SlideShare a Scribd company logo
OfficePLKAN CV Page1of 10
Kan Pak Loy
Personal Information: Contact Information :
Gender : Male Mobile :+ 6012 -2168571/011-33427498
Nationality : Malaysian Residence : +603 –80919385
Marital Status : Married E-mail : kanpakloy@gmail.com
WORK EXPERINCE / EMPLOYMENT HISTORY
1. Period of Employment : 1st January 2014 – March 2015
Tee Teh Oil Mill Sdn. Bhd.
Position Held : Assistant Mill Manager
Additional Qualification : 2nd Grade Steam Engineer
Certificate.
Company Profile : Palm oil Estate & Oil Mill.
Responsibilities :
Assist mill Manager on day to day operational aspects of milling process
including efficiency improvement, operational product quality together with
production control, utilization, product improvement, labour and security
control of mill.
 Involved in project work in installation of new machines and alteration
work in mill.
 Supervise repair work and suggest possible improvement on many of the
mill machineries & presses to reduce mill downtime.
 Take over store inventory and control to reduce operational stock level in
store.
 Supervise daily monitoring and operation of bio-gas plant and gas
engines in supplying electric power to mill.
 Monitor and control safety within mill to comply with OSHA
regulations.
2. Period of Employment : January 2012 – November 2013
Havy’s Oil Mill ,Bahau.
Position Held :Senior Project Engineer
Company Profile : Palm Oil Estate & Mill.
Responsibilities/Area of Expertise:
i) Testing Conducted on Mill Effluent (POME)
OfficePLKAN CV Page2of 10
Conduct experimental testing on the quality of mill effluent (POME) after
undergone anaerobic treatment pond by electrolytic charging method.
Aim of experiment is to achieve “Zero Discharge” from mill by reducing mill
waste water (POME) Chemical Oxygen Demand (COD) and Biological
Oxygen Demand (BOD) to an acceptable level by Malaysia Department of
Environment (DOE) to enable treated water can be recycle and re use in mill
for process purpose.
ii)Repair boiler furnace.
Took charge of project to repair boiler furnace, with in mill workers to
control quality.
iii) Steam Loss Study.
Steam from boilers unable to meet company’s Plant demand. Took charge
involving this issue.
iv) Liaison with Department of Environment (DOE).
Took charge of Project in liaison with various government department,,
Malaysia to built the effluent treatment plant to realize company’s aim to
achieved “Zero Discharge” from mill.
v)Supervision of Civil work.
Liaison with civil contractor on building new concrete ponds for effluent
treatment process from the mill.
vi) Composting of Mill Waste.
Help composting supervisor in general maintenance of the composting
machineries and bagging machineries used in the fertilizer division.
vii) Higher Education Training courses
Liaison with local University when conducting field training for their PhD.
students to complete their thesis on waste water treatment (POME) within
the palm oil industry.
1. A) Period of Employment : October 2010 – April 2012.(Retired at 55 years)
KNM Process Systems Berhad.
Position held Project Manager
Recall back to Malaysia due to excessive project
in Malaysia.
B)Period of Employment : December 2009 – September 2010
Name of Employer : FBM – KNM FZCO (Dubai - UAE)
(Subsidiary of FBM – Hudson Italiana, Italy)
OfficePLKAN CV Page3of 10
Position held : Project Manager
(Seconded to FBM-Hudson Italiana)
Company certification : ISO Certified by ABS (USA)
Company profile : Manufacturer of high
end pressure process equipment’s for Oil &Gas
and Petrochemical Industries.
C) Period of Employment : February 2007 – November 2009(< 2 year)
Name of Employer : KNM Process Systems Berhad
Position held : Project Manager
Company certification : ISO certified by ABS (M)
Company profile : Manufacturer of pressure equipment’s for Oil
& Gas & Petrochemical Industries.
Responsibilities/Area of Expertise :
i) Manage multiple projects relating to Oil & Gas and Petrochemical
Industries. Total projects handle in anyone time value worth USD +23
million.
ii) Handle the largest& heaviest single pressure vessel size – Diameter 12M x
110M Length x 1100Mt weight (recorded in Malaysia Guinness book of
record).
 Clients: Shell Eastern Petroleum Ltd.(Singapore), ABB- Lummus- Toyo
JV(Netherland), Shaw Stone & Webster(USA), CBI (USA), CBI-Clough
Singapore, Foster Wheeler(U.K), Daelim(Korea), Hamworthy Combustion
(Italy), Selas Fluid – Linde (Germany), Prosernat (France), Hanwha (Korea),
Exxon - Mobil Australia (Papua New Genea –PNG project).
 Relation & Technical Management: Resolve outstanding technical issues
speedily with clients and their appointed inspectors in Malaysia.
 Procurement Control: Monitor procurement of critical long lead items to
ensure compliance to specification plus timely delivery.
 Quality Management: Monitor and ensure Project quality documents are
developed and submitted to client as per schedule up to approval stage.
 Performance Reporting: Update regular project status reports plus any
technical design problems encountered during fabrication with client or their
representatives.
 Cost Control: Control cost to ensure project within budget and produce
monthly project budget report to higher management.
OfficePLKAN CV Page4of 10
 Project Coordination: Co-ordination with related departments to ensure
project work in progress comply to client’s specification and ongoing work
documents are up dated regularly for client review.
 Team Building: Organize meetings with project related team members to
ensure project contractual awareness and update team on newest
development.
 Commercial Awareness: Prepare estimation and proposal for Project change
negotiation with clients and ensure the change orders are correctly
documented and implemented.
 Planning: Prepare projects execution plan with supporting departments and
analyze on-going work with planning department.
 HSE Monitoring: Ensure Health & Safety Environment (HSE) is
implemented in work place together with Safety Manager.
2. Period of Employment: 2003 – 2006 (Completion of Contract)
Name of Employer : PT. Mechmar Jaya Industries, Medan, Indonesia.
Initial Position Held : General Manager (Operation) 2003- 2004
Last Position Held : Director (Operation) 2005 - 2006
Company certification : ISO certified by Lloyd’s Register (M).
Company profile : Manufacturer of Industrial fire tube boilers and
water tube boilers.
Responsibilities/Area of Expertise:
 Managed an industrial boiler plant with departmental managers plus 80
workers.
 Efficiency improvement with shorter fabrication time, improved quality plus
saving of 13% cost reduction on raw material and labor. The end results in
reversing two years of lost position of +RM 1 million within two years.
 Head the ISO team. Instituted and monitored rewriting of company’s
production and quality procedures to comply with ISO new requirements.
 Rules & Policies compliance. Implemented improve rules and procedures to
comply with the complicated Tax & Custom regulations in Indonesia,
eliminating yearly penalty of over RM 1 million from Tax & custom
government offices since year 2000.
OfficePLKAN CV Page5of 10
 Appealed to Indonesian Tax & Custom court. Reclaim back Tax & Custom on
past years penalties.
 Applied to government bodies for Tax Relief and Custom concession for
imported parts and components needed for manufacturing of boiler.
 Improved administrative control procedures within factory and site project
work with a reduction in stock variance within a year.
 Instituted recruitment and training of employees. Result in better overall co-
ordination and performance in all departments within two years.
 Planned and directed sales team(sales office in Medan & Jakarta) to exceed
forecast sales by over 10% yearly and to implement market risk management
control according to company’s approved policies and standards.
 Submit monthly report to Board in Malaysia on financial position of
company.
 Conduct monthly meeting with all departments to solve difficult issues.
 Planned yearly budget and control expenditure. Responsible for profit and
loss for Medan center.
 Gather market intelligence and feed back to head office of any new
development in Indonesian market plus proposal on counter action taken.
3. A. Period of Employment : Year 1999 – Year 2003 (4 years)
Name of Employer : FavelleFavco Cranes (M) Sdn. Bhd.
(subsidiary of Muhibbah Construction Bhd.)
Last Position Held : Senior Project Manager.
Company certification :American Petroleum Institute (API)
Certification.
Company Profile :Manufacture Tower cranes for construction
industries, RTG Cranes for container Port and
offshore cranes for oil Rigs
Responsibilities/Area of expertise:
B) Senior Project Manager – (January 2002 - January 2003)
 Seconded to Muhibbah Marine Sdn. Bhd. an ISO certified company by ABS.
OfficePLKAN CV Page6of 10
 Take charge of project for the repair of 200MT A-Frame barge crane to
salvage sunken ships from around the world from the sea for Titan Salvage
Ltd, USA.
 Co-ordinate with client, their designer and Third party Inspectors on work in
progress on feasible methods and procedures in the fabrication methods in
overcoming technical issues.
 Plan and implement repair work to be carried out.
 Monitor all procurement of essential materials to ensure compliance and
timely delivery.
 Source and negotiate with contractors on machining of critical & long lead
items to ensure it’s delivery is as planned schedule.
 Plan & monitor trial assembly of structures to ensure alignment.
Production Manager – (1999 – 2001)
 In charge of Production works for all offshore cranes, port cranes and
construction cranes.
 Plan and monitor fabrication work to ensure timely delivery, within budget
and as per specification.
 Review design drawings for possible fabrication problems and proposed
feed back to design office on remedial action to be taken.
 Control Man hours labor cost for fabrications.
 Secure and Evaluate vendors contract for construction projects.
 Plan & monitor trial assembly and testing of individual cranes manufactured.
 Liaise with Project Manager on new development for the various order
secured.
 Liaise with QA inspectors and client’s inspector on quality issues with
proposal on improvement.
 Take necessary actions to ensure HSE is maintain within factory.
 Support Site Erecting &Maintenance Manager on site work.
4. Period of Employment : 1993 – 1999
Name of Employer : Torsco Sdn. Bhd.
(Subsidiary of IJM Construction Berhad).
Last Position held : Assistant Project/Production Manager.
OfficePLKAN CV Page7of 10
Company certification :ISO certified company by SIRIM (M)
Company Profile : Design and fabrication work for all types of on shore and
off shore structures plus other related metal works.
Responsibilities/Areas of expertise:
Assistant Project/ Production Manager – (1995 to 1999)
 Managed Torsco, Lumut Plant No.2 Malaysia.
 Take charge of factory fabrication work for projects in hand to ensure timely
delivery and as per specification.
 Liaise with clients and appointed inspectors to speedily resolve technical
issues.
 Conduct regular meeting with project team to coordinate work and build
team work.
 Monitor cost to ensure within budget.
 Quote and implement change Order.
 Arrange & supervise transportation of finished items to site.
Project Engineer (1993 – 1994)
 Managed projects in Ipoh Torsco Plant No. 1, Malaysia.
 In charge of overall performance of project assigned to ensure timely
completion and smooth hand over to clients.
 Projects handled:
o Fabrication of cooling water pipes for Segari Power Plant - Lumut,
Malaysia.
o Monitor and control Cooling water Intake head for Turbine & structures
for Segari Power Electric Power Plant – Lumut, Malaysia .
o Fabrication of Container Cranes Structures for oversea main contractor.
o Fabrication of pressure vessels for Petronas Gas refineries.
o Fabrication of Water Gates for Pergau Hydro Power plant in Kelantan,
Malaysia.
o Fabrication of structures & rolling kiln shell for Ipoh cement plant for
main contractor, IHI Japan.
o Manufacture of Heat exchangers.
OfficePLKAN CV Page8of 10
 Clients
o KeaverBoving Ltd.UK.
o Mitsubishi Heavy Industries, Japan
o Chiyoda, Japan
o Foster Wheeler, UK.
o ABB Power Plant Division, USA.
o IHI, Japan
o Petronas, Malaysia
o Impsa Crane, Argentina
o Morris Mechanical Handling Industries, UK.
5. Period of Employment : 1979 – 1980 (1 1/2 years)
Name of Employer : Far East Industries.
Last Position held : Apprentice Mould Maker
Company Profile : Company produces and sell general house hold plastic
items for local market. It has a mould making department to make steel
mould for its own use.
Job Scope : Operate various workshop machines (i.e lathes, milling& shaping
machines) in the mould making process plus mould repair.
COURSES/TRAINING
 Business Enterprise Course (4 weeks course – 1992)
 Use of Microsoft Project software.
EDUCATION
 Bachelor of Engineering (Mechanical)
Thames Polytechnic, (University of Greenwich) London, England.
Graduated year 1990.
 Higher National Diploma in Engineering (Mechanical)
South Bank Polytechnic, (South Bank University) London, England.
Full Time Practical Training in Hackney Technical College on Manufacturing
Engineering for Professional Engineers.
Graduated year 1986.
OfficePLKAN CV Page9of 10
 Ordinary National Diploma (Technology)
Medway Collage of Higher & Further Education, (Mid-Kent College) Kent,
England.
Graduated year 1981.
 Diploma in Technology (Mechanical)
Institute Technology Negeri, Perak,.
(Course on Workshop Technology, Automobile Engineering and General
Mechanical Engineering)
Year Graduated: 1979.
 Additional Qualification
i) Obtained 2nd Grade Certificate Steam Certificate.
ii) Is applying for 1st Grade Steam Certificate in 2015
EXPERINCE SUMMARY
iii) Experience professional with over 30 years in projects and plant
management.
iv) Sales and customers relation management.
v) Commercial awareness.
vi) Team player with ability to multi task.
vii) Oversea experience.
viii) Distribution and Productivity improvement.
ix) Problem Identification & Solution implementation.
x) Schedule and Budget Control (P & L) accountability.
xi) Quality deliverable.
OTHER SKILLS
Computer Literate :
 Microsoft Office
 Microsoft Project
 Auto Cad
OfficePLKAN CV Page10of 10
ADDITIONAL INFORMATION
Languages : English, Bahasa Malaysia, Bahasa Indonesia, Chinese
Reference:
1. Lim Meng Hong 2) David Lim
Management Consultant Executive Director
TeeTeh Sdn Bhd Havys Oil Mill Sdn Berhad
PO Box 54 Segamat Johore. C/O Paramount Estate KM 31
H/p Nol : 6019-8336575 Bahau Keratong Highway,
Karung Berkunci No. 4
Hp No:6019-217-7798.

More Related Content

What's hot

Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)
Khalid Eltahir
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site Engineer
SOHAIL SHAH
 
CV of Tahir Mahmood
CV of Tahir MahmoodCV of Tahir Mahmood
CV of Tahir Mahmood
Tahir Mahmood
 
MEP Supervisor
MEP SupervisorMEP Supervisor
MEP Supervisor
Arun Arun
 
Civil Engineer - CV
Civil Engineer - CVCivil Engineer - CV
Civil Engineer - CV
Mohammad Issa
 
CV CIVIL ENGINEER
CV CIVIL ENGINEERCV CIVIL ENGINEER
CV CIVIL ENGINEER
Muhammed Shafi
 
Nawaz Safety Officer CV
Nawaz Safety Officer CVNawaz Safety Officer CV
Nawaz Safety Officer CV
Rahmat Nawaz
 
Mr. fateh Sarhan corporate HSE Manager -update cv
Mr. fateh  Sarhan  corporate HSE Manager -update cvMr. fateh  Sarhan  corporate HSE Manager -update cv
Mr. fateh Sarhan corporate HSE Manager -update cv
Fateh Sarhan
 
Sajid CV BE Civil 2007
Sajid CV BE Civil 2007Sajid CV BE Civil 2007
Sajid CV BE Civil 2007
sajid hasan
 
Muthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdfMuthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdf
MUTHUKUMAR428109
 
Senior Electrical Engineer CV
Senior Electrical Engineer CVSenior Electrical Engineer CV
Senior Electrical Engineer CV
Hosam Elbanna
 
Nawab civil supervisor cv
Nawab civil supervisor cvNawab civil supervisor cv
Nawab civil supervisor cv
WasimIqbal28
 
Mechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire FightingMechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire Fighting
Hazem Mahdy
 
Nazim cv Camp Boss
Nazim cv  Camp BossNazim cv  Camp Boss
Nazim cv Camp Boss
nazim ahmed
 
GURUDEV S M - 2016
GURUDEV S M - 2016GURUDEV S M - 2016
GURUDEV S M - 2016
GURUDEV S M
 
CV_CIVIL ENGINEER_JOEMAR
CV_CIVIL ENGINEER_JOEMARCV_CIVIL ENGINEER_JOEMAR
CV_CIVIL ENGINEER_JOEMAR
Joemar Ramos
 
Updated CV - Aquib Pagarkar - June 2015
Updated CV - Aquib Pagarkar - June 2015Updated CV - Aquib Pagarkar - June 2015
Updated CV - Aquib Pagarkar - June 2015
Aquib Pagarkar
 
Danish CV Electrician
Danish CV ElectricianDanish CV Electrician
Danish CV Electrician
DANISH AKSAR
 
CV ELECTRICIAN ( UPDATED )zamir
CV ELECTRICIAN ( UPDATED )zamirCV ELECTRICIAN ( UPDATED )zamir
CV ELECTRICIAN ( UPDATED )zamir
MUHAMMAD ZAMIR
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
Mostafa Sayed
 

What's hot (20)

Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site Engineer
 
CV of Tahir Mahmood
CV of Tahir MahmoodCV of Tahir Mahmood
CV of Tahir Mahmood
 
MEP Supervisor
MEP SupervisorMEP Supervisor
MEP Supervisor
 
Civil Engineer - CV
Civil Engineer - CVCivil Engineer - CV
Civil Engineer - CV
 
CV CIVIL ENGINEER
CV CIVIL ENGINEERCV CIVIL ENGINEER
CV CIVIL ENGINEER
 
Nawaz Safety Officer CV
Nawaz Safety Officer CVNawaz Safety Officer CV
Nawaz Safety Officer CV
 
Mr. fateh Sarhan corporate HSE Manager -update cv
Mr. fateh  Sarhan  corporate HSE Manager -update cvMr. fateh  Sarhan  corporate HSE Manager -update cv
Mr. fateh Sarhan corporate HSE Manager -update cv
 
Sajid CV BE Civil 2007
Sajid CV BE Civil 2007Sajid CV BE Civil 2007
Sajid CV BE Civil 2007
 
Muthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdfMuthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdf
 
Senior Electrical Engineer CV
Senior Electrical Engineer CVSenior Electrical Engineer CV
Senior Electrical Engineer CV
 
Nawab civil supervisor cv
Nawab civil supervisor cvNawab civil supervisor cv
Nawab civil supervisor cv
 
Mechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire FightingMechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire Fighting
 
Nazim cv Camp Boss
Nazim cv  Camp BossNazim cv  Camp Boss
Nazim cv Camp Boss
 
GURUDEV S M - 2016
GURUDEV S M - 2016GURUDEV S M - 2016
GURUDEV S M - 2016
 
CV_CIVIL ENGINEER_JOEMAR
CV_CIVIL ENGINEER_JOEMARCV_CIVIL ENGINEER_JOEMAR
CV_CIVIL ENGINEER_JOEMAR
 
Updated CV - Aquib Pagarkar - June 2015
Updated CV - Aquib Pagarkar - June 2015Updated CV - Aquib Pagarkar - June 2015
Updated CV - Aquib Pagarkar - June 2015
 
Danish CV Electrician
Danish CV ElectricianDanish CV Electrician
Danish CV Electrician
 
CV ELECTRICIAN ( UPDATED )zamir
CV ELECTRICIAN ( UPDATED )zamirCV ELECTRICIAN ( UPDATED )zamir
CV ELECTRICIAN ( UPDATED )zamir
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
 

Viewers also liked

CV
CVCV
Rafid CV
Rafid CVRafid CV
Rafid CV
rafid zwain
 
Ammar cv 1
Ammar cv 1Ammar cv 1
Ammar cv 1
ammar imran
 
aqeel shaikh CV IRAQ
aqeel shaikh CV IRAQaqeel shaikh CV IRAQ
aqeel shaikh CV IRAQ
Aqeel Shaikh
 
High Tunnel Caneberry Production - NARBA 2015
High Tunnel Caneberry Production - NARBA 2015High Tunnel Caneberry Production - NARBA 2015
High Tunnel Caneberry Production - NARBA 2015
Luke Freeman
 
Andryaas Project Manager Cv 2012
Andryaas Project Manager Cv 2012Andryaas Project Manager Cv 2012
Andryaas Project Manager Cv 2012
Andryaas Mamuaya
 
Heat Tracing - Fire Protection Association's RC38 Recommendation for Frost Pr...
Heat Tracing - Fire Protection Association's RC38 Recommendation for Frost Pr...Heat Tracing - Fire Protection Association's RC38 Recommendation for Frost Pr...
Heat Tracing - Fire Protection Association's RC38 Recommendation for Frost Pr...
Thorne & Derrick UK
 
CV
CVCV
V Simpson Senior Project Manager Resume v 2
V Simpson Senior Project Manager Resume v 2V Simpson Senior Project Manager Resume v 2
V Simpson Senior Project Manager Resume v 2
Vicci Simpson
 
OMRAN CV
OMRAN CVOMRAN CV
Barrie Dennis Resume
Barrie Dennis ResumeBarrie Dennis Resume
Barrie Dennis Resume
Barrie Dennis
 
CV-Juan Bernardino.June 2016
CV-Juan Bernardino.June 2016CV-Juan Bernardino.June 2016
CV-Juan Bernardino.June 2016
Juan Jr. Bernardino
 

Viewers also liked (12)

CV
CVCV
CV
 
Rafid CV
Rafid CVRafid CV
Rafid CV
 
Ammar cv 1
Ammar cv 1Ammar cv 1
Ammar cv 1
 
aqeel shaikh CV IRAQ
aqeel shaikh CV IRAQaqeel shaikh CV IRAQ
aqeel shaikh CV IRAQ
 
High Tunnel Caneberry Production - NARBA 2015
High Tunnel Caneberry Production - NARBA 2015High Tunnel Caneberry Production - NARBA 2015
High Tunnel Caneberry Production - NARBA 2015
 
Andryaas Project Manager Cv 2012
Andryaas Project Manager Cv 2012Andryaas Project Manager Cv 2012
Andryaas Project Manager Cv 2012
 
Heat Tracing - Fire Protection Association's RC38 Recommendation for Frost Pr...
Heat Tracing - Fire Protection Association's RC38 Recommendation for Frost Pr...Heat Tracing - Fire Protection Association's RC38 Recommendation for Frost Pr...
Heat Tracing - Fire Protection Association's RC38 Recommendation for Frost Pr...
 
CV
CVCV
CV
 
V Simpson Senior Project Manager Resume v 2
V Simpson Senior Project Manager Resume v 2V Simpson Senior Project Manager Resume v 2
V Simpson Senior Project Manager Resume v 2
 
OMRAN CV
OMRAN CVOMRAN CV
OMRAN CV
 
Barrie Dennis Resume
Barrie Dennis ResumeBarrie Dennis Resume
Barrie Dennis Resume
 
CV-Juan Bernardino.June 2016
CV-Juan Bernardino.June 2016CV-Juan Bernardino.June 2016
CV-Juan Bernardino.June 2016
 

Similar to CV 1

mohamed alaa C V
mohamed alaa C Vmohamed alaa C V
mohamed alaa C V
mohamed alaa fahmy
 
Circulem viate
Circulem viateCirculem viate
Circulem viate
Alkhatim Alrasheed
 
MOHAMMED IMRAN_CV_O&M
MOHAMMED IMRAN_CV_O&MMOHAMMED IMRAN_CV_O&M
MOHAMMED IMRAN_CV_O&M
Mohammed Imran
 
MOHAMMED IMRAN_CV_O&M
MOHAMMED IMRAN_CV_O&MMOHAMMED IMRAN_CV_O&M
MOHAMMED IMRAN_CV_O&M
Mohammed Imran
 
PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015
gufron gufron
 
CV
CVCV
Venugopala Rao resume
Venugopala Rao resumeVenugopala Rao resume
Venugopala Rao resume
Munagala Venugopala Rao
 
Cv qa qc 15th july m
Cv qa qc 15th july mCv qa qc 15th july m
Cv qa qc 15th july m
Michael Corcoran
 
Cv qa qc 15th july m
Cv qa qc 15th july mCv qa qc 15th july m
Cv qa qc 15th july m
Michael Corcoran
 
Arun Goyle resume
Arun Goyle resumeArun Goyle resume
Arun Goyle resume
Arun Goyle
 
Arun Goyle resume
Arun Goyle resumeArun Goyle resume
Arun Goyle resume
Arun Goyle
 
vinoth-projects
vinoth-projectsvinoth-projects
vinoth-projects
Vinoth Kumar
 
Resume
ResumeResume
Resume
Abdul Rauf
 
Mohamed El Sayed - Updated CV Nov. 2015
Mohamed El Sayed - Updated CV Nov. 2015Mohamed El Sayed - Updated CV Nov. 2015
Mohamed El Sayed - Updated CV Nov. 2015
Mohamed Elsayed
 
Peter cv
Peter cvPeter cv
Peter cv
peter nganga
 
Ahmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil CV & Resume
Ahmed Khalil CV & Resume
Ahmed Khalil
 
Resume - Pawat Suwantanut
Resume - Pawat SuwantanutResume - Pawat Suwantanut
Resume - Pawat Suwantanut
Pawat Suwantanut
 
CV Czech
CV CzechCV Czech
CV Czech
John Power
 
pk
pkpk
pk
pkpk

Similar to CV 1 (20)

mohamed alaa C V
mohamed alaa C Vmohamed alaa C V
mohamed alaa C V
 
Circulem viate
Circulem viateCirculem viate
Circulem viate
 
MOHAMMED IMRAN_CV_O&M
MOHAMMED IMRAN_CV_O&MMOHAMMED IMRAN_CV_O&M
MOHAMMED IMRAN_CV_O&M
 
MOHAMMED IMRAN_CV_O&M
MOHAMMED IMRAN_CV_O&MMOHAMMED IMRAN_CV_O&M
MOHAMMED IMRAN_CV_O&M
 
PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015
 
CV
CVCV
CV
 
Venugopala Rao resume
Venugopala Rao resumeVenugopala Rao resume
Venugopala Rao resume
 
Cv qa qc 15th july m
Cv qa qc 15th july mCv qa qc 15th july m
Cv qa qc 15th july m
 
Cv qa qc 15th july m
Cv qa qc 15th july mCv qa qc 15th july m
Cv qa qc 15th july m
 
Arun Goyle resume
Arun Goyle resumeArun Goyle resume
Arun Goyle resume
 
Arun Goyle resume
Arun Goyle resumeArun Goyle resume
Arun Goyle resume
 
vinoth-projects
vinoth-projectsvinoth-projects
vinoth-projects
 
Resume
ResumeResume
Resume
 
Mohamed El Sayed - Updated CV Nov. 2015
Mohamed El Sayed - Updated CV Nov. 2015Mohamed El Sayed - Updated CV Nov. 2015
Mohamed El Sayed - Updated CV Nov. 2015
 
Peter cv
Peter cvPeter cv
Peter cv
 
Ahmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil CV & Resume
Ahmed Khalil CV & Resume
 
Resume - Pawat Suwantanut
Resume - Pawat SuwantanutResume - Pawat Suwantanut
Resume - Pawat Suwantanut
 
CV Czech
CV CzechCV Czech
CV Czech
 
pk
pkpk
pk
 
pk
pkpk
pk
 

CV 1

  • 1. OfficePLKAN CV Page1of 10 Kan Pak Loy Personal Information: Contact Information : Gender : Male Mobile :+ 6012 -2168571/011-33427498 Nationality : Malaysian Residence : +603 –80919385 Marital Status : Married E-mail : kanpakloy@gmail.com WORK EXPERINCE / EMPLOYMENT HISTORY 1. Period of Employment : 1st January 2014 – March 2015 Tee Teh Oil Mill Sdn. Bhd. Position Held : Assistant Mill Manager Additional Qualification : 2nd Grade Steam Engineer Certificate. Company Profile : Palm oil Estate & Oil Mill. Responsibilities : Assist mill Manager on day to day operational aspects of milling process including efficiency improvement, operational product quality together with production control, utilization, product improvement, labour and security control of mill.  Involved in project work in installation of new machines and alteration work in mill.  Supervise repair work and suggest possible improvement on many of the mill machineries & presses to reduce mill downtime.  Take over store inventory and control to reduce operational stock level in store.  Supervise daily monitoring and operation of bio-gas plant and gas engines in supplying electric power to mill.  Monitor and control safety within mill to comply with OSHA regulations. 2. Period of Employment : January 2012 – November 2013 Havy’s Oil Mill ,Bahau. Position Held :Senior Project Engineer Company Profile : Palm Oil Estate & Mill. Responsibilities/Area of Expertise: i) Testing Conducted on Mill Effluent (POME)
  • 2. OfficePLKAN CV Page2of 10 Conduct experimental testing on the quality of mill effluent (POME) after undergone anaerobic treatment pond by electrolytic charging method. Aim of experiment is to achieve “Zero Discharge” from mill by reducing mill waste water (POME) Chemical Oxygen Demand (COD) and Biological Oxygen Demand (BOD) to an acceptable level by Malaysia Department of Environment (DOE) to enable treated water can be recycle and re use in mill for process purpose. ii)Repair boiler furnace. Took charge of project to repair boiler furnace, with in mill workers to control quality. iii) Steam Loss Study. Steam from boilers unable to meet company’s Plant demand. Took charge involving this issue. iv) Liaison with Department of Environment (DOE). Took charge of Project in liaison with various government department,, Malaysia to built the effluent treatment plant to realize company’s aim to achieved “Zero Discharge” from mill. v)Supervision of Civil work. Liaison with civil contractor on building new concrete ponds for effluent treatment process from the mill. vi) Composting of Mill Waste. Help composting supervisor in general maintenance of the composting machineries and bagging machineries used in the fertilizer division. vii) Higher Education Training courses Liaison with local University when conducting field training for their PhD. students to complete their thesis on waste water treatment (POME) within the palm oil industry. 1. A) Period of Employment : October 2010 – April 2012.(Retired at 55 years) KNM Process Systems Berhad. Position held Project Manager Recall back to Malaysia due to excessive project in Malaysia. B)Period of Employment : December 2009 – September 2010 Name of Employer : FBM – KNM FZCO (Dubai - UAE) (Subsidiary of FBM – Hudson Italiana, Italy)
  • 3. OfficePLKAN CV Page3of 10 Position held : Project Manager (Seconded to FBM-Hudson Italiana) Company certification : ISO Certified by ABS (USA) Company profile : Manufacturer of high end pressure process equipment’s for Oil &Gas and Petrochemical Industries. C) Period of Employment : February 2007 – November 2009(< 2 year) Name of Employer : KNM Process Systems Berhad Position held : Project Manager Company certification : ISO certified by ABS (M) Company profile : Manufacturer of pressure equipment’s for Oil & Gas & Petrochemical Industries. Responsibilities/Area of Expertise : i) Manage multiple projects relating to Oil & Gas and Petrochemical Industries. Total projects handle in anyone time value worth USD +23 million. ii) Handle the largest& heaviest single pressure vessel size – Diameter 12M x 110M Length x 1100Mt weight (recorded in Malaysia Guinness book of record).  Clients: Shell Eastern Petroleum Ltd.(Singapore), ABB- Lummus- Toyo JV(Netherland), Shaw Stone & Webster(USA), CBI (USA), CBI-Clough Singapore, Foster Wheeler(U.K), Daelim(Korea), Hamworthy Combustion (Italy), Selas Fluid – Linde (Germany), Prosernat (France), Hanwha (Korea), Exxon - Mobil Australia (Papua New Genea –PNG project).  Relation & Technical Management: Resolve outstanding technical issues speedily with clients and their appointed inspectors in Malaysia.  Procurement Control: Monitor procurement of critical long lead items to ensure compliance to specification plus timely delivery.  Quality Management: Monitor and ensure Project quality documents are developed and submitted to client as per schedule up to approval stage.  Performance Reporting: Update regular project status reports plus any technical design problems encountered during fabrication with client or their representatives.  Cost Control: Control cost to ensure project within budget and produce monthly project budget report to higher management.
  • 4. OfficePLKAN CV Page4of 10  Project Coordination: Co-ordination with related departments to ensure project work in progress comply to client’s specification and ongoing work documents are up dated regularly for client review.  Team Building: Organize meetings with project related team members to ensure project contractual awareness and update team on newest development.  Commercial Awareness: Prepare estimation and proposal for Project change negotiation with clients and ensure the change orders are correctly documented and implemented.  Planning: Prepare projects execution plan with supporting departments and analyze on-going work with planning department.  HSE Monitoring: Ensure Health & Safety Environment (HSE) is implemented in work place together with Safety Manager. 2. Period of Employment: 2003 – 2006 (Completion of Contract) Name of Employer : PT. Mechmar Jaya Industries, Medan, Indonesia. Initial Position Held : General Manager (Operation) 2003- 2004 Last Position Held : Director (Operation) 2005 - 2006 Company certification : ISO certified by Lloyd’s Register (M). Company profile : Manufacturer of Industrial fire tube boilers and water tube boilers. Responsibilities/Area of Expertise:  Managed an industrial boiler plant with departmental managers plus 80 workers.  Efficiency improvement with shorter fabrication time, improved quality plus saving of 13% cost reduction on raw material and labor. The end results in reversing two years of lost position of +RM 1 million within two years.  Head the ISO team. Instituted and monitored rewriting of company’s production and quality procedures to comply with ISO new requirements.  Rules & Policies compliance. Implemented improve rules and procedures to comply with the complicated Tax & Custom regulations in Indonesia, eliminating yearly penalty of over RM 1 million from Tax & custom government offices since year 2000.
  • 5. OfficePLKAN CV Page5of 10  Appealed to Indonesian Tax & Custom court. Reclaim back Tax & Custom on past years penalties.  Applied to government bodies for Tax Relief and Custom concession for imported parts and components needed for manufacturing of boiler.  Improved administrative control procedures within factory and site project work with a reduction in stock variance within a year.  Instituted recruitment and training of employees. Result in better overall co- ordination and performance in all departments within two years.  Planned and directed sales team(sales office in Medan & Jakarta) to exceed forecast sales by over 10% yearly and to implement market risk management control according to company’s approved policies and standards.  Submit monthly report to Board in Malaysia on financial position of company.  Conduct monthly meeting with all departments to solve difficult issues.  Planned yearly budget and control expenditure. Responsible for profit and loss for Medan center.  Gather market intelligence and feed back to head office of any new development in Indonesian market plus proposal on counter action taken. 3. A. Period of Employment : Year 1999 – Year 2003 (4 years) Name of Employer : FavelleFavco Cranes (M) Sdn. Bhd. (subsidiary of Muhibbah Construction Bhd.) Last Position Held : Senior Project Manager. Company certification :American Petroleum Institute (API) Certification. Company Profile :Manufacture Tower cranes for construction industries, RTG Cranes for container Port and offshore cranes for oil Rigs Responsibilities/Area of expertise: B) Senior Project Manager – (January 2002 - January 2003)  Seconded to Muhibbah Marine Sdn. Bhd. an ISO certified company by ABS.
  • 6. OfficePLKAN CV Page6of 10  Take charge of project for the repair of 200MT A-Frame barge crane to salvage sunken ships from around the world from the sea for Titan Salvage Ltd, USA.  Co-ordinate with client, their designer and Third party Inspectors on work in progress on feasible methods and procedures in the fabrication methods in overcoming technical issues.  Plan and implement repair work to be carried out.  Monitor all procurement of essential materials to ensure compliance and timely delivery.  Source and negotiate with contractors on machining of critical & long lead items to ensure it’s delivery is as planned schedule.  Plan & monitor trial assembly of structures to ensure alignment. Production Manager – (1999 – 2001)  In charge of Production works for all offshore cranes, port cranes and construction cranes.  Plan and monitor fabrication work to ensure timely delivery, within budget and as per specification.  Review design drawings for possible fabrication problems and proposed feed back to design office on remedial action to be taken.  Control Man hours labor cost for fabrications.  Secure and Evaluate vendors contract for construction projects.  Plan & monitor trial assembly and testing of individual cranes manufactured.  Liaise with Project Manager on new development for the various order secured.  Liaise with QA inspectors and client’s inspector on quality issues with proposal on improvement.  Take necessary actions to ensure HSE is maintain within factory.  Support Site Erecting &Maintenance Manager on site work. 4. Period of Employment : 1993 – 1999 Name of Employer : Torsco Sdn. Bhd. (Subsidiary of IJM Construction Berhad). Last Position held : Assistant Project/Production Manager.
  • 7. OfficePLKAN CV Page7of 10 Company certification :ISO certified company by SIRIM (M) Company Profile : Design and fabrication work for all types of on shore and off shore structures plus other related metal works. Responsibilities/Areas of expertise: Assistant Project/ Production Manager – (1995 to 1999)  Managed Torsco, Lumut Plant No.2 Malaysia.  Take charge of factory fabrication work for projects in hand to ensure timely delivery and as per specification.  Liaise with clients and appointed inspectors to speedily resolve technical issues.  Conduct regular meeting with project team to coordinate work and build team work.  Monitor cost to ensure within budget.  Quote and implement change Order.  Arrange & supervise transportation of finished items to site. Project Engineer (1993 – 1994)  Managed projects in Ipoh Torsco Plant No. 1, Malaysia.  In charge of overall performance of project assigned to ensure timely completion and smooth hand over to clients.  Projects handled: o Fabrication of cooling water pipes for Segari Power Plant - Lumut, Malaysia. o Monitor and control Cooling water Intake head for Turbine & structures for Segari Power Electric Power Plant – Lumut, Malaysia . o Fabrication of Container Cranes Structures for oversea main contractor. o Fabrication of pressure vessels for Petronas Gas refineries. o Fabrication of Water Gates for Pergau Hydro Power plant in Kelantan, Malaysia. o Fabrication of structures & rolling kiln shell for Ipoh cement plant for main contractor, IHI Japan. o Manufacture of Heat exchangers.
  • 8. OfficePLKAN CV Page8of 10  Clients o KeaverBoving Ltd.UK. o Mitsubishi Heavy Industries, Japan o Chiyoda, Japan o Foster Wheeler, UK. o ABB Power Plant Division, USA. o IHI, Japan o Petronas, Malaysia o Impsa Crane, Argentina o Morris Mechanical Handling Industries, UK. 5. Period of Employment : 1979 – 1980 (1 1/2 years) Name of Employer : Far East Industries. Last Position held : Apprentice Mould Maker Company Profile : Company produces and sell general house hold plastic items for local market. It has a mould making department to make steel mould for its own use. Job Scope : Operate various workshop machines (i.e lathes, milling& shaping machines) in the mould making process plus mould repair. COURSES/TRAINING  Business Enterprise Course (4 weeks course – 1992)  Use of Microsoft Project software. EDUCATION  Bachelor of Engineering (Mechanical) Thames Polytechnic, (University of Greenwich) London, England. Graduated year 1990.  Higher National Diploma in Engineering (Mechanical) South Bank Polytechnic, (South Bank University) London, England. Full Time Practical Training in Hackney Technical College on Manufacturing Engineering for Professional Engineers. Graduated year 1986.
  • 9. OfficePLKAN CV Page9of 10  Ordinary National Diploma (Technology) Medway Collage of Higher & Further Education, (Mid-Kent College) Kent, England. Graduated year 1981.  Diploma in Technology (Mechanical) Institute Technology Negeri, Perak,. (Course on Workshop Technology, Automobile Engineering and General Mechanical Engineering) Year Graduated: 1979.  Additional Qualification i) Obtained 2nd Grade Certificate Steam Certificate. ii) Is applying for 1st Grade Steam Certificate in 2015 EXPERINCE SUMMARY iii) Experience professional with over 30 years in projects and plant management. iv) Sales and customers relation management. v) Commercial awareness. vi) Team player with ability to multi task. vii) Oversea experience. viii) Distribution and Productivity improvement. ix) Problem Identification & Solution implementation. x) Schedule and Budget Control (P & L) accountability. xi) Quality deliverable. OTHER SKILLS Computer Literate :  Microsoft Office  Microsoft Project  Auto Cad
  • 10. OfficePLKAN CV Page10of 10 ADDITIONAL INFORMATION Languages : English, Bahasa Malaysia, Bahasa Indonesia, Chinese Reference: 1. Lim Meng Hong 2) David Lim Management Consultant Executive Director TeeTeh Sdn Bhd Havys Oil Mill Sdn Berhad PO Box 54 Segamat Johore. C/O Paramount Estate KM 31 H/p Nol : 6019-8336575 Bahau Keratong Highway, Karung Berkunci No. 4 Hp No:6019-217-7798.