5. Introduction
Solution
Timeline
Risks
Overview
Conclusion
Situational Overview
If CSX does not adapt to the
changing market in the next
3 years, it will not be able to
see profitable growth
CSX Transportation is a rail
freight company operating
along the Eastern seaboard,
carrying various types of
items
How can CSX provide
service excellence, while
improving its cash flows
over the next 10 years?
7. Introduction
Solution
Timeline
Risks
Overview
Conclusion
Acquisition of TSI
Acquiring TSI to incorporate a B2C model within CSX
Transit Systems Inc.
• Trucking company in Wayne, PA
• B2B & B2C business model
• Individualized customer service
Integration within CSX
• Transformation to regional
• Holistic approach towards
shipping
• Utilize existing competencies
Team of
Tomorrow
Service
Excellence
10. Introduction
Solution
Timeline
Risks
Overview
Conclusion
Railroad Trends in Double Stacking
Expand the intermodal network to capitalize on consumer trends
Network of Tomorrow
”Is there a way to optimize operational efficiency
while maintaining service excellence? “
15% of CSX’s
total revenue
25% of U.S.
railroad total
revenue
Fastest growing
segment of
freight rail
industry
Intermodal
11. Introduction
Solution
Timeline
Risks
Overview
Conclusion
Expansion of Intermodal
Northwest Ohio Terminal
Existing Terminals Served
Double Stacked Route
Future Double Stacked Route
CSX Rail Network
Double Stacked Partner
Using double stacks to connect terminals and increase profits
Double stacks are two
containers stacked high on
railroad cars
What?
• To increase efficiency
between Southeast
Corridor & I-90
• Decreased carbon
footprint due to a
decrease in trips
required
• 650 ft3 more per well in
double stack cars
Why?
12. Introduction
Solution
Timeline
Risks
Overview
Conclusion
Efficiency of Double Stack
Total Costs:
$115.70 million
Total Capital Costs:
Containers + Wells
$88.13 million
Total Operating Cost:
1.06 cents/ton/mile
$27.56 million
Profit with double stack:
$28.92 million
First year projections after implementation of double stack
Profit with single stack:
$8.71 million
Total Revenue:
5.56 cents/ton/mile
$144.61 million
21. Introduction
Solution
Timeline
Risks
Overview
Conclusion
Appendix B
$2,000 per container (240 containers)= $480,000
$730,490 per well (120 wells)= $87,658,916
Total Capital Costs = $88.13 million
Total Operating Costs for double in first year= $27.56 million
Total Costs= 115,698,576
Calculating Capital Costs Associated with Venture
23. Introduction
Solution
Timeline
Risks
Overview
Conclusion
Operating Costs $27.56 million 1st
year
Appendix D
Decreasing operating costs while increasing revenue
Single-Cost vs Revenue
(2.68 𝑐𝑒𝑛𝑡𝑠 𝑝𝑒𝑟 𝑡𝑜𝑛 𝑝𝑒𝑟 𝑚𝑖𝑙𝑒) (3,360 𝑡𝑜𝑛𝑠 𝑝𝑒𝑟 𝑡𝑟𝑎𝑖𝑛) Costs $34.84 million per year
(3.35 𝑐𝑒𝑛𝑡𝑠 𝑝𝑒𝑟 𝑡𝑜𝑛 𝑝𝑒𝑟 𝑚𝑖𝑙𝑒) (3,360 𝑡𝑜𝑛𝑠 𝑝𝑒𝑟 𝑡𝑟𝑎𝑖𝑛)
(5.56 𝑐𝑒𝑛𝑡𝑠 𝑝𝑒𝑟 𝑡𝑜𝑛 𝑝𝑒𝑟 𝑚𝑖𝑙𝑒) (6,720 𝑡𝑜𝑛𝑠 𝑝𝑒𝑟 𝑡𝑟𝑎𝑖𝑛)
Generates $43.55 million per year
Double-Cost vs Revenue
Generates $144.61 million 1st year
$8.71 million in profit
(1.06 𝑐𝑒𝑛𝑡𝑠 𝑝𝑒𝑟 𝑡𝑜𝑛 𝑝𝑒𝑟 𝑚𝑖𝑙𝑒)(6,720 𝑡𝑜𝑛𝑠 𝑝𝑒𝑟 𝑡𝑟𝑎𝑖𝑛)
($2,000 𝑝𝑒𝑟 𝑐𝑜𝑛𝑡𝑎𝑖𝑛𝑒𝑟)(240 𝑐𝑜𝑛𝑡𝑎𝑖𝑛𝑒𝑟𝑠)($730, 490 𝑝𝑒𝑟 𝑤𝑒𝑙𝑙)(120 𝑤𝑒𝑙𝑙𝑠)
$88.13 million
in fixed costs
$28.92 million in profit$114.61 million — ($88.13 million + $27.56 million)
24. Introduction
Solution
Timeline
Risks
Overview
Conclusion
Appendix E
Valuation & depreciation of TSI trucking assets
Cost of Truck 150,000$ dollars
Average life of a truck 750,000 miles
Miles per year 42,900 miles
Life of a truck 17.48 years
Average age of truck 8.74 years
Value at at avg. age 72,780$
Assumed # of trucks 300
Cost of trucks 21,834,000$
Valuation of Truck Assets
Annual Depreciation 8,580$
Year Value
1 141,420$
2 132,840$
3 124,260$
4 115,680$
5 107,100$
6 98,520$
7 89,940$
8 81,360$
9 72,780$
10 64,200$
11 55,620$
12 47,040$
13 38,460$
14 29,880$
15 21,300$
16 12,720$
17 4,140$
Depreciation Schedule
25. Introduction
Solution
Timeline
Risks
Overview
Conclusion
Appendix F
Calculation of operating cost & revenue per mile
Miles driven per year 42,900
Category Cost Unit Annual Cost
Fuel Economy 7 mpg -
Fuel - Gallons per year 6,129 gallons -
Fuel - cost per gallon 2.92$ /gallon 17,895.43$
Driver Salary 0.36$ /mile 15,444.00$
Maintenance - cab & trailer 0.24$ /mile 10,296.00$
Maintenance - engine 0.12$ /mile 5,148.00$
Maintenance - tires 0.03$ /mile 1,287.00$
Insurance 0.05$ /mile 2,145.00$
DOT permits 0.02$ /mile 858.00$
Total operating cost per year
Operating Cost Per Mile
Operating Revenue Per Mile
53,073.43$
1.24$
4.05$
26. Introduction
Solution
Timeline
Risks
Overview
Conclusion
Appendix G
Calculation of operating income
Average Trip Length 50 miles
Average Speed 26.8 mph
Average Trip Time 1.87 hours
Average turnaround time 1 hour
Business day length 8 hours
Number of trips per day 3 trips
Revenue per trip 202.50$ -
Operating cost per trip 61.86$ -
Profit per trip 140.64$ -
Number of Trucks 300 trucks
Shipping days per year 286 days
Trips per truck per year 858 trips
Total Trips per year 257,400 trips
Annual revenue per truck 173,745.00$
Annual cost per truck 53,073.43$
Annual depreciation per truck 8,580.00$
Annual profit per truck 112,091.57$
Annual Trucking Profit 33,627,471$
Operating Income
Cumulative Time Action
9:00 AM Start
9:30 AM First Load
11:22 AM Trip
12:22 PM Turnaround
2:14 PM Trip
3:14 PM Turnaround
5:06 PM Trip
Trips Per 8 Hour Day
31. Introduction
Solution
Timeline
Risks
Overview
Conclusion
Derailment Cost
$461,500,000.00 Damage from derailments from 2010-2014
2,141 Derailments caused by track and rail defects from 2010-2014
$215,553.48 Avg. cost per derailment
$461,500,000.00 Damage from derailments from 2010-2014
4 2010-2014
$115,375,000.00 Cost of Derailments per year
50% Most Likely reduction in derailments per year
$57,687,500.00 Derailment Cost Saved
$115,375,000.00
35% Conservative reduction in derailments per year
$40,381,250.00
$115,375,000.00
65% Bullish reduction in derailments per year
$74,993,750.00
Inspector Salary
21,000 Miles of track
100 Miles covered per 2 inspectors
210 Pairs of inspectors
2 Inspectors per pair
420 Total inspectors
10 Hours worked per day
$26.00 Average pay rate
$109,200.00 Cost per day
4 Days per week
52 Weeks per year
$22,713,600.00 $ Spent on inspector salaries per year
200% Increase in inspectors
$45,427,200.00
$22,713,600.00 Salary Investment
Appendix L
Aurora Cost
$150,000 Cost of 1 Aurora 21,000 Miles of track
210 New Auroras 420 New Total of Auroras
$31,500,000 Total Cost 50 Miles minimum coverage per Aurora
32. Introduction
Solution
Timeline
Risks
Overview
Conclusion
Appendix L
A. Appendix A: Efficiency of Double-Stack
B. Appendix B: Calculating Capital Costs Associated with Venture
C. Appendix C: Single vs. Double-Stack Efficiency
D. Appendix D: Decreasing operating costs while increasing revenue
E. Appendix E: Valuation & depreciation of TSI trucking assets
F. Appendix F: Calculation of operating cost & revenue per mile
G. Appendix G: Calculation of operating income
H. Appendix H: Operating cost & profit: 10 year projections
I. Appendix I: TSI acquisition valuation
J. Appendix J: 3 cases of future profitability & ultimate acquisition returns
Editor's Notes
Nearly 70% of all U.S. intermodal services are double stacked
Cheaper per container
Generates $490.353 million 1st year
(18.86 𝑐𝑒𝑛𝑡𝑠 𝑝𝑒𝑟 𝑡𝑜𝑛 𝑝𝑒𝑟 𝑚𝑖𝑙𝑒) (6,720 𝑡𝑜𝑛𝑠 𝑝𝑒𝑟 𝑡𝑟𝑎𝑖𝑛)
This is not going in the final presentation this is just for explaining purposes if confused**