & Cost over
Invoice, Economic Value Addition, ROCE and other schedules at regular intervals.
- Resource mobilization & de-mobilization as per Plan, Project Health and Site
Condition, Risk Assessment for the Project, Progress Monitoring & Controlling,
Graphical Representation of S Curve, Cash Flow, Bar Charts, etc.
- Identifying contractual ambiguities and clearing the same with client along with the
obligations for successful execution & discharge of the contract.
- Client’s billing as per contract & budgetary parameters.
- Generating S/C rates, work orders & amendments for sub-contract works and
executing their Monthly RA bills.
- Reconciliation through sub ordinate: Client Material, Sub Contractor Material, Client
Bill Vs Sub Contractor Bill (Qty & Value), and Issue vs. Consumption.
- Reducing the time and effort required for reconciliation’s through the preparation of
customized formats.
- Effective and timely fulfillment of various contractual requirements and statutory
obligations like WCT, Service Tax and Systems Compliance Reports.
- Preparing monthly financial forecasts and provisions for Sub contractors / Vendors
and Overheads.
- Implementing project quality plans for effective control of documents and records
related to contractual & ISO requirements.
- Performing manpower productivity analysis for sub contractor to lift up the
individual contractor’s performance.
 Title : AREP Project
Client : Madhyanchal Vidyut Vitran Nigam Limited, Lakhimpur
Value : INR 94.08 Crores
Tenure : Aug’05 – Jul’09
Role : As Planning Engineer (E&I), involved in:
- MS Project & CEMA software and working across variousmodules like MIS
schedules, performance indication Charts, S curves, Billing, Invoicing.
- Drafting ACE and preparing MPCS schedule, MIS reports & monitoring job using
tools like Performance reports, JCR and other schedules at regular intervals.
- Identifying contractual ambiguities and discuss with seniors for successful execution
& discharge of the contract.
- Client’s billing as per contract parameters & preparing S/C rates, work orders &
amendments for sub-contract works and their Monthly RA bills.
- Planning Reconciliation: Client Material, Sub Contractor Material, Client Bill Vs Sub
Contractor Bill (Qty & Value), and Issue vs. Consumption.
- Reducing the overall time and effort required for reconciliation’s by preparing
customized formats.
- Generating MIS reports like Performance Report, Job Synopsis & Job Cost Report.
- Timely fulfillment of various contractual requirements and statutory obligations like
WCT, Service Tax, Sales in Transit Systems Compliance Reports.
- Preparing monthly financial forecasts and provisions for the Sub-Contractors and the
overheads.
- Implementing project quality plans for effective control of documents and records
related to contractual requirements.
- Conducting manpower productivity analyses.
 Title : MSQ Up-gradation Project
Client : Mathura Refinery
Value : INR 26.5 Crore
Tenure : Jul’04 – Aug’05
Role : As Site Engineer (Instrumentation), involved in:
- Instrumentation activities like Cable Tray Erection, Cable Laying, Impulse Piping,
Calibration of Instrumentations, all type instrumentation erection (Control Valve, PI,
PT, DPT, FI, FT, TI, TT, etc.) and testing & commissioning of above mentions.
- Handling five plant’s MSQ, SWS, TGT, SRU, FCCU instrumentation work with 12
sub-contractor & 10 sub-ordinates.
- Electrical work in (6 x 5 MVA) Sub Station & Control Room Building of MSQ Plant
like Cable Tray Erection, Cable Laying, Glanding & Termination, Fire Fighting
Instruments, PA System, CCTV, Analyzers Erection, Testing & Commissioning etc.
- Implementing project quality plans for effective control of documents and records
related to contractual requirements.
- Performing manpower productivity analyses for sub-contractor to lift up the
individual contractor’s performance.
- Preparing the sub contractor measurement, material reconciliation as directed by the
Manager.
- Identifying physical problems, discussing the same with client and resolving it for
successful execution & discharge of the contract with in contract period.

More Related Content

What's hot

Kristina Klingler Resume 06/2016
Kristina Klingler Resume 06/2016Kristina Klingler Resume 06/2016
Kristina Klingler Resume 06/2016Kristina Klingler
 
Planning and Scheduling Construction Projects using Primavera Software A Case...
Planning and Scheduling Construction Projects using Primavera Software A Case...Planning and Scheduling Construction Projects using Primavera Software A Case...
Planning and Scheduling Construction Projects using Primavera Software A Case...ijtsrd
 
Brian Nicholls resume 2016-08-11
Brian Nicholls resume   2016-08-11Brian Nicholls resume   2016-08-11
Brian Nicholls resume 2016-08-11Brian Nicholls
 
Resume +Tahir 2016
Resume +Tahir 2016Resume +Tahir 2016
Resume +Tahir 2016Tahir Khan
 
CV - Marjorie Anne Abulon updated 2016
CV - Marjorie Anne Abulon updated 2016CV - Marjorie Anne Abulon updated 2016
CV - Marjorie Anne Abulon updated 2016Marjorie Anne Abulon
 
Samir Patil 16 YRs EXP
Samir Patil 16 YRs EXPSamir Patil 16 YRs EXP
Samir Patil 16 YRs EXPSamir Patil
 
Resume_Rocchino Dec 2015
Resume_Rocchino Dec 2015Resume_Rocchino Dec 2015
Resume_Rocchino Dec 2015Jon Rocchino
 
RESUME - Cas Scheepers 1 Rev
RESUME - Cas Scheepers 1 RevRESUME - Cas Scheepers 1 Rev
RESUME - Cas Scheepers 1 RevCas Scheepers
 
Resume - Prakash Patil
Resume - Prakash PatilResume - Prakash Patil
Resume - Prakash PatilPrakash Patil
 

What's hot (19)

PREMENDRA CV Apr 6
PREMENDRA CV Apr 6PREMENDRA CV Apr 6
PREMENDRA CV Apr 6
 
11 year Exp in Instrumentation Field.
11 year Exp in Instrumentation Field.11 year Exp in Instrumentation Field.
11 year Exp in Instrumentation Field.
 
Kristina Klingler Resume 06/2016
Kristina Klingler Resume 06/2016Kristina Klingler Resume 06/2016
Kristina Klingler Resume 06/2016
 
Planning and Scheduling Construction Projects using Primavera Software A Case...
Planning and Scheduling Construction Projects using Primavera Software A Case...Planning and Scheduling Construction Projects using Primavera Software A Case...
Planning and Scheduling Construction Projects using Primavera Software A Case...
 
Project Planning & Control Engineer
Project Planning & Control EngineerProject Planning & Control Engineer
Project Planning & Control Engineer
 
Kiran H K 17-06-2016
Kiran H K 17-06-2016Kiran H K 17-06-2016
Kiran H K 17-06-2016
 
Edg resume 06.2016
Edg resume 06.2016Edg resume 06.2016
Edg resume 06.2016
 
Brian Nicholls resume 2016-08-11
Brian Nicholls resume   2016-08-11Brian Nicholls resume   2016-08-11
Brian Nicholls resume 2016-08-11
 
Resume +Tahir 2016
Resume +Tahir 2016Resume +Tahir 2016
Resume +Tahir 2016
 
Rahim a m
Rahim a mRahim a m
Rahim a m
 
CV - Marjorie Anne Abulon updated 2016
CV - Marjorie Anne Abulon updated 2016CV - Marjorie Anne Abulon updated 2016
CV - Marjorie Anne Abulon updated 2016
 
Samir Patil 16 YRs EXP
Samir Patil 16 YRs EXPSamir Patil 16 YRs EXP
Samir Patil 16 YRs EXP
 
Amol-KulkarniResume
Amol-KulkarniResumeAmol-KulkarniResume
Amol-KulkarniResume
 
RINAL_PATEL
RINAL_PATELRINAL_PATEL
RINAL_PATEL
 
vijins new-11-2016
vijins new-11-2016vijins new-11-2016
vijins new-11-2016
 
Kristina M Klingler Resume
Kristina M Klingler ResumeKristina M Klingler Resume
Kristina M Klingler Resume
 
Resume_Rocchino Dec 2015
Resume_Rocchino Dec 2015Resume_Rocchino Dec 2015
Resume_Rocchino Dec 2015
 
RESUME - Cas Scheepers 1 Rev
RESUME - Cas Scheepers 1 RevRESUME - Cas Scheepers 1 Rev
RESUME - Cas Scheepers 1 Rev
 
Resume - Prakash Patil
Resume - Prakash PatilResume - Prakash Patil
Resume - Prakash Patil
 

Similar to RRV CV (20)

Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Pushpendra Singh Gangwar- 2016
Pushpendra Singh Gangwar- 2016Pushpendra Singh Gangwar- 2016
Pushpendra Singh Gangwar- 2016
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated Resume
 
Resume-Naresh.B (1).pdf
Resume-Naresh.B (1).pdfResume-Naresh.B (1).pdf
Resume-Naresh.B (1).pdf
 
Vikas Resume
Vikas ResumeVikas Resume
Vikas Resume
 
Mahesh - Resume (3)
Mahesh -   Resume (3)Mahesh -   Resume (3)
Mahesh - Resume (3)
 
Saikat Mazumder_PMP
Saikat Mazumder_PMPSaikat Mazumder_PMP
Saikat Mazumder_PMP
 
cv 2015
cv 2015cv 2015
cv 2015
 
Muralidhar
MuralidharMuralidhar
Muralidhar
 
PRAFUL CHAUHAN
PRAFUL CHAUHANPRAFUL CHAUHAN
PRAFUL CHAUHAN
 
Amit Hankare CV Sept 16
Amit Hankare CV Sept 16Amit Hankare CV Sept 16
Amit Hankare CV Sept 16
 
Cv Anirudh
Cv AnirudhCv Anirudh
Cv Anirudh
 
Henry CV
Henry CVHenry CV
Henry CV
 
Project controls function
Project controls functionProject controls function
Project controls function
 
Gurpreet_Resume_BillRAFM
Gurpreet_Resume_BillRAFMGurpreet_Resume_BillRAFM
Gurpreet_Resume_BillRAFM
 
Gurpreet_Resume_BillRAFM
Gurpreet_Resume_BillRAFMGurpreet_Resume_BillRAFM
Gurpreet_Resume_BillRAFM
 
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERResume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
 
OFFICIAL CV
OFFICIAL CVOFFICIAL CV
OFFICIAL CV
 
Soumyajit Das
Soumyajit DasSoumyajit Das
Soumyajit Das
 
Resume for Senior Manager - projects
Resume for  Senior Manager -  projectsResume for  Senior Manager -  projects
Resume for Senior Manager - projects
 

RRV CV

  • 1. RAM ROOP VISHWAKARMA Contact: 09717555034 ~ E-Mail: rrv1985@gmail.com JOB OBJECTIVE Seeking middle level assignments in Project Management, Planning, Scheduling, Resource Mobilisation, Monitoring, Estimation & Cost Controlling, MIS Reporting to higher Management, Rate Analysis, Negotiation, Customer / Vendor Billing with a reputed organization. PROFILE SUMMARY  Currently associated with L&T – ECC, Project Planning In-charge, as Assistant Construction Manager (Planning Dept.)  A dynamic individual with 11.5 years of experience in Project Management, Planning, Scheduling, Resource Mobilisation, Monitoring, Estimation & Cost Controlling, MIS Reporting to higher Management, Rate Analysis, Negotiation, Customer / Vendor Billing in Various Electrical & Instrumentation projects like Refineries, Power Distribution, Metros which involves Electrical & Instrumentation works for Refineries & Nuclear Power Projects, LV Power Distribution, Fire Fighting system ,Plumbing & drainage system for Metros.  Ability to handle multiple tasks simultaneously with my good planning, scheduling and time management skills.  Preparation of Management information system (MIS) reports, Management Planning & Control Schedules (MPCS), Project Cost Estimation, & monitoring through various System compliance Reports, Job Cost Reports (JCR), Performance Reports.  Meeting with Client and consultant for approval of Variations, Change Orders, and Extra Item Rate Proposal & Approvals.  Coordinating with Execution team, purchase team, sub-contractor and client for proper execution of project with quality, time and budget.  Monitoring project budgetary parameters & project health with ratio analysis parameters like PBIT, EVA, ROCE, Net Earnings etc. and projecting the same to management.  Documentation as per company standard manuals.  Handling Techno-commercial side of Management among technical team, Top Management, Finance & Accountings .  Deft at commercial parts, Various Taxes & Duties, Legal formalities & Co-Ordinating with Accounts, Tax Department for timely reimbursement of taxes as per contractual parameters.  Good communicator with excellent planning & interpersonal skills.  Led, guided & mentored the team at Planning & Project Management to ensure timely & smooth running of Project CORE COMPETENCIES  Looking after end to end project management from planning to site mapping to monitoring on-site activities & final execution of projects.  Preparation of sub-contractor Rates, terms & conditions,  Ratios analysis of project (like Working capital Management ratios, ROA, ROTE, breakeven point analysis etc) enhancing their fiscal performance.  Analysing various processes / applications and recommending process modifications to enhance efficiency.  Identifying scope for o Planning and implementing technological changes to enhance the operational efficiency & effectiveness. o Modifications in equipment’s, process flow, working practices, consumables, etc. for controlling & reducing conversion cost per unit produced.  Good price negotiator with having knowledge of commercial terms, tax & duties.  Understanding of various norms & standard such as IS, BS.  Reviewing vendor Commercial Offers & Price break ups & Costing Details.
  • 2.  Cost analysis , cost control, Cost monitoring & contribution in margin improvement by various optimisation technique, Excel solver. KNOWLEDGE PURVIEW  Well versed with the following subjects: o Project Planning & Scheduling & monitoring. o Price Negotiation o Cost analysis & Controlling o Project Monitoring ORGANISATIONAL EXPERIENCE Since Jul’2004 L&T-ECC, Power Transmission & Distribution, Industrial Electrification as Assistant Construction Manager (Project Planning & Cordination) Growth Path: Jul’04 – Jul’06 Diploma Engineering Trainee through campus interview – (Worked in MSQ Upgradation Project in IOCL Mathura Refinery as a Instrumentation Engineer) Jul’06 – Jul’09 Engineer(Planning)–AssistingtoPlanningIncharge (AREPProjectinLakhimpurDistrict underRGGVY Phase-1forM/s MVVNL) Jul’09 - Sep’12 Sr. Engineer(ProjectPlanningIncharge) (E&I Worksin GGS RefineryBathinda(Pb.)forM/sHPCL-Mittal EnergyLimited) Oct’12 – Mar’13 Sr. Engineer(Project PlanningIncharge) (InstrumentationWorksatNPCIL,KakaraparAtomicPowerProject) Apr’13 – Till Now Asst.ConstructionManager(ProjectPlanning InCharge) (CE09 (Lot-2) E&M Worksfor UndergroundMetroProjectof Delhi MRTSProjectPh-3) Performance Evaluation by HR: 2 year (2012, 2013) Outstanding Performer in Annual Evaluation 5 Year (2009, 2010, 2011, 2014, 2015)Top Performer in Annual Evaluation Highlights: Deftly administered :  Currently Handling DMRC Phase-3, CE-09 project as Project Planning Incharge which includes design verification, detail engineering, manufacture, supply, installation, testing and commissioning of electrical and mechanical system including fire and hydraulic systems for 10 underground stations of Delhi mass rapid transport system project.  Looking after end to end project management from planning to site mapping to monitoring on-site activities & final execution of projects.  Ratios analysis of project (like Working capital management ratios, ROA, ROTE, breakeven point analysis etc) enhancing their fiscal performance.  Analysing various processes / applications and recommending process modifications & equipment calibration to enhance efficiency.  Identifying scope for  Planning and implementing technological changes to enhance the operational efficiency.  Modifications in equipment’s, process flow, working practices, consumables, etc. for controlling & reducing conversion cost per unit produced.  Implementing innovative concepts for cycle time / cost reduction, entailing identification of opportunities, analysis of data, conducting tests, cost benefit analysis and implementation.  Recruiting, directing, leading & motivating workforce; imparting continuous on job training for accomplishing greater operational effectiveness / efficiency.  Working on succession planning of the workforce, rendering technical guidance to the staff, shift management activities, appraising the member’s performance & providing feedback.  Managing the instrumentation activities and conducting tests / inspections to ensure operational effectiveness of plant & utilities.  Handling the instrumentation related operations for a wide range of control systems & instruments. CERTIFICATION  Certificate course in Primavera from CADD Centre, Bathinda (Punjab).  Internal Auditor Certification in L&T for ISO 9001:2008 IT SKILLS  Expert in : o MS Office (Word, Excel & PowerPoint)  Conversant with:
  • 3. o PRIMAVERA o MS Access o MS Project EDUCATION  2014- BS in Engineering Technology with CGPA 6.75 from Birla Institute of Technology and Sciences, Pilani (Rajesthan –INDIA) under Work Integrated Learning Program  2004-Diploma in Instrumentation & Control Engineering with 80.5% from Institute of Engineering & Rural Technology, Allahabad.  2001-10+2 from with 60.8 % from F.C.I. Inter College, Gorakhpur -273007(Uttar Pradesh) SOCIAL ENGAGEMENTS  Actively involved in donating blood. PERSONAL DETAILS Date of Birth: 02nd July 1985 Present Address: First Floor , B-278, Lado Sarai, New Delhi-110030 Permanent Address: H. No. 105, Indraprasth Awasiya Colony, Rapti Nagar Ph-4, Gorakhpur (U.P.) PIN Code: 273013 Languages Known: English and Hindi Passport No. G8509040 (Valid up to April 2018) Marital Status Single Blood Group O (+ve) Notice Period 45 days Location Preference in INDIA : Delhi / Noida / Gurgaon / Faridabad/ Ghaziabad / Lucknow Location Preference in ABROAD : U.S./U.K./Malaysia/Europe/Singapore/Dubai/Abu Dhabi/Qatar Current CTC : INR 14 Lakhs per Annum Expected CTC : INR 20 Lakhs per Annum (in India) Expected CTC : INR 30 Lakhs per Annum ( in Aborad)
  • 4. ANNEXURE Project Handled  Title : E&M Works for CE-09 (Lot-2) Delhi MRTS Project Phase-3 Client : Delhi Metro Rail Corporation limited Value : INR 238 Crores Tenure : Apr’2013 to till Now Role : As Planning In-charge for E&M Works for CE-09 (Lot-2), involved in: - Executing EIP Company’s in-house developed software for Construction Management; working across various modules of EIP like Customer Relation Module, Work Order Module, Project Management Module and Job Costing Module. - Preparing accepted cost estimate, management planning construction schedule, management information system reports & monitoring the job through various management tools like Job Performance Reports, Job Cost Report & Cost over Invoice, Economic Value Addition, ROCE and other schedules at regular intervals. - Progress Monitoring & Controlling, Graphical Representation of S Curve, Cash Flow, Bar Charts, etc. - Identifying contractual ambiguities and clearing the same with client along with the obligations for successful execution & discharge of the contract. - Client’s billing as per contract & budgetary parameters. - Generating S/C rates, work orders & amendments for sub-contract works and executing their Monthly RA bills. - Reconciliation through sub ordinate: Client Material, Sub Contractor Material, Client Bill Vs Sub Contractor Bill (Qty & Value), and Issue vs. Consumption. - Reducing the time and effort required for reconciliation’s through the preparation of customized formats. - Effective and timely fulfillment of various contractual requirements and statutory obligations like WCT, Service Tax and Systems Compliance Reports. - Implementing project quality plans for effective control of documents and records related to contractual & ISO requirements. - Performing manpower productivity analysis for sub-contractor to lift up the individual contractor’s performance. Project Handled  Title : Field Instrumentation Package for Unit 3 & 4 of Kakarpar Atomic Power Project Client : Nuclear Power Corporation of India Limited Value : INR 194.34 Crores Tenure : Oct’2012 to Mar’2013 Role : As Planning In-charge for Field Instrumentation Pkg of KAPP 3 & 4, involved in: - Executing EIP Company’s in-house developed software for Construction Management; working across various modules of EIP like Customer Relation Module, Work Order Module, Project Management Module and Job Costing Module. - Preparing accepted cost estimate, management planning construction schedule, management information system reports & monitoring the job through various management tools like Job Performance Reports, Job Cost Report & Cost over Invoice, Economic Value Addition, ROCE and other schedules at regular intervals.
  • 5. - Resource mobilization & de-mobilization as per Plan, Project Health and Site Condition, Risk Assessment for the Project, Progress Monitoring & Controlling, Graphical Representation of S Curve, Cash Flow, Bar Charts, etc. - Identifying contractual ambiguities and clearing the same with client along with the obligations for successful execution & discharge of the contract. - Client’s billing as per contract & budgetary parameters. - Generating S/C rates, work orders & amendments for sub-contract works and executing their Monthly RA bills. - Reconciliation through sub ordinate: Client Material, Sub Contractor Material, Client Bill Vs Sub Contractor Bill (Qty & Value), and Issue vs. Consumption. - Reducing the time and effort required for reconciliation’s through the preparation of customized formats. - Effective and timely fulfillment of various contractual requirements and statutory obligations like WCT, Service Tax and Systems Compliance Reports. - Preparing monthly financial forecasts and provisions for Sub contractors / Vendors and Overheads. - Implementing project quality plans for effective control of documents and records related to contractual & ISO requirements. - Performing manpower productivity analysis for sub-contractor to lift up the individual contractor’s performance.  Title : Composite Package of Guru Gobind Singh Refinery Project Client : HPCL – Mittal Energy Limited, Bathinda District, Punjab Value : INR 95.00 Crores Tenure : Aug’2009 to Sep’2012 Role : As Planning In-charge (E&I), involved in: - Executing EIP Company’s in-house developed software for Construction Management; working across various modules of EIP like Customer Relation Module, Work Order Module, Project Management Module and Job Costing Module. - Preparing accepted cost estimate, management planning construction schedule, management information system reports & monitoring the job through various management tools like Job Performance Reports, Job Cost Report & Cost over Invoice, Economic Value Addition, ROCE and other schedules at regular intervals. - Resource mobilization & de-mobilization as per Plan, Project Health and Site Condition, Risk Assessment for the Project, Progress Monitoring & Controlling, Graphical Representation of S Curve, Cash Flow, Bar Charts, etc. - Identifying contractual ambiguities and clearing the same with client along with the obligations for successful execution & discharge of the contract. - Client’s billing as per contract & budgetary parameters. - Generating S/C rates, work orders & amendments for sub-contract works and executing their Monthly RA bills. - Reconciliation through sub ordinate: Client Material, Sub Contractor Material, Client Bill Vs Sub Contractor Bill (Qty & Value), and Issue vs. Consumption. - Reducing the time and effort required for reconciliation’s through the preparation of customized formats. - Effective and timely fulfillment of various contractual requirements and statutory obligations like WCT, Service Tax and Systems Compliance Reports. - Preparing monthly financial forecasts and provisions for Sub contractors / Vendors and Overheads. - Implementing project quality plans for effective control of documents and records related to contractual & ISO requirements. - Performing manpower productivity analysis for sub contractor to lift up the individual contractor’s performance.
  • 6.  Title : AREP Project Client : Madhyanchal Vidyut Vitran Nigam Limited, Lakhimpur Value : INR 94.08 Crores Tenure : Aug’05 – Jul’09 Role : As Planning Engineer (E&I), involved in: - MS Project & CEMA software and working across variousmodules like MIS schedules, performance indication Charts, S curves, Billing, Invoicing. - Drafting ACE and preparing MPCS schedule, MIS reports & monitoring job using tools like Performance reports, JCR and other schedules at regular intervals. - Identifying contractual ambiguities and discuss with seniors for successful execution & discharge of the contract. - Client’s billing as per contract parameters & preparing S/C rates, work orders & amendments for sub-contract works and their Monthly RA bills. - Planning Reconciliation: Client Material, Sub Contractor Material, Client Bill Vs Sub Contractor Bill (Qty & Value), and Issue vs. Consumption. - Reducing the overall time and effort required for reconciliation’s by preparing customized formats. - Generating MIS reports like Performance Report, Job Synopsis & Job Cost Report. - Timely fulfillment of various contractual requirements and statutory obligations like WCT, Service Tax, Sales in Transit Systems Compliance Reports. - Preparing monthly financial forecasts and provisions for the Sub-Contractors and the overheads. - Implementing project quality plans for effective control of documents and records related to contractual requirements. - Conducting manpower productivity analyses.  Title : MSQ Up-gradation Project Client : Mathura Refinery Value : INR 26.5 Crore Tenure : Jul’04 – Aug’05 Role : As Site Engineer (Instrumentation), involved in: - Instrumentation activities like Cable Tray Erection, Cable Laying, Impulse Piping, Calibration of Instrumentations, all type instrumentation erection (Control Valve, PI, PT, DPT, FI, FT, TI, TT, etc.) and testing & commissioning of above mentions. - Handling five plant’s MSQ, SWS, TGT, SRU, FCCU instrumentation work with 12 sub-contractor & 10 sub-ordinates. - Electrical work in (6 x 5 MVA) Sub Station & Control Room Building of MSQ Plant like Cable Tray Erection, Cable Laying, Glanding & Termination, Fire Fighting Instruments, PA System, CCTV, Analyzers Erection, Testing & Commissioning etc. - Implementing project quality plans for effective control of documents and records related to contractual requirements. - Performing manpower productivity analyses for sub-contractor to lift up the individual contractor’s performance. - Preparing the sub contractor measurement, material reconciliation as directed by the Manager. - Identifying physical problems, discussing the same with client and resolving it for successful execution & discharge of the contract with in contract period.