Financial Study of
Kathmandu Kulekhani Hetauda Tunnel
Road
Outline of Presentation
Background
 Road length from Hetauda to Kathmandu: 227 km
with travel time of 6-8 hrs.
 Hetauda-Narayanghat-Mugling-Kathmandu: highest
trafficked road
 Short cut route out of the valley
 Nepal Purbadhar Bikas Company Limited: build own
operate and transfer the KKHT Highway.
 4P compilation (Private, Public, Partnership and
People)
Project Benefit
 Save 15 billion annually on fuel and spare parts
 Saves time and energy as the travel time :1.5 hours
from 7 hours
 Reduction in existing road maintenance cost
 Promote employment opportunities and also positive
impact on economic of surrounding regions
 Help to lower the production cost in Kathmandu
Assumptions
 The estimated toll revenue: Increased by 30%
 Straight line depreciation method
 WACC was considered fixed although Debt to Equity ratio
changes across the life of project.
 The WACC was calculated as per the Debt to Equity ratio of year
2017, which is the starting year of operation
 Operation and Construction cost of tunnel road is 10 times more
as compared to normal road
 No dividend was paid out during the project
 No complexity for Civil Engineering was considered
Data Source
 Secondary source: Published by the NPBCL and
various news articles.
Model
 Capital Structure
 50% Debt (BFIs) and 50% Equity (60+40)
 Debt repayment period:15 years
 Interest charged on Debt: 11% (+1 provision)
 Project financing concept
 Equity: ordinary shares and convertible preference shares
 10% stock dividend to preference shares
 Tax 20% with 40% rebate=12%
 WACC: 11.14%
Model cont..
 Revenue Structure
Cost Estimate
As per International Standards, the cost for
tunnel construction and operations has been
taken 10 times more than the average cost
for road construction.
Model
 Cost Model (Road Tunnel Manual)
12%
9%
8%
71%
Costs
Heavy Repairs
Maintenance
Operation
Construction
Model
 Leasing: Leasing revenue increases at the rate of 3% per year
from 2018.
 Toll Revenue: NPBCL have fixed a toll rate in agreement with the
Government of Nepal (Increases 3.5% every year)
 Operations costs increase at the rate of 2% per year from 2018.
 Traffic increases at the rate of 5% every year
Project Analysis
 Customization of Model
Under Normal Toll Rates and no Leasing
NPV (for 30 years operation) (4,857,649,159)
NPV (for 35 years operation) (1,587,889,421)
Introduced Leasing Concept
NPV (for 30 years operation) (4,465,166,668)
NPV (for 35 years operation) (1,181,713,107)
3.5
pc
5 pc 10 pc
14.71
pc
15 pc 20 pc 25 pc 30 pc 35 pc 40 pc
NPV (30 yrs) (3.39 (2.94 (1.42 - 0.089 1.602 3.106 4.611 6.110 7.606
NPV (35 yrs) - 5.061 2.189 3.770 3.868 5.546 7.216 8.886 10.55 12.21
(6.000)
(4.000)
(2.000)
-
2.000
4.000
6.000
8.000
10.000
12.000
14.000
NPV(inbillionsofRupees) NPV for various increments in Toll Rates
Project Analysis
 NPV
 IRR
 Discounted Payback Period
NPV (for 30 years operation) 4,610,872,060
NPV (for 35 years operation) 8,886,017,959
IRR Total Capital Equity
For 30 years of Operation: 12.12% 15.22%
For 35 years of Operation: 12.76% 16.68%
Discounted PayBack Period(from 2012): 30.18 years
Discounted PayBack Period(start of operation): 25.18 years
Sensitivity Analysis
 Annual Traffic Increment
1.0% 3.0% 5.0% 7.0%
NPV (30 Years) (9,356,780,1 (3,484,061,0 4,610,872,06 15,919,160,1
NPV (35 Years) (8,134,923,2 (1,181,009,1 8,886,017,95 23,753,116,8
(15,000,000,000)
(10,000,000,000)
(5,000,000,000)
-
5,000,000,000
10,000,000,000
15,000,000,000
20,000,000,000
25,000,000,000
30,000,000,000
NPV
Sensitivity Analysis
 Loan Interest Rates
10.00% 10.50% 11.00% 11.50% 12.00%
NPV (30 Years) 8,376,524, 6,448,812, 4,610,872, 2,856,019, 1,184,562,
NPV (35 Years) 13,437,699 11,099,940 8,886,017, 6,786,349, 4,798,595,
-
2,000,000,000
4,000,000,000
6,000,000,000
8,000,000,000
10,000,000,000
12,000,000,000
14,000,000,000
16,000,000,000
NPV
Sensitivity Analysis
 Construction Cost
100.00% 105.00% 110.00% 115.00% 120.00%
NPV (30 Years) 4,610,872, 2,929,730, 1,247,350, (444,066,2 (2,135,482
NPV (35 Years) 8,886,017, 7,204,876, 5,522,496, 3,831,079, 2,139,663,
(4,000,000,000)
(2,000,000,000)
-
2,000,000,000
4,000,000,000
6,000,000,000
8,000,000,000
10,000,000,000
NPV
Sensitivity Analysis
 Project Delay
Project Delay 0 years 1 year
NPV (for 30 years operation) 4,610,872,060 1,497,800,531
NPV (for 35 years operation) 8,886,017,959 5,344,437,493
Scenario Analysis (Fast-Track)
Scenarios Pessimistic Neutral Optimistic
Probability 0.100 0.500 0.400
Project Traffic for 2016 (of estimate) 80.0% 90.0% 100.0%
Weighted Average Toll Rate (of estimate) 85.0% 92.5% 100.0%
Pessimisti
c
Neutral Optimistic
Weighted
Average
NPVs
NPV (30 Years) (7,997,389,89 (1,961,894,78 4,610,872,060 63,662,441
NPV (35 Years) (5,097,390,70 1,593,447,756 8,886,017,959 3,841,391,991
(10,000,000,000)
(5,000,000,000)
-
5,000,000,000
10,000,000,000
NPV
Limitation
 Accurate data for operation cost, cost of equity , bank
deposit rate, leasing income, annual operation cost
increase and leasing rate increase was not available
 Various assumptions were made for the calculation of
NPV
Conclusion
 Initial Analysis: Project Infeasible
 Project affected by fluctuations in traffic
 Lease commercial space
 Increase toll revenue
Recommendation
 Construction Materials Hedging
 Infrastructure Debentures
 Ensure High Traffic Flow
 Construction on Time
 Lobby for 5 year Extension
Challenges
 Stable government and strong commitment from all
political parties and stakeholders
 Traffic tunnels are new to Nepal and because of
fragile geology might be difficult
 Requires trained personal, special equipments, and
continuous power supply for operation and
maintenance
 High construction cost
Thank You

More Related Content

What's hot

Analysis of TESLA’s Strategy in Germany
Analysis of TESLA’s Strategy in Germany Analysis of TESLA’s Strategy in Germany
Analysis of TESLA’s Strategy in Germany
Jai Sharma
 
Competitor Marketing Analysis Framework PowerPoint Presentation Slides
Competitor Marketing Analysis Framework PowerPoint Presentation Slides Competitor Marketing Analysis Framework PowerPoint Presentation Slides
Competitor Marketing Analysis Framework PowerPoint Presentation Slides
SlideTeam
 
Type ii diabetes case study for Drug Launch
Type ii diabetes case study for Drug LaunchType ii diabetes case study for Drug Launch
Type ii diabetes case study for Drug Launch
Koushik Sircar
 
Valeo First brake pad range for passenger cars and LCV 2014 catalogue 968211
Valeo First brake pad range for passenger cars and LCV 2014 catalogue 968211Valeo First brake pad range for passenger cars and LCV 2014 catalogue 968211
Valeo First brake pad range for passenger cars and LCV 2014 catalogue 968211
Hugo Vallet
 
Toyota Prodution System
Toyota Prodution SystemToyota Prodution System
Toyota Prodution System
CLT Valuebased Services
 
Go to market strategy
Go to market strategy Go to market strategy
Go to market strategy
Infocrest
 
Pharmaceutical Marketing Strategy
Pharmaceutical Marketing StrategyPharmaceutical Marketing Strategy
Pharmaceutical Marketing Strategy
Awais e Siraj
 
Tesla Motors
Tesla MotorsTesla Motors
Tesla Motors
Qazi Faheem
 
Pharmaceutical Sales in Pakistan
Pharmaceutical Sales in PakistanPharmaceutical Sales in Pakistan
Pharmaceutical Sales in Pakistan
Muhammad Ali Jehangir
 
Indonesia & Thailand's Growing Automotive Aftermarket Landscape
Indonesia & Thailand's Growing Automotive Aftermarket LandscapeIndonesia & Thailand's Growing Automotive Aftermarket Landscape
Indonesia & Thailand's Growing Automotive Aftermarket Landscape
Ipsos Business Consulting
 
Mature brand management
Mature brand managementMature brand management
Mature brand management
Jean-Michel Peny
 
New Product Introduction Process PowerPoint Presentation Slides
New Product Introduction Process PowerPoint Presentation SlidesNew Product Introduction Process PowerPoint Presentation Slides
New Product Introduction Process PowerPoint Presentation Slides
SlideTeam
 
Tesla motors Strategic Analysis
Tesla motors Strategic AnalysisTesla motors Strategic Analysis
Tesla motors Strategic Analysis
Shubham Rishav
 
Best in-class Pharma Marketers
Best in-class Pharma MarketersBest in-class Pharma Marketers
Best in-class Pharma Marketers
Jean-Michel Peny
 
Pharma Sales Crediting: Incentives for Accurate & Compliant Processes
Pharma Sales Crediting: Incentives for Accurate & Compliant ProcessesPharma Sales Crediting: Incentives for Accurate & Compliant Processes
Pharma Sales Crediting: Incentives for Accurate & Compliant Processes
Cognizant
 
Presentation Slides - Training on Business Development - Mr. Sohan Babu Khatri
Presentation Slides - Training on Business Development - Mr. Sohan Babu KhatriPresentation Slides - Training on Business Development - Mr. Sohan Babu Khatri
Presentation Slides - Training on Business Development - Mr. Sohan Babu Khatri
MobileNepal
 
Sales Reports PowerPoint Presentation Slides
Sales Reports PowerPoint Presentation Slides Sales Reports PowerPoint Presentation Slides
Sales Reports PowerPoint Presentation Slides
SlideTeam
 

What's hot (18)

Analysis of TESLA’s Strategy in Germany
Analysis of TESLA’s Strategy in Germany Analysis of TESLA’s Strategy in Germany
Analysis of TESLA’s Strategy in Germany
 
Competitor Marketing Analysis Framework PowerPoint Presentation Slides
Competitor Marketing Analysis Framework PowerPoint Presentation Slides Competitor Marketing Analysis Framework PowerPoint Presentation Slides
Competitor Marketing Analysis Framework PowerPoint Presentation Slides
 
Type ii diabetes case study for Drug Launch
Type ii diabetes case study for Drug LaunchType ii diabetes case study for Drug Launch
Type ii diabetes case study for Drug Launch
 
Valeo First brake pad range for passenger cars and LCV 2014 catalogue 968211
Valeo First brake pad range for passenger cars and LCV 2014 catalogue 968211Valeo First brake pad range for passenger cars and LCV 2014 catalogue 968211
Valeo First brake pad range for passenger cars and LCV 2014 catalogue 968211
 
Toyota Prodution System
Toyota Prodution SystemToyota Prodution System
Toyota Prodution System
 
Go to market strategy
Go to market strategy Go to market strategy
Go to market strategy
 
Pharmaceutical Marketing Strategy
Pharmaceutical Marketing StrategyPharmaceutical Marketing Strategy
Pharmaceutical Marketing Strategy
 
Tesla Motors
Tesla MotorsTesla Motors
Tesla Motors
 
Pharmaceutical Sales in Pakistan
Pharmaceutical Sales in PakistanPharmaceutical Sales in Pakistan
Pharmaceutical Sales in Pakistan
 
Etizola brand plan
Etizola brand planEtizola brand plan
Etizola brand plan
 
Indonesia & Thailand's Growing Automotive Aftermarket Landscape
Indonesia & Thailand's Growing Automotive Aftermarket LandscapeIndonesia & Thailand's Growing Automotive Aftermarket Landscape
Indonesia & Thailand's Growing Automotive Aftermarket Landscape
 
Mature brand management
Mature brand managementMature brand management
Mature brand management
 
New Product Introduction Process PowerPoint Presentation Slides
New Product Introduction Process PowerPoint Presentation SlidesNew Product Introduction Process PowerPoint Presentation Slides
New Product Introduction Process PowerPoint Presentation Slides
 
Tesla motors Strategic Analysis
Tesla motors Strategic AnalysisTesla motors Strategic Analysis
Tesla motors Strategic Analysis
 
Best in-class Pharma Marketers
Best in-class Pharma MarketersBest in-class Pharma Marketers
Best in-class Pharma Marketers
 
Pharma Sales Crediting: Incentives for Accurate & Compliant Processes
Pharma Sales Crediting: Incentives for Accurate & Compliant ProcessesPharma Sales Crediting: Incentives for Accurate & Compliant Processes
Pharma Sales Crediting: Incentives for Accurate & Compliant Processes
 
Presentation Slides - Training on Business Development - Mr. Sohan Babu Khatri
Presentation Slides - Training on Business Development - Mr. Sohan Babu KhatriPresentation Slides - Training on Business Development - Mr. Sohan Babu Khatri
Presentation Slides - Training on Business Development - Mr. Sohan Babu Khatri
 
Sales Reports PowerPoint Presentation Slides
Sales Reports PowerPoint Presentation Slides Sales Reports PowerPoint Presentation Slides
Sales Reports PowerPoint Presentation Slides
 

Similar to Kathmandu kulekhani hetauda tunnel (kkht) road financial study

Solar water pump (swp) in india "Research thesis presentation"
Solar water pump (swp) in india "Research thesis presentation"Solar water pump (swp) in india "Research thesis presentation"
Solar water pump (swp) in india "Research thesis presentation"
kevIN kovaDIA
 
CSX Case - NCG Consultant Training Program
CSX Case - NCG Consultant Training ProgramCSX Case - NCG Consultant Training Program
CSX Case - NCG Consultant Training Program
Katie M. Gustas
 
Power sector reforms
Power sector reformsPower sector reforms
Power sector reforms
PSPCL
 
As study on continual occuring losses of Delhi Transportation Corporation
As study on continual occuring losses of Delhi Transportation CorporationAs study on continual occuring losses of Delhi Transportation Corporation
As study on continual occuring losses of Delhi Transportation Corporation
Shranik Jain
 
Banglalink (VEON) Ennovators 2.0 Winning Idea Brochure
Banglalink (VEON) Ennovators 2.0 Winning Idea BrochureBanglalink (VEON) Ennovators 2.0 Winning Idea Brochure
Banglalink (VEON) Ennovators 2.0 Winning Idea Brochure
Md Asif Imrul
 
On the Selection of Optimum Blend of WPO – Combinatorial Mathematics Based Ap...
On the Selection of Optimum Blend of WPO – Combinatorial Mathematics Based Ap...On the Selection of Optimum Blend of WPO – Combinatorial Mathematics Based Ap...
On the Selection of Optimum Blend of WPO – Combinatorial Mathematics Based Ap...
IRJET Journal
 
Sunil Hitech Engineers bags major government contracts; Buy
Sunil Hitech Engineers bags major government contracts; BuySunil Hitech Engineers bags major government contracts; Buy
Sunil Hitech Engineers bags major government contracts; Buy
IndiaNotes.com
 
Infrastructure Development New (3)
Infrastructure Development New (3)Infrastructure Development New (3)
Infrastructure Development New (3)Ashutosh Kumar Jha
 
Site Plan for Rathmalana Railway Station - Amali Pathiraja
Site Plan for Rathmalana Railway Station - Amali PathirajaSite Plan for Rathmalana Railway Station - Amali Pathiraja
Site Plan for Rathmalana Railway Station - Amali Pathiraja
Amali Pathiraja
 
2. Economic Analysis Concepts.pptx
2. Economic Analysis Concepts.pptx2. Economic Analysis Concepts.pptx
2. Economic Analysis Concepts.pptx
YogeshShah95
 
New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21
Rajesh Prasad
 
Team+2 energyt+storage+system final_2013 spring
Team+2 energyt+storage+system final_2013 springTeam+2 energyt+storage+system final_2013 spring
Team+2 energyt+storage+system final_2013 spring
Jaeho Jung
 
Repowering Indian Discoms - Academic Research
Repowering Indian Discoms - Academic ResearchRepowering Indian Discoms - Academic Research
Repowering Indian Discoms - Academic Research
Aditya Parchure
 
Electric Vehicle charging station(B-Plan)
Electric Vehicle charging station(B-Plan)Electric Vehicle charging station(B-Plan)
Electric Vehicle charging station(B-Plan)
VishwaradhyaBhantano
 
Irb infrastructure developers ltd q3 fy12 result update
Irb infrastructure developers ltd   q3 fy12 result updateIrb infrastructure developers ltd   q3 fy12 result update
Irb infrastructure developers ltd q3 fy12 result updateKeynote Capitals Ltd.
 
Session 12 project costing & economics
Session 12   project costing & economicsSession 12   project costing & economics
Session 12 project costing & economics
Chirag Jain
 
Presentation transport economics 17_may2106
Presentation transport economics 17_may2106Presentation transport economics 17_may2106
Presentation transport economics 17_may2106
Sok-Tharath CHREUNG
 

Similar to Kathmandu kulekhani hetauda tunnel (kkht) road financial study (20)

Solar water pump (swp) in india "Research thesis presentation"
Solar water pump (swp) in india "Research thesis presentation"Solar water pump (swp) in india "Research thesis presentation"
Solar water pump (swp) in india "Research thesis presentation"
 
CSX Case - NCG Consultant Training Program
CSX Case - NCG Consultant Training ProgramCSX Case - NCG Consultant Training Program
CSX Case - NCG Consultant Training Program
 
uday scheme
uday schemeuday scheme
uday scheme
 
Power sector reforms
Power sector reformsPower sector reforms
Power sector reforms
 
TPDDL Excellence Journey
TPDDL Excellence JourneyTPDDL Excellence Journey
TPDDL Excellence Journey
 
As study on continual occuring losses of Delhi Transportation Corporation
As study on continual occuring losses of Delhi Transportation CorporationAs study on continual occuring losses of Delhi Transportation Corporation
As study on continual occuring losses of Delhi Transportation Corporation
 
Banglalink (VEON) Ennovators 2.0 Winning Idea Brochure
Banglalink (VEON) Ennovators 2.0 Winning Idea BrochureBanglalink (VEON) Ennovators 2.0 Winning Idea Brochure
Banglalink (VEON) Ennovators 2.0 Winning Idea Brochure
 
On the Selection of Optimum Blend of WPO – Combinatorial Mathematics Based Ap...
On the Selection of Optimum Blend of WPO – Combinatorial Mathematics Based Ap...On the Selection of Optimum Blend of WPO – Combinatorial Mathematics Based Ap...
On the Selection of Optimum Blend of WPO – Combinatorial Mathematics Based Ap...
 
Equipment Replacement Model1 modi
Equipment Replacement Model1 modiEquipment Replacement Model1 modi
Equipment Replacement Model1 modi
 
Sunil Hitech Engineers bags major government contracts; Buy
Sunil Hitech Engineers bags major government contracts; BuySunil Hitech Engineers bags major government contracts; Buy
Sunil Hitech Engineers bags major government contracts; Buy
 
Infrastructure Development New (3)
Infrastructure Development New (3)Infrastructure Development New (3)
Infrastructure Development New (3)
 
Site Plan for Rathmalana Railway Station - Amali Pathiraja
Site Plan for Rathmalana Railway Station - Amali PathirajaSite Plan for Rathmalana Railway Station - Amali Pathiraja
Site Plan for Rathmalana Railway Station - Amali Pathiraja
 
2. Economic Analysis Concepts.pptx
2. Economic Analysis Concepts.pptx2. Economic Analysis Concepts.pptx
2. Economic Analysis Concepts.pptx
 
New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21
 
Team+2 energyt+storage+system final_2013 spring
Team+2 energyt+storage+system final_2013 springTeam+2 energyt+storage+system final_2013 spring
Team+2 energyt+storage+system final_2013 spring
 
Repowering Indian Discoms - Academic Research
Repowering Indian Discoms - Academic ResearchRepowering Indian Discoms - Academic Research
Repowering Indian Discoms - Academic Research
 
Electric Vehicle charging station(B-Plan)
Electric Vehicle charging station(B-Plan)Electric Vehicle charging station(B-Plan)
Electric Vehicle charging station(B-Plan)
 
Irb infrastructure developers ltd q3 fy12 result update
Irb infrastructure developers ltd   q3 fy12 result updateIrb infrastructure developers ltd   q3 fy12 result update
Irb infrastructure developers ltd q3 fy12 result update
 
Session 12 project costing & economics
Session 12   project costing & economicsSession 12   project costing & economics
Session 12 project costing & economics
 
Presentation transport economics 17_may2106
Presentation transport economics 17_may2106Presentation transport economics 17_may2106
Presentation transport economics 17_may2106
 

More from Ujjwal Chand

Strategic managment on Starbucks
Strategic managment on StarbucksStrategic managment on Starbucks
Strategic managment on Starbucks
Ujjwal Chand
 
Strategic management of newell
Strategic management of newellStrategic management of newell
Strategic management of newellUjjwal Chand
 
Child labor in Transportation Industry in Nepal
Child labor in Transportation Industry in NepalChild labor in Transportation Industry in Nepal
Child labor in Transportation Industry in Nepal
Ujjwal Chand
 
Hr strategy at tata power
Hr strategy at tata powerHr strategy at tata power
Hr strategy at tata powerUjjwal Chand
 
Enterprise Content Management
Enterprise Content ManagementEnterprise Content Management
Enterprise Content Management
Ujjwal Chand
 
Future strategy for apparel manufacturer in nepal
Future strategy for apparel manufacturer in nepalFuture strategy for apparel manufacturer in nepal
Future strategy for apparel manufacturer in nepalUjjwal Chand
 
Marketing Plan of Food Hub
Marketing Plan of Food HubMarketing Plan of Food Hub
Marketing Plan of Food Hub
Ujjwal Chand
 
Merger and acquisition of BFIs in Nepal
Merger and acquisition of BFIs in NepalMerger and acquisition of BFIs in Nepal
Merger and acquisition of BFIs in Nepal
Ujjwal Chand
 
Ncell facebook page for communication
Ncell facebook page for communicationNcell facebook page for communication
Ncell facebook page for communicationUjjwal Chand
 

More from Ujjwal Chand (10)

Strategic managment on Starbucks
Strategic managment on StarbucksStrategic managment on Starbucks
Strategic managment on Starbucks
 
Strategic management of newell
Strategic management of newellStrategic management of newell
Strategic management of newell
 
Child labor in Transportation Industry in Nepal
Child labor in Transportation Industry in NepalChild labor in Transportation Industry in Nepal
Child labor in Transportation Industry in Nepal
 
Hr strategy at tata power
Hr strategy at tata powerHr strategy at tata power
Hr strategy at tata power
 
Enterprise Content Management
Enterprise Content ManagementEnterprise Content Management
Enterprise Content Management
 
Future strategy for apparel manufacturer in nepal
Future strategy for apparel manufacturer in nepalFuture strategy for apparel manufacturer in nepal
Future strategy for apparel manufacturer in nepal
 
Hr at ibm
Hr at ibmHr at ibm
Hr at ibm
 
Marketing Plan of Food Hub
Marketing Plan of Food HubMarketing Plan of Food Hub
Marketing Plan of Food Hub
 
Merger and acquisition of BFIs in Nepal
Merger and acquisition of BFIs in NepalMerger and acquisition of BFIs in Nepal
Merger and acquisition of BFIs in Nepal
 
Ncell facebook page for communication
Ncell facebook page for communicationNcell facebook page for communication
Ncell facebook page for communication
 

Recently uploaded

Tax System, Behaviour, Justice, and Voluntary Compliance Culture in Nigeria -...
Tax System, Behaviour, Justice, and Voluntary Compliance Culture in Nigeria -...Tax System, Behaviour, Justice, and Voluntary Compliance Culture in Nigeria -...
Tax System, Behaviour, Justice, and Voluntary Compliance Culture in Nigeria -...
Godwin Emmanuel Oyedokun MBA MSc PhD FCA FCTI FCNA CFE FFAR
 
The secret way to sell pi coins effortlessly.
The secret way to sell pi coins effortlessly.The secret way to sell pi coins effortlessly.
The secret way to sell pi coins effortlessly.
DOT TECH
 
BONKMILLON Unleashes Its Bonkers Potential on Solana.pdf
BONKMILLON Unleashes Its Bonkers Potential on Solana.pdfBONKMILLON Unleashes Its Bonkers Potential on Solana.pdf
BONKMILLON Unleashes Its Bonkers Potential on Solana.pdf
coingabbar
 
Abhay Bhutada Leads Poonawalla Fincorp To Record Low NPA And Unprecedented Gr...
Abhay Bhutada Leads Poonawalla Fincorp To Record Low NPA And Unprecedented Gr...Abhay Bhutada Leads Poonawalla Fincorp To Record Low NPA And Unprecedented Gr...
Abhay Bhutada Leads Poonawalla Fincorp To Record Low NPA And Unprecedented Gr...
Vighnesh Shashtri
 
1. Elemental Economics - Introduction to mining.pdf
1. Elemental Economics - Introduction to mining.pdf1. Elemental Economics - Introduction to mining.pdf
1. Elemental Economics - Introduction to mining.pdf
Neal Brewster
 
how to swap pi coins to foreign currency withdrawable.
how to swap pi coins to foreign currency withdrawable.how to swap pi coins to foreign currency withdrawable.
how to swap pi coins to foreign currency withdrawable.
DOT TECH
 
Patronage and Good Governance 5.pptx pptc
Patronage and Good Governance 5.pptx pptcPatronage and Good Governance 5.pptx pptc
Patronage and Good Governance 5.pptx pptc
AbdulNasirNichari
 
What price will pi network be listed on exchanges
What price will pi network be listed on exchangesWhat price will pi network be listed on exchanges
What price will pi network be listed on exchanges
DOT TECH
 
APP I Lecture Notes to students 0f 4the year
APP I  Lecture Notes  to students 0f 4the yearAPP I  Lecture Notes  to students 0f 4the year
APP I Lecture Notes to students 0f 4the year
telilaalilemlem
 
一比一原版(UoB毕业证)伯明翰大学毕业证如何办理
一比一原版(UoB毕业证)伯明翰大学毕业证如何办理一比一原版(UoB毕业证)伯明翰大学毕业证如何办理
一比一原版(UoB毕业证)伯明翰大学毕业证如何办理
nexop1
 
Earn a passive income with prosocial investing
Earn a passive income with prosocial investingEarn a passive income with prosocial investing
Earn a passive income with prosocial investing
Colin R. Turner
 
5 Tips for Creating Standard Financial Reports
5 Tips for Creating Standard Financial Reports5 Tips for Creating Standard Financial Reports
5 Tips for Creating Standard Financial Reports
EasyReports
 
NEW NORMAL! WHAT BECOMES OF ACCOUNTING PROFESSION
NEW NORMAL!  WHAT BECOMES OF ACCOUNTING PROFESSION NEW NORMAL!  WHAT BECOMES OF ACCOUNTING PROFESSION
NEW NORMAL! WHAT BECOMES OF ACCOUNTING PROFESSION
Godwin Emmanuel Oyedokun MBA MSc PhD FCA FCTI FCNA CFE FFAR
 
when will pi network coin be available on crypto exchange.
when will pi network coin be available on crypto exchange.when will pi network coin be available on crypto exchange.
when will pi network coin be available on crypto exchange.
DOT TECH
 
Donald Trump Presentation and his life.pptx
Donald Trump Presentation and his life.pptxDonald Trump Presentation and his life.pptx
Donald Trump Presentation and his life.pptx
SerdarHudaykuliyew
 
Scope Of Macroeconomics introduction and basic theories
Scope Of Macroeconomics introduction and basic theoriesScope Of Macroeconomics introduction and basic theories
Scope Of Macroeconomics introduction and basic theories
nomankalyar153
 
An Overview of the Prosocial dHEDGE Vault works
An Overview of the Prosocial dHEDGE Vault worksAn Overview of the Prosocial dHEDGE Vault works
An Overview of the Prosocial dHEDGE Vault works
Colin R. Turner
 
Turin Startup Ecosystem 2024 - Ricerca sulle Startup e il Sistema dell'Innov...
Turin Startup Ecosystem 2024  - Ricerca sulle Startup e il Sistema dell'Innov...Turin Startup Ecosystem 2024  - Ricerca sulle Startup e il Sistema dell'Innov...
Turin Startup Ecosystem 2024 - Ricerca sulle Startup e il Sistema dell'Innov...
Quotidiano Piemontese
 
Which Crypto to Buy Today for Short-Term in May-June 2024.pdf
Which Crypto to Buy Today for Short-Term in May-June 2024.pdfWhich Crypto to Buy Today for Short-Term in May-June 2024.pdf
Which Crypto to Buy Today for Short-Term in May-June 2024.pdf
Kezex (KZX)
 
SWAIAP Fraud Risk Mitigation Prof Oyedokun.pptx
SWAIAP Fraud Risk Mitigation   Prof Oyedokun.pptxSWAIAP Fraud Risk Mitigation   Prof Oyedokun.pptx
SWAIAP Fraud Risk Mitigation Prof Oyedokun.pptx
Godwin Emmanuel Oyedokun MBA MSc PhD FCA FCTI FCNA CFE FFAR
 

Recently uploaded (20)

Tax System, Behaviour, Justice, and Voluntary Compliance Culture in Nigeria -...
Tax System, Behaviour, Justice, and Voluntary Compliance Culture in Nigeria -...Tax System, Behaviour, Justice, and Voluntary Compliance Culture in Nigeria -...
Tax System, Behaviour, Justice, and Voluntary Compliance Culture in Nigeria -...
 
The secret way to sell pi coins effortlessly.
The secret way to sell pi coins effortlessly.The secret way to sell pi coins effortlessly.
The secret way to sell pi coins effortlessly.
 
BONKMILLON Unleashes Its Bonkers Potential on Solana.pdf
BONKMILLON Unleashes Its Bonkers Potential on Solana.pdfBONKMILLON Unleashes Its Bonkers Potential on Solana.pdf
BONKMILLON Unleashes Its Bonkers Potential on Solana.pdf
 
Abhay Bhutada Leads Poonawalla Fincorp To Record Low NPA And Unprecedented Gr...
Abhay Bhutada Leads Poonawalla Fincorp To Record Low NPA And Unprecedented Gr...Abhay Bhutada Leads Poonawalla Fincorp To Record Low NPA And Unprecedented Gr...
Abhay Bhutada Leads Poonawalla Fincorp To Record Low NPA And Unprecedented Gr...
 
1. Elemental Economics - Introduction to mining.pdf
1. Elemental Economics - Introduction to mining.pdf1. Elemental Economics - Introduction to mining.pdf
1. Elemental Economics - Introduction to mining.pdf
 
how to swap pi coins to foreign currency withdrawable.
how to swap pi coins to foreign currency withdrawable.how to swap pi coins to foreign currency withdrawable.
how to swap pi coins to foreign currency withdrawable.
 
Patronage and Good Governance 5.pptx pptc
Patronage and Good Governance 5.pptx pptcPatronage and Good Governance 5.pptx pptc
Patronage and Good Governance 5.pptx pptc
 
What price will pi network be listed on exchanges
What price will pi network be listed on exchangesWhat price will pi network be listed on exchanges
What price will pi network be listed on exchanges
 
APP I Lecture Notes to students 0f 4the year
APP I  Lecture Notes  to students 0f 4the yearAPP I  Lecture Notes  to students 0f 4the year
APP I Lecture Notes to students 0f 4the year
 
一比一原版(UoB毕业证)伯明翰大学毕业证如何办理
一比一原版(UoB毕业证)伯明翰大学毕业证如何办理一比一原版(UoB毕业证)伯明翰大学毕业证如何办理
一比一原版(UoB毕业证)伯明翰大学毕业证如何办理
 
Earn a passive income with prosocial investing
Earn a passive income with prosocial investingEarn a passive income with prosocial investing
Earn a passive income with prosocial investing
 
5 Tips for Creating Standard Financial Reports
5 Tips for Creating Standard Financial Reports5 Tips for Creating Standard Financial Reports
5 Tips for Creating Standard Financial Reports
 
NEW NORMAL! WHAT BECOMES OF ACCOUNTING PROFESSION
NEW NORMAL!  WHAT BECOMES OF ACCOUNTING PROFESSION NEW NORMAL!  WHAT BECOMES OF ACCOUNTING PROFESSION
NEW NORMAL! WHAT BECOMES OF ACCOUNTING PROFESSION
 
when will pi network coin be available on crypto exchange.
when will pi network coin be available on crypto exchange.when will pi network coin be available on crypto exchange.
when will pi network coin be available on crypto exchange.
 
Donald Trump Presentation and his life.pptx
Donald Trump Presentation and his life.pptxDonald Trump Presentation and his life.pptx
Donald Trump Presentation and his life.pptx
 
Scope Of Macroeconomics introduction and basic theories
Scope Of Macroeconomics introduction and basic theoriesScope Of Macroeconomics introduction and basic theories
Scope Of Macroeconomics introduction and basic theories
 
An Overview of the Prosocial dHEDGE Vault works
An Overview of the Prosocial dHEDGE Vault worksAn Overview of the Prosocial dHEDGE Vault works
An Overview of the Prosocial dHEDGE Vault works
 
Turin Startup Ecosystem 2024 - Ricerca sulle Startup e il Sistema dell'Innov...
Turin Startup Ecosystem 2024  - Ricerca sulle Startup e il Sistema dell'Innov...Turin Startup Ecosystem 2024  - Ricerca sulle Startup e il Sistema dell'Innov...
Turin Startup Ecosystem 2024 - Ricerca sulle Startup e il Sistema dell'Innov...
 
Which Crypto to Buy Today for Short-Term in May-June 2024.pdf
Which Crypto to Buy Today for Short-Term in May-June 2024.pdfWhich Crypto to Buy Today for Short-Term in May-June 2024.pdf
Which Crypto to Buy Today for Short-Term in May-June 2024.pdf
 
SWAIAP Fraud Risk Mitigation Prof Oyedokun.pptx
SWAIAP Fraud Risk Mitigation   Prof Oyedokun.pptxSWAIAP Fraud Risk Mitigation   Prof Oyedokun.pptx
SWAIAP Fraud Risk Mitigation Prof Oyedokun.pptx
 

Kathmandu kulekhani hetauda tunnel (kkht) road financial study

  • 1. Submitted By: Suraj Bansal (12304) Ujjwal Chand (12310) Monika Maheshwari (12319) Ashish Naulakha (12320) Financial Study of Kathmandu Kulekhani Hetauda Tunnel Road
  • 3.
  • 4. Background  Road length from Hetauda to Kathmandu: 227 km with travel time of 6-8 hrs.  Hetauda-Narayanghat-Mugling-Kathmandu: highest trafficked road  Short cut route out of the valley  Nepal Purbadhar Bikas Company Limited: build own operate and transfer the KKHT Highway.  4P compilation (Private, Public, Partnership and People)
  • 5. Project Benefit  Save 15 billion annually on fuel and spare parts  Saves time and energy as the travel time :1.5 hours from 7 hours  Reduction in existing road maintenance cost  Promote employment opportunities and also positive impact on economic of surrounding regions  Help to lower the production cost in Kathmandu
  • 6. Assumptions  The estimated toll revenue: Increased by 30%  Straight line depreciation method  WACC was considered fixed although Debt to Equity ratio changes across the life of project.  The WACC was calculated as per the Debt to Equity ratio of year 2017, which is the starting year of operation  Operation and Construction cost of tunnel road is 10 times more as compared to normal road  No dividend was paid out during the project  No complexity for Civil Engineering was considered
  • 7. Data Source  Secondary source: Published by the NPBCL and various news articles.
  • 8. Model  Capital Structure  50% Debt (BFIs) and 50% Equity (60+40)  Debt repayment period:15 years  Interest charged on Debt: 11% (+1 provision)  Project financing concept  Equity: ordinary shares and convertible preference shares  10% stock dividend to preference shares  Tax 20% with 40% rebate=12%  WACC: 11.14%
  • 10. Cost Estimate As per International Standards, the cost for tunnel construction and operations has been taken 10 times more than the average cost for road construction.
  • 11. Model  Cost Model (Road Tunnel Manual) 12% 9% 8% 71% Costs Heavy Repairs Maintenance Operation Construction
  • 12. Model  Leasing: Leasing revenue increases at the rate of 3% per year from 2018.  Toll Revenue: NPBCL have fixed a toll rate in agreement with the Government of Nepal (Increases 3.5% every year)  Operations costs increase at the rate of 2% per year from 2018.  Traffic increases at the rate of 5% every year
  • 13. Project Analysis  Customization of Model Under Normal Toll Rates and no Leasing NPV (for 30 years operation) (4,857,649,159) NPV (for 35 years operation) (1,587,889,421) Introduced Leasing Concept NPV (for 30 years operation) (4,465,166,668) NPV (for 35 years operation) (1,181,713,107)
  • 14. 3.5 pc 5 pc 10 pc 14.71 pc 15 pc 20 pc 25 pc 30 pc 35 pc 40 pc NPV (30 yrs) (3.39 (2.94 (1.42 - 0.089 1.602 3.106 4.611 6.110 7.606 NPV (35 yrs) - 5.061 2.189 3.770 3.868 5.546 7.216 8.886 10.55 12.21 (6.000) (4.000) (2.000) - 2.000 4.000 6.000 8.000 10.000 12.000 14.000 NPV(inbillionsofRupees) NPV for various increments in Toll Rates
  • 15. Project Analysis  NPV  IRR  Discounted Payback Period NPV (for 30 years operation) 4,610,872,060 NPV (for 35 years operation) 8,886,017,959 IRR Total Capital Equity For 30 years of Operation: 12.12% 15.22% For 35 years of Operation: 12.76% 16.68% Discounted PayBack Period(from 2012): 30.18 years Discounted PayBack Period(start of operation): 25.18 years
  • 16. Sensitivity Analysis  Annual Traffic Increment 1.0% 3.0% 5.0% 7.0% NPV (30 Years) (9,356,780,1 (3,484,061,0 4,610,872,06 15,919,160,1 NPV (35 Years) (8,134,923,2 (1,181,009,1 8,886,017,95 23,753,116,8 (15,000,000,000) (10,000,000,000) (5,000,000,000) - 5,000,000,000 10,000,000,000 15,000,000,000 20,000,000,000 25,000,000,000 30,000,000,000 NPV
  • 17. Sensitivity Analysis  Loan Interest Rates 10.00% 10.50% 11.00% 11.50% 12.00% NPV (30 Years) 8,376,524, 6,448,812, 4,610,872, 2,856,019, 1,184,562, NPV (35 Years) 13,437,699 11,099,940 8,886,017, 6,786,349, 4,798,595, - 2,000,000,000 4,000,000,000 6,000,000,000 8,000,000,000 10,000,000,000 12,000,000,000 14,000,000,000 16,000,000,000 NPV
  • 18. Sensitivity Analysis  Construction Cost 100.00% 105.00% 110.00% 115.00% 120.00% NPV (30 Years) 4,610,872, 2,929,730, 1,247,350, (444,066,2 (2,135,482 NPV (35 Years) 8,886,017, 7,204,876, 5,522,496, 3,831,079, 2,139,663, (4,000,000,000) (2,000,000,000) - 2,000,000,000 4,000,000,000 6,000,000,000 8,000,000,000 10,000,000,000 NPV
  • 19. Sensitivity Analysis  Project Delay Project Delay 0 years 1 year NPV (for 30 years operation) 4,610,872,060 1,497,800,531 NPV (for 35 years operation) 8,886,017,959 5,344,437,493
  • 20. Scenario Analysis (Fast-Track) Scenarios Pessimistic Neutral Optimistic Probability 0.100 0.500 0.400 Project Traffic for 2016 (of estimate) 80.0% 90.0% 100.0% Weighted Average Toll Rate (of estimate) 85.0% 92.5% 100.0% Pessimisti c Neutral Optimistic Weighted Average NPVs NPV (30 Years) (7,997,389,89 (1,961,894,78 4,610,872,060 63,662,441 NPV (35 Years) (5,097,390,70 1,593,447,756 8,886,017,959 3,841,391,991 (10,000,000,000) (5,000,000,000) - 5,000,000,000 10,000,000,000 NPV
  • 21. Limitation  Accurate data for operation cost, cost of equity , bank deposit rate, leasing income, annual operation cost increase and leasing rate increase was not available  Various assumptions were made for the calculation of NPV
  • 22. Conclusion  Initial Analysis: Project Infeasible  Project affected by fluctuations in traffic  Lease commercial space  Increase toll revenue
  • 23. Recommendation  Construction Materials Hedging  Infrastructure Debentures  Ensure High Traffic Flow  Construction on Time  Lobby for 5 year Extension
  • 24. Challenges  Stable government and strong commitment from all political parties and stakeholders  Traffic tunnels are new to Nepal and because of fragile geology might be difficult  Requires trained personal, special equipments, and continuous power supply for operation and maintenance  High construction cost