Jeffery C. Zimmermann has over 39 years of experience in the construction industry, specifically in construction management. He is a licensed Certified Construction Manager with a proven record of minimizing risk and liabilities while maximizing profits. He has strong leadership, problem-solving, and communication skills. His project experience includes various types of infrastructure such as rail, civil works, power plants, and oil and gas facilities.
Alistair Howson is a mechanical engineer with over 11 years of experience in construction project management seeking a new opportunity. He has extensive experience managing all phases of multidisciplinary construction projects, from planning and budgeting to commissioning. Howson has a track record of completing projects on schedule and within budget while maintaining safety and quality standards. His most recent role was as Project Manager and Fabrication Facility Manager for Dutco McConnell Dowell in Dubai, where he successfully led several pipeline, plant upgrade, and fabrication projects.
Christopher R. Forbes' resume summarizes his over 21 years of experience in construction project and program management across various industries including private, public, and utilities. He has held roles such as Construction Manager, Vice President of Business Development, Project Manager, Project Executive, and Program Director. His experience spans management of projects ranging from $2 million to $85 million. He possesses expertise in areas such as construction administration, contracts, commissioning, safety, scheduling, cost control, and ensuring compliance.
Gary Knurbein is an award-winning construction operations executive with over 30 years of experience managing large, complex industrial construction projects in sectors including oil and gas, power, and government facilities. He has led projects with budgets up to $350M and teams with over 1,000 personnel. Some of his accomplishments include achieving over 8 million safe work hours on two projects, developing strategies that increased revenue by $30M, and bringing a $50M project in on time and under budget. He is a Project Management Professional with expertise in areas such as project management, safety, cost control, and stakeholder relations.
Having 13 years of experience in Oil & Gas and Petrochemical sector with exposure to various phases of project life cycle. Executive diploma in project management from International institute of project and program management with CIPM and CrtPRM. Believes to work as a team player to get the desired goal of an organization.
Lee Ann Reiter has over 20 years of experience in petroleum engineering and management. She holds a Bachelor's degree in Petroleum Engineering and is a licensed professional engineer in Wyoming. Reiter has held several leadership roles at Marathon Oil Company including Production Engineering Manager, Business Development Engineer, and Reservoir Engineering Supervisor. She has a proven track record of improving operations and financial performance. Reiter also has extensive experience in emergency response and community leadership through organizations like Rotary International.
Shivendra Kumar Agarwal has over 23 years of experience in project management, business development, construction management, and operations management in industries including power, oil and gas, and real estate. He is currently the Additional Vice President and Head of Project at Jindal India Thermal Power Ltd, overseeing the construction of a 3000 MW coal-based power plant. Previously he held leadership roles managing large infrastructure projects such as power plants, refineries, highways, and buildings.
Polivka International has over 50 years of experience completing over 300 rail projects, nearly 100 as a design-build contractor. They have a proven safety record and quality management processes. The document provides examples of their previous projects for various clients, demonstrating their experience in areas like design, construction, and meeting tight schedules.
Jois Lakshmipathy has over 40 years of experience in engineering and management roles related to infrastructure development and utility services projects. He has extensive experience in project planning, commercial operations, site management, and resource planning. Some of the major projects he has worked on include utilities diversions for Crossrail in the UK, water and sewerage projects in Qatar, and infrastructure works for developments like Burj Khalifa in Dubai. He is seeking a senior role applying his expertise in multi-disciplinary project management.
Alistair Howson is a mechanical engineer with over 11 years of experience in construction project management seeking a new opportunity. He has extensive experience managing all phases of multidisciplinary construction projects, from planning and budgeting to commissioning. Howson has a track record of completing projects on schedule and within budget while maintaining safety and quality standards. His most recent role was as Project Manager and Fabrication Facility Manager for Dutco McConnell Dowell in Dubai, where he successfully led several pipeline, plant upgrade, and fabrication projects.
Christopher R. Forbes' resume summarizes his over 21 years of experience in construction project and program management across various industries including private, public, and utilities. He has held roles such as Construction Manager, Vice President of Business Development, Project Manager, Project Executive, and Program Director. His experience spans management of projects ranging from $2 million to $85 million. He possesses expertise in areas such as construction administration, contracts, commissioning, safety, scheduling, cost control, and ensuring compliance.
Gary Knurbein is an award-winning construction operations executive with over 30 years of experience managing large, complex industrial construction projects in sectors including oil and gas, power, and government facilities. He has led projects with budgets up to $350M and teams with over 1,000 personnel. Some of his accomplishments include achieving over 8 million safe work hours on two projects, developing strategies that increased revenue by $30M, and bringing a $50M project in on time and under budget. He is a Project Management Professional with expertise in areas such as project management, safety, cost control, and stakeholder relations.
Having 13 years of experience in Oil & Gas and Petrochemical sector with exposure to various phases of project life cycle. Executive diploma in project management from International institute of project and program management with CIPM and CrtPRM. Believes to work as a team player to get the desired goal of an organization.
Lee Ann Reiter has over 20 years of experience in petroleum engineering and management. She holds a Bachelor's degree in Petroleum Engineering and is a licensed professional engineer in Wyoming. Reiter has held several leadership roles at Marathon Oil Company including Production Engineering Manager, Business Development Engineer, and Reservoir Engineering Supervisor. She has a proven track record of improving operations and financial performance. Reiter also has extensive experience in emergency response and community leadership through organizations like Rotary International.
Shivendra Kumar Agarwal has over 23 years of experience in project management, business development, construction management, and operations management in industries including power, oil and gas, and real estate. He is currently the Additional Vice President and Head of Project at Jindal India Thermal Power Ltd, overseeing the construction of a 3000 MW coal-based power plant. Previously he held leadership roles managing large infrastructure projects such as power plants, refineries, highways, and buildings.
Polivka International has over 50 years of experience completing over 300 rail projects, nearly 100 as a design-build contractor. They have a proven safety record and quality management processes. The document provides examples of their previous projects for various clients, demonstrating their experience in areas like design, construction, and meeting tight schedules.
Jois Lakshmipathy has over 40 years of experience in engineering and management roles related to infrastructure development and utility services projects. He has extensive experience in project planning, commercial operations, site management, and resource planning. Some of the major projects he has worked on include utilities diversions for Crossrail in the UK, water and sewerage projects in Qatar, and infrastructure works for developments like Burj Khalifa in Dubai. He is seeking a senior role applying his expertise in multi-disciplinary project management.
Sharzad Winkelmann owns a consulting firm called S & B Enterprises, Inc. located in La Jolla, CA. She has over 30 years of experience in engineering, project management, and consulting roles for companies like Southwest Research Institute and Solar Turbines Incorporated. She holds a B.S. in Electrical Engineering from UC San Diego and an MBA from the University of Redlands. Currently, she provides process improvement recommendations and diagnostics as a consultant through her firm.
This document provides a summary of an individual's 15 years of experience in project management across multiple industries and roles. They have extensive experience managing large scale extractive industry and infrastructure projects, with responsibilities including project controls, planning, cost estimating, risk management, and contract administration. The individual holds several advanced degrees in project management and construction law.
This document summarizes the Oman EPC Projects Summit 2015, which focused on improving project delivery amid low oil prices. Key discussions centered around:
- Establishing in-house FEED offices to better align operational and design aspects of EPC projects.
- The importance of clear scope definitions, risk assessments, and project planning to facilitate successful transitions from FEED to construction.
- Best practices for contracting strategies that incentivize safety, quality and minimize disputes between clients and contractors.
- Evaluating offshore EPC risks particularly related to complex logistics, environmental requirements, and cost estimations during FEED.
The document is a 4-page resume for Mr. Zulfiqar Ali Awan outlining his experience as a resident engineer and project manager over 16 years, with expertise in civil engineering, construction project management, and contract administration on various commercial and residential building projects in the UAE and Pakistan. It details his educational background and qualifications, roles and responsibilities in previous engineering positions, projects he has worked on, and skills.
This document presents a risk management final project for a construction project located in the 10th of Ramadan district in Sharkia, Egypt. It outlines the risk management processes to be followed, including developing a risk management plan, identifying risks, conducting qualitative and quantitative risk analyses, developing a risk response plan, and monitoring risks. It then provides details of the risk identification process, categorizing 42 potential risks to the project. It gives examples of qualitative risk analyses through probability/impact matrices and sensitivity analyses for selected risks. Expected value analyses are also presented to quantify the risks.
The document provides a summary of Glen E Dimick's extensive professional experience over 40 years in project management and construction management roles. It details his experience managing a wide range of projects from $0.5M to $26B across various industries. It also lists his education, certifications, and roles held with Fluor Enterprises from 1978 to present.
RESUME - Miguel Montalvo del Toro - February 2016Miguel Montalvo
Miguel Montalvo is a licensed engineer and MBA with over 37 years of experience in project management, construction management, facilities maintenance, safety, and design for federal ESPC projects and various industries. He has managed projects ranging from $3.5 million to $25 million. Montalvo has extensive experience developing energy saving solutions, overseeing safety compliance, and managing budgets, schedules, and customer satisfaction for industrial and commercial clients. He is skilled in OSHA regulations, problem solving, Microsoft Office, and both English and Spanish.
Rajkumar Jaganathan is a senior construction engineer with over 12 years of experience in project management in GCC countries. He has skills in various aspects of project management including project integration, HSE management, scope management, time and cost management, quality management, and risk management. He holds qualifications in mechanical engineering, safety certifications, and project management software. He has experience managing a variety of oil, gas and petrochemical construction projects with budgets over $1 billion. His responsibilities include planning, executing, monitoring and controlling projects to deliver on time and on budget while ensuring safety and quality standards.
Mid-American Group is an industrial construction firm that has been in business for over 30 years. It provides services such as engineering, maintenance, refractory construction, concrete work, and general construction. The company has over 550 employees and offices in multiple states. It has experience with large projects in various industries such as power generation, oil, steel, automotive, and chemical plants. The company's chairman, Lawrence Masserant, has over 30 years of construction experience. Mid-American Group prides itself on its innovative solutions and safety record on complex projects for clients such as DTE Energy and BP Oil. It has extensive experience with nuclear power facilities and uses specialized techniques like dry ice blasting.
Ashok Upadhyay has over 20 years of experience managing large pipeline, terminal, and process plant projects across several countries. He has led projects worth over $830 million for major clients like Petronas and ONGC. Upadhyay specializes in project management, engineering, safety, and executing projects on schedule and under budget in difficult terrain and weather conditions.
For decades, persistent failure has marred the delivery of capital investment projects in the resource development sector. Regrettably even though the causes are well known, companies have been slow to respond with effective control strategies. As the scale and complexity of projects has increased so too has the magnitude of shareholder value destruction. It seems that when the biggest projects fail, they fail spectacularly. Performance statistics going back several decades demonstrate that mining projects of all sizes and complexity mostly fail to achieve objectives. For a time, the commodities super cycle, which peaked in 2011, concealed poor capital expenditure discipline. High sales prices cover many sins, but recent price turbulence has exposed companies to a legacy of record impairments and over-priced and under-performing assets unprecedented in the modern era. This has led to a renewed focus on reducing or eliminating capital expenditure. Companies spending on capital developments have an opportunity to apply new levels of discipline to both the allocation and delivery of capital in an environment of stagnating labour costs and increasing competitiveness. Contracting approaches that provide greater opportunities for cost certainty or gross cost reduction are now more readily available as contractors are prepared to accept greater levels of cost and schedule risk to secure work. Mining companies must also improve in-house project management capability, especially in risk management and performance control. Teams of proven performers should be equipped with sound management processes and tools to capture the value of the opportunity at the front-end of the project delivery cycle and maintain that value through to completion. We conclude with an overview of our proprietary capital delivery process and management system to demonstrate a methodology that reduces risks in a project portfolio and greatly increases the likelihood of achieving predictable project outcomes.
Salman Mohammed Al-Kadhem is a senior management professional with over 34 years of experience in project management, engineering management, and plant operations in the oil and gas industry. He is currently the Project Mechanical Superintendent at Sadara Chemical Company in Jubail, KSA, where he oversees all field activities related to equipment installation and commissioning. Al-Kadhem has extensive experience managing large capital projects and overseeing maintenance operations. He is seeking a new management position where he can utilize his skills and experience to deliver strong results.
Graham Construction Corp. is a construction company based in Michigan that has been operating since 1991. It prides itself on developing strong teams for each project and maintaining good client relationships through open communication. The company can handle projects throughout the Midwest from concept to completion.
Mohamed Rafeek Samsudeen is a Quantity Surveying professional with over 18 years of experience in the construction field in Sri Lanka, Saudi Arabia, and Dubai. He currently works as a Project QS for Khatib @ Alami Consolidated Engineering Co. LLC in Dubai. He has a Bachelor's degree in Engineering from the University of Moratuwa and a Bachelor's degree in Quantity Surveying and Construction Management from Sheffield Hallam University. He has extensive experience managing various infrastructure projects such as roads, water and sewage systems.
This document is a resume for Erfan-Ul-Haque Farooqui that outlines his objective, experience, education, areas of expertise, and details of work experience. The resume summarizes Farooqui's 25 years of experience in structural engineering projects across several countries, including managing large rail projects in Singapore. It also provides details on his technical expertise in areas like buildings, bridges, mass transit systems, and oil and gas facilities.
Emeka Lewis is a Nigerian project manager with over 7 years of experience in oil and gas operations. He holds several certifications in project planning, scheduling, and risk analysis. His background includes experience planning maintenance shutdowns, developing schedules and budgets, and monitoring project progress. He is proficient in project management software like Primavera and Microsoft Project. Lewis is currently a Principal Planning and Scheduling Engineer for Eiffage Oil and Gas on a platform construction project in Nigeria.
GARRY RESUME Red Seal industrial Electrician.Garry Doiron
Garry Doiron has over 30 years of experience as a certified industrial electrician working in various industrial sectors including oil and gas, mining, and milling operations. He has held several supervisory roles managing electrical projects and teams. Some of his past roles include commissioning coordinator, project manager, and electrical supervisor and trainer. He is seeking a new position utilizing his electrical and supervisory skills and experience.
Patrick S. Muga has over 34 years of experience in project management, engineering, safety management, and commissioning of oil, gas, and shipping projects. He has led multi-disciplinary teams on projects in several countries. Muga is also an experienced lecturer and trainer in areas related to oil and gas such as project management, risk assessment, instrumentation, and safety.
Sachin Parab has over 14 years of experience as a construction manager in civil engineering projects. He has strong leadership and technical skills and has successfully managed a variety of infrastructure projects across multiple countries. Parab is proficient in all aspects of project delivery including planning, resource management, quality control, and safety compliance. He currently works as a Construction Manager at Larsen & Toubro Limited in Abu Dhabi.
This resume summarizes Christopher R. Forbes' experience in construction project and program management over 21 years. He has extensive experience managing both private and public construction projects, with a focus on resilient construction and renewable energy. Currently, he is overseeing the construction of an 11 megawatt CHP power plant and ice factory as a Construction Manager. Prior roles include Vice President of Business Development, Project Manager for NYC Housing Authority projects, and Project Executive overseeing public utility projects. He has broad experience across various construction disciplines and management roles.
Who I am …
Global Engineering Project Manager; PMP certified, Registered Professional Engineer
Award-winning team leader, coach, and mentor with extensive experience in every phase of Project Management from proposal preparation to project execution to project close and resolution of warranty issues. Supervised engineering teams and installation contractors. Excellent track record in project schedule, budget, risk, and scope management. Strong scope, risk and schedule manager with the ability to work well with all levels of project teams across divisional lines. Excellent verbal and written communication skills.
Awards and Recognition …
Awarded 4 ‘Golden Gobs’ for unsolicited customer praise with SmartSignal.
Closed projects under budget for 12 consecutive years with United Conveyor.
Achieved 95+ % customer satisfaction with United Conveyor.
Awarded patent #4,932,985 for new electro-mechanical device with Midwest Power.
What I do …
Manage electro-Mechanical project teams plus Controls, IT, and Software Project Managers from project conception through proposal preparation, management acceptance, design, fabrication and assembly, installation and commissioning including sub-contractor specification, selection, and work site supervision. Put my feet in the customer’s shoes and see things from their perspective. My management style is collaborative; letting team members exhibit strengths while helping them develop new abilities.
How I add value …
Perform Budgeting and CPM scheduling, controlling scope, schedule, and budget
Manage project teams
Establish Resource assignment & leveling methods
Develop and implement standard project status reporting tools
Manage product development projects
Negotiate and secure site permitting
Execute projects from $5 thousand to $32+ million
Successfully interface with Customers, contractors, and consultants in North America, Europe, and Asia
A bit about Project Management …
A wise man once said that Project Management was 80% Project Management skills developed over a long period of time and 20% engineering knowledge easily learned in a short while.
Sharzad Winkelmann owns a consulting firm called S & B Enterprises, Inc. located in La Jolla, CA. She has over 30 years of experience in engineering, project management, and consulting roles for companies like Southwest Research Institute and Solar Turbines Incorporated. She holds a B.S. in Electrical Engineering from UC San Diego and an MBA from the University of Redlands. Currently, she provides process improvement recommendations and diagnostics as a consultant through her firm.
This document provides a summary of an individual's 15 years of experience in project management across multiple industries and roles. They have extensive experience managing large scale extractive industry and infrastructure projects, with responsibilities including project controls, planning, cost estimating, risk management, and contract administration. The individual holds several advanced degrees in project management and construction law.
This document summarizes the Oman EPC Projects Summit 2015, which focused on improving project delivery amid low oil prices. Key discussions centered around:
- Establishing in-house FEED offices to better align operational and design aspects of EPC projects.
- The importance of clear scope definitions, risk assessments, and project planning to facilitate successful transitions from FEED to construction.
- Best practices for contracting strategies that incentivize safety, quality and minimize disputes between clients and contractors.
- Evaluating offshore EPC risks particularly related to complex logistics, environmental requirements, and cost estimations during FEED.
The document is a 4-page resume for Mr. Zulfiqar Ali Awan outlining his experience as a resident engineer and project manager over 16 years, with expertise in civil engineering, construction project management, and contract administration on various commercial and residential building projects in the UAE and Pakistan. It details his educational background and qualifications, roles and responsibilities in previous engineering positions, projects he has worked on, and skills.
This document presents a risk management final project for a construction project located in the 10th of Ramadan district in Sharkia, Egypt. It outlines the risk management processes to be followed, including developing a risk management plan, identifying risks, conducting qualitative and quantitative risk analyses, developing a risk response plan, and monitoring risks. It then provides details of the risk identification process, categorizing 42 potential risks to the project. It gives examples of qualitative risk analyses through probability/impact matrices and sensitivity analyses for selected risks. Expected value analyses are also presented to quantify the risks.
The document provides a summary of Glen E Dimick's extensive professional experience over 40 years in project management and construction management roles. It details his experience managing a wide range of projects from $0.5M to $26B across various industries. It also lists his education, certifications, and roles held with Fluor Enterprises from 1978 to present.
RESUME - Miguel Montalvo del Toro - February 2016Miguel Montalvo
Miguel Montalvo is a licensed engineer and MBA with over 37 years of experience in project management, construction management, facilities maintenance, safety, and design for federal ESPC projects and various industries. He has managed projects ranging from $3.5 million to $25 million. Montalvo has extensive experience developing energy saving solutions, overseeing safety compliance, and managing budgets, schedules, and customer satisfaction for industrial and commercial clients. He is skilled in OSHA regulations, problem solving, Microsoft Office, and both English and Spanish.
Rajkumar Jaganathan is a senior construction engineer with over 12 years of experience in project management in GCC countries. He has skills in various aspects of project management including project integration, HSE management, scope management, time and cost management, quality management, and risk management. He holds qualifications in mechanical engineering, safety certifications, and project management software. He has experience managing a variety of oil, gas and petrochemical construction projects with budgets over $1 billion. His responsibilities include planning, executing, monitoring and controlling projects to deliver on time and on budget while ensuring safety and quality standards.
Mid-American Group is an industrial construction firm that has been in business for over 30 years. It provides services such as engineering, maintenance, refractory construction, concrete work, and general construction. The company has over 550 employees and offices in multiple states. It has experience with large projects in various industries such as power generation, oil, steel, automotive, and chemical plants. The company's chairman, Lawrence Masserant, has over 30 years of construction experience. Mid-American Group prides itself on its innovative solutions and safety record on complex projects for clients such as DTE Energy and BP Oil. It has extensive experience with nuclear power facilities and uses specialized techniques like dry ice blasting.
Ashok Upadhyay has over 20 years of experience managing large pipeline, terminal, and process plant projects across several countries. He has led projects worth over $830 million for major clients like Petronas and ONGC. Upadhyay specializes in project management, engineering, safety, and executing projects on schedule and under budget in difficult terrain and weather conditions.
For decades, persistent failure has marred the delivery of capital investment projects in the resource development sector. Regrettably even though the causes are well known, companies have been slow to respond with effective control strategies. As the scale and complexity of projects has increased so too has the magnitude of shareholder value destruction. It seems that when the biggest projects fail, they fail spectacularly. Performance statistics going back several decades demonstrate that mining projects of all sizes and complexity mostly fail to achieve objectives. For a time, the commodities super cycle, which peaked in 2011, concealed poor capital expenditure discipline. High sales prices cover many sins, but recent price turbulence has exposed companies to a legacy of record impairments and over-priced and under-performing assets unprecedented in the modern era. This has led to a renewed focus on reducing or eliminating capital expenditure. Companies spending on capital developments have an opportunity to apply new levels of discipline to both the allocation and delivery of capital in an environment of stagnating labour costs and increasing competitiveness. Contracting approaches that provide greater opportunities for cost certainty or gross cost reduction are now more readily available as contractors are prepared to accept greater levels of cost and schedule risk to secure work. Mining companies must also improve in-house project management capability, especially in risk management and performance control. Teams of proven performers should be equipped with sound management processes and tools to capture the value of the opportunity at the front-end of the project delivery cycle and maintain that value through to completion. We conclude with an overview of our proprietary capital delivery process and management system to demonstrate a methodology that reduces risks in a project portfolio and greatly increases the likelihood of achieving predictable project outcomes.
Salman Mohammed Al-Kadhem is a senior management professional with over 34 years of experience in project management, engineering management, and plant operations in the oil and gas industry. He is currently the Project Mechanical Superintendent at Sadara Chemical Company in Jubail, KSA, where he oversees all field activities related to equipment installation and commissioning. Al-Kadhem has extensive experience managing large capital projects and overseeing maintenance operations. He is seeking a new management position where he can utilize his skills and experience to deliver strong results.
Graham Construction Corp. is a construction company based in Michigan that has been operating since 1991. It prides itself on developing strong teams for each project and maintaining good client relationships through open communication. The company can handle projects throughout the Midwest from concept to completion.
Mohamed Rafeek Samsudeen is a Quantity Surveying professional with over 18 years of experience in the construction field in Sri Lanka, Saudi Arabia, and Dubai. He currently works as a Project QS for Khatib @ Alami Consolidated Engineering Co. LLC in Dubai. He has a Bachelor's degree in Engineering from the University of Moratuwa and a Bachelor's degree in Quantity Surveying and Construction Management from Sheffield Hallam University. He has extensive experience managing various infrastructure projects such as roads, water and sewage systems.
This document is a resume for Erfan-Ul-Haque Farooqui that outlines his objective, experience, education, areas of expertise, and details of work experience. The resume summarizes Farooqui's 25 years of experience in structural engineering projects across several countries, including managing large rail projects in Singapore. It also provides details on his technical expertise in areas like buildings, bridges, mass transit systems, and oil and gas facilities.
Emeka Lewis is a Nigerian project manager with over 7 years of experience in oil and gas operations. He holds several certifications in project planning, scheduling, and risk analysis. His background includes experience planning maintenance shutdowns, developing schedules and budgets, and monitoring project progress. He is proficient in project management software like Primavera and Microsoft Project. Lewis is currently a Principal Planning and Scheduling Engineer for Eiffage Oil and Gas on a platform construction project in Nigeria.
GARRY RESUME Red Seal industrial Electrician.Garry Doiron
Garry Doiron has over 30 years of experience as a certified industrial electrician working in various industrial sectors including oil and gas, mining, and milling operations. He has held several supervisory roles managing electrical projects and teams. Some of his past roles include commissioning coordinator, project manager, and electrical supervisor and trainer. He is seeking a new position utilizing his electrical and supervisory skills and experience.
Patrick S. Muga has over 34 years of experience in project management, engineering, safety management, and commissioning of oil, gas, and shipping projects. He has led multi-disciplinary teams on projects in several countries. Muga is also an experienced lecturer and trainer in areas related to oil and gas such as project management, risk assessment, instrumentation, and safety.
Sachin Parab has over 14 years of experience as a construction manager in civil engineering projects. He has strong leadership and technical skills and has successfully managed a variety of infrastructure projects across multiple countries. Parab is proficient in all aspects of project delivery including planning, resource management, quality control, and safety compliance. He currently works as a Construction Manager at Larsen & Toubro Limited in Abu Dhabi.
This resume summarizes Christopher R. Forbes' experience in construction project and program management over 21 years. He has extensive experience managing both private and public construction projects, with a focus on resilient construction and renewable energy. Currently, he is overseeing the construction of an 11 megawatt CHP power plant and ice factory as a Construction Manager. Prior roles include Vice President of Business Development, Project Manager for NYC Housing Authority projects, and Project Executive overseeing public utility projects. He has broad experience across various construction disciplines and management roles.
Who I am …
Global Engineering Project Manager; PMP certified, Registered Professional Engineer
Award-winning team leader, coach, and mentor with extensive experience in every phase of Project Management from proposal preparation to project execution to project close and resolution of warranty issues. Supervised engineering teams and installation contractors. Excellent track record in project schedule, budget, risk, and scope management. Strong scope, risk and schedule manager with the ability to work well with all levels of project teams across divisional lines. Excellent verbal and written communication skills.
Awards and Recognition …
Awarded 4 ‘Golden Gobs’ for unsolicited customer praise with SmartSignal.
Closed projects under budget for 12 consecutive years with United Conveyor.
Achieved 95+ % customer satisfaction with United Conveyor.
Awarded patent #4,932,985 for new electro-mechanical device with Midwest Power.
What I do …
Manage electro-Mechanical project teams plus Controls, IT, and Software Project Managers from project conception through proposal preparation, management acceptance, design, fabrication and assembly, installation and commissioning including sub-contractor specification, selection, and work site supervision. Put my feet in the customer’s shoes and see things from their perspective. My management style is collaborative; letting team members exhibit strengths while helping them develop new abilities.
How I add value …
Perform Budgeting and CPM scheduling, controlling scope, schedule, and budget
Manage project teams
Establish Resource assignment & leveling methods
Develop and implement standard project status reporting tools
Manage product development projects
Negotiate and secure site permitting
Execute projects from $5 thousand to $32+ million
Successfully interface with Customers, contractors, and consultants in North America, Europe, and Asia
A bit about Project Management …
A wise man once said that Project Management was 80% Project Management skills developed over a long period of time and 20% engineering knowledge easily learned in a short while.
The document provides a summary of Yasser Hassan's professional experience and qualifications. It outlines his 19+ years of experience managing MEP projects in various roles in Dubai, Canada, and Kuwait. It details his educational background which includes a BSc in Mechanical Engineering and various project management and safety certifications. It also lists technical specialties and past projects as well as IT skills and availability of references.
Diruhi Lilly Korkukluoglu is an experienced Prime Contract Manager seeking a new position. She has over 40 years of experience managing complex construction and engineering projects in industries such as nuclear, mining, infrastructure, and government. Some of her accomplishments include achieving an award for managing a $15 billion airport project in Qatar and earning accolades for her work on the Yucca Mountain Nuclear Waste Depository. She is proficient in contract administration, risk management, and regulatory compliance.
Thomas Bastian has over 35 years of experience in program and project controls, construction project management, and cost engineering across various industries and locations globally. He has expertise in planning, scheduling, cost monitoring, risk management, and quality assurance. His experience includes managing large infrastructure projects in areas like civil works, petrochemicals, pharmaceuticals, and military facilities. Bastian is seeking new opportunities requiring his skills in project controls, construction management, and cost engineering.
Bruce W. Kain has over 35 years of experience in project management, construction management, operations management, and safety for pipelines, gathering systems, storage facilities, and compressor stations. He is skilled in quality assurance, regulatory compliance, cost control, and contract management. Currently he works as the Chief Inspector for Enstor, overseeing installation and commissioning of new equipment to ensure quality and compliance.
Michael Syslak has over 20 years of experience managing construction projects in the oil and gas industry. He has managed crews of up to 110 people on pipeline and facility construction projects. His skills include construction project management, budgeting, safety compliance, and supervising subcontractors. His background includes managing multimillion-dollar projects on schedule and on budget for oil and gas companies.
Jamal J. Oklah is a civil engineer with over 35 years of experience in the Middle East. He received a Bachelor of Science in Civil Engineering from the University of Oklahoma in 1980. Currently he works as a Construction Manager for Parsons Corporation in Riyadh, Saudi Arabia, where he oversees infrastructure projects worth over $350 million. Prior to this role, he served as Project Manager for several large construction firms in Saudi Arabia and the UAE, managing projects such as hospitals, commercial buildings, and infrastructure works. He has extensive experience developing strategies, managing teams, and ensuring projects are completed on time and on budget.
The Gooch Companies are part of NVC Fund Holding Trust Group of Companies. NVC and Gooch companies are entities under the Frank Ekejija Estate Trust changing and developing the world.
Patrick S. Muga has over 33 years of experience in project management, engineering, construction, and commissioning of oil and gas facilities. He has led large teams on many projects around the world. Some of his roles include engineering design, contractor management, HSE leadership, and training other engineers. He has successfully completed numerous offshore and onshore projects in countries like Malaysia, Nigeria, Singapore, and more.
Lawrence Dick is a senior Operations and Health and Safety Manager with over 25 years of experience in the oil and gas industry. He has a proven track record of successfully managing complex exploration projects and leading multi-disciplinary teams. Currently seeking a Project Management or QHSE Manager role where he can utilize his leadership, technical, and HSE skills to ensure strategic objectives are met safely, efficiently, and within budget.
Sr. Level Project Consultant with expertise in both EPC firms and as an Owner Representative Managed the E&I activities to meet the required project schedule from detailed design phase through project execution, completion and hand-over to Field Operations Group.
The document provides a summary for Gary W. Armstrong, an engineer with over 20 years of experience in project management, operations, and engineering for refineries, petrochemical plants, and other industrial facilities. He has worked as a project manager, turnaround project engineer, operations engineer, optimization engineer, and construction engineer. His skills include project management, process engineering, equipment design, and team leadership. He holds a Bachelor's degree in Mechanical Engineering and certifications in root cause failure analysis and project management.
Neil McKie is a project and program manager with extensive experience successfully delivering projects across various industries such as oil and gas, IT, telecommunications, and energy. He has a proven track record of taking established methodologies like Prince2 and enhancing them with his techniques to ensure project success. McKie also has experience establishing project management offices, managing change, and training teams. His career highlights include establishing a project management office in Russia, creating project plans that improved company performance, and rescuing a $28 million telecommunications project.
M.P. has over 35 years of experience in commercial construction management. He has held roles such as construction project manager, senior construction foreman, and owner of his own construction company. He has expertise in areas like estimating, scheduling, budgeting, contract negotiations, and safety compliance. M.P. seeks to contribute his extensive industry knowledge and leadership skills to help companies grow successfully.
David Sanders has over 25 years of experience in facilities management, project management, and contract management. He has a proven track record of completing projects ahead of schedule and under budget. His previous roles include Maintenance Section Manager for Gwinnett County Government where he reduced operating costs by 11% and work order backlogs by over 90%. As Director of Maintenance for DNC Parks & Resorts, he returned $187k to the budget and completed $454k in emergency projects while reducing costs by 18%. Currently, he is looking for a new opportunity to apply his expertise in facilities infrastructure management.
Sarmad has over 21 years of experience in contracts management, commercial management, and leading project teams across multiple sectors. He currently works as a senior claim consultant for AECOM-Qatar, managing a team that provides advice on claims, delays, and disputes. Previously he has worked on large-scale real estate, infrastructure, and industrial projects in Qatar, Oman, and India, taking on roles such as senior contracts manager, senior cost manager, and senior quantity surveyor.
Rick Hudgens has over 30 years of experience in project management for engineering, construction, and infrastructure projects ranging from $400 million to $20 billion. He has a proven track record of leading teams, developing client relationships, and managing all phases of large capital projects. Hudgens is currently the Vice President of Operations and Business Development at ACMS Group, where he oversees professional staff and construction operations.
Robert McCray has over 30 years of experience managing construction projects around the world. He has led projects in the US, Saudi Arabia, and Iraq worth hundreds of millions of dollars. Some of his responsibilities include overseeing budgets, schedules, subcontractors, and ensuring safety and regulatory compliance. He has a proven track record of completing projects on time and under budget.
A review on techniques and modelling methodologies used for checking electrom...nooriasukmaningtyas
The proper function of the integrated circuit (IC) in an inhibiting electromagnetic environment has always been a serious concern throughout the decades of revolution in the world of electronics, from disjunct devices to today’s integrated circuit technology, where billions of transistors are combined on a single chip. The automotive industry and smart vehicles in particular, are confronting design issues such as being prone to electromagnetic interference (EMI). Electronic control devices calculate incorrect outputs because of EMI and sensors give misleading values which can prove fatal in case of automotives. In this paper, the authors have non exhaustively tried to review research work concerned with the investigation of EMI in ICs and prediction of this EMI using various modelling methodologies and measurement setups.
International Conference on NLP, Artificial Intelligence, Machine Learning an...gerogepatton
International Conference on NLP, Artificial Intelligence, Machine Learning and Applications (NLAIM 2024) offers a premier global platform for exchanging insights and findings in the theory, methodology, and applications of NLP, Artificial Intelligence, Machine Learning, and their applications. The conference seeks substantial contributions across all key domains of NLP, Artificial Intelligence, Machine Learning, and their practical applications, aiming to foster both theoretical advancements and real-world implementations. With a focus on facilitating collaboration between researchers and practitioners from academia and industry, the conference serves as a nexus for sharing the latest developments in the field.
Comparative analysis between traditional aquaponics and reconstructed aquapon...bijceesjournal
The aquaponic system of planting is a method that does not require soil usage. It is a method that only needs water, fish, lava rocks (a substitute for soil), and plants. Aquaponic systems are sustainable and environmentally friendly. Its use not only helps to plant in small spaces but also helps reduce artificial chemical use and minimizes excess water use, as aquaponics consumes 90% less water than soil-based gardening. The study applied a descriptive and experimental design to assess and compare conventional and reconstructed aquaponic methods for reproducing tomatoes. The researchers created an observation checklist to determine the significant factors of the study. The study aims to determine the significant difference between traditional aquaponics and reconstructed aquaponics systems propagating tomatoes in terms of height, weight, girth, and number of fruits. The reconstructed aquaponics system’s higher growth yield results in a much more nourished crop than the traditional aquaponics system. It is superior in its number of fruits, height, weight, and girth measurement. Moreover, the reconstructed aquaponics system is proven to eliminate all the hindrances present in the traditional aquaponics system, which are overcrowding of fish, algae growth, pest problems, contaminated water, and dead fish.
ACEP Magazine edition 4th launched on 05.06.2024Rahul
This document provides information about the third edition of the magazine "Sthapatya" published by the Association of Civil Engineers (Practicing) Aurangabad. It includes messages from current and past presidents of ACEP, memories and photos from past ACEP events, information on life time achievement awards given by ACEP, and a technical article on concrete maintenance, repairs and strengthening. The document highlights activities of ACEP and provides a technical educational article for members.
Embedded machine learning-based road conditions and driving behavior monitoringIJECEIAES
Car accident rates have increased in recent years, resulting in losses in human lives, properties, and other financial costs. An embedded machine learning-based system is developed to address this critical issue. The system can monitor road conditions, detect driving patterns, and identify aggressive driving behaviors. The system is based on neural networks trained on a comprehensive dataset of driving events, driving styles, and road conditions. The system effectively detects potential risks and helps mitigate the frequency and impact of accidents. The primary goal is to ensure the safety of drivers and vehicles. Collecting data involved gathering information on three key road events: normal street and normal drive, speed bumps, circular yellow speed bumps, and three aggressive driving actions: sudden start, sudden stop, and sudden entry. The gathered data is processed and analyzed using a machine learning system designed for limited power and memory devices. The developed system resulted in 91.9% accuracy, 93.6% precision, and 92% recall. The achieved inference time on an Arduino Nano 33 BLE Sense with a 32-bit CPU running at 64 MHz is 34 ms and requires 2.6 kB peak RAM and 139.9 kB program flash memory, making it suitable for resource-constrained embedded systems.
Understanding Inductive Bias in Machine LearningSUTEJAS
This presentation explores the concept of inductive bias in machine learning. It explains how algorithms come with built-in assumptions and preferences that guide the learning process. You'll learn about the different types of inductive bias and how they can impact the performance and generalizability of machine learning models.
The presentation also covers the positive and negative aspects of inductive bias, along with strategies for mitigating potential drawbacks. We'll explore examples of how bias manifests in algorithms like neural networks and decision trees.
By understanding inductive bias, you can gain valuable insights into how machine learning models work and make informed decisions when building and deploying them.
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...University of Maribor
Slides from talk presenting:
Aleš Zamuda: Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapter and Networking.
Presentation at IcETRAN 2024 session:
"Inter-Society Networking Panel GRSS/MTT-S/CIS
Panel Session: Promoting Connection and Cooperation"
IEEE Slovenia GRSS
IEEE Serbia and Montenegro MTT-S
IEEE Slovenia CIS
11TH INTERNATIONAL CONFERENCE ON ELECTRICAL, ELECTRONIC AND COMPUTING ENGINEERING
3-6 June 2024, Niš, Serbia
New techniques for characterising damage in rock slopes.pdf
CV Resume
1. Jeffery C. Zimmermann, CCM (714) 227-4772
936 S. CreekviewLane * Anaheim, California 92808 jeffery.zimmermann@gmail.com
Executive Summary
As a highly accomplished individual with over 39 years’ experience in the construction industry
specifically in construction management. I am a licensed Certified Construction Manager (CCM) well
experienced in minimizing risk, liabilities, increase shareholder value, maximize company profits, and
utilize available resources. My proven record in assembling & motivating quality teams,setting goals and
achieving peak levels. Provide problem solving intuitive, creative,and passionate ideas, along with quality
communication. My leadership skills are strong due to my high Integrity, ethics and wiliness to recognize
merit, continue to improve and train and wiliness to accept challenges outside of my comfort zone, but
within the constraints of a safe environment. My project experience encompasses light and heavy rail, civil
works, water & wastewater,airports,power plants, renewables,oil & gas, refineries.
Professional Registrations / Licenses
California –
General Engineering Contractor Lic. “A”, General Building Lic. “B”, Electrical Lic C-10,
Certified Construction Manager (CCM), License #A1769 (2010- Present)
Colorado Master Electrician 1982 (expired 1991)
Memberships / Affiliations:
CMAA,Construction Management Association of America, Member (2009 – Present),
CMAA -Southern California Chapter, CCM Committee Chair & Board Member
Paint Your Heart Out,Board member (2001 – Present)
Boy Scouts of America- Life Scout / Assistant Scoutmaster (2005 – Present)
Education
Construction Management, Santa Monica State College, 1991-1994
Business, Miramar College, 1986-1991
Engineering, University of Colorado at Denver, 1985
Engineering, Western State College, 1979
Professional Titles
The titles I have held in my career are as follows:
President, Vice President, Director, Operations Leader,Chief Estimator, Sr. Manager,Sr. Estimator,
Project Manager, Certified Construction Manager
2. Professional Experience
GW Civil Constructors, Inc – Project Executive 2016
Scope/Description: Owens Lake DustMitigation Phase 9/10 Contractualscope of work installation of
36 Miles of sub-surface HDPE Pipeline, 200,000 Tons of gravel placement, 18 million sf of geotextile
fabric placement,
Provided leadership and oversight for the day-to-day operations for all Construction, Project Management
and Project Administration activities associated with the project. Managed a staff of Project Managers,
Superintendents, and Project Support staff. Executed the development and implementation of corporate
policies and procedures to achieve established corporate goals and support the corporate mission statement.
Operations oversight and direction for:
*Client & Stakeholders / Proceduraland process issues / Financial issues and reporting processes.
*Subcontractor performance issues / Manpower issues and analysis / Constructability and technical issues.
*Legal and liability issues / Risk analysis and mitigation / Special issues.
Reviewed the performance of all Construction Operations employees and provided recommendations
regarding staffing, developmental needs, position evaluations, and compensation.
Performed monthly project reviews to include the following major activities:
*Project schedule, safety, administration, profitability, Material, equipment procurement.
*Quality of work, Quality of relationships with Owner, Subcontractors, and A/E firms.
Hobbs-Bannerman, Inc - Vice President 2013-2016
Responsible for creation & implementation of a start-up General Engineering
Contracting Company, for a multi-billion-dollar organization, including building key
relationships with a variety of constituencies including but not limited to:
Clients, potential JV Partners,Stakeholders, and generally those who influence
decisions.
Creation and implementation of Company policies, procedures, organizational structure,
business plan, growth objectives, profit, loss, revenue, budgets, business development
Managed,direction, guidance, mentoring and oversight to executives, supervisory, and safety
personnel, motivating mangers to function as a cohesive organization.
Established company spirit, creativity and integrity, to produce maximum benefit to the company,
employee and community.
Development of an overall effective Company business development program.
Direction and participated in close the "sale" on large, strategic project pursuits, assisting in final
contract negotiations.
Established WBS / Company cost codes,procedures for estimating, bid reviews and pre-
construction meetings.
Monitored and analyzes operations with Managers and reported current work in progress and
workloads to corporate executives.
Oversaw of the company safety program director for safety in the working environment.
Promotes safety among subordinates. Ultimately responsible for the safety results.
Performed additional assignments as directed by corporate executives.
Local signing authority for bids, bonds and contracts.
Well organized multi-task and strong understanding of engineering and construction
management to facilitate and promote progressive communications. Pre-construction
decisions, design review, value engineer, establish risk & liability plan, constructability
review, contract and change order negotiations.
3. Our marketplaces included but not limited to the following:
Alternative Energy, Power Generation,
LNG Export Terminals, CNG,
Light Rail, Refineries,
Oil & Gas, Upstream,Downstream
Transmission & Distribution,
Water / Wastewater
Samsung C&T, Business Development –North Americas Sr. Manager 2011-2013
Scope/Description:
EPC Contractor responsible for building key relationships with a variety of constituencies including but not
limited to: Clients, potential JV Partners, Project Financing, Stakeholders, Outreach and Community
Organizations, and generally those who influence decisions. Having the ability to be well organized multi-
task and strong understanding of engineering and construction management to facilitate and promote
progressive communications. Pre-construction decisions, scope of work, design review, value engineer,
establish risk & liability plan, inspection, constructability review, contract and change order negotiations,
scheduling, time impact analysis, site safety coordinator, review submittals, review loop / interconnecting
documents, start-up, commissioning, and worked with design engineers and contractors.
Heavy Civil – California High Speed Rail / Regional Connector Subway / Westside Subway
Renewable - Truckhaven Geo-Thermal Power Plant / Numerous Solar Utility Facilities / Wind Farms –
On-& Off Shore
Power - Co-Generation PP / Numerous Combined Cycle PP 600MW > 3500MW/ Coal Fired PP / Peaker
Single Cycle PP / Hydro Electric Power / John Hart Generation Station
Miscellaneous - LNGExport Terminals / GTL / Baltimore Airport PRT / Light Rail / Transmission &
Hart Generation Station
Renewable - Truckhaven Geo-Thermal Power Plant / Numerous Solar Utility Facilities / Wind Farms –
On-& Off Shore
Power - Co-Generation PP / Numerous Combined Cycle PP 600MW > 3500MW/ Coal Fired PP / Peaker
Single Cycle PP / Hydro Electric Power
Miscellaneous - LNGExport Terminals / GTL / Baltimore Airport PRT / Light Rail / Transmission &
Distribution
4. CH2M Hill Operations Leader and Sr. Project Manager 2001-2011
EPC Contractor responsibilities included building key relationships with a variety of constituencies
including but not limited to:
Clients, potential JV Partners,Stakeholders, and generally those who influence
decisions.
Creation and implementation of Division organizational structure,business plan, growth
objectives, profit, loss, revenue, budgets, business development
Managed,direction, guidance, mentoring and oversight to supervisory, and safety personnel,
motivating mangers to function as a cohesive organization.
Established company spirit, creativity and integrity, to produce maximum benefit to the company,
employee and community.
Development of an overall effective Division business development program.
Direction and participated in close the "sale" on large, strategic project pursuits, assisting in final
contract negotiations.
Monitored and analyzes operations with Managers and reported current work in progress and
workloads to corporate executives.
Oversaw of the company safety program for project safety in the working environment. Promotes
safety among subordinates. Ultimately responsible for the safety results.
Performed additional assignments as directed by corporate executives.
Organized multi-task and strong understanding of engineering and construction management to
facilitate and promote progressive communications. Pre-construction decisions, design review,
value engineer, establish risk & liability plan, constructability review, contract and change
order negotiations
Our marketplaces included but not limited to the following:
Airports / Transportation / Light & Heavy Rail
Environmental
Alternative Energy, Power Generation, Renewables,
Oil & Gas,
Transmission & Distribution,
Water / Wastewater
5. Contractor Experience
City ofLos Angeles – Hyperion Full Secondary Expansion. ProjectManager - Electrical / I&C
Scope/Description:
The facility expanded the wastewater capabilities from 160 to 640 million gallons per day of primary and
secondary treatment. Overall construction cost of the project totaled $2.4 billion when completed The
project encompassed a pre-cast structure with 80-foot invert two story elevation and one vertical of poured-
in-place concrete and placed structural steel.
Cost: $2.4B
Responsibilities: Managed the electrical and instrumentation work for seven years as part of this
facility expansion. Responsible for estimating, procuring materials and equipment; scheduling;
developing schedule of valves; managing payables and receivables; and developing and negotiating
more than $60 million in change orders.
C-111 WAS Thickening and Chemical Facility / C-112 Primary Batteries Modernization #2 & TSF
C-117 Hyperion Full Secondary Stage 2 / C-109 Hyperion Full Secondary Stage 1 / C-69 Digester
Modification / C-737 Truck Loading Facility / E-1101 Desulfurization Facility /
Division Maintenance Facility / North Outfall Facility / Steam Dryer Facility / DICE I & II
Industrial Division Manager,
Scope / Description:
Managed the electrical and instrumentation department for seven years. Responsible for safety,business
development, development key relationships, estimating, procuring materials and equipment; scheduling;
developing schedule of valves; managing payables and receivables; and developing and negotiating more
than $60 million in change orders.
Diemer Filtration Plant, Metropolitan Water Districts ofSouthern California.
Cargill Flour Mill Expansion (Design-Build)
Capital Milling Flour Mill Expansion (Design-Build)
Las Virgenes Water District. (Design-Build)
StringfellowFacility Cleanup. (Design- Build) (environmental)
Beverly Hills Water District (Design-Build)
Southern Cal Edison Petro-Chemical Facility
Arco (BP) Plant Expansion
Harbor Co-Generation Expansion (Design-Build)
Modesto Generation Facility
OCSD Co-Generation Facilities – 2000MWIC
Owens Lake Dust Mitigation – Air Quality Monitoring Stations
Transportation light rail systems (MTA – Blue, Red, Green lines), Highway
Electrical sub-stations & switchyards and street expansions
6. President / CEO / Owner
Scope / Description:
Responsible for creation & implementation of a start-up Contracting Company,
My responsibilities included building key relationships with a variety of constituencies
including but not limited to:
Clients, potential JV Partners,Stakeholders, and generally those who influence
decisions.
Creation and implementation of Company policies, procedures, organizational structure,
business plan, growth objectives, profit, loss, revenue, budgets, business development
Managed,direction, guidance, mentoring and oversight to executives, supervisory, and safety
personnel, motivating mangers to function as a cohesive organization.
Established company spirit, creativity and integrity, to produce maximum benefit to the company,
employee and community.
Development of an overall effective Company business development program.
Direction and participated in close the "sale" on large, strategic project pursuits, assisting in final
contract negotiations.
Established WBS / Company cost codes,procedures for estimating, bid reviews and pre-
construction meetings.
Monitored and analyzes operations with Managers and reported current work in progress and
workloads to corporate executives.
Oversaw of the company safety program director for safety in the working environment.
Promotes safety among subordinates. Ultimately responsible for the safety results.
Performed additional assignments as directed by corporate executives.
Local signing authority for bids, bonds and contracts.
ReferencesUponrequest: