This document provides biographical and professional information about Samer Mohamed Abduallh Hassan. It includes his address, contact information, education history, skills, work experience, and responsibilities in his current role at Ramah Aluminum Company as the Installation General Supervisor and Head of Maintenance Department. His experience includes working on projects in Egypt and Saudi Arabia in construction, engineering, and aluminum installation.
1. Samer Mohamed Abduallh Hassan
Adress of Egypt : 22th elmodir st. – elzohor dist.
-zagazeg-Sharkia
10th Zone - Nasr City – Cairo
Adress of KSA : Alsalam - Riyadh
(Mobile) : 0590509971
E-mail: arcsamer.eng@gmail.com
Personal Data Date of Birth: August 11, 1984
Nationality: Egyptian
Marital Status: Married
Religion: Muslim
Objectives My career objective is to reach my peak performance!! I will
try to accomplish this by working hard and try to add more to my
experience
Education Bachelor of Architecture and Urban planning,
Faculty of Engineering, Zagazig University
Major : Architecture
Degree: B.Sc. of Architecture(2003-2008)
Grade : Accepted
Project: Very Good
Skills
Language Skills: Fluent in both spoken and written Arabic and good
in English
Computer Skills: High knowledge of MS Office xp,
internet applications
Professional working in AutoCAD(2D3D)
good in Adobe Photoshop
Accept in 3d max programme
Functional Skills
Communication Skills:
Negotiation skills with different standards of people
Interacted and emerged with people from various cultures
Analytical Skills:
Analyzing data and reaching conclusions
Making research and evaluating the results
Interpersonal Skills:
I am distinguished by organization and honest in work
Hard working and ability to meet deadlines characterize me
2. Experience
• Working at Mahgoub Construction – Eng Sayed Mahjoub
from 2005 till 2008
• Department engineers in the Egyptian army
• Working at El-Araby Contracting – Eng Ahmed
Abdulkader from 2010 till 2011
• Working at Ramah Aluminum Company from 2011 till now
Experiences and the work assigned-:
Al-Mahgoub Construction : (2005 – 2008 ) training
1.Creation and finishing Hospital of El-Ahly Bank for the Integrated
Care ... Ring Road - Cairo (training the summer of 2005. (
2.Finishing the El-Ahly Bank of Egypt - Branch Hassanein Heikal -
Nasr City - Cairo (training the summer of 2006. (
3.Graphics preparation and implementation of the work of finishing the
main branch of El-Ahly Bank - City Stars (Training Summer 2006. (
4,The establishment and implementation of the El-Ahly Bank finishes
- Branch Bagour - Mnovia (training the summer of 2007. (
5,Finishing the El-Ahly Bank – Branch Rabaa Adawiya - Cairo
(2008. (
6,Establish and implement complex administrative entertaining and
garages compound (concrete business)- Cairo (2008. (
7.Finishing El-Ahly Bank – Branch Gisr el-Suez - Cairo (2008. (
Department engineers in the Egyptian army ; ( 2009(
1.The design and construction of buildings air defense ( 2009. (
2.Create additional buildings in the Air Force Academy ( 2009. (
El-Araby Contracting : ( 2010(
1.Finishing Bank Misr- Branch Demerdash - Cairo (2010. (
2.Design and oversee the implementation of complex El-Rahma
buildings Cairo in front of Carrefour (2010. (
3.Design and construction of the administrative building of the Suez
Gypsum plant - in Suez (2010. (
Ramah Aluminum Company ; ( 2011 – 2013 )
1. Creation and installation of aluminum and curtain wall in the Imam University
building - in Riyadh - Mohamed el-Rashed Contracting MARCO (309 - 305 -
313) .
3. 2. Creation and installation of aluminum and curtain wall in the Imam University
building - in Riyadh - Fawzan Trading & Contracting (323 - 324 - 261) .
3. Creation and installation of aluminum and curtain wall In the Ministry of
Higher Education - in Muzahmiah - Computer College and Science College .
4, Creation and installation of aluminum and curtain wall and structural glazing in
the Rahmaniya Hotel - the intersection of Olia Street with Tahlia Street .
5. Creation and installation of aluminum curtain wall in the building of the
Faculty of Tourism and Hotels - in Riyadh - King Abdullah road –
El-Dhahry Group Contracting .
6. Creation and installation of aluminum curtain wall in the building of El-Omais
hospital - in Abha - Al-Rashed Contracting - Khaled Al-Rashed .
7. Creation and installation of aluminum curtain wall in the building of the
Peninsula Shield - in Riyadh - Jawdat Contracting Company - Behind the
Airport .
8. Creation and installation of aluminum curtain wall in the building of Star Mall
- in Al-Ahsa - Al-Jawad Al-Mutawa - next to the Enter continental Hotel .
9. Construction and installation of aluminum curtain wall in Al-Rashed Towers -
in Al-Khobar - Al Rashid Trading & Contracting RTCC .
10. Creation and installation of aluminum curtain wall in a building Sulaiman Al
Habib Hospital - Riyadh – El-Takhasosi Street .
Ramah Aluminum Company ; ( 2014 – up to now )
It was upgraded as an {Installation general supervisor} and
{Head of Maintenance Department}...
Responsible for maintenance of all the old projects , make
contracting with sub contractors , handling small projects like
villas and showrooms projects , handover the work & Releasing the
invoices .
1.creation and installation of aluminum curtain wall , structural
windows and doors , cladding and Aluminum louver at Riyadh
bolivard center –exit 2 .
2.creation and installation of spider glass system at Noura square
building at takhasosi street .