SlideShare a Scribd company logo
Ioannis (Yiannis) Mikedis
CAREER PRESENTATION
Career Overview
 20 years in Technical Operations management
 Excellent reputation in the marine industry with global network
 Consensus builder and promoter of win-win results
 Tackled and resolved unique marine technical issues
 Spear headed change management initiatives and cruise brand
redesign
Career Overview
Worked for: Strategic Partnered with:
Reputation Strategy
US THEM
ISSUE
From Adversaries…
REPUTATION STRATEGY
Corporate
OEMs
RegulatorsShips
Operations ISSUE
…to Stakeholders
Case Study I:
 Common Rail engine reliability issues and implementation of a
prototype upgrade in service.
Case Study I: Challenges
 Lack of trust and ineffective management of expectations prevented
open exchange of ideas while the resolution was been developed
 Personality classes within the organization and a blame culture
 OEM internal constraints prevented allocation of vital resources
 The threat of lawsuits stalled necessary actions to stabilize the engines
performance in anticipation to the upgrade
Case Study I: Actions/Objectives
 Identified change agents in the OEM’s organization and development of a
base of trust.
 Initiated standing conference calls with senior sponsors of this effort from both
organizations.
 Established a tight protocol for the safe and reliable first installation/upgrade
with a specific engine performance criteria mutually agreed.
 Established comfort level on the merit of the upgrade by surveying main
supply chain key production areas (factories) for critical components and
performed quality assurance audits.
 Communicated at regular intervals with the candidate ships soliciting input at
every critical step of the preparation process.
 Selected senior engineer as project on-sight manager for the first ships engine
upgrades and developed the communication protocols for advising both
organizations of progress.
Case Study I: Results
 Success of first installation led to the planning and execution of the upgrades
on remaining 6 ships.
 Reliability of these engines improved dramatically reaching in many
occasions above company’s fleet average.
 Reduction of unscheduled down-times resulted a year later in the signing of
a multi-engine multi-year maintenance agreement valued in excess of 60M$.
 Relationship between parties improved and the relationship is excellent
today with multiple orders been put for future ships’ main engines.
Case Study I : Testimonials
“Ioannis demonstrates a strong penchant for project management and
applies his skills in this area in all aspects of his work.
He is always keen to take on additional work and is currently leading a
working group on the very important Alaska 2010 permit compliance issue.
He has shown excellent initiative in the independent development of a
number of fleet and ship projects and operating procedures, to the benefit of
the department.
Notable is the development of procedures with the technical purchasing
department and lately his work on Wartsila common rail issues and the
development of the CR1+ project for the ships. An excellent performance –
well done.”
Case Study II
 Design and installation of an additional diesel generator on two
ships
Case Study II (cont.)
Case Study II (cont.)
Case Study II: Challenges
 Compressed Project Design Timeline Impacted efficient Cost Control &
Implementation
 Initial Project Financial Assessment carried out without detailed work scope
information
 Significant Structural, Cabling and Pipework installations required works while
ship was in service
 Complexity of project created friction with various stakeholders and
relationships had to be managed.
 Personality clashes between functional leaders and project team
 In house Purchasing and Logistics departments inexperience
Case Study II: Actions/Objectives
 Engine selected based on comparison matrix supporting QC survey of
factory and prototype commercial installation.
 Established project responsibility matrix and incorporated it in the contract
 Established Project War Room to manage progress and provide updates.
 Established core group of knowledge experts tasked to sign off each critical
stage of the specification and installation.
 Instituted on board project team to provide daily progress via specifically
designed reporting tools.
 Led the preparation and execution of a 21 day dry-docking to install
prefabricated section. Vessel was safe to sail 48 hours ahead of schedule.
 Coordinated commissioning tests and advised all relevant parties to ensure
smooth execution of critical tests.
Case Study II: Results
 Solid Integrated Design with Good Energy Saving Initiatives
 Heavy pre-drydock installation of RO plant, Structural steel, conversion of Fuel
tanks to machinery space and relocation of key equipment
 Integrated Lloyds Plan Approval Process successfully achieved
 Documentation Process & Control Maintained Throughout Project
 Successful Installation of Diesel, Alternator & Auxiliaries in 17 Days (dry-dock)
 Completed project one month ahead of schedule.
 Success of project resulted in additional installation in 2015 (sister vessel)
Case Study II: Testimonials
“Ioannis is a pleasure to work with and is always willing to go the extra mile to support the team.
Ioannis completed the very challenging Coral (Princess) drydock and the significant additional
diesel (generator) project this year.
Both were successfully executed and completed while he was still managing day to day
superintendent duties for the Coral (Princess) and Island (Princess).
This was a significant task and I thank Ioannis for his prodigious effort. Well done.”
“Ioannis has managed CO & IP (Coral Princess, Island Princess) earlier in the year and then was
assigned to the additional diesel (generator) project which was a significant $21M undertaking.
With the departure of the superintendent for CO/IP, superintendent duties reverted to Ioannis
along with the dry dock planning responsibility at a late stage. Ioannis admirably immediately
stepped up to the task and took on this new work load which was most appreciated.
Ioannis was also a member of the Wartsila contract (negotiation) working group which successfully
competed the analysis and negotiation of the 5-year DG (Diesel Engine) maintenance contract
which was a significant undertaking and highly valued. Well done.”
Additional Testimonials
 “Ioannis is a prime mover and always delivers in times of extreme deadlines and
critical operational requirements. His command and management style is highly
recommended.”
Current Projects
 Project Management Institute
 Membership √
 Training & PMP Certification √
 American Society For Quality
 Membership
 Training & 6σ – GB Certification
 Institute of Chartered Shipbrokers
 Training & Examinations
 Membership
 Conference Participation
 Seatrade 2015 √
 ABS - Academy
 Training on Tanker Vetting
 Book Reviews
 The Handbook of Project Management √
 Inventing the Electronic Century √
 The Effective Executive √
 The Leadership Pipeline √
Closing Thoughts
 Candidate:
 20 years in Technical Operations management
 Excellent reputation in the marine industry with global network
 Consensus builder and promoter of win-win results
 Tackled and resolved unique marine technical issues
 Spear headed change management initiatives and cruise brand redesign
 Company:
 Industry leader
 Healthy financials and exceptional growth prospects
 In need of global change-management leader
 Fosters innovation
In conclusion:
Balancing of Strengths and Opportunities with Weaknesses and Threats
Strengths
Opportunities
Weaknesses
Threats

More Related Content

What's hot

CV 08 May 2015 ncd
CV 08 May 2015 ncdCV 08 May 2015 ncd
CV 08 May 2015 ncdDavid Bates
 
Min hamid career highlights summary
Min hamid   career highlights summaryMin hamid   career highlights summary
Min hamid career highlights summary
Min Hamid
 
PD185 LNG Terminal Operations
PD185 LNG Terminal OperationsPD185 LNG Terminal Operations
PD185 LNG Terminal Operations
petroEDGE
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013psmuga9
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013
psmuga9
 
Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013psmuga9
 
kizomba A & B FWP engine overhaul project
kizomba A &  B FWP engine overhaul projectkizomba A &  B FWP engine overhaul project
kizomba A & B FWP engine overhaul projectHelio De Oliveira
 
CV_Kushal Gowda_Dec 2016
CV_Kushal Gowda_Dec 2016CV_Kushal Gowda_Dec 2016
CV_Kushal Gowda_Dec 2016Kushal Gowda
 
Pradeep raja resume
Pradeep raja   resumePradeep raja   resume
Pradeep raja resume
Pradeep Raja A
 
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15Aaron Lian Kian Hoe
 

What's hot (20)

CV 08 May 2015 ncd
CV 08 May 2015 ncdCV 08 May 2015 ncd
CV 08 May 2015 ncd
 
Min hamid career highlights summary
Min hamid   career highlights summaryMin hamid   career highlights summary
Min hamid career highlights summary
 
PD185 LNG Terminal Operations
PD185 LNG Terminal OperationsPD185 LNG Terminal Operations
PD185 LNG Terminal Operations
 
Psm Cv Presentation 3 2012
Psm Cv Presentation 3  2012Psm Cv Presentation 3  2012
Psm Cv Presentation 3 2012
 
CONNEXUS_WoF_2
CONNEXUS_WoF_2CONNEXUS_WoF_2
CONNEXUS_WoF_2
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013
 
Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013
 
kizomba A & B FWP engine overhaul project
kizomba A &  B FWP engine overhaul projectkizomba A &  B FWP engine overhaul project
kizomba A & B FWP engine overhaul project
 
PAUL FOTHERGILL CV
PAUL FOTHERGILL CVPAUL FOTHERGILL CV
PAUL FOTHERGILL CV
 
project management UOC-1
project management UOC-1project management UOC-1
project management UOC-1
 
78-83-NovDec12
78-83-NovDec1278-83-NovDec12
78-83-NovDec12
 
Hemant Sharma Resume 2015
Hemant Sharma Resume 2015Hemant Sharma Resume 2015
Hemant Sharma Resume 2015
 
CV_Kushal Gowda_Dec 2016
CV_Kushal Gowda_Dec 2016CV_Kushal Gowda_Dec 2016
CV_Kushal Gowda_Dec 2016
 
Pradeep raja resume
Pradeep raja   resumePradeep raja   resume
Pradeep raja resume
 
Short Resume
Short Resume Short Resume
Short Resume
 
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
 
Presentation DOBE 2016
Presentation DOBE 2016Presentation DOBE 2016
Presentation DOBE 2016
 
OGP Awards 2011
OGP Awards 2011OGP Awards 2011
OGP Awards 2011
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 

Similar to Ioannis (Yiannis) Mikedis career presentation

PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015gufron gufron
 
CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1Dan Caouette
 
Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16Eric Stemen
 
Quaker Process Industry Maintenace Performance Improvement
Quaker Process Industry Maintenace Performance ImprovementQuaker Process Industry Maintenace Performance Improvement
Quaker Process Industry Maintenace Performance Improvement
Bob Snell
 
Petrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydPetrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydNitin Sethi
 
Achieving measurable performance improvement.pdf
Achieving measurable performance improvement.pdfAchieving measurable performance improvement.pdf
Achieving measurable performance improvement.pdf
PMIUKChapter
 
RONALD CV 17.11.2015
RONALD CV 17.11.2015RONALD CV 17.11.2015
RONALD CV 17.11.2015Ronald Fung
 
Formal Project Management and Lean Manufacturing as tools to solve some today...
Formal Project Management and Lean Manufacturing as tools to solve some today...Formal Project Management and Lean Manufacturing as tools to solve some today...
Formal Project Management and Lean Manufacturing as tools to solve some today...
Michele Lauriero
 
CV Resume
CV ResumeCV Resume

Similar to Ioannis (Yiannis) Mikedis career presentation (20)

Stephen Vianelli CV 23 Dec 2016
Stephen Vianelli CV 23 Dec 2016Stephen Vianelli CV 23 Dec 2016
Stephen Vianelli CV 23 Dec 2016
 
10_PFCRoundup
10_PFCRoundup10_PFCRoundup
10_PFCRoundup
 
PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015
 
CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1
 
Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16
 
William Richards
William RichardsWilliam Richards
William Richards
 
Gallagher_Resume_9-16
Gallagher_Resume_9-16Gallagher_Resume_9-16
Gallagher_Resume_9-16
 
Quaker Process Industry Maintenace Performance Improvement
Quaker Process Industry Maintenace Performance ImprovementQuaker Process Industry Maintenace Performance Improvement
Quaker Process Industry Maintenace Performance Improvement
 
Petrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydPetrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj Lloyd
 
Resume S&B
Resume S&BResume S&B
Resume S&B
 
Achieving measurable performance improvement.pdf
Achieving measurable performance improvement.pdfAchieving measurable performance improvement.pdf
Achieving measurable performance improvement.pdf
 
RONALD CV 17.11.2015
RONALD CV 17.11.2015RONALD CV 17.11.2015
RONALD CV 17.11.2015
 
Formal Project Management and Lean Manufacturing as tools to solve some today...
Formal Project Management and Lean Manufacturing as tools to solve some today...Formal Project Management and Lean Manufacturing as tools to solve some today...
Formal Project Management and Lean Manufacturing as tools to solve some today...
 
Final Mukesh Resume
Final Mukesh Resume Final Mukesh Resume
Final Mukesh Resume
 
L_Bacha_Project_Summary
L_Bacha_Project_SummaryL_Bacha_Project_Summary
L_Bacha_Project_Summary
 
chesbro resume
chesbro resumechesbro resume
chesbro resume
 
CV 1
CV 1CV 1
CV 1
 
CV Resume
CV ResumeCV Resume
CV Resume
 
Rohit Resume
Rohit ResumeRohit Resume
Rohit Resume
 
Resume ng ji xian jason
Resume ng ji xian jasonResume ng ji xian jason
Resume ng ji xian jason
 

More from Ioannis Mikedis, PMP, MBA

Carrefour's misadventure in Russia
Carrefour's misadventure in RussiaCarrefour's misadventure in Russia
Carrefour's misadventure in Russia
Ioannis Mikedis, PMP, MBA
 
Indonesia - Country Study
Indonesia - Country StudyIndonesia - Country Study
Indonesia - Country Study
Ioannis Mikedis, PMP, MBA
 
SPC applied in the cruise line services
SPC applied in the cruise line servicesSPC applied in the cruise line services
SPC applied in the cruise line services
Ioannis Mikedis, PMP, MBA
 
Global+consultants+presentation[1]
Global+consultants+presentation[1]Global+consultants+presentation[1]
Global+consultants+presentation[1]
Ioannis Mikedis, PMP, MBA
 
Rating agencies
Rating agenciesRating agencies
Rating agencies
Ioannis Mikedis, PMP, MBA
 
The euro
The euroThe euro
Bus 615 group presentation
Bus 615 group presentationBus 615 group presentation
Bus 615 group presentation
Ioannis Mikedis, PMP, MBA
 
High beam strategy and trend spotting
High beam strategy and trend spottingHigh beam strategy and trend spotting
High beam strategy and trend spotting
Ioannis Mikedis, PMP, MBA
 
Leadership
LeadershipLeadership
Strategic Management Case Study - Toyota
Strategic Management Case Study - ToyotaStrategic Management Case Study - Toyota
Strategic Management Case Study - Toyota
Ioannis Mikedis, PMP, MBA
 

More from Ioannis Mikedis, PMP, MBA (11)

Carrefour's misadventure in Russia
Carrefour's misadventure in RussiaCarrefour's misadventure in Russia
Carrefour's misadventure in Russia
 
Indonesia - Country Study
Indonesia - Country StudyIndonesia - Country Study
Indonesia - Country Study
 
SPC applied in the cruise line services
SPC applied in the cruise line servicesSPC applied in the cruise line services
SPC applied in the cruise line services
 
Global+consultants+presentation[1]
Global+consultants+presentation[1]Global+consultants+presentation[1]
Global+consultants+presentation[1]
 
Rating agencies
Rating agenciesRating agencies
Rating agencies
 
Reform
ReformReform
Reform
 
The euro
The euroThe euro
The euro
 
Bus 615 group presentation
Bus 615 group presentationBus 615 group presentation
Bus 615 group presentation
 
High beam strategy and trend spotting
High beam strategy and trend spottingHigh beam strategy and trend spotting
High beam strategy and trend spotting
 
Leadership
LeadershipLeadership
Leadership
 
Strategic Management Case Study - Toyota
Strategic Management Case Study - ToyotaStrategic Management Case Study - Toyota
Strategic Management Case Study - Toyota
 

Recently uploaded

Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
techboxsqauremedia
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
Ben Wann
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
Corey Perlman, Social Media Speaker and Consultant
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
Call 7735293663 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 7735293663 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 7735293663 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 7735293663 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
bosssp10
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
NZSG
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
BBPMedia1
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
daothibichhang1
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 

Recently uploaded (20)

Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
Call 7735293663 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 7735293663 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 7735293663 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 7735293663 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 

Ioannis (Yiannis) Mikedis career presentation

  • 2. Career Overview  20 years in Technical Operations management  Excellent reputation in the marine industry with global network  Consensus builder and promoter of win-win results  Tackled and resolved unique marine technical issues  Spear headed change management initiatives and cruise brand redesign
  • 3. Career Overview Worked for: Strategic Partnered with:
  • 6. Case Study I:  Common Rail engine reliability issues and implementation of a prototype upgrade in service.
  • 7. Case Study I: Challenges  Lack of trust and ineffective management of expectations prevented open exchange of ideas while the resolution was been developed  Personality classes within the organization and a blame culture  OEM internal constraints prevented allocation of vital resources  The threat of lawsuits stalled necessary actions to stabilize the engines performance in anticipation to the upgrade
  • 8. Case Study I: Actions/Objectives  Identified change agents in the OEM’s organization and development of a base of trust.  Initiated standing conference calls with senior sponsors of this effort from both organizations.  Established a tight protocol for the safe and reliable first installation/upgrade with a specific engine performance criteria mutually agreed.  Established comfort level on the merit of the upgrade by surveying main supply chain key production areas (factories) for critical components and performed quality assurance audits.  Communicated at regular intervals with the candidate ships soliciting input at every critical step of the preparation process.  Selected senior engineer as project on-sight manager for the first ships engine upgrades and developed the communication protocols for advising both organizations of progress.
  • 9. Case Study I: Results  Success of first installation led to the planning and execution of the upgrades on remaining 6 ships.  Reliability of these engines improved dramatically reaching in many occasions above company’s fleet average.  Reduction of unscheduled down-times resulted a year later in the signing of a multi-engine multi-year maintenance agreement valued in excess of 60M$.  Relationship between parties improved and the relationship is excellent today with multiple orders been put for future ships’ main engines.
  • 10. Case Study I : Testimonials “Ioannis demonstrates a strong penchant for project management and applies his skills in this area in all aspects of his work. He is always keen to take on additional work and is currently leading a working group on the very important Alaska 2010 permit compliance issue. He has shown excellent initiative in the independent development of a number of fleet and ship projects and operating procedures, to the benefit of the department. Notable is the development of procedures with the technical purchasing department and lately his work on Wartsila common rail issues and the development of the CR1+ project for the ships. An excellent performance – well done.”
  • 11. Case Study II  Design and installation of an additional diesel generator on two ships
  • 12. Case Study II (cont.)
  • 13. Case Study II (cont.)
  • 14. Case Study II: Challenges  Compressed Project Design Timeline Impacted efficient Cost Control & Implementation  Initial Project Financial Assessment carried out without detailed work scope information  Significant Structural, Cabling and Pipework installations required works while ship was in service  Complexity of project created friction with various stakeholders and relationships had to be managed.  Personality clashes between functional leaders and project team  In house Purchasing and Logistics departments inexperience
  • 15. Case Study II: Actions/Objectives  Engine selected based on comparison matrix supporting QC survey of factory and prototype commercial installation.  Established project responsibility matrix and incorporated it in the contract  Established Project War Room to manage progress and provide updates.  Established core group of knowledge experts tasked to sign off each critical stage of the specification and installation.  Instituted on board project team to provide daily progress via specifically designed reporting tools.  Led the preparation and execution of a 21 day dry-docking to install prefabricated section. Vessel was safe to sail 48 hours ahead of schedule.  Coordinated commissioning tests and advised all relevant parties to ensure smooth execution of critical tests.
  • 16. Case Study II: Results  Solid Integrated Design with Good Energy Saving Initiatives  Heavy pre-drydock installation of RO plant, Structural steel, conversion of Fuel tanks to machinery space and relocation of key equipment  Integrated Lloyds Plan Approval Process successfully achieved  Documentation Process & Control Maintained Throughout Project  Successful Installation of Diesel, Alternator & Auxiliaries in 17 Days (dry-dock)  Completed project one month ahead of schedule.  Success of project resulted in additional installation in 2015 (sister vessel)
  • 17. Case Study II: Testimonials “Ioannis is a pleasure to work with and is always willing to go the extra mile to support the team. Ioannis completed the very challenging Coral (Princess) drydock and the significant additional diesel (generator) project this year. Both were successfully executed and completed while he was still managing day to day superintendent duties for the Coral (Princess) and Island (Princess). This was a significant task and I thank Ioannis for his prodigious effort. Well done.” “Ioannis has managed CO & IP (Coral Princess, Island Princess) earlier in the year and then was assigned to the additional diesel (generator) project which was a significant $21M undertaking. With the departure of the superintendent for CO/IP, superintendent duties reverted to Ioannis along with the dry dock planning responsibility at a late stage. Ioannis admirably immediately stepped up to the task and took on this new work load which was most appreciated. Ioannis was also a member of the Wartsila contract (negotiation) working group which successfully competed the analysis and negotiation of the 5-year DG (Diesel Engine) maintenance contract which was a significant undertaking and highly valued. Well done.”
  • 18. Additional Testimonials  “Ioannis is a prime mover and always delivers in times of extreme deadlines and critical operational requirements. His command and management style is highly recommended.”
  • 19. Current Projects  Project Management Institute  Membership √  Training & PMP Certification √  American Society For Quality  Membership  Training & 6σ – GB Certification  Institute of Chartered Shipbrokers  Training & Examinations  Membership  Conference Participation  Seatrade 2015 √  ABS - Academy  Training on Tanker Vetting  Book Reviews  The Handbook of Project Management √  Inventing the Electronic Century √  The Effective Executive √  The Leadership Pipeline √
  • 20. Closing Thoughts  Candidate:  20 years in Technical Operations management  Excellent reputation in the marine industry with global network  Consensus builder and promoter of win-win results  Tackled and resolved unique marine technical issues  Spear headed change management initiatives and cruise brand redesign  Company:  Industry leader  Healthy financials and exceptional growth prospects  In need of global change-management leader  Fosters innovation
  • 21. In conclusion: Balancing of Strengths and Opportunities with Weaknesses and Threats Strengths Opportunities Weaknesses Threats