Harry Ramos has over 38 years of experience as a mechanical engineer, with expertise in project management, construction management, and facility operations and maintenance. He currently works as a Senior Mechanical Engineer for KEO International Consultants, where he supervises construction projects such as hospitals and malls. Previously, he has served as a project engineer for various infrastructure developments in Qatar, including airports, industrial facilities, and commercial buildings. Ramos holds a Bachelor's degree in Mechanical Engineering and is a licensed Professional Mechanical Engineer in the Philippines.
presentation of sampling , testing ,release and rejection of Raw materialsshaik malangsha
I hope this ppt would be help to improve & make aware about better sampling , testing ,release and rejection of Raw materials . I believe if once ill go through this ppt it ill defiantly help to improve our RM procedure. If any clarifications pls. mail me at shkrahul42@gmail.com
Auditing of critical parameter:- HVAC(heating, ventilation and air conditioning system) 2021; In these presentation includes the requirement of HVAC, Auditing of HVAC components, technical analysis of HVAC components, WHO-GMP audis of HVAC then
Rogert william statement on HVAC, working of HVAC systems and their components Core function of HVAC, Market trends and market analysis of HVAC, WHO guidelines on HVAC system.
In this slide contains Introduction, overview and details of FACTORY ACCEPTANCE TEST
Presented by: P.NARESH (Department of pharmaceutical analysis).RIPER, anantapur
presentation of sampling , testing ,release and rejection of Raw materialsshaik malangsha
I hope this ppt would be help to improve & make aware about better sampling , testing ,release and rejection of Raw materials . I believe if once ill go through this ppt it ill defiantly help to improve our RM procedure. If any clarifications pls. mail me at shkrahul42@gmail.com
Auditing of critical parameter:- HVAC(heating, ventilation and air conditioning system) 2021; In these presentation includes the requirement of HVAC, Auditing of HVAC components, technical analysis of HVAC components, WHO-GMP audis of HVAC then
Rogert william statement on HVAC, working of HVAC systems and their components Core function of HVAC, Market trends and market analysis of HVAC, WHO guidelines on HVAC system.
In this slide contains Introduction, overview and details of FACTORY ACCEPTANCE TEST
Presented by: P.NARESH (Department of pharmaceutical analysis).RIPER, anantapur
A explained presentation on fire and explosion hazard and their prevention in pharmaceutical and other chemical industry and transportation of flammable and explosive goods which could be helpful for pharmaceutical and other student who has hazard and there management in their syllabus
OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...AnupamaPanoli
OISD (Oil Industry Safety Directorate) is a technical directorate under the Ministry of Petroleum and Natural Gas that formulates and coordinates the implementation of a series of self regulatory measures aimed at enhancing the safety in the oil & gas industry in India.
It is intended that the provisions specified in this standard shall be implemented progressively for the existing facilities. For the new / upcoming locations / facilities, these shall be implemented along with commissioning.
This standard recommends the minimum requirement of fire protection facilities at Petroleum Depots, Terminals, Pipeline Installations with or without Storages, Central Tank Farms (CTF), Lube Oil Installations, Grease Manufacturing & Filling Facilities.
Air Based Hazards, M.pharm, sem 2,Bhumi Suratiya,.pptxBhumiSuratiya
Air Based Hazard, M.Pharm, Sem 2,Bhumi Suratiya, Pharmaceutical Quality Assurance. Source of air based hazard, types of air based hazard, air circulation maintenance for sterile and non sterile area . Application of air circulation, HEPA filter, clean area classification.
Heating, ventilation, and air conditioning is the technology of indoor and vehicular environmental comfort. Its goal is to provide thermal comfort and acceptable indoor air quality.
A post graduate of petroleum Engineer (from PME) with 10 years of experience in project engineering and project management from conception to commissioning of multi-discipline EPC contracts related to chemical, refinery, oil & gas and LNG sectors including Egypt, Qatar, Abu Dhabi and Oman.
Working in Arabian Industries (AI) LLC for nearly 6 years in feasibility, detailed engineering, EPC, EMC and IMC Projects for PDO (Petroleum Development Oman) and ORPIC.
I’m a petroleum Engineer with an Excellent experience In Oil & Gas Projects and industries such as exploration ,drilling ,work over , Oil & Gas well drilling & ALS Production services and Projects in oil & Gas Energy field section ,My experience in the Drilling , Well control & wellhead equipment Inspection ,Refurbishment , Maintenance , Testing , Recertification and Installation As per API(6A , 6D , 16A , 16D, 16C & 7K ) Specification. Oil & Gas artificial lift production technology and solution. Maintenance, Installation and Overhaul of well head and well control tools and equipment; furthermore, many projects for new rigs (on shore) and offshore rig (ST-Bahari1- Jack up), Prove leadership skills involving managing, developing and motivating teams to achieve their objectives. Reliable, trustworthy and meticulous, gained a good understanding of what is required of Oil & Gas engineering.
A explained presentation on fire and explosion hazard and their prevention in pharmaceutical and other chemical industry and transportation of flammable and explosive goods which could be helpful for pharmaceutical and other student who has hazard and there management in their syllabus
OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...AnupamaPanoli
OISD (Oil Industry Safety Directorate) is a technical directorate under the Ministry of Petroleum and Natural Gas that formulates and coordinates the implementation of a series of self regulatory measures aimed at enhancing the safety in the oil & gas industry in India.
It is intended that the provisions specified in this standard shall be implemented progressively for the existing facilities. For the new / upcoming locations / facilities, these shall be implemented along with commissioning.
This standard recommends the minimum requirement of fire protection facilities at Petroleum Depots, Terminals, Pipeline Installations with or without Storages, Central Tank Farms (CTF), Lube Oil Installations, Grease Manufacturing & Filling Facilities.
Air Based Hazards, M.pharm, sem 2,Bhumi Suratiya,.pptxBhumiSuratiya
Air Based Hazard, M.Pharm, Sem 2,Bhumi Suratiya, Pharmaceutical Quality Assurance. Source of air based hazard, types of air based hazard, air circulation maintenance for sterile and non sterile area . Application of air circulation, HEPA filter, clean area classification.
Heating, ventilation, and air conditioning is the technology of indoor and vehicular environmental comfort. Its goal is to provide thermal comfort and acceptable indoor air quality.
A post graduate of petroleum Engineer (from PME) with 10 years of experience in project engineering and project management from conception to commissioning of multi-discipline EPC contracts related to chemical, refinery, oil & gas and LNG sectors including Egypt, Qatar, Abu Dhabi and Oman.
Working in Arabian Industries (AI) LLC for nearly 6 years in feasibility, detailed engineering, EPC, EMC and IMC Projects for PDO (Petroleum Development Oman) and ORPIC.
I’m a petroleum Engineer with an Excellent experience In Oil & Gas Projects and industries such as exploration ,drilling ,work over , Oil & Gas well drilling & ALS Production services and Projects in oil & Gas Energy field section ,My experience in the Drilling , Well control & wellhead equipment Inspection ,Refurbishment , Maintenance , Testing , Recertification and Installation As per API(6A , 6D , 16A , 16D, 16C & 7K ) Specification. Oil & Gas artificial lift production technology and solution. Maintenance, Installation and Overhaul of well head and well control tools and equipment; furthermore, many projects for new rigs (on shore) and offshore rig (ST-Bahari1- Jack up), Prove leadership skills involving managing, developing and motivating teams to achieve their objectives. Reliable, trustworthy and meticulous, gained a good understanding of what is required of Oil & Gas engineering.
An experienced Engineering Manager with more than 12 years in the Offshore/Onshore renewable Energy, Oil and Gas industry, adhoc vendor inspection, HSE, Pre-shipment Inspection. Also, Abraham has experience as a Third-Party Inspection Subsea Manager, QHSE and QA/QC Inspectors for Onshore & Offshore Projects and has handled, Solar sales Projects, Subsea Inspection Repair Maintenance (IRM) Projects for clients in Norway and abroad. He excels in timely submission of quality reports while ensuring that safety and quality of equipment are in accordance with client’s specifications, using competent hands, up-to-date test equipment, approved test procedures, ensuring correct markings, and that MCCR and MRBs are up to date and correct.
Extensive experience executing large complex Capital Projects (grass-root or expansion/upgrading the existing facilities), related with different sectors of Energy and Oil/Gas Industry such as Upstream Oil & Gas Handling Facilities/Oil field Processing; Midstream (Gas Processing Plants; Pipelines, Marine Terminal/ Tank Farm, marine installations, and related infrastructure, etc), Downstream (Oil Refinery-Supply, Atm. & Vacuum Crude Oil Distillation systems, Distribution, Utilities & Auxiliaries); Fuel Aviation system and Power Plant Combined Heat & Power Steam Turbine unit (CTG & HRSG).
Ability to supporting & sustaining ongoing Operations of Production, performed by Continuous Process Optimization (monitoring the unit operations are running efficiently, increase production capacity, improve operating reliability, reduce manufacturing costs, reduce energy usage, conserve raw materials, improve product yields and improve product quality); oversight & compliance all aspect of Safety & Environmental ( controlling emissions to Air/Water, fire, etc.), identify new capital projects to enhance the process and reduce the cost of production, extend life of equipment, etc.
1. KEO INTERNATIONAL CONSULTANTS Harry Ramos - 1 of 4
HARRY RAMOS
Senior Mechanical Engineer
PMCM International – PMCM Department
•
SUMMARY OF QUALIFICATIONS
Professional Mechanical Engineer of 38 years’ experience in Project
Management, Construction Management, Infrastructure, Engineering,
Supervision, Operation and Maintenance of MEP Services for HVAC System,
Water Supply, Drainage, Waste and Vent System, Fire Protection both Active
and Passive System, Fire Alarm and Detection System, Building Automation
System, Integrated Building Management System and Power Generation System
on Hi-Tech Facilities, High Rise Buildings, Mix use Project, Industrial and Power
Plant, Gas and Oil Projects, through coordination, monitoring and design review.
Approved Technical Submittals, Shop Drawings Submittal, Material Approval
Request, Materials Delivered to Site, Method Statement, Inspection Test Plan,
Hazard Identification and Risk Management, Work Inspection Request, issuance
and closure of Non Compliance Report & Surveillance Deficiency Report,
witnessed Testing and Commissioning and do Inspection, snagging & de-
snagging, final walk down for Handing Over and provide Engineering solution for
rectification measures on design defects and constructability as well as the
implementation of the Plan Preventive Maintenance and Repairs accordingly.
PROFESSIONAL EXPERIENCE
Senior Mechanical Engineer
KEO International Consultants
Doha, State of Qatar
March 2010 – present
Construction Management and Supervision of TB (Communicable Disease)
Unit at Rumailah for Hamad Medical Corporation (HMC), the Island Palace
and the Mall of Qatar for the Highness and Excellences Sheikh
August 2014 to present
• Supervised and manage team of Engineers and Inspectors for the
Construction Supervision of the GF + 3F, a hundred (100)
Patient/Isolation Room TB (Communicable Disease) Unit for Hamad
Medical Corporation, the Island Palace comparable with a seven star
hotel complete with amenities located in the middle of a cove and
connected by an eight hundred meters (800 M) concrete bridge from a
Guardhouse/Security Compound where MEP equipment and Sub
Stations are located for its MEP Services and the 286, 264 sq. m mix use
plot area lifestyle Mall of Qatar consisting of Basement 2 for MEP
Equipment and Plant rooms to house the District Cooling System, Fire
Pump Room and Water Treatment, Basement 1 for Car Park and six (06)
Substations, the approx. leasable area of 163, 059 sq. m., hosting
approx. 400 Stores, Retail Shop, Food Court, Restaurants, Cinemas and
SPAs in Ground Floor, Mezzanine 1 and 2.
• Attend and witnessed the Factory Performance Test of the 2500 TR
Trane Water Cooled Chillers at Wisconsin, U.S.A., the Taco Pumps for
Condenser, Primary and Secondary Chilled Water Pumps at Providence
Island, U.S.A. and the Fan Coil Units and Air Handling Units of PETRA in
Amman, Jordan.
EDUCATION
Professional Mechanical
Engineer
Registration No. 0004231
Mechanical Engineer
Registration No. 0021640
Career Service Professional
Reference No. 675328-6 on
Nov. 1981
Civil Service Commission
Manila, Republic of the
Philippines
Bachelor of Science in
Mechanical Engineering
(BSME)
PROFESSION
Mechanical Engineer
NATIONALITY
Filipino
MEMBERSHIPS
American Society of Heating,
Refrigerating and Air
Conditioning Engineers, Inc.
(ASHRAE)
Grade: Member No. 8118697
Chapter: Qatar ORYX
CIBSE Membership – On
process
Philippine Society of
Mechanical Engineers (PSME)
Grade: Member # 80292
Chapter: Qatar Chapter
LANGUAGES
Filipino, English, Arabic
2. KEO INTERNATIONAL CONSULTANTS Harry Ramos - 2 of 4
HARRY RAMOS
Senior Mechanical Engineer
PMCM International – PMCM Department
Working as Secondee under the Technical Support Team for Facilities Management of Doha International
Airport (DIA) and the newly open Hamad International Airport (HIA)/New Doha International Airport (NDIA)
November 2012 – July 2014
• Client Representative (Qatar Airways) for a smooth transition, integration, Operation and Maintenance of
Airport Facilities from the old DIA to NDIA/HIA. Provide MEP technical support to the Facilities
Management of DIA thru inspection, snagging, de-snagging, Testing, Commissioning and advised
Engineering solution for design defect, constructability, installation, operation & maintenance to be within
internationally accepted standard as gateway for acceptance and opening of Hamad International Airport.
• In coordination with NDIA Steering Committee, Designers, Consultants and Contractors; attend final walk
down and Condition Survey in the HIA Facilities such as the Passenger Terminal Complex, Emiri
Terminal, Central Plant Utilities, Road Tunnels, Aircraft Maintenance Facility and Hangars, Cargo
Warehouse, Cargo Agent & Animal Building, Catering Facility, GSE Maintenance and Facility
Maintenance Building, Employee Canteen and Mosque, Administration Building and Medical Center, Fire
Station, Fire & Potable Water Pump Station, its Storage tanks, Vehicle Washing and Fuel Facility, Aircraft
Washing Facility, Qatar Duty Free Warehouse, Inflight Duty Free Facility, Electrical Substations,
Navigation Aid, Sea Rescue Shelters, Airline Operation Facility, Communication Facilities, Security
Checkpoints, Public Mosque, Car Park Management, Lagoon Water Features, Airport Employee Access
Facility, etc., for a successful handing over of its MEP system and Special System as well.
• Attend O & M Training conducted by Manufacturer / Vendor for HIAs’ Computerized Management
Maintenance System (CMMS), Central Fire Alarm and Protection System (CFAD), Building and
Integrated Building Management System (BMS/IBMS) for HVAC System, Vacuum Waste Collection
System, Vertical Horizontal Transport System, Power Monitoring Control System, Lighting Management
System, Apron Flood Light System, External Shade Control System, Passenger Loading Bridge System,
Aircraft Docking System, Baggage Handling System, Domestic Hot and Cold Water System, Car Park
Management System, etc.
• Provide trainings & lectures to HIA Facilities Maintenance Crew and Contractor to sort out issues of
concern that affects the endeavor and mission of the HIA Facilities Management in delivering world class,
safe and reliable integrated Facilities Management, putting its customers at the heart of everything it do.
Provision of Consultancy Management & Project Engineer (CMPE) Services for Onshore Facilities Project
of RasGas Company Ltd. at Qatar -
March 2010 – Nov. 2012
• Client Representative as Secondee to RasGas HVAC/Mechanical Specialist and Team Leader of the
Engineering Quality Management Team under the Facilities Project Management Department of RasGas
Ltd.
• Oversee the Project Management Team, Construction Supervision Team and Design Engineer for
RasGas’ Headquarter P140 RGHQ Enhancement and Fit out Project being the 1st
Qatar Gold Certified
Interior Commercial LEED Project consisting of 2B+G+M+57 floors at West Bay, Doha as well as RasGas
Project P080 Engineering, Procurement and Construction of the Warehouse Expansion Project at Ras
Laffan, Qatar. Review and approved MEP Design Calculation, Specification, Drawing and Material
Submittal, Inspection Test Plan, Method Statement, Job Safety Analysis, Material Inspection Request,
Work Inspection Request, issuance of Hot and Cold Work Permit, and witness Testing, and
Commissioning and Handing Over stage as acceptance. Supervise and provide technical support to
RasGas’ Facilities Maintenance and Construction Contractor for MEP Services on its Security Building,
Training Building, Maintenance Office & Workshop Building, Zikreet Data Center Office Building, Sub
Stations, P020 AKIS New Primary School, P300 Sifa Touq Project, P250 Building Gas Ingress Protection
Project, P260 Landscape and Building External Areas Upgrade Project and the Refurbishment /
Enhancement of Administration Building (XK-01), ensuring business interruption are under control, work
execution are within safety standard, delivered in a timely manner and within budget.
3. KEO INTERNATIONAL CONSULTANTS Harry Ramos - 3 of 4
HARRY RAMOS
Senior Mechanical Engineer
PMCM International – PMCM Department
Senior Mechanical Engineer
Cansult / Maunsell / AECOM
Doha, State of Qatar
October 2007 - February 2010
• Project Management/Construction Management duties for US$ 500M Phase II & III Doha City Center
Expansion consisting five (5), fifty (50) storey, five (5) star hotels (Marriott Renaissance, Shangri-la &
Rotana), four (4) star hotels (Marriott Courtyard & Merweb), Restaurants, Health Club, Car Park, etc.
• Report to Project Manager – Associate; Prepare letters to Design Consultant and Engineer for comments
and recommendations raised on issues of MEP services derived from Projects’ Car Park, Restaurants,
Health Club Facilities, Substation and Plantrooms such as its District Cooling Chilled Water Plantroom,
AHU Plantroom, Grey Water Treatment and Domestic Water Plantroom, Boiler and Calorifier Plantroom,
Diesel Generator Plantroom, Fire Pumproom, HV / MV Room, etc.;
• Attend Coordination and Technical Meeting with KHARAMAA, ASHGHAL and QATAR COOL as well as
the with Design Engineer (HOK) and Construction Supervision Team (EHAF) to resolve issues on MEP
utilities & services in achieving Project completion on time, on budget & of quality to Clients satisfaction.
Senior Mechanical Engineer
Mercury Engineering Qatar
Doha, State of Qatar
February 2006 – October 2007
• Working under the direct supervision of the Regional Engineering Manager for the construction of US$
200 million Qatar Science and Technology Park of Qatar Foundation, Education City that won the
Leading European Architect Forum (LEAF) award for the Best Overall Building and Best Commercial
Building; Prepare MEP drawing & material Submittals, its selection, take-off, quotation and raise purchase
order. Assist the Construction Manager for site supervision, installation, testing & commissioning of MEP
Services. Coordinate with the Main Contractor Messrs. Darwish Kontrac JV & the Consultant Messrs.
KEO for approval of Material Submittals, Shop Drawing, Work Inspection Request, etc.
General Manager
Ramos Farm and Mechanical Services
Lebak, Sultan Kudarat, Philippines
April 1992 – January 2006
• Project Manager for MEP services’ installation, testing & commissioning, handling over, as well as
operations and maintenance of the multi-million peso - Land Bank Lebak USP Branch Building, E & R
Hotel and Restaurant, the 300 bed Medical Mission Hospital, Municipal Wharf / Port and the FLGC multi-
stage rice mill. Manage the O & M of the machineries & equipment involved for optimum production of a
five (05) hectare Industrial Sand and Gravel Quarry, Twenty four (24) hectares Aqua Farm, and nearly
two hundred (200) hectares Agricultural Farm with diversified Poultry & Livestock Raising.
Mechanical Engineer and Safety Engineer
Ministry of Defense and Aviation (MODA), Royal Saudi Air Force (RSAF),
Operation & Maintenance Division (OMD).King Khalid Air Base, Khamis Mushayt, K.S.A,
March 1986 – March 1992
4. KEO INTERNATIONAL CONSULTANTS Harry Ramos - 4 of 4
HARRY RAMOS
Senior Mechanical Engineer
PMCM International – PMCM Department
• Report to Major Mohammed Murie Al Assiri, the Chief, Engineering & Works Section, Project Officer for
Airfield Facility Project, Construction Officer for Peace Shield, Peace Sun and Peace Hawk Project.
• Government (CLIENT) representative to oversee the “ENGINEER” and CONTRACTORS’ activities and
coordinate with the U.S. Corps of Engineers and RSAF Officers for MEP works on all Construction Project
and Project Management related works of the Royal Saudi Air Force Facilities at King Khalid Air Base.
• Safety Engineer on behalf of: The chief, Engineering and Works Section in relation to the Air Base
activities, The Project Officer, in relation to the Airfield Facility Project, The Construction Officer, in relation
to Peace Shield/Peace Sun / Peace Hawk Project. Presiding Safety Meetings, monitor safety aspects and
implement procedures / guidelines for proper safety acts in blasting operation, O & M of machineries and
workers construction activities compliant to The Health and Safety Occupational Work Act of 1974, United
States Corps of Engineers Safety & Health Requirements Manual EM-385-1-1, Royal Saudi Air Force
Safety Manual 78-4, National Electrical Code (NEC) and National Fire Protection Association (NFPA).
Mechanical Supervisor designated as Head – Mechanical Department
MODA, RSAF, OMD, King Khalid Air Base, Khamis Mushayt, Kingdom of Saudi Arabia
March 1984 – March 1986
• Report to O & M Officer Lt. Saeed Saad Al Sharani as Head of Mechanical Department for the Operation
and Maintenance of MEP Services on Aircraft Technical Facilities, Sewage Treatment Plant, Building
Offices, Hospital, Gymnasium, Supermarket, the Housing and the Amenities of the King Khalid Airbase,.
• Trained the enlisted men of the Royal Saudi Air Force in preparation to Saudization program of the
Kingdom to become Welders, Air Conditioning Technicians, electricians, plumbers, heavy equipment
operators, pump mechanics, light and heavy mechanic and update needed tools, machineries and
materials requirements for the Motorpool, Fabrication/Welding Shop, Plumbing, Drainage, Air
Conditioning, Transport and Dispatching Section.
Power Plant Engineer, Maintenance Engr., Installation Engr., Engr. Trainee
M & S Company Inc. – a subsidiary of Dacon Group of Companies & DMCI
Lebak, Sultan Kudarat, Philippines
November 1978 – March 1984
• Reporting to Industrial Plant Engineer as Head of Power and Boiler Section for smooth operations and
maintenance of the Power Plant and Water Treatment Plant, its equipment, machineries and prime
movers. Act as Industrial Plant Engineer and Processing Plant Manager during an assigned night shift
• Power Plant Engineer, Maintenance Engineer, Installation Engineer, Shift Engineer, Engineer Trainee,
Draftsman, Diesel Tender, Boiler Tender, Driver, Plumber, Welder, Mechanic on the reconstruction,
renovation, enhancement, operation and maintenance of a Wood Processing Plant composed of Sawmill,
Veneer, Plywood, Ply board, and Core board Plant, its Power Plant and Offices, machineries, equipment
and auxiliaries such as Diesel Gen. sets and its Main Distribution and Synchronizing Panel Boards, Water
Tube and Fire Tube Boilers, Steam Turbine, Cooling Tower, Heat Exchangers, Fuel & Water Storage
Tanks, Pumps, De-aerators, Water Softeners/Filters, its pipe works and distribution, Light and Heavy
Transports, Air Conditioning Units, Fans and Blowers, Lathe Machine, Kiln Dryer, Veneer Dryers,
Splicers, Clippers, Stock Composer, Bailing Press, Air Compressors, Hog Machine, Conveyors,
Hoist/Travelling Crane and other material handling equipment.
Attended Training and Seminars on LEED Green Associate, CMMS, CFADS, BMS, IBMS, EST3 Edwards
Fire Alarm System, First Aid Course Permit to Work Signatory, Job Safety Analysis Computer Aided
Design oDuctwork Calculation, Computer Aided Design on HVAC Load Calculation, Design and
Installation of Sprinkler System, Lo Delta T Syndrome in Large Chiller Water AC System, Variable
Refrigerant Volume (VRV) System, Two Day Project Managers’ Training Program
5. KEO INTERNATIONAL CONSULTANTS Harry Ramos - 5 of 4
HARRY RAMOS
Senior Mechanical Engineer
PMCM International – PMCM Department
6. KEO INTERNATIONAL CONSULTANTS Harry Ramos - 5 of 4
HARRY RAMOS
Senior Mechanical Engineer
PMCM International – PMCM Department