July 14, 2015 Page: 1 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3 History and Rationale
July 14, 2015
July 14, 2015 Page: 2 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SESSION OVERVIEW
• ABOUT ME
• SCOPE AND LEARNING OBJECTIVES
• COURSE AGENDA
• HL7 V3 HISTORY AND RATIONALE
• Q&A
July 13, 2015 Page: 3 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
About Me
• I have been, and continue to be,
an active member of HL7 since
1991.
• I currently co-chair the HL7
Modeling and Methodology
Workgroup.
• My HL7 History:
o Chaired the HL7 Education
Workgroup from 1996 to 2010.
o Received the HL7 volunteer of
the year award in 1997
o Served on the HL7 Board of
Directors from 2000 to 2005
o Board appointed member of the
HL7 ARB since 2001and ARB
modeling facilitator since 2012
o Received the HL7 Fellowship
award in 2012
AbdulMalik Shakir
President and Chief Informatics Scientist
Hi3 Solutions | your healthcare standards conformance partner
3500 West Olive Ave, Suite # 300, Burbank, CA 91505.
July 14, 2015 Page: 4 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Scope and Learning Objectives
• Scope - an introduction to HL7’s health information
exchange standards:
 HL7 Family of Standards
 HL7 v2 Messaging (v2)
 HL7 v3 Messaging (v3)
 HL7 v3 Clinical Document Architecture (CDA)
 HL7 Compliance and Conformance Specification
• Learning Objectives –
 To better understand the business case for HL7,
 Gain familiarity with the full suite of HL7 standards,
 Receive an in-depth overview of the HL7 information exchange standards
Course Agenda
July 13, 2015 July 14, 2015
• 09:00 – 09:30 Introductions and
Course Overview
• 09:30 – 10:30 Health Level Seven
and the HL7 Family of
Standards
 10:30 – 10:45 Break
• 10:45 – 12:00 HL7 v2 Abstract
Message Definition
 12:00 - 12:30 Break
• 12:30 – 02:00 HL7 v2 Message
Construction Rules
 02:00 - 02:15 Break
• 02:15 – 03:30 Local Extensions and
inter-version Compatibility
• 03:30 – 04:00 HL7 v2 Retrospective
• 09:00 – 09:30 HL7 v3 History and
Rationale
• 09:30 – 10:30 HL7 v3 Development
Frameworks and
Architectures
 10:30 – 10:45 Break
• 10:45 – 12:00 HL7 v3 Messaging Artifacts
 12:00 - 12:30 Break
• 12:30 – 02:00 HL7 v3 Clinical Document
Architecture
 02:00 - 02:15 Break
• 02:15 – 03:30 HL7 Standards Compliance
and Profile Conformance
• 03:30 – 04:00 HL7 v3 Retrospective
July 14, 2015 Page: 6 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 V3 HISTORY AND RATIONALE
July 14, 2015 Page: 7 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
International
National
Inter-Enterprise
Enterprise
Institution
Ever-Increasing Circles
Source: Gartner
July 14, 2015 Page: 8 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3 Messaging
 HL7 Version 3 (V3) introduced a common Reference
Information Model (RIM), data type model and set of
vocabulary as well as a formal standards
development methodology.
 In addition, it introduced the use of "documents" as
an alternative architecture for sharing healthcare
information. However, the term "V3" is typically used
to refer to "V3 messaging".
 The data types used as a basis for V3 have also
been adopted by ISO as ISO 21090. The HL7 RIM
has also been adopted as an ISO standard.
July 14, 2015 Page: 9 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
World-class System Interface Standards
 The HL7 v3.0 messaging standard is not a replacement for
HL7 v2.0; it is an alternative specification providing enhanced
capabilities.
 New versions of HL7 v2.x will continue to be developed for as
long as it continues to address the needs of HL7 members
and the healthcare community in general.
 HL7 v3.0 uses a model driven methodology and includes
specifications for messaging and non-messaging standards.
 The community of users served by HL7 is continually
increasing in size. As the size of the community
increases so does the complexity and the diversity of
their needs.
 HL7 v3.0 increases the quality and reduces the variability
in HL7 standards enabling it to address the more
complex and diverse needs of the HL7 members.
July 14, 2015 Page: 10 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 Version 3.0: What and Why
 Version 3.0 is a fundamental shift in the methodology HL7
uses to develop its standards specifications.
 Version 3.0 is a model-driven methodology based upon the
Object Management Group’s Unified Modeling Language
(UML).
 Version 3.0 uses datatype specifications, vocabulary
specifications, and a Reference Information Model (RIM), to
derive the information component of V3 message
specifications.
 Version 3.0 reduces optionality, maximizes reuse, and
increases consistency in HL7 message specifications.
 Version 3.0 improves the quality of HL7 message
specifications and includes support for conformance
validation.
 Version 3.0 enables HL7 implementers to leverage emerging
July 14, 2015 Page: 11 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Difficulties with the Existing HL7 v2.x Process
 The HL7 V2.x development process is entirely ad hoc.
There is no explicit methodology.
 Members receive no formal guidance in constructing
messages. Trigger events and data fields are described
solely in natural language.
 The structural relationships among data fields are not
clear. Segments are reused in many messages and
message definitions are reused for many trigger events.
 In order to accommodate this extensive reuse, most data
fields are optional. Chapters are inconsistent in their use
of trigger events versus status codes.
July 14, 2015 Page: 12 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Opportunities to Improve
 HL7 spent four years creating a methodology to adapt modern
analysis techniques from system building to message design.
 Initially, the HL7 Board of Directors chartered an independent task
force to establish the broad outline of the approach.
 In January 1996, the Technical Steering Committee (TSC) agreed to
adopt the main features of the approach and take over its
management.
 Planning work continued in the Modeling and Methodology Work
Group and the Implementation/Conformance Work Group.
 At the completion of V2.3, in the spring of 1997, the HL7 Work
Groups all began to use the V3 process.
July 14, 2015 Page: 13 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
What's New with HL7 V3
 HL7 employs a completely new development approach with V3, an
Object Oriented approach that is model and repository-based.
 This OO approach is supported with trained facilitators, formal
education classes, and computerized tools.
 This approach leads to increased detail, clarity and precision of the
specification and finer granularity in the ultimate message.
 HL7 isn't just Level 7 any more! HL7 standard developers realized it
was necessary to include other levels of the ISO OSI Model.
 Today, Work Groups exist for XML, Security & Accountability, Service
Oriented Architecture, Clinical Document Architecture, and Restful
Services Resource Definitions.
July 14, 2015 Page: 14 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Questions
July 14, 2015 Page: 15 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Hi3 Solutions
3500 W. Olive Ave, Suite
300
Burbank, CA 91505
ww.hi3solutions.com +1 800 918-
6520
July 14, 2015 Page: 16 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3 Development
Frameworks and Architectures
July 14, 2015 Page: 17 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SESSION OVERVIEW
 HL7 V3 MESSAGE DEVELOPMENT FRAMEWORK
(MDF)
 HL7 DEVELOPMENT FRAMEWORK (HDF)
 SERVICES AWARE INTEROPERABILITY FRAMEWORK
(SAIF)
 HL7 V3 REFERENCE MODELS
July 14, 2015 Page: 18 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3 Message Development
Framework
July 14, 2015 Page: 19 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
The MDF Methodology Overview
July 14, 2015 Page: 20 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 V3 Message Design Information Models
 RIM: Reference Information Model
 D-MIM: Domain Message Information Model
 R-MIM: Refined Message Information Model
 HMD: Hierarchical Message Definition
RIM
Restrict
R-MIM
Serialize
HMD
D-MIM
Derive
July 14, 2015 Page: 21 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 V3 Message Development Framework
Use Case Modeling
Interaction Modeling
Message Design
Information Modeling
RIM
Restrict
R-MIM
Serialize
HMD
Restrict
Message
Type
Example
Storyboard
Storyboard
Example
D-MIM
Derive
Application
Role
Sender Receiver
Trigger
Event
Triggers
Content
Interaction
References
July 14, 2015 Page: 22 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 V3 Message Development
Methodology: How
 Use Case Modeling
• Produce a storyboard example
• Generalize the storyboard example into a storyboard
 Information Modeling
• Define classes, attributes, datatypes, and relationships
• Define vocabulary domains, code systems, and value sets
• Define states, trigger events, and transitions
 Interaction Modeling
• Define application roles
• Define interactions
 Message Design
• Define D-MIM, CMETs, and R-MIMs
• Define HMD and Message Types
July 14, 2015 Page: 23 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 V3 Methodology (in plain language):
How
 What application interface problem are we trying to
solve?
 What application systems are within the scope of the
problem domain?
 What events initiate communication between
applications?
 What information needs to be communicated between
participating applications?
 What is the definition, format, and interrelationship of the
information to be communicated?
 How should the information to be communicated between
applications be structured and packaged?
July 14, 2015 Page: 24 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 V3 Message Design Information Models
RIM
Account
name : ST
balanceAmt : MO
currencyCode : CE
interestRateQuantity : RTO<MO,PQ>
allowedBalanceQuantity : IVL<MO>
DeviceTask
parameterValue : LIST<ANY>
DiagnosticImage
subjectOrientationCode : CE
Diet
energyQuantity : PQ
carbohydrateQuantity : PQ
FinancialContract
paymentTermsCode : CE
FinancialTransaction
amt : MO
creditExchangeRateQuantity : REAL
debitExchangeRateQuantity : REAL
InvoiceElement
modifierCode : SET<CE>
unitQuantity : RTO<PQ,PQ>
unitPriceAmt : RTO<MO,PQ>
netAmt : MO
factorNumber : REAL
pointsNumber : REAL
ManagedParticipation
id : SET<II>
statusCode : SET<CS>
Observation
value : ANY
interpretationCode : SET<CE>
methodCode : SET<CE>
targetSiteCode : SET<CD>
PatientEncounter
preAdmitTestInd : BL
admissionReferralSourceCode : CE
lengthOfStayQuantity : PQ
dischargeDispositionCode : CE
specialCourtesiesCode : SET<CE>
specialAccommodationCode : SET<CE>
acuityLevelCode : CE
Procedure
methodCode : SET<CE>
approachSiteCode : SET<CD>
targetSiteCode : SET<CD>
PublicHealthCase
detectionMethodCode : CE
transmissionModeCode : CE
diseaseImportedCode : CE
SubstanceAdministration
routeCode : CE
approachSiteCode : SET<CD>
doseQuantity : IVL<PQ>
rateQuantity : IVL<PQ>
doseCheckQuantity : SET<RTO>
maxDoseQuantity : SET<RTO>
substitutionCode : CE
Supply
quantity : PQ
expectedUseTime : IVL<TS>
WorkingList
ownershipLevelCode : CE
Container
capacityQuantity : PQ
heightQuantity : PQ
diameterQuantity : PQ
capTypeCode : CE
separatorTypeCode : CE
barrierDeltaQuantity : PQ
bottomDeltaQuantity : PQ
Device
manufacturerModelName : SC
softwareName : SC
localRemoteControlStateCode : CE...
alertLevelCode : CE
lastCalibrationTime : TS
LivingSubject
administrativeGenderCode : CE
birthTime : TS
deceasedInd : BL
deceasedTime : TS
multipleBirthInd : BL
multipleBirthOrderNumber : INT
organDonorInd : BL
ManufacturedMaterial
lotNumberText : ST
expirationTime : IVL<TS>
stabilityTime : IVL<TS>
Material
formCode : CE
NonPersonLivingSubject
strainText : ED
genderStatusCode : CE
Organization
addr : BAG<AD>
standardIndustryClassCode : CE
Person
addr : BAG<AD>
maritalStatusCode : CE
educationLevelCode : CE
raceCode : SET<CE>
disabilityCode : SET<CE>
livingArrangementCode : CE
religiousAffiliationCode : CE
ethnicGroupCode : SET<CE>
Place
mobileInd : BL
addr : AD
directionsText : ED
positionText : ED
gpsText : ST
Access
approachSiteCode : CD
targetSiteCode : CD
gaugeQuantity : PQ
Employee
jobCode : CE
jobTitleName : SC
jobClassCode : CE
salaryTypeCode : CE
salaryQuantity : MO
hazardExposureText : ED
protectiveEquipmentText : ED
LicensedEntity
recertificationTime : TS
Patient
confidentialityCode : CE
veryImportantPersonCode : CE
ActRelationship
typeCode : CS
inversionInd : BL
contextControlCode : CS
contextConductionInd : BL
sequenceNumber : INT
priorityNumber : INT
pauseQuantity : PQ
checkpointCode : CS
splitCode : CS
joinCode : CS
negationInd : BL
conjunctionCode : CS
localVariableName : ST
seperatableInd : BL
Act
classCode : CS
moodCode : CS
id : SET<II>
code : CD
negationInd : BL
derivationExpr : ST
text : ED
statusCode : SET<CS>
effectiveTime : GTS
activityTime : GTS
availabilityTime : TS
priorityCode : SET<CE>
confidentialityCode : SET<CE>
repeatNumber : IVL<INT>
interruptibleInd : BL
levelCode : CE
independentInd : BL
uncertaintyCode : CE
reasonCode : SET<CE>
languageCode : CE
0..n
1
outboundRelationship
0..n
source1
0..n
1
inboundRelationship
0..n
target
1
LanguageCommunication
languageCode : CE
modeCode : CE
proficiencyLevelCode : CE
preferenceInd : BL
Participation
typeCode : CS
functionCode : CD
contextControlCode : CS
sequenceNumber : INT
negationInd : BL
noteText : ED
time : IVL<TS>
modeCode : CE
awarenessCode : CE
signatureCode : CE
signatureText : ED
performInd : BL
substitutionConditionCode : CE...
0..n
1
0..n
1
Entity
classCode : CS
determinerCode : CS
id : SET<II>
code : CE
quantity : SET<PQ>
name : BAG<EN>
desc : ED
statusCode : SET<CS>
existenceTime : IVL<TS>
telecom : BAG<TEL>
riskCode : CE
handlingCode : CE
1
0..n
1
0..n
RoleLink
typeCode : CS
effectiveTime : IVL<TS>
Role
classCode : CS
id : SET<II>
code : CE
negationInd : BL
addr : BAG<AD>
telecom : BAG<TEL>
statusCode : SET<CS>
effectiveTime : IVL<TS>
certificateText : ED
quantity : RTO
positionNumber : LIST<INT>
0..n
1
0..n
1
0..n0..1
playedRole
0..n
player
0..1
0..n
0..1
scopedRole
0..n
scoper
0..1
0..n
1
outboundLink 0..n
source1
0..n
1
inboundLink
0..n
target1
HMD
D-MIM
PatientIncident
classCode*:<=ENC
moodCode*:<=EVN
id:[1..*](RegistNum)
code:CVCNE[0..1]<=ExternallyDefinedActCodes(PatientType)
statusCode:LIST<CS>CNE<=ActStatus(IDPHStatus)
activityTime:TS(EDDate)
Injury
classCode*:<=ACT
moodCode*:<=EVN
activityTime:TS(InjuryDate)
0..1pertinentInjury
typeCode*:<=PERT
pertinentInformation1
TraumaRegistryExport
(IDPH_RM00001)
DatacontentofHL7
messagesusedtoexport
datafromtheIDPHTrauma
Registry.
PatientPerson
classCode*:<=PSN
determinerCode*:<=INSTANCE
name:PN[0..1](*Name)
existenceTime:(Age)
administrativeGenderCode:CVCWE<=AdministrativeGender
(GenderID)
birthTime:(DateOfBirth)
addr:AD[0..1](AddressHome)
raceCode:CVCWE[0..1]<=Race(RaceID)
ethnicGroupCode:CVCWE[0..1]<=Ethnicity(EthnicID)
1..1patientPatientPerson
1..1providerTraumaParticipant
Patient
classCode*:<=PAT
id:II[0..1](MedicaRecordNum)
TraumaParticipant
classCode*:<=ORG
determinerCode*:<=INSTANCE
id:[1..1](HospitNum)
code:CVCWE[0..1]<=EntityCode
name:ON[0..1](HospitName)
statusCode:CSCNE[0..1]<=EntityStatus(ActiveFacili)
addr:AD[0..1](HospitCity)
1..1patient
typeCode*:<=SBJ
subject
InjuryLocation
classCode*:<=PLC
determinerCode*:<=INSTANCE
code:CVCWE[0..1]<=EntityCode(InjuryPlaceID)
addr:AD[0..1](AddressScene)
0..1playingInjuryLocation
Role
classCode*:<=ROL
1..1participant
typeCode*:<=LOC
location
InjuryRelatedObservation
classCode*:<=OBS
moodCode*:<=EVN
code:<=ExternallyDefinedActCodes
priorityCode:CVCWE[0..1]<=ActPriority
value:[0..1]
0..*pertinentInjuryRelatedObservation
typeCode*:<=PERT
sequenceNumber:INT[0..1](InjurySequen)
pertinentInformation
Procedure
classCode*:<=PROC
moodCode*:<=EVN
code:CVCWE<=ActCode(ICDCodeID)
activityTime:TS(ProcedDate)
0..*pertinentProcedure
typeCode*:<=PERT
pertinentInformation7
0..1medicalStaff
typeCode*:<=PRF
performer
MedicalStaff
classCode*:<=PROV
id:II[0..1](MedicalStaffID)
0..1procedureLocation
typeCode*:<=LOC
location
ProcedureLocation
classCode*:<=SDLOC
code:<=RoleCode(ProcedLocateID)
PatientIncidentRelatedObservation
classCode*:<=OBS
moodCode*:<=EVN
code:<=ActCode
reasonCode:CVCWE[0..1]<=ActReason
value:ANY[0..1]
0..*pertinentPatientIncidentRelatedObservation
typeCode*:<=PERT
pertinentInformation2
PatientTransfer
classCode*:<=TRNS
moodCode*:<=EVN
activityTime:IVL<TS>(DischaDatetoArriveDate)
reasonCode:CVCWE[0..1]<=TransferActReason(REASONTRANSFID)
1..1arrivalPatientTransfer
typeCode*:<=ARR
arrivedBy
0..*aRole
typeCode*:<=ORG
origin
0..1playingTraumaParticipant
aRole
classCode*:<=ROL
TransferRelatedObservation
classCode*:<=OBS
moodCode*:<=EVN
code:CVCWE<=ExternallyDefinedActCodes
value:PQ[0..1]
methodCode:CVCWE[0..1]<=ObservationMethod
1..*pertinentTransferRelatedObservation
typeCode*:<=PERT
pertinentInformation
1..1transferVehicle
typeCode*:<=VIA
via
1..1owningVehicleProvider
TransferVehicle
classCode*:<=OWN
id:II[0..1](VehiclNum)
code:<=RoleCode(VehiclLevelID)
VehicleProvider
classCode*:<=ORG
determinerCode*:<=INSTANCE
id:II[0..1](VehiclProvide)
code:<=EntityCode(MaxVehiclLevelID)
name:ON[0..1](VehiclProvidName)
HospitalVisit
classCode*:<=ENC
moodCode*:<=EVN
code:CVCWE<=ActCode(AdmitServicID)
activityTime:TS(DischaDate)
dischargeDispositionCode:CVCWE[0..1]
<=EncounterDischargeDisposition
1..1pertinentHospitalVisit
typeCode*:<=PERT
pertinentInformation5
HospitalVisitRelatedObservation
classCode*:<=OBS
moodCode*:<=EVN
code:CVCWE<=ExternallyDefinedActCodes
value:[0..1]
0..*pertinentHospitalVisitRelatedObservation
typeCode*:<=PERT
pertinentInformation
1..1admittingProvider
typeCode*:<=ADM
admitter
0..1healthCareMedicalStaffPerson
AdmittingProvider
classCode*:<=PROV
id:II[0..1](ADMITMEDICASTAFFID)
code:CVCWE<=RoleCode(StaffTypeID)
0..*hospitalVisitPhysician
typeCode*:<=RESP
time:TS
responsibleParty
0..1healthCareMedicalStaffPerson
HospitalVisitPhysician
classCode*:<=PROV
id:II[0..1]
code:CVCWE<=RoleCode(StaffTypeID)
MedicalStaffPerson
classCode*:<=PSN
determinerCode*:<=INSTANCE
name:PN[0..1](MedicaStaffName)
0..1licensedEntity
typeCode*:<=DST
destination
0..1subjectChoice
LicensedEntity
classCode*:<=LIC
id:II[0..1]
Choice
Facility
classCode*:<=ORG
determinerCode*:<=INSTANCE
id:
code*:CSCNE<=EntityCode"FAC"
name:
Hospital
classCode*:<=ORG
determinerCode*:<=INSTANCE
id:
code*:CSCNE<=EntityCode"HOSP"
name:
EmergencyDepartmentEncounter
classCode*:<=ENC
moodCode*:<=EVN
activityTime:IVL<TS>
dischargeDispositionCode:CVCWE<=EncounterDischargeDisposition
0..1pertinentEmergencyDepartmentEncounter
typeCode*:<=PERT
pertinentInformation3
EmergencyDepartmentRelatedObservation
classCode*:<=OBS
moodCode*:<=EVN
code:CVCWE<=ExternallyDefinedActCodes
text:
activityTime:TS
reasonCode:<=ActReason
value:[0..1]
methodCode:CVCWE[0..1]<=ObservationMethod
targetSiteCode:CVCWE[0..1]<=HumanActSite
0..*pertinentEmergencyDepartmentRelatedObservation
typeCode*:<=PERT
pertinentInformation
0..*emergencyDepartmentPhysician
typeCode*:<=PRF
performer
0..1healthCareMedicalStaffPerson EmergencyDepartmentPhysician
classCode*:<=PROV
id:II[0..1]
code:CECWE[0..1]<=RoleCode(StaffTypeID)
PreHospitalEncounter
classCode*:<=ENC
moodCode*:<=EVN
id:II[0..1](crashNum)
activityTime:IVL<TS>
0..1priorPreHospitalEncounter
typeCode*:<=PREV
predecessor
PreHosptialRelatedObservation
classCode*:<=OBS
moodCode*:<=EVN
code:<=ExternallyDefinedActCodes
value:ANY[0..1]
0..*pertinentPreHosptialRelatedObservation
typeCode*:<=PERT
pertinentInformation
1..1preHospitalVehicle
typeCode*:<=ParticipationType
participant
1..1owningVehicleProvider
PreHospitalVehicle
classCode*:<=OWN
id:II[0..1](VehiclNum)
code:<=RoleCode(VehiclLevelID)
0..*emergencyDepartmentPhysicianAct
typeCode*:<=COMP
component
EmergencyDepartmentPhysicianAct
classCode*:<=ACT
moodCode*:<=EVN
code:CSCNE[0..1]<=ExternallyDefinedActCodes
activityTime*:TS[0..1]
component
0..*patientIncidentRelatedObservation
typeCode*:<=COMP
VehicleProvider
MedicalStaffPerson
TraumaParticipant
R-MIM
PatientIncident
classCode*: <= ENC
moodCode*: <= EVN
id: [1..*] (RegistNum)
code: CV CNE <= ExternallyDefinedActCodes (PatientType)
statusCode: LIST<CS> CNE <= ActStatus (IDPHStatus)
activityTime: TS (EDDate)
Injury
classCode*: <= ACT
moodCode*: <= EVN
activityTime: TS (InjuryDate)
0..1 pertinentInjury
typeCode*: <= PERT
pertinentInformation1
PatientPerson
classCode*: <= PSN
determinerCode*: <= INSTANCE
name: PN [0..1] (*Name)
existenceTime: (Age)
administrativeGenderCode: CV CWE <= AdministrativeGender
(GenderID)
birthTime: (DateOfBirth)
addr: AD [0..1] (AddressHome)
raceCode: CV CWE [0..1] <= Race (RaceID)
ethnicGroupCode: CV CWE [0..1] <= Ethnicity (EthnicID)
1..1 patientPatientPerson
1..1 providerTraumaParticipant
Patient
classCode*: <= PAT
id: II [0..1] (MedicaRecordNum)
TraumaParticipant
classCode*: <= ORG
determinerCode*: <= INSTANCE
id: [1..1] (HospitNum)
code: CV CWE [0..1] <= EntityCode
name: ON [0..1] (HospitName)
statusCode: CS CNE [0..1] <= EntityStatus (ActiveFacili)
addr: AD [0..1] (HospitCity)
1..1 patient
typeCode*: <= SBJ
subject
InjuryLocation
classCode*: <= PLC
determinerCode*: <= INSTANCE
code: CV CWE [0..1] <= EntityCode (InjuryPlaceID)
addr: AD [0..1] (AddressScene)
0..1 playingInjuryLocation
Role
classCode*: <= ROL
1..1 participant
typeCode*: <= LOC
location
InjuryRelatedObservation
classCode*: <= OBS
moodCode*: <= EVN
code: <= ExternallyDefinedActCodes
priorityCode: CV CWE [0..1] <= ActPriority
value: [0..1]
0..* pertinentInjuryRelatedObservation
typeCode*: <= PERT
sequenceNumber: INT [0..1] (InjurySequen)
pertinentInformation
PatientIncidentRelatedObservation
classCode*: <= OBS
moodCode*: <= EVN
code: <= ActCode
reasonCode: CV CWE [0..1] <= ActReason
value: ANY [0..1]
0..* pertinentPatientIncidentRelatedObservation
typeCode*: <= PERT
pertinentInformation2
component
0..* patientIncidentRelatedObservation
typeCode*: <= COMP
July 14, 2015 Page: 25 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 XML Schema Generator
HL7 Vocabulary
Specification
HL7 Data Type
Specification
HL7 XML
Schema
Generator
Hierarchical Message
Definition
And
CMET Specifications
XML Schema
Specification
July 14, 2015 Page: 26 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 V3 Message Implementation Technology
HL7-Conformant
Application
Data
HL7
Message
Creation
HL7-Conformant
Application
HL7
Message
Parsing Data
Message
Instance
XML Schema
Specification
Hierarchical Message
Definition
July 14, 2015 Page: 27 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 Development Framework
July 14, 2015 Page: 28 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Seven Phases of the HDF Methodology
1. Project initiation
2. Requirements Documentation
3. Specification Modeling
4. Specification Documentation
5. Specification Approval
6. Specification Publication
7. Specification Profiling
July 14, 2015 Page: 29 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HDF Workflow Diagram
Initiate
Project
Project
Charter
Specify
Requirements
Reference
Models
Requirement
Specification
Prepare Specification
Design Models
Specification
Design Models
Prepare
Specification
Approve
Specification
Approved
Specification
Publish
Approved
Specification
Published
Specification
Prepare Specification
Profiles
Specification
Profile
Conformance
Statement
Proposed
Specification
The HDF workflow is not a waterfall methodology.
Each phase builds upon the prior and may cause
prior activities to be revisited and their deliverables
adjusted.
July 14, 2015 Page: 30 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Project initiation
During project initiation the project is defined, a project plan is produced, and
project approval is obtained. The primary deliverable produced during project
initiation is the project charter.
Project
Initiation
Project
Charter
1. Define project scope, objectives, and intended deliverables
2. Identify project stakeholders, participants, and required resources
3. Document project assumptions, constraints, and risk
4. Prepare preliminary project plan and document inter-project dependencies
5. Obtain project approval and launch the project
July 14, 2015 Page: 31 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Requirements Documentation
During requirements documentation the problem domain is defined, a model of the
domain is produced, and the problem domain model is harmonized with HL7
reference models. The primary deliverable produced during requirements
documentation is the requirements specification.
Requirements
Documentation
Requirements
Specification
1. Document Business Process: Dynamic Behavior and Static Structure
2. Capture Process Flow: UML Activity Diagram
3. Capture Structure: Domain Information Model and Glossary
4. Capture Business Rules: Relationships, Triggers, and Constraints
5. Harmonize the Domain Analysis Model with HL7 Reference Models
Project
Charter
July 14, 2015 Page: 32 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Specification Modeling
During specification modeling reference models are constrained into design models
through an iterative process of requirements driven refinements following specification
design rules, conventions, and guidelines. The primary deliverable produced during
specification modeling is a set of specification design models.
Specification
Modeling
Specification
Design Models
1. Build design models of static information views
2. Construct design models of behavioral views
3. Define reusable design model components
4. Construct design models of collaboration and interaction
5. Harmonize design models with HL7 Reference Models
Requirements
Specification
July 14, 2015 Page: 33 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Specification Documentation
During specification Documentation the specification design models are packaged
into logical units, supplemented with explanatory text, and prepared for approval.
The primary deliverable produced during specification documentation is a
proposed specification.
Specification
Documentation
Proposed
Specification
1. Organize design model elements into logical packages
2. Compose explanatory text, examples, and design rationale
3. Update design models and requirement specifications
4. Assemble a proposed specification package
5. Submit specification for approval
Specification
Design Models
July 14, 2015 Page: 34 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Specification Approval
During specification approval the pre-approval specification is subjected to a series of
approvals steps. The specific approval steps vary by kind of specification, level of
approval, and realm of interest. The primary deliverable produced during specification
approval is an approved specification.
Specification
Approval
Approved
Specification
1. Obtain TSC and Board approval to ballot specification
2. Form a ballot pool and conduct specification ballot
3. Assess negative ballots and affirmative comments
4. Modify specification in response to ballot comments
5. Resolve negative ballot responses and if necessary re-ballot
Proposed
Specification
July 14, 2015 Page: 35 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Specification Publication
During specification publication the approved specification is prepared for
prepared for publication and distribution. The primary deliverable produced during
specification publication is a published specification.
Specification
Publication
Published
Specification
1. Obtain TSC and Board approval to publish specification
2. Prepare specification for publication
3. Submit publication to standards authorities (ANSI/ISO)
4. Render the specification in various forms of publication media
5. Post and distribute approved specifications
Approved
Specification
July 14, 2015 Page: 36 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Specification Profiling
During specification profiling specification models and published specifications are
further refined to produce a specification profile for use in a particular environment by
a defined community of users. The primary deliverable produced during specification
profiling is a set of specification constraints and conformance statements.
Specification
Profiling
Specification
Constraints and
Conformance
Statements
1. Identify community of user for the published specification
2. Further refine and constrain specification design models
3. Document exceptions, extensions, and annotations to specifications
4. Prepare and publish specification profile
5. Prepare and publish conformance statements
Published
Specification
July 14, 2015 Page: 37 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SAIF Canonical Definition
July 14, 2015 Page: 38 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SAIF Canonical Definition
 The development of the SAIF Canonical Definition (SAIF-CD) began in early
2008 .
 It was motivated and directed by a high-level set of requirements
communicated to the HL7 Architecture Board (ArB) by the HL7 Chief
Technology Officer (CTO), John Quinn.
 The ArB was asked to specify a Services Aware Interoperability Framework
(SAIF) to serve as the foundation for an HL7 enterprise architecture.
 The HL7 enterprise architecture enables the explicit description of
technology components from the perspective of the interactions between
those components as they are involved in scenarios whose purpose is to
achieve an agreed-upon goal based on “cross-boundary shared purpose.”
 The scope of the components themselves was not specified, i.e. a
“component” could be defined as a system, a service, an enterprise, or a
generic party.
July 14, 2015 Page: 39 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
ECCF Overview
 A key component of the SAIF Enterprise Architecture is the creation
of the Enterprise Conformance and Compliance Framework (ECCF).
 ECCF is an architecture for organizing service specification artifacts.
It combines concepts from RM-ODP, the ISO Reference Model for
Open Distributed Processing; and MDA, the OMG Model Driven
Architecture.
 RM-ODP provides a framework specification used to describe
distributed, heterogeneous systems within and across organizations.
It defines five viewpoints of a distributed system specification. The
ECCF uses four of the five RM-ODP viewpoints.
 MDA is a framework for building systems that abstracts systems into
a hierarchy of abstraction specification layers. The ECCF utilizes
three level of the four abstractions defined by MDA.
July 14, 2015 Page: 40 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
RM-ODP Viewpoints
 The five viewpoints defined
within the
RM-ODP standard are:
 Enterprise Viewpoint: focused on purpose,
scope and policy for the system; promoting
an understanding of the business
environment and its influences upon the
distributed system.
 Information Viewpoint: focused on the
semantics of the information and the
information processing performed;
essentially the articulation of the business
rules and content to be supported by the
system.
 Computational Viewpoint: focused on the
functional decomposition of the system. It
provides for the logical design of the system
through encapsulation of capability,
separation of functionality, and interface
definition.
 Engineering Viewpoint: focused on
mechanisms and functions to support
distributed interaction between the
components of the system.
 Technology Viewpoint: focused on the
choice of technology to be employed within
the system. It includes a description of the
implementation of the system and testing
requirements
July 14, 2015 Page: 41 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
OMG MDA Abstraction Layers
 The four levels of abstaction
defined by the OMG MDA are:
 Computational-Independent Model
(CIM): The CIM represents the highest-
level business model. The CIM
transcends computer systems. It
describes business processes, the
interaction between processes, and the
responsibilities of the actors involved.
 Platform-Independent Model (PIM): The
PIM represents the business model to be
implemented by an information system.
The PIM describes the processes and
structure of the system, without reference
to the delivery platforms.
 Platform-Specific Model (PSM): The
PSM projects the PIM onto a specific
platform. One PIM may be transformed
into multiple PSMs, however, the PSMs
collaborate to deliver a consistent and
complete solution.
 Code Model (CM): The code model
represents the deployable code, usually
in a high-level language such as XML,
Java, or VB..
July 14, 2015 Page: 42 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
ECCF Specification Stack
July 14, 2015 Page: 43 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
ECCF Organizing Paradigm
 The ECCF is an organizing
paradigm for the models,
specifications, and other work
products produced as part of a
systems development project.
 The ECCF provides a foundation
for assessing the conformance and
compliance of system analysis,
design, and construction artifacts.
 The ECCF also provides the basis
for organization of project teams
and the assignment of project team
functional boundaries,
interrelationships.
July 14, 2015 Page: 44 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
ECCF Influence on Model Artifacts
 The viewpoints of the ECCF provide a framework for organizing UML model elements,
diagrams, and specifications.
 The Enterprise viewpoint includes the UML concept of actor and the business perspectives
of requirements and reference materials.
 The Information, Computation, and Engineering viewpoints correspond to the UML diagram
categories of Structure, Behavior, and Interaction.
 The four viewpoints taken collectively across one layer of abstraction is a single internally
consistent model and is used along with expository text to form a single model
specification.
July 14, 2015 Page: 45 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
ECCF Influence on Project Teams
 Domain experts are the providers of
system requirements and the
deployment team is the provider of the
solution systems.
 Sandwiched between the domain
experts and the deployment team are
the Analyst, Architecture, and
Development teams.
 The Analyst team is responsible for the
transformation of system requirements
into a CIM.
 The Architecture team is responsible for
the transformation of a CIM into a PIM.
 The Development team is responsible
for transformation of a PIM into a PSM.
 The quality assurance team is
responsible for ensuring traceability and
compliance from deployment to
requirements.
July 14, 2015 Page: 46 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Health Level Seven
Version 3 Reference Models
The HL7 reference models are the foundational artifacts
of HL7 version 3.0.
July 14, 2015 Page: 47 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3.0 Foundational Artifacts
Reference
Information
Model
Datatype
Specification
Vocabulary
Specification
The HL7 Reference Information Model is the
information model from which all other information
models and message specifications are derived.
The HL7 Vocabulary Specification defines the set of all
concepts that can be taken as valid values in an instance
of a coded attribute or data type property.
The HL7 Datatype Specification defines the structural
format of the data carried in an attribute and influences
the set of allowable values an attribute may assume.
July 14, 2015 Page: 48 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 Version 3.0 Reference Models
Reference Information Model
Data Type
Specification
Vocabulary
Specification
July 14, 2015 Page: 49 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SESSION RETROSPECTIVE
 HL7 V3 MESSAGE DEVELOPMENT FRAMEWORK
(MDF)
 HL7 DEVELOPMENT FRAMEWORK (HDF)
 SERVICES AWARE INTEROPERABILITY FRAMEWORK
(SAIF)
 HL7 V3 REFERENCE MODELS
July 14, 2015 Page: 50 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Hi3 Solutions
3500 W. Olive Ave, Suite
300
Burbank, CA 91505
ww.hi3solutions.com +1 800 918-
6520
July 14, 2015 Page: 51 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3 Messaging Artifacts
July 14, 2015
July 14, 2015 Page: 52 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SESSION OVERVIEW
 Messaging Artifacts ECCF
 Foundational Artifacts
 Design Artifacts
 Specification Artifacts
 HL7 v3 Message Design Example
 HL7 v3 Development Tools
July 14, 2015 Page: 53 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
ECCF Specification Stack
July 14, 2015 Page: 54 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3.0 Messaging Artifacts
Reference
Information
Model
Datatype
Specification
Vocabulary
Specification
Foundational
Models
(CIM)
Dynamic
Model
Constrained
Information
Model
Common
Message Type
Model
Design
Models
(PIM)
Hierarchical
Message
Definition
Message
Type
Definition
Implementation
Technology
Specification
Message
Specifications
(PSM)
July 14, 2015 Page: 55 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3.0 Messaging Artifacts
Reference
Information
Model
Datatype
Specification
Vocabulary
Specification
Foundational
Models
Dynamic
Model
Constrained
Information
Model
Common
Message Type
Model
Design
Models
Hierarchical
Message
Definition
Message
Type
Definition
Implementation
Technology
Specification
Message
Specifications
July 14, 2015 Page: 56 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Health Level Seven
Version 3 Reference Models
The HL7 reference models are the foundational artifacts
of HL7 version 3.0.
July 14, 2015 Page: 57 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3.0 Foundational Artifacts
Reference
Information
Model
Datatype
Specification
Vocabulary
Specification
The HL7 Reference Information Model is the
information model from which all other information
models and message specifications are derived.
The HL7 Vocabulary Specification defines the set of all
concepts that can be taken as valid values in an instance
of a coded attribute or data type property.
The HL7 Datatype Specification defines the structural
format of the data carried in an attribute and influences
the set of allowable values an attribute may assume.
July 14, 2015 Page: 58 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 Version 3.0 Reference Models
Reference Information Model
Data Type
Specification
Vocabulary
Specification
July 14, 2015 Page: 59 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3.0 Foundational Artifacts
Reference
Information
Model
Datatype
Specification
Vocabulary
Specification
The HL7 Reference Information Model is the
information model from which all other information
models and message specifications are derived.
The HL7 Vocabulary Specification defines the set of all
concepts that can be taken as valid values in an instance
of a coded attribute or data type property.
The HL7 Datatype Specification defines the structural
format of the data carried in an attribute and influences
the set of allowable values an attribute may assume.
July 14, 2015 Page: 60 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 Version 3.0
Reference Information
Model
The HL7 Reference Information Model is the information
model from which all other information models and message
specifications are derived.
July 14, 2015 Page: 61 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 Reference Information Model
 The HL7 Reference Information Model (RIM) is a static model of
health and health care information as viewed within the scope of HL7
standards development activities.
 It is the combined consensus view of information from the perspective
of the HL7 working group and the HL7 international affiliates.
 The RIM is the ultimate source from which the information-related
content of all HL7 version 3.0 protocol specification standards is
drawn.
 The RIM is modeled using the modeling syntax defined by the Object
Management Group’s Unified Modeling Language (UML).
 UML is a graphical language for visualizing, specifying, constructing,
and documenting the artifacts of a software-intensive system.
July 14, 2015 Page: 62 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Reference Information Model History
 Development of the HL7 Reference Information Model began in April 1996.
 The first draft of the RIM was created by consolidating data models developed
by HL7 Technical Committees, contributed by HL7 Member Organizations,
and published by national and international standards organizations and
government bodies.
 The first release of the RIM (v0.80) was adopted by the HL7 Technical
Steering Committee at the January 1997 working group meeting.
 The next two working group meetings focused on gaining familiarity with the
draft RIM and implementing a process for obtaining and reconciling proposed
enhancements to the model.
 The RIM maintenance process became known as "RIM harmonization.” The
first RIM harmonization meeting was held July 1997 in Indianapolis, Indiana.
July 14, 2015 Page: 63 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
RIM Development Process
B
X F
E
C A D
G
1
0..*
0..* 1 0..* 1
0..* 0..1 0..*1
Model I Model II Model III
A
C
B
0..*
0..*
0..* 1 X
C
B
0..*
0..*
0..* 1
D
A B0..* 0..*
0..*
1
July 14, 2015 Page: 64 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Contributing Data Models
circa April 1996
 HL7 Technical Committees
 Admission/Discharge/Transfer
 Finance
 Medical Records
 Orders/Results
 Patient Care
 Standards Development Organizations
 CEN TC251
 DICOM
 HL7 Member Organizations
 Eli Lilly and Company
 HBO and Company
 Health Data Sciences
 IBM Worldwide
 Kaiser Permanente
 Mayo Foundation
 Hewlett Packard
 National Health Programs
 United Kingdom
 Australia
Abdul-Malik Shakir
Manager, Information Administration
Kaiser Foundation Health Plan, Inc.
One Kaiser Plaza, Oakland, CA 94612
v: (510) 271-6856 f: (510) 271-6859
Email: 74353.1431@Compuserve.com
July 14, 2015 Page: 65 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
July 14, 2015 Page: 66 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
RIM Harmonization Process
Change Proposal Preparation
Prepare RIM
Change Proposal
Review RIM
Change Proposal
w/ Stewards
Document Rationale
for not supporting
RIM change proposal
Revise or Withdraw
RIM Proposal
Post RIM Change Proposals
Submit
RIM Change
Proposal
Post RIM
Change Proposal
Notify HL7 Members
of RIM Change
Proposal Posting
Provide Comment
on RIM Change
Proposals
Harmonization Meeting
Discuss the RIM
Change Proposal
Revise, withdraw,
or Table RIM
Change Proposal
Vote on RIM
Change Proposal
Apply Approved
Changes to RIM
Apply Technical
Corrections
Post Harmonization Meeting Review
Present RIM
Harmonization Report
to TSC
Hold TSC and/or
Board Appeals
Finalize
Revised RIM
July 14, 2015 Page: 67 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Major Early Harmonization Themes
 Ensure coverage of HL7 version 2.x. This set of change proposals
introduced content to the draft model to ensure that it included all the
information content of HL7 version 2.x.
 Remove unsubstantiated content from the model. This set of change
proposals focused on removing content from the draft model that the
steward technical committee did not originate and could find no rationale for
retaining.
 Unified service action model. This set of change proposals introduced a
concise, well-defined set of structures and vocabularies that address the
information needs of a wide variety of clinical scenarios. This collection of
proposals, known as USAM, involved the combined effort of multiple
technical committees.
 Ensure quality. This set of change proposals addressed inconsistencies in
the draft model and conflicts between the model and the modeling style
guide. It began the practice of recording and tracking open issues in the
model.
 Address the "left hand side" of the model. This set of change proposals
introduced powerful structures and vocabularies for the non-clinical portions
July 14, 2015 Page: 68 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
USAM
July 14, 2015 Page: 69 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
The RIM Prior to USAM
July 14, 2015 Page: 70 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
The Unified Service Action Model
July 14, 2015 Page: 71 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Observation
value : ANY
interpretationCode : SET<CE>
methodCode : SET<CE>
targetSiteCode : SET<CD>
SubstanceAdministration
routeCode : CE
approachSiteCode : SET<CD>
doseQuantity : IVL<PQ>
rateQuantity : IVL<PQ>
doseCheckQuantity : SET<RTO>
maxDoseQuantity : SET<RTO>
Procedure
methodCode : SET<CE>
approachSiteCode : SET<CD>
targetSiteCode : SET<CD>
Supply
quantity : PQ
expectedUseTime : IVL<TS>
Diet
energyQuantity : PQ
carbohydrateQuantity : PQ
Document
setId : II
versionNumber : INT
completionCode : CE
storageCode : CE
copyTime : TS
Container
capacityQuantity : PQ
heightQuantity : PQ
diameterQuantity : PQ
capTypeCode : CE
separatorTypeCode : CE
barrierDeltaQuantity : PQ
bottomDeltaQuantity : PQ
Access
approachSiteCode : CD
targetSiteCode : CD
gaugeQuantity : PQ
Device
manufacturerModelName : SC
softwareName : SC
localRemoteControlStateCode : CE
alertLevelCode : CE
lastCalibrationTime : TS
Employee
jobCode : CE
jobTitleName : SC
jobClassCode : CE
salaryTypeCode : CE
salaryQuantity : MO
hazardExposureText : ED
protectiveEquipmentText : ED
LivingSubject
administrativeGenderCode : CE
birthTime : TS
deceasedInd : BL
deceasedTime : TS
multipleBirthInd : BL
multipleBirthOrderNumber : INT
organDonorInd : BL
Material
formCode : CE
LicensedEntity
recertificationTime : TS
Place
mobileInd : BL
addr : AD
directionsText : ED
positionText : ED
gpsText : ST
ManufacturedMaterial
lotNumberText : ST
expirationTime : IVL<TS>
stabilityTime : IVL<TS>
NonPersonLivingSubject
strainText : ED
genderStatusCode : CE
Patient
confidentialityCode : CE
veryImportantPersonCode : CE
Organization
addr : BAG<AD>
standardIndustryClassCode : CE
Account
name : ST
balanceAmt : MO
currencyCode : CE
interestRateQuantity : RTO<MO,PQ>
allowedBalanceQuantity : IVL<MO>
Person
addr : BAG<AD>
maritalStatusCode : CE
educationLevelCode : CE
raceCode : SET<CE>
disabilityCode : SET<CE>
livingArrangementCode : CE
religiousAffiliationCode : CE
ethnicGroupCode : SET<CE>
WorkingList
ownershipLevelCode : CE
PublicHealthCase
detectionMethodCode : CE
transmissionModeCode : CE
diseaseImportedCode : CE
PatientEncounter
preAdmitTestInd : BL
admissionReferralSourceCode : CE
lengthOfStayQuantity : PQ
dischargeDispositionCode : CE
specialCourtesiesCode : SET<CE>
specialAccommodationCode : SET<CE>
acuityLevelCode : CE
Other
Acts
Infrastructure (Structured documents)
HEALTH LEVEL 7
REFERENCE INFORMATION MODEL
VERSION 1.25 (RIM_0125)
Reflects changes to RIM in RIM Harmonization Through 06/30/2003.
Billboard produced by:
Rochester Outdoor Advertising
Roles
DiagnosticImage
subjectOrientationCode : CE
QueryAck
queryResponseCode : CS
resultTotalQuantity : INT
resultCurrentQuantity : INT
resultRemainingQuantity : INT
QueryContinuation
startResultNumber : INT
continuationQuantity : INT
Table
summary : ST
width : ST
rules : CS
cellspacing : ST
cellpadding : ST
border : INT
frame : CS
TableStructure
char : ST
charoff : ST
halign : CS
valign : CS
TableColumnStructure
span : INT
width : ST
TableCell
scope : CS
abbr : ST
axis : ST
colspan : INT
headers : SET<ED>
rowspan : INT
LocalAttr
name : ST
value : ST
LocalMarkup
descriptor : ST
render : ST
ignoreCode : CS
LinkHtml
href : ED
name : ST
rel : SET<CE>
rev : SET<CE>
title : ST
ContextStructure
localId : ST
Infrastructure (Structured
documents)
Infrastructure
(Communications)
Enitites
Message Control
FinancialTransaction
amt : MO
creditExchangeRateQuantity : REAL
debitExchangeRateQuantity : REAL
InvoiceElement
modifierCode : SET<CE>
unitQuantity : RTO<PQ,PQ>
unitPriceAmt : RTO<MO,PQ>
netAmt : MO
factorNumber : REAL
pointsNumber : REAL
FinancialContract
paymentTermsCode : CE
RoleHeir
EntityHeir
SortControl
sequenceNumber : INT
elementName : SC
directionCode : CS
QuerySpec
modifyCode : CS
responseElementGroupId : SET<II>
responseModalityCode : CS
responsePriorityCode : CS
initialQuantity : INT
initialQuantityCode : CE
executionAndDeliveryTime : TS
0..n
1
0..n
1
RelationalExpression
elementName : SC
relationalOperatorCode : CS
value : ST
QueryBySelection
SelectionExpression
0..n
1
0..n
1
LogicalExpression
relationalConjunctionCode : CS
0..n
0..1
userAsRight
0..n
rightSide 0..1
0..n
0..1
userAsLeft0..n
leftSide0..1
QueryByParameter
ParameterList
Parameter
id : II 0..n 0..10..n 0..1
0..1
0..n
0..1
0..n
ParameterItem
value : ANY
semanticsText : ST
DeviceTask
parameterValue : LIST<ANY>
ManagedParticipation
id : SET<II>
statusCode : SET<CS>
ActHeir
ActRelationship
typeCode : CS
inversionInd : BL
contextControlCode : CS
contextConductionInd : BL
sequenceNumber : INT
priorityNumber : INT
pauseQuantity : PQ
checkpointCode : CS
splitCode : CS
joinCode : CS
negationInd : BL
conjunctionCode : CS
localVariableName : ST
seperatableInd : BL
Act
classCode : CS
moodCode : CS
id : SET<II>
code : CD
negationInd : BL
derivationExpr : ST
text : ED
statusCode : SET<CS>
effectiveTime : GTS
activityTime : GTS
availabilityTime : TS
priorityCode : SET<CE>
confidentialityCode : SET<CE>
repeatNumber : IVL<INT>
interruptibleInd : BL
levelCode : CE
independentInd : BL
uncertaintyCode : CE
reasonCode : SET<CE>
languageCode : CE
0..n
1
inboundRelationship
0..n
target
1
0..n1
outboundRelationship
0..n
source
1
Participation
typeCode : CS
functionCode : CD
contextControlCode : CS
sequenceNumber : INT
negationInd : BL
noteText : ED
time : IVL<TS>
modeCode : CE
awarenessCode : CE
signatureCode : CE
signatureText : ED
performInd : BL
substitutionConditionCode : CE
0..n
1
0..n
1
RoleLink
typeCode : CS
effectiveTime : IVL<TS>
Role
classCode : CS
id : SET<II>
code : CE
negationInd : BL
addr : BAG<AD>
telecom : BAG<TEL>
statusCode : SET<CS>
effectiveTime : IVL<TS>
certificateText : ED
quantity : RTO
positionNumber : LIST<INT>
0..n
1
0..n
1
0..n1
outboundLink
0..n
source
1 0..n1
inboundLink
0..n
target
1
LanguageCommunication
languageCode : CE
modeCode : CE
proficiencyLevelCode : CE
preferenceInd : BL
AttentionLine
keyWordText : SC
value : ST
Entity
classCode : CS
determinerCode : CS
id : SET<II>
code : CE
quantity : SET<PQ>
name : BAG<EN>
desc : ED
statusCode : SET<CS>
existenceTime : IVL<TS>
telecom : BAG<TEL>
riskCode : CE
handlingCode : CE
0..n0..1
playedRole
0..n
player
0..1
0..n0..1
scopedRole
0..n
scoper
0..1
10..n 10..n
Transmission
id : II
creationTime : TS
securityText : ST
0..n
1
0..n
1
CommunicationFunction
typeCode : CS
telecom : TEL
1..n
0..*
1..n
0..*
1..*
0..*
1..*
0..*
InfrastructureRoot
templateId : SET<OID>
realmCode : SET<CS>
typeID : SET<OID>
nullFlavor : CS
QueryEvent
queryId : II
statusCode : CS
ControlAct
0..1
1
0..1
1
Message
versionCode : CS
interactionId : II
profileId : SET<II>
processingCode : CS
processingModeCode : CS
acceptAckCode : CS
attachmentText : SET<ED>
responseCode : CS
sequenceNumber : INT
0..1
0..n
0..1
payload
0..n
Acknowledgement
typeCode : CS
messageWaitingNumber : INT
messageWaitingPriorityCode : CE
expectedSequenceNumber : INT
0..n
1
acknowledgedBy
0..n
acknowledges
1
0..1
1
conveyedAcknowledgement
0..1
conveyingMessage
1
AcknowledgementDetail
typeCode : CS
code : CE
text : ED
location : SET<ST>
1
0..n
1
0..n
Batch
referenceControlId : II
name : SC
batchComment : SET<ST>
transmissionQuantity : INT
batchTotalNumber : SET<INT>
0..1
0..n
0..1
0..n
RoleEntity
Participation
Acts
The RIM After USAM
Version 1.25 06/30/2003
Infrastructure
July 14, 2015 Page: 72 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Normative R6 RIM Class Diagram
Version 2.44 11/22/2013
July 14, 2015 Page: 73 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Entity and Act
 Entity
a physical thing or an
organization/group of physical
things capable of participating in
Acts. This includes living subjects,
organizations, material, and places.
 Act
a discernible action of interest in the
healthcare domain. An instance of
Act is a record of that action. Acts
definitions (master files), orders,
plans, and performance records
(events)
are all represented by an
instance of Act.
Entity Act
July 14, 2015 Page: 74 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Entity
classCode : CS
determinerCode: CS
code: CE
statusCode : CS
id : II
Act
classCode : CS
moodCode: CS
code: CD
statusCode : CS
effectiveTime : GTS
id : II
RIM Core Classes
 Entity - a physical thing or an organization/group of physical things
capable of participating in Acts. This includes living subjects, organizations,
material, and places.
 Act – a discernible action of interest in the healthcare domain. An
instance of Act is a record of that action. Acts definitions (master files), orders,
plans, and performance records (events) are all represented by an instance of
Act.
0..* 0..*
July 14, 2015 Page: 75 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Entity
classCode : CS
determinerCode: CS
code: CE
statusCode : CS
id : II
Role
classCode : CS
code: CE
effectiveTime : IVL<TS>
statusCode : CS
id : II
Act
classCode : CS
moodCode: CS
code: CD
statusCode : CS
effectiveTime : GTS
id : II
RIM Core Classes
0..* 0..*1 0..*plays
July 14, 2015 Page: 76 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
0..1
0..*
0..1
0..*
plays
scopes
Entity
classCode : CS
determinerCode: CS
code: CE
statusCode : CS
id : II
Role
classCode : CS
code: CE
effectiveTime : IVL<TS>
statusCode : CS
id : II
Act
classCode : CS
moodCode: CS
code: CD
statusCode : CS
effectiveTime : GTS
id : II
RIM Core Classes
 Role – a classification/specialization of an Entity defined by the
relationship of the playing Entity to a scoping Entity. An example of Role
is “Employee”. An employee is a classification attributed to a person which
has an employment relationship with an organization (Employer).
0..* 0..*
July 14, 2015 Page: 77 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Entity
classCode : CS
determinerCode: CS
code: CE
statusCode : CS
id : II
Role
classCode : CS
code: CE
effectiveTime : IVL<TS>
statusCode : CS
id : II
Participation
typeCode : CS
time : IVL<TS>
statusCode : CS
Act
classCode : CS
moodCode: CS
code: CD
statusCode : CS
effectiveTime : GTS
id : II
0..1
0..* 1
0..*
1
0..*
RIM Core Classes
 Participation – an association between a Role and an Act representing
the function assumed by the Role within the context of the Act. A single
Role may participate in multiple Acts and a single Act may have multiple
participating Roles. A single Participation is always an association between a
particular Role and a particular Act.
0..1
0..*
plays
scopes
July 14, 2015 Page: 78 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Entity
classCode : CS
determinerCode: CS
code: CE
statusCode : CS
id : II
Role
classCode : CS
code: CE
effectiveTime : IVL<TS>
statusCode : CS
id : II
Participation
typeCode : CS
time : IVL<TS>
statusCode : CS
Act
classCode : CS
moodCode: CS
code: CD
statusCode : CS
effectiveTime : GTS
id : II
0..1
0..*
1
0..*
1
0..*
Act Relationship
typeCode : CS
1 1
0..* 0..*
RIM Core Classes
 Act relationship – an association between two Acts.
This includes Act to Act associations such as
collector/component, predecessor/successor, and
cause/outcome. The semantics of the association is
captured by the Act Relationship attributes.
0..1
0..*
plays
scopes
July 14, 2015 Page: 79 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Entity
classCode : CS
determinerCode: CS
code: CE
statusCode : CS
id : II
Role
classCode : CS
code: CE
effectiveTime : IVL<TS>
statusCode : CS
id : II
Participation
typeCode : CS
time : IVL<TS>
statusCode : CS
Act
classCode : CS
moodCode: CS
code: CD
statusCode : CS
effectiveTime : GTS
id : II
0..1
0..*
1
0..*
1
0..*
Role Link
typeCode : CS
effectiveTime : IVL<TS>
Act Relationship
typeCode : CS
RIM Core Classes
 Role Link – An association between
two Roles. It is used to capture
relationships that exists between
Entities other than the scoping
relationships. A
0..1
0..*
plays
scopes
single Role may
have a Role Link
with multiple other
Roles. A single Role
Link is always
between two distinct
instances of Role.
1 1
0..* 0..*
1 1
0..* 0..*
July 14, 2015 Page: 80 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Definition of RIM Core Classes
 Act – a discernible action of interest in the healthcare domain. An instance of Act is a record of
that action. Acts definitions (master files), orders, plans, and performance records (events) are all
represented by an instance of Act.
 Act relationship – an association between two Acts. This includes Act to Act associations such
as collector/component, predecessor/successor, and cause/outcome. The semantics of the
association is captured by the Act Relationship attributes.
 Entity - a physical thing or an organization/group of physical things capable of participating
in Acts. This includes living subjects, organizations, material, and places.
 Participation – an association between a Role and an Act representing the function
assumed by the Role within the context of the Act. A single Role may participate in multiple Acts
and a single Act may have multiple participating Roles. A single Participation is always an
association between a particular Role and a particular Act.
 Role – a classification/specialization of an Entity defined by the relationship of the playing
Entity to a scoping Entity. An example of Role is “Employee”. An employee is a classification
attributed to a person which has an employment relationship with an organization (Employer).
 Role Link – An association between two Roles. It is used to capture relationships that exists
between Entities other than the scoping relationships. A single Role may have a Role Link
with multiple other Roles. A single Role Link is always between two distinct instances of Role.
July 14, 2015 Page: 81 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Entity
classCode : CS
determinerCode: CS
code: CE
statusCode : CS
id : II
Role
classCode : CS
code: CE
effectiveTime : IVL<TS>
statusCode : CS
id : II
Participation
typeCode : CS
time : IVL<TS>
statusCode : CS
Act
classCode : CS
moodCode: CS
code: CD
statusCode : CS
effectiveTime : GTS
id : II
0..1
0..*
1
0..*
1
0..*
Role Link
typeCode : CS
effectiveTime : IVL<TS>
Act Relationship
typeCode : CS
RIM Backbone Classes
0..1
0..*
plays
scopes
1 1
0..* 0..*
1 1
0..* 0..*
July 14, 2015 Page: 82 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
RIM Backbone Classes
Entity
classCode : CS
determinerCode: CS
code: CE
statusCode : CS
id : II
Role
classCode : CS
code: CE
effectiveTime : IVL<TS>
statusCode : CS
id : II
Participation
typeCode : CS
time : IVL<TS>
statusCode : CS
Act
classCode : CS
moodCode: CS
code: CD
statusCode : CS
effectiveTime : GTS
id : II
0..1
0..*
1
0..*
1
0..*
0..1
0..*
plays
scopes
July 14, 2015 Page: 83 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
RIM Backbone Classes
Entity
classCode : CS
determinerCode: CS
code: CE
statusCode : CS
id : II
Role
classCode : CS
code: CE
effectiveTime : IVL<TS>
statusCode : CS
id : II
Participation
typeCode : CS
time : IVL<TS>
statusCode : CS
Act
classCode : CS
moodCode: CS
code: CD
statusCode : CS
effectiveTime : GTS
id : II
0..1
0..*
1
0..*
1
0..*
0..1
0..*
plays
scopes
Living Subject
Place
Organization
Material
Licensed Entity
Patient
Access
Employee
Managed Participation
Observation
Supply
Patient Encounter
Procedure
Device Task
Substance Administration
Financial Transaction
Invoice Element
Financial Contract
Account
Working List
Control Act
July 14, 2015 Page: 84 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 RIM Class Diagram
July 14, 2015 Page: 85 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Entity
classCode : CS
determinerCode : CS
statusCode : CS
code: CE
Role
classCode : CS
effectiveTime : IVL<TS>
code: CE
Participation
typeCode : CS
time : IVL<TS>
statusCode : CS
Act
classCode : CS
moodCode : CS
statusCode : CS
code: CD
effectiveTime : GTS
0..1
0..* 1
0..*
1
0..*
RIM Core Attribute Value Sets
Entity
Class Code
• Living Subject
• Person
• Organization
• Material
• Place
• ...
Role
Class Code
• Patient
• Provider
• Employee
• Specimen
• Certified
Practitioner
• ...
Participation
Type Code
• Performer
• Author
• Witness
• Subject
• Destination
• ...
Act
Mood Code
• Definition
• Intent
• Order
• Event
• Criterion
• ...
Act
Class Code
• Observation
• Procedure
• Supply
• Substance
Admin
• Financial
• ...
Entity
Determiner
Code
• Kind
• Instance
• Quantified
Group
0..1
0..*
plays
scopes
July 14, 2015 Page: 86 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Coded Structural Attributes
 RIM coded attributes with a data type of Coded Simple (CS) are referred
to as “structural”
 A CS data type is assigned to an attribute when the only allowable code
values for the attribute are determined by HL7
 There are 18 such attributes in the RIM. Each of them is bound to a
vocabulary value set defined by HL7.
 These attributes are referred to as “structural” because their presence in
the model eliminates the need to include other structural model
components such as classes, generalizations, and associations.
 Vocabulary value sets bound to coded structural attributes are
normative.
July 14, 2015 Page: 87 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Coded “Structural” Attributes
 Act.classCode
 Act.moodCode
 Act.statusCode
 ActRelationship.checkpointCode
 ActRelationship.conjunctionCode
 ActRelationship.joinCode
 ActRelationship.splitCode
 ActRelationship.Type
 ActRelationship.contextControlCode
 Entity.classCode
 Entity.determinerCode
 Entity.statusCode
 ManagedParticipation.statusCode
 Participation.contextControlCode
 Participation.typeCode
 Role.classCode
 Role.statusCode
 RoleLink.typeCode
July 14, 2015 Page: 88 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Act.classCode
3.1.1.1 Act.classCode :: CS (1..1) Mandatory
Vocabulary domain: ActClass (CNE)
Attribute description:
A code specifying the major type of Act that this Act-instance represents.
Constraints:
The classCode domain is a tightly controlled vocabulary, not an external or
user-defined vocabulary.
Every Act-instance must have a classCode. If the act class is not further
specified, the most general Act.classCode (ACT) is used.
The Act.classCode must be a generalization of the specific Act concept (e.g., as
expressed in Act.code), in other words, the Act concepts conveyed in an Act
must be specializations of the Act.classCode. Especially, the classCode is not a
"modifier" or the Act.code that can alter the meaning of a class code. (See
Act.code for contrast.)
Name DatatypeCardinalityUsageValue DomainCoding Strength
July 14, 2015 Page: 89 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Act.moodCode
3.1.1.2 Act.moodCode :: CS (1..1) Mandatory
Vocabulary domain: ActMood (CNE)
Attribute description:
A code distinguishing whether an Act is conceived of as a factual statement or in some
other manner as a command, possibility, goal, etc.
Constraints:
An Act-instance must have one and only one moodCode value. The moodCode of a single
Act-instance never changes. Mood is not state. To describe the progression of a business
activity from defined to planned to executed, etc. one must instantiate different Act-
instances in the different moods and link them using ActRelationship of general type
"sequel". (See ActRelationship.typeCode.)
Discussion:
The Act.moodCode includes the following notions: (1) event, i.e., factual description of an
actions that occurred; (2) definition of possible actions and action plans (the master file
layer); (3) intent, i.e., an action plan instantiated for a patient as a care plan or order; (4)
goal, i.e., an desired outcome attached to patient problems and plans; and (5) criterion, i.e.,
a predicate used to evaluate a logical expression
July 14, 2015 Page: 90 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Act.code
3.1.1.4 Act.code :: CD (0..1)
Vocabulary domain: ActCode (CWE)
Attribute description:
A code specifying the particular kind of Act that the Act-instance represents
within its class.
Constraints:
The kind of Act (e.g. physical examination, serum potassium, inpatient
encounter, charge financial transaction, etc.) is specified with a code from one
of several, typically external, coding systems. The coding system will depend
on the class of Act, such as LOINC for observations, etc. Conceptually, the
Act.code must be a specialization of the Act.classCode. This is why the
structure of ActClass domain should be reflected in the superstructure of the
ActCode domain and then individual codes or externally referenced
vocabularies subordinated under these domains that reflect the ActClass
structure.
July 14, 2015 Page: 91 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
ActRelationship.typeCode
3.1.2.1 ActRelationship.typeCode :: CS (1..1) Mandatory
Vocabulary domain: ActRelationshipType (CNE)
Attribute description:
A code specifying the meaning and purpose of every ActRelationship instance. Each of its
values implies specific constraints to what kinds of Act objects can be related and in which
way.
Discussion:
The types of act relationships fall under one of 5 categories:
1.) (De)-composition, with composite (source) and component (target).
2.) Sequel which includes follow-up, fulfillment, instantiation, replacement, transformation,
etc. that all have in common that source and target are Acts of essentially the same kind but
with variances in mood and other attributes, and where the target exists before the source
and the source refers to the target that it links back to.
3.) Pre-condition, trigger, reason, contraindication, with the conditioned Act at the source
and the condition or reason at the target.
4.) Post-condition, outcome, goal and risk, with the Act at the source having the outcome or
goal at the target.
5.) A host of functional relationships including support, cause, derivation, etc. generalized
under the notion of "pertinence".
July 14, 2015 Page: 92 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Participation.typeCode
3.1.3.1 Participation.typeCode :: CS (1..1) Mandatory
Vocabulary domain: ParticipationType (CNE)
Attribute description:
A code specifying the kind of Participation or involvement the Entity
playing the Role associated with the Participation has with regard to
the associated Act.
Constraints:
The Participant.typeCode contains only categories that have crisp
semantic relevance in the scope of HL7. It is a coded attribute without
exceptions and no alternative coding systems allowed.
July 14, 2015 Page: 93 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Entity.classCode
3.2.1.1 Entity.classCode :: CS (1..1) Mandatory
Vocabulary domain: EntityClass (CNE)
Attribute description:
An HL7 defined value representing the class or category that the Entity instance
represents.
Examples:
Person, Animal, Chemical Substance, Group, Organization
Rationale:
Due to the extremely large number of potential values for a code set
representing all physical things in the universe, the class code indicates both
the subtype branch of the Entity hierarchy used as well as a high level classifier
to represent the instance of Entity. This can be used to constrain the eligible
value domains for the Entity.code attribute.
July 14, 2015 Page: 94 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Entity.determinerCode
3.2.1.2 Entity.determinerCode :: CS (1..1) Mandatory
Vocabulary domain: EntityDeterminer (CNE)
Attribute description:
An HL7 defined value representing whether the Entity represents a kind-of or a
specific instance.
Examples:
1 human being (an instance), 3 syringes (quantified kind) or the population of
Indianapolis (kind of group)
Rationale:
An Entity may at times represent information concerning a specific instance
(the most common), a quantifiable group with common characteristics or a
general type of Entity. This code distinguishes these different representations.
July 14, 2015 Page: 95 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Entity.code
3.2.1.4 Entity.code :: CE (0..1)
Vocabulary domain: EntityCode (CWE)
Attribute description:
A value representing the specific kind of Entity the instance represents.
Examples:
A medical building, a Doberman Pinscher, a blood collection tube, a tissue
biopsy.
Rationale:
For each Entity, the value for this attribute is drawn from one of several coding
systems depending on the Entity.classCode, such as living subjects (animal and
plant taxonomies), chemical substance (e.g., IUPAC code), organizations,
insurance company, government agency, hospital, park, lake, syringe, etc. It is
possible that Entity.code may be so fine grained that it represents a single
instance. An example is the CDC vaccine manufacturer code, modeled as a
concept vocabulary, when in fact each concept refers to a single instance.
July 14, 2015 Page: 96 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Role.classCode
3.3.1.1 Role.classCode :: CS (1..1) Mandatory
Vocabulary domain: RoleClass (CNE)
Attribute description:
A code specifying the major category of a Role as defined by HL7 vocabulary.
July 14, 2015 Page: 97 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Role.code
3.3.1.3 Role.code :: CE (0..1)
Vocabulary domain: RoleCode (CWE)
Attribute description:
A code further specifying the kind of Role.
Discussion:
The Role.code must conceptually be a proper specialization of Role.classCode.
Role.code does not modify Role.classCode. Rather, each is a complete concept
or a Role-like relationship between two Entities, but Role.code may be more
specific than Role.classCode.
The Role.code may not be coded if only an un-coded name for the type of role is
commonly used.
July 14, 2015 Page: 98 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
RoleLink.typeCode
3.3.2.1 RoleLink.typeCode :: CS (1..1) Mandatory
Vocabulary domain: RoleLinkType (CNE)
Attribute description:
A code specifying the kind of connection represented by this RoleLink, e.g.,
has-part, has-authority.
July 14, 2015 Page: 99 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Accessing the RIM
http://www.hl7.org/participate/toolsandresources.cfm?ref=nav
July 14, 2015 Page: 100 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
RoseTree
July 14, 2015 Page: 101 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Model Browsing Tree - Attributes
Packages (AKA Subject Areas)
Classes
Attributes
Datatype
Datatype Components
(AKA Properties)
Descriptive
Text
July 14, 2015 Page: 102 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Model Browsing Tree - Relationships
Source Class (AKA Focal Class)
Relationships
Distal Class
Descriptive
Text
July 14, 2015 Page: 103 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Model Browsing Tree - States
States
Transitions
Descriptive
Text
July 14, 2015 Page: 104 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
State Machine
 The HL7 Reference Information
Model includes state machines for
the Entity, Role,
ManagedParticipation, and Act
classes.
 A state machine specifies the
allowable states and valid state
transitions for a given class.
 A class transitions from one state
to another sometimes triggers one
or more interactions.
July 14, 2015 Page: 105 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Entity State Machine
normal
active inactive
null
active inactivecreate
revise revise
reactivate
inactivate
nullified
nullify
July 14, 2015 Page: 106 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Role State Machine
July 14, 2015 Page: 107 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Managed Participation State Machine
normal
pending active completed
cancelled
pending active completed
null
revise revise revise
complete
reactivate
activate
nullified
nullify
cancelled
cancel
createcreatecreate
July 14, 2015 Page: 108 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Act State Machine
July 14, 2015 Page: 109 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 RIM Class Diagram
July 14, 2015 Page: 110 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
RIM is First ISO/HL7 Standard
 On August 3, 2006 the HL7
Reference Information Model
was published as an ISO
standard (21731:2006).
 The RIM was accepted and
approved through the ISO
Technical Committee 215 –
Health Informatics.
 The RIM is the first publication
of an ISO/HL7 standard.
 Other ISO/HL7 collaborations
include:
 HL7 V2.5 Messaging Standard
 Clinical Data Architecture –
 Common Terminology Server
 Structured Product Labeling
 Annotated Electrocardiogram
 Individual Case Safety Report
July 14, 2015 Page: 111 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
RIM From Draft to Normative
 Apr 96 – Dec 96: Initial development
 Jan 97 – Jan 00: Pre-USAM Harmonization
 Jan 00 – Jul 03: Post-USAM and Pre-Normative
 Normative Releases:
– V1.25 Release 1.0: Jul 2003
– V2.29 Release 2.0: Oct 2009
– V2.33 Release 3.0: Nov 2010
– V2.36 Release 4.0: Jul 2011
– V2.40 Release 5.0: Jul 2012
– V2.46 Release 6.0: Dec 2013
July 14, 2015 Page: 112 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3.0 Foundational Artifacts
Reference
Information
Model
Datatype
Specification
Vocabulary
Specification
The HL7 Reference Information Model is the
information model from which all other information
models and message specifications are derived.
The HL7 Vocabulary Specification defines the set of all
concepts that can be taken as valid values in an instance
of a coded attribute or data type property.
The HL7 Datatype Specification defines the structural
format of the data carried in an attribute and influences
the set of allowable values an attribute may assume.
July 14, 2015 Page: 113 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3.0 Foundational Artifacts
Reference
Information
Model
Datatype
Specification
Vocabulary
Specification
The HL7 Reference Information Model is the
information model from which all other information
models and message specifications are derived.
The HL7 Vocabulary Specification defines the set of all
concepts that can be taken as valid values in an instance
of a coded attribute or data type property.
The HL7 Datatype Specification defines the structural
format of the data carried in an attribute and influences
the set of allowable values an attribute may assume.
July 14, 2015 Page: 114 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 Version 3.0
Data Type Specification
The HL7 v3 Abstract Datatype Specification defines the
structural format of the data carried in an attribute and
influences the set of allowable values an attribute may assume.
July 14, 2015 Page: 115 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 Version 3.0 Data Types
 HL7 data types define the structure and constrain the allowable
values of attributes in the RIM.
 The HL7 v3 abstract data type specification declares the set of
data types, identifies components of complex types, and defines
relationships between data types.
 The HL7 data type implementation technology specification
defines constraints and operations for data types and describes
how data types are to be represented in XML.
 Data types are reusable atomic building blocks used to create all
HL7 V3 information structures.
 Each RIM attribute is assigned one data type; each data type is
assigned to zero, one, or more RIM attribute.
July 14, 2015 Page: 116 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 Version 3.0 Data Types (R1)
 AD: Postal Address
 ANY: DataValue
 BAG: Bag
 BL: Boolean
 CD: Concept Descriptor
 CE: Coded With Equivalents
 CS: Coded Simple Value
 ED: Encapsulated Data
 EN: Entity Name
 GTS: General Timing Specification
 HIST: History
 II: Instance Identifier
 INT: Integer Number
 IVL: Interval
 LIST: Sequence
 MO: Monetary Amount
 ON: Organization Name
 PN: Person Name
 PPD: Parametric Probability Distribution
 PQ: Physical Quantity
 REAL: Real Number
 RTO: Ratio
 SC: Character String with Code
 SET: Set
 ST: Character String
 TEL: Telecommunication Address
 TN: Trivial Name
 TS: Point in Time
 UVP: Uncertain Value - Probabilistic
July 14, 2015 Page: 117 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Datatype Class Diagram
T
Sequence : LIST
T
Set : SET
T
Bag : BAG
Quantity : QTY
IntegerNumber : INT
RealNumber : REAL
PhysicalQuantity : PQ
MonetaryAmount : MO
Ratio : RTO
PointInTime : TS
Boolean : BL
CharacterString : ST
ConceptDescriptor : CD
CodedValue : CV
InstanceIdentifier : II
TelecommunicationAddress : TEL
T
Interval : IVL
DataValue : ANY
BinaryData : BIN
List_of_Boolean : LIST<BL>
<<extends>>
EncapsulatedData : ED
<<extends>>
ConceptRole : CR
CodedSimpleValue : CS
<<restricts>>
CodedWithEquivalents : CE
ISO_object_identifier : OID
List_ADXP : LIST<ADXP>
PostalAndResidentialAddress : AD
<<extends>>
AddressPart : ADXP
PersonNameType : PN
List_ENXP : LIST<ENXP>
EntityNamePart : ENXP
T
PeriodicIntervalOfTime : PIVL
T
EventRelatedPeriodicIntervalOfTime : EIVL
GeneralTimingSpecification : GTS
Set_of_TS : SET<TS>
<<extends>>
T : T
T
Annotated : ANT
T
History_item : HXIT
T
History : HIST
Set_of_HXIT : SET<HXIT<T>>
T
UncertainValueNarrative : UVN
<<extends>>
T
UncertainValueProbabilistic : UVP
T
NonParametricProbabilityDistribution : NPPD
Set_UVP : SET<UVP<T>>
T
ParametricProbabilityDistribution : PPD
UniversalResourceLocator : URL
<<extends>>
OrganizationName : ON
<<extends>>
<<extends>><<extends>>
<<extends>>
<<extends>>
<<extends>>
<<extends>>
<<extends>>
<<extends>>
<<extends>>
<<extends>>
<<restricts>>
<<restricts>>
<<restricts>>
<<extends>>
<<extends>>
<<extends>><<extends>>
<<extends>>
<<extends>>
<<extends>>
<<extends>>
<<extends>><<extends>>
<<restricts>>
<<extends>>
<<extends>>
<<extends>>
<<extends>> <<extends>>
<<extends>>
July 14, 2015 Page: 118 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
AddressDataTypes
+ AddressPart : ADXP
+ PostalAndResidentialAddress : AD
+ TelecommunicationAddress : TEL
+ UniversalResourceLocator : URL
CharacterStringDatatypes
+ CharacterString : ST
+ EncapsulatedData : ED
+ StringWithCode : SC
ConceptDescriptorDataTypes
+ CodedSimpleValue : CS
+ CodedValue : CV
+ CodedWithEquivalents : CE
+ ConceptDescriptor : CD
+ ConceptRole : CR
AnyDataType
+ DataValue : ANY
ParameterizedDataTypes
+ Bag : BAG
+ Interval : IVL
+ Sequence : LIST
+ Set : SET
IdentifierDataTypes
+ ISOObjectIdentifier : OID
+ InstanceIdentifier : II
EntityNameDataTypes
+ EntityName : EN
+ EntityNamePart : ENXP
+ OrganizationName : ON
+ PersonNameType : PN
+ TrivialName : TN
QuantityDataTypes
+ BinaryData : BIN
+ Boolean : BL
+ IntegerNumber : INT
+ MonetaryAmount : MO
+ PhysicalQuantity : PQ
+ Quantity : QTY
+ Ratio : RTO
+ RealNumber : REAL
TimingExpressionDatatypes
+ GeneralTimingSpecification : GTS
+ GeneralTimingSpecificationTerm
+ PointInTime : TS
HL7 Data Type Packages
July 14, 2015 Page: 119 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Basic Datatype Descriptions
Name Symbol Description
Boolean BL The Boolean type stands for the values of two-valued logic. A Boolean value can be either
true or false.
Encapsulated Data ED Data that is primarily intended for human interpretation or for further machine processing
outside the scope of this specification. This includes unformatted or formatted written
language, multimedia data, or structured information in as defined by a different standard
(e.g., XML-signatures.) Instead of the data itself, an ED may contain only a reference (see
TEL.) Note that the ST data type is a specialization of the ED data type when the ED
media type is text/plain.
Character String ST Text data, primarily intended for machine processing (e.g., sorting, querying, indexing,
etc.) Used for names, symbols, and formal expressions.) Note that the ST data type is a
specialization of the ED data type when the ED media type is text/plain.
Coded Simple Value CS Coded data, consists of a code and display name. The code system and code system
version is fixed by the context in which the CS value occurs. CS is used for coded
attributes that have a single HL7-defined value set.
Coded Value CV Coded data, consists of a code, display name, code system, and original text. Used when
a single code value must be sent.
Coded With Equivalents CE Coded data, consists of a coded value (CV) and, optionally, coded value(s) from other
coding systems that identify the same concept. Used when alternative codes may exist.
Concept Descriptor CD Coded data, is like a CE with the extension of modifiers. Modifiers for codes have an
optional role name and a value. Modifiers allow one to express, e.g., "FOOT, LEFT" as a
postcoordinated term built from the primary code "FOOT" and the modifier "LEFT".
July 14, 2015 Page: 120 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Basic Datatype Descriptions
Name Symbol Description
Instance Identifier II An identifier to uniquely identify an individual instance. Examples are medical record
number, order number, service catalog item number, etc. Based on the ISO Object
Identifier (OID)
Telecommunication Address TEL A telephone number or e-mail address specified as a URL. In addition, this type
contains a time specification when that address is to be used, plus a code describing
the kind of situations and requirements that would suggest that address to be used
(e.g., work, home, pager, answering machine, etc.)
Postal Address AD For example, a mailing address. Typically includes street or post office Box, city,
postal code, country, etc.
Entity Name EN A name of a person, organization, place, or thing. Can be a simple character string or
may consist of several name parts that can be classified as given name, family name,
nickname, suffix, etc.
Person Name PN A name of a person. Person names usually consist of several name parts that can be
classified as given, family, nickname etc. PN is a restriction of EN.
Organization Name ON A name of an organization. ON name parts are typically not distinguished, but may
distinguish the suffix for the legal standing of an organization (e.g. "Inc.", "Co.", "B.V.",
"GmbH", etc.) from the name itself. ON is a restriction of EN.
Trivial Name TN A restriction of EN that is equivalent with a plain character string (ST). Typically used
for the names of things, where name parts are not distinguished.
Integer Number INT Positive and negative whole numbers typically the results of counting and
enumerating. The standard imposes no bounds on the size of integer numbers.
July 14, 2015 Page: 121 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Basic Datatype Descriptions
Name Symbol Description
Decimal number REAL Fractional numbers. Typically used whenever quantities are measured, estimated, or
computed from other real numbers. The typical representation is decimal, where the
number of significant decimal digits is known as the precision.
Physical Quantity PQ A dimensioned quantity expressing the result of measurement. It consists of a real
number value and a physical unit. Physical quantities are often constrained to a certain
dimension by specifying a unit representing the dimension (e.g. m, kg, s, kcal/d, etc.)
However, physical quantities should not be constrained to any particular unit (e.g.,
should not be constrained to centimeter instead of meter or inch.)
Monetary Amount MO The amount of money in some currency. Consists of a value and a currency
denomination (e.g., U.S.$, Pound sterling, Euro, Indian Rupee.)
Ratio RTO A quantity explicitly including both a numerator and a denominator (e.g. 1:128.) Only in
the rare cases when the numerator and denominator must stand separate should the
Ratio data type should be used. Normally, the REAL, PQ, or MO data types are more
appropriate.
Point in Time TS A time stamp.
General Timing Specification GTS One or more time intervals used to specify the timing of events. Every event spans one
time interval (occurrence interval). A repeating event is timed through a sequence of
such occurrence intervals. Such timings are often specified not directly as a sequence of
intervals but as a rule, e.g., "every other day (Mon - Fri) between 08:00 and 17:00 for 10
minutes."
July 14, 2015 Page: 122 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
ED: Encapsulated Data
Name Type Status Definition
BIN BIN mandatory The binary data.
type CS mandatory Identifies the encoding of the data and a method to interpret the data.
charset CS optional Where applicable, specifies the character set and character encoding
used. The charset may be implied or fixed by the ITS.
language CS optional Where applicable, specifies the language of text data.
compression CS optional Indicates whether the raw byte data is compressed, and what
compression algorithm was used.
reference TEL optional A telecommunication address that resolves to the binary data.
integrityCheck BIN optional A short binary value representing a cryptographically strong checksum
over the binary data.
integrityCheckAlgorithm CS optional Specifies the algorithm used to compute the integrityCheck value.
thumbnail ED optional An abbreviated rendition of the full data.
July 14, 2015 Page: 123 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
ST: Character String
Name Type Status Definition
data BIN mandatory The binary data of the character string.
charset CS optional Specifies the character set and character encoding used.
language CS optional Specifies the language of text data.
July 14, 2015 Page: 124 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
CD: Concept Descriptor
Name Description
code A string containing the value of the code (e.g., "F150")
displayName A string containing a short, human-readable description of the code. ("Ford F150 Full-size Pickup Truck")
codeSystem An Object Identifier (OID) that uniquely identifies the code system to which the code belongs (e.g.,
"106.75.314.67.89.24," where this uniquely identifies Ford Motor Company's set of model numbers).
codeSystemName A string containing a short, human-readable description of the code system (e.g., "Ford Car and Truck Models ").
codeSystemVersion A string qualifying the version of the code system (e.g., "Model Year 2001").
originalText This is the text, phrase, etc., that is the basis for the coding. (e.g., "The new truck purchased for hospital facility
maintenance was a Ford model F150 ...").
modifier Some code systems permit modifiers, additional codes that refine the meaning represented by the primary code.
HL7 Version 3 accommodates a list of modifiers. Continuing with our truck example, the list of modifiers "Body-
ECAB, Eng-V8, EM-CE" modify "F150" to designate that the truck has an extended cab, V8 engine, and California
Emissions package. "Body-," "Eng-," and "EM" designate the roles (body, engine, emissions) represented by the
codes "ECAB," "V8," and "CE."
translation Quite often in an interfaced environment, codes need to be translated into one or more other coding systems. In our
example, the California DMV may have their own code
July 14, 2015 Page: 125 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Concept Descriptor Datatypes
Name Type Status
code ST mandatory
displayName ST optional
Name Type Status
code ST mandatory
displayName ST optional
codeSystem OID mandatory
codeSystemName ST optional
codeSystemVersion ST optional
originalText ST optional
Name Type Status
code ST mandatory
displayName ST optional
codeSystem OID mandatory
codeSystemName ST optional
codeSystemVersion ST optional
originalText ST optional
translation SET<CV> optional
CS: Coded Simple
CV: Coded Value
CE: Coded With Equivalents
July 14, 2015 Page: 126 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
II: Instance Identifier
Name Type Status Definition
extension ST optional The value of the identifier, unique within its assigning authority's namespace.
root OID mandatory A unique identifier that guarantees the global uniqueness of the instance identifier.
The root alone may be the entire instance identifier, an extension value is not
needed.
assigningAuthorityName ST optional A human readable name or mnemonic for the assigning authority. This name is
provided solely for the convenience of unaided humans interpreting an II value.
Note: no automated processing must depend on the assigning authority name to be
present in any form.
validTime IVL<TS> optional If applicable, specifies during what time the identifier is valid. By default, the
identifier is valid indefinitely. Any specific interval may be undefined on either side
indicating unknown effective or expiry time.
Note: identifiers for information objects in computer systems should not have
restricted valid times, but should be globally unique at all times. The identifier valid
time is provided mainly for real-world identifiers, whose maintenance policy may
include expiry (e.g., credit card numbers.)
July 14, 2015 Page: 127 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Tel: Telecommunication Address
Name Type Status Definition
URL URL mandatory The essence of a telecommunication address is a Universal Resource Locator.
use SET<CS> optional
A code advising a system or user which telecommunication address in a set of like
addresses to select for a given telecommunication need.
validTime GTS optional
Identifies the periods of time during which the telecommunication address can be
used. For a telephone number, this can indicate the time of day in which the party
can be reached on that telephone. For a web address, it may specify a time range in
which the web content is promised to be available under the given address.
July 14, 2015 Page: 128 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
AD: Postal Address
Name Type Status Definition
LIST<ADXP> mandatory The address data
use SET<CS> optional
A code advising a system or user which address in a set of like addresses to
select for a given purpose
validTime GTS optional
Identifies the periods of time during which the address can be used. Typically
used to refer to different addresses for different times of the year or to refer to
historical addresses.
Name Type Status Definition
ST ST mandatory The address part data
type CS optional
Indicates whether an address part is the street, city, country, postal code, post
box, etc.
ADXP: Postal Address Part
July 14, 2015 Page: 129 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
EN: Entity Name
Name Type Status Default Constraint Definition
ST mandatory NULL The entity name part data
type CS optional NULL EntityNamePartType Indicates whether the name part is a
given name, family name, prefix,
suffix, etc.
qualifier SET<CS> optional NULL EntityNameQualifier A set of codes each of which specifies
a certain subcategory of the name part
in addition to the main name part type
Name Type Status Default Constraint Definition
LIST<ENXP> mandatory NULL The name data
use SET<CS> optional NULL NamePurpose A code advising a system or user
which name in a set of names to select
for a given purpose
validTime IVL<TS> optional NULL Identifies the interval of time during
which the name was used. Typically
used to record historical names.
ENXP: Entity Name Part
Entity Name Specializations:
TN: Trivial Name
PN: Person Name
ON: Organization Name
July 14, 2015 Page: 130 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
RTO: Ratio
Name Type Status Definition
numerator QTY mandatory The numerator of the ratio.
denominator QTY mandatory
The denominator of the ratio
The QTY data type is an abstract generalization that stands for INT, REAL, PQ,
and MO.
July 14, 2015 Page: 131 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
PQ: Physical Quantity
Name Type Status Definition
value REAL mandatory The magnitude of the quantity measured in terms of the unit
unit CS mandatory The unit of measure
original value REAL optional The magnitude of the quantity measured in terms of the original unit.
original unit CV optional The original unit of measure.
July 14, 2015 Page: 132 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
MO: Monetary Amount
Name Type Status Default Constraint Definition
value REAL mandatory NULL
The magnitude of the monetary amount in terms of
the currency unit.
currency CS mandatory NULL ISO 4217 The currency unit
July 14, 2015 Page: 133 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Additional Datatypes and Collections
 BL: Boolean
 INT: Integer
 Real: Real
 Precision :: Int
 TS: Point in Time
 Offset :: PQ
 Calendar :: CS
 Precision :: INT
 Timezone :: PQ
 SET
 LIST
 BAG
 IVL
 Low
 Center
 Width
 High
July 14, 2015 Page: 134 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3.0 Foundational Artifacts
Reference
Information
Model
Datatype
Specification
Vocabulary
Specification
The HL7 Reference Information Model is the
information model from which all other information
models and message specifications are derived.
The HL7 Vocabulary Specification defines the set of all
concepts that can be taken as valid values in an instance
of a coded attribute or data type property.
The HL7 Datatype Specification defines the structural
format of the data carried in an attribute and influences
the set of allowable values an attribute may assume.
July 14, 2015 Page: 135 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3.0 Foundational Artifacts
Reference
Information
Model
Datatype
Specification
Vocabulary
Specification
The HL7 Reference Information Model is the
information model from which all other information
models and message specifications are derived.
The HL7 Vocabulary Specification defines the set of all
concepts that can be taken as valid values in an instance
of a coded attribute or data type property.
The HL7 Datatype Specification defines the structural
format of the data carried in an attribute and influences
the set of allowable values an attribute may assume.
July 14, 2015 Page: 136 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 Version 3.0
Vocabulary Specification
The HL7 Vocabulary Specification defines the set of all
concepts that can be taken as valid values in an instance
of a coded attribute or message element.
July 14, 2015 Page: 137 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 V3 Vocabulary Specification
 The HL7 V3 Vocabulary Specification defines vocabulary domains
used in RIM coded Attributes and coded data type properties.
 A vocabulary domain is an abstract collection of interrelated
concepts. It describes the purpose or intent of a coded attribute.
 A value set is a collection of coded concepts drawn from one or
more code systems. A vocabulary domain may be associated with
many value sets (e.g. for use in different countries).
 A context expression provides a means of designating which value
set for a given domain are applicable for a given usage context.
 A coded concept has a concept code assigned by the coding
system and a concept designation which names the referenced
concept.
 A coded concept may be a parent concept for a collection of
additional concepts within the same code system.
July 14, 2015 Page: 138 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 V3 Vocabulary Specification
Metamodel
ParentConcept
VocabularyDomain
name : String
description : String
CodedConcept
conceptCode : String
conceptDesignation : String
0..*0..*
ValueSet
name : String
description : String
definingExpression : String
0..*
0..*
0..*
0..*
0..*
0..*
0..*
0..*
includes
CodeSystem
identifier : OID
name : String
description : String
0..*0..*
0..*
0..1
0..*
0..1
based on
ValueSetContext
contextExpression : String
July 14, 2015 Page: 139 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
ActCode
July 14, 2015 Page: 140 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
EntityCode
July 14, 2015 Page: 141 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
RoleCode
July 14, 2015 Page: 142 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
ParticipationType
July 14, 2015 Page: 143 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Vocabulary TermsVocabulary BindingInformation Model
Vocabulary Binding
Class
Attribute
Vocabulary
Domain
Value Set Coded
Concept
Code
System
1
0..* 0..*
0..1
0..10..*
0..*
0..*
0..* 0..*
0..*
1
0..*
0..1
July 14, 2015 Page: 144 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
CodeSystem
- id: II
- fullName: ST
- localName: ST
- description: ST
- copyright: ST
- status: CS
- statusDate: TS
CodeSystemVersion
- versionId: II
- effectiveDate: TS
- isComplete: boolean
- versionOrder: int
- releaseDate: TS
- releaseFormats: SET[ST]
- releaseLocation: ST
- supportedLanguages: SET[CS]
- status: CS
- statusDate: TS
ConceptCodeSystemVersionMembership
- /isConceptInitiator: boolean
ValueSet
- id: II
- name: ST
- description: ST
- ruleSetID: ST
- status: CS
- statusDate: TS
ValueSetVersion
- versionID: II
- effectiveDate: TS
- releaseDate: TS
- versionOrder: int
- isComplete: boolean
- rulesSetVersionID: ST
- supportedLanguages: SET[CS]
- status: CS
- statusDate: TS
ConceptValueSetMembership
- effectiveDate[0..1]: TS
Designation
- id: II
- name: ST
- description: ST
- isPreferred: boolean
- language: CS
- format: ST
- status: CS
- statusDate: TS
CodeSystemConcept
- code: ST
- codeSynonyms: SET[ST]
- id[0..1]: II
- status: CS
- statusDate: TS
CodeSystemVersionConceptAssociation
- associationKind: CS
- status: CS
- statusDate: TS
DefinedConceptProperty
- id: II
- name: ST
- description: ST
- status: CS
- statusDate: TS
These identify the defined or
"allowable" properties and associations
that may be applied to a concept.
DefinedConceptAssociation
- id: II
- associationKind: enum
- forwardName: ST
- reverseName: ST
- isDirected: boolean
- ruleSetID: ST
- description: ST
- status: CS
- statusDate: TS
DesignationValueSetVersionMembership
- isDefault: boolean
- effectiveDate[0..1]: TS
Includes both assocations within a
ocde set (hierarchic) and associations
between concpets in different code
sets. Type may indicate: map, rules
based, lexical etc. May need
specializations if different properties
needed.
CodeSystemConceptVersion
- versionId: II
- effectiveDate: TS
- versionOrder: int
- status: CS
- statusDate: TS
ConceptPropertyVersion
- value: ST
- status: CS
- statusDate: TS
This covers the Concept of "supplemental"
(per MIF) or realm/local specifc variations,
with restriction (per HL7 principles) that they
cannot actually add additional "codes".
UsageContext
- id: II
- name: ST
- description: ST
JurisdictionalDomain
- id: II
- name: ST
- description: ST
1..*10..*
1
0..*
1
1..*
1..*
11..*
0..*
used in
0..*
0..*
0..*
1
0..*
1..*
1..*
+targetConcept
1
0..*
0..1
0..*
1
0..*
0..*
1
1..*
0..*
0..1
0..*
1..*
0..*isSourceOf
0..*
isTargetOf
1
1..*
0..1
0..*
+sourceConcept
1
0..*
Controlled Terminology Service Conceptual Data Model
July 13, 2015 Page: 145 0f 211Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v2 Message Elements
Message Specification
Segment Group
Message Segment
Segment Segment Field
Data Element
Data Type Composite Data Type
Data Type Component
Code Table Code Table Item
Code System Term
Code System
July 13, 2015 Page: 146 0f 211Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3.0 Messaging Artifacts
Reference
Information
Model
Datatype
Specification
Vocabulary
Specification
Foundational
Models
(CIM)
Dynamic
Model
Constrained
Information
Model
Common
Message Type
Model
Design
Models
(PIM)
Hierarchical
Message
Definition
Message
Type
Definition
Implementation
Technology
Specification
Message
Specifications
(PSM)
July 14, 2015 Page: 147 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 Version 3.0 Reference Models
Reference Information Model
Data Type
Specification
Vocabulary
Specification
July 14, 2015 Page: 148 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 Version 3.0 Reference Models
ParentConcept
VocabularyDomain
name : String
description : String
CodedConcept
conceptCode : String
conceptDesignation : String
0..*0..*
ValueSet
name : String
description : String
definingExpression : String
0..*
0..*
0..*
0..*
0..*
0..*
0..*
0..*
includes
CodeSystem
identifier : OID
name : String
description : String
0..*0..*
0..*
0..1
0..*
0..1
based on
ValueSetContext
contextExpression : String
T
Sequence : LIST
T
Set : SET
T
Bag : BAG
Quantity : QTY
IntegerNumber : INT
RealNumber : REAL
PhysicalQuantity : PQ
MonetaryAmount : MO
Ratio : RTO
PointInTime : TS
Boolean : BL
CharacterString : ST
ConceptDescriptor : CD
CodedValue : CV
InstanceIdentifier : II
TelecommunicationAddress : TEL
T
Interval : IVL
DataValue : ANY
BinaryData : BIN
List_of_Boolean : LIST<BL>
<<extends>>
EncapsulatedData : ED
<<extends>>
ConceptRole : CR
CodedSimpleValue : CS
<<restricts>>
CodedWithEquivalents : CE
ISO_object_identifier : OID
List_ADXP : LIST<ADXP>
PostalAndResidentialAddress : AD
<<extends>>
AddressPart : ADXP
PersonNameType : PN
List_ENXP : LIST<ENXP>
EntityNamePart : ENXP
T
PeriodicIntervalOfTime : PIVL
T
EventRelatedPeriodicIntervalOfTime : EIVL
GeneralTimingSpecification : GTS
Set_of_TS : SET<TS>
<<extends>>
T : T
T
Annotated : ANT
T
History_item : HXIT
T
History : HIST
Set_of_HXIT : SET<HXIT<T>>
T
UncertainValueNarrative : UVN
<<extends>>
T
UncertainValueProbabilistic : UVP
T
NonParametricProbabilityDistribution : NPPD
Set_UVP : SET<UVP<T>>
T
ParametricProbabilityDistribution : PPD
UniversalResourceLocator : URL
<<extends>>
OrganizationName : ON
<<extends>>
<<extends>><<extends>>
<<extends>>
<<extends>>
<<extends>>
<<extends>>
<<extends>>
<<extends>>
<<extends>>
<<extends>>
<<restricts>>
<<restricts>>
<<restricts>>
<<extends>>
<<extends>>
<<extends>><<extends>>
<<extends>>
<<extends>>
<<extends>>
<<extends>>
<<extends>><<extends>>
<<restricts>>
<<extends>>
<<extends>>
<<extends>>
<<extends>> <<extends>>
<<extends>>
July 14, 2015 Page: 149 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3.0 Messaging Artifacts
Reference
Information
Model
Datatype
Specification
Vocabulary
Specification
Foundational
Models
Dynamic
Model
Constrained
Information
Model
Common
Message Type
Model
Design
Models
Hierarchical
Message
Definition
Message
Type
Definition
Implementation
Technology
Specification
Message
Specifications
July 14, 2015 Page: 150 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3.0 Messaging Artifacts
Reference
Information
Model
Datatype
Specification
Vocabulary
Specification
Foundational
Models
Dynamic
Model
Constrained
Information
Model
Common
Message Type
Model
Design
Models
Hierarchical
Message
Definition
Message
Type
Definition
Implementation
Technology
Specification
Message
Specifications
July 14, 2015 Page: 151 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3.0 Messaging Artifacts
Reference
Information
Model
Datatype
Specification
Vocabulary
Specification
Foundational
Models
Dynamic
Model
Constrained
Information
Model
Common
Message Type
Model
Design
Models
Hierarchical
Message
Definition
Message
Type
Definition
Implementation
Technology
Specification
Message
Specifications
July 14, 2015 Page: 152 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3.0 Messaging Design Models
A Dynamic Model is a specification of information
exchanges within a particular domain as described in
storyboards and storyboard examples.
A Design Information Model is an information
structure that represents the information content for a
set of messages within a particular domain area.
A Common Message Type Model is a definition of a set
of common message components that can be
referenced in various message specifications.
Dynamic
Model
Design
Information
Model
Common
Message Type
Model
HL7 Version 3.0
Dynamic Model
A Dynamic Model is a specification of
information exchanges within a particular
domain as described in storyboards and
storyboard examples.
July 14, 2015 Page: 154 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Message Development Framework
RIM
Restrict
R-MIM
Serialize
HMD
Restrict
Message
Type
Example
Storyboard
Storyboard
Example
D-MIM
Derive
Application
Role
Sender Receiver
Trigger
Event
Triggers
Content
Interaction
References
July 14, 2015 Page: 155 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
DynamicModel
Message Development Framework
RIM
Restrict
R-MIM
Serialize
HMD
Restrict
Message
Type
Example
Storyboard
Storyboard
Example
D-MIM
Derive
Application
Role
Sender Receiver
Trigger
Event
Triggers
Content
Interaction
References
July 14, 2015 Page: 156 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
v3 Dynamic Model
Example
Storyboard
Storyboard
Example
Application
Role
Sender Receiver
Trigger
Event
Triggers
Interaction
References
July 14, 2015 Page: 157 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SAIF View of v3 Dynamic Model
«Interaction»
Storyboard
artifactId
name
narrative
«Exchange»
Interaction
artifactID
name
narrative
structuredName
interactionType
«InterchangePoint»
ApplicationRole
artifactID
name
description
structuredName
«ProviderInterchangePoi...
SendingApplicationRole
::ApplicationRole
artifactID
name
description
structuredName
«ConsumerInterchangePoint»
RecievingApplicationRole
::ApplicationRole
artifactID
name
description
structuredName
TriggerEvent
artifactID
name
description
type
structuredName
InteractionBasedTriggerEvent
::TriggerEvent
artifactID
name
description
type
structuredName
StateTransitionBasedTriggerEvent
::TriggerEvent
artifactID
name
description
type
structuredName
UserRequestBasedTriggerEvent
::TriggerEvent
artifactID
name
description
type
structuredName
«ConstrainedInformationMod...
StaticModel
artifactID
name
type
ReceiverResponsibility
reason
«SoftwareUnit»
Application
ConformanceStatement
StoryboardExample
narrative
«ImplementableInformationModel»
InformationStructure
disjoint = false
1..*
1..*
sends
sender 1
1..*
receives
receiver 1
1..* {ordered} 0..*contains
1
0..*
0..*
0..*
0..*
fulfills
1
0..*
invokes
0..1
0..*
invokes
0..1
0..*
fulfills
0..*
0..*
0..*
intiates
1
Name:
Package:
Version:
Author:
Behavioral Model
Behavioral Model
v01r04
AbdulMalik Shakir
July 14, 2015 Page: 158 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
V3 Dynamic Model
 The v3 Dynamic Model provides behavioral context for static v3
message types. The v3 Dynamic Model is made up of:
1. Interactions
2. Storyboards and Storyboard Examples
3. Sender and Receiver Application Roles
4. Trigger Events
 An Interaction is an ordered collection of information exchanges
supporting one or more Use Cases outlined in a Storyboard.
 Interactions are initiated by a single Trigger Event and are
associated with one or more Application Roles.
 An Application Role is a collection of interaction exchanges. It
defines a generic interface specification to which a particular
healthcare application can conform.
 A UML sequence diagram is used to document application roles
and interactions.
July 14, 2015 Page: 159 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
An example Interaction Diagram
Application Roles
Interactions
July 14, 2015 Page: 160 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
v3 Dynamic Model
Example
Storyboard
Storyboard
Example
Application
Role
Sender Receiver
Trigger
Event
Triggers
Interaction
References
July 14, 2015 Page: 161 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
v3 Dynamic Model - Interaction
Example
Storyboard
Storyboard
Example
Application
Role
Sender Receiver
Trigger
Event
Triggers
Interaction
References
July 14, 2015 Page: 162 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Interaction
 Interactions are at the heart of messaging.
 An interaction is a unique association between:
• a specific message type (information transfer)
• a particular trigger event that initiates or "triggers" the transfer
• the Receiver Responsibilities (in terms of response
interactions) associated with the receipt of the Interaction.
 Interactions are presented with a name, the artifact ID,
and a table that lists the sending and receiving
application roles, the trigger event, the message type, the
Event type and the Wrapper types.
July 14, 2015 Page: 163 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Example Interaction Specification
July 14, 2015 Page: 164 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Example Interaction
w/Receiver Responsibilities
July 14, 2015 Page: 165 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
An example Interaction Diagram
July 14, 2015 Page: 166 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
v3 Dynamic Model
Example
Storyboard
Storyboard
Example
Application
Role
Sender Receiver
Trigger
Event
Triggers
Interaction
References
July 14, 2015 Page: 167 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
v3 Dynamic Model - Storyboard
Example
Storyboard
Storyboard
Example
Application
Role
Sender Receiver
Trigger
Event
Triggers
Interaction
References
July 14, 2015 Page: 168 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Storyboard
 The storyboard concept is borrowed from the movie and animation
industry, and is useful to the development of HL7 messages for the
same reasons proven in that industry:
 A storyboard depicts a story using a series of "snapshots" or events in
chronological sequence;
 Each snapshot represents a recognizable, meaningful moment in the
sequence of events in a functional domain
 Each snapshot illustrates the key participants in the storyboard and
their interaction with other players;
 The whole series of snapshots provides a coherent description of a
complete process or activity.
 A storyboard narrative provides the necessary context for
development of specific interactions using a fictitious illustrative
storyboard example. The process of storyboarding lays the
foundation for describing HL7 messages and their content.
July 14, 2015 Page: 169 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Example Storyboard
(Complex Laboratory Result (POLB_ST221000UV01)
 Storyboard Purpose
 To illustrate a complex laboratory result message involving a
substance administration and several specimen collections over a
period of time.
 A preliminary and final report will be messaged.
 Storyboard Narrative:
 Eve Everywoman, a 27-year-old female, presents at Good Health
Hospital Outpatient Clinic and is seen by Dr. Patricia Primary. Eve
reports extreme thirst, fatigue, and recent unexplained weight loss.
She also reports having a family history of diabetes. Dr. Patricia
Primary wants to rule out diabetes mellitus by performing a GTT2HR
 Sequence of Events:
1. Eve Everywoman, a 27-year-old female, presents at Good Health Hospital
Outpatient Clinic and is seen by Dr. Patricia Primary.
2. Eve reports extreme thirst, fatigue, and recent unexplained weight loss. She also
reports having a family history of diabetes.
3. Dr. Patricia Primary wants to rule out diabetes mellitus by performing a GTT2HR
(Two- Hour Glucose Tolerance Test).
July 14, 2015 Page: 170 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
v3 Dynamic Model
Example
Storyboard
Storyboard
Example
Application
Role
Sender Receiver
Trigger
Event
Triggers
Interaction
References
July 14, 2015 Page: 171 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
v3 Dynamic Model – Application Role
Example
Storyboard
Storyboard
Example
Application
Role
Sender Receiver
Trigger
Event
Triggers
Interaction
References
July 14, 2015 Page: 172 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Application Role
 As an HL7 interaction is defined, one application role is assigned
responsibility for sending (initiating) that interaction, and one
application role is assigned responsibility to receive that interaction
and fulfill appropriate receiver responsibilities.
 The sending and receiving responsibilities for a particular interaction
may both be assigned to a single application role.
 Application roles are the basis of conformance statements and
conformance claims in a conformance profile.
 Application roles are realizations of actors in a use case scenario or
storyboard specification.
 An application role has a name, an artifact ID and a description.
July 14, 2015 Page: 173 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Example Application Roles
July 14, 2015 Page: 174 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Sending Application Role
Prescribing System (Prescription processing) (PORX_AR990101UV02)
Description
This is a system which supports a clinician with prescribing authority. This role specifically captures
those interactions pertaining to management.
July 14, 2015 Page: 175 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Receiving Application Role
Dispensing System
(Prescription processing)
(PORX_AR990102UV02)
Description
This is a system which supports a
clinician with dispensing authority.
This role specifically captures those
interactions pertaining to
management.
July 14, 2015 Page: 176 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
An example Interaction Diagram
July 14, 2015 Page: 177 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Receiver Responsibility
July 14, 2015 Page: 178 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
v3 Dynamic Model
Example
Storyboard
Storyboard
Example
Application
Role
Sender Receiver
Trigger
Event
Triggers
Interaction
References
July 14, 2015 Page: 179 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
v3 Dynamic Model – Trigger Event
Example
Storyboard
Storyboard
Example
Application
Role
Sender Receiver
Trigger
Event
Triggers
Interaction
References
July 14, 2015 Page: 180 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Trigger Event
 A trigger event is an explicit set of conditions that initiate the transfer
of information between system components (application roles).
 Trigger events have a specified Type, from the following list:
 State-Transition Based: Trigger events resulting from a state
transition as depicted in the State Transition Model for a particular
message interaction. The trigger for canceling a document, for
example, may be considered a State Transition Based trigger event
 Interaction Based: Trigger events can be based on another
interaction. For example, the response to a query (which is an
interaction) is an Interaction Based trigger event.
 User Request Based: Trigger events may be based on a user
request. For example, the trigger event that prompts a system to send
all accumulated data to a tracking system every 12 hours is
considered User Based.
 Trigger events have a name, artifact ID, description, and a type.
July 14, 2015 Page: 181 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Example Trigger Event
July 14, 2015 Page: 182 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
State Machine
 The HL7 Reference Information
Model includes state machines for
the Entity, Role, Managed
Participation, and Act classes.
 A state machine specifies the
allowable states and valid state
transitions for a given class.
 A class transitions from one state
to another sometimes triggers one
or more interactions.
July 14, 2015 Page: 183 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Act State Machine
July 14, 2015 Page: 184 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Design-Level State Machine
 A design-level state machine defines the allowable states
and state transitions for the focal class of a design
information model.
 The design-level state machine is a proper subset of the
state machine associated with the Reference Information
Model (RIM) class that the DIM focal class is derived
from.
 An annotated version of the RIM class state machine is
used to depict the scope of a design level state machine.
 Design-level state machine annotations may include
optional alias term names for in-scope States and State
Transition triggers.
July 14, 2015 Page: 185 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Example Design-Level State Machine
Result Activate (POLB_TE004102UV01)
State Transition
 State transitions are depicted by a line
with a arrowhead showing the
direction of the transition.
 An example of a state transition might
be the change in the state of an Act
from Active to Complete.
 The change in state is associated with
a trigger event that causes the
transition.
 The trigger event in this example is the
fulfillment of an order.
 An order is a special type of Act. The
transition from an Active order to a
Completed order is triggered by the
fulfillment of the Order.
 The state diagram depicts the states,
trigger event, and state transitions of
interest.
July 14, 2015 Page: 187 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
v3 Dynamic Model
Example
Storyboard
Storyboard
Example
Application
Role
Sender Receiver
Trigger
Event
Triggers
Interaction
References
July 14, 2015 Page: 188 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Message Development Framework
RIM
Restrict
R-MIM
Serialize
HMD
Restrict
Message
Type
Example
Storyboard
Storyboard
Example
D-MIM
Derive
Application
Role
Sender Receiver
Trigger
Event
Triggers
Content
Interaction
References
July 14, 2015 Page: 189 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
StaticModel
Message Development Framework
RIM
Restrict
R-MIM
Serialize
HMD
Restrict
Message
Type
Example
Storyboard
Storyboard
Example
D-MIM
Derive
Application
Role
Sender Receiver
Trigger
Event
Triggers
Content
Interaction
References
July 14, 2015 Page: 190 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
StaticModel
v3 Dynamic Model - Message Type
Message
Type
Example
Storyboard
Storyboard
Example
Application
Role
Sender Receiver
Trigger
Event
Triggers
Content
Interaction
References
July 14, 2015 Page: 191 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Example Interaction
July 14, 2015 Page: 192 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3 Dynamic Model
Interaction
TriggerEvent
CompositeMessageStructure
ReceiverResponsibilityTransportMessageType ControlActMessageType DomainContentMessageType
ApplicationRole
Interface HealthcareApplication
ConformanceSpecification
1..*
0..*
1..*1
«instantiate»
1
0..1
1 0..*
0..* 1
+sending
0..* 1
+recieving
1+recieving
0..*
1
0..*
0..1
0..* 0..*
0..* 0..*
1
Transport
Message
Type
Control
Message
Type
Content
Message
Type
Composite
Message
Structure
Trigger
Event
Interaction
Receiver
Responsibility
Application
Role
Interface
Healthcare
Application
Conformance
Specification
July 14, 2015 Page: 193 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
v3 Dynamic Model –
Composite Message Structure
Interaction
TriggerEvent
CompositeMessageStructure
ReceiverResponsibilityTransportMessageType ControlActMessageType DomainContentMessageType
ApplicationRole
Interface HealthcareApplication
ConformanceSpecification
1..*
0..*
1..*1
«instantiate»
1
0..1
1 0..*
0..* 1
+sending
0..* 1
+recieving
1+recieving
0..*
1
0..*
0..1
0..* 0..*
0..* 0..*
1
Transport
Message
Type
Control
Message
Type
Content
Message
Type
Composite
Message
Structure
Trigger
Event
Interaction
Receiver
Responsibility
Application
Role
Interface
Healthcare
Application
Conformance
Specification
July 14, 2015 Page: 194 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
v3 Dynamic Model –
Composite Message Structure
A Transport Message Type specifies the metadata
about an interaction that is necessary to establish
message identity and facilitate message routing.
A Control Message Type specifies additional optional
interaction metadata necessary to establish message
context (trigger event, timeframes, actors involved) .
A Content Message Type is the payload of the
interaction. It is the message instance containing the
data of primary interest to the exchange.
Transport
Message Type
Control
Message Type
Content
Message Type
July 14, 2015 Page: 195 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Transport Message Type
 The Transport Message Type, also know as the transmission
wrapper, is required for all Version 3 messages.
 It contains a number of optional fields whose usage vary from one
context to another, (e.g., loosely coupled systems may require the
use of a larger set of attributes than tightly coupled systems).
 All Transmission Wrappers have mandatory attributes which identify
the sending and receiving systems of a message transmission
 Additional information about the Sender and Receiver may also be
transmitted, but the use of mandatory attributes ensures that a
Messaging Infrastructure has sufficient metadata to facilitate
message routing.
 The Transmission Wrapper in v3 is similar in function as the MSH
segment in v2.
July 14, 2015 Page: 196 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Transport Message Type
 Optional Elements:
 SecurityText
 VersionCode
 ProfileId
 SequenceNumber
 AttachmentText
 RespondTo
 AttentionLine
 ControlActProcess
 Mandatory Elements:
 ID
 CreationTime
 InteractionId
 ProcessingCode
 ProcessingModeCode
 AcceptAckCode
 Receiver
 Sender
July 14, 2015 Page: 197 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
v3 Dynamic Model –
Composite Message Structure
Interaction
TriggerEvent
CompositeMessageStructure
ReceiverResponsibilityTransportMessageType ControlActMessageType DomainContentMessageType
ApplicationRole
Interface HealthcareApplication
ConformanceSpecification
1..*
0..*
1..*1
«instantiate»
1
0..1
1 0..*
0..* 1
+sending
0..* 1
+recieving
1+recieving
0..*
1
0..*
0..1
0..* 0..*
0..* 0..*
1
Transport
Message
Type
Control
Message
Type
Content
Message
Type
Composite
Message
Structure
Trigger
Event
Interaction
Receiver
Responsibility
Application
Role
Interface
Healthcare
Application
Conformance
Specification
July 14, 2015 Page: 198 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Control Message Type
 The Control Message Type, also known as the control act wrapper,
provides interaction metadata required to establish message context
and facilitate appropriate processing by the receiving application.
 It also contains data that are useful to facilitate overall message
management and audit capabilities.
 In some exceptional cases there is no need for such information to
be included in the exchange. Therefore, the Control Message Type is
an optional component of the complex message structure.
 The control act wrapper in v3 is similar in function to the EVN
segment in v2.
July 14, 2015 Page: 199 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Control Message Type Elements
 Id
 Code
 Text
 EffectiveTime
 PriorityCode
 ReasonCode
 LanguageCode
 Overseer
 authorOrPerformer
 DataEnterer
 InformationRecipient
 Subject
 ReasonOf
July 14, 2015 Page: 200 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
v3 Dynamic Model –
Composite Message Structure
Interaction
TriggerEvent
CompositeMessageStructure
ReceiverResponsibilityTransportMessageType ControlActMessageType DomainContentMessageType
ApplicationRole
Interface HealthcareApplication
ConformanceSpecification
1..*
0..*
1..*1
«instantiate»
1
0..1
1 0..*
0..* 1
+sending
0..* 1
+recieving
1+recieving
0..*
1
0..*
0..1
0..* 0..*
0..* 0..*
1
Transport
Message
Type
Control
Message
Type
Content
Message
Type
Composite
Message
Structure
Trigger
Event
Interaction
Receiver
Responsibility
Application
Role
Interface
Healthcare
Application
Conformance
Specification
July 14, 2015 Page: 201 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Content Message
 A Content Message Type is the payload of the interaction. It is the
message instance containing the data of primary interest to the
exchange
 The Content Message is included in the Interaction as the subject of
a control act wrapper
 The linkage includes a reference to the entry point of the content
message message type:
 <xs:element name="actRequest" type="PORX_MT990020UV02.ActRequest"
nillable="true" minOccurs="1" maxOccurs="1"/>
July 14, 2015 Page: 202 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
v3 Dynamic Model –
Composite Message Structure
Interaction
TriggerEvent
CompositeMessageStructure
ReceiverResponsibilityTransportMessageType ControlActMessageType DomainContentMessageType
ApplicationRole
Interface HealthcareApplication
ConformanceSpecification
1..*
0..*
1..*1
«instantiate»
1
0..1
1 0..*
0..* 1
+sending
0..* 1
+recieving
1+recieving
0..*
1
0..*
0..1
0..* 0..*
0..* 0..*
1
Transport
Message
Type
Control
Message
Type
Content
Message
Type
Composite
Message
Structure
Trigger
Event
Interaction
Receiver
Responsibility
Application
Role
Interface
Healthcare
Application
Conformance
Specification
July 14, 2015 Page: 203 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
v3 Dynamic Model –
Composite Message Structure
Interaction
TriggerEvent
CompositeMessageStructure
ReceiverResponsibilityTransportMessageType ControlActMessageType DomainContentMessageType
ApplicationRole
Interface HealthcareApplication
ConformanceSpecification
1..*
0..*
1..*1
«instantiate»
1
0..1
1 0..*
0..* 1
+sending
0..* 1
+recieving
1+recieving
0..*
1
0..*
0..1
0..* 0..*
0..* 0..*
1
Transport
Message
Type
Control
Message
Type
Content
Message
Type
Composite
Message
Structure
Trigger
Event
Interaction
Receiver
Responsibility
Application
Role
Interface
Healthcare
Application
Conformance
Specification
July 14, 2015 Page: 204 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
v3 Dynamic Model - Message Type
Message
Type
Example
Storyboard
Storyboard
Example
Application
Role
Sender Receiver
Trigger
Event
Triggers
Content
Interaction
References
July 14, 2015 Page: 205 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3.0 Messaging Artifacts
Reference
Information
Model
Datatype
Specification
Vocabulary
Specification
Foundational
Models
Dynamic
Model
Constrained
Information
Model
Common
Message Type
Model
Design
Models
Hierarchical
Message
Definition
Message
Type
Definition
Implementation
Technology
Specification
Message
Specifications
HL7 Version 3.0
Constrained Information Model
A Constrained Information Model is an
information structure derived from the HL7
RIM that represents the information content for
a set of messages within a particular domain
area.
July 14, 2015 Page: 207 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
StaticModel
Message Development Framework
RIM
Restrict
R-MIM
Serialize
HMD
Restrict
Message
Type
Example
Storyboard
Storyboard
Example
D-MIM
Derive
Application
Role
Sender Receiver
Trigger
Event
Triggers
Content
Interaction
References
July 14, 2015 Page: 208 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
StaticModel
V3 Static Models
RIM
Restrict
R-MIM
Serialize
HMD
Restrict
Message
Type
D-MIM
Derive
July 14, 2015 Page: 209 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Implementable Information Models
Constrained Information Models
Reference Information Model
V3 Static Models
RIM
Restrict
R-MIM
Serialize
HMD
Restrict
Message
Type
D-MIM
Derive
CIM
PIM
PSM
July 14, 2015 Page: 210 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
RIM
Account
name : ST
balanceAmt : MO
currencyCode : CE
interestRateQuantity : RTO<MO,PQ>
allowedBalanceQuantity : IVL<MO>
DeviceTask
parameterValue : LIST<ANY>
DiagnosticImage
subjectOrientationCode : CE
Diet
energyQuantity : PQ
carbohydrateQuantity : PQ
FinancialContract
paymentTermsCode : CE
FinancialTransaction
amt : MO
creditExchangeRateQuantity : REAL
debitExchangeRateQuantity : REAL
InvoiceElement
modifierCode : SET<CE>
unitQuantity : RTO<PQ,PQ>
unitPriceAmt : RTO<MO,PQ>
netAmt : MO
factorNumber : REAL
pointsNumber : REAL
ManagedParticipation
id : SET<II>
statusCode : SET<CS>
Observation
value : ANY
interpretationCode : SET<CE>
methodCode : SET<CE>
targetSiteCode : SET<CD>
PatientEncounter
preAdmitTestInd : BL
admissionReferralSourceCode : CE
lengthOfStayQuantity : PQ
dischargeDispositionCode : CE
specialCourtesiesCode : SET<CE>
specialAccommodationCode : SET<CE>
acuityLevelCode : CE
Procedure
methodCode : SET<CE>
approachSiteCode : SET<CD>
targetSiteCode : SET<CD>
PublicHealthCase
detectionMethodCode : CE
transmissionModeCode : CE
diseaseImportedCode : CE
SubstanceAdministration
routeCode : CE
approachSiteCode : SET<CD>
doseQuantity : IVL<PQ>
rateQuantity : IVL<PQ>
doseCheckQuantity : SET<RTO>
maxDoseQuantity : SET<RTO>
substitutionCode : CE
Supply
quantity : PQ
expectedUseTime : IVL<TS>
WorkingList
ownershipLevelCode : CE
Container
capacityQuantity : PQ
heightQuantity : PQ
diameterQuantity : PQ
capTypeCode : CE
separatorTypeCode : CE
barrierDeltaQuantity : PQ
bottomDeltaQuantity : PQ
Device
manufacturerModelName : SC
softwareName : SC
localRemoteControlStateCode : CE...
alertLevelCode : CE
lastCalibrationTime : TS
LivingSubject
administrativeGenderCode : CE
birthTime : TS
deceasedInd : BL
deceasedTime : TS
multipleBirthInd : BL
multipleBirthOrderNumber : INT
organDonorInd : BL
ManufacturedMaterial
lotNumberText : ST
expirationTime : IVL<TS>
stabilityTime : IVL<TS>
Material
formCode : CE
NonPersonLivingSubject
strainText : ED
genderStatusCode : CE
Organization
addr : BAG<AD>
standardIndustryClassCode : CE
Person
addr : BAG<AD>
maritalStatusCode : CE
educationLevelCode : CE
raceCode : SET<CE>
disabilityCode : SET<CE>
livingArrangementCode : CE
religiousAffiliationCode : CE
ethnicGroupCode : SET<CE>
Place
mobileInd : BL
addr : AD
directionsText : ED
positionText : ED
gpsText : ST
Access
approachSiteCode : CD
targetSiteCode : CD
gaugeQuantity : PQ
Employee
jobCode : CE
jobTitleName : SC
jobClassCode : CE
salaryTypeCode : CE
salaryQuantity : MO
hazardExposureText : ED
protectiveEquipmentText : ED
LicensedEntity
recertificationTime : TS
Patient
confidentialityCode : CE
veryImportantPersonCode : CE
ActRelationship
typeCode : CS
inversionInd : BL
contextControlCode : CS
contextConductionInd : BL
sequenceNumber : INT
priorityNumber : INT
pauseQuantity : PQ
checkpointCode : CS
splitCode : CS
joinCode : CS
negationInd : BL
conjunctionCode : CS
localVariableName : ST
seperatableInd : BL
Act
classCode : CS
moodCode : CS
id : SET<II>
code : CD
negationInd : BL
derivationExpr : ST
text : ED
statusCode : SET<CS>
effectiveTime : GTS
activityTime : GTS
availabilityTime : TS
priorityCode : SET<CE>
confidentialityCode : SET<CE>
repeatNumber : IVL<INT>
interruptibleInd : BL
levelCode : CE
independentInd : BL
uncertaintyCode : CE
reasonCode : SET<CE>
languageCode : CE
0..n
1
outboundRelationship
0..n
source1
0..n
1
inboundRelationship
0..n
target
1
LanguageCommunication
languageCode : CE
modeCode : CE
proficiencyLevelCode : CE
preferenceInd : BL
Participation
typeCode : CS
functionCode : CD
contextControlCode : CS
sequenceNumber : INT
negationInd : BL
noteText : ED
time : IVL<TS>
modeCode : CE
awarenessCode : CE
signatureCode : CE
signatureText : ED
performInd : BL
substitutionConditionCode : CE...
0..n
1
0..n
1
Entity
classCode : CS
determinerCode : CS
id : SET<II>
code : CE
quantity : SET<PQ>
name : BAG<EN>
desc : ED
statusCode : SET<CS>
existenceTime : IVL<TS>
telecom : BAG<TEL>
riskCode : CE
handlingCode : CE
1
0..n
1
0..n
RoleLink
typeCode : CS
effectiveTime : IVL<TS>
Role
classCode : CS
id : SET<II>
code : CE
negationInd : BL
addr : BAG<AD>
telecom : BAG<TEL>
statusCode : SET<CS>
effectiveTime : IVL<TS>
certificateText : ED
quantity : RTO
positionNumber : LIST<INT>
0..n
1
0..n
1
0..n0..1
playedRole
0..n
player
0..1
0..n
0..1
scopedRole
0..n
scoper
0..1
0..n
1
outboundLink 0..n
source1
0..n
1
inboundLink
0..n
target1
HMD
Constrained Information Model
D-MIM
PatientIncident
classCode*:<=ENC
moodCode*:<=EVN
id:[1..*](RegistNum)
code:CVCNE[0..1]<=ExternallyDefinedActCodes(PatientType)
statusCode:LIST<CS>CNE<=ActStatus(IDPHStatus)
activityTime:TS(EDDate)
Injury
classCode*:<=ACT
moodCode*:<=EVN
activityTime:TS(InjuryDate)
0..1pertinentInjury
typeCode*:<=PERT
pertinentInformation1
TraumaRegistryExport
(IDPH_RM00001)
DatacontentofHL7
messagesusedtoexport
datafromtheIDPHTrauma
Registry.
PatientPerson
classCode*:<=PSN
determinerCode*:<=INSTANCE
name:PN[0..1](*Name)
existenceTime:(Age)
administrativeGenderCode:CVCWE<=AdministrativeGender
(GenderID)
birthTime:(DateOfBirth)
addr:AD[0..1](AddressHome)
raceCode:CVCWE[0..1]<=Race(RaceID)
ethnicGroupCode:CVCWE[0..1]<=Ethnicity(EthnicID)
1..1patientPatientPerson
1..1providerTraumaParticipant
Patient
classCode*:<=PAT
id:II[0..1](MedicaRecordNum)
TraumaParticipant
classCode*:<=ORG
determinerCode*:<=INSTANCE
id:[1..1](HospitNum)
code:CVCWE[0..1]<=EntityCode
name:ON[0..1](HospitName)
statusCode:CSCNE[0..1]<=EntityStatus(ActiveFacili)
addr:AD[0..1](HospitCity)
1..1patient
typeCode*:<=SBJ
subject
InjuryLocation
classCode*:<=PLC
determinerCode*:<=INSTANCE
code:CVCWE[0..1]<=EntityCode(InjuryPlaceID)
addr:AD[0..1](AddressScene)
0..1playingInjuryLocation
Role
classCode*:<=ROL
1..1participant
typeCode*:<=LOC
location
InjuryRelatedObservation
classCode*:<=OBS
moodCode*:<=EVN
code:<=ExternallyDefinedActCodes
priorityCode:CVCWE[0..1]<=ActPriority
value:[0..1]
0..*pertinentInjuryRelatedObservation
typeCode*:<=PERT
sequenceNumber:INT[0..1](InjurySequen)
pertinentInformation
Procedure
classCode*:<=PROC
moodCode*:<=EVN
code:CVCWE<=ActCode(ICDCodeID)
activityTime:TS(ProcedDate)
0..*pertinentProcedure
typeCode*:<=PERT
pertinentInformation7
0..1medicalStaff
typeCode*:<=PRF
performer
MedicalStaff
classCode*:<=PROV
id:II[0..1](MedicalStaffID)
0..1procedureLocation
typeCode*:<=LOC
location
ProcedureLocation
classCode*:<=SDLOC
code:<=RoleCode(ProcedLocateID)
PatientIncidentRelatedObservation
classCode*:<=OBS
moodCode*:<=EVN
code:<=ActCode
reasonCode:CVCWE[0..1]<=ActReason
value:ANY[0..1]
0..*pertinentPatientIncidentRelatedObservation
typeCode*:<=PERT
pertinentInformation2
PatientTransfer
classCode*:<=TRNS
moodCode*:<=EVN
activityTime:IVL<TS>(DischaDatetoArriveDate)
reasonCode:CVCWE[0..1]<=TransferActReason(REASONTRANSFID)
1..1arrivalPatientTransfer
typeCode*:<=ARR
arrivedBy
0..*aRole
typeCode*:<=ORG
origin
0..1playingTraumaParticipant
aRole
classCode*:<=ROL
TransferRelatedObservation
classCode*:<=OBS
moodCode*:<=EVN
code:CVCWE<=ExternallyDefinedActCodes
value:PQ[0..1]
methodCode:CVCWE[0..1]<=ObservationMethod
1..*pertinentTransferRelatedObservation
typeCode*:<=PERT
pertinentInformation
1..1transferVehicle
typeCode*:<=VIA
via
1..1owningVehicleProvider
TransferVehicle
classCode*:<=OWN
id:II[0..1](VehiclNum)
code:<=RoleCode(VehiclLevelID)
VehicleProvider
classCode*:<=ORG
determinerCode*:<=INSTANCE
id:II[0..1](VehiclProvide)
code:<=EntityCode(MaxVehiclLevelID)
name:ON[0..1](VehiclProvidName)
HospitalVisit
classCode*:<=ENC
moodCode*:<=EVN
code:CVCWE<=ActCode(AdmitServicID)
activityTime:TS(DischaDate)
dischargeDispositionCode:CVCWE[0..1]
<=EncounterDischargeDisposition
1..1pertinentHospitalVisit
typeCode*:<=PERT
pertinentInformation5
HospitalVisitRelatedObservation
classCode*:<=OBS
moodCode*:<=EVN
code:CVCWE<=ExternallyDefinedActCodes
value:[0..1]
0..*pertinentHospitalVisitRelatedObservation
typeCode*:<=PERT
pertinentInformation
1..1admittingProvider
typeCode*:<=ADM
admitter
0..1healthCareMedicalStaffPerson
AdmittingProvider
classCode*:<=PROV
id:II[0..1](ADMITMEDICASTAFFID)
code:CVCWE<=RoleCode(StaffTypeID)
0..*hospitalVisitPhysician
typeCode*:<=RESP
time:TS
responsibleParty
0..1healthCareMedicalStaffPerson
HospitalVisitPhysician
classCode*:<=PROV
id:II[0..1]
code:CVCWE<=RoleCode(StaffTypeID)
MedicalStaffPerson
classCode*:<=PSN
determinerCode*:<=INSTANCE
name:PN[0..1](MedicaStaffName)
0..1licensedEntity
typeCode*:<=DST
destination
0..1subjectChoice
LicensedEntity
classCode*:<=LIC
id:II[0..1]
Choice
Facility
classCode*:<=ORG
determinerCode*:<=INSTANCE
id:
code*:CSCNE<=EntityCode"FAC"
name:
Hospital
classCode*:<=ORG
determinerCode*:<=INSTANCE
id:
code*:CSCNE<=EntityCode"HOSP"
name:
EmergencyDepartmentEncounter
classCode*:<=ENC
moodCode*:<=EVN
activityTime:IVL<TS>
dischargeDispositionCode:CVCWE<=EncounterDischargeDisposition
0..1pertinentEmergencyDepartmentEncounter
typeCode*:<=PERT
pertinentInformation3
EmergencyDepartmentRelatedObservation
classCode*:<=OBS
moodCode*:<=EVN
code:CVCWE<=ExternallyDefinedActCodes
text:
activityTime:TS
reasonCode:<=ActReason
value:[0..1]
methodCode:CVCWE[0..1]<=ObservationMethod
targetSiteCode:CVCWE[0..1]<=HumanActSite
0..*pertinentEmergencyDepartmentRelatedObservation
typeCode*:<=PERT
pertinentInformation
0..*emergencyDepartmentPhysician
typeCode*:<=PRF
performer
0..1healthCareMedicalStaffPerson EmergencyDepartmentPhysician
classCode*:<=PROV
id:II[0..1]
code:CECWE[0..1]<=RoleCode(StaffTypeID)
PreHospitalEncounter
classCode*:<=ENC
moodCode*:<=EVN
id:II[0..1](crashNum)
activityTime:IVL<TS>
0..1priorPreHospitalEncounter
typeCode*:<=PREV
predecessor
PreHosptialRelatedObservation
classCode*:<=OBS
moodCode*:<=EVN
code:<=ExternallyDefinedActCodes
value:ANY[0..1]
0..*pertinentPreHosptialRelatedObservation
typeCode*:<=PERT
pertinentInformation
1..1preHospitalVehicle
typeCode*:<=ParticipationType
participant
1..1owningVehicleProvider
PreHospitalVehicle
classCode*:<=OWN
id:II[0..1](VehiclNum)
code:<=RoleCode(VehiclLevelID)
0..*emergencyDepartmentPhysicianAct
typeCode*:<=COMP
component
EmergencyDepartmentPhysicianAct
classCode*:<=ACT
moodCode*:<=EVN
code:CSCNE[0..1]<=ExternallyDefinedActCodes
activityTime*:TS[0..1]
component
0..*patientIncidentRelatedObservation
typeCode*:<=COMP
VehicleProvider
MedicalStaffPerson
TraumaParticipant
R-MIM
PatientIncident
classCode*: <= ENC
moodCode*: <= EVN
id: [1..*] (RegistNum)
code: CV CNE <= ExternallyDefinedActCodes (PatientType)
statusCode: LIST<CS> CNE <= ActStatus (IDPHStatus)
activityTime: TS (EDDate)
Injury
classCode*: <= ACT
moodCode*: <= EVN
activityTime: TS (InjuryDate)
0..1 pertinentInjury
typeCode*: <= PERT
pertinentInformation1
PatientPerson
classCode*: <= PSN
determinerCode*: <= INSTANCE
name: PN [0..1] (*Name)
existenceTime: (Age)
administrativeGenderCode: CV CWE <= AdministrativeGender
(GenderID)
birthTime: (DateOfBirth)
addr: AD [0..1] (AddressHome)
raceCode: CV CWE [0..1] <= Race (RaceID)
ethnicGroupCode: CV CWE [0..1] <= Ethnicity (EthnicID)
1..1 patientPatientPerson
1..1 providerTraumaParticipant
Patient
classCode*: <= PAT
id: II [0..1] (MedicaRecordNum)
TraumaParticipant
classCode*: <= ORG
determinerCode*: <= INSTANCE
id: [1..1] (HospitNum)
code: CV CWE [0..1] <= EntityCode
name: ON [0..1] (HospitName)
statusCode: CS CNE [0..1] <= EntityStatus (ActiveFacili)
addr: AD [0..1] (HospitCity)
1..1 patient
typeCode*: <= SBJ
subject
InjuryLocation
classCode*: <= PLC
determinerCode*: <= INSTANCE
code: CV CWE [0..1] <= EntityCode (InjuryPlaceID)
addr: AD [0..1] (AddressScene)
0..1 playingInjuryLocation
Role
classCode*: <= ROL
1..1 participant
typeCode*: <= LOC
location
InjuryRelatedObservation
classCode*: <= OBS
moodCode*: <= EVN
code: <= ExternallyDefinedActCodes
priorityCode: CV CWE [0..1] <= ActPriority
value: [0..1]
0..* pertinentInjuryRelatedObservation
typeCode*: <= PERT
sequenceNumber: INT [0..1] (InjurySequen)
pertinentInformation
PatientIncidentRelatedObservation
classCode*: <= OBS
moodCode*: <= EVN
code: <= ActCode
reasonCode: CV CWE [0..1] <= ActReason
value: ANY [0..1]
0..* pertinentPatientIncidentRelatedObservation
typeCode*: <= PERT
pertinentInformation2
component
0..* patientIncidentRelatedObservation
typeCode*: <= COMP
Constrained Information Models
July 14, 2015 Page: 211 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Constrained Information Models
 Domain Message Information Models (D-MIMs) and
Refined Message Information Models (R-MIMs) are types
of Constrained Information Models (CIMs).
 Constrained information models are composed of class
clones that are a restricted subset of the HL7 RIM.
 Class clones contain a subset of the attributes and
relationships that are defined for the RIM class upon
which the clone is based.
 Multiple class clones based upon the same RIM class
may be included in a constrained information model.
 Each class clone in a constrained information model is
assigned a unique name.
July 14, 2015 Page: 212 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Constrained Information Model Diagram
SubstanceAdministrationStep
classCode*: <= SBADM
moodCode*: <= x_ActMoodOrdPrmsEvn
id*: II [1..1]
code*: CE CWE <= SubstanceAdministrationActCode
text*:
statusCode*: CS CNE [0..1]
effectiveTime*: IVL<TS>
routeCode: <= RouteOfAdministration
doseQuantity: PQ
rateQuantity: PQ
1..1 manufacturedProduct *
typeCode*: <= CSM
consumable
1..1 manufacturedDrug *
0..1 manufacturerOrganization
ManufacturedProduct1
classCode*: <= MANU
Organization
classCode*: <= ORG
determinerCode*: <= INSTANCE
name*: ON [1..1]
Drug
classCode*: <= MMAT
determinerCode*: <= INSTANCE
code*: [1..1] <= DrugEntity (Drug code)
quantity:
desc:
 A Constrained Information Model
diagrams used a variety of visual
tools to document message
design.
 Entities, Roles, and Acts are
represented by rectangular
shapes colored Green, Yellow,
and Red respectively.
 Participations, Role Links, and
Act Relationships are
represented by arrow shapes
colored blue, gold, and pink
respectively.
 Bold font is used to denote
mandatory attributes.
July 14, 2015 Page: 213 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
V3 Constrained Information Model
A_AbnormalityAssessment
(COCT_RM420000UV)
Description: assessment of clinical findings, including lab test results,
for indications of the presence and severity of abnormal conditions
AbnormalityAssessment
classCode*: = "OBS"
moodCode*: = "EVN"
code*: CD CWE [1..1] <= V:ObservationType ("ADVERSE_REACTION")
statusCode*: CS CNE [1..1] <= V:ActStatusAbortedCancelledCompleted
activityTime*: TS.DATETIME [1..1]
value: CD CWE [0..1] <= V:AbnormalityAssessmentValue
methodCode: SET<CE> CWE [0..*] <= V:AbnormalityAssessmentMethod
1..* assessmentOutcome *
typeCode*: = "OUTC"
contextConductionInd*: BL [1..1] ="true"
outcome
AssessmentException
classCode*: = "OBS"
moodCode*: = "EVN"
code*: CD CWE [1..1] <= V:ObservationType ("ASSERTION")
value*: SC CWE [1..1] <= V:AssessmentExceptionValue
AbnormalityGrade
classCode*: = "OBS"
moodCode*: = "EVN"
code*: CD CWE [1..1] <= V:ObservationType ("SEV")
uncertaintyCode: CE CNE [0..1] <= V:ActUncertainty
value*: CD CWE [1..1] <= V:AbnormalityGradeValue
AssessmentOutcome
0..* assessmentOutcomeAnnotation
typeCode*: = "APND"
contextConductionInd*: BL [1..1] ="true"
appendageOf
AssessmentOutcomeAnnotation
classCode*: = "OBS"
moodCode*: = "EVN"
code*: CD CWE [1..1] <= V:ObservationType ("ASSERTION")
value*: SC CWE [1..1] <= V:AssessmentOutcomeAnnotationValue
Model Components
 Entry Point(s)
 Clones
• Focal Class
• Traversal Path
• Choice Structure
 Attributes
• Datatype
• Cardinality
• Terminology Binding
July 14, 2015 Page: 214 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Discovery of the underlying meta-model
A_AbnormalityAssessment
(COCT_RM420000UV)
Description: assessment of clinical findings, including lab test results,
for indications of the presence and severity of abnormal conditions
AbnormalityAssessment
classCode*: = "OBS"
moodCode*: = "EVN"
code*: CD CWE [1..1] <= V:ObservationType ("ADVERSE_REACTION")
statusCode*: CS CNE [1..1] <= V:ActStatusAbortedCancelledCompleted
activityTime*: TS.DATETIME [1..1]
value: CD CWE [0..1] <= V:AbnormalityAssessmentValue
methodCode: SET<CE> CWE [0..*] <= V:AbnormalityAssessmentMethod
1..* assessmentOutcome *
typeCode*: = "OUTC"
contextConductionInd*: BL [1..1] ="true"
outcome
AssessmentException
classCode*: = "OBS"
moodCode*: = "EVN"
code*: CD CWE [1..1] <= V:ObservationType ("ASSERTION")
value*: SC CWE [1..1] <= V:AssessmentExceptionValue
AbnormalityGrade
classCode*: = "OBS"
moodCode*: = "EVN"
code*: CD CWE [1..1] <= V:ObservationType ("SEV")
uncertaintyCode: CE CNE [0..1] <= V:ActUncertainty
value*: CD CWE [1..1] <= V:AbnormalityGradeValue
AssessmentOutcome
0..* assessmentOutcomeAnnotation
typeCode*: = "APND"
contextConductionInd*: BL [1..1] ="true"
appendageOf
AssessmentOutcomeAnnotation
classCode*: = "OBS"
moodCode*: = "EVN"
code*: CD CWE [1..1] <= V:ObservationType ("ASSERTION")
value*: SC CWE [1..1] <= V:AssessmentOutcomeAnnotationValue
«clone»
Class
localName: char
fixedName: char
businessName: char
comment: Annotation
isEntryPointIndicator: boolean
isStubIndicator: boolean
«RIM»
Class
name: char
description: Annotation
«clone»
Attribute
businessName: char
datatype: DataType
cardinality: Cardinality
conformance: Conformance
comment: Annotation
initialValue: char
initialValueRole: ValueRole
maximumLength: int
«RIM»
Attribute
name: char
datatype: DataType
cardinality: Cardinality
mandatoryInclusionIndicator: boolean
description: Annotation
«RIM»
Relationship
name: char
relationshipType: RelationshipType
«clone»
Relationship
ConstrainedInformationModel
name: char
description: Annotation
modelType: ModelType
ControllingAttribute
constraints
{datatype = CS}
{cardinality = (1..1)}
{conformance = Mandatory}
{codingStrength = CNE}
{terminologyReference = CodeSystem}
«RIM»
AssociationEnd
roleName: char
multiplicity: Cardinality
navigabilityIndicator: boolean
«clone»
TraversalPath
name: char
enabledIndicator: boolean
requiredIndicator: boolean
mandatoryIndicator: boolean
multiplicity: Cardinality
«enumeration»
Cardinality
0..1
0..n
0..*
1
1..1
1..n
1..*
n..m
n..*
«enumeration»
RelationshipType
Generalization
Association
Composition
Aggregation
«clone»
Choice
name: char
nameExtension: char
«enumeration»
Conformance
Optional
Required
Mandatory
«enumeration»
ValueRole
Fixed
Default
«enumeration»
ModelType
DMIM = Domain Message ...
RMIM = Refined Message...
CMET = Common Message ...
HMD = Hierarchical Me...
0..*
associates source
1
«restrict»
1..*
0..*
associates target
1
0..*
associates target
1
0..*
associates source
1
0..*
isDerivedFrom
1
0..*
{ordered}
1..*
{ordered}
0..*
isDerivedFrom
1
0..*
isDerivedFrom
1
0..*
isDerivedFrom
root1
1..*
0..1
0..*
isDerivedFrom
1
2
0,2
July 14, 2015 Page: 215 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 CIM Clones, Attributes, and Traversals
«clone»
Class
localName: char
fixedName: char
businessName: char
comment: Annotation
isEntryPointIndicator: boolean
isStubIndicator: boolean
«RIM»
Class
name: char
description: Annotation
«clone»
Attribute
businessName: char
datatype: DataType
cardinality: Cardinality
conformance: Conformance
comment: Annotation
initialValue: char
initialValueRole: ValueRole
maximumLength: int
«RIM»
Attribute
name: char
datatype: DataType
cardinality: Cardinality
mandatoryInclusionIndicator: boolean
description: Annotation
«RIM»
Relationship
name: char
relationshipType: RelationshipType
«clone»
Relationship
ConstrainedInformationModel
name: char
description: Annotation
modelType: ModelType
ControllingAttribute
constraints
{datatype = CS}
{cardinality = (1..1)}
{conformance = Mandatory}
{codingStrength = CNE}
{terminologyReference = CodeSystem}
«RIM»
AssociationEnd
roleName: char
multiplicity: Cardinality
navigabilityIndicator: boolean
«clone»
TraversalPath
name: char
enabledIndicator: boolean
requiredIndicator: boolean
mandatoryIndicator: boolean
multiplicity: Cardinality
«enumeration»
Cardinality
0..1
0..n
0..*
1
1..1
1..n
1..*
n..m
n..*
«enumeration»
RelationshipType
Generalization
Association
Composition
Aggregation
«clone»
Choice
name: char
nameExtension: char
«enumeration»
Conformance
Optional
Required
Mandatory
«enumeration»
ValueRole
Fixed
Default
«enumeration»
ModelType
DMIM = Domain Message ...
RMIM = Refined Message...
CMET = Common Message ...
HMD = Hierarchical Me...
0..*
associates source
1
«restrict»
1..*
0..*
associates target
1
0..*
associates target
1
0..*
associates source
1
0..*
isDerivedFrom
1
0..*
{ordered}
1..*
{ordered}
0..*
isDerivedFrom
1
0..*
isDerivedFrom
1
0..*
isDerivedFrom
root1
1..*
0..1
0..*
isDerivedFrom
1
2
2
July 14, 2015 Page: 216 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 CIM Terminology and Datatype
«clone»
Attribute
businessName: char
datatype: DataType
cardinality: Cardinality
conformance: Conformance
comment: Annotation
initialValue: char
initialValueRole: ValueRole
maximumLength: int
«RIM»
Attribute
name: char
datatype: DataType
cardinality: Cardinality
mandatoryInclusionIndicator: boolean
description: Annotation
ControllingAttribute
constraints
{datatype = CS}
{cardinality = (1..1)}
{conformance = Mandatory}
{codingStrength = CNE}
{terminologyReference = CodeSystem}
«RIM»
TerminologyBinding
codingStrength: CodingStrength
«clone»
TerminologyBinding
codingStrength: CodingStrength
TerminologyReference
{abstract}
name: char
description: Annotation
VocabularyDomain
ValueSet
conceptIdentifier: char
CodeSystem
objectIdentifier: char
releaseIdentifier: char
isExternalIndicator: boolean
CodeSystemTerm
code: char [0..1]
designation: char
description: Annotation
internalIdentifier: char
DataType
longName: char
shortName: char
description: Annotation
DatatypeAttribute
name: char
datatype: DataType
description: Annotation
ParentDatatype
«datatype»
TerminologyBinding
codingStrength: CodingStrength
Annotation
{abstract}
«enumeration»
CodingStrength
CNE
CWE
ParentCodeSystemTerm
AnnotationSection
sectionRole: AnnotationSectionRole
sectionText: char
«enumeration»
AnnotationSectionRole
Description
Rationale
Design Comment
Issue
Implementation Note
History
Mapping
0..*
binds
1
0..1
binds
1
0..1
binds
1
0..*
isDerivedFrom
1
«restrict»
0..*
isDerivedFrom
1
0..*
binds
1
1..*
subkind
1..*
0..*
0..*
binds
1
0..1
binds
1
0..*
0..*
isBoundTo
1
member
1..*0..*
1..*
subkind
1..*
0..1
July 14, 2015 Page: 217 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
CIM Retrospective
 A Constrained information models is a constrained subset of the HL7
Reference Information Model.
 CIM Classes (clones) contain a subset of the attributes and
relationships that are defined for the RIM class upon which the clone is
based.
 CIM Attributes constrain the cardinality, datatypes, and terminology
bindings defined for the RIM attribute upon which the CIM attribute is
based.
 The information needs for a CIM are typically expressed in a Domain
Analysis model that has been cross referenced to the RIM.
 Types of Constrained Information Models include:
 Domain Message Information Models (D-MIMs)
 Refined Message Information Models (R-MIMs)
July 14, 2015 Page: 218 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Constrained Information Models
V3 Constrained Information Models
RIM
Restrict
R-MIM
Serialize
HMD
Restrict
Message
Type
D-MIM
Derive
July 14, 2015 Page: 219 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3.0 Messaging Artifacts
Reference
Information
Model
Datatype
Specification
Vocabulary
Specification
Foundational
Models
Dynamic
Model
Constrained
Information
Model
Common
Message Type
Model
Design
Models
Hierarchical
Message
Definition
Message
Type
Definition
Implementation
Technology
Specification
Message
Specifications
HL7 Version 3.0
Common Message Element Type
A Common Message Type Model is a definition
of a set of common message components that
can be referenced in various message
specifications.
July 14, 2015 Page: 221 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Common Message Element Types
 A Common Message Element Type (CMET) is a fragment of a
constrained information model (CIM) that is intended to be
included in other constrained information models by reference.
 Common Message Element types provide a means of
constructing reusable building blocks to be used across a range
of domain areas and message types.
 Usage of CMETs increases the consistency of message types
developed by separate workgroups and project teams.
 CMETs accelerate the development process by reducing the
need to redesign information structures that have already been
developed.
 A CMET model has one entry point. It is included in other design
information models by reference to its entry point name.
July 14, 2015 Page: 222 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
CMET Reference
Accession
classCode*: <= ACSN
moodCode*: <= EVN
id*: II [1..1]
CMET: (AGNT)
R_Responsible
[universal]
(COCT_MT040000)
0..1 roleName
1..1 agent *
typeCode*: <= AUT
author
CMET
R-MIM
July 14, 2015 Page: 223 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
CMET Retrospective
 Technically a CMET is just another type of
constrained information model.
 A CMET has a single entry point and is always
serializable. It is a special type of RMIM.
 CMETs differs from other RMIMs in that they are
domain area agnostic.
 CMETs are balloted as domain independent
artifacts.
 Their status as DSTU or Normative is dependent
upon the status of RMIMs and DMIMs that
reference them.
July 14, 2015 Page: 224 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3.0 Messaging Artifacts
Reference
Information
Model
Datatype
Specification
Vocabulary
Specification
Foundational
Models
Dynamic
Model
Constrained
Information
Model
Common
Message Type
Model
Design
Models
Hierarchical
Message
Definition
Message
Type
Definition
Implementation
Technology
Specification
Message
Specifications
July 14, 2015 Page: 225 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3.0 Messaging Artifacts
Reference
Information
Model
Datatype
Specification
Vocabulary
Specification
Foundational
Models
Dynamic
Model
Constrained
Information
Model
Common
Message Type
Model
Design
Models
Hierarchical
Message
Definition
Message
Type
Definition
Implementation
Technology
Specification
Message
Specifications
July 14, 2015 Page: 226 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3.0 Messaging Design Models
An Hierarchical Message Definition is a specification
of message elements including a specification of their
grouping, sequence, optionality, and cardinality.
A Message Type Definition is a specification of a
collection of message elements and a set of rules for
constructing a message instance.
The Implementation Technology Specification, or ITS,
defines how to represent RIM objects for transmission
in messages.
Hierarchical
Message
Definition
Message
Type
Definition
Implementation
Technology
Specification
HL7 V3 Hierarchical Message
Definition
An Hierarchical Message Definition is a
specification of message elements including a
specification of their grouping, sequence,
optionality, and cardinality.
July 14, 2015 Page: 228 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
V3 Hierarchical Message Definition
 An HMD is a tabular representation of the sequence of
elements (i.e., classes, attributes and associations)
represented in an R-MIM.
 It defines the message without reference to the
implementation technology.
 The HMD defines a single base message structure - the
"common" message type.
 This base message structure is never sent and thus has
no corresponding trigger event.
 It is the template from which the other specific and
corresponding message types are drawn.
July 14, 2015 Page: 229 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Hierarchical Message Definition
July 14, 2015 Page: 230 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HMD Components
InformationModelMapping
MessageElementSpecifications
CommonConstraints
MessageTypeSpecification(S)
July 14, 2015 Page: 231 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HMD Components
MappingtotheInformationModel
MessageElementSpecifications
CommonConstraints
MessageTypeSpecification(S)
July 14, 2015 Page: 232 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HMD Columns
July 14, 2015 Page: 233 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HMD Columns (A – F)
ColHeading Description
A (row type) Each row represents either a class, an association or an attribute from
the R-MIM. Class rows have their name displayed in bold; associations
have their name in italics; and attributes have their names in plain font.
B No Row number. Each row is sequentially numbered and identifies the order
in which the data were serialized from the R-MIM.
C Element Name The name of the element as it appears in the R-MIM. This may or may
not be the same as the value in Property. This value will be different
when a class, association or role is cloned and renamed in the process of
creating the R-MIM.
D Card Cardinality. This specifies the minimum and maximum number of
occurrences of the message element.
E Mand Mandatory. Valid values are M (Mandatory) or Blank. An M in the field
requires that some data be sent for this element. If the data is not
known, a value of unknown, not given, etc. must be sent. An M in this
column (for Mandatory) differs from a 1 in the Cardinality column in that
an M indicates that the message cannot be validly parsed without a value
in this field or without defining a default. If no default is provided, you
either do not send a message or must send a value. An M in this column
also differs from an R in the Conformance column (explained below).
F Conf Conformance. Valid values are R (required), NP (not permitted), and
Blank (not required). A value of R(required) means that the message
elements must appear every time the message description is used for an
Interaction. If the data is available, the element must carry the data. If
the data is not available, a blank may be sent. NP (not permitted) means
that the message element is never sent for this essage type. Blank
means that conformance for this element is to be negotiated on a site-
specific basis.
July 14, 2015 Page: 234 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HMD Columns (G – M)
ColHeading Description
G RIM Source Identifies the class from which the attribute or association
originates.
H Of Message Element Type This column identifies the data type of attributes or class
name of associations.
I SRC Message Element Type Source. Valid values are D (data
type), N (new, being defined starting at this row), U (use,
meaning that an element, but not its value, from a previous
row in the HMD is being reused), C (CMET), I (Instance,
refers to the reuse of a particular element and its value as
defined previously in the HMD), and R (recursive, into itself).
J Domain Vocabulary Domain Specification. Clicking on this link will
take you to the Domain Specification for this element.
K CS Coding Strength. Valid values are CWE (coded with
extensions, meaning that the code set can be expanded to
meet local implementation needs) and CNE (coded no
extensions, meaning that the code set cannot be expanded).
L Abstract Is a boolean assigned to classes or associations in a gen-
spec hierarchy, which becomes a choice in an HMD. If the
value is true, then this type may not appear in message
instances.
M Nt Note. If one is provided, this is simply a free text note
provided by the work group.
July 14, 2015 Page: 235 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Constraint Descriptions
Constraint Description
Cardinality This specifies the minimum and maximum number of occurrences of the field/association. For
example, 1..* implies the minimum number of occurrences is 1 whereas the maximum number of
occurrences is unlimited.
Mandatory Valid values are M (mandatory) or Blank (not mandatory). M (mandatory) means that the
field/association must be present in the message, otherwise the message is non-conformant. For
Mandatory fields, HL7 sets the minimum cardinality to 1. Blank (not mandatory) means that the
field/association need not be present in a conformant message.
Conformance Valid values are R (required), NP (not permitted), and Blank (optional). R (required) means that the
sending application must support this field/association. If the data is available, then the
field/association is included in the message. If the minimum cardinality is 0 and the data is not
available, the field/association may be omitted from the message and still be conformant. If the
minimum cardinality is 1 and the data is not available, a NullFlavor is required. NP (not permitted)
means that the field/association is not included in the message schema and never included in a
message instance. Blank (optional) means that the field/association may/may not be sent and
support for this field/association is not required of sending applications. Conformance for this
element is to be negotiated on a site-specific basis.
NullFlavor For required fields/associations with a minimum cardinality of 1, a NullFlavor must be sent for
fields/associations that are not available to a sending application. Sample Nullflavors are "no
information", "unknown", "masked", "not asked" and "asked, but unknown".
July 14, 2015 Page: 236 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Cardinality Requirements
Cardinality Mandatory Conformance
NullFlavor
Required?
Explanation of Rules
0.., 1.. No The field/association may or may not be
present in a message. Conformance for this
element is to be negotiated on a site-specific
basis
0.., 1.. NP Not allowed The field/association is not present in the
schema and cannot be included in a message
instance.
0.. R No Support for the field/association is required in a
sending application. The field/assocation may
or may not be present in a message.
1.. R Yes Support for the field/association is required in a
sending application. The field/assocation must
be present in a message, but may not be
valued. If the field/assocation is not valued, a
NullFlavor must be specified.
1.. M R Not Allowed Support for the field/association is required in a
sending application. NullFlavor may not be
specified. The field/association must be
present and valued in a message.
July 14, 2015 Page: 237 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3.0 Messaging Artifacts
Reference
Information
Model
Datatype
Specification
Vocabulary
Specification
Foundational
Models
Dynamic
Model
Constrained
Information
Model
Common
Message Type
Model
Design
Models
Hierarchical
Message
Definition
Message
Type
Definition
Implementation
Technology
Specification
Message
Specifications
HL7 Version 3.0
Message Type Definition
A Message Type Definition is a specification of
a collection of message elements and a set of
rules for constructing a message instance.
July 14, 2015 Page: 239 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Message Type Definition
 An HMD contains one or more message type definition.
 Each message type definition includes the collection of
message elements defined in the HMD.
 The message type inherits or overrides aspects of the
common constraints defined in the HMD.
 Message elements defined in the HMD can be eliminated
from the message type definition by specifying “NP” for
conformance.
 Each message type definition is independent of each
other.
 A message type definition may be referenced in one or
more interaction specification.
July 14, 2015 Page: 240 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3.0 Messaging Artifacts
Reference
Information
Model
Datatype
Specification
Vocabulary
Specification
Foundational
Models
Dynamic
Model
Constrained
Information
Model
Common
Message Type
Model
Design
Models
Hierarchical
Message
Definition
Message
Type
Definition
Implementation
Technology
Specification
Message
Specifications
Implementation
Technology Specification
The Implementation Technology Specification,
or ITS, defines how to represent RIM objects
for transmission in messages.
July 14, 2015 Page: 242 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Implementation Technology Specification
 HL7 v3 uses XML as the implementation technology for messaging.
The XML ITS specifies the wire format for HL7 messages.
 The ITS provides encodings for all the types of component that are
defined in an HL7 message specification.
 The XML schema specifies what is acceptable in an XML document
through defining constraints.
 The schema for an HL7 message can be used by standard XML
tools to determine whether any particular HL7 message is valid
according to that particular schema.
 The most extensive part of the ITS definition is for data types where
specific schema fragments have been defined against each of the
Data Types that HL7 supports.
July 14, 2015 Page: 243 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
XML Implementation Technology
Specification
July 14, 2015 Page: 244 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Essential XML ITS Transformation Rules
 All XML elements and attributes are to be represented in the namespace
defined by "urn:hl7-org:v3".
 The XML representation for the members of a class will be a sequence of
child elements, one for each attribute followed by one for each outbound
association.
 Where the HL7 static model allows for an association to a choice of classes,
the representation of the XML shall be the same as would be the case if
there had been no choice, and only the class corresponding to the
information items in the HL7 instances were included in the specification.
 All HL7 RIM structural attributes are represented as XML attributes. All other
HL7 RIM attributes are represented as XML elements.
 The type of the HL7 attribute will be one of the types defined in the ISO
datatypes. That specification includes a definition of the XML serialization to
be used.
 When included in an instance local extensions MUST be in a namespace
other than the HL7v3 namespace.
July 14, 2015 Page: 245 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 XML Schema Generator
HL7 Vocabulary
Specification
HL7 Data Type
Specification
HL7 XML
Schema
Generator
Hierarchical Message
Definition
XML Schema
Specification
July 14, 2015 Page: 246 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3.0 Messaging Artifacts
Reference
Information
Model
Datatype
Specification
Vocabulary
Specification
Foundational
Models
Dynamic
Model
Constrained
Information
Model
Common
Message Type
Model
Design
Models
Hierarchical
Message
Definition
Message
Type
Definition
Implementation
Technology
Specification
Message
Specifications
HL7 V3 Message Specification
Design Example
Pharmacy OTC Sales Data
July 14, 2015 Page: 248 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Pharmacy OTC Sales Data
Purchase date Units Category Promotion Zipcode County State Reporting stores Participating stores
20040109 5 Cough/Cold N 88019 Some County XX 1 1
20040109 1 Thermometers N 88019 Some County XX 1 1
20040110 1 Cough/Cold N 88001 Some County XX 1 1
20040110 1 Cough/Cold N 88059 Some County XX 1 1
20040110 1 Cough/Cold N 88210 Some County XX 1 2
20040110 68 Cough/Cold N 88245 Some County XX 1 1
20040110 1 Cough/Cold N 88723 Some County XX 1 1
20040110 27 Cough/Cold Y 88245 Some County XX 1 1
20040110 1 Thermometers N 88245 Some County XX 1 1
20040110 1 Baby/Child Electrolytes N 88245 Some County XX 1 1
20040110 1 Baby/Child Electrolytes N 88806 Some County XX 1 2
20040110 1 Baby/Child Electrolytes N 88331 Some County XX 1 2
20040111 37 Cough/Cold N 88004 Some County XX 1 1
20040111 1 Cough/Cold N 88019 Some County XX 1 1
20040111 72 Cough/Cold N 88020 Some County XX 1 2
20040111 2 Cough/Cold N 88024 Some County XX 1 1
20040111 46 Cough/Cold N 88029 Some County XX 1 1
20040111 55 Cough/Cold N 88038 Some County XX 1 1
20040111 25 Cough/Cold N 88046 Some County XX 1 1
20040111 1 Cough/Cold N 88059 Some County XX 1 1
20040111 1 Cough/Cold N 88066 Some County XX 1 1
20040111 28 Cough/Cold N 88210 Some County XX 1 2
20040111 3 Cough/Cold N 88241 Some County XX 1 1
20040111 70 Cough/Cold N 88245 Some County XX 1 1
20040111 1 Cough/Cold N 88250 Some County XX 1 1
20040111 4 Cough/Cold N 88288 Some County XX 1 1
20040111 10 Cough/Cold N 88403 Some County XX 1 3
20040111 3 Cough/Cold N 88602 Some County XX 1 2
20040111 1 Cough/Cold N 88731 Some County XX 1 1
20040111 9 Cough/Cold N 88806 Some County XX 1 2
20040111 10 Cough/Cold N 88807 Some County XX 1 2
20040111 25 Cough/Cold N 88815 Some County XX 1 4
July 14, 2015 Page: 249 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Pharmacy OTC Sales Data
Purchase date Units Category Promotion Zipcode County State Reporting stores Participating stores
20040109 5 Cough/Cold N 88019 Some County XX 1 1
20040109 1 Thermometers N 88019 Some County XX 1 1
20040110 1 Cough/Cold N 88001 Some County XX 1 1
20040110 1 Cough/Cold N 88059 Some County XX 1 1
20040110 1 Cough/Cold N 88210 Some County XX 1 2
20040110 68 Cough/Cold N 88245 Some County XX 1 1
20040110 1 Cough/Cold N 88723 Some County XX 1 1
20040110 27 Cough/Cold Y 88245 Some County XX 1 1
20040110 1 Thermometers N 88245 Some County XX 1 1
20040110 1 Baby/Child Electrolytes N 88245 Some County XX 1 1
20040110 1 Baby/Child Electrolytes N 88806 Some County XX 1 2
20040110 1 Baby/Child Electrolytes N 88331 Some County XX 1 2
20040111 37 Cough/Cold N 88004 Some County XX 1 1
20040111 1 Cough/Cold N 88019 Some County XX 1 1
20040111 72 Cough/Cold N 88020 Some County XX 1 2
20040111 2 Cough/Cold N 88024 Some County XX 1 1
20040111 46 Cough/Cold N 88029 Some County XX 1 1
20040111 55 Cough/Cold N 88038 Some County XX 1 1
20040111 25 Cough/Cold N 88046 Some County XX 1 1
20040111 1 Cough/Cold N 88059 Some County XX 1 1
20040111 1 Cough/Cold N 88066 Some County XX 1 1
20040111 28 Cough/Cold N 88210 Some County XX 1 2
20040111 3 Cough/Cold N 88241 Some County XX 1 1
20040111 70 Cough/Cold N 88245 Some County XX 1 1
20040111 1 Cough/Cold N 88250 Some County XX 1 1
20040111 4 Cough/Cold N 88288 Some County XX 1 1
20040111 10 Cough/Cold N 88403 Some County XX 1 3
20040111 3 Cough/Cold N 88602 Some County XX 1 2
20040111 1 Cough/Cold N 88731 Some County XX 1 1
20040111 9 Cough/Cold N 88806 Some County XX 1 2
20040111 10 Cough/Cold N 88807 Some County XX 1 2
20040111 25 Cough/Cold N 88815 Some County XX 1 4
• Purchase Date
• Units
• Product Category
• Promotion Indicator
• Postal Zone
• County
• State
• Reporting Stores
• Participating Stores
July 14, 2015 Page: 250 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Pharmacy OTC Sales Domain Analysis
Model
ProductType
- categoryCode : String
OTCSale
- unitsSold : Integer
- purchaseDate : Date
- promotionIndicator : Boolean
1
0..n
1
0..n
ReportingPharmacy
- count : Integer
1
1..n
1
1..n
ParticipatingPharmacy
- count : Integer
PostalZone
- ZipCode : String
1 1..n
1
0..1
1
0..1
County
- name : String
1
1..n
State
- name : String
1
1..n
1
1..n
1
1..n
1 1..n
OTC Sales
Domain Analysis Model
3/30/2004
July 14, 2015 Page: 251 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Pharmacy OTC Sales R-MIM
OTCSaleEvent
classCode *: <= SPLY
moodCode*: <= EVN
activityTime *: TS[1..1] (PurchaseDate)
quantity*: PQ[1..1] (UnitsSold)
1..1 retailedProduct *
typeCode *: <= SBJ
subject
1..1 retailedManufacturedMaterialKind *
1..1retailerReportingPharmacy *
RetailedProduct
classCode *: <= RET
ManufacturedMaterialKind
classCode *: <= MMAT
determinerCode *: <= KIND
code*: CSCNE[1..1] <=ProductEntityType(Category )
ReportingPharmacy
classCode *: <= ORG
determinerCode *: <= QUANTIFIED_KIND
quantity *:PQ[0..1](Count)
PostalArea
classCode *: <= PLC
determinerCode *: <= INSTANCE
id*:II [1..1](PostalZone)
1..1 location *
ReportingPharamacyLocation 1..1 playedReportingPharamacyLocation *
classCode *: <= LOCE
ParticipatingPharmacy
classCode *: <= ORG
determinerCode *: <= QUANTIFIED_KIND
quantity*: PQ[1..1] (Count)
1..1locatedParticipatingPharmacy *
ParticipatingPharmacyLocation
0..1scopedParticipatingPharmacy Location
classCode *: <= LOCE
OTCSalesEventData
(PHIM_RM000001)
Description
Ov er-the-counter pharmacy product
saledata.
OTC Pharmacy Product Sales Events
RM000001v5
3/30/04
County
classCode *: <= COUNTY
determinerCode *: <= INSTANCE
name *:TN[1..1](County Name)
State
classCode *: <= PROVINCE
determinerCode *: <= INSTANCE
name *:TN [1..1](StateName)
1..1wholeCounty
PartOfCounty
1..1 playedPartOfCounty *
classCode *: <= PART
1..1 wholeState
PartOfState 1..1 playedPartOfState *
classCode *: <= PART
1..1 pertinentPromotion *
typeCode *: <= PERT
pertinentInformation
Promotion
classCode *: <= COND
moodCode*: <= EVN
value*:BL[1..1](PromotionIndicator)
July 14, 2015 Page: 252 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Pharmacy OTC Sales HMD
No Element Name Rim Source of Message Element Type Domain CS Nt
(Link to tabular view)
OTCSalesEventData
1 OTCSaleEvent Supply OTCSaleEvent
2 classCode Act CS SPLY CNE
3 moodCode Act CS EVN CNE
4 activityTime Act TS DesignNote: PurchaseDate
5 quantity Supply PQ DesignNote: UnitsSold
6 subject Act Subject
7 typeCode Participation CS SBJ CNE
8 retailedProduct Participation RetailedProduct
9 classCode Role CS RET CNE
10 retailedManufacturedMaterialKind Role ManufacturedMaterialKind
11 classCode Entity CS MMAT CNE
12 determinerCode Entity CS KIND CNE
13 code Entity CS ProductEntityType CNE DesignNote: Category
14 retailerReportingPharmacy Role ReportingPharmacy
15 classCode Entity CS ORG CNE
16 determinerCode Entity CS QUANTIFIED_KIND CNE
17 quantity Entity PQ DesignNote: Count
18 playedReportingPharamacyLocation Entity ReportingPharamacyLocation
19 classCode Role CS LOCE CNE
20 location Role PostalArea
21 classCode Entity CS PLC CNE
22 determinerCode Entity CS INSTANCE CNE
23 id Entity II DesignNote: PostalZone
24 playedPartOfCounty Entity PartOfCounty
25 classCode Role CS PART CNE
26 wholeCounty Role County
27 classCode Entity CS COUNTY CNE
28 determinerCode Entity CS INSTANCE CNE
29 name Entity TN DesignNote: CountyName
30 playedPartOfState Entity PartOfState
31 classCode Role CS PART CNE
32 wholeState Role State
33 classCode Entity CS PROVINCE CNE
34 determinerCode Entity CS INSTANCE CNE
35 name Entity TN DesignNote: StateName
36 scopedParticipatingPharmacyLocation Entity ParticipatingPharmacyLocation
37 classCode Role CS LOCE CNE
38 locatedParticipatingPharmacy Role ParticipatingPharmacy
39 classCode Entity CS ORG CNE
40 determinerCode Entity CS QUANTIFIED_KIND CNE
41 quantity Entity PQ DesignNote: Count
42 pertinentInformation Act PertinentInformation
43 typeCode ActRelationship CS PERT CNE
44 pertinentPromotion ActRelationship Promotion
45 classCode Act CS COND CNE
46 moodCode Act CS EVN CNE
July 14, 2015 Page: 253 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Pharmacy OTC Sales XML Schema
<?xml version="1.0" encoding="UTF-8" standalone="no" ?>
- <xs:schema xmlns:xs="http://www.w3.org/2001/XMLSchema"
targetNamespace="urn:hl7-org:v3" elementFormDefault="qualified" xmlns="urn:hl7-
org:v3" xmlns:voc="urn:hl7-org:v3/voc" xmlns:hl7="urn:hl7-org:v3"
xmlns:msg="urn:hl7-org:v3/mif" xmlns:fo="http://www.w3.org/1999/XSL/Format">
<xs:include schemaLocation="../dt/datatypes.xsd" />
<xs:include schemaLocation="../voc/voc.xsd" />
- <xs:group name="PHIM_MT000001">
- <xs:sequence>
<xs:element name="OTCSaleEvent" type="PHIM_MT000001.OTCSaleEvent" />
</xs:sequence>
</xs:group>
- <xs:complexType name="PHIM_MT000001.OTCSaleEvent">
- <xs:sequence>
<xs:element name="activityTime" minOccurs="1" maxOccurs="1" type="TS" />
<xs:element name="quantity" minOccurs="1" maxOccurs="1" type="PQ" />
<xs:element type="PHIM_MT000001.Subject" minOccurs="1" maxOccurs="1"
name="subject" />
<xs:element type="PHIM_MT000001.PertinentInformation" minOccurs="1"
maxOccurs="1" name="pertinentInformation" />
</xs:sequence>
<xs:attribute name="type" type="Classes" default="Supply" />
<xs:attribute name="classCode" type="ActClass" />
<xs:attribute name="moodCode" type="ActMood" />
</xs:complexType>
- <xs:complexType name="PHIM_MT000001.Subject">
- <xs:sequence>
<xs:element type="PHIM_MT000001.RetailedProduct" minOccurs="1" maxOccurs="1"
name="retailedProduct" />
</xs:sequence>
<xs:attribute name="type" type="Classes" default="Participation" />
<xs:attribute name="typeCode" type="ParticipationType" />
</xs:complexType>
- <xs:complexType name="PHIM_MT000001.RetailedProduct">
- <xs:sequence>
<xs:element type="PHIM_MT000001.ManufacturedMaterialKind" minOccurs="1"
maxOccurs="1" name="retailedManufacturedMaterialKind" />
<xs:element type="PHIM_MT000001.ReportingPharmacy" minOccurs="1"
maxOccurs="1" name="retailerReportingPharmacy" />
</xs:sequence>
<xs:attribute name="type" type="Classes" default="RoleHeir" />
July 14, 2015 Page: 254 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Pharmacy OTC Data XML Example
<?xml version="1.0" encoding="utf-8" standalone="no" ?>
- <OTCSaleEvent xmlns="urn:hl7-org:v3"
xmlns:xsi="http://www.w3.org/2002/XMLSchema-instance"
xsi:schemaLocation="urn:hl7-org:v3 PHIM_HD000001.xsd">
<activityTime value="20040109" />
<quantity value="5" unit="" />
- <subject>
- <retailedProduct>
- <retailedManufacturedMaterialKind>
<code code="Cough/Cold" />
</retailedManufacturedMaterialKind>
- <retailerReportingPharmacy>
<quantity value="1" unit="" />
- <playedReportingPharamacyLocation>
- <location>
<id root="2.16.840.1.113883.19.3.2409" extension="88019" displayable="true" />
- <playedPartOfCounty>
- <wholeCounty>
<name>Some County</name>
- <playedPartOfState>
- <wholeState>
<name>CA</name>
</wholeState>
</playedPartOfState>
</wholeCounty>
</playedPartOfCounty>
- <scopedParticipatingPharmacyLocation>
- <locatedParticipatingPharmacy>
<quantity value="1" unit="" />
</locatedParticipatingPharmacy>
</scopedParticipatingPharmacyLocation>
</location>
</playedReportingPharamacyLocation>
</retailerReportingPharmacy>
</retailedProduct>
</subject>
- <pertinentInformation>
- <pertinentPromotion>
<value value="false" />
</pertinentPromotion>
July 14, 2015 Page: 255 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 V3 Modeling Tools
July 14, 2015 Page: 256 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 V3 Modeling Tools
Rational
Rose
Reference
Model
Repository
RoseTree
R-MIM
Designer
Schema
Generator
RIM RIM
R-MIM
RIM
R-MIM
HMD HMD
XSD
July 14, 2015 Page: 257 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
V3 RMIM Design Tool
July 14, 2015 Page: 258 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
MS-Visio R-MIM Designer
July 14, 2015 Page: 259 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 R-MIM Designer Stencil
July 14, 2015 Page: 260 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
IDPH-TRE R-MIM
July 14, 2015 Page: 261 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Clone Properties
July 14, 2015 Page: 262 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Attribute Properties
July 14, 2015 Page: 263 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Save RMIM to MIF Repository
July 14, 2015 Page: 264 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
V3 RoseTree (Model Browser)
July 14, 2015 Page: 265 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
RoseTree RMIM Browser
July 14, 2015 Page: 266 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
RoseTree HMD Generator
July 14, 2015 Page: 267 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Generated HMD
July 14, 2015 Page: 268 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Multiple Message Types
July 14, 2015 Page: 269 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
RoseTree HMD Export
July 14, 2015 Page: 270 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
MS-Excel HMD
July 14, 2015 Page: 271 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
V3 Schema Generator
July 14, 2015 Page: 272 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 XML Schema Generator
HL7 Vocabulary
Specification
HL7 Data Type
Specification
HL7 XML
Schema
Generator
Hierarchical Message
Definition
XML Schema
Specification
July 14, 2015 Page: 273 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 V3 Modeling Tools
Rational
Rose
Reference
Model
Repository
RoseTree
R-MIM
Designer
Schema
Generator
RIM RIM
R-MIM
RIM
R-MIM
HMD HMD
XSD
R-MIM
July 14, 2015 Page: 274 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 XML Schema Generator
HL7 Vocabulary
Specification
HL7 Data Type
Specification
HL7 XML
Schema
Generator
XML Schema
Specification
Refined Message
Information ModelHierarchical Message
Definition
HL7 V3 Message Specification Core
Schema
July 14, 2015 Page: 276 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Core Schema
Our
Schema
Infrastructure
Root.XSD
Datatype.XSD
Datatype-
base.XSD
Voc.XSD
Include Include
Include Include Include
Include
Core Schema
 Our generated schema is used in conjunction with core schema
specifications provided by HL7.
 The core schema specifications include infrastructure root, datatype
base, datatype, and vocabulary.
 The core schema specifications include no domain content. They are
present only to facilitate interpretation of datatypes and validation of
structural vocabulary.
July 14, 2015 Page: 277 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
InfrastructureRoot.xsd
July 14, 2015 Page: 278 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Datatype.xsd
July 14, 2015 Page: 279 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Datatype-base.xsd
July 14, 2015 Page: 280 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Voc.xsd
July 14, 2015 Page: 281 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Core Schema
Our
Schema
Infrastructure
Root.XSD
Datatype.XSD
Datatype-
base.XSD
Voc.XSD
Include Include
Include Include Include
Include
Core Schema
July 14, 2015 Page: 282 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 XML Schema Generator
HL7 Vocabulary
Specification
HL7 Data Type
Specification
HL7 XML
Schema
Generator
XML Schema
Specification
Refined Message
Information Model
Datatype.XSD
Voc.XSD
July 14, 2015 Page: 283 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 V3 Modeling Tools
Rational
Rose
Reference
Model
Repository
RoseTree
R-MIM
Designer
Schema
Generator
RIM RIM
R-MIM
RIM
R-MIM
HMD HMD
XSD
R-MIM
July 14, 2015 Page: 284 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
V3 Design Tools
July 14, 2015 Page: 285 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Electronic Services and Tools Workgroup
July 14, 2015 Page: 286 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SESSION OVERVIEW
 Messaging Artifacts ECCF
 Foundational Artifacts
 Design Artifacts
 Specification Artifacts
 HL7 v3 Message Design Example
 HL7 v3 Development Tools
July 14, 2015 Page: 287 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Hi3 Solutions
3500 W. Olive Ave, Suite
300
Burbank, CA 91505
ww.hi3solutions.com +1 800 918-
6520
July 14, 2015 Page: 288 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
History, Rationale, and Future
HL7 v3 Clinical Document
Architecture
July 14, 2015 Page: 289 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SESSION OVERVIEW
• KEY ASPECTS OF CDA
• EARLY HISTORY OF CDA
• CDA SPECIFICATION FRAMEWORK
• TEMPLATED CDA AND IMPLEMENTATION GUIDES
• SAMPLE HL7 V3 CDA ARTIFACTS
• CONSOLIDATED CDA IMPLEMENTATION GUIDE
July 14, 2015 Page: 290 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Clinical Document Architecture (CDA)
 The HL7 Clinical Document Architecture (CDA) is a
document markup standard that specifies the structure
and semantics of "clinical documents" for the purpose of
exchange.
 A clinical document contains observations and services
and has the following characteristics:
 Persistence – A clinical document continues to exist in an unaltered
state, for a time period defined by local and regulatory requirements.
 Stewardship – A clinical document is maintained by an organization
entrusted with its care.
 Potential for authentication - A clinical document is an assemblage
of information that is intended to be legally authenticated.
 Context - A clinical document establishes the default context for its
contents.
 Wholeness - Authentication of a clinical document applies to the
whole and does not apply to portions of the document without the full
context of the document.
 Human readability – A clinical document is human readable.
July 14, 2015 Page: 291 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Clinical Document Architecture (CDA)
 A CDA document is a defined and complete
information object that can include text, images,
sounds, and other multimedia content.
 Key aspects of the CDA include:
 CDA documents are encoded in Extensible Markup
Language (XML).
 CDA documents derive their meaning from the HL7
Reference Information Model (RIM) and use the HL7
Version 3 Data Types.
 The CDA specification is richly expressive and
flexible. Document-level, section-level and entry-
level templates can be used to constrain the generic
CDA specification
July 14, 2015 Page: 292 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
A Brief History of CDA
 1997 – HL7 SGML SIG begins work on the
Patient Record Architecture
 1998 – Patient Record Architecture draft
 1999 – CDA Release 1.0 Approved by HL7
Membership
 2000 – CDA Release 1.0 adopted as an
American National Standard
 2000 – HL7 XML SIG becomes Structured
Documents Technical Committee
 2005 – Clinical Document Architecture
Release 2 Adopted
 2006 – Care Record Summary
Implementation Guide
 2007 – Continuity of Care Document
Implementation Guide
 2008 – Recognition of HL7 CDA by the
Secretary of HHS
 2008 – Submission of CDA to ISO TC-215
 2009 – ISO TC-215 Approves CDA as an ISO
Standard
 2010 – CDA reaffirmed by HL7 and ANSI as
an American National Standard
 2011 – Consolidated CDA Implementation
Guide
 2012 - HL7 Releases New Tool for Reviewing
CDA Templates
 2013 - HL7 Announces a CCD® to Blue
Button Transform Tool
 2014 – Consolidated CDA R2 DSTU
published
July 14, 2015 Page: 293 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Early History of the CDA
 CDA® grew out of work that originated outside of HL7 in early 1996 when a
group of physicians including Tom Lincoln, John Spinosa, Dan Essin, John
Mattison and Bob Dolin began to meet to discuss the potential for structured
markup in clinical documents.
 The earliest draft was called the Kona Architecture and was developed in
1997 after the group had joined HL7.
 Since that time, many people have worked on it and the basic ideas have
been refined and developed along with the HL7 Version 3 framework and the
Reference Information Model (RIM).
 The original group morphed into the HL7 Structured Documents Work Group
which is responsible for CDA and other HL7 document types.
 CDA introduces the concept of incremental semantic interoperability. The
minimal CDA is a small number of XML-encoded metadata fields (such as
provider name, document type, document identifier, and so on) and a body
which can be any commonly-used MIME type such as pdf or doc (Microsoft
Word) or even a scanned image file.
 The most recent version of CDA is Release 2 which is used as the
foundation for all current CDA Implementation Guides. CDA Release 3 is
currently under development.
July 14, 2015 Page: 294 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
CDA “Levels” of Conformance
 The CDA standard describes conformance requirements in
terms of three general levels corresponding to three different,
incremental types of conformance statements:
 Level 1 requirements impose constraints upon the CDA
Header. The body of a Level 1 document may be XML or an
alternate allowed format. If XML, it must be CDA-conformant
markup.
 Level 2 requirements specify constraints at the section level of
a CDA XML document: most critically, the section code and the
cardinality of the sections themselves, whether optional or
required.
 Level 3 requirements specify constraints at the entry level
within a section. A specification is considered “Level 3” if it
requires any entry-level templates.
 These levels are rough indications of what a recipient can
expect in terms of machine-processable coding and content
July 14, 2015 Page: 295 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
CDA SPECIFICATION FRAMEWORK
July 14, 2015 Page: 296 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Introduction
 The HL7 Clinical Document Architecture (CDA) is a document
markup standard that specifies the structure and semantics of
"clinical documents" for the purpose of exchange.
 The CDA is a constrained refinement of the HL7 v3 Reference
Information Model (RIM) specific to the purpose of clinical document
exchange.
 The CDA standard is further constrained via the specification of
implementation guides for specific document types, clinical domains,
and document exchange scenarios.
 The CDA is one of the initial set of standards, implementation
specifications, and certification criteria for Electronic Health Record
technology specified in Meaningful Use legislation.
 The collection of implementation guides developed for CDA are
being widely adopted by EMR vendors; secondary users of EMR
data are aligning their information requirements with the guides in
anticipation of these data becoming more readily assessable.
July 14, 2015 Page: 297 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Clinical Document Architecture RMIM
Clinical Document
Participating
Entities
Structured
Document Sections
Section Entries and
Sub-Entries
July 14, 2015 Page: 298 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
TEMPLATED CDA AND
IMPLEMENTATION GUIDES
July 14, 2015 Page: 299 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Sample CDA Templated Constraints
Age Observation: templateId 2.16.840.1.113883.10.20.22.4.31 (open)
1. SHALL contain exactly one [1..1] @classCode="OBS" Observation (CodeSystem:
HL7ActClass 2.16.840.1.113883.5.6 STATIC) (CONF:7613).
2. SHALL contain exactly one [1..1] @moodCode="EVN" Event (CodeSystem:
ActMood 2.16.840.1.113883.5.1001 STATIC) (CONF:7614).
3. SHALL contain exactly one [1..1] templateId (CONF:7899) such that it
 SHALL contain exactly one [1..1] @root="2.16.840.1.113883.10.20.22.4.31"
(CONF:10487).
4. SHALL contain exactly one [1..1] code (CONF:7615).
 This code SHALL contain exactly one [1..1] @code="445518008" Age At Onset
(CodeSystem: SNOMED-CT 2.16.840.1.113883.6.96 STATIC) (CONF:16776).
5. SHALL contain exactly one [1..1] statusCode (CONF:15965).
 This statusCode SHALL contain exactly one [1..1] @code="completed" Completed
(CodeSystem: ActStatus 2.16.840.1.113883.5.14 STATIC) (CONF:15966).
6. SHALL contain exactly one [1..1] value with @xsi:type="PQ" (CONF:7617).
 This value SHALL contain exactly one [1..1] @unit, which SHALL be selected from
ValueSet AgePQ_UCUM 2.16.840.1.113883.11.20.9.21 DYNAMIC (CONF:7618).
July 14, 2015 Page: 300 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Segment of the CDA affected by the Age
Observation template
Clinical Document
Participating
Entities
Structured
Document Sections
Section Entries and
Sub-Entries
July 14, 2015 Page: 301 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Segment of the CDA affected by the Age
Observation template
July 14, 2015 Page: 302 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Conformance Verbs
 The conformance verb keyword at the start of a
constraint ( SHALL , SHOULD , MAY, etc.) indicates
usage conformance.
 SHALL is an indication that the constraint is to be
enforced without exception;
 SHOULD is an indication that the constraint is
optional but highly recommended; and
 MAY is an indication that the constraint is optional
and that adherence to the constraint is at the
discretion of the document creator.
July 14, 2015 Page: 303 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Cardinality
 The cardinality indicator (0..1, 0..*, 1..1, 1..*, etc.) specifies the
allowable occurrences within an instance.
 Thus, " MAY contain 0..1" and " SHOULD contain 0..1" both
allow for a document to omit the particular component, but the
latter is a stronger recommendation that the component be
included if it is known.
 The following cardinality indicators may be interpreted as
follows:
 0..1 as contains zero or one
 1..1 as contains exactly one
 2..2 as contains exactly two
 1..* as contains one or more
 0..* as contains zero or more
 Each constraint is uniquely identified (e.g., "CONF:605") by an
identifier placed at or near the end of the constraint.
July 14, 2015 Page: 304 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Value Set Binding
 Value set bindings adhere to HL7 Vocabulary Working Group
best practices, and include both a conformance verb ( SHALL ,
SHOULD , MAY, etc.) and an indication of DYNAMIC vs.
STATIC binding.
 The use of SHALL requires that the component be valued with
a member from the cited value set; however, in every case any
HL7 "null" value such as other (OTH) or unknown (UNK) may
be used.
 STATIC binding means that the allowed values of the value set
do not change automatically as new values are added to a
value set. That is, the binding is to a single version of a value
set.
 DYNAMIC binding means that the intent is to have the allowed
values for a coded item automatically change (expand or
contract) as the value set is maintained over time.
July 14, 2015 Page: 305 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SAMPLE HL7 V3 CDA ARTIFACTS
July 14, 2015 Page: 306 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
From Data Dict. to CDA Guide
July 14, 2015 Page: 307 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
From Data Dict. to CDA Guide
July 14, 2015 Page: 308 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
From Data Dict. to CDA Guide
July 14, 2015 Page: 309 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
From Data Dict. to CDA Guide
July 14, 2015 Page: 310 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
From Data Dict. to CDA Guide
July 14, 2015 Page: 311 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Implementation Guide Development
311
July 14, 2015 Page: 312 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
DAM: a UML representation of dictionary
elements
PreHospitalEcounter
- arrivalDateTime :TS [0..1]
- departureDateTime :TS [0..1]
- dispatchDateTime :TS [0..1]
+ preHospitalTransportationMethodCode :TransportationMethod [0..*]
PreHospitalNervousSystemObservation
+ glasgowComaEyeResponseValue :INT
+ glasgowComaMotorResponseValue :INT
+ glasgowComaScoreValue :INT
+ glasgowComaVerbalResponseCode :INT
PreHospitalCirculatorySystemObservation
+ heartRateAmount :PQ
+ systolicBloodPressureAmount :PQ
PreHospitalRespiratorySystemObservation
+ arterialOxygenSaturationAmount :PQ
+ respiratoryRateAmount :PQ
2.0 Submission::
RegistrySubmissionTransaction
0..1 0..1
0..1
0..1
July 14, 2015 Page: 313 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Organization of DAM Classes
2.0 Submission
+ RegistrySubmissionTransaction
1.0 Patients
+ Patient
3.0 Injury Events
+ InjuryEvent
+ InjurySeverityObservation
4.0 PreHospital Encounters
+ PreHospitalCirculatorySystemObservation
+ PreHospitalEcounter
+ PreHospitalNervousSystemObservation
+ PreHospitalRespiratorySystemObservation
5.0 Hospital Care Episodes
+ HospitalCareEpisode
+ HospitalCirculatorySystemObservation
+ HospitalNervousSystemObservation
+ HospitalPhysiologicalObservation
+ HospitalRespiratorySystemObservation
+ 5.1 Emergency Hospital Encounters
+ 5.2 InpatientHospitalEncounters
July 14, 2015 Page: 314 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Dictionary to DAM
Element ID NTDB Dictionary Element DAM Package DAM Class DAM Attribute
D_01 D_01: PATIENT’S HOME ZIP CODE 2.0 Patients Patient postalAddress
D_02 D_02: PATIENT’S HOME COUNTRY 2.0 Patients Patient postalAddress
D_03 D_03: PATIENT’S HOME STATE 2.0 Patients Patient postalAddress
D_04 D_04: PATIENT’S HOME COUNTY 2.0 Patients Patient postalAddress
D_05 D_05: PATIENT’S HOME CITY 2.0 Patients Patient postalAddress
D_06 D_06: ALTERNATE HOME RESIDENCE 2.0 Patients Patient residenceStatusCode
D_07 D_07: DATE OF BIRTH 2.0 Patients Patient birthDate
D_08 D_08: AGE 2.0 Patients Patient eventRelatedAgeQuantity
D_09 D_09: AGE UNITS 2.0 Patients Patient eventRelatedAgeQuantity
D_10 D_10: RACE 2.0 Patients Patient raceCode
D_11 D_11: ETHNICITY 2.0 Patients Patient ethnicCode
D_12 D_12: SEX 2.0 Patients Patient genderCode
DG_01 DG_01: CO-MORBID CONDITIONS 5.0 Hospital Care Episodes HospitalCareEpisode coMorbidConditionCode
DG_02 DG_02: ICD-9 INJURY DIAGNOSES 5.0 Hospital Care Episodes HospitalCareEpisode injuryDiagnosisCode
DG_03 DG_03: ICD-10 INJURY DIAGNOSES 5.0 Hospital Care Episodes HospitalCareEpisode injuryDiagnosisCode
ED_01 ED_01: ED/HOSPITAL ARRIVAL DATE 5.0 Hospital Care Episodes HospitalCareEpisode arrivalDateTime
ED_02 ED_02: ED/HOSPITAL ARRIVAL TIME 5.0 Hospital Care Episodes HospitalCareEpisode arrivalDateTime
ED_03 ED_03: INITIAL ED/HOSPITAL SYSTOLIC BLOOD PRESSURE 5.0 Hospital Care Episodes HospitalCirculatorySystemObservation systolicBloodPressureAmount
ED_043 ED_043: INITIAL ED/HOSPITAL PULSE RATE 5.0 Hospital Care Episodes HospitalCirculatorySystemObservation heartRateAmount
ED_05 ED_05: INITIAL ED/HOSPITAL TEMPERATURE 5.0 Hospital Care Episodes HospitalPhysiologicalObservation temperatureAmount
ED_06 ED_06: INITIAL ED/HOSPITAL RESPIRATORY RATE 5.0 Hospital Care Episodes HospitalRespiratorySystemObservation respiratoryRateAmount
ED_07 ED_07: INITIAL ED/HOSPITAL RESPIRATORY ASSISTANCE 5.0 Hospital Care Episodes HospitalRespiratorySystemObservation respiratoryAssistanceIndicator
ED_08 ED_08: INITIAL ED/HOSPITAL OXYGEN SATURATION 5.0 Hospital Care Episodes HospitalRespiratorySystemObservation arterialOxygenSaturationAmount
ED_09 ED_09: INITIAL ED/HOSPITAL SUPPLEMENTAL OXYGEN 5.0 Hospital Care Episodes HospitalRespiratorySystemObservation supplementalOxygenIndicator
July 14, 2015 Page: 315 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
CIM: a CDA influenced UML
representation of dictionary elements
Domain Analysis
Model
2
CDA RMIM
Constrained
Information Model
ArterialOxygenSaturationObservation
+ code :CD = ObservationType
- value :PQ
::RespiratorySystemObservation
+ classCode :CS = "OBS"
+ moodCode :CS = "EVN"
RespiratoryRateObservation
+ code :CD = ObservationType
- value :PQ
::RespiratorySystemObservation
+ classCode :CS = "OBS"
+ moodCode :CS = "EVN"
RespiratorySystemObservation
+ classCode :CS = "OBS"
+ moodCode :CS = "EVN"
PreHospitalEncounterDetail::
PreHospitalEncounter
RespiratorySystemEntryRelationship
+ typeCode :CS = x_ActRelationsh...
+ contextConductionInd :BL = "true"
0..*
1
315
July 14, 2015 Page: 316 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Organization of CIM Classes
InjuryEventSection
+ InjuryEventSection
+ StructuredBodyInjuryEventComponent
+ InjuryEventDetailEntry
(from TraumaRegistrySubmissionDocument)
TraumaRegistrySubmissionDocument
+ HealthcareFacility
+ RegistryParticipant
+ StructuredBodyComponent
+ StucturedBody
+ Submitter
+ TraumaRegistrySubmissionDocument
+ Patient
+ InjuryEventSection
+ PreHospital Encounter Section
+ Hospital Care Episode Section
+ EntryPoint
Patient
+ RecordTarget
+ Patient
+ PatientRole
+ PatientDetailSection
(from TraumaRegistrySubmissionDocument)
PreHospital Encounter Section
+ PreHospitalEncounterSection
+ StructoredBodyPreHospitalEncounterComponent
+ PreHospitalEncounterDetail
(from TraumaRegistrySubmissionDocument)
Hospital Care Episode Section
+ HospitalCareEpisodeSection
+ StructuredBodyHospitalCareEpisodeComponent
+ HospitalCareEpisodeActivityDetail
(from TraumaRegistrySubmissionDocument)
July 14, 2015 Page: 317 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
DAM to CIM
DAM Class DAM Attribute CIM Class CIM Attribute
Patient birthDate Patient birthTime
Patient ethnicCode Patient ethnicGroupCode
Patient eventRelatedAgeQuantity PatientAgeObservation value
Patient genderCode Patient administrativeGenderCode
Patient industryCode PatientIndustryObservation value
Patient occupationCode PatientOccupationObservation value
Patient postalAddress PatientRole addr
Patient raceCode Patient raceCode
Patient residenceStatusCode PatientResidenceStatusObservation value
InjuryEvent abbreviatedInjuryCode AbreviatedInjuryObservation value
InjuryEvent airbagDeploymentCode AirbagDeploymentObservation value
InjuryEvent bodyInjuryRegionCode BodyInjuryObservation value
InjuryEvent injurySeverityScoreValue SeverityScoreObservation value
InjuryEvent locationTypeCode LocationTypeObservation value
InjuryEvent occurenceDateTime InjuryEventAct effectiveTime
InjuryEvent postalAddress PostalAddressObservation value
InjuryEvent primaryInjuryCauseCode PrimaryInjuryCauseObservation value
InjuryEvent safetyEquipmentUsedCode SafetyEquipmentUsedObservation value
InjuryEvent supplementalInjuryCauseCode SupplementalInjuryCauseObservation value
InjuryEvent workRelatedEventInd WorkRelatedObservation value
PreHospitalCirculatorySystemObservation heartRateAmount HeartRateObservation value
PreHospitalCirculatorySystemObservation systolicBloodPressureAmount SystolicBloodPressureObservation value
PreHospitalEncounter arrivalDateTime PreHospitalEncounter effectiveTime
PreHospitalEncounter departureDateTime PreHospitalEncounter effectiveTime
July 14, 2015 Page: 318 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
IG: Dictionary elements represented as
templated CDA constraints
3
CDA RMIM
Constrained
Information Model
NTDB
Implementation Guide
EMS
Implementation Guide
318
July 14, 2015 Page: 319 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Organization of IG Templates
July 14, 2015 Page: 320 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Organization of IG Templates
StucturedBody
+ classCode :CS = "DOCBODY"
+ moodCode :CS = "EVN"
StructuredBodyComponent
+ typeCode :CS = "COMP"
+ contextConductionInd :BL = "true"
TraumaRegistrySubmissionDocument
+ classCode :CS = "DOCCLIN"
+ moodCode :CS = "EVN"
+ id :II
+ code :CE = DocumentType
- effectiveTime :TS
PatientDetailSection::PatientDetailSection
Patient::PatientRole RegistryParticipant
+ classCode :CS = "ASSIGNED"
Submitter
+ typeCode :CS = "INF"
+ contextControlCode :CS = "OP"
HealthcareFacility
+ classCode :CS = "ORG"
+ determinerCode :CS = "INSTANCE"
- id :II
EntryPoint
Patient
+ RecordTarget
+ Patient
+ PatientRole
+ PatientDetailSection
PatientDetailSection
+ PatientDetailSection
+ StucturedBodyPatientDetailComponent
+ PatientDemographicObservation
+ PatientEmploymentObservation
(from Patient)
InjuryEventSection::InjuryEventSection PreHospital Encounter Section::
PreHospitalEncounterSection
Hospital Care Episode Section::
HospitalCareEpisodeSection
InjuryEventSection
+ InjuryEventSection
+ StructuredBodyInjuryEventComponent
+ InjuryEventDetailEntry
PreHospital Encounter Section
+ PreHospitalEncounterSection
+ StructoredBodyPreHospitalEncounterComponent
+ PreHospitalEncounterDetail
Hospital Care Episode Section
+ HospitalCareEpisodeSection
+ StructuredBodyHospitalCareEpisodeComponent
+ HospitalCareEpisodeActivityDetail
Name: TraumaRegistrySubmissionDocument
Author: Salimah Shakir
Version: 1.0
Created: 2/7/2013 9:30:31 PM
Updated: 6/14/2013 12:01:15 AM
Act
Entity
Role
Participation
ActRelationship
Foriegn Class
Legend
1..11
1..1
1
1..1
1
1..1
1
1..1
1
1..1
1
0..1
1
1..1
1
HEADER
BODY
ENTRIES
July 14, 2015 Page: 321 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Dict to DAM to CIM to IG
NTDB Dictionary Element CDA Template CDA ITEM CDA Clone CDA Attribute CDA CONF
D_01: PATIENT’S HOME ZIP CODE 3.1 Trauma Registry Submission Document 8.c.111 patientRole addr 27773
D_02: PATIENT’S HOME COUNTRY 3.1 Trauma Registry Submission Document 8.c.111 patientRole addr 27773
D_03: PATIENT’S HOME STATE 3.1 Trauma Registry Submission Document 8.c.111 patientRole addr 27773
D_04: PATIENT’S HOME COUNTY 3.1 Trauma Registry Submission Document 8.c.111 patientRole addr 27773
D_05: PATIENT’S HOME CITY 3.1 Trauma Registry Submission Document 8.c.111 patientRole addr 27773
D_06: ALTERNATE HOME RESIDENCE 5.3 Patient Demographic Observations Organizer 42.c.iv observation value 30000
D_07: DATE OF BIRTH 3.1 Trauma Registry Submission Document 8.c.iv.4 patient birthTime 27776
D_08: AGE 5.3 Patient Demographic Observations Organizer 43.c.iv observation value 30008
D_09: AGE UNITS 5.3 Patient Demographic Observations Organizer 43.c.iv.1 observation value@unit 30455
D_10: RACE 5.3 Patient Demographic Observations Organizer 44.c.iv observation value 30508
D_11: ETHNICITY 3.1 Trauma Registry Submission Document 8.c.iv.5 patient ethnicGroupCode 27778
D_12: SEX 3.1 Trauma Registry Submission Document 8.c.iv.3 patient administrativeGenderCode 27775
DG_01: CO-MORBID CONDITIONS 6.5 Hospital Care Episode Observation Organizer 84.c.iv observation value 30385
DG_02: ICD-9 INJURY DIAGNOSES 6.5 Hospital Care Episode Observation Organizer 85.c.iv observation value 30397
DG_03: ICD-10 INJURY DIAGNOSES 6.5 Hospital Care Episode Observation Organizer 85.c.iv observation value 30397
ED_01: ED/HOSPITAL ARRIVAL DATE 5.1 Hospital Care Episode Encounter 31 encounter effectiveTime 30341
ED_02: ED/HOSPITAL ARRIVAL TIME 5.1 Hospital Care Episode Encounter 31 encounter effectiveTime 30341
ED_03: INITIAL ED/HOSPITAL SYSTOLIC BLOOD PRESSURE 6.1 Circulatory System Observation Entry 63.c.iv observation value 29639
ED_043: INITIAL ED/HOSPITAL PULSE RATE 6.1 Circulatory System Observation Entry 62.c.iv observation value 29633
ED_05: INITIAL ED/HOSPITAL TEMPERATURE 6.7 Hospital Care Physiological Observation 100.c.iv observation value 30431
ED_06: INITIAL ED/HOSPITAL RESPIRATORY RATE 6.16 Respiratory System Observation Entry 145.c.iv observation value 30092
ED_07: INITIAL ED/HOSPITAL RESPIRATORY ASSISTANCE 6.15 Respiratory System Observation 140.c.iv observation value 30437
ED_08: INITIAL ED/HOSPITAL OXYGEN SATURATION 6.16 Respiratory System Observation Entry 144.c.iv observation value 30085
ED_09: INITIAL ED/HOSPITAL SUPPLEMENTAL OXYGEN 6.15 Respiratory System Observation 141.c.iv observation value 30441
July 14, 2015 Page: 322 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Trauma Registry Data Submission IG
July 14, 2015 Page: 323 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Introduction and Specification
Overview
July 14, 2015 Page: 324 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Scope
July 14, 2015 Page: 325 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Templates
July 14, 2015 Page: 326 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Document Template
July 14, 2015 Page: 327 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Section Templates
July 14, 2015 Page: 328 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Entry Templates
July 14, 2015 Page: 329 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Subentry Templates
July 14, 2015 Page: 330 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Vocabulary Tables
July 14, 2015 Page: 331 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Implementation Guide Development
July 14, 2015 Page: 332 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
From Data Dict. to CDA Impl. Guide
July 14, 2015 Page: 333 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Consolidated CDA
Implementation Guide
July 14, 2015 Page: 334 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Consolidated CDA
July 14, 2015 Page: 335 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Collaborative Work Product
 This guide was produced and developed through the joint efforts of Health
Level Seven (HL7), Integrating the Healthcare Environment (IHE), the Health
Story Project, and the Office of the National Coordinator (ONC) within the
US Department of Health and Human Services (HHS).
 The project was carried out within the ONC’s Standards and Interoperability
(S&I) Framework as the Clinical Document Architecture (CDA) Consolidation
Project with a number of goals, one of which is providing a set of
harmonized CDA templates for the US Realm.
July 14, 2015 Page: 336 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
US Realm Header Template
1. realmCode
2. typeId
3. templateId
4. id
5. code
6. title
7. effectiveDateTime
8. confidentialityCode
9. languageCode
10. setId
11. versionNumber
July 14, 2015 Page: 337 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Document Types
1. Continuity of Care Document (CCD)
2. Consultation Notes
3. Discharge Summary
4. Diagnostic Imaging Reports (DIR)
5. History and Physical (H&P)
6. Operative Note
7. Progress Note
8. Procedure Note
9. Unstructured Documents
July 14, 2015 Page: 338 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Continuity of Care Document (CCD)
 The Continuity of Care Document (CCD) represents a core data set
of the most relevant administrative, demographic, and clinical
information facts about a patient's healthcare, covering one or more
healthcare encounters.
 It provides a means for one healthcare practitioner, system, or setting
to aggregate all of the pertinent data about a patient and forward it to
another to support the continuity of care.
 The primary use case for the CCD is to provide a snapshot in time
containing the germane clinical, demographic, and administrative
data for a specific patient.
 The key characteristic of a CCD is that the ServiceEvent is
constrained to "PCPR". This means it does not function to report new
ServiceEvents associated with performing care. It reports on care
that has already been provided.
 The CCD provides a historical tally of the care over a range of time
and is not a record new services delivered.
July 14, 2015 Page: 339 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
CCD Contained Templates
July 14, 2015 Page: 340 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Consultation Notes
 The Consultation Note is generated by a request from a
clinician for an opinion or advice from another clinician.
 Consultations may involve face-to-face time with the
patient or may fall under the auspices of tele-medicine
visits.
 Consultations may occur while the patient is inpatient or
ambulatory.
 The Consultation note should also be used to summarize
an Emergency Room or Urgent Care encounter.
 A consultation note includes the reason for the referral,
history of present illness, physical examination, and
decision-making components (Assessment and Plan).
July 14, 2015 Page: 341 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Consultation Notes Contained Templates
July 14, 2015 Page: 342 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Discharge Summary
 The Discharge Summary is a document which synopsizes a
patient's admission to a hospital, LTPAC provider, or other
admission.
 It provides information for the continuation of care following
discharge.
 The Joint Commission requires the following information to be
included in the Discharge Summary:
• The reason for hospitalization the admission
• The procedures performed, as applicable
• The care, treatment, and services provided
• The patient’s condition and disposition at discharge
• Information provided to the patient and family
• Provisions for follow-up care
July 14, 2015 Page: 343 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Discharge Summary Contained
Templates
July 14, 2015 Page: 344 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
14 Document Level Templates
July 14, 2015 Page: 345 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
52 Section Level Templates
July 14, 2015 Page: 346 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
88 Entry Level Templates
July 14, 2015 Page: 347 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Required and Optional Sections by
Document Type
July 14, 2015 Page: 348 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
CDA Implementation Guides
July 14, 2015 Page: 349 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Partial list of Implementation Guides
(by country)
 USA
 CCD (Continuity of Care Document) Rel.1
 CRS (Care Record Summary)
 SPL – Structured Product Label
 HAI (Healthcare associated infections)
 HITSP
 C32 –Summary Documents Using HL7 Continuity of Care Document (CCD)
 C37 – Lab Report
 C48 –Encounter Document Using IHE Medical Summary (XDS-MS)
Component
 Consultation Notes
 History and Physical
 Operative Notes
 Imaging Integration, Basic Imaging Reports
 Canada
 e-MS (electronic Medical Summary)
 Germany
 VHitG-Arztbrief v1.50 (discharge summary)
 Addendum Laboratory
 Addendum Medication
 Addendum notifiable diseases (in progress)
 DRV Reha-Enlassbrief
 Reha-Kurzarztbrief
 Nursing Summary (ePflegebericht)
 South Korea
 CDA conference 2004
 Austria
 ELGA (currently in progress)
 Switzerland
 CDA-CH v1.1
 France
 French CRS CDA Body implementation Guide (in
French)
 Finland
 seamless Care and CDA
 Finnish (CDA) implementation guides: CDA R2, V3,
Medical Records, V2, CDA R (in Finnish)
 Japan
 Japanese Clinical Summary document (in Japanese)
July 14, 2015 Page: 350 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
CDA Implementation Guides
(available for download from the HL7 website)
1. Clinical Oncology Treatment Plan and Summary,
DSTU Release 1
2. Personal Healthcare Monitoring Report
3. Patient Generated Document Header Template,
Release 1
4. Plan-to-Plan Personal Health Record (PHR) Data
Transfer, Release 1
5. Public Health Case Reports (US Realm)
6. Quality Reporting Document Architecture –
Category I (QRDA) DSTU Release 2 (US Realm)
7. Level 1 and 2 - Care Record Summary (US realm)
8. Level 3: Emergency Medical Services; Patient
Care Report, Release 1 – US Realm
9. CDA Framework for Questionnaire Assessments,
DSTU Release 2
10. Digital Signatures and Delegation of Rights,
Release 1
11. Exchange of Clinical Trial Subject Data; Patient
Narratives, Release 1 - US Realm
12. Genetic Testing Reports, Release 1
13. Healthcare Associated Infection (HAI) Reports
14. HIV/AIDS Services Report, Release 1 - US Realm
15. IHE Health Story Consolidation, Release 1.1 - US
Realm
16. Long-Term Post-Acute Care Summary, DSTU
Release 1 (US Realm)
17. Patient Assessments, Release 1
18. Quality Reporting Document Architecture - Category
III (QRDA III), DSTU Release 1
19. Questionnaire Form Definition Document, Release
1
20. Questionnaire Response Document, Release 1
21. Reference Profile for EHR Interoperability, Release
1
22. Trauma Registry Data Submission, Release 1
23. Consent Directives, Release 1
24. Procedure Note, Release 1
25. greenCDA Modules for CCD®, Release 1
26. Imaging Integration; Basic Imaging Reports in CDA
and DICOM, Release 1
27. Specification and Use of Reusable Information
Constraint Templates, Release 1
28. Neonatal Care Reports (NCR), R1
29. Continuity of Care Document (CCD®) Release 1
July 14, 2015 Page: 351 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SESSION RETROSPECTIVE
• KEY ASPECTS OF CDA
• EARLY HISTORY OF CDA
• CDA SPECIFICATION FRAMEWORK
• TEMPLATED CDA AND IMPLEMENTATION GUIDES
• SAMPLE HL7 V3 CDA ARTIFACTS
• CONSOLIDATED CDA IMPLEMENTATION GUIDE
July 14, 2015 Page: 352 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Questions
July 14, 2015 Page: 353 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Hi3 Solutions
3500 W. Olive Ave, Suite
300
Burbank, CA 91505
ww.hi3solutions.com +1 800 918-
6520
July 14, 2015 Page: 354 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Specification and validation
HL7 Compliance and
Conformance
July 14, 2015 Page: 355 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SESSION OVERVIEW
 SPECIFICATION CONFORMANCE PROFILING
 PURPOSE AND GOAL OF CONFORMANCE PROFILING
 HL7 V2 MESSAGE CONFORMANCE PROFILING
 USE CASES OF MESSAGE CONFORMANCE
PROFILING
 CONFORMANCE VALIDATION
 HI3 SOLUTIONS CONFORMANCE VALITATOR
July 14, 2015 Page: 356 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HDF Workflow Diagram
Initiate
Project
Project
Charter
Specify
Requirements
Reference
Models
Requirement
Specification
Prepare Specification
Design Models
Specification
Design Models
Prepare
Specification
Approve
Specification
Approved
Specification
Publish
Approved
Specification
Published
Specification
Prepare Specification
Profiles
Specification
Profile
Conformance
Statement
Proposed
Specification
The HDF workflow is not a waterfall methodology.
Each phase builds upon the prior and may cause
prior activities to be revisited and their deliverables
adjusted.
July 14, 2015 Page: 357 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Specification Profiling
During specification profiling specification models and published specifications are
further refined to produce a specification profile for use in a particular environment by
a defined community of users. The primary deliverable produced during specification
profiling is a set of specification constraints and conformance statements.
Specification
Profiling
Specification
Constraints and
Conformance
Statements
1. Identify community of user for the published specification
2. Further refine and constrain specification design models
3. Document exceptions, extensions, and annotations to specifications
4. Prepare and publish specification profile
5. Prepare and publish conformance statements
Published
Specification
July 14, 2015 Page: 358 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Purpose and goals for
conformance profiling
July 14, 2015 Page: 359 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Reveal Assumptions
Revealing assumptions is an essential component of effective communication.
Yes, I do
play
football.
Do you
play
football?
July 14, 2015 Page: 360 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Reveal Assumptions
Message Profiles are an effective means of documenting our assumptions
about message structures
Do you
use
HL7?
MSH
EVN
PID
[PD1]
[ { NK1 } ]
Yes, I
use
HL7.
MSH
EVN
PID
[ NK1 ]
OBX
July 14, 2015 Page: 361 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Reduce Ambiguity
Message Profiles provide a language that allows us to unambiguously express our
understanding and assumptions about the information in a message structure used
in a particular scenario
MSH
EVN
PID
[PD1]
[ { NK1 } ]
July 14, 2015 Page: 362 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Highlight Conflicts
Sharing message profiles provides
an opportunity to identify and reconcile conflicts in our understanding
and to validate our assumptions about message structures.
MSH
EVN
PID
[PD1]
[ { NK1 } ]
MSH
EVN
PID
[ NK1 ]
OBX
July 14, 2015 Page: 363 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Consolidate Viewpoints
Message Profile Message Profile Message Profile
MSH
EVN
PID
[PD1]
[ { NK1 } ]
MSH
EVN
PID
[ NK1 ]
OBX
MSH
EVN
{ PID }
[PD1]
[ { GT1 } ]
MSH
EVN
{ PID }
[PD1]
[ { NK1 } ]
[ { GT1 } ]
[ OBX ]
July 14, 2015 Page: 364 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Value of Profiling
 Reveal Assumptions
 Reduce Ambiguity
 Highlight Conflicts
 Consolidate Viewpoints
July 14, 2015 Page: 365 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Profile Defined
 Unambiguous specification of an HL7 data exchange
standard for use within a particular community of
users for a specified set of requirements
 Prescribes a set of precise constraints upon one or more
standard
 Supported by use case analysis and interaction modeling
 Measurable
 What data will be passed
 The format in which the data will be passed
 The acknowledgement responsibilities of the receiver
July 14, 2015 Page: 366 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Profile Defined (cont’d)
 Based on HL7, although may further constrain
 Static structure and content of each message
 The dynamic interactions
 Parts of a profile
 Use Case Model
 Static Definition
 Dynamic Definition
 Represented as an XML document
 Can be registered with HL7
 May be reused by other HL7 users
 May be used for documentation
July 14, 2015 Page: 367 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v2 Conformance
Profiling
July 14, 2015 Page: 368 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Conceptual Overview
Message Profile = Static Profile + Dynamic Profile
Critical Care Unit
ADT System
Acknowledgement Message
Initiating Message
Initiating Message
Clinical Data Repository
July 14, 2015 Page: 369 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Message conformance profile
dynamic definition
July 14, 2015 Page: 370 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Use Case Model
 Documents the scope and requirements for an HL7
Message Type or set of Message Types
 May include a use case diagram or detailed text
 Provides a name that clearly and concisely defines
the exchange
 Defines the actors, including the sending and
receiving applications
 Defines the responsibilities of these actors
 Documents the situations in which the exchange of a
particular HL7 Message Profile is required
July 14, 2015 Page: 371 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Dynamic Definition
 Defines interaction between the sender and receiver
 Acknowledgment mode supported
 Conditions under which an accept and/or application level
acknowledgment is expected
 Always
 Never
 Only on success
 Only on error
 Interaction Model
 Defines specific interactions between the applications that
support message profile communication requirements
 Includes interaction diagrams that illustrate the sequence of
trigger event and resulting message flows between the sending
and receiving applications
 Dynamic can refer one to many static definitions
July 14, 2015 Page: 372 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Dynamic Interaction
Vectra
XU
5/90C
BED1OFF
BED1OFF
BED1OFF
BED1OFF
BED1OFF
BED1OFF
BED1OFF
BED1OFF
BED1OFF
BED1OFF
POTASSIUM3.5-5.0
BED1OFF
POTASSIUM3.5-5.0
POTASSIUM3.5-5.0
POTASSIUM3.5-5.0
BED1OFF
POTASSIUM3.5-5.0
BED1OFF BED1OFF
BED1OFF
BED1OFFBED1OFF
Critical Care Unit
HIS/CIS
Vectra
XU
5/90C
BED1OFF
BED1OFF
BED1OFF
BED1OFF
BED1OFF
BED1OFF
BED1OFF
BED1OFF
BED1OFF
BED1OFF
POTASSIUM3.5-5.0
BED1OFF
POTASSIUM3.5-5.0
POTASSIUM3.5-5.0
POTASSIUM3.5-5.0
BED1OFF
POTASSIUM3.5-5.0
BED1OFF BED1OFF
BED1OFF
BED1OFFBED1OFF
Clinical Data
Repository
A/D/T System
Order Filling Application
Accept Ack
Accept + App ACK
Receiver Responsibility
MSH-15,16
No ACK
July 14, 2015 Page: 373 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SIIS SIP Use Case Diagram
ud Use Case Model
Local Registry User
1.0 Immunization
History Query
2.0 Patient
Demographic
Update
3.0 Vaccine
Record Update Prov ider Organization
SIIS Registry
Administration
4.0 Immunization
Statistical Analysis
Trusted Third PartiesLocal Registry
Administration
SIIS Analysis Report
SIIS Analysis Report
SIIS Analysis Report SIIS Analysis Report
Update Confirmation
Update Confirmation
Query Response
Vaccine Record Update
Patient Information Update
Immunization History Request
July 14, 2015 Page: 374 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SIIS SIP Activity Model
ad InteractionActivityModel
Requesting Registry System SIIS SIP Immunization Information Exchange System Responding Registry System
1.1 Request Immunization
Data
«message»
M.01 Immunization Data
Request (VXQ)
2.2 Validate Immunization
Data Request Message
«message»
M.02 Request Error Message
(ACK)
2.3 Route Immunization
Data Request Message2.4 Notify System
Administrator
«message»
M.03 Immunization
Data Request (VXQ)
3.1 Retrive Requested
Immunization Data
«datastore»
D.04 Immunization
Registry
3.2 Retrival
Result?
3.2.1 Return "No Matching
Record" Response
3.2.2 Return "Multiple
Matching Records"
Response
3.2.3 Return Requested
Immunization Data
«message»
M.04 No Matching
Record Response (QCK)
«message»
M.05 Multiple Matching
Records Response (VXX)
«message»
M.06 Requested
Immunization Data (VXR)
4.2 Validate Response
Message
«message»
M.07 Response Message
Error (ACK)
4.3 Route Response
Message
4.4 Notify System
Administrator
«message»
M.08 No Matching Record
Message (QCK)
«message»
M.09 Multiple Matching
Record Message (VXX)
«message»
M.10 Requested Immunization
Data Message (VXR)
5.1 Refine Demographic
Data
5.2 Select Desired Record
5.3 Merge Immunization
Data with existing data
«datastore»
D.01 Immunization
Registry
[Valid Message]
[Invalid Message]
[Valid Message]
[No Matching Record]
[Desired Record Not Present]
[Multiple Matching Records]
[Single Matching Record]
[Desired Record Selected]
[Invalid Message]
1
2 3
4
6
5
July 14, 2015 Page: 375 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SIIP SIP Interaction Model
sd Interactions
Requesting Registry
System
SIIS SIP Immunization
Information Exchange
System
Responding Registry
System
Vaccination Record Query (VXQ)
[Invalid VXQ Message]: General Acknowledgement (ACK)
[Valid VXR Message]: Vaccination Record Query (VXQ)
[No Matching Record]: Query Acknowledgement (QCK)
[Invalid QCK Message]: General Acknowledgement (ACK)
[Valid QCK Message]: Query Acknowledgement (QCK)
[Multiple Matching Records]: Vaccination Query Response (VXX)
[Invalid VXX Message]: General Acknowledgement (ACK)
[Valid VXX Message]: Vaccination Query Response (VXX)
[Single Matching Record]: Vaccination Query Response (VXR)
[Invalid VXR Message]: General Acknowledgement (ACK)
[Valid VXR Message]: Vaccination Query Response (VXR)
July 14, 2015 Page: 376 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SIIS SIP Acknowledgement Requirements
Message Source Destination Acknowledgment
• Vaccination Record Query (VXQ) Requester IIES Only on error
• General Acknowledgement (ACK) IIES Requester Never
• Vaccination Record Query (VXQ) IIES Responder Never
• Query Acknowledgement (QCK) Responder IIES Only on error
• General Acknowledgement (ACK) IIES Responder Never
• Query Acknowledgement (QCK) IIES Requester Never
• Vaccination Query Response (VXX) Responder IIES Only on error
• General Acknowledgement (ACK) IIES Responder Never
• Vaccination Query Response (VXX) IIES Requester Never
• Vaccination Query Response (VXR) Responder IIES Only on error
• General Acknowledgement (ACK) IIES Responder Never
• Vaccination Query Response (VXR) IIES Requester Never
July 14, 2015 Page: 377 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Message conformance profile
static definition
July 14, 2015 Page: 378 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Static Definition
 A specification for a message structure intended to
support the use case
 Based on a message defined in HL7 Std
 Defined at the message, segment, and field levels
 Follows the HL7 rules (chapter 2)
 May further constrain
 Identifies only those specific elements used in the exchange
 Removes all instances of optionality, defining explicitly
 Segments, segment groups, fields and components usage rules
 Cardinalities
 Value sets and coding systems
 Implementation notes
July 14, 2015 Page: 379 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Static Definition Example
...
...
...
NK1
MSH
EVN
PID
NK1 NK1 NK1 NK1
PV1
PV2
OBX
AL1
HL7 Message Structure
...
NK1
MSH
EVN
PID
NK1 NK1 NK1 NK1
PV1
PV2
OBX
AL1
Message Profile
Segments/Segment Groups:
•Usage (Optionality)
•Cardinality (min, max)
Fields/Components:
- Usage (Optionality)
- Cardinality (min, max)
- Value Sets/Coding system
- Descriptions
July 14, 2015 Page: 380 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Profiling Concepts
 Profile Types
 HL7 Standard
 Constrainable
 Implementable
 Generic term ‘message element’ used
 Segment groups
 Segments
 Fields
 Components
 Sub-components
 Cardinality
 Usage
July 14, 2015 Page: 381 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Profile Types
 HL7 Standard Profile
 represents a specific HL7 published standard
 creation and publication limited to HL7 use
 Constrainable
 May have optionality - not implementable
 Narrower profiles may be defined based on this
 Realm Specific (National, Regional, SIGs, etc.)
 Organization / Application Specific
 Implementation
 Further constrained
 No optionality
July 14, 2015 Page: 382 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v2 Message Elements
Message Specification
Segment Group
Message Segment
Segment Segment Field
Data Element
Data Type Composite Data Type
Data Type Component
Code Table Code Table Item
Code System Term
Code System
July 14, 2015 Page: 383 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Cardinality
 Identifies minimum and maximum number of
occurrences
 Special values for cardinality
 Minimum number of occurrences is 0, the element may be
omitted from a message
 The maximum value may have no practical limit
(In this case, it may be identified as ‘*’)
July 14, 2015 Page: 384 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Cardinality Examples
Value Description
[0..0] Element never present
[0..1] Element may be omitted and it can have at most one occurrence
[1..1] Element must have exactly one occurrence
[0..n] Element may be omitted or may repeat up to n times
[1..n] Element must appear at least once, and may repeat up to n times
[0..*] Element may be omitted or repeat for an unlimited number of
times
[1..*] Element must appear at least once, and may repeat unlimited
number of times
[m..n] Element must appear at least “m” and at most” n” times
July 14, 2015 Page: 385 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Usage
 The circumstances under which an element appears in a
message
 Some elements must always be present
 others may never be present
 others may only be present in certain circumstances
 Rules governing restrictions on the sending applications
and the expected behavior of receiving applications with
respect to a message element
 Required
 Required, but may be empty
 Optional
 Conditional
 Conditional, but may be empty
 Not supported
July 14, 2015 Page: 386 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Usage (continued)
 R - Required
 A conforming sending application
 populate all “R” elements with a non-empty value
 A conforming receiving application
 process (save/print/archive/etc.) or ignore the information
conveyed by required elements
 must not raise an error due to the presence of a required
element, but may raise an error due to the absence of a
required element
 For complete compatibility with HL7, any element
designated as required in a standard HL7 message
definition shall also be required in all HL7 Message
Profiles of that standard message
July 14, 2015 Page: 387 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Usage (continued)
 RE - Required but may be empty
 May be missing from the message, but must be sent by the
sending application if there is relevant data
 A conforming sending application
 must be capable of providing all “RE” element
 if it knows the required values for the element, then it must send
that element
 if the conforming sending application does not know the required
values, then element will be omitted
 A conforming receiving applications
 will be expected to process (save/print/archive/etc.) or ignore data
contained in the element
 must be able to successfully process the message if the element is
omitted (I.e. no error message should be generated because the
element is missing
July 14, 2015 Page: 388 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Usage (continued)
 O - Optional
 This code indicates that the Usage for this element has
not yet been defined
 May NOT be used in ‘Implementation’ profiles (no-
optionality profiles)
 Conformance cannot be tested on an Optional field
July 14, 2015 Page: 389 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Usage (continued)
 C - Conditional
 Predicate associated with this element that identifies the
conditions under which the element must be present
 must be testable and based on other values within the message
 may be expressed as a mathematical expression or in text and
may utilize operators such as equivalence, logical AND, logical OR
and NOT
 The conforming sending and receiving applications shall both
evaluate the predicate
 If the predicate is satisfied:
 See rules for R (Required)
 If the predicate is NOT satisfied:
 A conformant sending application must NOT send the element
 A conformant receiving application must NOT raise an error if the
condition predicate is false and the element is not present, though
it MAY raise an error if the element IS present
July 14, 2015 Page: 390 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Usage (continued)
 CE - Conditional but may be empty
 This usage also has an associated condition predicate
similar to Conditional (C)
 If the predicate is satisfied:
 See rules for RE (Required but may be empty)
 If the predicate is not satisfied:
 The conformant sending application must NOT send the
element
 The conformant receiving application MAY raise an application
error if the element IS present
 X - Not supported
 Conformant sending applications will NOT send the
element
 Conformant receiving applications MAY ignore the
element if it IS present, or may raise an application error
July 14, 2015 Page: 391 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Optionality / Usage Relationship
 Conformance Usage codes are more specific than
HL7 Optionality codes
HL7 Optionality Allowed Conformance Usage Comment
R - Required R
O - Optional R, RE, O*, C, CE, X O is only permitted for
constrainable profiles
C - Conditional C, CE, R** ** If satisfied by use case
X – Not Supported X
B – Backward
Compatibility
R, RE, O*, C, CE, X O is only permitted for
constrainable profiles
W – Withdrawn X
July 14, 2015 Page: 392 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Message Level Profile
 Segment Definitions
 The set of segments and segment groups included within
the message of an HL7 Message Profile shall be defined
 Any segments or segment groups that are required by
HL7 shall be included
 Segment Usage
 Segment Cardinality
 Profile does not allow for “empty” segment
 HL7 abstract message syntax PLUS
 Usage
 Cardinality
July 14, 2015 Page: 393 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Message Level Profile Example
ADT^A01^ADT_A01 ADT Message Usage Cardinality Chapter
MSH Message Header R [1..1] 2
EVN Event Type R [1..1] 3
PID Patient Identification R [1..1] 3
[ PD1 ] Additional Demographics X [0..0] 3
[{ ROL }] Role X [0..0] 12
[{ NK1 }] Next of Kin / Associated
Parties
RE [0..3] 3
PV1 Patient Visit R [1..1] 3
[ PV2 ] Patient Visit - Additional
Info.
RE [0..1] 3
[{ ROL }] Role X [0..0] 12
[{ DB1 }] Disability Information X [0..0] 3
[{ OBX }] Observation/Result X [0..0] 7
[{ AL1 }] Allergy Information RE [0..*] 3
[{ DG1 }] Diagnosis Information X [0..0] 6
[ DRG ] Diagnosis Related Group X [0..0] 6
[{ X [0..0]
PR1 Procedures X [0..0] 6
[{ ROL }] Role X [0..0] 12
}]
[{ GT1 }] Guarantor X [0..0] 6
[{ X [0..0]
IN1 Insurance X [0..0] 6
[ IN2 ] Insurance Additional Info. X [0..0] 6
[{ IN3 }] Insurance Additional Info -
Cert.
X [0..0] 6
[{ ROL }] Role X [0..0] 12
}]
[ ACC ] Accident Information X [0..0] 6
[ UB1 ] Universal Bill Information X [0..0] 6
[ UB2 ] Universal Bill 92 Information X [0..0] 6
[ PDA ] Patient Death and Autopsy X [0..0] 3
July 14, 2015 Page: 394 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Message Level Profile Example
ADT^A01^ADT_A01 ADT Message Usage Cardinality Chapter
MSH Message Header R [1..1] 2
EVN Event Type R [1..1] 3
PID Patient Identification R [1..1] 3
[{ NK1 }] Next of Kin / Associated
Parties
RE [0..3] 3
PV1 Patient Visit R [1..1] 3
[ PV2 ] Patient Visit - Additional
Info.
RE [0..1] 3
[{ AL1 }] Allergy Information RE [0..*] 3
July 14, 2015 Page: 395 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Message Level Profile Example 2
ADT^A01^ADT_A01 ADT Message Usage Cardinality Chapter
MSH Message Header R [1..1] 2
EVN Event Type R [1..1] 3
PID Patient Identification R [1..1] 3
[ PD1 ] Additional Demographics X [0..0] 3
[{ ROL }] Role X [0..0] 12
[{ NK1 }] Next of Kin / Associated
Parties
RE [0..10] 3
PV1 Patient Visit R [1..1] 3
[ PV2 ] Patient Visit - Additional
Info.
R [1..1] 3
[{ ROL }] Role X [0..0] 12
[{ DB1 }] Disability Information X [0..0] 3
[{ OBX }] Observation/Result X [0..0] 7
[{ AL1 }] Allergy Information RE [0..*] 3
[{ DG1 }] Diagnosis Information X [0..0] 6
[ DRG ] Diagnosis Related Group X [0..0] 6
[{ X [0..0]
PR1 Procedures X [0..0] 6
[{ ROL }] Role X [0..0] 12
}]
[{ GT1 }] Guarantor X [0..0] 6
[{ RE [0..3]
IN1 Insurance R [1..1] 6
[ IN2 ] Insurance Additional Info. RE [0..1] 6
[{ IN3 }] Insurance Additional Info -
Cert.
X [0..0] 6
[{ ROL }] Role X [0..0] 12
}]
[ ACC ] Accident Information RE [0..1] 6
[ UB1 ] Universal Bill Information X [0..0] 6
[ UB2 ] Universal Bill 92 Information X [0..0] 6
[ PDA ] Patient Death and Autopsy X [0..0] 3
July 14, 2015 Page: 396 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Message Level Profile Example 2
ADT^A01^ADT_A01 ADT Message Usage Cardinality Chapter
MSH Message Header R [1..1] 2
EVN Event Type R [1..1] 3
PID Patient Identification R [1..1] 3
[{ NK1 }] Next of Kin / Associated
Parties
RE [0..10] 3
PV1 Patient Visit R [1..1] 3
[ PV2 ] Patient Visit - Additional
Info.
R [1..1] 3
[{ AL1 }] Allergy Information RE [0..*] 3
[{ RE [0..3]
IN1 Insurance R [1..1] 6
[ IN2 ] Insurance Additional Info. RE [0..1] 6
}]
[ ACC ] Accident Information RE [0..1] 6
July 14, 2015 Page: 397 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Segment Level Profile
 The set of fields of each instance of a segment
within the Message Profile
 If a segment occurs multiple times, it may be
represented by different segment profiles
 Field Usage
 Field Cardinality
 Syntax (tabular HL7 segment definitions)
 Length (updated)
 Usage (new column)
 Cardinality (new column)
July 14, 2015 Page: 398 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Segment Level Profile Example (PID)
SEQ LEN DT Usage Cardinality TBL# ITEM# ELEMENT NAME
1 4 SI X 00104 Set ID - PID
2 20 CX RE [0..1] 00105 Patient ID
3 20 CX R [1..*] 00106 Patient Identifier List
4 20 CX X 00107 Alternate Patient ID - PID
5 48 XPN R [1..*] 00108 Patient Name
6 48 XPN RE [0..*] 00109 Mother’s Maiden Name
7 26 TS RE [0..*] 00110 Date/Time of Birth
8 1 IS RE [0..*] 0001 00111 Sex
9 48 XPN X 00112 Patient Alias
10 80 CE X 0005 00113 Race
11 106 XAD RE [0..3] 00114 Patient Address
12 4 IS X 0289 00115 County Code
13 40 XTN RE [0..3] 00116 Phone Number - Home
14 40 XTN RE [0..3] 00117 Phone Number - Business
15 60 CE X 0296 00118 Primary Language
16 80 CE X 0002 00119 Marital Status
17 80 CE X 0006 00120 Religion
18 20 CX X 00121 Patient Account Number
19 16 ST RE [0..1] 00122 SSN Number - Patient
20 25 DLN X 00123 Driver's License Number - Patient
21 20 CX X 00124 Mother's Identifier
22 80 CE X 0189 00125 Ethnic Group
23 60 ST RE [0..1] 00126 Birth Place
24 1 ID X 0136 00127 Multiple Birth Indicator
25 2 NM X 00128 Birth Order
26 80 CE X 0171 00129 Citizenship
27 60 CE X 0172 00130 Veterans Military Status
28 80 CE X 0212 00739 Nationality
29 26 TS X 00740 Patient Death Date and Time
30 1 ID X 0136 00741 Patient Death Indicator
SEQ LEN DT OPT RP/# TBL# ITEM# ELEMENT NAME
1 4 SI O 00104 Set ID - PID
2 20 CX B 00105 Patient ID
3 250 CX R Y 00106 Patient Identifier List
4 20 CX B Y 00107 Alternate Patient ID - PID
5 250 XPN R Y 00108 Patient Name
6 250 XPN O Y 00109 Mother’s Maiden Name
7 26 TS O Y 00110 Date/Time of Birth
8 1 IS O Y 0001 00111 Sex
9 250 XPN B 00112 Patient Alias
10 250 CE O 0005 00113 Race
11 250 XAD O Y 00114 Patient Address
12 4 IS B 0289 00115 County Code
13 250 XTN O Y 00116 Phone Number - Home
14 250 XTN O Y 00117 Phone Number - Business
15 250 CE O 0296 00118 Primary Language
16 250 CE O 0002 00119 Marital Status
17 250 CE O 0006 00120 Religion
18 250 CX O 00121 Patient Account Number
19 16 ST B 00122 SSN Number - Patient
20 25 DLN B 00123 Driver's License Number - Patient
21 250 CX O Y 00124 Mother's Identifier
22 250 CE O Y 0189 00125 Ethnic Group
23 250 ST O 00126 Birth Place
24 1 ID O 0136 00127 Multiple Birth Indicator
25 2 NM O 00128 Birth Order
26 250 CE O Y 0171 00129 Citizenship
27 250 CE O 0172 00130 Veterans Military Status
28 250 CE B 0212 00739 Nationality
29 26 TS O 00740 Patient Death Date and Time
30 1 ID O 0136 00741 Patient Death Indicator
July 14, 2015 Page: 399 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Segment Level Profile Example (PID)
SEQ LEN DT Usage Cardinality TBL# ITEM# ELEMENT NAME
1 4 SI X 00104 Set ID - PID
2 20 CX RE [0..1] 00105 Patient ID
3 20 CX R [1..*] 00106 Patient Identifier List
4 20 CX X 00107 Alternate Patient ID - PID
5 48 XPN R [1..*] 00108 Patient Name
6 48 XPN RE [0..*] 00109 Mother’s Maiden Name
7 26 TS RE [0..*] 00110 Date/Time of Birth
8 1 IS RE [0..*] 0001 00111 Sex
9 48 XPN X 00112 Patient Alias
10 80 CE X 0005 00113 Race
11 106 XAD RE [0..3] 00114 Patient Address
12 4 IS X 0289 00115 County Code
13 40 XTN RE [0..3] 00116 Phone Number - Home
14 40 XTN RE [0..3] 00117 Phone Number - Business
15 60 CE X 0296 00118 Primary Language
16 80 CE X 0002 00119 Marital Status
17 80 CE X 0006 00120 Religion
18 20 CX X 00121 Patient Account Number
19 16 ST RE [0..1] 00122 SSN Number - Patient
20 25 DLN X 00123 Driver's License Number - Patient
21 20 CX X 00124 Mother's Identifier
22 80 CE X 0189 00125 Ethnic Group
23 60 ST RE [0..1] 00126 Birth Place
24 1 ID X 0136 00127 Multiple Birth Indicator
25 2 NM X 00128 Birth Order
26 80 CE X 0171 00129 Citizenship
27 60 CE X 0172 00130 Veterans Military Status
28 80 CE X 0212 00739 Nationality
29 26 TS X 00740 Patient Death Date and Time
30 1 ID X 0136 00741 Patient Death Indicator
July 14, 2015 Page: 400 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Message Profile Identifier
 Uniquely identifies static and dynamic profile
 The static profile identifier is a means to uniquely
identify a message profile, expressed as an ASN.1
Object Identifier (OID)
 The sending application uses the profile identifiers to
determine the specific HL7 Message Profile to send
 Branch from ISO to HL7 and Message Profile
 2.16.840.1.113883.9
July 14, 2015 Page: 401 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
MSH-21 Message Profile Identifier
 Sites may use this field to assert adherence to, or
reference, a message profile.
 Message profiles contain detailed explanations of
grammar, syntax, and usage for a particular message or
set of messages.
 Repetition of this field allows more flexibility in creating
and naming message profiles.
 Using repetition, this field can identify a set of message
profiles that the message conforms to.
 As of v2.5, the HL7 message profile identifiers might be
used for conformance claims.
 Prior to v2.5, the field was called Conformance
Statement ID. For backward compatibility, the
Conformance Statement ID can be used here.
July 14, 2015 Page: 402 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
How it all ties together
Static Definition – Field Level
Vocabulary
SEQ LEN DT Usage Cardinality TBL# ITEM# ELEMENT NAME
1 4 SI X 00104 Set ID - PID
2 20 CX RE [1..1] 00105 Patient ID
3 20 CX R [1..*] 00106 Patient Identifier List
4 20 CX X 00107 Alternate Patient ID - PID
5 48 XPN R [1..*] 00108 Patient Name
6 48 XPN RE [1..*] 00109 Mother’s Maiden Name
7 26 TS RE 00110 Date/Time of Birth
8 1 IS RE 0001 00111 Sex
9 48 XPN X 00112 Patient Alias
10 80 CE X 0005 00113 Race
11 106 XAD RE [1..3] 00114 Patient Address
12 4 IS X 0289 00115 County Code
13 40 XTN RE [1..3] 00116 Phone Number - Home
14 40 XTN RE [1..3] 00117 Phone Number - Business
15 60 CE X 0296 00118 Primary Language
16 80 CE X 0002 00119 Marital Status
17 80 CE X 0006 00120 Religion
18 20 CX X 00121 Patient Account Number
19 16 ST RE 00122 SSN Number - Patient
20 25 DLN X 00123 Driver's License Number - Patient
21 20 CX X 00124 Mother's Identifier
22 80 CE X 0189 00125 Ethnic Group
23 60 ST RE 00126 Birth Place
24 1 ID X 0136 00127 Multiple Birth Indicator
25 2 NM X 00128 Birth Order
26 80 CE X 0171 00129 Citizenship
27 60 CE X 0172 00130 Veterans Military Status
28 80 CE X 0212 00739 Nationality
29 26 TS X 00740 Patient Death Date and Time
30 1 ID X 0136 00741 Patient Death Indicator
: ADT Sy stem : ADT Notification
Recip ient
ADT^A01
ACK ^A01
Interaction Model
Segment ADT Message Usage Cardinality Chapter
MSH Message Header R [1..1] 2
EVN Event Type R [1..1] 3
PID Patient Identification R [1..1] 3
[ PD1 ] Additional Demographics X [0..0] 3
[{ ROL }] Role X [0..0] 12
[{ NK1 }] Next of Kin / Associated
Parties
RE [0..3] 3
PV1 Patient Visit R [1..1] 3
[ PV2 ] Patient Visit - Additional
Info.
RE [0..1] 3
[{ ROL }] Role X [0..0] 12
[{ DB1 }] Disability Information X [0..0] 3
[{ OBX }] Observation/Result X [0..0] 7
[{ AL1 }] Allergy Information RE [0..*] 3
[{ DG1 }] Diagnosis Information X [0..0] 6
[ DRG ] Diagnosis Related Group X [0..0] 6
[{ X [0..0]
PR1 Procedures X [0..0] 6
[{ ROL
}]
Role X [0..0] 12
}]
[{ GT1 }] Guarantor X [0..0] 6
[{ X [0..0]
IN1 Insurance X [0..0] 6
[ IN2 ] Insurance Additional Info. X [0..0] 6
[{ IN3
}]
Insurance Additional Info -
Cert.
X [0..0] 6
[{ ROL
}]
Role X [0..0] 12
}]
[ ACC ] Accident Information X [0..0] 6
[ UB1 ] Universal Bill Information X [0..0] 6
[ UB2 ] Universal Bill 92 Information X [0..0] 6
[ PDA ] Patient Death and Autopsy X [0..0] 3
Dynamic Definition
Static Definition – Segment Level
P at ie nt
P hy s ic ian
A D T No tific at ion
Re c ipien t
A D T S y s tem
A dm it/ V is it Notific ation
is s u b jec t of
autho riz es
rec e ives notific ations en ds no tific at ion
Reg is trar
trig gers
Use Case Model
Static Definition – Message Level
1 Use Case Model
1.1 Use Case: Admit/Visit Notification
2. Dynamic Interaction Model
3 Dynamic Definition: ADT/ACK (Event A01)
3.1 ADT^A01
3.2 ACK^A01
4 Static Definition: - Message Level -
ADT/ACK (event A01)
4.1 ADT^A01
4.2 ACK^A01
5 Static Defintiion - Segment Level
5.1 MSH – Message Header Segment Definition
5.2 EVN - Event Type Segment Definition
5.3 PID (Y) - Patient Demographics Segment
Definition
5.4 PD1 – Patient Additional Demographic
Segment Definition
5.5 NK1 - Next of kin Segment Definition
5.6 PV1 (2) - Admit Visit Info Segment
Definition
5.7 AL1 - Allergy Segment Definition
5.8 MSA - Message Acknowledgment Segment
Definition
5.9 ERR - Error Segment Definition
6 Static Definition - Field Level
6.1 Table 0001 – Sex
6.2 Table 0002 – Marital Status
6.3 Table 0003 – Event Type Code
6.4 Table 0004 – Patient Class
6.5 Table 0005 – Race
6.6 Table 0006 – Religion
6.7 Table 0007 – Admission Type
6.8 Table 0008 – Acknowledgement Code
6.9 Table 0009 – Ambulatory Status
July 14, 2015 Page: 403 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Compliance and Conformance
 Compliance
Messages that adhere to the rules
and conventions for constructing
of a specific version of a standard
are compliant to that version of
the standard.
 Conformance
Messages that adhere to the
constraints of a precise and
unambiguous specification called
a message profile are said to be
conformant to the profile.
Compliance Conformance
July 14, 2015 Page: 404 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Conformance Profiling Benefits
 Consistent Documentation
 Reuse of Specification
 Lower Cost of Integration
 Similar to Version 3
 Chaos -> order
 Site Specific Profiles
 Supports specific needs
 Required of third-party application vendors
 RFP
 Simplifies introduction/acquisition of new applications
July 14, 2015 Page: 405 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Use Cases of Message
Conformance Profiling
July 14, 2015 Page: 406 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
California Department
of Health Services
Electronic Laboratory Reporting Project
July 14, 2015 Page: 407 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
CA ELR Project Use Cases
UC01: Report Laboratory
Result UC02: Reroute Misdirected
Laboratory Result
UC03: Persist Laboratory
Result Message Content
UC04: Laboratory Result
Business Intellegence /
Analytics
Reporting Laboratory
Receiving Public Health
Agency
Accountable Public Health
Agency
ELR HUB
ELR Repository
Business Analysts
and Statisticians
July 14, 2015 Page: 408 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Lab Message
Supplier
Inbound
Laboratory
Message
Inbound
Message Profile
Transform
Translate
Inbound
Message Mapping
Canonical
Laboratory
Message
Canonical
Message Profile
Transform
Translate
Outbound
Message Mapping
Outbound
Laboratory
Message
Lab Message
Consumer
Knowledge
Management
Service
Knowledge
Management
Service
Object Graph
Generation
Laboratory
Message
Objects
Object
Relational
Mapping
Laboratory
Message
Respository
Object Relational
Map
ELR Database
Design Model
CA Public Health
Logical Data
Model
HL7 RIM &
CDC PHLDM
Canonical
Message Profile
Laboratory
Message Object
Model
Extract,
Transform,
and Load
Laboratory
Datamart
Business
Intelligence
Application
Business
Intelligence
Application
Business
Intelligence
Application
Outbound
Message Profile
Extract,
Transform,
and Load
Additional Data
Sources
July 14, 2015 Page: 409 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Inbound Message Processing Outbound Message Processing
Data Persistence
Business Intelligence
Lab Message
Supplier
Inbound
Laboratory
Message
Inbound
Message Profile
Transform
Translate
Inbound
Message Mapping
Canonical
Laboratory
Message
Canonical
Message Profile
Transform
Translate
Outbound
Message Mapping
Outbound
Laboratory
Message
Lab Message
Consumer
Knowledge
Management
Service
Knowledge
Management
Service
Object Graph
Generation
Laboratory
Message
Objects
Object
Relational
Mapping
Laboratory
Message
Respository
Object Relational
Map
ELR Database
Design Model
CA Public Health
Logical Data
Model
HL7 RIM &
CDC PHLDM
Canonical
Message Profile
Laboratory
Message Object
Model
Extract,
Transform,
and Load
Laboratory
Datamart
Business
Intelligence
Application
Business
Intelligence
Application
Business
Intelligence
Application
Outbound
Message Profile
Extract,
Transform,
and Load
Additional Data
Sources
July 14, 2015 Page: 410 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Inbound
Laboratory
Message
Inbound
Message Profile
Transform
Translate
Inbound
Message Mapping
Canonical
Laboratory
Message
Canonical
Message Profile
Transform
Translate
Outbound
Message Mapping
Outbound
Laboratory
Message
Outbound
Lab Message
Supplier
Lab Message
Consumer
Knowledge
Management
Service
Knowledge
Management
Service
Object Graph
Generation
Laboratory
Message
Objects
Object
Relational
Mapping
Laboratory
Message
Repository
Object Relational
Map
ELR Database
Design Model
CA Public Health
Logical Data
Model
HL7 RIM &
CDC PHLDM
Canonical
Message Profile
Laboratory
Message Object
Model
Extract,
Transform,
and Load
Laboratory
Datamart
Business
Intelligence
Application
Business
Intelligence
Application
Business
Intelligence
Application
Message Profile
Extract,
Transform,
and Load
Additional Data
Sources
July 14, 2015 Page: 411 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Message Profiles
 Describe message structure and anticipated application behavior
 Identify required, optional, and conditional message elements
 Identify coding systems or value-sets for coded elements
 Enable message validation, transformation, and persistence
 Are essential for achieving system-to-system interoperability
Inbound
Laboratory
Message
Inbound
Message Profile
Transform
Translate
Inbound
Message Mapping
Canonical
Laboratory
Message
Canonical
Message Profile
Transform
Translate
Outbound
Message Mapping
Outbound
Laboratory
Message
Outbound
Message Profile
July 14, 2015 Page: 412 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
California State
Immunization Information System
System Interface Project
July 14, 2015 Page: 413 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
 The California State Immunization
Information System (SIIS) is a
collaboration of
 regional immunization registries,
 local health departments,
 the California Department of Health
Services Immunization Branch, and
 a spectrum of key stakeholders
across the state of California.
 The goal of SIIS is to ensure that
health care providers have rapid
access to complete and up-to-date
immunization records.
 The objective is to eliminate both
missed opportunities to immunize and
unnecessary duplicate
immunizations.
 SIIS consists of nine regional
registries and two county registries.
 SIIS is a system of systems each
independently managed and
operated.
July 14, 2015 Page: 414 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Regional and County Registries
 Immunization Network of Northern California (INNC)
 Shots For Tots KIDS Regional Immunization Registry (SFT)
 Bay Area Regional Immunization Registry (BARR)
 Imperial County (IMPL) **
 Contra Costa County Automated Immunization Registry (CCAIR)**
 Regional Immunization Data Exchange (RIDE)
 Central Valley Immunization Information System (CVIIS)
 Central Coast Immunization Registry (CCIR)
 Los Angeles-Orange Immunization Network (LINK)
 VaxTrack Regional Immunization Registry (VaxTrack)
 San Diego Regional Immunization Registry (SDIR)
July 14, 2015 Page: 415 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
 The scope of the California Statewide Immunization
Information System (SIIS) Systems Interface Project (SIP) is
to design, construct, and implement a centralized electronic
messaging hub that facilitates the automated exchange of
immunization related data within the state of California.
 The objective is to enable registry users to gain access to an
individual’s complete immunization history regardless of
where that history is maintained.
Project Scope
July 14, 2015 Page: 416 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
 The premise behind the project is that, for many reasons,
a person’s immunization history data becomes
fragmented over time.
 The data are stored and maintained in separate state
registries and immunization provider information
systems.
 Typical scenarios that lead to this situation are changes
in a person’s primary residence, changes in a person’s
primary healthcare provider, and ad hoc administration of
immunizations such as during travel or emergencies.
 Once a person’s immunization data becomes fragmented
across multiple registry or provider information systems it
can be difficult to ascertain their current immunization
status.
 This can result in over immunization or under
immunization.
Problem Statement
July 14, 2015 Page: 417 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
ad Dynamic View
Health Level Seven CDC / AIRA SIIS SIP Project Team Regional Registry
HL7 v 2.5 Messaging
Standard
IZ Messaging
Implemenation Guide
Prepare Preliminary
Segment Lev el Profile
Preliminary Segment
Lev el Profile
Prepare SIIS SIP
Conceptual Data Model
SIIS SIP Conceptual
Data Model
Map Profile to Regional
Systems
Regional System to
Profile Mapping
Prepare Final Segment
Lev el Profile
Final Segment Lev el
Profile
Prepare SIIS SIP Logical
Data Model
SIIS SIP Logical Data
Model
Prepare SIIS SIP Phase I
Message Lev el Profiles
SIIS SIP Phase I
Message Lev el Profiles
Prepare SIIS SIP
Vocabulary Specification
SIIS SIP Vocabulary
Specification
Prepare IZ Implementation
Guide
 Prepare IZ messaging implementation guide
 Prepare preliminary segment level profile
 Prepare SIIS SIP conceptual data model
 Map preliminary profile to regional IZ systems
 Prepare final segment level profile
 Prepare SIIS SIP logical data model
 Prepare SIIS SIP phase I message level profiles
 Prepare SIIS SIP vocabulary specification
July 14, 2015 Page: 418 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Immunization Messaging Implementation
Guide
 The Centers for Disease Control and Prevention (CDC) National
Immunization Program (NIP) publishes an implementation guide for
immunization data messaging.
 The title of the guide is “Implementation Guide for Immunization
Data Transactions using version 2.3.1 of the Health Level Seven
(HL7) Standard Protocol”.
 The intent of the guide is to help familiarize developers of
immunization information systems with HL7 immunization message
definitions and encoding rules and provide a nationally consistent
implementation of those messages.
 Changes to the guide are coordinated through the Data Exchange
Steering Committee of the American Immunization Registry
Association (AIRA) and its associated work groups.
 The members of AIRA are committed to advancing the exchange of
immunization data using a common protocol.
July 14, 2015 Page: 419 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Immunization Messaging Implementation
Guide
 The guide identifies the set of HL7 messages needed to enable
information systems that maintain immunization records to transmit
patient-specific immunization histories electronically to other systems to
allow healthcare providers to have access to these records at the time
health care is given.
 The use cases detailed in the guide indicate that data transmission will
occur as the result of four activities:
 a query from one system for a patient’s vaccination record that
is held in another system using the HL7 VXQ message;
 a response to a query containing multiple patient “matches” to
the query, but not returning vaccination records using the HL7
VXX message;
 a response to a query containing the vaccination record using
the HL7 VXR message; and
 an unsolicited update to a vaccination record using the HL7
VXU message.
 In addition to the messages used for the four primary activities the guide
also includes specifications for transmission confirmation and exception
notification messages; ACK and QCK.
July 14, 2015 Page: 420 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Preliminary Segment Level Profile
Message Tree Seq ETyp DTyp Usage Min Max Table Len Reference
PID 011 Segment R 1 1
Set ID - PID 001 Field SI RE 0 1 4 3.4.2.1
Patient ID 002 Field CX RE 0 1 33 3.4.2.2
Patient Identifier List 003 Field CX R 1 0 250 3.4.2.3
Alternate Patient ID - PID 004 Field CX RE 0 1 33 3.4.2.4
Patient Name 005 Field XPN R 1 0 250 3.4.2.5
Mother's Maiden Name 006 Field XPN RE 0 1 250 6.5.7.40
Date/Time Of Birth 007 Field TS RE 0 1 26 15.4.6.6
Administrative Sex 008 Field IS RE 0 1 0001 1 15.4.6.5
Patient Alias 009 Field XPN RE 0 1 250 3.4.2.9
Race 010 Field CE RE 0 1 0005 250 15.4.6.27
Patient Address 011 Field XAD RE 0 1 250 3.4.2.11
County Code 012 Field IS RE 0 1 0289 4 3.4.2.12
Phone Number - Home 013 Field XTN RE 0 1 250 3.4.2.13
Phone Number - Business 014 Field XTN RE 0 1 250 3.4.2.14
Primary Language 015 Field CE RE 0 1 0296 250 6.5.7.34
Patient Account Number 018 Field CX RE 0 1 250 3.4.2.18
SSN Number - Patient 019 Field ST RE 0 1 16 3.4.2.19
Mother's Identifier 021 Field CX RE 0 1 250 3.4.2.21
Ethnic Group 022 Field CE RE 0 1 0189 250 15.4.6.28
Birth Place 023 Field ST RE 0 1 250 3.4.2.23
Multiple Birth Indicator 024 Field ID RE 0 1 0136 1 3.4.2.24
Birth Order 025 Field NM RE 0 1 2 3.4.2.25
Citizenship 026 Field CE RE 0 2 0171 250 6.5.7.33
Veterans Military Status 027 Field CE RE 0 1 0172 250 3.4.2.27
Patient Death Date and Time 029 Field TS RE 0 1 26 3.4.2.29
Patient Death Indicator 030 Field ID RE 0 1 0136 1 3.4.2.30
Last Update Date/Time 033 Field TS RE 0 1 26 3.4.2.33
Production Class Code 038 Field CE RE 0 1 0429 250 3.4.2.38
July 14, 2015 Page: 421 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SIIS SIP Conceptual Data Model
cd Logical Model Patient Demographics
Facility
identifier: char(20)
name: char(50)
assigningAuthorityId: char(20)
namespaceId: char(20)
streetAddress: char(120)
city: char(50)
stateOrProvince: char(50)
zipOrPostalCode: char(12)
country: char(3)
addressType: char(3)
Patient
dateTimeOfBirth: timestamp
birthState: char(60)
multipleBirthIndicator: char(1)
administrativeSex: char(1)
birthOrder: numeric(2)
deathDateTime: timestamp
deathIndicator: char(1)
lastUpdateDateTime: timestamp
lastUpdateFacility: char(20)
PublicityCodeID: char(20)
publicityCodeEffectiveDate: datetime
publicityCodeText: char(199)
protectionIndicator: char(1)
protectionIndicatorEffectiveDate: datetime
immunizationRegistryStatus: char(1)
immunizationRegistryStatusEffectiveDate: datetime
PersonPostalAddress
streetOrMailingAddress: char(120)
streetName: char(50)
dwellingNumber: char(12)
city: char(50)
stateOrProvince: char(50)
zipOrPostalCode: char(12)
addressType: char(3)
countyParishCode: char(20)
countryCode: char(3)
PatientLanguageAbility
identifier: char(20)
text: char(199)
preferenceIndicator: char(1)
PersonTelecommunicationAddress
telecommunicationUseCode: char(3)
areaCityCode: numeric(5)
phoneNumber: numeric(9)
extension: numeric(5)
anyText: char(199)
Person
surname: char(50)
givenName: char(30)
secondAndFurtherGivenNamesOrInitialsThereof: char(30)
suffix: char(20)
PersonIdentifier
id: char(15)
idType: char(6)
namespaceId: char(20)
PersonAlternateName
typeCode: char(1)
surname: char(50)
givenName: char(30)
secondAndFurtherGivenNamesOrInitialsThereof: char(30)
suffix: char(20)
PatientRelationship
identifier: char(20)
text: char(199)
contactRoleIdentifier: char(20)
contactRoleText: char(199)
livingArrangement: char(2)
PatientRace
identifier: char(20)
text: char(199) PatientEthnicGroup
identifier: char(20)
text: char(199)
0..*
1
1..*
1
1..*
1
0..1
1
0..*
1
0..*
1
0..* 1..* 0..*1..*
0..*
1
0..* 11..* 1
July 14, 2015 Page: 422 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Regional System to Segment Profile Mapping
Path
LINK
SDIR
VAXTRACK
CCIR
BARR
RIDE
INNC
SFT
CVIIS
Imperial
ProfileUsage
COMMENT
PID PID
PID.1 SetID-PID Y Y N Y Y N Y Y Y N Y
PID.3 PatientIdentifierList
PID.3.1 ID Y Y N Y Y Y Y Y Y Y Y
PID.3.4 assigningauthority
PID.3.4.1 namespaceID Y Y N Y Y Y Y Y Y N Y
PID.5 PatientName
PID.5.1 familyname
PID.5.1.1 surname Y Y Y Y Y Y Y Y Y Y Y
PID.5.2 givenname Y Y Y Y Y Y Y Y Y Y Y
PID.5.3 secondandfurthergivennamesorinitialsthereof Y Y Y Y Y Y Y Y Y Y Y
PID.5.4 suffix(e.g.,JRorIII) Y Y Y Y Y Y Y Y Y N Y
PID.6 Mother'sMaidenName
PID.6.1 familyname
PID.6.1.1 surname Y Y Y Y Y Y Y Y Y Y Y
PID.7 Date/TimeOfBirth
PID.7.1 Date/Time Y Y Y Y Y Y Y Y Y Y Y
PID.8 AdministrativeSex Y Y Y Y Y Y Y Y Y Y Y
PID.9 PatientAlias
PID.9.1 familyname
PID.9.1.1 surname N N Y N Y Y Y/Y Y Y Y Y
PID.9.2 givenname N N Y N Y Y Y/Y Y Y Y Y
PID.9.3 secondandfurthergivennamesorinitialsthereof N N Y N Y N Y/Y Y Y Y Y
PID.9.4 suffix(e.g.,JRorIII) N N Y N Y N Y/Y N Y N Y
PID.10 Race
PID.10.1 identifier Y Y Y Y Y Y Y Y Y Y Y
PID.10.2 text Y N Y Y Y N Y Y Y Y Y
PID.10.3 nameofcodingsystem Y Y Y Y Y N Y Y Y N Y
PID.11 PatientAddress
PID.11.1 streetaddress(SAD)
PID.11.1.1 streetormailingaddress Y Y Y Y Y Y Y Y Y Y Y
PID.11.1.2 streetname N N N N N N N N N Y N
PID.11.1.3 dwellingnumber N N N N N N N N N Y N
PID.11.3 city Y Y Y Y Y Y Y Y Y Y Y
PID.11.4 stateorprovince Y Y Y Y Y Y Y Y Y Y Y
PID.11.5 ziporpostalcode Y Y Y Y Y Y Y Y Y Y Y
PID.11.7 addresstype Y Y Y Y Y N Y Y Y Y Y
PID.11.9 county/parishcode Y Y Y Y Y Y Y Y Y Y Y
Element Name
July 14, 2015 Page: 423 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Final Segment Level Profile
Message Tree Seq ETyp DTyp Usage Min Max Table
PID 009 Segment R 1 1 0396
Set ID - PID 001 Field SI R 1 1
Patient Identifier List 003 Field CX R 1 *
ID number 001 Component ST R 1 1
assigning authority 004 Component HD R 1 1
namespace ID 001 SubComponent IS R 1 1 0363
identifier type code 005 Component ID R 1 1 0203
Patient Name 005 Field XPN R 1 1
family name 001 Component FN R 1 1
surname 001 SubComponent ST R 1 1
given name 002 Component ST RE 0 1
second and further given names or initials thereof 003 Component ST RE 0 1
suffix (e.g., JR or III) 004 Component ST RE 0 1
name type code 007 Component ID R 1 1 0200
Mother_s Maiden Name 006 Field XPN RE 0 1
family name 001 Component FN R 1 1
surname 001 SubComponent ST R 1 1
name type code 007 Component ID R 1 1 0200
Date/Time of Birth 007 Field TS R 1 1
time 001 Component DTM R 1 1
Administrative Sex 008 Field IS R 1 1 0001
Patient Alias 009 Field XPN RE 0 *
family name 001 Component FN R 1 1
surname 001 SubComponent ST R 1 1
given name 002 Component ST RE 0 1
second and further given names or initials thereof 003 Component ST RE 0 1
suffix (e.g., JR or III) 004 Component ST RE 0 1
name type code 007 Component ID R 1 1 0200
Race 010 Field CE RE 0 1
identifier 001 Component ST R 1 1 0005
text 002 Component ST RE 0 1
name of coding system 003 Component ID R 1 1 0396
alternate identifier 004 Component ST RE 0 1
alternate text 005 Component ST RE 0 1
name of alternate coding system 006 Component ID RE 0 1 0396
July 14, 2015 Page: 424 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SIIS SIP Logical Data Model
cd Logical Model Patient Demographics
Facility
*PK idNumber: int
FK providerOrganizationIdNumber: int
addressLine1Text: char(120)
addressLine2Text: char(120)
cityName: char(50)
statePostalCode: char(50)
postalCode: char(12)
countryCode: char(3)
addressTypeCode: char(3)
FK
+ FK_Facility_ProviderOrganization(int)
PK
+ PK_Facility(int)
Patient
*PK idNumber: int
FK facilityIdNumber: int
* birthDate: datetime
birthStateCode: char(60)
multipleBirthIndicator: char(1)
* sexCode: char(1)
deathIndicator: char(1)
* raceCode: char(20)
* ethnicityCode: char(20)
* allowableReminderTypeCode: char(20)
* primaryLanguageCode: char(20)
recordSharingConsentIndicator: char(1)
immunizationRegistryStatusCode: char(1)
FK
+ FK_Patient_Facility(int)
PK
+ PK_Patient(int)
PersonPostalAddress
*PK idNumber: int
*FK personIdNumber: int
addressLine1Text: char(120)
addressLine2Text: char(120)
cityName: char(50)
stateCode: char(50)
postalCode: char(12)
addressTypeCode: char(3)
countyCode: char(20)
FK
+ FK_PersonPostalAddress_Person(int)
PK
+ PK_PersonPostalAddress(int)
PersonTelecommunicationAddress
*PK idNumber: int
*FK personIdNumber: int
telecommunicationUseCode: char(3)
areaCode: numeric(5)
* phoneNumber: numeric(9)
extensionNumber: numeric(5)
concatenatedTelecomNumber: char(199)
FK
+ FK_PersonTelecommunicationAddress_Person(int)
Person
*PK idNumber: int
surname: char(50)
givenName: char(30)
middleName: char(30)
nameSuffix: char(20)
PK
+ PK_Person(int)
PersonIdentifier
*PK idNumber: int
FK organizationIdNumber: int
* idCode: char(15)
*FK personIdNumber: int
idTypeCode: char(6)
* idAssigningAuthority: char(20)
* statusCode: char(2)
FK
+ FK_PersonIdentifier_Organization(int)
+ FK_PersonIdentifier_Person(int)
PersonAlternateName
*PK idNumber: int
*FK personIdNumber: int
* typeCode: char(1)
* surname: char(50)
givenName: char(30)
middleName: char(30)
nameSuffix: char(20)
FK
+ FK_PersonAlternateName_Person(int)
PatientRelationship
*PK idNumber: int
*FK patientIdNumber: int
* typeCode: char(20)
*FK patientIdNumber: int
*FK personIdNumber: int
* effectiveDate: datetime
FK
+ FK_PatientRelationship_Patient(int)
+ FK_PatientRelationship_Person(int)
PK
+ PK_PatientRelationship(int)
Organization
*PK idNumber: int
idCode: char(20)
* assigningAuthorityIdCode: char(20)
* name: char(50)
PK
+ PK_ProvderOrganization(int)
FacilityAlternateIdentifier
*PK facilityAlternateId: char(20)
*pfK FacilityIdNumber: int
FK identifierAssigningAuthority: int
identifierTypeCode: bigint
FK
+ FK_FacilityAlternateIdentifier_Facility(int)
+ FK_FacilityAlternateIdentifier_Organization(int)
PK
+ PK_FacilityAlternateIdentifier(char, int)
TreatmentRefusal
*PK reasonIdCode: char(20)
*pfK vaccineAdministrationIdNumber: int
FK
+ FK_TreatmentRefusal_VaccineAdministration(int)
PK
+ PK_TreatmentRefusal(char, int)
VaccineAdministration
FK administeringProvideridNumber: int
*FK patientIdNumber: int
*PK idNumber: int
*FK FacilityIdNumber: int
* doseSequenceNumber: numeric(4)
* substanceIdCode: char(20)
* startDateTime: datetime
* endDateTime: datetime
* substanceAdministeredAmount: numeric(20)
* routeIdCode: char(20)
* substanceUnitOfMeasureCode: char(20)
* siteIdCode: char(20)
substanceLotNumber: char(20)
* substanceDosageFormIdCode: char(20)
* substanceManufacturerIdCode: char(20)
* systemEntryDateTime: datetime
FK
+ FK_VaccineAdministration_Facility(int)
+ FK_VaccineAdministration_Patient(int)
+ FK_VaccineAdministration_Person(int)
PK
+ PK_VaccineAdministration(int)
0..*
1
0..*
(identifierAssigningAuthority = idNumber)
0..1
0..*
(personIdNumber = idNumber)
1
0..*
(organizationIdNumber = idNumber)
1
0..*
(providerOrganizationIdNumber
= idNumber)
0..1
1..*
(patientIdNumber =
idNumber)
1
0..*
(patientIdNumber = idNumber)
1
0..*
(personIdNumber = idNumber)
1
0..*
(administeringProvideridNumber = idNumber)
1
0..*
(personIdNumber = idNumber)
1
0..*
(personIdNumber = idNumber)
1
0..*
(vaccineAdministrationIdNumber = idNumber)
1
0..*
normally receives
care at
1
0..*
(FacilityIdNumber = idNumber)
1
0..*
(patientIdNumber =
idNumber)
1
July 14, 2015 Page: 425 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SIIS SIP Message Level Profiles
 HL7 defines a message profile as “an unambiguous specification of one or
more standard HL7 messages that have been analyzed for a particular use
case”. It prescribes a set of precise constraints upon one or more standard
HL7 messages.
 A message profile eliminates ambiguity in a HL7 message specification by
declaring static and semantic constraints for constituent elements of a
message and the expected dynamic behavior of conformant application
systems.
 The SIIS SIP HL7 message profile is an extension to the NIP Implementation
Guide. The profile is based upon version 2.1 of the guide published in
September 2002.
 The profile extends the specifications included in the guide. The profiles do
not conflict with the guide; however, they are more constrained than the
guide.
 Messages that conform to the profile are conformant with the guide as well;
although the converse may not be true.
 A message profile has dynamic definition and a static definition.
July 14, 2015 Page: 426 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 Message Profile Dynamic Definition
 The dynamic definition describes the supported use
cases, interactions, and acknowledgement requirements.
 Use Case Model
The use case portion of the message profile dynamic definition documents the scope
and requirements for an HL7 message profile or set of message profiles. The use
case model documents the purpose for each message exchange; defines the actors,
including the sending and receiving applications; and document the situations in which
the exchange of a particular HL7 message profile is required
 Interaction Model
The Interaction Model illustrates the sequence of trigger events and resulting message
flows between 2 or more systems. It may be in literal or graphical form. Graphical form
should be a UML activity diagram.
 Acknowledgement Requirements
The specific HL7 acknowledgments required and/or allowed for use with the specified
static definition of the HL7 message profile is defined. Specifically, the dynamic
definition identifies whether accept and application level acknowledgments are allowed
or required. For any one static definition there may be one or more dynamic
definitions. The dynamic definition defines the conditions under which accept and
application level acknowledgments are expected. Allowed conditions include: Always,
Never, Only on success, and Only on error.
July 14, 2015 Page: 427 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 Message Profile Static Definition
 The static definition describes usage rules, cardinalities,
and code systems.
 Usage Rules
Usage refers to the circumstances under which an element appears in a message instance. Some elements
must always be present, others may never be present, and others may only be present in certain
circumstances. HL7 has defined a set of codes to clearly identify the rules governing the presence of a
particular element. These usage codes expand/clarify the optionality codes defined in the HL7 standard.
 Cardinality
Cardinality identifies the minimum and maximum number of occurrences for a particular element (Segment
Group, Segment or Field). Cardinalities are expressed as a minimum-maximum pair of non-negative integers.
A conformant application must always send at least the minimum number of occurrences, and may never
send more than the maximum number of occurrences.
 Vocabulary Specification
Vocabulary specifications declare an organized set of code systems and code system terms. Code system
terms are coded concepts including concept codes, concept names, and concept relationships. Code system
terms are collected into value sets declared as code tables associated with segment fields and data type
components. The static definition declares the value sets for tables associated with coded message
elements. Some of the value sets are HL7 defined, third party defined, or user defined.
July 14, 2015 Page: 428 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SIIS SIP Use Case Diagram
ud Use Case Model
Local Registry User
1.0 Immunization
History Query
2.0 Patient
Demographic
Update
3.0 Vaccine
Record Update Provider Organization
SIIS Registry
Administration
4.0 Immunization
Statistical Analysis
Trusted Third PartiesLocal Registry
Administration
SIIS Analysis Report
SIIS Analysis Report
SIIS Analysis Report SIIS Analysis Report
Update Confirmation
Update Confirmation
Query Response
Vaccine Record Update
Patient Information Update
Immunization History Request
July 14, 2015 Page: 429 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SIIS SIP Activity Model
ad InteractionActivityModel
Requesting Registry System SIIS SIP Immunization Information Exchange System Responding Registry System
1.1 Request Immunization
Data
«message»
M.01 Immunization Data
Request (VXQ)
2.2 Validate Immunization
Data Request Message
«message»
M.02 Request Error Message
(ACK)
2.3 Route Immunization
Data Request Message2.4 Notify System
Administrator
«message»
M.03 Immunization
Data Request (VXQ)
3.1 Retrive Requested
Immunization Data
«datastore»
D.04 Immunization
Registry
3.2 Retrival
Result?
3.2.1 Return "No Matching
Record" Response
3.2.2 Return "Multiple
Matching Records"
Response
3.2.3 Return Requested
Immunization Data
«message»
M.04 No Matching
Record Response (QCK)
«message»
M.05 Multiple Matching
Records Response (VXX)
«message»
M.06 Requested
Immunization Data (VXR)
4.2 Validate Response
Message
«message»
M.07 Response Message
Error (ACK)
4.3 Route Response
Message
4.4 Notify System
Administrator
«message»
M.08 No Matching Record
Message (QCK)
«message»
M.09 Multiple Matching
Record Message (VXX)
«message»
M.10 Requested Immunization
Data Message (VXR)
5.1 Refine Demographic
Data
5.2 Select Desired Record
5.3 Merge Immunization
Data with existing data
«datastore»
D.01 Immunization
Registry
[Valid Message]
[Invalid Message]
[Valid Message]
[No Matching Record]
[Desired Record Not Present]
[Multiple Matching Records]
[Single Matching Record]
[Desired Record Selected]
[Invalid Message]
1
2 3
4
6
5
July 14, 2015 Page: 430 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SIIP SIP Interaction Model
sd Interactions
Requesting Registry
System
SIIS SIP Immunization
Information Exchange
System
Responding Registry
System
Vaccination Record Query (VXQ)
[Invalid VXQ Message]: General Acknowledgement (ACK)
[Valid VXR Message]: Vaccination Record Query (VXQ)
[No Matching Record]: Query Acknowledgement (QCK)
[Invalid QCK Message]: General Acknowledgement (ACK)
[Valid QCK Message]: Query Acknowledgement (QCK)
[Multiple Matching Records]: Vaccination Query Response (VXX)
[Invalid VXX Message]: General Acknowledgement (ACK)
[Valid VXX Message]: Vaccination Query Response (VXX)
[Single Matching Record]: Vaccination Query Response (VXR)
[Invalid VXR Message]: General Acknowledgement (ACK)
[Valid VXR Message]: Vaccination Query Response (VXR)
July 14, 2015 Page: 431 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SIIS SIP Acknowledgement Requirements
Message Source Destination Acknowledgment
• Vaccination Record Query (VXQ) Requester IIES Only on error
• General Acknowledgement (ACK) IIES Requester Never
• Vaccination Record Query (VXQ) IIES Responder Never
• Query Acknowledgement (QCK) Responder IIES Only on error
• General Acknowledgement (ACK) IIES Responder Never
• Query Acknowledgement (QCK) IIES Requester Never
• Vaccination Query Response (VXX) Responder IIES Only on error
• General Acknowledgement (ACK) IIES Responder Never
• Vaccination Query Response (VXX) IIES Requester Never
• Vaccination Query Response (VXR) Responder IIES Only on error
• General Acknowledgement (ACK) IIES Responder Never
• Vaccination Query Response (VXR) IIES Requester Never
July 14, 2015 Page: 432 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SIIS SIP Message
Profile Static
Definitions
 The static definition portion of
the message profile declares the
usage and cardinality constraints
for the constituent message
elements of the SIIS SIP HL7
messages.
 There is a static definition for
each message type (VXQ, VXX,
VXR, QCK, and ACK).
 Each static definition includes a
message level, segment level,
and field level definition.
 The static definition also
includes a supported elements
definition.
 The supported elements
definition is a field level definition
containing supported message
elements only.
July 14, 2015 Page: 433 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SIIS SIP Message
Profile Static
Definitions
 The static definition portion of
the message profile declares the
usage and cardinality constraints
for the constituent message
elements of the SIIS SIP HL7
messages.
 There is a static definition for
each message type (VXQ, VXX,
VXR, QCK, and ACK).
 Each static definition includes a
message level, segment level,
and field level definition.
 The static definition also
includes a supported elements
definition.
 The supported elements
definition is a field level definition
containing supported message
elements only.
July 14, 2015 Page: 434 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SIIS SIP Message
Profile Static
Definitions
 The static definition portion of
the message profile declares the
usage and cardinality constraints
for the constituent message
elements of the SIIS SIP HL7
messages.
 There is a static definition for
each message type (VXQ, VXX,
VXR, QCK, and ACK).
 Each static definition includes a
message level, segment level,
and field level definition.
 The static definition also
includes a supported elements
definition.
 The supported elements
definition is a field level definition
containing supported message
elements only.
July 14, 2015 Page: 435 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SIIS SIP Message Profile
Vocabulary Specification
 The Health Level Seven (HL7) message
profile vocabulary specification is a
companion document to the California
State Immunization Information System
System Interface Project HL7 message
profiles.
 The specification contains the value
sets for supported coded message
elements identified in the profile.
 The values presented in this
specification are the primary code
values to be used for coded message
elements in the SIIS SIP message
profile.
 Fields with a data type of CE may
include an equivalent code drawn from
an alternate coding system. However,
the values included in this specification
must be used as the primary code.
July 14, 2015 Page: 436 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SIIS SIP Message Profile
Vocabulary Specification
 The Health Level Seven (HL7)
message profile vocabulary
specification is a companion
document to the California State
Immunization Information System
System Interface Project HL7
message profiles.
 The specification contains the value
sets for supported coded message
elements identified in the profile.
 The values presented in this
specification are the primary code
values to be used for coded message
elements in the SIIS SIP message
profile.
 Fields with a data type of CE may
include an equivalent code drawn
from an alternate coding system.
However, the values included in this
specification must be used as the
primary code.
July 14, 2015 Page: 437 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Conformance Validation
July 14, 2015 Page: 438 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Conformance Profile Authoring Tools
 Message Workbench (MWB)
 Model Driven Health Tools (MDHT)
 ART-DECOR
 Trifolia Workbench
 MS Word
July 14, 2015 Page: 439 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Messaging Workbench
July 14, 2015 Page: 440 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
The Messaging Workbench (MWB)
 For those who:
 Design HL7 2.x messages
 Manage specification repositories
 Collaborate on varied messaging projects within and outside of their
organizations
 Free of charge from HL7 Web site (www.hl7.org)
 Current version supports up to HL7 v2.6
 NIST is working on the future plans
 First level support provided by Mayo Clinic volunteer
July 14, 2015 Page: 441 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Model Driven Health Tools (MDHT) is an open source
framework that enables community authoring.
July 14, 2015 Page: 442 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
July 14, 2015 Page: 443 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
What is ART-DECOR?
 DECOR (Data Elements, Codes, OIDs and Rules) is a methodology to record the
information model used by health professionals.
 DECOR uses this model to generate various artifacts: documentation, XML- and test-
tooling, etc.
 With DECOR it is possible to improve the recorded information model by generating
and resolving issues per item.
 DECOR registers (amongst others) datasets, datatypes, valuesets, codes,
identifications, and business rules.
 The underlying data-format is XML. Generation of HTML-documentation and XML-
materials is possible through transformations with stylesheets.
 DECOR consists of two parts:
 DECOR methodology: a framework to model artifacts (including documentation)
 DECOR software: XML-schemas, XML-schematrons, XML-stylesheets.
 ART (Advanced Requirement Tooling) is the DECOR user interface to create and
adapt DECOR files, and to generate artifacts from DECOR files.
 ART is based on the eXist-db XML database, XQuery and Orbeon XForms.
July 14, 2015 Page: 444 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
July 14, 2015 Page: 445 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Trifolia Workbench
July 14, 2015 Page: 446 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Instance Validation Technologies
 HL7 v2 Schema Specification
 MWB Profile Validation
 CDA Schema Specification
 MDHT Generated Java Objects
 Trifolia Generated Schematron Logic
July 14, 2015 Page: 447 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Instance Validation Services
 NIST HL7 v2 and v3 CDA Validation
 SMART C-CDA Collaborative
 CDC PHIN Message Quality Framework
 Lantana Consulting Group CDA Validator
 IHE Gazelle HL7 Validator
July 14, 2015 Page: 448 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
NIST Standards and Testing
July 14, 2015 Page: 449 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
NIST CDA Guideline Validation
July 14, 2015 Page: 450 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SMART C-CDA Collaborative
July 14, 2015 Page: 451 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
CDC PHIN MQF
July 14, 2015 Page: 452 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Lantana Consulting Group CDA Validator
July 14, 2015 Page: 453 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
IHE Gazelle HL7 Validator
July 14, 2015 Page: 454 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Instance Validation Commercial Products
 Middleware Vendor Products
 Interface Engine Product Adapters
 Hi3 Solutions Standards Conformance Validator
July 14, 2015 Page: 455 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Middleware Vendor Products
July 14, 2015 Page: 456 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Interface Engine Adapters
 Interface engine adapters take advantage of public
APIs made available by leading interface engine
vendors.
 Interface engine adapters are typically product
specific and provide capabilities not otherwise
available in the base product.
 The CDC’s PHIN Messaging System takes
advantage of the APIs provided by Orion Health
Rhapsody.
 Caristix has developed adapters that facilitate the
reverse engineering of message instances into HL7
message profiles that are compatible with many of
the leading interface engines APIs.
July 14, 2015 Page: 457 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
PHIN Messaging System
July 14, 2015 Page: 458 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Caristix HL7 Message Profiler
July 14, 2015 Page: 459 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Hi3 Solutions Standards
Conformance Validator
July 14, 2015 Page: 460 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Healthcare Information Integration Infrastructure
Healthcare Quality and Performance Monitoring
Health Information Integration
Health Information Transformation
Health Information Standards Compliance
Inbound
Information
Processing
Inbound
Information
Processing
Standard Compliance and
Conformance Validation
Standard Compliance and
Conformance Validation
Outbound
Information
Processing
Outbound
Information
Processing
Source
Information System
Source
Information System
Receiving
Information System
Receiving
Information System
Information
Transformation
Services
Information
Transformation
Services
Analysis,
Visualization,
and Reporting
Analysis,
Visualization,
and Reporting
Integrated Data
Repository
Business Intelligence
& Decision
Support Services
Health Information
Exchange Standards
Health Information
Exchange Standards
Controlled Clinical
Terminology Services
Controlled Clinical
Terminology Services
HL7 Reference
Information Model
July 14, 2015 Page: 461 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Health Information Standards Compliance
 Hi3 Solutions’ STANDARDS CONFORMANCE VALIDATOR™ (SCV) is a
comprehensive suite of application services that validates
compliance with healthcare information exchange standard
specifications and conformance with related implementation guides
and profiles.
July 14, 2015 Page: 462 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Health Information Integration
 Hi3 Solutions’ HEALTH INFORMATION INTEGRATOR™ (HII) is a
comprehensive suite of application and database services that
facilitate the transformation of data structures, translation of clinical
terminologies, and integration of health information.
Health Information Integration
Health Information Transformation
Inbound
Information
Processing
Inbound
Information
Processing
Outbound
Information
Processing
Outbound
Information
Processing
Source
Information System
Source
Information System
Receiving
Information System
Receiving
Information System
Information
Transformation
Services
Information
Transformation
Services
Integrated Data
Repository
HL7 Reference
Information Model
July 14, 2015 Page: 463 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Healthcare Quality and Performance Measurement
 Hi3 Solutions’ HEALTHCARE QUALITY MONITOR™ (HQM) is a
comprehensive suite of data warehousing and business intelligence
solutions geared specifically toward monitoring quality and
performance in healthcare in accordance with established
measurement standards.
Healthcare Quality and Performance Monitoring
Inbound
Information
Processing
Inbound
Information
Processing
Source
Information System
Source
Information System
Information
Transformation
Services
Information
Transformation
Services
Analysis,
Visualization,
and Reporting
Analysis,
Visualization,
and Reporting
Integrated Data
Repository
Business Intelligence
& Decision
Support Services
HL7 Reference
Information Model
July 14, 2015 Page: 464 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Hi3 Solutions Product Suite
July 14, 2015 Page: 465 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Standards Conformance Validator
 Syntax Compliance
 Verification of adherence
to the syntax rules
specified in standards.
 Structural Conformance
 Verification of adherence
to the element usage
rules specified in profiles.
 Semantic Conformance
 Verification of adherence
to value constraints for
coded data elements.
July 14, 2015 Page: 466 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Standards Conformance Validation
July 14, 2015 Page: 467 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SCV: Syntax Compliance
 Verification of adherence to
the syntax rules specified in
standards.
 Supported SDOs include:
 Health Level Seven
 ASC X12
 ISO/TC 215
 Supported standards
include:
 HL7 v2, v3, and CDA
 X12 v5010 (834, 835,
837)
 ISO Datatypes and RIM
July 14, 2015 Page: 468 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SCV: Structural Conformance
 Verification of adherence to
the element usage rules
specified in profiles.
 Supported communities of
users include:
 Integrating the Healthcare
Enterprise (IHE)
 Public Health Information
Network (PHIN)
 Biomedical Research
Integrated Domain Group
(BRIDG)
 HL7 Clinical Interoperability
Council (CIC)
July 14, 2015 Page: 469 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SCV: Semantic Conformance
 Verification of adherence to
value constraints for coded
data elements.
 Supported Vocabulary
Servers:
 PHIN VADS
 NCI EVS
 LexGrid
 Supported Code Systems
include:
 LOINC
 Snomed
 RxNorm
 ICD 9 & 10
July 14, 2015 Page: 470 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Hi3 Solutions SCV Targeted Standards
Standards / Terminologies Profiles / Guides
 Exchange Structures
 HL7 v2.x
 HL7 v3 Messages
 HL7 v3 CDA Documents
 ASC X12 v5010
 Code Systems
 SNOMED CT
 LOINC
 RxNorm
 ICD 9 & 10
 HL7
 Birth and Fetal Death
Reporting
 Laboratory Results Reporting
 Immunization Reporting
 Consolidated CDA
 X12
 834 Benefit Enrollment
 837 Health Care Claim
 835 Health Care Claim
Payment
July 14, 2015 Page: 471 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Standards Conformance Validation
July 14, 2015 Page: 472 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Hi3 Solutions Product Suite
July 14, 2015 Page: 473 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
SESSION RETROSPECTIVE
 SPECIFICATION CONFORMANCE PROFILING
 PURPOSE AND GOAL OF CONFORMANCE PROFILING
 HL7 V2 MESSAGE CONFORMANCE PROFILING
 USE CASES OF MESSAGE CONFORMANCE
PROFILING
 CONFORMANCE VALIDATION
 HI3 SOLUTIONS CONFORMANCE VALIDATOR
July 14, 2015 Page: 474 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Questions
July 14, 2015 Page: 475 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Hi3 Solutions
3500 W. Olive Ave, Suite
300
Burbank, CA 91505
ww.hi3solutions.com +1 800 918-
6520
July 14, 2015 Page: 476 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
July 14, 2015
HL7 v3 Retrospective
July 14, 2015 Page: 477 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 Version 3 Topics
 HL7 v3 History and Rationale
 HL7 v3 Development Frameworks and Architectures
 HL7 v3 Messaging Artifacts
 HL7 v3 Clinical Document Architecture
 HL7 Standards Compliance and Profile Conformance
July 14, 2015 Page: 478 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 V3 HISTORY AND RATIONALE
July 14, 2015 Page: 479 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
International
National
Inter-Enterprise
Enterprise
Institution
Ever-Increasing Circles
Source: Gartner
July 14, 2015 Page: 480 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 Version 3.0: What and Why
 Version 3.0 is a fundamental shift in the methodology HL7
uses to develop its standards specifications.
 Version 3.0 is a model-driven methodology based upon the
Object Management Group’s Unified Modeling Language
(UML).
 Version 3.0 uses datatype specifications, vocabulary
specifications, and a Reference Information Model (RIM), to
derive the information component of V3 message
specifications.
 Version 3.0 reduces optionality, maximizes reuse, and
increases consistency in HL7 message specifications.
 Version 3.0 improves the quality of HL7 message
specifications and includes support for conformance
validation.
 Version 3.0 enables HL7 implementers to leverage emerging
July 14, 2015 Page: 481 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3 Development Frameworks
and Architectures
July 14, 2015 Page: 482 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
The MDF Methodology Overview
July 14, 2015 Page: 483 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 V3 Message Development Framework
Use Case Modeling
Interaction Modeling
Message Design
Information Modeling
RIM
Restrict
R-MIM
Serialize
HMD
Restrict
Message
Type
Example
Storyboard
Storyboard
Example
D-MIM
Derive
Application
Role
Sender Receiver
Trigger
Event
Triggers
Content
Interaction
References
July 14, 2015 Page: 484 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HDF Workflow Diagram
Initiate
Project
Project
Charter
Specify
Requirements
Reference
Models
Requirement
Specification
Prepare Specification
Design Models
Specification
Design Models
Prepare
Specification
Approve
Specification
Approved
Specification
Publish
Approved
Specification
Published
Specification
Prepare Specification
Profiles
Specification
Profile
Conformance
Statement
Proposed
Specification
The HDF workflow is not a waterfall methodology.
Each phase builds upon the prior and may cause
prior activities to be revisited and their deliverables
adjusted.
July 14, 2015 Page: 485 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
ECCF Specification Stack
July 14, 2015 Page: 486 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 Version 3.0 Reference Models
Reference Information Model
Data Type
Specification
Vocabulary
Specification
July 14, 2015 Page: 487 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3 Messaging Artifacts
July 14, 2015 Page: 488 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3.0 Messaging Artifacts
Reference
Information
Model
Datatype
Specification
Vocabulary
Specification
Foundational
Models
(CIM)
Dynamic
Model
Constrained
Information
Model
Common
Message Type
Model
Design
Models
(PIM)
Hierarchical
Message
Definition
Message
Type
Definition
Implementation
Technology
Specification
Message
Specifications
(PSM)
July 14, 2015 Page: 489 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3.0 Foundational Artifacts
Reference
Information
Model
Datatype
Specification
Vocabulary
Specification
The HL7 Reference Information Model is the
information model from which all other information
models and message specifications are derived.
The HL7 Vocabulary Specification defines the set of all
concepts that can be taken as valid values in an instance
of a coded attribute or data type property.
The HL7 Datatype Specification defines the structural
format of the data carried in an attribute and influences
the set of allowable values an attribute may assume.
July 14, 2015 Page: 490 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Normative R6 RIM Class Diagram
Version 2.44 11/22/2013
July 14, 2015 Page: 491 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Entity
classCode : CS
determinerCode: CS
code: CE
statusCode : CS
id : II
Role
classCode : CS
code: CE
effectiveTime : IVL<TS>
statusCode : CS
id : II
Participation
typeCode : CS
time : IVL<TS>
statusCode : CS
Act
classCode : CS
moodCode: CS
code: CD
statusCode : CS
effectiveTime : GTS
id : II
0..1
0..*
1
0..*
1
0..*
Role Link
typeCode : CS
effectiveTime : IVL<TS>
Act Relationship
typeCode : CS
RIM Core Classes
0..1
0..*
plays
scopes
1 1
0..* 0..*
1 1
0..* 0..*
July 14, 2015 Page: 492 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Datatype Class Diagram
T
Sequence : LIST
T
Set : SET
T
Bag : BAG
Quantity : QTY
IntegerNumber : INT
RealNumber : REAL
PhysicalQuantity : PQ
MonetaryAmount : MO
Ratio : RTO
PointInTime : TS
Boolean : BL
CharacterString : ST
ConceptDescriptor : CD
CodedValue : CV
InstanceIdentifier : II
TelecommunicationAddress : TEL
T
Interval : IVL
DataValue : ANY
BinaryData : BIN
List_of_Boolean : LIST<BL>
<<extends>>
EncapsulatedData : ED
<<extends>>
ConceptRole : CR
CodedSimpleValue : CS
<<restricts>>
CodedWithEquivalents : CE
ISO_object_identifier : OID
List_ADXP : LIST<ADXP>
PostalAndResidentialAddress : AD
<<extends>>
AddressPart : ADXP
PersonNameType : PN
List_ENXP : LIST<ENXP>
EntityNamePart : ENXP
T
PeriodicIntervalOfTime : PIVL
T
EventRelatedPeriodicIntervalOfTime : EIVL
GeneralTimingSpecification : GTS
Set_of_TS : SET<TS>
<<extends>>
T : T
T
Annotated : ANT
T
History_item : HXIT
T
History : HIST
Set_of_HXIT : SET<HXIT<T>>
T
UncertainValueNarrative : UVN
<<extends>>
T
UncertainValueProbabilistic : UVP
T
NonParametricProbabilityDistribution : NPPD
Set_UVP : SET<UVP<T>>
T
ParametricProbabilityDistribution : PPD
UniversalResourceLocator : URL
<<extends>>
OrganizationName : ON
<<extends>>
<<extends>><<extends>>
<<extends>>
<<extends>>
<<extends>>
<<extends>>
<<extends>>
<<extends>>
<<extends>>
<<extends>>
<<restricts>>
<<restricts>>
<<restricts>>
<<extends>>
<<extends>>
<<extends>><<extends>>
<<extends>>
<<extends>>
<<extends>>
<<extends>>
<<extends>><<extends>>
<<restricts>>
<<extends>>
<<extends>>
<<extends>>
<<extends>> <<extends>>
<<extends>>
July 14, 2015 Page: 493 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 V3 Vocabulary Specification
Metamodel
ParentConcept
VocabularyDomain
name : String
description : String
CodedConcept
conceptCode : String
conceptDesignation : String
0..*0..*
ValueSet
name : String
description : String
definingExpression : String
0..*
0..*
0..*
0..*
0..*
0..*
0..*
0..*
includes
CodeSystem
identifier : OID
name : String
description : String
0..*0..*
0..*
0..1
0..*
0..1
based on
ValueSetContext
contextExpression : String
July 14, 2015 Page: 494 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 Version 3.0 Reference Models
ParentConcept
VocabularyDomain
name : String
description : String
CodedConcept
conceptCode : String
conceptDesignation : String
0..*0..*
ValueSet
name : String
description : String
definingExpression : String
0..*
0..*
0..*
0..*
0..*
0..*
0..*
0..*
includes
CodeSystem
identifier : OID
name : String
description : String
0..*0..*
0..*
0..1
0..*
0..1
based on
ValueSetContext
contextExpression : String
T
Sequence : LIST
T
Set : SET
T
Bag : BAG
Quantity : QTY
IntegerNumber : INT
RealNumber : REAL
PhysicalQuantity : PQ
MonetaryAmount : MO
Ratio : RTO
PointInTime : TS
Boolean : BL
CharacterString : ST
ConceptDescriptor : CD
CodedValue : CV
InstanceIdentifier : II
TelecommunicationAddress : TEL
T
Interval : IVL
DataValue : ANY
BinaryData : BIN
List_of_Boolean : LIST<BL>
<<extends>>
EncapsulatedData : ED
<<extends>>
ConceptRole : CR
CodedSimpleValue : CS
<<restricts>>
CodedWithEquivalents : CE
ISO_object_identifier : OID
List_ADXP : LIST<ADXP>
PostalAndResidentialAddress : AD
<<extends>>
AddressPart : ADXP
PersonNameType : PN
List_ENXP : LIST<ENXP>
EntityNamePart : ENXP
T
PeriodicIntervalOfTime : PIVL
T
EventRelatedPeriodicIntervalOfTime : EIVL
GeneralTimingSpecification : GTS
Set_of_TS : SET<TS>
<<extends>>
T : T
T
Annotated : ANT
T
History_item : HXIT
T
History : HIST
Set_of_HXIT : SET<HXIT<T>>
T
UncertainValueNarrative : UVN
<<extends>>
T
UncertainValueProbabilistic : UVP
T
NonParametricProbabilityDistribution : NPPD
Set_UVP : SET<UVP<T>>
T
ParametricProbabilityDistribution : PPD
UniversalResourceLocator : URL
<<extends>>
OrganizationName : ON
<<extends>>
<<extends>><<extends>>
<<extends>>
<<extends>>
<<extends>>
<<extends>>
<<extends>>
<<extends>>
<<extends>>
<<extends>>
<<restricts>>
<<restricts>>
<<restricts>>
<<extends>>
<<extends>>
<<extends>><<extends>>
<<extends>>
<<extends>>
<<extends>>
<<extends>>
<<extends>><<extends>>
<<restricts>>
<<extends>>
<<extends>>
<<extends>>
<<extends>> <<extends>>
<<extends>>
July 14, 2015 Page: 495 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3.0 Messaging Design Models
A Dynamic Model is a specification of information
exchanges within a particular domain as described in
storyboards and storyboard examples.
A Design Information Model is an information
structure that represents the information content for a
set of messages within a particular domain area.
A Common Message Type Model is a definition of a set
of common message components that can be
referenced in various message specifications.
Dynamic
Model
Design
Information
Model
Common
Message Type
Model
July 14, 2015 Page: 496 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
StaticModel
DynamicModel
Message Development Framework
RIM
Restrict
R-MIM
Serialize
HMD
Restrict
Message
Type
Example
Storyboard
Storyboard
Example
D-MIM
Derive
Application
Role
Sender Receiver
Trigger
Event
Triggers
Content
Interaction
References
July 14, 2015 Page: 497 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
An example Interaction Diagram
Application Roles
Interactions
July 14, 2015 Page: 498 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
An example Interaction Diagram
July 14, 2015 Page: 499 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
V3 Constrained Information Model
A_AbnormalityAssessment
(COCT_RM420000UV)
Description: assessment of clinical findings, including lab test results,
for indications of the presence and severity of abnormal conditions
AbnormalityAssessment
classCode*: = "OBS"
moodCode*: = "EVN"
code*: CD CWE [1..1] <= V:ObservationType ("ADVERSE_REACTION")
statusCode*: CS CNE [1..1] <= V:ActStatusAbortedCancelledCompleted
activityTime*: TS.DATETIME [1..1]
value: CD CWE [0..1] <= V:AbnormalityAssessmentValue
methodCode: SET<CE> CWE [0..*] <= V:AbnormalityAssessmentMethod
1..* assessmentOutcome *
typeCode*: = "OUTC"
contextConductionInd*: BL [1..1] ="true"
outcome
AssessmentException
classCode*: = "OBS"
moodCode*: = "EVN"
code*: CD CWE [1..1] <= V:ObservationType ("ASSERTION")
value*: SC CWE [1..1] <= V:AssessmentExceptionValue
AbnormalityGrade
classCode*: = "OBS"
moodCode*: = "EVN"
code*: CD CWE [1..1] <= V:ObservationType ("SEV")
uncertaintyCode: CE CNE [0..1] <= V:ActUncertainty
value*: CD CWE [1..1] <= V:AbnormalityGradeValue
AssessmentOutcome
0..* assessmentOutcomeAnnotation
typeCode*: = "APND"
contextConductionInd*: BL [1..1] ="true"
appendageOf
AssessmentOutcomeAnnotation
classCode*: = "OBS"
moodCode*: = "EVN"
code*: CD CWE [1..1] <= V:ObservationType ("ASSERTION")
value*: SC CWE [1..1] <= V:AssessmentOutcomeAnnotationValue
Model Components
 Entry Point(s)
 Clones
• Focal Class
• Traversal Path
• Choice Structure
 Attributes
• Datatype
• Cardinality
• Terminology Binding
July 14, 2015 Page: 500 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
CMET Reference
Accession
classCode*: <= ACSN
moodCode*: <= EVN
id*: II [1..1]
CMET: (AGNT)
R_Responsible
[universal]
(COCT_MT040000)
0..1 roleName
1..1 agent *
typeCode*: <= AUT
author
CMET
R-MIM
July 14, 2015 Page: 501 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3.0 Messaging Design Models
An Hierarchical Message Definition is a specification
of message elements including a specification of their
grouping, sequence, optionality, and cardinality.
A Message Type Definition is a specification of a
collection of message elements and a set of rules for
constructing a message instance.
The Implementation Technology Specification, or ITS,
defines how to represent RIM objects for transmission
in messages.
Hierarchical
Message
Definition
Message
Type
Definition
Implementation
Technology
Specification
July 14, 2015 Page: 502 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HMD Components
InformationModelMapping
MessageElementSpecifications
CommonConstraints
MessageTypeSpecification(S)
July 14, 2015 Page: 503 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 XML Schema Generator
HL7 Vocabulary
Specification
HL7 Data Type
Specification
HL7 XML
Schema
Generator
Hierarchical Message
Definition
XML Schema
Specification
July 14, 2015 Page: 504 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 XML Schema Generator
HL7 Vocabulary
Specification
HL7 Data Type
Specification
HL7 XML
Schema
Generator
XML Schema
Specification
Refined Message
Information Model
Datatype.XSD
Voc.XSD
July 14, 2015 Page: 505 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 V3 Modeling Tools
Rational
Rose
Reference
Model
Repository
RoseTree
R-MIM
Designer
Schema
Generator
RIM RIM
R-MIM
RIM
R-MIM
HMD HMD
XSD
R-MIM
July 14, 2015 Page: 506 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 v3 Clinical Document
Architecture
July 14, 2015 Page: 507 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Clinical Document Architecture RMIM
Clinical Document
Participating
Entities
Structured
Document Sections
Section Entries and
Sub-Entries
July 14, 2015 Page: 508 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Implementation Guide Development
508
July 14, 2015 Page: 509 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Collaborative Work Product
 This guide was produced and developed through the joint efforts of Health
Level Seven (HL7), Integrating the Healthcare Environment (IHE), the Health
Story Project, and the Office of the National Coordinator (ONC) within the
US Department of Health and Human Services (HHS).
 The project was carried out within the ONC’s Standards and Interoperability
(S&I) Framework as the Clinical Document Architecture (CDA) Consolidation
Project with a number of goals, one of which is providing a set of
harmonized CDA templates for the US Realm.
July 14, 2015 Page: 510 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 Standards Compliance and
Profile Conformance
July 14, 2015 Page: 511 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Reveal Assumptions
Message Profiles are an effective means of documenting our assumptions
about message structures
Do you
use
HL7?
MSH
EVN
PID
[PD1]
[ { NK1 } ]
Yes, I
use
HL7.
MSH
EVN
PID
[ NK1 ]
OBX
July 14, 2015 Page: 512 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Conceptual Overview
Message Profile = Static Profile + Dynamic Profile
Critical Care Unit
ADT System
Acknowledgement Message
Initiating Message
Initiating Message
Clinical Data Repository
July 14, 2015 Page: 513 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Dynamic Interaction
Vectra
XU
5/90C
BED1OFF
BED1OFF
BED1OFF
BED1OFF
BED1OFF
BED1OFF
BED1OFF
BED1OFF
BED1OFF
BED1OFF
POTASSIUM3.5-5.0
BED1OFF
POTASSIUM3.5-5.0
POTASSIUM3.5-5.0
POTASSIUM3.5-5.0
BED1OFF
POTASSIUM3.5-5.0
BED1OFF BED1OFF
BED1OFF
BED1OFFBED1OFF
Critical Care Unit
HIS/CIS
Vectra
XU
5/90C
BED1OFF
BED1OFF
BED1OFF
BED1OFF
BED1OFF
BED1OFF
BED1OFF
BED1OFF
BED1OFF
BED1OFF
POTASSIUM3.5-5.0
BED1OFF
POTASSIUM3.5-5.0
POTASSIUM3.5-5.0
POTASSIUM3.5-5.0
BED1OFF
POTASSIUM3.5-5.0
BED1OFF BED1OFF
BED1OFF
BED1OFFBED1OFF
Clinical Data
Repository
A/D/T System
Order Filling Application
Accept Ack
Accept + App ACK
Receiver Responsibility
MSH-15,16
No ACK
July 14, 2015 Page: 514 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Static Definition Example
...
...
...
NK1
MSH
EVN
PID
NK1 NK1 NK1 NK1
PV1
PV2
OBX
AL1
HL7 Message Structure
...
NK1
MSH
EVN
PID
NK1 NK1 NK1 NK1
PV1
PV2
OBX
AL1
Message Profile
Segments/Segment Groups:
•Usage (Optionality)
•Cardinality (min, max)
Fields/Components:
- Usage (Optionality)
- Cardinality (min, max)
- Value Sets/Coding system
- Descriptions
July 14, 2015 Page: 515 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Message Level Profile Example
ADT^A01^ADT_A01 ADT Message Usage Cardinality Chapter
MSH Message Header R [1..1] 2
EVN Event Type R [1..1] 3
PID Patient Identification R [1..1] 3
[ PD1 ] Additional Demographics X [0..0] 3
[{ ROL }] Role X [0..0] 12
[{ NK1 }] Next of Kin / Associated
Parties
RE [0..3] 3
PV1 Patient Visit R [1..1] 3
[ PV2 ] Patient Visit - Additional
Info.
RE [0..1] 3
[{ ROL }] Role X [0..0] 12
[{ DB1 }] Disability Information X [0..0] 3
[{ OBX }] Observation/Result X [0..0] 7
[{ AL1 }] Allergy Information RE [0..*] 3
[{ DG1 }] Diagnosis Information X [0..0] 6
[ DRG ] Diagnosis Related Group X [0..0] 6
[{ X [0..0]
PR1 Procedures X [0..0] 6
[{ ROL }] Role X [0..0] 12
}]
[{ GT1 }] Guarantor X [0..0] 6
[{ X [0..0]
IN1 Insurance X [0..0] 6
[ IN2 ] Insurance Additional Info. X [0..0] 6
[{ IN3 }] Insurance Additional Info -
Cert.
X [0..0] 6
[{ ROL }] Role X [0..0] 12
}]
[ ACC ] Accident Information X [0..0] 6
[ UB1 ] Universal Bill Information X [0..0] 6
[ UB2 ] Universal Bill 92 Information X [0..0] 6
[ PDA ] Patient Death and Autopsy X [0..0] 3
July 14, 2015 Page: 516 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Message Level Profile Example
ADT^A01^ADT_A01 ADT Message Usage Cardinality Chapter
MSH Message Header R [1..1] 2
EVN Event Type R [1..1] 3
PID Patient Identification R [1..1] 3
[{ NK1 }] Next of Kin / Associated
Parties
RE [0..3] 3
PV1 Patient Visit R [1..1] 3
[ PV2 ] Patient Visit - Additional
Info.
RE [0..1] 3
[{ AL1 }] Allergy Information RE [0..*] 3
July 14, 2015 Page: 517 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
How it all ties together
Static Definition – Field Level
Vocabulary
SEQ LEN DT Usage Cardinality TBL# ITEM# ELEMENT NAME
1 4 SI X 00104 Set ID - PID
2 20 CX RE [1..1] 00105 Patient ID
3 20 CX R [1..*] 00106 Patient Identifier List
4 20 CX X 00107 Alternate Patient ID - PID
5 48 XPN R [1..*] 00108 Patient Name
6 48 XPN RE [1..*] 00109 Mother’s Maiden Name
7 26 TS RE 00110 Date/Time of Birth
8 1 IS RE 0001 00111 Sex
9 48 XPN X 00112 Patient Alias
10 80 CE X 0005 00113 Race
11 106 XAD RE [1..3] 00114 Patient Address
12 4 IS X 0289 00115 County Code
13 40 XTN RE [1..3] 00116 Phone Number - Home
14 40 XTN RE [1..3] 00117 Phone Number - Business
15 60 CE X 0296 00118 Primary Language
16 80 CE X 0002 00119 Marital Status
17 80 CE X 0006 00120 Religion
18 20 CX X 00121 Patient Account Number
19 16 ST RE 00122 SSN Number - Patient
20 25 DLN X 00123 Driver's License Number - Patient
21 20 CX X 00124 Mother's Identifier
22 80 CE X 0189 00125 Ethnic Group
23 60 ST RE 00126 Birth Place
24 1 ID X 0136 00127 Multiple Birth Indicator
25 2 NM X 00128 Birth Order
26 80 CE X 0171 00129 Citizenship
27 60 CE X 0172 00130 Veterans Military Status
28 80 CE X 0212 00739 Nationality
29 26 TS X 00740 Patient Death Date and Time
30 1 ID X 0136 00741 Patient Death Indicator
: ADT Sy stem : ADT Notification
Recip ient
ADT^A01
ACK ^A01
Interaction Model
Segment ADT Message Usage Cardinality Chapter
MSH Message Header R [1..1] 2
EVN Event Type R [1..1] 3
PID Patient Identification R [1..1] 3
[ PD1 ] Additional Demographics X [0..0] 3
[{ ROL }] Role X [0..0] 12
[{ NK1 }] Next of Kin / Associated
Parties
RE [0..3] 3
PV1 Patient Visit R [1..1] 3
[ PV2 ] Patient Visit - Additional
Info.
RE [0..1] 3
[{ ROL }] Role X [0..0] 12
[{ DB1 }] Disability Information X [0..0] 3
[{ OBX }] Observation/Result X [0..0] 7
[{ AL1 }] Allergy Information RE [0..*] 3
[{ DG1 }] Diagnosis Information X [0..0] 6
[ DRG ] Diagnosis Related Group X [0..0] 6
[{ X [0..0]
PR1 Procedures X [0..0] 6
[{ ROL
}]
Role X [0..0] 12
}]
[{ GT1 }] Guarantor X [0..0] 6
[{ X [0..0]
IN1 Insurance X [0..0] 6
[ IN2 ] Insurance Additional Info. X [0..0] 6
[{ IN3
}]
Insurance Additional Info -
Cert.
X [0..0] 6
[{ ROL
}]
Role X [0..0] 12
}]
[ ACC ] Accident Information X [0..0] 6
[ UB1 ] Universal Bill Information X [0..0] 6
[ UB2 ] Universal Bill 92 Information X [0..0] 6
[ PDA ] Patient Death and Autopsy X [0..0] 3
Dynamic Definition
Static Definition – Segment Level
P at ie nt
P hy s ic ian
A D T No tific at ion
Re c ipien t
A D T S y s tem
A dm it/ V is it Notific ation
is s u b jec t of
autho riz es
rec e ives notific ations en ds no tific at ion
Reg is trar
trig gers
Use Case Model
Static Definition – Message Level
1 Use Case Model
1.1 Use Case: Admit/Visit Notification
2. Dynamic Interaction Model
3 Dynamic Definition: ADT/ACK (Event A01)
3.1 ADT^A01
3.2 ACK^A01
4 Static Definition: - Message Level -
ADT/ACK (event A01)
4.1 ADT^A01
4.2 ACK^A01
5 Static Defintiion - Segment Level
5.1 MSH – Message Header Segment Definition
5.2 EVN - Event Type Segment Definition
5.3 PID (Y) - Patient Demographics Segment
Definition
5.4 PD1 – Patient Additional Demographic
Segment Definition
5.5 NK1 - Next of kin Segment Definition
5.6 PV1 (2) - Admit Visit Info Segment
Definition
5.7 AL1 - Allergy Segment Definition
5.8 MSA - Message Acknowledgment Segment
Definition
5.9 ERR - Error Segment Definition
6 Static Definition - Field Level
6.1 Table 0001 – Sex
6.2 Table 0002 – Marital Status
6.3 Table 0003 – Event Type Code
6.4 Table 0004 – Patient Class
6.5 Table 0005 – Race
6.6 Table 0006 – Religion
6.7 Table 0007 – Admission Type
6.8 Table 0008 – Acknowledgement Code
6.9 Table 0009 – Ambulatory Status
July 14, 2015 Page: 518 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Middleware Vendor Products
July 14, 2015 Page: 519 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Health Information Standards Compliance
 Hi3 Solutions’ STANDARDS CONFORMANCE VALIDATOR™ (SCV) is a
comprehensive suite of application services that validates
compliance with healthcare information exchange standard
specifications and conformance with related implementation guides
and profiles.
July 14, 2015 Page: 520 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
HL7 Version 3 Topics
 HL7 v3 History and Rationale
 HL7 v3 Development Frameworks and Architectures
 HL7 v3 Messaging Artifacts
 HL7 v3 Clinical Document Architecture
 HL7 Standards Compliance and Profile Conformance
July 14, 2015 Page: 521 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Course Topics
HL7 v2 Messaging HL7 v3 Messaging
HL7 Clinical
Document
Architecture
HL7 Family of
Standards
HL7 Compliance
and Conformance
July 14, 2015 Page: 522 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Q&A
July 14, 2015 Page: 523 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
Thank You!
Peace...AMS
Abdul-Malik Shakir
President and Chief Informatics Scientist
Hi3 Solutions
3500 West Olive Ave, Suite # 300, Burbank, CA 91505
Skype: +1 9098334661  Mobile: (626) 644-4491
Email: abdulmalik.shakir@hi3Solutions.com

Introduction to hl7 v3

  • 1.
    July 14, 2015Page: 1 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3 History and Rationale July 14, 2015
  • 2.
    July 14, 2015Page: 2 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SESSION OVERVIEW • ABOUT ME • SCOPE AND LEARNING OBJECTIVES • COURSE AGENDA • HL7 V3 HISTORY AND RATIONALE • Q&A
  • 3.
    July 13, 2015Page: 3 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner About Me • I have been, and continue to be, an active member of HL7 since 1991. • I currently co-chair the HL7 Modeling and Methodology Workgroup. • My HL7 History: o Chaired the HL7 Education Workgroup from 1996 to 2010. o Received the HL7 volunteer of the year award in 1997 o Served on the HL7 Board of Directors from 2000 to 2005 o Board appointed member of the HL7 ARB since 2001and ARB modeling facilitator since 2012 o Received the HL7 Fellowship award in 2012 AbdulMalik Shakir President and Chief Informatics Scientist Hi3 Solutions | your healthcare standards conformance partner 3500 West Olive Ave, Suite # 300, Burbank, CA 91505.
  • 4.
    July 14, 2015Page: 4 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Scope and Learning Objectives • Scope - an introduction to HL7’s health information exchange standards:  HL7 Family of Standards  HL7 v2 Messaging (v2)  HL7 v3 Messaging (v3)  HL7 v3 Clinical Document Architecture (CDA)  HL7 Compliance and Conformance Specification • Learning Objectives –  To better understand the business case for HL7,  Gain familiarity with the full suite of HL7 standards,  Receive an in-depth overview of the HL7 information exchange standards
  • 5.
    Course Agenda July 13,2015 July 14, 2015 • 09:00 – 09:30 Introductions and Course Overview • 09:30 – 10:30 Health Level Seven and the HL7 Family of Standards  10:30 – 10:45 Break • 10:45 – 12:00 HL7 v2 Abstract Message Definition  12:00 - 12:30 Break • 12:30 – 02:00 HL7 v2 Message Construction Rules  02:00 - 02:15 Break • 02:15 – 03:30 Local Extensions and inter-version Compatibility • 03:30 – 04:00 HL7 v2 Retrospective • 09:00 – 09:30 HL7 v3 History and Rationale • 09:30 – 10:30 HL7 v3 Development Frameworks and Architectures  10:30 – 10:45 Break • 10:45 – 12:00 HL7 v3 Messaging Artifacts  12:00 - 12:30 Break • 12:30 – 02:00 HL7 v3 Clinical Document Architecture  02:00 - 02:15 Break • 02:15 – 03:30 HL7 Standards Compliance and Profile Conformance • 03:30 – 04:00 HL7 v3 Retrospective
  • 6.
    July 14, 2015Page: 6 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 V3 HISTORY AND RATIONALE
  • 7.
    July 14, 2015Page: 7 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner International National Inter-Enterprise Enterprise Institution Ever-Increasing Circles Source: Gartner
  • 8.
    July 14, 2015Page: 8 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3 Messaging  HL7 Version 3 (V3) introduced a common Reference Information Model (RIM), data type model and set of vocabulary as well as a formal standards development methodology.  In addition, it introduced the use of "documents" as an alternative architecture for sharing healthcare information. However, the term "V3" is typically used to refer to "V3 messaging".  The data types used as a basis for V3 have also been adopted by ISO as ISO 21090. The HL7 RIM has also been adopted as an ISO standard.
  • 9.
    July 14, 2015Page: 9 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner World-class System Interface Standards  The HL7 v3.0 messaging standard is not a replacement for HL7 v2.0; it is an alternative specification providing enhanced capabilities.  New versions of HL7 v2.x will continue to be developed for as long as it continues to address the needs of HL7 members and the healthcare community in general.  HL7 v3.0 uses a model driven methodology and includes specifications for messaging and non-messaging standards.  The community of users served by HL7 is continually increasing in size. As the size of the community increases so does the complexity and the diversity of their needs.  HL7 v3.0 increases the quality and reduces the variability in HL7 standards enabling it to address the more complex and diverse needs of the HL7 members.
  • 10.
    July 14, 2015Page: 10 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 Version 3.0: What and Why  Version 3.0 is a fundamental shift in the methodology HL7 uses to develop its standards specifications.  Version 3.0 is a model-driven methodology based upon the Object Management Group’s Unified Modeling Language (UML).  Version 3.0 uses datatype specifications, vocabulary specifications, and a Reference Information Model (RIM), to derive the information component of V3 message specifications.  Version 3.0 reduces optionality, maximizes reuse, and increases consistency in HL7 message specifications.  Version 3.0 improves the quality of HL7 message specifications and includes support for conformance validation.  Version 3.0 enables HL7 implementers to leverage emerging
  • 11.
    July 14, 2015Page: 11 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Difficulties with the Existing HL7 v2.x Process  The HL7 V2.x development process is entirely ad hoc. There is no explicit methodology.  Members receive no formal guidance in constructing messages. Trigger events and data fields are described solely in natural language.  The structural relationships among data fields are not clear. Segments are reused in many messages and message definitions are reused for many trigger events.  In order to accommodate this extensive reuse, most data fields are optional. Chapters are inconsistent in their use of trigger events versus status codes.
  • 12.
    July 14, 2015Page: 12 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Opportunities to Improve  HL7 spent four years creating a methodology to adapt modern analysis techniques from system building to message design.  Initially, the HL7 Board of Directors chartered an independent task force to establish the broad outline of the approach.  In January 1996, the Technical Steering Committee (TSC) agreed to adopt the main features of the approach and take over its management.  Planning work continued in the Modeling and Methodology Work Group and the Implementation/Conformance Work Group.  At the completion of V2.3, in the spring of 1997, the HL7 Work Groups all began to use the V3 process.
  • 13.
    July 14, 2015Page: 13 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner What's New with HL7 V3  HL7 employs a completely new development approach with V3, an Object Oriented approach that is model and repository-based.  This OO approach is supported with trained facilitators, formal education classes, and computerized tools.  This approach leads to increased detail, clarity and precision of the specification and finer granularity in the ultimate message.  HL7 isn't just Level 7 any more! HL7 standard developers realized it was necessary to include other levels of the ISO OSI Model.  Today, Work Groups exist for XML, Security & Accountability, Service Oriented Architecture, Clinical Document Architecture, and Restful Services Resource Definitions.
  • 14.
    July 14, 2015Page: 14 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Questions
  • 15.
    July 14, 2015Page: 15 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Hi3 Solutions 3500 W. Olive Ave, Suite 300 Burbank, CA 91505 ww.hi3solutions.com +1 800 918- 6520
  • 16.
    July 14, 2015Page: 16 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3 Development Frameworks and Architectures
  • 17.
    July 14, 2015Page: 17 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SESSION OVERVIEW  HL7 V3 MESSAGE DEVELOPMENT FRAMEWORK (MDF)  HL7 DEVELOPMENT FRAMEWORK (HDF)  SERVICES AWARE INTEROPERABILITY FRAMEWORK (SAIF)  HL7 V3 REFERENCE MODELS
  • 18.
    July 14, 2015Page: 18 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3 Message Development Framework
  • 19.
    July 14, 2015Page: 19 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner The MDF Methodology Overview
  • 20.
    July 14, 2015Page: 20 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 V3 Message Design Information Models  RIM: Reference Information Model  D-MIM: Domain Message Information Model  R-MIM: Refined Message Information Model  HMD: Hierarchical Message Definition RIM Restrict R-MIM Serialize HMD D-MIM Derive
  • 21.
    July 14, 2015Page: 21 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 V3 Message Development Framework Use Case Modeling Interaction Modeling Message Design Information Modeling RIM Restrict R-MIM Serialize HMD Restrict Message Type Example Storyboard Storyboard Example D-MIM Derive Application Role Sender Receiver Trigger Event Triggers Content Interaction References
  • 22.
    July 14, 2015Page: 22 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 V3 Message Development Methodology: How  Use Case Modeling • Produce a storyboard example • Generalize the storyboard example into a storyboard  Information Modeling • Define classes, attributes, datatypes, and relationships • Define vocabulary domains, code systems, and value sets • Define states, trigger events, and transitions  Interaction Modeling • Define application roles • Define interactions  Message Design • Define D-MIM, CMETs, and R-MIMs • Define HMD and Message Types
  • 23.
    July 14, 2015Page: 23 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 V3 Methodology (in plain language): How  What application interface problem are we trying to solve?  What application systems are within the scope of the problem domain?  What events initiate communication between applications?  What information needs to be communicated between participating applications?  What is the definition, format, and interrelationship of the information to be communicated?  How should the information to be communicated between applications be structured and packaged?
  • 24.
    July 14, 2015Page: 24 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 V3 Message Design Information Models RIM Account name : ST balanceAmt : MO currencyCode : CE interestRateQuantity : RTO<MO,PQ> allowedBalanceQuantity : IVL<MO> DeviceTask parameterValue : LIST<ANY> DiagnosticImage subjectOrientationCode : CE Diet energyQuantity : PQ carbohydrateQuantity : PQ FinancialContract paymentTermsCode : CE FinancialTransaction amt : MO creditExchangeRateQuantity : REAL debitExchangeRateQuantity : REAL InvoiceElement modifierCode : SET<CE> unitQuantity : RTO<PQ,PQ> unitPriceAmt : RTO<MO,PQ> netAmt : MO factorNumber : REAL pointsNumber : REAL ManagedParticipation id : SET<II> statusCode : SET<CS> Observation value : ANY interpretationCode : SET<CE> methodCode : SET<CE> targetSiteCode : SET<CD> PatientEncounter preAdmitTestInd : BL admissionReferralSourceCode : CE lengthOfStayQuantity : PQ dischargeDispositionCode : CE specialCourtesiesCode : SET<CE> specialAccommodationCode : SET<CE> acuityLevelCode : CE Procedure methodCode : SET<CE> approachSiteCode : SET<CD> targetSiteCode : SET<CD> PublicHealthCase detectionMethodCode : CE transmissionModeCode : CE diseaseImportedCode : CE SubstanceAdministration routeCode : CE approachSiteCode : SET<CD> doseQuantity : IVL<PQ> rateQuantity : IVL<PQ> doseCheckQuantity : SET<RTO> maxDoseQuantity : SET<RTO> substitutionCode : CE Supply quantity : PQ expectedUseTime : IVL<TS> WorkingList ownershipLevelCode : CE Container capacityQuantity : PQ heightQuantity : PQ diameterQuantity : PQ capTypeCode : CE separatorTypeCode : CE barrierDeltaQuantity : PQ bottomDeltaQuantity : PQ Device manufacturerModelName : SC softwareName : SC localRemoteControlStateCode : CE... alertLevelCode : CE lastCalibrationTime : TS LivingSubject administrativeGenderCode : CE birthTime : TS deceasedInd : BL deceasedTime : TS multipleBirthInd : BL multipleBirthOrderNumber : INT organDonorInd : BL ManufacturedMaterial lotNumberText : ST expirationTime : IVL<TS> stabilityTime : IVL<TS> Material formCode : CE NonPersonLivingSubject strainText : ED genderStatusCode : CE Organization addr : BAG<AD> standardIndustryClassCode : CE Person addr : BAG<AD> maritalStatusCode : CE educationLevelCode : CE raceCode : SET<CE> disabilityCode : SET<CE> livingArrangementCode : CE religiousAffiliationCode : CE ethnicGroupCode : SET<CE> Place mobileInd : BL addr : AD directionsText : ED positionText : ED gpsText : ST Access approachSiteCode : CD targetSiteCode : CD gaugeQuantity : PQ Employee jobCode : CE jobTitleName : SC jobClassCode : CE salaryTypeCode : CE salaryQuantity : MO hazardExposureText : ED protectiveEquipmentText : ED LicensedEntity recertificationTime : TS Patient confidentialityCode : CE veryImportantPersonCode : CE ActRelationship typeCode : CS inversionInd : BL contextControlCode : CS contextConductionInd : BL sequenceNumber : INT priorityNumber : INT pauseQuantity : PQ checkpointCode : CS splitCode : CS joinCode : CS negationInd : BL conjunctionCode : CS localVariableName : ST seperatableInd : BL Act classCode : CS moodCode : CS id : SET<II> code : CD negationInd : BL derivationExpr : ST text : ED statusCode : SET<CS> effectiveTime : GTS activityTime : GTS availabilityTime : TS priorityCode : SET<CE> confidentialityCode : SET<CE> repeatNumber : IVL<INT> interruptibleInd : BL levelCode : CE independentInd : BL uncertaintyCode : CE reasonCode : SET<CE> languageCode : CE 0..n 1 outboundRelationship 0..n source1 0..n 1 inboundRelationship 0..n target 1 LanguageCommunication languageCode : CE modeCode : CE proficiencyLevelCode : CE preferenceInd : BL Participation typeCode : CS functionCode : CD contextControlCode : CS sequenceNumber : INT negationInd : BL noteText : ED time : IVL<TS> modeCode : CE awarenessCode : CE signatureCode : CE signatureText : ED performInd : BL substitutionConditionCode : CE... 0..n 1 0..n 1 Entity classCode : CS determinerCode : CS id : SET<II> code : CE quantity : SET<PQ> name : BAG<EN> desc : ED statusCode : SET<CS> existenceTime : IVL<TS> telecom : BAG<TEL> riskCode : CE handlingCode : CE 1 0..n 1 0..n RoleLink typeCode : CS effectiveTime : IVL<TS> Role classCode : CS id : SET<II> code : CE negationInd : BL addr : BAG<AD> telecom : BAG<TEL> statusCode : SET<CS> effectiveTime : IVL<TS> certificateText : ED quantity : RTO positionNumber : LIST<INT> 0..n 1 0..n 1 0..n0..1 playedRole 0..n player 0..1 0..n 0..1 scopedRole 0..n scoper 0..1 0..n 1 outboundLink 0..n source1 0..n 1 inboundLink 0..n target1 HMD D-MIM PatientIncident classCode*:<=ENC moodCode*:<=EVN id:[1..*](RegistNum) code:CVCNE[0..1]<=ExternallyDefinedActCodes(PatientType) statusCode:LIST<CS>CNE<=ActStatus(IDPHStatus) activityTime:TS(EDDate) Injury classCode*:<=ACT moodCode*:<=EVN activityTime:TS(InjuryDate) 0..1pertinentInjury typeCode*:<=PERT pertinentInformation1 TraumaRegistryExport (IDPH_RM00001) DatacontentofHL7 messagesusedtoexport datafromtheIDPHTrauma Registry. PatientPerson classCode*:<=PSN determinerCode*:<=INSTANCE name:PN[0..1](*Name) existenceTime:(Age) administrativeGenderCode:CVCWE<=AdministrativeGender (GenderID) birthTime:(DateOfBirth) addr:AD[0..1](AddressHome) raceCode:CVCWE[0..1]<=Race(RaceID) ethnicGroupCode:CVCWE[0..1]<=Ethnicity(EthnicID) 1..1patientPatientPerson 1..1providerTraumaParticipant Patient classCode*:<=PAT id:II[0..1](MedicaRecordNum) TraumaParticipant classCode*:<=ORG determinerCode*:<=INSTANCE id:[1..1](HospitNum) code:CVCWE[0..1]<=EntityCode name:ON[0..1](HospitName) statusCode:CSCNE[0..1]<=EntityStatus(ActiveFacili) addr:AD[0..1](HospitCity) 1..1patient typeCode*:<=SBJ subject InjuryLocation classCode*:<=PLC determinerCode*:<=INSTANCE code:CVCWE[0..1]<=EntityCode(InjuryPlaceID) addr:AD[0..1](AddressScene) 0..1playingInjuryLocation Role classCode*:<=ROL 1..1participant typeCode*:<=LOC location InjuryRelatedObservation classCode*:<=OBS moodCode*:<=EVN code:<=ExternallyDefinedActCodes priorityCode:CVCWE[0..1]<=ActPriority value:[0..1] 0..*pertinentInjuryRelatedObservation typeCode*:<=PERT sequenceNumber:INT[0..1](InjurySequen) pertinentInformation Procedure classCode*:<=PROC moodCode*:<=EVN code:CVCWE<=ActCode(ICDCodeID) activityTime:TS(ProcedDate) 0..*pertinentProcedure typeCode*:<=PERT pertinentInformation7 0..1medicalStaff typeCode*:<=PRF performer MedicalStaff classCode*:<=PROV id:II[0..1](MedicalStaffID) 0..1procedureLocation typeCode*:<=LOC location ProcedureLocation classCode*:<=SDLOC code:<=RoleCode(ProcedLocateID) PatientIncidentRelatedObservation classCode*:<=OBS moodCode*:<=EVN code:<=ActCode reasonCode:CVCWE[0..1]<=ActReason value:ANY[0..1] 0..*pertinentPatientIncidentRelatedObservation typeCode*:<=PERT pertinentInformation2 PatientTransfer classCode*:<=TRNS moodCode*:<=EVN activityTime:IVL<TS>(DischaDatetoArriveDate) reasonCode:CVCWE[0..1]<=TransferActReason(REASONTRANSFID) 1..1arrivalPatientTransfer typeCode*:<=ARR arrivedBy 0..*aRole typeCode*:<=ORG origin 0..1playingTraumaParticipant aRole classCode*:<=ROL TransferRelatedObservation classCode*:<=OBS moodCode*:<=EVN code:CVCWE<=ExternallyDefinedActCodes value:PQ[0..1] methodCode:CVCWE[0..1]<=ObservationMethod 1..*pertinentTransferRelatedObservation typeCode*:<=PERT pertinentInformation 1..1transferVehicle typeCode*:<=VIA via 1..1owningVehicleProvider TransferVehicle classCode*:<=OWN id:II[0..1](VehiclNum) code:<=RoleCode(VehiclLevelID) VehicleProvider classCode*:<=ORG determinerCode*:<=INSTANCE id:II[0..1](VehiclProvide) code:<=EntityCode(MaxVehiclLevelID) name:ON[0..1](VehiclProvidName) HospitalVisit classCode*:<=ENC moodCode*:<=EVN code:CVCWE<=ActCode(AdmitServicID) activityTime:TS(DischaDate) dischargeDispositionCode:CVCWE[0..1] <=EncounterDischargeDisposition 1..1pertinentHospitalVisit typeCode*:<=PERT pertinentInformation5 HospitalVisitRelatedObservation classCode*:<=OBS moodCode*:<=EVN code:CVCWE<=ExternallyDefinedActCodes value:[0..1] 0..*pertinentHospitalVisitRelatedObservation typeCode*:<=PERT pertinentInformation 1..1admittingProvider typeCode*:<=ADM admitter 0..1healthCareMedicalStaffPerson AdmittingProvider classCode*:<=PROV id:II[0..1](ADMITMEDICASTAFFID) code:CVCWE<=RoleCode(StaffTypeID) 0..*hospitalVisitPhysician typeCode*:<=RESP time:TS responsibleParty 0..1healthCareMedicalStaffPerson HospitalVisitPhysician classCode*:<=PROV id:II[0..1] code:CVCWE<=RoleCode(StaffTypeID) MedicalStaffPerson classCode*:<=PSN determinerCode*:<=INSTANCE name:PN[0..1](MedicaStaffName) 0..1licensedEntity typeCode*:<=DST destination 0..1subjectChoice LicensedEntity classCode*:<=LIC id:II[0..1] Choice Facility classCode*:<=ORG determinerCode*:<=INSTANCE id: code*:CSCNE<=EntityCode"FAC" name: Hospital classCode*:<=ORG determinerCode*:<=INSTANCE id: code*:CSCNE<=EntityCode"HOSP" name: EmergencyDepartmentEncounter classCode*:<=ENC moodCode*:<=EVN activityTime:IVL<TS> dischargeDispositionCode:CVCWE<=EncounterDischargeDisposition 0..1pertinentEmergencyDepartmentEncounter typeCode*:<=PERT pertinentInformation3 EmergencyDepartmentRelatedObservation classCode*:<=OBS moodCode*:<=EVN code:CVCWE<=ExternallyDefinedActCodes text: activityTime:TS reasonCode:<=ActReason value:[0..1] methodCode:CVCWE[0..1]<=ObservationMethod targetSiteCode:CVCWE[0..1]<=HumanActSite 0..*pertinentEmergencyDepartmentRelatedObservation typeCode*:<=PERT pertinentInformation 0..*emergencyDepartmentPhysician typeCode*:<=PRF performer 0..1healthCareMedicalStaffPerson EmergencyDepartmentPhysician classCode*:<=PROV id:II[0..1] code:CECWE[0..1]<=RoleCode(StaffTypeID) PreHospitalEncounter classCode*:<=ENC moodCode*:<=EVN id:II[0..1](crashNum) activityTime:IVL<TS> 0..1priorPreHospitalEncounter typeCode*:<=PREV predecessor PreHosptialRelatedObservation classCode*:<=OBS moodCode*:<=EVN code:<=ExternallyDefinedActCodes value:ANY[0..1] 0..*pertinentPreHosptialRelatedObservation typeCode*:<=PERT pertinentInformation 1..1preHospitalVehicle typeCode*:<=ParticipationType participant 1..1owningVehicleProvider PreHospitalVehicle classCode*:<=OWN id:II[0..1](VehiclNum) code:<=RoleCode(VehiclLevelID) 0..*emergencyDepartmentPhysicianAct typeCode*:<=COMP component EmergencyDepartmentPhysicianAct classCode*:<=ACT moodCode*:<=EVN code:CSCNE[0..1]<=ExternallyDefinedActCodes activityTime*:TS[0..1] component 0..*patientIncidentRelatedObservation typeCode*:<=COMP VehicleProvider MedicalStaffPerson TraumaParticipant R-MIM PatientIncident classCode*: <= ENC moodCode*: <= EVN id: [1..*] (RegistNum) code: CV CNE <= ExternallyDefinedActCodes (PatientType) statusCode: LIST<CS> CNE <= ActStatus (IDPHStatus) activityTime: TS (EDDate) Injury classCode*: <= ACT moodCode*: <= EVN activityTime: TS (InjuryDate) 0..1 pertinentInjury typeCode*: <= PERT pertinentInformation1 PatientPerson classCode*: <= PSN determinerCode*: <= INSTANCE name: PN [0..1] (*Name) existenceTime: (Age) administrativeGenderCode: CV CWE <= AdministrativeGender (GenderID) birthTime: (DateOfBirth) addr: AD [0..1] (AddressHome) raceCode: CV CWE [0..1] <= Race (RaceID) ethnicGroupCode: CV CWE [0..1] <= Ethnicity (EthnicID) 1..1 patientPatientPerson 1..1 providerTraumaParticipant Patient classCode*: <= PAT id: II [0..1] (MedicaRecordNum) TraumaParticipant classCode*: <= ORG determinerCode*: <= INSTANCE id: [1..1] (HospitNum) code: CV CWE [0..1] <= EntityCode name: ON [0..1] (HospitName) statusCode: CS CNE [0..1] <= EntityStatus (ActiveFacili) addr: AD [0..1] (HospitCity) 1..1 patient typeCode*: <= SBJ subject InjuryLocation classCode*: <= PLC determinerCode*: <= INSTANCE code: CV CWE [0..1] <= EntityCode (InjuryPlaceID) addr: AD [0..1] (AddressScene) 0..1 playingInjuryLocation Role classCode*: <= ROL 1..1 participant typeCode*: <= LOC location InjuryRelatedObservation classCode*: <= OBS moodCode*: <= EVN code: <= ExternallyDefinedActCodes priorityCode: CV CWE [0..1] <= ActPriority value: [0..1] 0..* pertinentInjuryRelatedObservation typeCode*: <= PERT sequenceNumber: INT [0..1] (InjurySequen) pertinentInformation PatientIncidentRelatedObservation classCode*: <= OBS moodCode*: <= EVN code: <= ActCode reasonCode: CV CWE [0..1] <= ActReason value: ANY [0..1] 0..* pertinentPatientIncidentRelatedObservation typeCode*: <= PERT pertinentInformation2 component 0..* patientIncidentRelatedObservation typeCode*: <= COMP
  • 25.
    July 14, 2015Page: 25 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 XML Schema Generator HL7 Vocabulary Specification HL7 Data Type Specification HL7 XML Schema Generator Hierarchical Message Definition And CMET Specifications XML Schema Specification
  • 26.
    July 14, 2015Page: 26 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 V3 Message Implementation Technology HL7-Conformant Application Data HL7 Message Creation HL7-Conformant Application HL7 Message Parsing Data Message Instance XML Schema Specification Hierarchical Message Definition
  • 27.
    July 14, 2015Page: 27 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 Development Framework
  • 28.
    July 14, 2015Page: 28 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Seven Phases of the HDF Methodology 1. Project initiation 2. Requirements Documentation 3. Specification Modeling 4. Specification Documentation 5. Specification Approval 6. Specification Publication 7. Specification Profiling
  • 29.
    July 14, 2015Page: 29 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HDF Workflow Diagram Initiate Project Project Charter Specify Requirements Reference Models Requirement Specification Prepare Specification Design Models Specification Design Models Prepare Specification Approve Specification Approved Specification Publish Approved Specification Published Specification Prepare Specification Profiles Specification Profile Conformance Statement Proposed Specification The HDF workflow is not a waterfall methodology. Each phase builds upon the prior and may cause prior activities to be revisited and their deliverables adjusted.
  • 30.
    July 14, 2015Page: 30 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Project initiation During project initiation the project is defined, a project plan is produced, and project approval is obtained. The primary deliverable produced during project initiation is the project charter. Project Initiation Project Charter 1. Define project scope, objectives, and intended deliverables 2. Identify project stakeholders, participants, and required resources 3. Document project assumptions, constraints, and risk 4. Prepare preliminary project plan and document inter-project dependencies 5. Obtain project approval and launch the project
  • 31.
    July 14, 2015Page: 31 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Requirements Documentation During requirements documentation the problem domain is defined, a model of the domain is produced, and the problem domain model is harmonized with HL7 reference models. The primary deliverable produced during requirements documentation is the requirements specification. Requirements Documentation Requirements Specification 1. Document Business Process: Dynamic Behavior and Static Structure 2. Capture Process Flow: UML Activity Diagram 3. Capture Structure: Domain Information Model and Glossary 4. Capture Business Rules: Relationships, Triggers, and Constraints 5. Harmonize the Domain Analysis Model with HL7 Reference Models Project Charter
  • 32.
    July 14, 2015Page: 32 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Specification Modeling During specification modeling reference models are constrained into design models through an iterative process of requirements driven refinements following specification design rules, conventions, and guidelines. The primary deliverable produced during specification modeling is a set of specification design models. Specification Modeling Specification Design Models 1. Build design models of static information views 2. Construct design models of behavioral views 3. Define reusable design model components 4. Construct design models of collaboration and interaction 5. Harmonize design models with HL7 Reference Models Requirements Specification
  • 33.
    July 14, 2015Page: 33 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Specification Documentation During specification Documentation the specification design models are packaged into logical units, supplemented with explanatory text, and prepared for approval. The primary deliverable produced during specification documentation is a proposed specification. Specification Documentation Proposed Specification 1. Organize design model elements into logical packages 2. Compose explanatory text, examples, and design rationale 3. Update design models and requirement specifications 4. Assemble a proposed specification package 5. Submit specification for approval Specification Design Models
  • 34.
    July 14, 2015Page: 34 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Specification Approval During specification approval the pre-approval specification is subjected to a series of approvals steps. The specific approval steps vary by kind of specification, level of approval, and realm of interest. The primary deliverable produced during specification approval is an approved specification. Specification Approval Approved Specification 1. Obtain TSC and Board approval to ballot specification 2. Form a ballot pool and conduct specification ballot 3. Assess negative ballots and affirmative comments 4. Modify specification in response to ballot comments 5. Resolve negative ballot responses and if necessary re-ballot Proposed Specification
  • 35.
    July 14, 2015Page: 35 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Specification Publication During specification publication the approved specification is prepared for prepared for publication and distribution. The primary deliverable produced during specification publication is a published specification. Specification Publication Published Specification 1. Obtain TSC and Board approval to publish specification 2. Prepare specification for publication 3. Submit publication to standards authorities (ANSI/ISO) 4. Render the specification in various forms of publication media 5. Post and distribute approved specifications Approved Specification
  • 36.
    July 14, 2015Page: 36 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Specification Profiling During specification profiling specification models and published specifications are further refined to produce a specification profile for use in a particular environment by a defined community of users. The primary deliverable produced during specification profiling is a set of specification constraints and conformance statements. Specification Profiling Specification Constraints and Conformance Statements 1. Identify community of user for the published specification 2. Further refine and constrain specification design models 3. Document exceptions, extensions, and annotations to specifications 4. Prepare and publish specification profile 5. Prepare and publish conformance statements Published Specification
  • 37.
    July 14, 2015Page: 37 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SAIF Canonical Definition
  • 38.
    July 14, 2015Page: 38 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SAIF Canonical Definition  The development of the SAIF Canonical Definition (SAIF-CD) began in early 2008 .  It was motivated and directed by a high-level set of requirements communicated to the HL7 Architecture Board (ArB) by the HL7 Chief Technology Officer (CTO), John Quinn.  The ArB was asked to specify a Services Aware Interoperability Framework (SAIF) to serve as the foundation for an HL7 enterprise architecture.  The HL7 enterprise architecture enables the explicit description of technology components from the perspective of the interactions between those components as they are involved in scenarios whose purpose is to achieve an agreed-upon goal based on “cross-boundary shared purpose.”  The scope of the components themselves was not specified, i.e. a “component” could be defined as a system, a service, an enterprise, or a generic party.
  • 39.
    July 14, 2015Page: 39 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner ECCF Overview  A key component of the SAIF Enterprise Architecture is the creation of the Enterprise Conformance and Compliance Framework (ECCF).  ECCF is an architecture for organizing service specification artifacts. It combines concepts from RM-ODP, the ISO Reference Model for Open Distributed Processing; and MDA, the OMG Model Driven Architecture.  RM-ODP provides a framework specification used to describe distributed, heterogeneous systems within and across organizations. It defines five viewpoints of a distributed system specification. The ECCF uses four of the five RM-ODP viewpoints.  MDA is a framework for building systems that abstracts systems into a hierarchy of abstraction specification layers. The ECCF utilizes three level of the four abstractions defined by MDA.
  • 40.
    July 14, 2015Page: 40 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner RM-ODP Viewpoints  The five viewpoints defined within the RM-ODP standard are:  Enterprise Viewpoint: focused on purpose, scope and policy for the system; promoting an understanding of the business environment and its influences upon the distributed system.  Information Viewpoint: focused on the semantics of the information and the information processing performed; essentially the articulation of the business rules and content to be supported by the system.  Computational Viewpoint: focused on the functional decomposition of the system. It provides for the logical design of the system through encapsulation of capability, separation of functionality, and interface definition.  Engineering Viewpoint: focused on mechanisms and functions to support distributed interaction between the components of the system.  Technology Viewpoint: focused on the choice of technology to be employed within the system. It includes a description of the implementation of the system and testing requirements
  • 41.
    July 14, 2015Page: 41 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner OMG MDA Abstraction Layers  The four levels of abstaction defined by the OMG MDA are:  Computational-Independent Model (CIM): The CIM represents the highest- level business model. The CIM transcends computer systems. It describes business processes, the interaction between processes, and the responsibilities of the actors involved.  Platform-Independent Model (PIM): The PIM represents the business model to be implemented by an information system. The PIM describes the processes and structure of the system, without reference to the delivery platforms.  Platform-Specific Model (PSM): The PSM projects the PIM onto a specific platform. One PIM may be transformed into multiple PSMs, however, the PSMs collaborate to deliver a consistent and complete solution.  Code Model (CM): The code model represents the deployable code, usually in a high-level language such as XML, Java, or VB..
  • 42.
    July 14, 2015Page: 42 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner ECCF Specification Stack
  • 43.
    July 14, 2015Page: 43 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner ECCF Organizing Paradigm  The ECCF is an organizing paradigm for the models, specifications, and other work products produced as part of a systems development project.  The ECCF provides a foundation for assessing the conformance and compliance of system analysis, design, and construction artifacts.  The ECCF also provides the basis for organization of project teams and the assignment of project team functional boundaries, interrelationships.
  • 44.
    July 14, 2015Page: 44 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner ECCF Influence on Model Artifacts  The viewpoints of the ECCF provide a framework for organizing UML model elements, diagrams, and specifications.  The Enterprise viewpoint includes the UML concept of actor and the business perspectives of requirements and reference materials.  The Information, Computation, and Engineering viewpoints correspond to the UML diagram categories of Structure, Behavior, and Interaction.  The four viewpoints taken collectively across one layer of abstraction is a single internally consistent model and is used along with expository text to form a single model specification.
  • 45.
    July 14, 2015Page: 45 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner ECCF Influence on Project Teams  Domain experts are the providers of system requirements and the deployment team is the provider of the solution systems.  Sandwiched between the domain experts and the deployment team are the Analyst, Architecture, and Development teams.  The Analyst team is responsible for the transformation of system requirements into a CIM.  The Architecture team is responsible for the transformation of a CIM into a PIM.  The Development team is responsible for transformation of a PIM into a PSM.  The quality assurance team is responsible for ensuring traceability and compliance from deployment to requirements.
  • 46.
    July 14, 2015Page: 46 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Health Level Seven Version 3 Reference Models The HL7 reference models are the foundational artifacts of HL7 version 3.0.
  • 47.
    July 14, 2015Page: 47 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3.0 Foundational Artifacts Reference Information Model Datatype Specification Vocabulary Specification The HL7 Reference Information Model is the information model from which all other information models and message specifications are derived. The HL7 Vocabulary Specification defines the set of all concepts that can be taken as valid values in an instance of a coded attribute or data type property. The HL7 Datatype Specification defines the structural format of the data carried in an attribute and influences the set of allowable values an attribute may assume.
  • 48.
    July 14, 2015Page: 48 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 Version 3.0 Reference Models Reference Information Model Data Type Specification Vocabulary Specification
  • 49.
    July 14, 2015Page: 49 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SESSION RETROSPECTIVE  HL7 V3 MESSAGE DEVELOPMENT FRAMEWORK (MDF)  HL7 DEVELOPMENT FRAMEWORK (HDF)  SERVICES AWARE INTEROPERABILITY FRAMEWORK (SAIF)  HL7 V3 REFERENCE MODELS
  • 50.
    July 14, 2015Page: 50 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Hi3 Solutions 3500 W. Olive Ave, Suite 300 Burbank, CA 91505 ww.hi3solutions.com +1 800 918- 6520
  • 51.
    July 14, 2015Page: 51 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3 Messaging Artifacts July 14, 2015
  • 52.
    July 14, 2015Page: 52 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SESSION OVERVIEW  Messaging Artifacts ECCF  Foundational Artifacts  Design Artifacts  Specification Artifacts  HL7 v3 Message Design Example  HL7 v3 Development Tools
  • 53.
    July 14, 2015Page: 53 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner ECCF Specification Stack
  • 54.
    July 14, 2015Page: 54 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3.0 Messaging Artifacts Reference Information Model Datatype Specification Vocabulary Specification Foundational Models (CIM) Dynamic Model Constrained Information Model Common Message Type Model Design Models (PIM) Hierarchical Message Definition Message Type Definition Implementation Technology Specification Message Specifications (PSM)
  • 55.
    July 14, 2015Page: 55 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3.0 Messaging Artifacts Reference Information Model Datatype Specification Vocabulary Specification Foundational Models Dynamic Model Constrained Information Model Common Message Type Model Design Models Hierarchical Message Definition Message Type Definition Implementation Technology Specification Message Specifications
  • 56.
    July 14, 2015Page: 56 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Health Level Seven Version 3 Reference Models The HL7 reference models are the foundational artifacts of HL7 version 3.0.
  • 57.
    July 14, 2015Page: 57 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3.0 Foundational Artifacts Reference Information Model Datatype Specification Vocabulary Specification The HL7 Reference Information Model is the information model from which all other information models and message specifications are derived. The HL7 Vocabulary Specification defines the set of all concepts that can be taken as valid values in an instance of a coded attribute or data type property. The HL7 Datatype Specification defines the structural format of the data carried in an attribute and influences the set of allowable values an attribute may assume.
  • 58.
    July 14, 2015Page: 58 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 Version 3.0 Reference Models Reference Information Model Data Type Specification Vocabulary Specification
  • 59.
    July 14, 2015Page: 59 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3.0 Foundational Artifacts Reference Information Model Datatype Specification Vocabulary Specification The HL7 Reference Information Model is the information model from which all other information models and message specifications are derived. The HL7 Vocabulary Specification defines the set of all concepts that can be taken as valid values in an instance of a coded attribute or data type property. The HL7 Datatype Specification defines the structural format of the data carried in an attribute and influences the set of allowable values an attribute may assume.
  • 60.
    July 14, 2015Page: 60 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 Version 3.0 Reference Information Model The HL7 Reference Information Model is the information model from which all other information models and message specifications are derived.
  • 61.
    July 14, 2015Page: 61 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 Reference Information Model  The HL7 Reference Information Model (RIM) is a static model of health and health care information as viewed within the scope of HL7 standards development activities.  It is the combined consensus view of information from the perspective of the HL7 working group and the HL7 international affiliates.  The RIM is the ultimate source from which the information-related content of all HL7 version 3.0 protocol specification standards is drawn.  The RIM is modeled using the modeling syntax defined by the Object Management Group’s Unified Modeling Language (UML).  UML is a graphical language for visualizing, specifying, constructing, and documenting the artifacts of a software-intensive system.
  • 62.
    July 14, 2015Page: 62 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Reference Information Model History  Development of the HL7 Reference Information Model began in April 1996.  The first draft of the RIM was created by consolidating data models developed by HL7 Technical Committees, contributed by HL7 Member Organizations, and published by national and international standards organizations and government bodies.  The first release of the RIM (v0.80) was adopted by the HL7 Technical Steering Committee at the January 1997 working group meeting.  The next two working group meetings focused on gaining familiarity with the draft RIM and implementing a process for obtaining and reconciling proposed enhancements to the model.  The RIM maintenance process became known as "RIM harmonization.” The first RIM harmonization meeting was held July 1997 in Indianapolis, Indiana.
  • 63.
    July 14, 2015Page: 63 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner RIM Development Process B X F E C A D G 1 0..* 0..* 1 0..* 1 0..* 0..1 0..*1 Model I Model II Model III A C B 0..* 0..* 0..* 1 X C B 0..* 0..* 0..* 1 D A B0..* 0..* 0..* 1
  • 64.
    July 14, 2015Page: 64 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Contributing Data Models circa April 1996  HL7 Technical Committees  Admission/Discharge/Transfer  Finance  Medical Records  Orders/Results  Patient Care  Standards Development Organizations  CEN TC251  DICOM  HL7 Member Organizations  Eli Lilly and Company  HBO and Company  Health Data Sciences  IBM Worldwide  Kaiser Permanente  Mayo Foundation  Hewlett Packard  National Health Programs  United Kingdom  Australia Abdul-Malik Shakir Manager, Information Administration Kaiser Foundation Health Plan, Inc. One Kaiser Plaza, Oakland, CA 94612 v: (510) 271-6856 f: (510) 271-6859 Email: 74353.1431@Compuserve.com
  • 65.
    July 14, 2015Page: 65 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
  • 66.
    July 14, 2015Page: 66 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner RIM Harmonization Process Change Proposal Preparation Prepare RIM Change Proposal Review RIM Change Proposal w/ Stewards Document Rationale for not supporting RIM change proposal Revise or Withdraw RIM Proposal Post RIM Change Proposals Submit RIM Change Proposal Post RIM Change Proposal Notify HL7 Members of RIM Change Proposal Posting Provide Comment on RIM Change Proposals Harmonization Meeting Discuss the RIM Change Proposal Revise, withdraw, or Table RIM Change Proposal Vote on RIM Change Proposal Apply Approved Changes to RIM Apply Technical Corrections Post Harmonization Meeting Review Present RIM Harmonization Report to TSC Hold TSC and/or Board Appeals Finalize Revised RIM
  • 67.
    July 14, 2015Page: 67 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Major Early Harmonization Themes  Ensure coverage of HL7 version 2.x. This set of change proposals introduced content to the draft model to ensure that it included all the information content of HL7 version 2.x.  Remove unsubstantiated content from the model. This set of change proposals focused on removing content from the draft model that the steward technical committee did not originate and could find no rationale for retaining.  Unified service action model. This set of change proposals introduced a concise, well-defined set of structures and vocabularies that address the information needs of a wide variety of clinical scenarios. This collection of proposals, known as USAM, involved the combined effort of multiple technical committees.  Ensure quality. This set of change proposals addressed inconsistencies in the draft model and conflicts between the model and the modeling style guide. It began the practice of recording and tracking open issues in the model.  Address the "left hand side" of the model. This set of change proposals introduced powerful structures and vocabularies for the non-clinical portions
  • 68.
    July 14, 2015Page: 68 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner USAM
  • 69.
    July 14, 2015Page: 69 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner The RIM Prior to USAM
  • 70.
    July 14, 2015Page: 70 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner The Unified Service Action Model
  • 71.
    July 14, 2015Page: 71 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Observation value : ANY interpretationCode : SET<CE> methodCode : SET<CE> targetSiteCode : SET<CD> SubstanceAdministration routeCode : CE approachSiteCode : SET<CD> doseQuantity : IVL<PQ> rateQuantity : IVL<PQ> doseCheckQuantity : SET<RTO> maxDoseQuantity : SET<RTO> Procedure methodCode : SET<CE> approachSiteCode : SET<CD> targetSiteCode : SET<CD> Supply quantity : PQ expectedUseTime : IVL<TS> Diet energyQuantity : PQ carbohydrateQuantity : PQ Document setId : II versionNumber : INT completionCode : CE storageCode : CE copyTime : TS Container capacityQuantity : PQ heightQuantity : PQ diameterQuantity : PQ capTypeCode : CE separatorTypeCode : CE barrierDeltaQuantity : PQ bottomDeltaQuantity : PQ Access approachSiteCode : CD targetSiteCode : CD gaugeQuantity : PQ Device manufacturerModelName : SC softwareName : SC localRemoteControlStateCode : CE alertLevelCode : CE lastCalibrationTime : TS Employee jobCode : CE jobTitleName : SC jobClassCode : CE salaryTypeCode : CE salaryQuantity : MO hazardExposureText : ED protectiveEquipmentText : ED LivingSubject administrativeGenderCode : CE birthTime : TS deceasedInd : BL deceasedTime : TS multipleBirthInd : BL multipleBirthOrderNumber : INT organDonorInd : BL Material formCode : CE LicensedEntity recertificationTime : TS Place mobileInd : BL addr : AD directionsText : ED positionText : ED gpsText : ST ManufacturedMaterial lotNumberText : ST expirationTime : IVL<TS> stabilityTime : IVL<TS> NonPersonLivingSubject strainText : ED genderStatusCode : CE Patient confidentialityCode : CE veryImportantPersonCode : CE Organization addr : BAG<AD> standardIndustryClassCode : CE Account name : ST balanceAmt : MO currencyCode : CE interestRateQuantity : RTO<MO,PQ> allowedBalanceQuantity : IVL<MO> Person addr : BAG<AD> maritalStatusCode : CE educationLevelCode : CE raceCode : SET<CE> disabilityCode : SET<CE> livingArrangementCode : CE religiousAffiliationCode : CE ethnicGroupCode : SET<CE> WorkingList ownershipLevelCode : CE PublicHealthCase detectionMethodCode : CE transmissionModeCode : CE diseaseImportedCode : CE PatientEncounter preAdmitTestInd : BL admissionReferralSourceCode : CE lengthOfStayQuantity : PQ dischargeDispositionCode : CE specialCourtesiesCode : SET<CE> specialAccommodationCode : SET<CE> acuityLevelCode : CE Other Acts Infrastructure (Structured documents) HEALTH LEVEL 7 REFERENCE INFORMATION MODEL VERSION 1.25 (RIM_0125) Reflects changes to RIM in RIM Harmonization Through 06/30/2003. Billboard produced by: Rochester Outdoor Advertising Roles DiagnosticImage subjectOrientationCode : CE QueryAck queryResponseCode : CS resultTotalQuantity : INT resultCurrentQuantity : INT resultRemainingQuantity : INT QueryContinuation startResultNumber : INT continuationQuantity : INT Table summary : ST width : ST rules : CS cellspacing : ST cellpadding : ST border : INT frame : CS TableStructure char : ST charoff : ST halign : CS valign : CS TableColumnStructure span : INT width : ST TableCell scope : CS abbr : ST axis : ST colspan : INT headers : SET<ED> rowspan : INT LocalAttr name : ST value : ST LocalMarkup descriptor : ST render : ST ignoreCode : CS LinkHtml href : ED name : ST rel : SET<CE> rev : SET<CE> title : ST ContextStructure localId : ST Infrastructure (Structured documents) Infrastructure (Communications) Enitites Message Control FinancialTransaction amt : MO creditExchangeRateQuantity : REAL debitExchangeRateQuantity : REAL InvoiceElement modifierCode : SET<CE> unitQuantity : RTO<PQ,PQ> unitPriceAmt : RTO<MO,PQ> netAmt : MO factorNumber : REAL pointsNumber : REAL FinancialContract paymentTermsCode : CE RoleHeir EntityHeir SortControl sequenceNumber : INT elementName : SC directionCode : CS QuerySpec modifyCode : CS responseElementGroupId : SET<II> responseModalityCode : CS responsePriorityCode : CS initialQuantity : INT initialQuantityCode : CE executionAndDeliveryTime : TS 0..n 1 0..n 1 RelationalExpression elementName : SC relationalOperatorCode : CS value : ST QueryBySelection SelectionExpression 0..n 1 0..n 1 LogicalExpression relationalConjunctionCode : CS 0..n 0..1 userAsRight 0..n rightSide 0..1 0..n 0..1 userAsLeft0..n leftSide0..1 QueryByParameter ParameterList Parameter id : II 0..n 0..10..n 0..1 0..1 0..n 0..1 0..n ParameterItem value : ANY semanticsText : ST DeviceTask parameterValue : LIST<ANY> ManagedParticipation id : SET<II> statusCode : SET<CS> ActHeir ActRelationship typeCode : CS inversionInd : BL contextControlCode : CS contextConductionInd : BL sequenceNumber : INT priorityNumber : INT pauseQuantity : PQ checkpointCode : CS splitCode : CS joinCode : CS negationInd : BL conjunctionCode : CS localVariableName : ST seperatableInd : BL Act classCode : CS moodCode : CS id : SET<II> code : CD negationInd : BL derivationExpr : ST text : ED statusCode : SET<CS> effectiveTime : GTS activityTime : GTS availabilityTime : TS priorityCode : SET<CE> confidentialityCode : SET<CE> repeatNumber : IVL<INT> interruptibleInd : BL levelCode : CE independentInd : BL uncertaintyCode : CE reasonCode : SET<CE> languageCode : CE 0..n 1 inboundRelationship 0..n target 1 0..n1 outboundRelationship 0..n source 1 Participation typeCode : CS functionCode : CD contextControlCode : CS sequenceNumber : INT negationInd : BL noteText : ED time : IVL<TS> modeCode : CE awarenessCode : CE signatureCode : CE signatureText : ED performInd : BL substitutionConditionCode : CE 0..n 1 0..n 1 RoleLink typeCode : CS effectiveTime : IVL<TS> Role classCode : CS id : SET<II> code : CE negationInd : BL addr : BAG<AD> telecom : BAG<TEL> statusCode : SET<CS> effectiveTime : IVL<TS> certificateText : ED quantity : RTO positionNumber : LIST<INT> 0..n 1 0..n 1 0..n1 outboundLink 0..n source 1 0..n1 inboundLink 0..n target 1 LanguageCommunication languageCode : CE modeCode : CE proficiencyLevelCode : CE preferenceInd : BL AttentionLine keyWordText : SC value : ST Entity classCode : CS determinerCode : CS id : SET<II> code : CE quantity : SET<PQ> name : BAG<EN> desc : ED statusCode : SET<CS> existenceTime : IVL<TS> telecom : BAG<TEL> riskCode : CE handlingCode : CE 0..n0..1 playedRole 0..n player 0..1 0..n0..1 scopedRole 0..n scoper 0..1 10..n 10..n Transmission id : II creationTime : TS securityText : ST 0..n 1 0..n 1 CommunicationFunction typeCode : CS telecom : TEL 1..n 0..* 1..n 0..* 1..* 0..* 1..* 0..* InfrastructureRoot templateId : SET<OID> realmCode : SET<CS> typeID : SET<OID> nullFlavor : CS QueryEvent queryId : II statusCode : CS ControlAct 0..1 1 0..1 1 Message versionCode : CS interactionId : II profileId : SET<II> processingCode : CS processingModeCode : CS acceptAckCode : CS attachmentText : SET<ED> responseCode : CS sequenceNumber : INT 0..1 0..n 0..1 payload 0..n Acknowledgement typeCode : CS messageWaitingNumber : INT messageWaitingPriorityCode : CE expectedSequenceNumber : INT 0..n 1 acknowledgedBy 0..n acknowledges 1 0..1 1 conveyedAcknowledgement 0..1 conveyingMessage 1 AcknowledgementDetail typeCode : CS code : CE text : ED location : SET<ST> 1 0..n 1 0..n Batch referenceControlId : II name : SC batchComment : SET<ST> transmissionQuantity : INT batchTotalNumber : SET<INT> 0..1 0..n 0..1 0..n RoleEntity Participation Acts The RIM After USAM Version 1.25 06/30/2003 Infrastructure
  • 72.
    July 14, 2015Page: 72 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Normative R6 RIM Class Diagram Version 2.44 11/22/2013
  • 73.
    July 14, 2015Page: 73 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Entity and Act  Entity a physical thing or an organization/group of physical things capable of participating in Acts. This includes living subjects, organizations, material, and places.  Act a discernible action of interest in the healthcare domain. An instance of Act is a record of that action. Acts definitions (master files), orders, plans, and performance records (events) are all represented by an instance of Act. Entity Act
  • 74.
    July 14, 2015Page: 74 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Entity classCode : CS determinerCode: CS code: CE statusCode : CS id : II Act classCode : CS moodCode: CS code: CD statusCode : CS effectiveTime : GTS id : II RIM Core Classes  Entity - a physical thing or an organization/group of physical things capable of participating in Acts. This includes living subjects, organizations, material, and places.  Act – a discernible action of interest in the healthcare domain. An instance of Act is a record of that action. Acts definitions (master files), orders, plans, and performance records (events) are all represented by an instance of Act. 0..* 0..*
  • 75.
    July 14, 2015Page: 75 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Entity classCode : CS determinerCode: CS code: CE statusCode : CS id : II Role classCode : CS code: CE effectiveTime : IVL<TS> statusCode : CS id : II Act classCode : CS moodCode: CS code: CD statusCode : CS effectiveTime : GTS id : II RIM Core Classes 0..* 0..*1 0..*plays
  • 76.
    July 14, 2015Page: 76 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner 0..1 0..* 0..1 0..* plays scopes Entity classCode : CS determinerCode: CS code: CE statusCode : CS id : II Role classCode : CS code: CE effectiveTime : IVL<TS> statusCode : CS id : II Act classCode : CS moodCode: CS code: CD statusCode : CS effectiveTime : GTS id : II RIM Core Classes  Role – a classification/specialization of an Entity defined by the relationship of the playing Entity to a scoping Entity. An example of Role is “Employee”. An employee is a classification attributed to a person which has an employment relationship with an organization (Employer). 0..* 0..*
  • 77.
    July 14, 2015Page: 77 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Entity classCode : CS determinerCode: CS code: CE statusCode : CS id : II Role classCode : CS code: CE effectiveTime : IVL<TS> statusCode : CS id : II Participation typeCode : CS time : IVL<TS> statusCode : CS Act classCode : CS moodCode: CS code: CD statusCode : CS effectiveTime : GTS id : II 0..1 0..* 1 0..* 1 0..* RIM Core Classes  Participation – an association between a Role and an Act representing the function assumed by the Role within the context of the Act. A single Role may participate in multiple Acts and a single Act may have multiple participating Roles. A single Participation is always an association between a particular Role and a particular Act. 0..1 0..* plays scopes
  • 78.
    July 14, 2015Page: 78 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Entity classCode : CS determinerCode: CS code: CE statusCode : CS id : II Role classCode : CS code: CE effectiveTime : IVL<TS> statusCode : CS id : II Participation typeCode : CS time : IVL<TS> statusCode : CS Act classCode : CS moodCode: CS code: CD statusCode : CS effectiveTime : GTS id : II 0..1 0..* 1 0..* 1 0..* Act Relationship typeCode : CS 1 1 0..* 0..* RIM Core Classes  Act relationship – an association between two Acts. This includes Act to Act associations such as collector/component, predecessor/successor, and cause/outcome. The semantics of the association is captured by the Act Relationship attributes. 0..1 0..* plays scopes
  • 79.
    July 14, 2015Page: 79 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Entity classCode : CS determinerCode: CS code: CE statusCode : CS id : II Role classCode : CS code: CE effectiveTime : IVL<TS> statusCode : CS id : II Participation typeCode : CS time : IVL<TS> statusCode : CS Act classCode : CS moodCode: CS code: CD statusCode : CS effectiveTime : GTS id : II 0..1 0..* 1 0..* 1 0..* Role Link typeCode : CS effectiveTime : IVL<TS> Act Relationship typeCode : CS RIM Core Classes  Role Link – An association between two Roles. It is used to capture relationships that exists between Entities other than the scoping relationships. A 0..1 0..* plays scopes single Role may have a Role Link with multiple other Roles. A single Role Link is always between two distinct instances of Role. 1 1 0..* 0..* 1 1 0..* 0..*
  • 80.
    July 14, 2015Page: 80 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Definition of RIM Core Classes  Act – a discernible action of interest in the healthcare domain. An instance of Act is a record of that action. Acts definitions (master files), orders, plans, and performance records (events) are all represented by an instance of Act.  Act relationship – an association between two Acts. This includes Act to Act associations such as collector/component, predecessor/successor, and cause/outcome. The semantics of the association is captured by the Act Relationship attributes.  Entity - a physical thing or an organization/group of physical things capable of participating in Acts. This includes living subjects, organizations, material, and places.  Participation – an association between a Role and an Act representing the function assumed by the Role within the context of the Act. A single Role may participate in multiple Acts and a single Act may have multiple participating Roles. A single Participation is always an association between a particular Role and a particular Act.  Role – a classification/specialization of an Entity defined by the relationship of the playing Entity to a scoping Entity. An example of Role is “Employee”. An employee is a classification attributed to a person which has an employment relationship with an organization (Employer).  Role Link – An association between two Roles. It is used to capture relationships that exists between Entities other than the scoping relationships. A single Role may have a Role Link with multiple other Roles. A single Role Link is always between two distinct instances of Role.
  • 81.
    July 14, 2015Page: 81 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Entity classCode : CS determinerCode: CS code: CE statusCode : CS id : II Role classCode : CS code: CE effectiveTime : IVL<TS> statusCode : CS id : II Participation typeCode : CS time : IVL<TS> statusCode : CS Act classCode : CS moodCode: CS code: CD statusCode : CS effectiveTime : GTS id : II 0..1 0..* 1 0..* 1 0..* Role Link typeCode : CS effectiveTime : IVL<TS> Act Relationship typeCode : CS RIM Backbone Classes 0..1 0..* plays scopes 1 1 0..* 0..* 1 1 0..* 0..*
  • 82.
    July 14, 2015Page: 82 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner RIM Backbone Classes Entity classCode : CS determinerCode: CS code: CE statusCode : CS id : II Role classCode : CS code: CE effectiveTime : IVL<TS> statusCode : CS id : II Participation typeCode : CS time : IVL<TS> statusCode : CS Act classCode : CS moodCode: CS code: CD statusCode : CS effectiveTime : GTS id : II 0..1 0..* 1 0..* 1 0..* 0..1 0..* plays scopes
  • 83.
    July 14, 2015Page: 83 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner RIM Backbone Classes Entity classCode : CS determinerCode: CS code: CE statusCode : CS id : II Role classCode : CS code: CE effectiveTime : IVL<TS> statusCode : CS id : II Participation typeCode : CS time : IVL<TS> statusCode : CS Act classCode : CS moodCode: CS code: CD statusCode : CS effectiveTime : GTS id : II 0..1 0..* 1 0..* 1 0..* 0..1 0..* plays scopes Living Subject Place Organization Material Licensed Entity Patient Access Employee Managed Participation Observation Supply Patient Encounter Procedure Device Task Substance Administration Financial Transaction Invoice Element Financial Contract Account Working List Control Act
  • 84.
    July 14, 2015Page: 84 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 RIM Class Diagram
  • 85.
    July 14, 2015Page: 85 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Entity classCode : CS determinerCode : CS statusCode : CS code: CE Role classCode : CS effectiveTime : IVL<TS> code: CE Participation typeCode : CS time : IVL<TS> statusCode : CS Act classCode : CS moodCode : CS statusCode : CS code: CD effectiveTime : GTS 0..1 0..* 1 0..* 1 0..* RIM Core Attribute Value Sets Entity Class Code • Living Subject • Person • Organization • Material • Place • ... Role Class Code • Patient • Provider • Employee • Specimen • Certified Practitioner • ... Participation Type Code • Performer • Author • Witness • Subject • Destination • ... Act Mood Code • Definition • Intent • Order • Event • Criterion • ... Act Class Code • Observation • Procedure • Supply • Substance Admin • Financial • ... Entity Determiner Code • Kind • Instance • Quantified Group 0..1 0..* plays scopes
  • 86.
    July 14, 2015Page: 86 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Coded Structural Attributes  RIM coded attributes with a data type of Coded Simple (CS) are referred to as “structural”  A CS data type is assigned to an attribute when the only allowable code values for the attribute are determined by HL7  There are 18 such attributes in the RIM. Each of them is bound to a vocabulary value set defined by HL7.  These attributes are referred to as “structural” because their presence in the model eliminates the need to include other structural model components such as classes, generalizations, and associations.  Vocabulary value sets bound to coded structural attributes are normative.
  • 87.
    July 14, 2015Page: 87 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Coded “Structural” Attributes  Act.classCode  Act.moodCode  Act.statusCode  ActRelationship.checkpointCode  ActRelationship.conjunctionCode  ActRelationship.joinCode  ActRelationship.splitCode  ActRelationship.Type  ActRelationship.contextControlCode  Entity.classCode  Entity.determinerCode  Entity.statusCode  ManagedParticipation.statusCode  Participation.contextControlCode  Participation.typeCode  Role.classCode  Role.statusCode  RoleLink.typeCode
  • 88.
    July 14, 2015Page: 88 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Act.classCode 3.1.1.1 Act.classCode :: CS (1..1) Mandatory Vocabulary domain: ActClass (CNE) Attribute description: A code specifying the major type of Act that this Act-instance represents. Constraints: The classCode domain is a tightly controlled vocabulary, not an external or user-defined vocabulary. Every Act-instance must have a classCode. If the act class is not further specified, the most general Act.classCode (ACT) is used. The Act.classCode must be a generalization of the specific Act concept (e.g., as expressed in Act.code), in other words, the Act concepts conveyed in an Act must be specializations of the Act.classCode. Especially, the classCode is not a "modifier" or the Act.code that can alter the meaning of a class code. (See Act.code for contrast.) Name DatatypeCardinalityUsageValue DomainCoding Strength
  • 89.
    July 14, 2015Page: 89 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Act.moodCode 3.1.1.2 Act.moodCode :: CS (1..1) Mandatory Vocabulary domain: ActMood (CNE) Attribute description: A code distinguishing whether an Act is conceived of as a factual statement or in some other manner as a command, possibility, goal, etc. Constraints: An Act-instance must have one and only one moodCode value. The moodCode of a single Act-instance never changes. Mood is not state. To describe the progression of a business activity from defined to planned to executed, etc. one must instantiate different Act- instances in the different moods and link them using ActRelationship of general type "sequel". (See ActRelationship.typeCode.) Discussion: The Act.moodCode includes the following notions: (1) event, i.e., factual description of an actions that occurred; (2) definition of possible actions and action plans (the master file layer); (3) intent, i.e., an action plan instantiated for a patient as a care plan or order; (4) goal, i.e., an desired outcome attached to patient problems and plans; and (5) criterion, i.e., a predicate used to evaluate a logical expression
  • 90.
    July 14, 2015Page: 90 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Act.code 3.1.1.4 Act.code :: CD (0..1) Vocabulary domain: ActCode (CWE) Attribute description: A code specifying the particular kind of Act that the Act-instance represents within its class. Constraints: The kind of Act (e.g. physical examination, serum potassium, inpatient encounter, charge financial transaction, etc.) is specified with a code from one of several, typically external, coding systems. The coding system will depend on the class of Act, such as LOINC for observations, etc. Conceptually, the Act.code must be a specialization of the Act.classCode. This is why the structure of ActClass domain should be reflected in the superstructure of the ActCode domain and then individual codes or externally referenced vocabularies subordinated under these domains that reflect the ActClass structure.
  • 91.
    July 14, 2015Page: 91 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner ActRelationship.typeCode 3.1.2.1 ActRelationship.typeCode :: CS (1..1) Mandatory Vocabulary domain: ActRelationshipType (CNE) Attribute description: A code specifying the meaning and purpose of every ActRelationship instance. Each of its values implies specific constraints to what kinds of Act objects can be related and in which way. Discussion: The types of act relationships fall under one of 5 categories: 1.) (De)-composition, with composite (source) and component (target). 2.) Sequel which includes follow-up, fulfillment, instantiation, replacement, transformation, etc. that all have in common that source and target are Acts of essentially the same kind but with variances in mood and other attributes, and where the target exists before the source and the source refers to the target that it links back to. 3.) Pre-condition, trigger, reason, contraindication, with the conditioned Act at the source and the condition or reason at the target. 4.) Post-condition, outcome, goal and risk, with the Act at the source having the outcome or goal at the target. 5.) A host of functional relationships including support, cause, derivation, etc. generalized under the notion of "pertinence".
  • 92.
    July 14, 2015Page: 92 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Participation.typeCode 3.1.3.1 Participation.typeCode :: CS (1..1) Mandatory Vocabulary domain: ParticipationType (CNE) Attribute description: A code specifying the kind of Participation or involvement the Entity playing the Role associated with the Participation has with regard to the associated Act. Constraints: The Participant.typeCode contains only categories that have crisp semantic relevance in the scope of HL7. It is a coded attribute without exceptions and no alternative coding systems allowed.
  • 93.
    July 14, 2015Page: 93 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Entity.classCode 3.2.1.1 Entity.classCode :: CS (1..1) Mandatory Vocabulary domain: EntityClass (CNE) Attribute description: An HL7 defined value representing the class or category that the Entity instance represents. Examples: Person, Animal, Chemical Substance, Group, Organization Rationale: Due to the extremely large number of potential values for a code set representing all physical things in the universe, the class code indicates both the subtype branch of the Entity hierarchy used as well as a high level classifier to represent the instance of Entity. This can be used to constrain the eligible value domains for the Entity.code attribute.
  • 94.
    July 14, 2015Page: 94 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Entity.determinerCode 3.2.1.2 Entity.determinerCode :: CS (1..1) Mandatory Vocabulary domain: EntityDeterminer (CNE) Attribute description: An HL7 defined value representing whether the Entity represents a kind-of or a specific instance. Examples: 1 human being (an instance), 3 syringes (quantified kind) or the population of Indianapolis (kind of group) Rationale: An Entity may at times represent information concerning a specific instance (the most common), a quantifiable group with common characteristics or a general type of Entity. This code distinguishes these different representations.
  • 95.
    July 14, 2015Page: 95 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Entity.code 3.2.1.4 Entity.code :: CE (0..1) Vocabulary domain: EntityCode (CWE) Attribute description: A value representing the specific kind of Entity the instance represents. Examples: A medical building, a Doberman Pinscher, a blood collection tube, a tissue biopsy. Rationale: For each Entity, the value for this attribute is drawn from one of several coding systems depending on the Entity.classCode, such as living subjects (animal and plant taxonomies), chemical substance (e.g., IUPAC code), organizations, insurance company, government agency, hospital, park, lake, syringe, etc. It is possible that Entity.code may be so fine grained that it represents a single instance. An example is the CDC vaccine manufacturer code, modeled as a concept vocabulary, when in fact each concept refers to a single instance.
  • 96.
    July 14, 2015Page: 96 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Role.classCode 3.3.1.1 Role.classCode :: CS (1..1) Mandatory Vocabulary domain: RoleClass (CNE) Attribute description: A code specifying the major category of a Role as defined by HL7 vocabulary.
  • 97.
    July 14, 2015Page: 97 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Role.code 3.3.1.3 Role.code :: CE (0..1) Vocabulary domain: RoleCode (CWE) Attribute description: A code further specifying the kind of Role. Discussion: The Role.code must conceptually be a proper specialization of Role.classCode. Role.code does not modify Role.classCode. Rather, each is a complete concept or a Role-like relationship between two Entities, but Role.code may be more specific than Role.classCode. The Role.code may not be coded if only an un-coded name for the type of role is commonly used.
  • 98.
    July 14, 2015Page: 98 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner RoleLink.typeCode 3.3.2.1 RoleLink.typeCode :: CS (1..1) Mandatory Vocabulary domain: RoleLinkType (CNE) Attribute description: A code specifying the kind of connection represented by this RoleLink, e.g., has-part, has-authority.
  • 99.
    July 14, 2015Page: 99 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Accessing the RIM http://www.hl7.org/participate/toolsandresources.cfm?ref=nav
  • 100.
    July 14, 2015Page: 100 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner RoseTree
  • 101.
    July 14, 2015Page: 101 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Model Browsing Tree - Attributes Packages (AKA Subject Areas) Classes Attributes Datatype Datatype Components (AKA Properties) Descriptive Text
  • 102.
    July 14, 2015Page: 102 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Model Browsing Tree - Relationships Source Class (AKA Focal Class) Relationships Distal Class Descriptive Text
  • 103.
    July 14, 2015Page: 103 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Model Browsing Tree - States States Transitions Descriptive Text
  • 104.
    July 14, 2015Page: 104 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner State Machine  The HL7 Reference Information Model includes state machines for the Entity, Role, ManagedParticipation, and Act classes.  A state machine specifies the allowable states and valid state transitions for a given class.  A class transitions from one state to another sometimes triggers one or more interactions.
  • 105.
    July 14, 2015Page: 105 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Entity State Machine normal active inactive null active inactivecreate revise revise reactivate inactivate nullified nullify
  • 106.
    July 14, 2015Page: 106 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Role State Machine
  • 107.
    July 14, 2015Page: 107 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Managed Participation State Machine normal pending active completed cancelled pending active completed null revise revise revise complete reactivate activate nullified nullify cancelled cancel createcreatecreate
  • 108.
    July 14, 2015Page: 108 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Act State Machine
  • 109.
    July 14, 2015Page: 109 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 RIM Class Diagram
  • 110.
    July 14, 2015Page: 110 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner RIM is First ISO/HL7 Standard  On August 3, 2006 the HL7 Reference Information Model was published as an ISO standard (21731:2006).  The RIM was accepted and approved through the ISO Technical Committee 215 – Health Informatics.  The RIM is the first publication of an ISO/HL7 standard.  Other ISO/HL7 collaborations include:  HL7 V2.5 Messaging Standard  Clinical Data Architecture –  Common Terminology Server  Structured Product Labeling  Annotated Electrocardiogram  Individual Case Safety Report
  • 111.
    July 14, 2015Page: 111 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner RIM From Draft to Normative  Apr 96 – Dec 96: Initial development  Jan 97 – Jan 00: Pre-USAM Harmonization  Jan 00 – Jul 03: Post-USAM and Pre-Normative  Normative Releases: – V1.25 Release 1.0: Jul 2003 – V2.29 Release 2.0: Oct 2009 – V2.33 Release 3.0: Nov 2010 – V2.36 Release 4.0: Jul 2011 – V2.40 Release 5.0: Jul 2012 – V2.46 Release 6.0: Dec 2013
  • 112.
    July 14, 2015Page: 112 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3.0 Foundational Artifacts Reference Information Model Datatype Specification Vocabulary Specification The HL7 Reference Information Model is the information model from which all other information models and message specifications are derived. The HL7 Vocabulary Specification defines the set of all concepts that can be taken as valid values in an instance of a coded attribute or data type property. The HL7 Datatype Specification defines the structural format of the data carried in an attribute and influences the set of allowable values an attribute may assume.
  • 113.
    July 14, 2015Page: 113 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3.0 Foundational Artifacts Reference Information Model Datatype Specification Vocabulary Specification The HL7 Reference Information Model is the information model from which all other information models and message specifications are derived. The HL7 Vocabulary Specification defines the set of all concepts that can be taken as valid values in an instance of a coded attribute or data type property. The HL7 Datatype Specification defines the structural format of the data carried in an attribute and influences the set of allowable values an attribute may assume.
  • 114.
    July 14, 2015Page: 114 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 Version 3.0 Data Type Specification The HL7 v3 Abstract Datatype Specification defines the structural format of the data carried in an attribute and influences the set of allowable values an attribute may assume.
  • 115.
    July 14, 2015Page: 115 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 Version 3.0 Data Types  HL7 data types define the structure and constrain the allowable values of attributes in the RIM.  The HL7 v3 abstract data type specification declares the set of data types, identifies components of complex types, and defines relationships between data types.  The HL7 data type implementation technology specification defines constraints and operations for data types and describes how data types are to be represented in XML.  Data types are reusable atomic building blocks used to create all HL7 V3 information structures.  Each RIM attribute is assigned one data type; each data type is assigned to zero, one, or more RIM attribute.
  • 116.
    July 14, 2015Page: 116 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 Version 3.0 Data Types (R1)  AD: Postal Address  ANY: DataValue  BAG: Bag  BL: Boolean  CD: Concept Descriptor  CE: Coded With Equivalents  CS: Coded Simple Value  ED: Encapsulated Data  EN: Entity Name  GTS: General Timing Specification  HIST: History  II: Instance Identifier  INT: Integer Number  IVL: Interval  LIST: Sequence  MO: Monetary Amount  ON: Organization Name  PN: Person Name  PPD: Parametric Probability Distribution  PQ: Physical Quantity  REAL: Real Number  RTO: Ratio  SC: Character String with Code  SET: Set  ST: Character String  TEL: Telecommunication Address  TN: Trivial Name  TS: Point in Time  UVP: Uncertain Value - Probabilistic
  • 117.
    July 14, 2015Page: 117 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Datatype Class Diagram T Sequence : LIST T Set : SET T Bag : BAG Quantity : QTY IntegerNumber : INT RealNumber : REAL PhysicalQuantity : PQ MonetaryAmount : MO Ratio : RTO PointInTime : TS Boolean : BL CharacterString : ST ConceptDescriptor : CD CodedValue : CV InstanceIdentifier : II TelecommunicationAddress : TEL T Interval : IVL DataValue : ANY BinaryData : BIN List_of_Boolean : LIST<BL> <<extends>> EncapsulatedData : ED <<extends>> ConceptRole : CR CodedSimpleValue : CS <<restricts>> CodedWithEquivalents : CE ISO_object_identifier : OID List_ADXP : LIST<ADXP> PostalAndResidentialAddress : AD <<extends>> AddressPart : ADXP PersonNameType : PN List_ENXP : LIST<ENXP> EntityNamePart : ENXP T PeriodicIntervalOfTime : PIVL T EventRelatedPeriodicIntervalOfTime : EIVL GeneralTimingSpecification : GTS Set_of_TS : SET<TS> <<extends>> T : T T Annotated : ANT T History_item : HXIT T History : HIST Set_of_HXIT : SET<HXIT<T>> T UncertainValueNarrative : UVN <<extends>> T UncertainValueProbabilistic : UVP T NonParametricProbabilityDistribution : NPPD Set_UVP : SET<UVP<T>> T ParametricProbabilityDistribution : PPD UniversalResourceLocator : URL <<extends>> OrganizationName : ON <<extends>> <<extends>><<extends>> <<extends>> <<extends>> <<extends>> <<extends>> <<extends>> <<extends>> <<extends>> <<extends>> <<restricts>> <<restricts>> <<restricts>> <<extends>> <<extends>> <<extends>><<extends>> <<extends>> <<extends>> <<extends>> <<extends>> <<extends>><<extends>> <<restricts>> <<extends>> <<extends>> <<extends>> <<extends>> <<extends>> <<extends>>
  • 118.
    July 14, 2015Page: 118 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner AddressDataTypes + AddressPart : ADXP + PostalAndResidentialAddress : AD + TelecommunicationAddress : TEL + UniversalResourceLocator : URL CharacterStringDatatypes + CharacterString : ST + EncapsulatedData : ED + StringWithCode : SC ConceptDescriptorDataTypes + CodedSimpleValue : CS + CodedValue : CV + CodedWithEquivalents : CE + ConceptDescriptor : CD + ConceptRole : CR AnyDataType + DataValue : ANY ParameterizedDataTypes + Bag : BAG + Interval : IVL + Sequence : LIST + Set : SET IdentifierDataTypes + ISOObjectIdentifier : OID + InstanceIdentifier : II EntityNameDataTypes + EntityName : EN + EntityNamePart : ENXP + OrganizationName : ON + PersonNameType : PN + TrivialName : TN QuantityDataTypes + BinaryData : BIN + Boolean : BL + IntegerNumber : INT + MonetaryAmount : MO + PhysicalQuantity : PQ + Quantity : QTY + Ratio : RTO + RealNumber : REAL TimingExpressionDatatypes + GeneralTimingSpecification : GTS + GeneralTimingSpecificationTerm + PointInTime : TS HL7 Data Type Packages
  • 119.
    July 14, 2015Page: 119 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Basic Datatype Descriptions Name Symbol Description Boolean BL The Boolean type stands for the values of two-valued logic. A Boolean value can be either true or false. Encapsulated Data ED Data that is primarily intended for human interpretation or for further machine processing outside the scope of this specification. This includes unformatted or formatted written language, multimedia data, or structured information in as defined by a different standard (e.g., XML-signatures.) Instead of the data itself, an ED may contain only a reference (see TEL.) Note that the ST data type is a specialization of the ED data type when the ED media type is text/plain. Character String ST Text data, primarily intended for machine processing (e.g., sorting, querying, indexing, etc.) Used for names, symbols, and formal expressions.) Note that the ST data type is a specialization of the ED data type when the ED media type is text/plain. Coded Simple Value CS Coded data, consists of a code and display name. The code system and code system version is fixed by the context in which the CS value occurs. CS is used for coded attributes that have a single HL7-defined value set. Coded Value CV Coded data, consists of a code, display name, code system, and original text. Used when a single code value must be sent. Coded With Equivalents CE Coded data, consists of a coded value (CV) and, optionally, coded value(s) from other coding systems that identify the same concept. Used when alternative codes may exist. Concept Descriptor CD Coded data, is like a CE with the extension of modifiers. Modifiers for codes have an optional role name and a value. Modifiers allow one to express, e.g., "FOOT, LEFT" as a postcoordinated term built from the primary code "FOOT" and the modifier "LEFT".
  • 120.
    July 14, 2015Page: 120 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Basic Datatype Descriptions Name Symbol Description Instance Identifier II An identifier to uniquely identify an individual instance. Examples are medical record number, order number, service catalog item number, etc. Based on the ISO Object Identifier (OID) Telecommunication Address TEL A telephone number or e-mail address specified as a URL. In addition, this type contains a time specification when that address is to be used, plus a code describing the kind of situations and requirements that would suggest that address to be used (e.g., work, home, pager, answering machine, etc.) Postal Address AD For example, a mailing address. Typically includes street or post office Box, city, postal code, country, etc. Entity Name EN A name of a person, organization, place, or thing. Can be a simple character string or may consist of several name parts that can be classified as given name, family name, nickname, suffix, etc. Person Name PN A name of a person. Person names usually consist of several name parts that can be classified as given, family, nickname etc. PN is a restriction of EN. Organization Name ON A name of an organization. ON name parts are typically not distinguished, but may distinguish the suffix for the legal standing of an organization (e.g. "Inc.", "Co.", "B.V.", "GmbH", etc.) from the name itself. ON is a restriction of EN. Trivial Name TN A restriction of EN that is equivalent with a plain character string (ST). Typically used for the names of things, where name parts are not distinguished. Integer Number INT Positive and negative whole numbers typically the results of counting and enumerating. The standard imposes no bounds on the size of integer numbers.
  • 121.
    July 14, 2015Page: 121 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Basic Datatype Descriptions Name Symbol Description Decimal number REAL Fractional numbers. Typically used whenever quantities are measured, estimated, or computed from other real numbers. The typical representation is decimal, where the number of significant decimal digits is known as the precision. Physical Quantity PQ A dimensioned quantity expressing the result of measurement. It consists of a real number value and a physical unit. Physical quantities are often constrained to a certain dimension by specifying a unit representing the dimension (e.g. m, kg, s, kcal/d, etc.) However, physical quantities should not be constrained to any particular unit (e.g., should not be constrained to centimeter instead of meter or inch.) Monetary Amount MO The amount of money in some currency. Consists of a value and a currency denomination (e.g., U.S.$, Pound sterling, Euro, Indian Rupee.) Ratio RTO A quantity explicitly including both a numerator and a denominator (e.g. 1:128.) Only in the rare cases when the numerator and denominator must stand separate should the Ratio data type should be used. Normally, the REAL, PQ, or MO data types are more appropriate. Point in Time TS A time stamp. General Timing Specification GTS One or more time intervals used to specify the timing of events. Every event spans one time interval (occurrence interval). A repeating event is timed through a sequence of such occurrence intervals. Such timings are often specified not directly as a sequence of intervals but as a rule, e.g., "every other day (Mon - Fri) between 08:00 and 17:00 for 10 minutes."
  • 122.
    July 14, 2015Page: 122 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner ED: Encapsulated Data Name Type Status Definition BIN BIN mandatory The binary data. type CS mandatory Identifies the encoding of the data and a method to interpret the data. charset CS optional Where applicable, specifies the character set and character encoding used. The charset may be implied or fixed by the ITS. language CS optional Where applicable, specifies the language of text data. compression CS optional Indicates whether the raw byte data is compressed, and what compression algorithm was used. reference TEL optional A telecommunication address that resolves to the binary data. integrityCheck BIN optional A short binary value representing a cryptographically strong checksum over the binary data. integrityCheckAlgorithm CS optional Specifies the algorithm used to compute the integrityCheck value. thumbnail ED optional An abbreviated rendition of the full data.
  • 123.
    July 14, 2015Page: 123 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner ST: Character String Name Type Status Definition data BIN mandatory The binary data of the character string. charset CS optional Specifies the character set and character encoding used. language CS optional Specifies the language of text data.
  • 124.
    July 14, 2015Page: 124 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner CD: Concept Descriptor Name Description code A string containing the value of the code (e.g., "F150") displayName A string containing a short, human-readable description of the code. ("Ford F150 Full-size Pickup Truck") codeSystem An Object Identifier (OID) that uniquely identifies the code system to which the code belongs (e.g., "106.75.314.67.89.24," where this uniquely identifies Ford Motor Company's set of model numbers). codeSystemName A string containing a short, human-readable description of the code system (e.g., "Ford Car and Truck Models "). codeSystemVersion A string qualifying the version of the code system (e.g., "Model Year 2001"). originalText This is the text, phrase, etc., that is the basis for the coding. (e.g., "The new truck purchased for hospital facility maintenance was a Ford model F150 ..."). modifier Some code systems permit modifiers, additional codes that refine the meaning represented by the primary code. HL7 Version 3 accommodates a list of modifiers. Continuing with our truck example, the list of modifiers "Body- ECAB, Eng-V8, EM-CE" modify "F150" to designate that the truck has an extended cab, V8 engine, and California Emissions package. "Body-," "Eng-," and "EM" designate the roles (body, engine, emissions) represented by the codes "ECAB," "V8," and "CE." translation Quite often in an interfaced environment, codes need to be translated into one or more other coding systems. In our example, the California DMV may have their own code
  • 125.
    July 14, 2015Page: 125 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Concept Descriptor Datatypes Name Type Status code ST mandatory displayName ST optional Name Type Status code ST mandatory displayName ST optional codeSystem OID mandatory codeSystemName ST optional codeSystemVersion ST optional originalText ST optional Name Type Status code ST mandatory displayName ST optional codeSystem OID mandatory codeSystemName ST optional codeSystemVersion ST optional originalText ST optional translation SET<CV> optional CS: Coded Simple CV: Coded Value CE: Coded With Equivalents
  • 126.
    July 14, 2015Page: 126 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner II: Instance Identifier Name Type Status Definition extension ST optional The value of the identifier, unique within its assigning authority's namespace. root OID mandatory A unique identifier that guarantees the global uniqueness of the instance identifier. The root alone may be the entire instance identifier, an extension value is not needed. assigningAuthorityName ST optional A human readable name or mnemonic for the assigning authority. This name is provided solely for the convenience of unaided humans interpreting an II value. Note: no automated processing must depend on the assigning authority name to be present in any form. validTime IVL<TS> optional If applicable, specifies during what time the identifier is valid. By default, the identifier is valid indefinitely. Any specific interval may be undefined on either side indicating unknown effective or expiry time. Note: identifiers for information objects in computer systems should not have restricted valid times, but should be globally unique at all times. The identifier valid time is provided mainly for real-world identifiers, whose maintenance policy may include expiry (e.g., credit card numbers.)
  • 127.
    July 14, 2015Page: 127 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Tel: Telecommunication Address Name Type Status Definition URL URL mandatory The essence of a telecommunication address is a Universal Resource Locator. use SET<CS> optional A code advising a system or user which telecommunication address in a set of like addresses to select for a given telecommunication need. validTime GTS optional Identifies the periods of time during which the telecommunication address can be used. For a telephone number, this can indicate the time of day in which the party can be reached on that telephone. For a web address, it may specify a time range in which the web content is promised to be available under the given address.
  • 128.
    July 14, 2015Page: 128 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner AD: Postal Address Name Type Status Definition LIST<ADXP> mandatory The address data use SET<CS> optional A code advising a system or user which address in a set of like addresses to select for a given purpose validTime GTS optional Identifies the periods of time during which the address can be used. Typically used to refer to different addresses for different times of the year or to refer to historical addresses. Name Type Status Definition ST ST mandatory The address part data type CS optional Indicates whether an address part is the street, city, country, postal code, post box, etc. ADXP: Postal Address Part
  • 129.
    July 14, 2015Page: 129 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner EN: Entity Name Name Type Status Default Constraint Definition ST mandatory NULL The entity name part data type CS optional NULL EntityNamePartType Indicates whether the name part is a given name, family name, prefix, suffix, etc. qualifier SET<CS> optional NULL EntityNameQualifier A set of codes each of which specifies a certain subcategory of the name part in addition to the main name part type Name Type Status Default Constraint Definition LIST<ENXP> mandatory NULL The name data use SET<CS> optional NULL NamePurpose A code advising a system or user which name in a set of names to select for a given purpose validTime IVL<TS> optional NULL Identifies the interval of time during which the name was used. Typically used to record historical names. ENXP: Entity Name Part Entity Name Specializations: TN: Trivial Name PN: Person Name ON: Organization Name
  • 130.
    July 14, 2015Page: 130 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner RTO: Ratio Name Type Status Definition numerator QTY mandatory The numerator of the ratio. denominator QTY mandatory The denominator of the ratio The QTY data type is an abstract generalization that stands for INT, REAL, PQ, and MO.
  • 131.
    July 14, 2015Page: 131 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner PQ: Physical Quantity Name Type Status Definition value REAL mandatory The magnitude of the quantity measured in terms of the unit unit CS mandatory The unit of measure original value REAL optional The magnitude of the quantity measured in terms of the original unit. original unit CV optional The original unit of measure.
  • 132.
    July 14, 2015Page: 132 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner MO: Monetary Amount Name Type Status Default Constraint Definition value REAL mandatory NULL The magnitude of the monetary amount in terms of the currency unit. currency CS mandatory NULL ISO 4217 The currency unit
  • 133.
    July 14, 2015Page: 133 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Additional Datatypes and Collections  BL: Boolean  INT: Integer  Real: Real  Precision :: Int  TS: Point in Time  Offset :: PQ  Calendar :: CS  Precision :: INT  Timezone :: PQ  SET  LIST  BAG  IVL  Low  Center  Width  High
  • 134.
    July 14, 2015Page: 134 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3.0 Foundational Artifacts Reference Information Model Datatype Specification Vocabulary Specification The HL7 Reference Information Model is the information model from which all other information models and message specifications are derived. The HL7 Vocabulary Specification defines the set of all concepts that can be taken as valid values in an instance of a coded attribute or data type property. The HL7 Datatype Specification defines the structural format of the data carried in an attribute and influences the set of allowable values an attribute may assume.
  • 135.
    July 14, 2015Page: 135 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3.0 Foundational Artifacts Reference Information Model Datatype Specification Vocabulary Specification The HL7 Reference Information Model is the information model from which all other information models and message specifications are derived. The HL7 Vocabulary Specification defines the set of all concepts that can be taken as valid values in an instance of a coded attribute or data type property. The HL7 Datatype Specification defines the structural format of the data carried in an attribute and influences the set of allowable values an attribute may assume.
  • 136.
    July 14, 2015Page: 136 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 Version 3.0 Vocabulary Specification The HL7 Vocabulary Specification defines the set of all concepts that can be taken as valid values in an instance of a coded attribute or message element.
  • 137.
    July 14, 2015Page: 137 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 V3 Vocabulary Specification  The HL7 V3 Vocabulary Specification defines vocabulary domains used in RIM coded Attributes and coded data type properties.  A vocabulary domain is an abstract collection of interrelated concepts. It describes the purpose or intent of a coded attribute.  A value set is a collection of coded concepts drawn from one or more code systems. A vocabulary domain may be associated with many value sets (e.g. for use in different countries).  A context expression provides a means of designating which value set for a given domain are applicable for a given usage context.  A coded concept has a concept code assigned by the coding system and a concept designation which names the referenced concept.  A coded concept may be a parent concept for a collection of additional concepts within the same code system.
  • 138.
    July 14, 2015Page: 138 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 V3 Vocabulary Specification Metamodel ParentConcept VocabularyDomain name : String description : String CodedConcept conceptCode : String conceptDesignation : String 0..*0..* ValueSet name : String description : String definingExpression : String 0..* 0..* 0..* 0..* 0..* 0..* 0..* 0..* includes CodeSystem identifier : OID name : String description : String 0..*0..* 0..* 0..1 0..* 0..1 based on ValueSetContext contextExpression : String
  • 139.
    July 14, 2015Page: 139 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner ActCode
  • 140.
    July 14, 2015Page: 140 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner EntityCode
  • 141.
    July 14, 2015Page: 141 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner RoleCode
  • 142.
    July 14, 2015Page: 142 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner ParticipationType
  • 143.
    July 14, 2015Page: 143 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Vocabulary TermsVocabulary BindingInformation Model Vocabulary Binding Class Attribute Vocabulary Domain Value Set Coded Concept Code System 1 0..* 0..* 0..1 0..10..* 0..* 0..* 0..* 0..* 0..* 1 0..* 0..1
  • 144.
    July 14, 2015Page: 144 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner CodeSystem - id: II - fullName: ST - localName: ST - description: ST - copyright: ST - status: CS - statusDate: TS CodeSystemVersion - versionId: II - effectiveDate: TS - isComplete: boolean - versionOrder: int - releaseDate: TS - releaseFormats: SET[ST] - releaseLocation: ST - supportedLanguages: SET[CS] - status: CS - statusDate: TS ConceptCodeSystemVersionMembership - /isConceptInitiator: boolean ValueSet - id: II - name: ST - description: ST - ruleSetID: ST - status: CS - statusDate: TS ValueSetVersion - versionID: II - effectiveDate: TS - releaseDate: TS - versionOrder: int - isComplete: boolean - rulesSetVersionID: ST - supportedLanguages: SET[CS] - status: CS - statusDate: TS ConceptValueSetMembership - effectiveDate[0..1]: TS Designation - id: II - name: ST - description: ST - isPreferred: boolean - language: CS - format: ST - status: CS - statusDate: TS CodeSystemConcept - code: ST - codeSynonyms: SET[ST] - id[0..1]: II - status: CS - statusDate: TS CodeSystemVersionConceptAssociation - associationKind: CS - status: CS - statusDate: TS DefinedConceptProperty - id: II - name: ST - description: ST - status: CS - statusDate: TS These identify the defined or "allowable" properties and associations that may be applied to a concept. DefinedConceptAssociation - id: II - associationKind: enum - forwardName: ST - reverseName: ST - isDirected: boolean - ruleSetID: ST - description: ST - status: CS - statusDate: TS DesignationValueSetVersionMembership - isDefault: boolean - effectiveDate[0..1]: TS Includes both assocations within a ocde set (hierarchic) and associations between concpets in different code sets. Type may indicate: map, rules based, lexical etc. May need specializations if different properties needed. CodeSystemConceptVersion - versionId: II - effectiveDate: TS - versionOrder: int - status: CS - statusDate: TS ConceptPropertyVersion - value: ST - status: CS - statusDate: TS This covers the Concept of "supplemental" (per MIF) or realm/local specifc variations, with restriction (per HL7 principles) that they cannot actually add additional "codes". UsageContext - id: II - name: ST - description: ST JurisdictionalDomain - id: II - name: ST - description: ST 1..*10..* 1 0..* 1 1..* 1..* 11..* 0..* used in 0..* 0..* 0..* 1 0..* 1..* 1..* +targetConcept 1 0..* 0..1 0..* 1 0..* 0..* 1 1..* 0..* 0..1 0..* 1..* 0..*isSourceOf 0..* isTargetOf 1 1..* 0..1 0..* +sourceConcept 1 0..* Controlled Terminology Service Conceptual Data Model
  • 145.
    July 13, 2015Page: 145 0f 211Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v2 Message Elements Message Specification Segment Group Message Segment Segment Segment Field Data Element Data Type Composite Data Type Data Type Component Code Table Code Table Item Code System Term Code System
  • 146.
    July 13, 2015Page: 146 0f 211Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3.0 Messaging Artifacts Reference Information Model Datatype Specification Vocabulary Specification Foundational Models (CIM) Dynamic Model Constrained Information Model Common Message Type Model Design Models (PIM) Hierarchical Message Definition Message Type Definition Implementation Technology Specification Message Specifications (PSM)
  • 147.
    July 14, 2015Page: 147 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 Version 3.0 Reference Models Reference Information Model Data Type Specification Vocabulary Specification
  • 148.
    July 14, 2015Page: 148 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 Version 3.0 Reference Models ParentConcept VocabularyDomain name : String description : String CodedConcept conceptCode : String conceptDesignation : String 0..*0..* ValueSet name : String description : String definingExpression : String 0..* 0..* 0..* 0..* 0..* 0..* 0..* 0..* includes CodeSystem identifier : OID name : String description : String 0..*0..* 0..* 0..1 0..* 0..1 based on ValueSetContext contextExpression : String T Sequence : LIST T Set : SET T Bag : BAG Quantity : QTY IntegerNumber : INT RealNumber : REAL PhysicalQuantity : PQ MonetaryAmount : MO Ratio : RTO PointInTime : TS Boolean : BL CharacterString : ST ConceptDescriptor : CD CodedValue : CV InstanceIdentifier : II TelecommunicationAddress : TEL T Interval : IVL DataValue : ANY BinaryData : BIN List_of_Boolean : LIST<BL> <<extends>> EncapsulatedData : ED <<extends>> ConceptRole : CR CodedSimpleValue : CS <<restricts>> CodedWithEquivalents : CE ISO_object_identifier : OID List_ADXP : LIST<ADXP> PostalAndResidentialAddress : AD <<extends>> AddressPart : ADXP PersonNameType : PN List_ENXP : LIST<ENXP> EntityNamePart : ENXP T PeriodicIntervalOfTime : PIVL T EventRelatedPeriodicIntervalOfTime : EIVL GeneralTimingSpecification : GTS Set_of_TS : SET<TS> <<extends>> T : T T Annotated : ANT T History_item : HXIT T History : HIST Set_of_HXIT : SET<HXIT<T>> T UncertainValueNarrative : UVN <<extends>> T UncertainValueProbabilistic : UVP T NonParametricProbabilityDistribution : NPPD Set_UVP : SET<UVP<T>> T ParametricProbabilityDistribution : PPD UniversalResourceLocator : URL <<extends>> OrganizationName : ON <<extends>> <<extends>><<extends>> <<extends>> <<extends>> <<extends>> <<extends>> <<extends>> <<extends>> <<extends>> <<extends>> <<restricts>> <<restricts>> <<restricts>> <<extends>> <<extends>> <<extends>><<extends>> <<extends>> <<extends>> <<extends>> <<extends>> <<extends>><<extends>> <<restricts>> <<extends>> <<extends>> <<extends>> <<extends>> <<extends>> <<extends>>
  • 149.
    July 14, 2015Page: 149 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3.0 Messaging Artifacts Reference Information Model Datatype Specification Vocabulary Specification Foundational Models Dynamic Model Constrained Information Model Common Message Type Model Design Models Hierarchical Message Definition Message Type Definition Implementation Technology Specification Message Specifications
  • 150.
    July 14, 2015Page: 150 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3.0 Messaging Artifacts Reference Information Model Datatype Specification Vocabulary Specification Foundational Models Dynamic Model Constrained Information Model Common Message Type Model Design Models Hierarchical Message Definition Message Type Definition Implementation Technology Specification Message Specifications
  • 151.
    July 14, 2015Page: 151 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3.0 Messaging Artifacts Reference Information Model Datatype Specification Vocabulary Specification Foundational Models Dynamic Model Constrained Information Model Common Message Type Model Design Models Hierarchical Message Definition Message Type Definition Implementation Technology Specification Message Specifications
  • 152.
    July 14, 2015Page: 152 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3.0 Messaging Design Models A Dynamic Model is a specification of information exchanges within a particular domain as described in storyboards and storyboard examples. A Design Information Model is an information structure that represents the information content for a set of messages within a particular domain area. A Common Message Type Model is a definition of a set of common message components that can be referenced in various message specifications. Dynamic Model Design Information Model Common Message Type Model
  • 153.
    HL7 Version 3.0 DynamicModel A Dynamic Model is a specification of information exchanges within a particular domain as described in storyboards and storyboard examples.
  • 154.
    July 14, 2015Page: 154 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Message Development Framework RIM Restrict R-MIM Serialize HMD Restrict Message Type Example Storyboard Storyboard Example D-MIM Derive Application Role Sender Receiver Trigger Event Triggers Content Interaction References
  • 155.
    July 14, 2015Page: 155 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner DynamicModel Message Development Framework RIM Restrict R-MIM Serialize HMD Restrict Message Type Example Storyboard Storyboard Example D-MIM Derive Application Role Sender Receiver Trigger Event Triggers Content Interaction References
  • 156.
    July 14, 2015Page: 156 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner v3 Dynamic Model Example Storyboard Storyboard Example Application Role Sender Receiver Trigger Event Triggers Interaction References
  • 157.
    July 14, 2015Page: 157 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SAIF View of v3 Dynamic Model «Interaction» Storyboard artifactId name narrative «Exchange» Interaction artifactID name narrative structuredName interactionType «InterchangePoint» ApplicationRole artifactID name description structuredName «ProviderInterchangePoi... SendingApplicationRole ::ApplicationRole artifactID name description structuredName «ConsumerInterchangePoint» RecievingApplicationRole ::ApplicationRole artifactID name description structuredName TriggerEvent artifactID name description type structuredName InteractionBasedTriggerEvent ::TriggerEvent artifactID name description type structuredName StateTransitionBasedTriggerEvent ::TriggerEvent artifactID name description type structuredName UserRequestBasedTriggerEvent ::TriggerEvent artifactID name description type structuredName «ConstrainedInformationMod... StaticModel artifactID name type ReceiverResponsibility reason «SoftwareUnit» Application ConformanceStatement StoryboardExample narrative «ImplementableInformationModel» InformationStructure disjoint = false 1..* 1..* sends sender 1 1..* receives receiver 1 1..* {ordered} 0..*contains 1 0..* 0..* 0..* 0..* fulfills 1 0..* invokes 0..1 0..* invokes 0..1 0..* fulfills 0..* 0..* 0..* intiates 1 Name: Package: Version: Author: Behavioral Model Behavioral Model v01r04 AbdulMalik Shakir
  • 158.
    July 14, 2015Page: 158 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner V3 Dynamic Model  The v3 Dynamic Model provides behavioral context for static v3 message types. The v3 Dynamic Model is made up of: 1. Interactions 2. Storyboards and Storyboard Examples 3. Sender and Receiver Application Roles 4. Trigger Events  An Interaction is an ordered collection of information exchanges supporting one or more Use Cases outlined in a Storyboard.  Interactions are initiated by a single Trigger Event and are associated with one or more Application Roles.  An Application Role is a collection of interaction exchanges. It defines a generic interface specification to which a particular healthcare application can conform.  A UML sequence diagram is used to document application roles and interactions.
  • 159.
    July 14, 2015Page: 159 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner An example Interaction Diagram Application Roles Interactions
  • 160.
    July 14, 2015Page: 160 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner v3 Dynamic Model Example Storyboard Storyboard Example Application Role Sender Receiver Trigger Event Triggers Interaction References
  • 161.
    July 14, 2015Page: 161 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner v3 Dynamic Model - Interaction Example Storyboard Storyboard Example Application Role Sender Receiver Trigger Event Triggers Interaction References
  • 162.
    July 14, 2015Page: 162 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Interaction  Interactions are at the heart of messaging.  An interaction is a unique association between: • a specific message type (information transfer) • a particular trigger event that initiates or "triggers" the transfer • the Receiver Responsibilities (in terms of response interactions) associated with the receipt of the Interaction.  Interactions are presented with a name, the artifact ID, and a table that lists the sending and receiving application roles, the trigger event, the message type, the Event type and the Wrapper types.
  • 163.
    July 14, 2015Page: 163 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Example Interaction Specification
  • 164.
    July 14, 2015Page: 164 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Example Interaction w/Receiver Responsibilities
  • 165.
    July 14, 2015Page: 165 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner An example Interaction Diagram
  • 166.
    July 14, 2015Page: 166 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner v3 Dynamic Model Example Storyboard Storyboard Example Application Role Sender Receiver Trigger Event Triggers Interaction References
  • 167.
    July 14, 2015Page: 167 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner v3 Dynamic Model - Storyboard Example Storyboard Storyboard Example Application Role Sender Receiver Trigger Event Triggers Interaction References
  • 168.
    July 14, 2015Page: 168 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Storyboard  The storyboard concept is borrowed from the movie and animation industry, and is useful to the development of HL7 messages for the same reasons proven in that industry:  A storyboard depicts a story using a series of "snapshots" or events in chronological sequence;  Each snapshot represents a recognizable, meaningful moment in the sequence of events in a functional domain  Each snapshot illustrates the key participants in the storyboard and their interaction with other players;  The whole series of snapshots provides a coherent description of a complete process or activity.  A storyboard narrative provides the necessary context for development of specific interactions using a fictitious illustrative storyboard example. The process of storyboarding lays the foundation for describing HL7 messages and their content.
  • 169.
    July 14, 2015Page: 169 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Example Storyboard (Complex Laboratory Result (POLB_ST221000UV01)  Storyboard Purpose  To illustrate a complex laboratory result message involving a substance administration and several specimen collections over a period of time.  A preliminary and final report will be messaged.  Storyboard Narrative:  Eve Everywoman, a 27-year-old female, presents at Good Health Hospital Outpatient Clinic and is seen by Dr. Patricia Primary. Eve reports extreme thirst, fatigue, and recent unexplained weight loss. She also reports having a family history of diabetes. Dr. Patricia Primary wants to rule out diabetes mellitus by performing a GTT2HR  Sequence of Events: 1. Eve Everywoman, a 27-year-old female, presents at Good Health Hospital Outpatient Clinic and is seen by Dr. Patricia Primary. 2. Eve reports extreme thirst, fatigue, and recent unexplained weight loss. She also reports having a family history of diabetes. 3. Dr. Patricia Primary wants to rule out diabetes mellitus by performing a GTT2HR (Two- Hour Glucose Tolerance Test).
  • 170.
    July 14, 2015Page: 170 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner v3 Dynamic Model Example Storyboard Storyboard Example Application Role Sender Receiver Trigger Event Triggers Interaction References
  • 171.
    July 14, 2015Page: 171 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner v3 Dynamic Model – Application Role Example Storyboard Storyboard Example Application Role Sender Receiver Trigger Event Triggers Interaction References
  • 172.
    July 14, 2015Page: 172 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Application Role  As an HL7 interaction is defined, one application role is assigned responsibility for sending (initiating) that interaction, and one application role is assigned responsibility to receive that interaction and fulfill appropriate receiver responsibilities.  The sending and receiving responsibilities for a particular interaction may both be assigned to a single application role.  Application roles are the basis of conformance statements and conformance claims in a conformance profile.  Application roles are realizations of actors in a use case scenario or storyboard specification.  An application role has a name, an artifact ID and a description.
  • 173.
    July 14, 2015Page: 173 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Example Application Roles
  • 174.
    July 14, 2015Page: 174 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Sending Application Role Prescribing System (Prescription processing) (PORX_AR990101UV02) Description This is a system which supports a clinician with prescribing authority. This role specifically captures those interactions pertaining to management.
  • 175.
    July 14, 2015Page: 175 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Receiving Application Role Dispensing System (Prescription processing) (PORX_AR990102UV02) Description This is a system which supports a clinician with dispensing authority. This role specifically captures those interactions pertaining to management.
  • 176.
    July 14, 2015Page: 176 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner An example Interaction Diagram
  • 177.
    July 14, 2015Page: 177 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Receiver Responsibility
  • 178.
    July 14, 2015Page: 178 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner v3 Dynamic Model Example Storyboard Storyboard Example Application Role Sender Receiver Trigger Event Triggers Interaction References
  • 179.
    July 14, 2015Page: 179 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner v3 Dynamic Model – Trigger Event Example Storyboard Storyboard Example Application Role Sender Receiver Trigger Event Triggers Interaction References
  • 180.
    July 14, 2015Page: 180 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Trigger Event  A trigger event is an explicit set of conditions that initiate the transfer of information between system components (application roles).  Trigger events have a specified Type, from the following list:  State-Transition Based: Trigger events resulting from a state transition as depicted in the State Transition Model for a particular message interaction. The trigger for canceling a document, for example, may be considered a State Transition Based trigger event  Interaction Based: Trigger events can be based on another interaction. For example, the response to a query (which is an interaction) is an Interaction Based trigger event.  User Request Based: Trigger events may be based on a user request. For example, the trigger event that prompts a system to send all accumulated data to a tracking system every 12 hours is considered User Based.  Trigger events have a name, artifact ID, description, and a type.
  • 181.
    July 14, 2015Page: 181 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Example Trigger Event
  • 182.
    July 14, 2015Page: 182 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner State Machine  The HL7 Reference Information Model includes state machines for the Entity, Role, Managed Participation, and Act classes.  A state machine specifies the allowable states and valid state transitions for a given class.  A class transitions from one state to another sometimes triggers one or more interactions.
  • 183.
    July 14, 2015Page: 183 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Act State Machine
  • 184.
    July 14, 2015Page: 184 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Design-Level State Machine  A design-level state machine defines the allowable states and state transitions for the focal class of a design information model.  The design-level state machine is a proper subset of the state machine associated with the Reference Information Model (RIM) class that the DIM focal class is derived from.  An annotated version of the RIM class state machine is used to depict the scope of a design level state machine.  Design-level state machine annotations may include optional alias term names for in-scope States and State Transition triggers.
  • 185.
    July 14, 2015Page: 185 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Example Design-Level State Machine Result Activate (POLB_TE004102UV01)
  • 186.
    State Transition  Statetransitions are depicted by a line with a arrowhead showing the direction of the transition.  An example of a state transition might be the change in the state of an Act from Active to Complete.  The change in state is associated with a trigger event that causes the transition.  The trigger event in this example is the fulfillment of an order.  An order is a special type of Act. The transition from an Active order to a Completed order is triggered by the fulfillment of the Order.  The state diagram depicts the states, trigger event, and state transitions of interest.
  • 187.
    July 14, 2015Page: 187 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner v3 Dynamic Model Example Storyboard Storyboard Example Application Role Sender Receiver Trigger Event Triggers Interaction References
  • 188.
    July 14, 2015Page: 188 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Message Development Framework RIM Restrict R-MIM Serialize HMD Restrict Message Type Example Storyboard Storyboard Example D-MIM Derive Application Role Sender Receiver Trigger Event Triggers Content Interaction References
  • 189.
    July 14, 2015Page: 189 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner StaticModel Message Development Framework RIM Restrict R-MIM Serialize HMD Restrict Message Type Example Storyboard Storyboard Example D-MIM Derive Application Role Sender Receiver Trigger Event Triggers Content Interaction References
  • 190.
    July 14, 2015Page: 190 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner StaticModel v3 Dynamic Model - Message Type Message Type Example Storyboard Storyboard Example Application Role Sender Receiver Trigger Event Triggers Content Interaction References
  • 191.
    July 14, 2015Page: 191 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Example Interaction
  • 192.
    July 14, 2015Page: 192 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3 Dynamic Model Interaction TriggerEvent CompositeMessageStructure ReceiverResponsibilityTransportMessageType ControlActMessageType DomainContentMessageType ApplicationRole Interface HealthcareApplication ConformanceSpecification 1..* 0..* 1..*1 «instantiate» 1 0..1 1 0..* 0..* 1 +sending 0..* 1 +recieving 1+recieving 0..* 1 0..* 0..1 0..* 0..* 0..* 0..* 1 Transport Message Type Control Message Type Content Message Type Composite Message Structure Trigger Event Interaction Receiver Responsibility Application Role Interface Healthcare Application Conformance Specification
  • 193.
    July 14, 2015Page: 193 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner v3 Dynamic Model – Composite Message Structure Interaction TriggerEvent CompositeMessageStructure ReceiverResponsibilityTransportMessageType ControlActMessageType DomainContentMessageType ApplicationRole Interface HealthcareApplication ConformanceSpecification 1..* 0..* 1..*1 «instantiate» 1 0..1 1 0..* 0..* 1 +sending 0..* 1 +recieving 1+recieving 0..* 1 0..* 0..1 0..* 0..* 0..* 0..* 1 Transport Message Type Control Message Type Content Message Type Composite Message Structure Trigger Event Interaction Receiver Responsibility Application Role Interface Healthcare Application Conformance Specification
  • 194.
    July 14, 2015Page: 194 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner v3 Dynamic Model – Composite Message Structure A Transport Message Type specifies the metadata about an interaction that is necessary to establish message identity and facilitate message routing. A Control Message Type specifies additional optional interaction metadata necessary to establish message context (trigger event, timeframes, actors involved) . A Content Message Type is the payload of the interaction. It is the message instance containing the data of primary interest to the exchange. Transport Message Type Control Message Type Content Message Type
  • 195.
    July 14, 2015Page: 195 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Transport Message Type  The Transport Message Type, also know as the transmission wrapper, is required for all Version 3 messages.  It contains a number of optional fields whose usage vary from one context to another, (e.g., loosely coupled systems may require the use of a larger set of attributes than tightly coupled systems).  All Transmission Wrappers have mandatory attributes which identify the sending and receiving systems of a message transmission  Additional information about the Sender and Receiver may also be transmitted, but the use of mandatory attributes ensures that a Messaging Infrastructure has sufficient metadata to facilitate message routing.  The Transmission Wrapper in v3 is similar in function as the MSH segment in v2.
  • 196.
    July 14, 2015Page: 196 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Transport Message Type  Optional Elements:  SecurityText  VersionCode  ProfileId  SequenceNumber  AttachmentText  RespondTo  AttentionLine  ControlActProcess  Mandatory Elements:  ID  CreationTime  InteractionId  ProcessingCode  ProcessingModeCode  AcceptAckCode  Receiver  Sender
  • 197.
    July 14, 2015Page: 197 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner v3 Dynamic Model – Composite Message Structure Interaction TriggerEvent CompositeMessageStructure ReceiverResponsibilityTransportMessageType ControlActMessageType DomainContentMessageType ApplicationRole Interface HealthcareApplication ConformanceSpecification 1..* 0..* 1..*1 «instantiate» 1 0..1 1 0..* 0..* 1 +sending 0..* 1 +recieving 1+recieving 0..* 1 0..* 0..1 0..* 0..* 0..* 0..* 1 Transport Message Type Control Message Type Content Message Type Composite Message Structure Trigger Event Interaction Receiver Responsibility Application Role Interface Healthcare Application Conformance Specification
  • 198.
    July 14, 2015Page: 198 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Control Message Type  The Control Message Type, also known as the control act wrapper, provides interaction metadata required to establish message context and facilitate appropriate processing by the receiving application.  It also contains data that are useful to facilitate overall message management and audit capabilities.  In some exceptional cases there is no need for such information to be included in the exchange. Therefore, the Control Message Type is an optional component of the complex message structure.  The control act wrapper in v3 is similar in function to the EVN segment in v2.
  • 199.
    July 14, 2015Page: 199 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Control Message Type Elements  Id  Code  Text  EffectiveTime  PriorityCode  ReasonCode  LanguageCode  Overseer  authorOrPerformer  DataEnterer  InformationRecipient  Subject  ReasonOf
  • 200.
    July 14, 2015Page: 200 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner v3 Dynamic Model – Composite Message Structure Interaction TriggerEvent CompositeMessageStructure ReceiverResponsibilityTransportMessageType ControlActMessageType DomainContentMessageType ApplicationRole Interface HealthcareApplication ConformanceSpecification 1..* 0..* 1..*1 «instantiate» 1 0..1 1 0..* 0..* 1 +sending 0..* 1 +recieving 1+recieving 0..* 1 0..* 0..1 0..* 0..* 0..* 0..* 1 Transport Message Type Control Message Type Content Message Type Composite Message Structure Trigger Event Interaction Receiver Responsibility Application Role Interface Healthcare Application Conformance Specification
  • 201.
    July 14, 2015Page: 201 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Content Message  A Content Message Type is the payload of the interaction. It is the message instance containing the data of primary interest to the exchange  The Content Message is included in the Interaction as the subject of a control act wrapper  The linkage includes a reference to the entry point of the content message message type:  <xs:element name="actRequest" type="PORX_MT990020UV02.ActRequest" nillable="true" minOccurs="1" maxOccurs="1"/>
  • 202.
    July 14, 2015Page: 202 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner v3 Dynamic Model – Composite Message Structure Interaction TriggerEvent CompositeMessageStructure ReceiverResponsibilityTransportMessageType ControlActMessageType DomainContentMessageType ApplicationRole Interface HealthcareApplication ConformanceSpecification 1..* 0..* 1..*1 «instantiate» 1 0..1 1 0..* 0..* 1 +sending 0..* 1 +recieving 1+recieving 0..* 1 0..* 0..1 0..* 0..* 0..* 0..* 1 Transport Message Type Control Message Type Content Message Type Composite Message Structure Trigger Event Interaction Receiver Responsibility Application Role Interface Healthcare Application Conformance Specification
  • 203.
    July 14, 2015Page: 203 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner v3 Dynamic Model – Composite Message Structure Interaction TriggerEvent CompositeMessageStructure ReceiverResponsibilityTransportMessageType ControlActMessageType DomainContentMessageType ApplicationRole Interface HealthcareApplication ConformanceSpecification 1..* 0..* 1..*1 «instantiate» 1 0..1 1 0..* 0..* 1 +sending 0..* 1 +recieving 1+recieving 0..* 1 0..* 0..1 0..* 0..* 0..* 0..* 1 Transport Message Type Control Message Type Content Message Type Composite Message Structure Trigger Event Interaction Receiver Responsibility Application Role Interface Healthcare Application Conformance Specification
  • 204.
    July 14, 2015Page: 204 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner v3 Dynamic Model - Message Type Message Type Example Storyboard Storyboard Example Application Role Sender Receiver Trigger Event Triggers Content Interaction References
  • 205.
    July 14, 2015Page: 205 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3.0 Messaging Artifacts Reference Information Model Datatype Specification Vocabulary Specification Foundational Models Dynamic Model Constrained Information Model Common Message Type Model Design Models Hierarchical Message Definition Message Type Definition Implementation Technology Specification Message Specifications
  • 206.
    HL7 Version 3.0 ConstrainedInformation Model A Constrained Information Model is an information structure derived from the HL7 RIM that represents the information content for a set of messages within a particular domain area.
  • 207.
    July 14, 2015Page: 207 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner StaticModel Message Development Framework RIM Restrict R-MIM Serialize HMD Restrict Message Type Example Storyboard Storyboard Example D-MIM Derive Application Role Sender Receiver Trigger Event Triggers Content Interaction References
  • 208.
    July 14, 2015Page: 208 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner StaticModel V3 Static Models RIM Restrict R-MIM Serialize HMD Restrict Message Type D-MIM Derive
  • 209.
    July 14, 2015Page: 209 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Implementable Information Models Constrained Information Models Reference Information Model V3 Static Models RIM Restrict R-MIM Serialize HMD Restrict Message Type D-MIM Derive CIM PIM PSM
  • 210.
    July 14, 2015Page: 210 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner RIM Account name : ST balanceAmt : MO currencyCode : CE interestRateQuantity : RTO<MO,PQ> allowedBalanceQuantity : IVL<MO> DeviceTask parameterValue : LIST<ANY> DiagnosticImage subjectOrientationCode : CE Diet energyQuantity : PQ carbohydrateQuantity : PQ FinancialContract paymentTermsCode : CE FinancialTransaction amt : MO creditExchangeRateQuantity : REAL debitExchangeRateQuantity : REAL InvoiceElement modifierCode : SET<CE> unitQuantity : RTO<PQ,PQ> unitPriceAmt : RTO<MO,PQ> netAmt : MO factorNumber : REAL pointsNumber : REAL ManagedParticipation id : SET<II> statusCode : SET<CS> Observation value : ANY interpretationCode : SET<CE> methodCode : SET<CE> targetSiteCode : SET<CD> PatientEncounter preAdmitTestInd : BL admissionReferralSourceCode : CE lengthOfStayQuantity : PQ dischargeDispositionCode : CE specialCourtesiesCode : SET<CE> specialAccommodationCode : SET<CE> acuityLevelCode : CE Procedure methodCode : SET<CE> approachSiteCode : SET<CD> targetSiteCode : SET<CD> PublicHealthCase detectionMethodCode : CE transmissionModeCode : CE diseaseImportedCode : CE SubstanceAdministration routeCode : CE approachSiteCode : SET<CD> doseQuantity : IVL<PQ> rateQuantity : IVL<PQ> doseCheckQuantity : SET<RTO> maxDoseQuantity : SET<RTO> substitutionCode : CE Supply quantity : PQ expectedUseTime : IVL<TS> WorkingList ownershipLevelCode : CE Container capacityQuantity : PQ heightQuantity : PQ diameterQuantity : PQ capTypeCode : CE separatorTypeCode : CE barrierDeltaQuantity : PQ bottomDeltaQuantity : PQ Device manufacturerModelName : SC softwareName : SC localRemoteControlStateCode : CE... alertLevelCode : CE lastCalibrationTime : TS LivingSubject administrativeGenderCode : CE birthTime : TS deceasedInd : BL deceasedTime : TS multipleBirthInd : BL multipleBirthOrderNumber : INT organDonorInd : BL ManufacturedMaterial lotNumberText : ST expirationTime : IVL<TS> stabilityTime : IVL<TS> Material formCode : CE NonPersonLivingSubject strainText : ED genderStatusCode : CE Organization addr : BAG<AD> standardIndustryClassCode : CE Person addr : BAG<AD> maritalStatusCode : CE educationLevelCode : CE raceCode : SET<CE> disabilityCode : SET<CE> livingArrangementCode : CE religiousAffiliationCode : CE ethnicGroupCode : SET<CE> Place mobileInd : BL addr : AD directionsText : ED positionText : ED gpsText : ST Access approachSiteCode : CD targetSiteCode : CD gaugeQuantity : PQ Employee jobCode : CE jobTitleName : SC jobClassCode : CE salaryTypeCode : CE salaryQuantity : MO hazardExposureText : ED protectiveEquipmentText : ED LicensedEntity recertificationTime : TS Patient confidentialityCode : CE veryImportantPersonCode : CE ActRelationship typeCode : CS inversionInd : BL contextControlCode : CS contextConductionInd : BL sequenceNumber : INT priorityNumber : INT pauseQuantity : PQ checkpointCode : CS splitCode : CS joinCode : CS negationInd : BL conjunctionCode : CS localVariableName : ST seperatableInd : BL Act classCode : CS moodCode : CS id : SET<II> code : CD negationInd : BL derivationExpr : ST text : ED statusCode : SET<CS> effectiveTime : GTS activityTime : GTS availabilityTime : TS priorityCode : SET<CE> confidentialityCode : SET<CE> repeatNumber : IVL<INT> interruptibleInd : BL levelCode : CE independentInd : BL uncertaintyCode : CE reasonCode : SET<CE> languageCode : CE 0..n 1 outboundRelationship 0..n source1 0..n 1 inboundRelationship 0..n target 1 LanguageCommunication languageCode : CE modeCode : CE proficiencyLevelCode : CE preferenceInd : BL Participation typeCode : CS functionCode : CD contextControlCode : CS sequenceNumber : INT negationInd : BL noteText : ED time : IVL<TS> modeCode : CE awarenessCode : CE signatureCode : CE signatureText : ED performInd : BL substitutionConditionCode : CE... 0..n 1 0..n 1 Entity classCode : CS determinerCode : CS id : SET<II> code : CE quantity : SET<PQ> name : BAG<EN> desc : ED statusCode : SET<CS> existenceTime : IVL<TS> telecom : BAG<TEL> riskCode : CE handlingCode : CE 1 0..n 1 0..n RoleLink typeCode : CS effectiveTime : IVL<TS> Role classCode : CS id : SET<II> code : CE negationInd : BL addr : BAG<AD> telecom : BAG<TEL> statusCode : SET<CS> effectiveTime : IVL<TS> certificateText : ED quantity : RTO positionNumber : LIST<INT> 0..n 1 0..n 1 0..n0..1 playedRole 0..n player 0..1 0..n 0..1 scopedRole 0..n scoper 0..1 0..n 1 outboundLink 0..n source1 0..n 1 inboundLink 0..n target1 HMD Constrained Information Model D-MIM PatientIncident classCode*:<=ENC moodCode*:<=EVN id:[1..*](RegistNum) code:CVCNE[0..1]<=ExternallyDefinedActCodes(PatientType) statusCode:LIST<CS>CNE<=ActStatus(IDPHStatus) activityTime:TS(EDDate) Injury classCode*:<=ACT moodCode*:<=EVN activityTime:TS(InjuryDate) 0..1pertinentInjury typeCode*:<=PERT pertinentInformation1 TraumaRegistryExport (IDPH_RM00001) DatacontentofHL7 messagesusedtoexport datafromtheIDPHTrauma Registry. PatientPerson classCode*:<=PSN determinerCode*:<=INSTANCE name:PN[0..1](*Name) existenceTime:(Age) administrativeGenderCode:CVCWE<=AdministrativeGender (GenderID) birthTime:(DateOfBirth) addr:AD[0..1](AddressHome) raceCode:CVCWE[0..1]<=Race(RaceID) ethnicGroupCode:CVCWE[0..1]<=Ethnicity(EthnicID) 1..1patientPatientPerson 1..1providerTraumaParticipant Patient classCode*:<=PAT id:II[0..1](MedicaRecordNum) TraumaParticipant classCode*:<=ORG determinerCode*:<=INSTANCE id:[1..1](HospitNum) code:CVCWE[0..1]<=EntityCode name:ON[0..1](HospitName) statusCode:CSCNE[0..1]<=EntityStatus(ActiveFacili) addr:AD[0..1](HospitCity) 1..1patient typeCode*:<=SBJ subject InjuryLocation classCode*:<=PLC determinerCode*:<=INSTANCE code:CVCWE[0..1]<=EntityCode(InjuryPlaceID) addr:AD[0..1](AddressScene) 0..1playingInjuryLocation Role classCode*:<=ROL 1..1participant typeCode*:<=LOC location InjuryRelatedObservation classCode*:<=OBS moodCode*:<=EVN code:<=ExternallyDefinedActCodes priorityCode:CVCWE[0..1]<=ActPriority value:[0..1] 0..*pertinentInjuryRelatedObservation typeCode*:<=PERT sequenceNumber:INT[0..1](InjurySequen) pertinentInformation Procedure classCode*:<=PROC moodCode*:<=EVN code:CVCWE<=ActCode(ICDCodeID) activityTime:TS(ProcedDate) 0..*pertinentProcedure typeCode*:<=PERT pertinentInformation7 0..1medicalStaff typeCode*:<=PRF performer MedicalStaff classCode*:<=PROV id:II[0..1](MedicalStaffID) 0..1procedureLocation typeCode*:<=LOC location ProcedureLocation classCode*:<=SDLOC code:<=RoleCode(ProcedLocateID) PatientIncidentRelatedObservation classCode*:<=OBS moodCode*:<=EVN code:<=ActCode reasonCode:CVCWE[0..1]<=ActReason value:ANY[0..1] 0..*pertinentPatientIncidentRelatedObservation typeCode*:<=PERT pertinentInformation2 PatientTransfer classCode*:<=TRNS moodCode*:<=EVN activityTime:IVL<TS>(DischaDatetoArriveDate) reasonCode:CVCWE[0..1]<=TransferActReason(REASONTRANSFID) 1..1arrivalPatientTransfer typeCode*:<=ARR arrivedBy 0..*aRole typeCode*:<=ORG origin 0..1playingTraumaParticipant aRole classCode*:<=ROL TransferRelatedObservation classCode*:<=OBS moodCode*:<=EVN code:CVCWE<=ExternallyDefinedActCodes value:PQ[0..1] methodCode:CVCWE[0..1]<=ObservationMethod 1..*pertinentTransferRelatedObservation typeCode*:<=PERT pertinentInformation 1..1transferVehicle typeCode*:<=VIA via 1..1owningVehicleProvider TransferVehicle classCode*:<=OWN id:II[0..1](VehiclNum) code:<=RoleCode(VehiclLevelID) VehicleProvider classCode*:<=ORG determinerCode*:<=INSTANCE id:II[0..1](VehiclProvide) code:<=EntityCode(MaxVehiclLevelID) name:ON[0..1](VehiclProvidName) HospitalVisit classCode*:<=ENC moodCode*:<=EVN code:CVCWE<=ActCode(AdmitServicID) activityTime:TS(DischaDate) dischargeDispositionCode:CVCWE[0..1] <=EncounterDischargeDisposition 1..1pertinentHospitalVisit typeCode*:<=PERT pertinentInformation5 HospitalVisitRelatedObservation classCode*:<=OBS moodCode*:<=EVN code:CVCWE<=ExternallyDefinedActCodes value:[0..1] 0..*pertinentHospitalVisitRelatedObservation typeCode*:<=PERT pertinentInformation 1..1admittingProvider typeCode*:<=ADM admitter 0..1healthCareMedicalStaffPerson AdmittingProvider classCode*:<=PROV id:II[0..1](ADMITMEDICASTAFFID) code:CVCWE<=RoleCode(StaffTypeID) 0..*hospitalVisitPhysician typeCode*:<=RESP time:TS responsibleParty 0..1healthCareMedicalStaffPerson HospitalVisitPhysician classCode*:<=PROV id:II[0..1] code:CVCWE<=RoleCode(StaffTypeID) MedicalStaffPerson classCode*:<=PSN determinerCode*:<=INSTANCE name:PN[0..1](MedicaStaffName) 0..1licensedEntity typeCode*:<=DST destination 0..1subjectChoice LicensedEntity classCode*:<=LIC id:II[0..1] Choice Facility classCode*:<=ORG determinerCode*:<=INSTANCE id: code*:CSCNE<=EntityCode"FAC" name: Hospital classCode*:<=ORG determinerCode*:<=INSTANCE id: code*:CSCNE<=EntityCode"HOSP" name: EmergencyDepartmentEncounter classCode*:<=ENC moodCode*:<=EVN activityTime:IVL<TS> dischargeDispositionCode:CVCWE<=EncounterDischargeDisposition 0..1pertinentEmergencyDepartmentEncounter typeCode*:<=PERT pertinentInformation3 EmergencyDepartmentRelatedObservation classCode*:<=OBS moodCode*:<=EVN code:CVCWE<=ExternallyDefinedActCodes text: activityTime:TS reasonCode:<=ActReason value:[0..1] methodCode:CVCWE[0..1]<=ObservationMethod targetSiteCode:CVCWE[0..1]<=HumanActSite 0..*pertinentEmergencyDepartmentRelatedObservation typeCode*:<=PERT pertinentInformation 0..*emergencyDepartmentPhysician typeCode*:<=PRF performer 0..1healthCareMedicalStaffPerson EmergencyDepartmentPhysician classCode*:<=PROV id:II[0..1] code:CECWE[0..1]<=RoleCode(StaffTypeID) PreHospitalEncounter classCode*:<=ENC moodCode*:<=EVN id:II[0..1](crashNum) activityTime:IVL<TS> 0..1priorPreHospitalEncounter typeCode*:<=PREV predecessor PreHosptialRelatedObservation classCode*:<=OBS moodCode*:<=EVN code:<=ExternallyDefinedActCodes value:ANY[0..1] 0..*pertinentPreHosptialRelatedObservation typeCode*:<=PERT pertinentInformation 1..1preHospitalVehicle typeCode*:<=ParticipationType participant 1..1owningVehicleProvider PreHospitalVehicle classCode*:<=OWN id:II[0..1](VehiclNum) code:<=RoleCode(VehiclLevelID) 0..*emergencyDepartmentPhysicianAct typeCode*:<=COMP component EmergencyDepartmentPhysicianAct classCode*:<=ACT moodCode*:<=EVN code:CSCNE[0..1]<=ExternallyDefinedActCodes activityTime*:TS[0..1] component 0..*patientIncidentRelatedObservation typeCode*:<=COMP VehicleProvider MedicalStaffPerson TraumaParticipant R-MIM PatientIncident classCode*: <= ENC moodCode*: <= EVN id: [1..*] (RegistNum) code: CV CNE <= ExternallyDefinedActCodes (PatientType) statusCode: LIST<CS> CNE <= ActStatus (IDPHStatus) activityTime: TS (EDDate) Injury classCode*: <= ACT moodCode*: <= EVN activityTime: TS (InjuryDate) 0..1 pertinentInjury typeCode*: <= PERT pertinentInformation1 PatientPerson classCode*: <= PSN determinerCode*: <= INSTANCE name: PN [0..1] (*Name) existenceTime: (Age) administrativeGenderCode: CV CWE <= AdministrativeGender (GenderID) birthTime: (DateOfBirth) addr: AD [0..1] (AddressHome) raceCode: CV CWE [0..1] <= Race (RaceID) ethnicGroupCode: CV CWE [0..1] <= Ethnicity (EthnicID) 1..1 patientPatientPerson 1..1 providerTraumaParticipant Patient classCode*: <= PAT id: II [0..1] (MedicaRecordNum) TraumaParticipant classCode*: <= ORG determinerCode*: <= INSTANCE id: [1..1] (HospitNum) code: CV CWE [0..1] <= EntityCode name: ON [0..1] (HospitName) statusCode: CS CNE [0..1] <= EntityStatus (ActiveFacili) addr: AD [0..1] (HospitCity) 1..1 patient typeCode*: <= SBJ subject InjuryLocation classCode*: <= PLC determinerCode*: <= INSTANCE code: CV CWE [0..1] <= EntityCode (InjuryPlaceID) addr: AD [0..1] (AddressScene) 0..1 playingInjuryLocation Role classCode*: <= ROL 1..1 participant typeCode*: <= LOC location InjuryRelatedObservation classCode*: <= OBS moodCode*: <= EVN code: <= ExternallyDefinedActCodes priorityCode: CV CWE [0..1] <= ActPriority value: [0..1] 0..* pertinentInjuryRelatedObservation typeCode*: <= PERT sequenceNumber: INT [0..1] (InjurySequen) pertinentInformation PatientIncidentRelatedObservation classCode*: <= OBS moodCode*: <= EVN code: <= ActCode reasonCode: CV CWE [0..1] <= ActReason value: ANY [0..1] 0..* pertinentPatientIncidentRelatedObservation typeCode*: <= PERT pertinentInformation2 component 0..* patientIncidentRelatedObservation typeCode*: <= COMP Constrained Information Models
  • 211.
    July 14, 2015Page: 211 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Constrained Information Models  Domain Message Information Models (D-MIMs) and Refined Message Information Models (R-MIMs) are types of Constrained Information Models (CIMs).  Constrained information models are composed of class clones that are a restricted subset of the HL7 RIM.  Class clones contain a subset of the attributes and relationships that are defined for the RIM class upon which the clone is based.  Multiple class clones based upon the same RIM class may be included in a constrained information model.  Each class clone in a constrained information model is assigned a unique name.
  • 212.
    July 14, 2015Page: 212 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Constrained Information Model Diagram SubstanceAdministrationStep classCode*: <= SBADM moodCode*: <= x_ActMoodOrdPrmsEvn id*: II [1..1] code*: CE CWE <= SubstanceAdministrationActCode text*: statusCode*: CS CNE [0..1] effectiveTime*: IVL<TS> routeCode: <= RouteOfAdministration doseQuantity: PQ rateQuantity: PQ 1..1 manufacturedProduct * typeCode*: <= CSM consumable 1..1 manufacturedDrug * 0..1 manufacturerOrganization ManufacturedProduct1 classCode*: <= MANU Organization classCode*: <= ORG determinerCode*: <= INSTANCE name*: ON [1..1] Drug classCode*: <= MMAT determinerCode*: <= INSTANCE code*: [1..1] <= DrugEntity (Drug code) quantity: desc:  A Constrained Information Model diagrams used a variety of visual tools to document message design.  Entities, Roles, and Acts are represented by rectangular shapes colored Green, Yellow, and Red respectively.  Participations, Role Links, and Act Relationships are represented by arrow shapes colored blue, gold, and pink respectively.  Bold font is used to denote mandatory attributes.
  • 213.
    July 14, 2015Page: 213 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner V3 Constrained Information Model A_AbnormalityAssessment (COCT_RM420000UV) Description: assessment of clinical findings, including lab test results, for indications of the presence and severity of abnormal conditions AbnormalityAssessment classCode*: = "OBS" moodCode*: = "EVN" code*: CD CWE [1..1] <= V:ObservationType ("ADVERSE_REACTION") statusCode*: CS CNE [1..1] <= V:ActStatusAbortedCancelledCompleted activityTime*: TS.DATETIME [1..1] value: CD CWE [0..1] <= V:AbnormalityAssessmentValue methodCode: SET<CE> CWE [0..*] <= V:AbnormalityAssessmentMethod 1..* assessmentOutcome * typeCode*: = "OUTC" contextConductionInd*: BL [1..1] ="true" outcome AssessmentException classCode*: = "OBS" moodCode*: = "EVN" code*: CD CWE [1..1] <= V:ObservationType ("ASSERTION") value*: SC CWE [1..1] <= V:AssessmentExceptionValue AbnormalityGrade classCode*: = "OBS" moodCode*: = "EVN" code*: CD CWE [1..1] <= V:ObservationType ("SEV") uncertaintyCode: CE CNE [0..1] <= V:ActUncertainty value*: CD CWE [1..1] <= V:AbnormalityGradeValue AssessmentOutcome 0..* assessmentOutcomeAnnotation typeCode*: = "APND" contextConductionInd*: BL [1..1] ="true" appendageOf AssessmentOutcomeAnnotation classCode*: = "OBS" moodCode*: = "EVN" code*: CD CWE [1..1] <= V:ObservationType ("ASSERTION") value*: SC CWE [1..1] <= V:AssessmentOutcomeAnnotationValue Model Components  Entry Point(s)  Clones • Focal Class • Traversal Path • Choice Structure  Attributes • Datatype • Cardinality • Terminology Binding
  • 214.
    July 14, 2015Page: 214 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Discovery of the underlying meta-model A_AbnormalityAssessment (COCT_RM420000UV) Description: assessment of clinical findings, including lab test results, for indications of the presence and severity of abnormal conditions AbnormalityAssessment classCode*: = "OBS" moodCode*: = "EVN" code*: CD CWE [1..1] <= V:ObservationType ("ADVERSE_REACTION") statusCode*: CS CNE [1..1] <= V:ActStatusAbortedCancelledCompleted activityTime*: TS.DATETIME [1..1] value: CD CWE [0..1] <= V:AbnormalityAssessmentValue methodCode: SET<CE> CWE [0..*] <= V:AbnormalityAssessmentMethod 1..* assessmentOutcome * typeCode*: = "OUTC" contextConductionInd*: BL [1..1] ="true" outcome AssessmentException classCode*: = "OBS" moodCode*: = "EVN" code*: CD CWE [1..1] <= V:ObservationType ("ASSERTION") value*: SC CWE [1..1] <= V:AssessmentExceptionValue AbnormalityGrade classCode*: = "OBS" moodCode*: = "EVN" code*: CD CWE [1..1] <= V:ObservationType ("SEV") uncertaintyCode: CE CNE [0..1] <= V:ActUncertainty value*: CD CWE [1..1] <= V:AbnormalityGradeValue AssessmentOutcome 0..* assessmentOutcomeAnnotation typeCode*: = "APND" contextConductionInd*: BL [1..1] ="true" appendageOf AssessmentOutcomeAnnotation classCode*: = "OBS" moodCode*: = "EVN" code*: CD CWE [1..1] <= V:ObservationType ("ASSERTION") value*: SC CWE [1..1] <= V:AssessmentOutcomeAnnotationValue «clone» Class localName: char fixedName: char businessName: char comment: Annotation isEntryPointIndicator: boolean isStubIndicator: boolean «RIM» Class name: char description: Annotation «clone» Attribute businessName: char datatype: DataType cardinality: Cardinality conformance: Conformance comment: Annotation initialValue: char initialValueRole: ValueRole maximumLength: int «RIM» Attribute name: char datatype: DataType cardinality: Cardinality mandatoryInclusionIndicator: boolean description: Annotation «RIM» Relationship name: char relationshipType: RelationshipType «clone» Relationship ConstrainedInformationModel name: char description: Annotation modelType: ModelType ControllingAttribute constraints {datatype = CS} {cardinality = (1..1)} {conformance = Mandatory} {codingStrength = CNE} {terminologyReference = CodeSystem} «RIM» AssociationEnd roleName: char multiplicity: Cardinality navigabilityIndicator: boolean «clone» TraversalPath name: char enabledIndicator: boolean requiredIndicator: boolean mandatoryIndicator: boolean multiplicity: Cardinality «enumeration» Cardinality 0..1 0..n 0..* 1 1..1 1..n 1..* n..m n..* «enumeration» RelationshipType Generalization Association Composition Aggregation «clone» Choice name: char nameExtension: char «enumeration» Conformance Optional Required Mandatory «enumeration» ValueRole Fixed Default «enumeration» ModelType DMIM = Domain Message ... RMIM = Refined Message... CMET = Common Message ... HMD = Hierarchical Me... 0..* associates source 1 «restrict» 1..* 0..* associates target 1 0..* associates target 1 0..* associates source 1 0..* isDerivedFrom 1 0..* {ordered} 1..* {ordered} 0..* isDerivedFrom 1 0..* isDerivedFrom 1 0..* isDerivedFrom root1 1..* 0..1 0..* isDerivedFrom 1 2 0,2
  • 215.
    July 14, 2015Page: 215 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 CIM Clones, Attributes, and Traversals «clone» Class localName: char fixedName: char businessName: char comment: Annotation isEntryPointIndicator: boolean isStubIndicator: boolean «RIM» Class name: char description: Annotation «clone» Attribute businessName: char datatype: DataType cardinality: Cardinality conformance: Conformance comment: Annotation initialValue: char initialValueRole: ValueRole maximumLength: int «RIM» Attribute name: char datatype: DataType cardinality: Cardinality mandatoryInclusionIndicator: boolean description: Annotation «RIM» Relationship name: char relationshipType: RelationshipType «clone» Relationship ConstrainedInformationModel name: char description: Annotation modelType: ModelType ControllingAttribute constraints {datatype = CS} {cardinality = (1..1)} {conformance = Mandatory} {codingStrength = CNE} {terminologyReference = CodeSystem} «RIM» AssociationEnd roleName: char multiplicity: Cardinality navigabilityIndicator: boolean «clone» TraversalPath name: char enabledIndicator: boolean requiredIndicator: boolean mandatoryIndicator: boolean multiplicity: Cardinality «enumeration» Cardinality 0..1 0..n 0..* 1 1..1 1..n 1..* n..m n..* «enumeration» RelationshipType Generalization Association Composition Aggregation «clone» Choice name: char nameExtension: char «enumeration» Conformance Optional Required Mandatory «enumeration» ValueRole Fixed Default «enumeration» ModelType DMIM = Domain Message ... RMIM = Refined Message... CMET = Common Message ... HMD = Hierarchical Me... 0..* associates source 1 «restrict» 1..* 0..* associates target 1 0..* associates target 1 0..* associates source 1 0..* isDerivedFrom 1 0..* {ordered} 1..* {ordered} 0..* isDerivedFrom 1 0..* isDerivedFrom 1 0..* isDerivedFrom root1 1..* 0..1 0..* isDerivedFrom 1 2 2
  • 216.
    July 14, 2015Page: 216 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 CIM Terminology and Datatype «clone» Attribute businessName: char datatype: DataType cardinality: Cardinality conformance: Conformance comment: Annotation initialValue: char initialValueRole: ValueRole maximumLength: int «RIM» Attribute name: char datatype: DataType cardinality: Cardinality mandatoryInclusionIndicator: boolean description: Annotation ControllingAttribute constraints {datatype = CS} {cardinality = (1..1)} {conformance = Mandatory} {codingStrength = CNE} {terminologyReference = CodeSystem} «RIM» TerminologyBinding codingStrength: CodingStrength «clone» TerminologyBinding codingStrength: CodingStrength TerminologyReference {abstract} name: char description: Annotation VocabularyDomain ValueSet conceptIdentifier: char CodeSystem objectIdentifier: char releaseIdentifier: char isExternalIndicator: boolean CodeSystemTerm code: char [0..1] designation: char description: Annotation internalIdentifier: char DataType longName: char shortName: char description: Annotation DatatypeAttribute name: char datatype: DataType description: Annotation ParentDatatype «datatype» TerminologyBinding codingStrength: CodingStrength Annotation {abstract} «enumeration» CodingStrength CNE CWE ParentCodeSystemTerm AnnotationSection sectionRole: AnnotationSectionRole sectionText: char «enumeration» AnnotationSectionRole Description Rationale Design Comment Issue Implementation Note History Mapping 0..* binds 1 0..1 binds 1 0..1 binds 1 0..* isDerivedFrom 1 «restrict» 0..* isDerivedFrom 1 0..* binds 1 1..* subkind 1..* 0..* 0..* binds 1 0..1 binds 1 0..* 0..* isBoundTo 1 member 1..*0..* 1..* subkind 1..* 0..1
  • 217.
    July 14, 2015Page: 217 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner CIM Retrospective  A Constrained information models is a constrained subset of the HL7 Reference Information Model.  CIM Classes (clones) contain a subset of the attributes and relationships that are defined for the RIM class upon which the clone is based.  CIM Attributes constrain the cardinality, datatypes, and terminology bindings defined for the RIM attribute upon which the CIM attribute is based.  The information needs for a CIM are typically expressed in a Domain Analysis model that has been cross referenced to the RIM.  Types of Constrained Information Models include:  Domain Message Information Models (D-MIMs)  Refined Message Information Models (R-MIMs)
  • 218.
    July 14, 2015Page: 218 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Constrained Information Models V3 Constrained Information Models RIM Restrict R-MIM Serialize HMD Restrict Message Type D-MIM Derive
  • 219.
    July 14, 2015Page: 219 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3.0 Messaging Artifacts Reference Information Model Datatype Specification Vocabulary Specification Foundational Models Dynamic Model Constrained Information Model Common Message Type Model Design Models Hierarchical Message Definition Message Type Definition Implementation Technology Specification Message Specifications
  • 220.
    HL7 Version 3.0 CommonMessage Element Type A Common Message Type Model is a definition of a set of common message components that can be referenced in various message specifications.
  • 221.
    July 14, 2015Page: 221 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Common Message Element Types  A Common Message Element Type (CMET) is a fragment of a constrained information model (CIM) that is intended to be included in other constrained information models by reference.  Common Message Element types provide a means of constructing reusable building blocks to be used across a range of domain areas and message types.  Usage of CMETs increases the consistency of message types developed by separate workgroups and project teams.  CMETs accelerate the development process by reducing the need to redesign information structures that have already been developed.  A CMET model has one entry point. It is included in other design information models by reference to its entry point name.
  • 222.
    July 14, 2015Page: 222 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner CMET Reference Accession classCode*: <= ACSN moodCode*: <= EVN id*: II [1..1] CMET: (AGNT) R_Responsible [universal] (COCT_MT040000) 0..1 roleName 1..1 agent * typeCode*: <= AUT author CMET R-MIM
  • 223.
    July 14, 2015Page: 223 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner CMET Retrospective  Technically a CMET is just another type of constrained information model.  A CMET has a single entry point and is always serializable. It is a special type of RMIM.  CMETs differs from other RMIMs in that they are domain area agnostic.  CMETs are balloted as domain independent artifacts.  Their status as DSTU or Normative is dependent upon the status of RMIMs and DMIMs that reference them.
  • 224.
    July 14, 2015Page: 224 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3.0 Messaging Artifacts Reference Information Model Datatype Specification Vocabulary Specification Foundational Models Dynamic Model Constrained Information Model Common Message Type Model Design Models Hierarchical Message Definition Message Type Definition Implementation Technology Specification Message Specifications
  • 225.
    July 14, 2015Page: 225 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3.0 Messaging Artifacts Reference Information Model Datatype Specification Vocabulary Specification Foundational Models Dynamic Model Constrained Information Model Common Message Type Model Design Models Hierarchical Message Definition Message Type Definition Implementation Technology Specification Message Specifications
  • 226.
    July 14, 2015Page: 226 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3.0 Messaging Design Models An Hierarchical Message Definition is a specification of message elements including a specification of their grouping, sequence, optionality, and cardinality. A Message Type Definition is a specification of a collection of message elements and a set of rules for constructing a message instance. The Implementation Technology Specification, or ITS, defines how to represent RIM objects for transmission in messages. Hierarchical Message Definition Message Type Definition Implementation Technology Specification
  • 227.
    HL7 V3 HierarchicalMessage Definition An Hierarchical Message Definition is a specification of message elements including a specification of their grouping, sequence, optionality, and cardinality.
  • 228.
    July 14, 2015Page: 228 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner V3 Hierarchical Message Definition  An HMD is a tabular representation of the sequence of elements (i.e., classes, attributes and associations) represented in an R-MIM.  It defines the message without reference to the implementation technology.  The HMD defines a single base message structure - the "common" message type.  This base message structure is never sent and thus has no corresponding trigger event.  It is the template from which the other specific and corresponding message types are drawn.
  • 229.
    July 14, 2015Page: 229 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Hierarchical Message Definition
  • 230.
    July 14, 2015Page: 230 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HMD Components InformationModelMapping MessageElementSpecifications CommonConstraints MessageTypeSpecification(S)
  • 231.
    July 14, 2015Page: 231 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HMD Components MappingtotheInformationModel MessageElementSpecifications CommonConstraints MessageTypeSpecification(S)
  • 232.
    July 14, 2015Page: 232 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HMD Columns
  • 233.
    July 14, 2015Page: 233 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HMD Columns (A – F) ColHeading Description A (row type) Each row represents either a class, an association or an attribute from the R-MIM. Class rows have their name displayed in bold; associations have their name in italics; and attributes have their names in plain font. B No Row number. Each row is sequentially numbered and identifies the order in which the data were serialized from the R-MIM. C Element Name The name of the element as it appears in the R-MIM. This may or may not be the same as the value in Property. This value will be different when a class, association or role is cloned and renamed in the process of creating the R-MIM. D Card Cardinality. This specifies the minimum and maximum number of occurrences of the message element. E Mand Mandatory. Valid values are M (Mandatory) or Blank. An M in the field requires that some data be sent for this element. If the data is not known, a value of unknown, not given, etc. must be sent. An M in this column (for Mandatory) differs from a 1 in the Cardinality column in that an M indicates that the message cannot be validly parsed without a value in this field or without defining a default. If no default is provided, you either do not send a message or must send a value. An M in this column also differs from an R in the Conformance column (explained below). F Conf Conformance. Valid values are R (required), NP (not permitted), and Blank (not required). A value of R(required) means that the message elements must appear every time the message description is used for an Interaction. If the data is available, the element must carry the data. If the data is not available, a blank may be sent. NP (not permitted) means that the message element is never sent for this essage type. Blank means that conformance for this element is to be negotiated on a site- specific basis.
  • 234.
    July 14, 2015Page: 234 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HMD Columns (G – M) ColHeading Description G RIM Source Identifies the class from which the attribute or association originates. H Of Message Element Type This column identifies the data type of attributes or class name of associations. I SRC Message Element Type Source. Valid values are D (data type), N (new, being defined starting at this row), U (use, meaning that an element, but not its value, from a previous row in the HMD is being reused), C (CMET), I (Instance, refers to the reuse of a particular element and its value as defined previously in the HMD), and R (recursive, into itself). J Domain Vocabulary Domain Specification. Clicking on this link will take you to the Domain Specification for this element. K CS Coding Strength. Valid values are CWE (coded with extensions, meaning that the code set can be expanded to meet local implementation needs) and CNE (coded no extensions, meaning that the code set cannot be expanded). L Abstract Is a boolean assigned to classes or associations in a gen- spec hierarchy, which becomes a choice in an HMD. If the value is true, then this type may not appear in message instances. M Nt Note. If one is provided, this is simply a free text note provided by the work group.
  • 235.
    July 14, 2015Page: 235 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Constraint Descriptions Constraint Description Cardinality This specifies the minimum and maximum number of occurrences of the field/association. For example, 1..* implies the minimum number of occurrences is 1 whereas the maximum number of occurrences is unlimited. Mandatory Valid values are M (mandatory) or Blank (not mandatory). M (mandatory) means that the field/association must be present in the message, otherwise the message is non-conformant. For Mandatory fields, HL7 sets the minimum cardinality to 1. Blank (not mandatory) means that the field/association need not be present in a conformant message. Conformance Valid values are R (required), NP (not permitted), and Blank (optional). R (required) means that the sending application must support this field/association. If the data is available, then the field/association is included in the message. If the minimum cardinality is 0 and the data is not available, the field/association may be omitted from the message and still be conformant. If the minimum cardinality is 1 and the data is not available, a NullFlavor is required. NP (not permitted) means that the field/association is not included in the message schema and never included in a message instance. Blank (optional) means that the field/association may/may not be sent and support for this field/association is not required of sending applications. Conformance for this element is to be negotiated on a site-specific basis. NullFlavor For required fields/associations with a minimum cardinality of 1, a NullFlavor must be sent for fields/associations that are not available to a sending application. Sample Nullflavors are "no information", "unknown", "masked", "not asked" and "asked, but unknown".
  • 236.
    July 14, 2015Page: 236 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Cardinality Requirements Cardinality Mandatory Conformance NullFlavor Required? Explanation of Rules 0.., 1.. No The field/association may or may not be present in a message. Conformance for this element is to be negotiated on a site-specific basis 0.., 1.. NP Not allowed The field/association is not present in the schema and cannot be included in a message instance. 0.. R No Support for the field/association is required in a sending application. The field/assocation may or may not be present in a message. 1.. R Yes Support for the field/association is required in a sending application. The field/assocation must be present in a message, but may not be valued. If the field/assocation is not valued, a NullFlavor must be specified. 1.. M R Not Allowed Support for the field/association is required in a sending application. NullFlavor may not be specified. The field/association must be present and valued in a message.
  • 237.
    July 14, 2015Page: 237 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3.0 Messaging Artifacts Reference Information Model Datatype Specification Vocabulary Specification Foundational Models Dynamic Model Constrained Information Model Common Message Type Model Design Models Hierarchical Message Definition Message Type Definition Implementation Technology Specification Message Specifications
  • 238.
    HL7 Version 3.0 MessageType Definition A Message Type Definition is a specification of a collection of message elements and a set of rules for constructing a message instance.
  • 239.
    July 14, 2015Page: 239 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Message Type Definition  An HMD contains one or more message type definition.  Each message type definition includes the collection of message elements defined in the HMD.  The message type inherits or overrides aspects of the common constraints defined in the HMD.  Message elements defined in the HMD can be eliminated from the message type definition by specifying “NP” for conformance.  Each message type definition is independent of each other.  A message type definition may be referenced in one or more interaction specification.
  • 240.
    July 14, 2015Page: 240 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3.0 Messaging Artifacts Reference Information Model Datatype Specification Vocabulary Specification Foundational Models Dynamic Model Constrained Information Model Common Message Type Model Design Models Hierarchical Message Definition Message Type Definition Implementation Technology Specification Message Specifications
  • 241.
    Implementation Technology Specification The ImplementationTechnology Specification, or ITS, defines how to represent RIM objects for transmission in messages.
  • 242.
    July 14, 2015Page: 242 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Implementation Technology Specification  HL7 v3 uses XML as the implementation technology for messaging. The XML ITS specifies the wire format for HL7 messages.  The ITS provides encodings for all the types of component that are defined in an HL7 message specification.  The XML schema specifies what is acceptable in an XML document through defining constraints.  The schema for an HL7 message can be used by standard XML tools to determine whether any particular HL7 message is valid according to that particular schema.  The most extensive part of the ITS definition is for data types where specific schema fragments have been defined against each of the Data Types that HL7 supports.
  • 243.
    July 14, 2015Page: 243 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner XML Implementation Technology Specification
  • 244.
    July 14, 2015Page: 244 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Essential XML ITS Transformation Rules  All XML elements and attributes are to be represented in the namespace defined by "urn:hl7-org:v3".  The XML representation for the members of a class will be a sequence of child elements, one for each attribute followed by one for each outbound association.  Where the HL7 static model allows for an association to a choice of classes, the representation of the XML shall be the same as would be the case if there had been no choice, and only the class corresponding to the information items in the HL7 instances were included in the specification.  All HL7 RIM structural attributes are represented as XML attributes. All other HL7 RIM attributes are represented as XML elements.  The type of the HL7 attribute will be one of the types defined in the ISO datatypes. That specification includes a definition of the XML serialization to be used.  When included in an instance local extensions MUST be in a namespace other than the HL7v3 namespace.
  • 245.
    July 14, 2015Page: 245 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 XML Schema Generator HL7 Vocabulary Specification HL7 Data Type Specification HL7 XML Schema Generator Hierarchical Message Definition XML Schema Specification
  • 246.
    July 14, 2015Page: 246 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3.0 Messaging Artifacts Reference Information Model Datatype Specification Vocabulary Specification Foundational Models Dynamic Model Constrained Information Model Common Message Type Model Design Models Hierarchical Message Definition Message Type Definition Implementation Technology Specification Message Specifications
  • 247.
    HL7 V3 MessageSpecification Design Example Pharmacy OTC Sales Data
  • 248.
    July 14, 2015Page: 248 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Pharmacy OTC Sales Data Purchase date Units Category Promotion Zipcode County State Reporting stores Participating stores 20040109 5 Cough/Cold N 88019 Some County XX 1 1 20040109 1 Thermometers N 88019 Some County XX 1 1 20040110 1 Cough/Cold N 88001 Some County XX 1 1 20040110 1 Cough/Cold N 88059 Some County XX 1 1 20040110 1 Cough/Cold N 88210 Some County XX 1 2 20040110 68 Cough/Cold N 88245 Some County XX 1 1 20040110 1 Cough/Cold N 88723 Some County XX 1 1 20040110 27 Cough/Cold Y 88245 Some County XX 1 1 20040110 1 Thermometers N 88245 Some County XX 1 1 20040110 1 Baby/Child Electrolytes N 88245 Some County XX 1 1 20040110 1 Baby/Child Electrolytes N 88806 Some County XX 1 2 20040110 1 Baby/Child Electrolytes N 88331 Some County XX 1 2 20040111 37 Cough/Cold N 88004 Some County XX 1 1 20040111 1 Cough/Cold N 88019 Some County XX 1 1 20040111 72 Cough/Cold N 88020 Some County XX 1 2 20040111 2 Cough/Cold N 88024 Some County XX 1 1 20040111 46 Cough/Cold N 88029 Some County XX 1 1 20040111 55 Cough/Cold N 88038 Some County XX 1 1 20040111 25 Cough/Cold N 88046 Some County XX 1 1 20040111 1 Cough/Cold N 88059 Some County XX 1 1 20040111 1 Cough/Cold N 88066 Some County XX 1 1 20040111 28 Cough/Cold N 88210 Some County XX 1 2 20040111 3 Cough/Cold N 88241 Some County XX 1 1 20040111 70 Cough/Cold N 88245 Some County XX 1 1 20040111 1 Cough/Cold N 88250 Some County XX 1 1 20040111 4 Cough/Cold N 88288 Some County XX 1 1 20040111 10 Cough/Cold N 88403 Some County XX 1 3 20040111 3 Cough/Cold N 88602 Some County XX 1 2 20040111 1 Cough/Cold N 88731 Some County XX 1 1 20040111 9 Cough/Cold N 88806 Some County XX 1 2 20040111 10 Cough/Cold N 88807 Some County XX 1 2 20040111 25 Cough/Cold N 88815 Some County XX 1 4
  • 249.
    July 14, 2015Page: 249 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Pharmacy OTC Sales Data Purchase date Units Category Promotion Zipcode County State Reporting stores Participating stores 20040109 5 Cough/Cold N 88019 Some County XX 1 1 20040109 1 Thermometers N 88019 Some County XX 1 1 20040110 1 Cough/Cold N 88001 Some County XX 1 1 20040110 1 Cough/Cold N 88059 Some County XX 1 1 20040110 1 Cough/Cold N 88210 Some County XX 1 2 20040110 68 Cough/Cold N 88245 Some County XX 1 1 20040110 1 Cough/Cold N 88723 Some County XX 1 1 20040110 27 Cough/Cold Y 88245 Some County XX 1 1 20040110 1 Thermometers N 88245 Some County XX 1 1 20040110 1 Baby/Child Electrolytes N 88245 Some County XX 1 1 20040110 1 Baby/Child Electrolytes N 88806 Some County XX 1 2 20040110 1 Baby/Child Electrolytes N 88331 Some County XX 1 2 20040111 37 Cough/Cold N 88004 Some County XX 1 1 20040111 1 Cough/Cold N 88019 Some County XX 1 1 20040111 72 Cough/Cold N 88020 Some County XX 1 2 20040111 2 Cough/Cold N 88024 Some County XX 1 1 20040111 46 Cough/Cold N 88029 Some County XX 1 1 20040111 55 Cough/Cold N 88038 Some County XX 1 1 20040111 25 Cough/Cold N 88046 Some County XX 1 1 20040111 1 Cough/Cold N 88059 Some County XX 1 1 20040111 1 Cough/Cold N 88066 Some County XX 1 1 20040111 28 Cough/Cold N 88210 Some County XX 1 2 20040111 3 Cough/Cold N 88241 Some County XX 1 1 20040111 70 Cough/Cold N 88245 Some County XX 1 1 20040111 1 Cough/Cold N 88250 Some County XX 1 1 20040111 4 Cough/Cold N 88288 Some County XX 1 1 20040111 10 Cough/Cold N 88403 Some County XX 1 3 20040111 3 Cough/Cold N 88602 Some County XX 1 2 20040111 1 Cough/Cold N 88731 Some County XX 1 1 20040111 9 Cough/Cold N 88806 Some County XX 1 2 20040111 10 Cough/Cold N 88807 Some County XX 1 2 20040111 25 Cough/Cold N 88815 Some County XX 1 4 • Purchase Date • Units • Product Category • Promotion Indicator • Postal Zone • County • State • Reporting Stores • Participating Stores
  • 250.
    July 14, 2015Page: 250 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Pharmacy OTC Sales Domain Analysis Model ProductType - categoryCode : String OTCSale - unitsSold : Integer - purchaseDate : Date - promotionIndicator : Boolean 1 0..n 1 0..n ReportingPharmacy - count : Integer 1 1..n 1 1..n ParticipatingPharmacy - count : Integer PostalZone - ZipCode : String 1 1..n 1 0..1 1 0..1 County - name : String 1 1..n State - name : String 1 1..n 1 1..n 1 1..n 1 1..n OTC Sales Domain Analysis Model 3/30/2004
  • 251.
    July 14, 2015Page: 251 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Pharmacy OTC Sales R-MIM OTCSaleEvent classCode *: <= SPLY moodCode*: <= EVN activityTime *: TS[1..1] (PurchaseDate) quantity*: PQ[1..1] (UnitsSold) 1..1 retailedProduct * typeCode *: <= SBJ subject 1..1 retailedManufacturedMaterialKind * 1..1retailerReportingPharmacy * RetailedProduct classCode *: <= RET ManufacturedMaterialKind classCode *: <= MMAT determinerCode *: <= KIND code*: CSCNE[1..1] <=ProductEntityType(Category ) ReportingPharmacy classCode *: <= ORG determinerCode *: <= QUANTIFIED_KIND quantity *:PQ[0..1](Count) PostalArea classCode *: <= PLC determinerCode *: <= INSTANCE id*:II [1..1](PostalZone) 1..1 location * ReportingPharamacyLocation 1..1 playedReportingPharamacyLocation * classCode *: <= LOCE ParticipatingPharmacy classCode *: <= ORG determinerCode *: <= QUANTIFIED_KIND quantity*: PQ[1..1] (Count) 1..1locatedParticipatingPharmacy * ParticipatingPharmacyLocation 0..1scopedParticipatingPharmacy Location classCode *: <= LOCE OTCSalesEventData (PHIM_RM000001) Description Ov er-the-counter pharmacy product saledata. OTC Pharmacy Product Sales Events RM000001v5 3/30/04 County classCode *: <= COUNTY determinerCode *: <= INSTANCE name *:TN[1..1](County Name) State classCode *: <= PROVINCE determinerCode *: <= INSTANCE name *:TN [1..1](StateName) 1..1wholeCounty PartOfCounty 1..1 playedPartOfCounty * classCode *: <= PART 1..1 wholeState PartOfState 1..1 playedPartOfState * classCode *: <= PART 1..1 pertinentPromotion * typeCode *: <= PERT pertinentInformation Promotion classCode *: <= COND moodCode*: <= EVN value*:BL[1..1](PromotionIndicator)
  • 252.
    July 14, 2015Page: 252 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Pharmacy OTC Sales HMD No Element Name Rim Source of Message Element Type Domain CS Nt (Link to tabular view) OTCSalesEventData 1 OTCSaleEvent Supply OTCSaleEvent 2 classCode Act CS SPLY CNE 3 moodCode Act CS EVN CNE 4 activityTime Act TS DesignNote: PurchaseDate 5 quantity Supply PQ DesignNote: UnitsSold 6 subject Act Subject 7 typeCode Participation CS SBJ CNE 8 retailedProduct Participation RetailedProduct 9 classCode Role CS RET CNE 10 retailedManufacturedMaterialKind Role ManufacturedMaterialKind 11 classCode Entity CS MMAT CNE 12 determinerCode Entity CS KIND CNE 13 code Entity CS ProductEntityType CNE DesignNote: Category 14 retailerReportingPharmacy Role ReportingPharmacy 15 classCode Entity CS ORG CNE 16 determinerCode Entity CS QUANTIFIED_KIND CNE 17 quantity Entity PQ DesignNote: Count 18 playedReportingPharamacyLocation Entity ReportingPharamacyLocation 19 classCode Role CS LOCE CNE 20 location Role PostalArea 21 classCode Entity CS PLC CNE 22 determinerCode Entity CS INSTANCE CNE 23 id Entity II DesignNote: PostalZone 24 playedPartOfCounty Entity PartOfCounty 25 classCode Role CS PART CNE 26 wholeCounty Role County 27 classCode Entity CS COUNTY CNE 28 determinerCode Entity CS INSTANCE CNE 29 name Entity TN DesignNote: CountyName 30 playedPartOfState Entity PartOfState 31 classCode Role CS PART CNE 32 wholeState Role State 33 classCode Entity CS PROVINCE CNE 34 determinerCode Entity CS INSTANCE CNE 35 name Entity TN DesignNote: StateName 36 scopedParticipatingPharmacyLocation Entity ParticipatingPharmacyLocation 37 classCode Role CS LOCE CNE 38 locatedParticipatingPharmacy Role ParticipatingPharmacy 39 classCode Entity CS ORG CNE 40 determinerCode Entity CS QUANTIFIED_KIND CNE 41 quantity Entity PQ DesignNote: Count 42 pertinentInformation Act PertinentInformation 43 typeCode ActRelationship CS PERT CNE 44 pertinentPromotion ActRelationship Promotion 45 classCode Act CS COND CNE 46 moodCode Act CS EVN CNE
  • 253.
    July 14, 2015Page: 253 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Pharmacy OTC Sales XML Schema <?xml version="1.0" encoding="UTF-8" standalone="no" ?> - <xs:schema xmlns:xs="http://www.w3.org/2001/XMLSchema" targetNamespace="urn:hl7-org:v3" elementFormDefault="qualified" xmlns="urn:hl7- org:v3" xmlns:voc="urn:hl7-org:v3/voc" xmlns:hl7="urn:hl7-org:v3" xmlns:msg="urn:hl7-org:v3/mif" xmlns:fo="http://www.w3.org/1999/XSL/Format"> <xs:include schemaLocation="../dt/datatypes.xsd" /> <xs:include schemaLocation="../voc/voc.xsd" /> - <xs:group name="PHIM_MT000001"> - <xs:sequence> <xs:element name="OTCSaleEvent" type="PHIM_MT000001.OTCSaleEvent" /> </xs:sequence> </xs:group> - <xs:complexType name="PHIM_MT000001.OTCSaleEvent"> - <xs:sequence> <xs:element name="activityTime" minOccurs="1" maxOccurs="1" type="TS" /> <xs:element name="quantity" minOccurs="1" maxOccurs="1" type="PQ" /> <xs:element type="PHIM_MT000001.Subject" minOccurs="1" maxOccurs="1" name="subject" /> <xs:element type="PHIM_MT000001.PertinentInformation" minOccurs="1" maxOccurs="1" name="pertinentInformation" /> </xs:sequence> <xs:attribute name="type" type="Classes" default="Supply" /> <xs:attribute name="classCode" type="ActClass" /> <xs:attribute name="moodCode" type="ActMood" /> </xs:complexType> - <xs:complexType name="PHIM_MT000001.Subject"> - <xs:sequence> <xs:element type="PHIM_MT000001.RetailedProduct" minOccurs="1" maxOccurs="1" name="retailedProduct" /> </xs:sequence> <xs:attribute name="type" type="Classes" default="Participation" /> <xs:attribute name="typeCode" type="ParticipationType" /> </xs:complexType> - <xs:complexType name="PHIM_MT000001.RetailedProduct"> - <xs:sequence> <xs:element type="PHIM_MT000001.ManufacturedMaterialKind" minOccurs="1" maxOccurs="1" name="retailedManufacturedMaterialKind" /> <xs:element type="PHIM_MT000001.ReportingPharmacy" minOccurs="1" maxOccurs="1" name="retailerReportingPharmacy" /> </xs:sequence> <xs:attribute name="type" type="Classes" default="RoleHeir" />
  • 254.
    July 14, 2015Page: 254 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Pharmacy OTC Data XML Example <?xml version="1.0" encoding="utf-8" standalone="no" ?> - <OTCSaleEvent xmlns="urn:hl7-org:v3" xmlns:xsi="http://www.w3.org/2002/XMLSchema-instance" xsi:schemaLocation="urn:hl7-org:v3 PHIM_HD000001.xsd"> <activityTime value="20040109" /> <quantity value="5" unit="" /> - <subject> - <retailedProduct> - <retailedManufacturedMaterialKind> <code code="Cough/Cold" /> </retailedManufacturedMaterialKind> - <retailerReportingPharmacy> <quantity value="1" unit="" /> - <playedReportingPharamacyLocation> - <location> <id root="2.16.840.1.113883.19.3.2409" extension="88019" displayable="true" /> - <playedPartOfCounty> - <wholeCounty> <name>Some County</name> - <playedPartOfState> - <wholeState> <name>CA</name> </wholeState> </playedPartOfState> </wholeCounty> </playedPartOfCounty> - <scopedParticipatingPharmacyLocation> - <locatedParticipatingPharmacy> <quantity value="1" unit="" /> </locatedParticipatingPharmacy> </scopedParticipatingPharmacyLocation> </location> </playedReportingPharamacyLocation> </retailerReportingPharmacy> </retailedProduct> </subject> - <pertinentInformation> - <pertinentPromotion> <value value="false" /> </pertinentPromotion>
  • 255.
    July 14, 2015Page: 255 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 V3 Modeling Tools
  • 256.
    July 14, 2015Page: 256 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 V3 Modeling Tools Rational Rose Reference Model Repository RoseTree R-MIM Designer Schema Generator RIM RIM R-MIM RIM R-MIM HMD HMD XSD
  • 257.
    July 14, 2015Page: 257 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner V3 RMIM Design Tool
  • 258.
    July 14, 2015Page: 258 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner MS-Visio R-MIM Designer
  • 259.
    July 14, 2015Page: 259 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 R-MIM Designer Stencil
  • 260.
    July 14, 2015Page: 260 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner IDPH-TRE R-MIM
  • 261.
    July 14, 2015Page: 261 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Clone Properties
  • 262.
    July 14, 2015Page: 262 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Attribute Properties
  • 263.
    July 14, 2015Page: 263 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Save RMIM to MIF Repository
  • 264.
    July 14, 2015Page: 264 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner V3 RoseTree (Model Browser)
  • 265.
    July 14, 2015Page: 265 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner RoseTree RMIM Browser
  • 266.
    July 14, 2015Page: 266 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner RoseTree HMD Generator
  • 267.
    July 14, 2015Page: 267 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Generated HMD
  • 268.
    July 14, 2015Page: 268 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Multiple Message Types
  • 269.
    July 14, 2015Page: 269 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner RoseTree HMD Export
  • 270.
    July 14, 2015Page: 270 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner MS-Excel HMD
  • 271.
    July 14, 2015Page: 271 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner V3 Schema Generator
  • 272.
    July 14, 2015Page: 272 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 XML Schema Generator HL7 Vocabulary Specification HL7 Data Type Specification HL7 XML Schema Generator Hierarchical Message Definition XML Schema Specification
  • 273.
    July 14, 2015Page: 273 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 V3 Modeling Tools Rational Rose Reference Model Repository RoseTree R-MIM Designer Schema Generator RIM RIM R-MIM RIM R-MIM HMD HMD XSD R-MIM
  • 274.
    July 14, 2015Page: 274 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 XML Schema Generator HL7 Vocabulary Specification HL7 Data Type Specification HL7 XML Schema Generator XML Schema Specification Refined Message Information ModelHierarchical Message Definition
  • 275.
    HL7 V3 MessageSpecification Core Schema
  • 276.
    July 14, 2015Page: 276 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Core Schema Our Schema Infrastructure Root.XSD Datatype.XSD Datatype- base.XSD Voc.XSD Include Include Include Include Include Include Core Schema  Our generated schema is used in conjunction with core schema specifications provided by HL7.  The core schema specifications include infrastructure root, datatype base, datatype, and vocabulary.  The core schema specifications include no domain content. They are present only to facilitate interpretation of datatypes and validation of structural vocabulary.
  • 277.
    July 14, 2015Page: 277 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner InfrastructureRoot.xsd
  • 278.
    July 14, 2015Page: 278 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Datatype.xsd
  • 279.
    July 14, 2015Page: 279 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Datatype-base.xsd
  • 280.
    July 14, 2015Page: 280 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Voc.xsd
  • 281.
    July 14, 2015Page: 281 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Core Schema Our Schema Infrastructure Root.XSD Datatype.XSD Datatype- base.XSD Voc.XSD Include Include Include Include Include Include Core Schema
  • 282.
    July 14, 2015Page: 282 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 XML Schema Generator HL7 Vocabulary Specification HL7 Data Type Specification HL7 XML Schema Generator XML Schema Specification Refined Message Information Model Datatype.XSD Voc.XSD
  • 283.
    July 14, 2015Page: 283 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 V3 Modeling Tools Rational Rose Reference Model Repository RoseTree R-MIM Designer Schema Generator RIM RIM R-MIM RIM R-MIM HMD HMD XSD R-MIM
  • 284.
    July 14, 2015Page: 284 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner V3 Design Tools
  • 285.
    July 14, 2015Page: 285 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Electronic Services and Tools Workgroup
  • 286.
    July 14, 2015Page: 286 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SESSION OVERVIEW  Messaging Artifacts ECCF  Foundational Artifacts  Design Artifacts  Specification Artifacts  HL7 v3 Message Design Example  HL7 v3 Development Tools
  • 287.
    July 14, 2015Page: 287 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Hi3 Solutions 3500 W. Olive Ave, Suite 300 Burbank, CA 91505 ww.hi3solutions.com +1 800 918- 6520
  • 288.
    July 14, 2015Page: 288 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner History, Rationale, and Future HL7 v3 Clinical Document Architecture
  • 289.
    July 14, 2015Page: 289 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SESSION OVERVIEW • KEY ASPECTS OF CDA • EARLY HISTORY OF CDA • CDA SPECIFICATION FRAMEWORK • TEMPLATED CDA AND IMPLEMENTATION GUIDES • SAMPLE HL7 V3 CDA ARTIFACTS • CONSOLIDATED CDA IMPLEMENTATION GUIDE
  • 290.
    July 14, 2015Page: 290 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Clinical Document Architecture (CDA)  The HL7 Clinical Document Architecture (CDA) is a document markup standard that specifies the structure and semantics of "clinical documents" for the purpose of exchange.  A clinical document contains observations and services and has the following characteristics:  Persistence – A clinical document continues to exist in an unaltered state, for a time period defined by local and regulatory requirements.  Stewardship – A clinical document is maintained by an organization entrusted with its care.  Potential for authentication - A clinical document is an assemblage of information that is intended to be legally authenticated.  Context - A clinical document establishes the default context for its contents.  Wholeness - Authentication of a clinical document applies to the whole and does not apply to portions of the document without the full context of the document.  Human readability – A clinical document is human readable.
  • 291.
    July 14, 2015Page: 291 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Clinical Document Architecture (CDA)  A CDA document is a defined and complete information object that can include text, images, sounds, and other multimedia content.  Key aspects of the CDA include:  CDA documents are encoded in Extensible Markup Language (XML).  CDA documents derive their meaning from the HL7 Reference Information Model (RIM) and use the HL7 Version 3 Data Types.  The CDA specification is richly expressive and flexible. Document-level, section-level and entry- level templates can be used to constrain the generic CDA specification
  • 292.
    July 14, 2015Page: 292 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner A Brief History of CDA  1997 – HL7 SGML SIG begins work on the Patient Record Architecture  1998 – Patient Record Architecture draft  1999 – CDA Release 1.0 Approved by HL7 Membership  2000 – CDA Release 1.0 adopted as an American National Standard  2000 – HL7 XML SIG becomes Structured Documents Technical Committee  2005 – Clinical Document Architecture Release 2 Adopted  2006 – Care Record Summary Implementation Guide  2007 – Continuity of Care Document Implementation Guide  2008 – Recognition of HL7 CDA by the Secretary of HHS  2008 – Submission of CDA to ISO TC-215  2009 – ISO TC-215 Approves CDA as an ISO Standard  2010 – CDA reaffirmed by HL7 and ANSI as an American National Standard  2011 – Consolidated CDA Implementation Guide  2012 - HL7 Releases New Tool for Reviewing CDA Templates  2013 - HL7 Announces a CCD® to Blue Button Transform Tool  2014 – Consolidated CDA R2 DSTU published
  • 293.
    July 14, 2015Page: 293 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Early History of the CDA  CDA® grew out of work that originated outside of HL7 in early 1996 when a group of physicians including Tom Lincoln, John Spinosa, Dan Essin, John Mattison and Bob Dolin began to meet to discuss the potential for structured markup in clinical documents.  The earliest draft was called the Kona Architecture and was developed in 1997 after the group had joined HL7.  Since that time, many people have worked on it and the basic ideas have been refined and developed along with the HL7 Version 3 framework and the Reference Information Model (RIM).  The original group morphed into the HL7 Structured Documents Work Group which is responsible for CDA and other HL7 document types.  CDA introduces the concept of incremental semantic interoperability. The minimal CDA is a small number of XML-encoded metadata fields (such as provider name, document type, document identifier, and so on) and a body which can be any commonly-used MIME type such as pdf or doc (Microsoft Word) or even a scanned image file.  The most recent version of CDA is Release 2 which is used as the foundation for all current CDA Implementation Guides. CDA Release 3 is currently under development.
  • 294.
    July 14, 2015Page: 294 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner CDA “Levels” of Conformance  The CDA standard describes conformance requirements in terms of three general levels corresponding to three different, incremental types of conformance statements:  Level 1 requirements impose constraints upon the CDA Header. The body of a Level 1 document may be XML or an alternate allowed format. If XML, it must be CDA-conformant markup.  Level 2 requirements specify constraints at the section level of a CDA XML document: most critically, the section code and the cardinality of the sections themselves, whether optional or required.  Level 3 requirements specify constraints at the entry level within a section. A specification is considered “Level 3” if it requires any entry-level templates.  These levels are rough indications of what a recipient can expect in terms of machine-processable coding and content
  • 295.
    July 14, 2015Page: 295 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner CDA SPECIFICATION FRAMEWORK
  • 296.
    July 14, 2015Page: 296 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Introduction  The HL7 Clinical Document Architecture (CDA) is a document markup standard that specifies the structure and semantics of "clinical documents" for the purpose of exchange.  The CDA is a constrained refinement of the HL7 v3 Reference Information Model (RIM) specific to the purpose of clinical document exchange.  The CDA standard is further constrained via the specification of implementation guides for specific document types, clinical domains, and document exchange scenarios.  The CDA is one of the initial set of standards, implementation specifications, and certification criteria for Electronic Health Record technology specified in Meaningful Use legislation.  The collection of implementation guides developed for CDA are being widely adopted by EMR vendors; secondary users of EMR data are aligning their information requirements with the guides in anticipation of these data becoming more readily assessable.
  • 297.
    July 14, 2015Page: 297 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Clinical Document Architecture RMIM Clinical Document Participating Entities Structured Document Sections Section Entries and Sub-Entries
  • 298.
    July 14, 2015Page: 298 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner TEMPLATED CDA AND IMPLEMENTATION GUIDES
  • 299.
    July 14, 2015Page: 299 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Sample CDA Templated Constraints Age Observation: templateId 2.16.840.1.113883.10.20.22.4.31 (open) 1. SHALL contain exactly one [1..1] @classCode="OBS" Observation (CodeSystem: HL7ActClass 2.16.840.1.113883.5.6 STATIC) (CONF:7613). 2. SHALL contain exactly one [1..1] @moodCode="EVN" Event (CodeSystem: ActMood 2.16.840.1.113883.5.1001 STATIC) (CONF:7614). 3. SHALL contain exactly one [1..1] templateId (CONF:7899) such that it  SHALL contain exactly one [1..1] @root="2.16.840.1.113883.10.20.22.4.31" (CONF:10487). 4. SHALL contain exactly one [1..1] code (CONF:7615).  This code SHALL contain exactly one [1..1] @code="445518008" Age At Onset (CodeSystem: SNOMED-CT 2.16.840.1.113883.6.96 STATIC) (CONF:16776). 5. SHALL contain exactly one [1..1] statusCode (CONF:15965).  This statusCode SHALL contain exactly one [1..1] @code="completed" Completed (CodeSystem: ActStatus 2.16.840.1.113883.5.14 STATIC) (CONF:15966). 6. SHALL contain exactly one [1..1] value with @xsi:type="PQ" (CONF:7617).  This value SHALL contain exactly one [1..1] @unit, which SHALL be selected from ValueSet AgePQ_UCUM 2.16.840.1.113883.11.20.9.21 DYNAMIC (CONF:7618).
  • 300.
    July 14, 2015Page: 300 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Segment of the CDA affected by the Age Observation template Clinical Document Participating Entities Structured Document Sections Section Entries and Sub-Entries
  • 301.
    July 14, 2015Page: 301 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Segment of the CDA affected by the Age Observation template
  • 302.
    July 14, 2015Page: 302 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Conformance Verbs  The conformance verb keyword at the start of a constraint ( SHALL , SHOULD , MAY, etc.) indicates usage conformance.  SHALL is an indication that the constraint is to be enforced without exception;  SHOULD is an indication that the constraint is optional but highly recommended; and  MAY is an indication that the constraint is optional and that adherence to the constraint is at the discretion of the document creator.
  • 303.
    July 14, 2015Page: 303 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Cardinality  The cardinality indicator (0..1, 0..*, 1..1, 1..*, etc.) specifies the allowable occurrences within an instance.  Thus, " MAY contain 0..1" and " SHOULD contain 0..1" both allow for a document to omit the particular component, but the latter is a stronger recommendation that the component be included if it is known.  The following cardinality indicators may be interpreted as follows:  0..1 as contains zero or one  1..1 as contains exactly one  2..2 as contains exactly two  1..* as contains one or more  0..* as contains zero or more  Each constraint is uniquely identified (e.g., "CONF:605") by an identifier placed at or near the end of the constraint.
  • 304.
    July 14, 2015Page: 304 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Value Set Binding  Value set bindings adhere to HL7 Vocabulary Working Group best practices, and include both a conformance verb ( SHALL , SHOULD , MAY, etc.) and an indication of DYNAMIC vs. STATIC binding.  The use of SHALL requires that the component be valued with a member from the cited value set; however, in every case any HL7 "null" value such as other (OTH) or unknown (UNK) may be used.  STATIC binding means that the allowed values of the value set do not change automatically as new values are added to a value set. That is, the binding is to a single version of a value set.  DYNAMIC binding means that the intent is to have the allowed values for a coded item automatically change (expand or contract) as the value set is maintained over time.
  • 305.
    July 14, 2015Page: 305 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SAMPLE HL7 V3 CDA ARTIFACTS
  • 306.
    July 14, 2015Page: 306 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner From Data Dict. to CDA Guide
  • 307.
    July 14, 2015Page: 307 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner From Data Dict. to CDA Guide
  • 308.
    July 14, 2015Page: 308 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner From Data Dict. to CDA Guide
  • 309.
    July 14, 2015Page: 309 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner From Data Dict. to CDA Guide
  • 310.
    July 14, 2015Page: 310 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner From Data Dict. to CDA Guide
  • 311.
    July 14, 2015Page: 311 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Implementation Guide Development 311
  • 312.
    July 14, 2015Page: 312 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner DAM: a UML representation of dictionary elements PreHospitalEcounter - arrivalDateTime :TS [0..1] - departureDateTime :TS [0..1] - dispatchDateTime :TS [0..1] + preHospitalTransportationMethodCode :TransportationMethod [0..*] PreHospitalNervousSystemObservation + glasgowComaEyeResponseValue :INT + glasgowComaMotorResponseValue :INT + glasgowComaScoreValue :INT + glasgowComaVerbalResponseCode :INT PreHospitalCirculatorySystemObservation + heartRateAmount :PQ + systolicBloodPressureAmount :PQ PreHospitalRespiratorySystemObservation + arterialOxygenSaturationAmount :PQ + respiratoryRateAmount :PQ 2.0 Submission:: RegistrySubmissionTransaction 0..1 0..1 0..1 0..1
  • 313.
    July 14, 2015Page: 313 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Organization of DAM Classes 2.0 Submission + RegistrySubmissionTransaction 1.0 Patients + Patient 3.0 Injury Events + InjuryEvent + InjurySeverityObservation 4.0 PreHospital Encounters + PreHospitalCirculatorySystemObservation + PreHospitalEcounter + PreHospitalNervousSystemObservation + PreHospitalRespiratorySystemObservation 5.0 Hospital Care Episodes + HospitalCareEpisode + HospitalCirculatorySystemObservation + HospitalNervousSystemObservation + HospitalPhysiologicalObservation + HospitalRespiratorySystemObservation + 5.1 Emergency Hospital Encounters + 5.2 InpatientHospitalEncounters
  • 314.
    July 14, 2015Page: 314 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Dictionary to DAM Element ID NTDB Dictionary Element DAM Package DAM Class DAM Attribute D_01 D_01: PATIENT’S HOME ZIP CODE 2.0 Patients Patient postalAddress D_02 D_02: PATIENT’S HOME COUNTRY 2.0 Patients Patient postalAddress D_03 D_03: PATIENT’S HOME STATE 2.0 Patients Patient postalAddress D_04 D_04: PATIENT’S HOME COUNTY 2.0 Patients Patient postalAddress D_05 D_05: PATIENT’S HOME CITY 2.0 Patients Patient postalAddress D_06 D_06: ALTERNATE HOME RESIDENCE 2.0 Patients Patient residenceStatusCode D_07 D_07: DATE OF BIRTH 2.0 Patients Patient birthDate D_08 D_08: AGE 2.0 Patients Patient eventRelatedAgeQuantity D_09 D_09: AGE UNITS 2.0 Patients Patient eventRelatedAgeQuantity D_10 D_10: RACE 2.0 Patients Patient raceCode D_11 D_11: ETHNICITY 2.0 Patients Patient ethnicCode D_12 D_12: SEX 2.0 Patients Patient genderCode DG_01 DG_01: CO-MORBID CONDITIONS 5.0 Hospital Care Episodes HospitalCareEpisode coMorbidConditionCode DG_02 DG_02: ICD-9 INJURY DIAGNOSES 5.0 Hospital Care Episodes HospitalCareEpisode injuryDiagnosisCode DG_03 DG_03: ICD-10 INJURY DIAGNOSES 5.0 Hospital Care Episodes HospitalCareEpisode injuryDiagnosisCode ED_01 ED_01: ED/HOSPITAL ARRIVAL DATE 5.0 Hospital Care Episodes HospitalCareEpisode arrivalDateTime ED_02 ED_02: ED/HOSPITAL ARRIVAL TIME 5.0 Hospital Care Episodes HospitalCareEpisode arrivalDateTime ED_03 ED_03: INITIAL ED/HOSPITAL SYSTOLIC BLOOD PRESSURE 5.0 Hospital Care Episodes HospitalCirculatorySystemObservation systolicBloodPressureAmount ED_043 ED_043: INITIAL ED/HOSPITAL PULSE RATE 5.0 Hospital Care Episodes HospitalCirculatorySystemObservation heartRateAmount ED_05 ED_05: INITIAL ED/HOSPITAL TEMPERATURE 5.0 Hospital Care Episodes HospitalPhysiologicalObservation temperatureAmount ED_06 ED_06: INITIAL ED/HOSPITAL RESPIRATORY RATE 5.0 Hospital Care Episodes HospitalRespiratorySystemObservation respiratoryRateAmount ED_07 ED_07: INITIAL ED/HOSPITAL RESPIRATORY ASSISTANCE 5.0 Hospital Care Episodes HospitalRespiratorySystemObservation respiratoryAssistanceIndicator ED_08 ED_08: INITIAL ED/HOSPITAL OXYGEN SATURATION 5.0 Hospital Care Episodes HospitalRespiratorySystemObservation arterialOxygenSaturationAmount ED_09 ED_09: INITIAL ED/HOSPITAL SUPPLEMENTAL OXYGEN 5.0 Hospital Care Episodes HospitalRespiratorySystemObservation supplementalOxygenIndicator
  • 315.
    July 14, 2015Page: 315 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner CIM: a CDA influenced UML representation of dictionary elements Domain Analysis Model 2 CDA RMIM Constrained Information Model ArterialOxygenSaturationObservation + code :CD = ObservationType - value :PQ ::RespiratorySystemObservation + classCode :CS = "OBS" + moodCode :CS = "EVN" RespiratoryRateObservation + code :CD = ObservationType - value :PQ ::RespiratorySystemObservation + classCode :CS = "OBS" + moodCode :CS = "EVN" RespiratorySystemObservation + classCode :CS = "OBS" + moodCode :CS = "EVN" PreHospitalEncounterDetail:: PreHospitalEncounter RespiratorySystemEntryRelationship + typeCode :CS = x_ActRelationsh... + contextConductionInd :BL = "true" 0..* 1 315
  • 316.
    July 14, 2015Page: 316 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Organization of CIM Classes InjuryEventSection + InjuryEventSection + StructuredBodyInjuryEventComponent + InjuryEventDetailEntry (from TraumaRegistrySubmissionDocument) TraumaRegistrySubmissionDocument + HealthcareFacility + RegistryParticipant + StructuredBodyComponent + StucturedBody + Submitter + TraumaRegistrySubmissionDocument + Patient + InjuryEventSection + PreHospital Encounter Section + Hospital Care Episode Section + EntryPoint Patient + RecordTarget + Patient + PatientRole + PatientDetailSection (from TraumaRegistrySubmissionDocument) PreHospital Encounter Section + PreHospitalEncounterSection + StructoredBodyPreHospitalEncounterComponent + PreHospitalEncounterDetail (from TraumaRegistrySubmissionDocument) Hospital Care Episode Section + HospitalCareEpisodeSection + StructuredBodyHospitalCareEpisodeComponent + HospitalCareEpisodeActivityDetail (from TraumaRegistrySubmissionDocument)
  • 317.
    July 14, 2015Page: 317 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner DAM to CIM DAM Class DAM Attribute CIM Class CIM Attribute Patient birthDate Patient birthTime Patient ethnicCode Patient ethnicGroupCode Patient eventRelatedAgeQuantity PatientAgeObservation value Patient genderCode Patient administrativeGenderCode Patient industryCode PatientIndustryObservation value Patient occupationCode PatientOccupationObservation value Patient postalAddress PatientRole addr Patient raceCode Patient raceCode Patient residenceStatusCode PatientResidenceStatusObservation value InjuryEvent abbreviatedInjuryCode AbreviatedInjuryObservation value InjuryEvent airbagDeploymentCode AirbagDeploymentObservation value InjuryEvent bodyInjuryRegionCode BodyInjuryObservation value InjuryEvent injurySeverityScoreValue SeverityScoreObservation value InjuryEvent locationTypeCode LocationTypeObservation value InjuryEvent occurenceDateTime InjuryEventAct effectiveTime InjuryEvent postalAddress PostalAddressObservation value InjuryEvent primaryInjuryCauseCode PrimaryInjuryCauseObservation value InjuryEvent safetyEquipmentUsedCode SafetyEquipmentUsedObservation value InjuryEvent supplementalInjuryCauseCode SupplementalInjuryCauseObservation value InjuryEvent workRelatedEventInd WorkRelatedObservation value PreHospitalCirculatorySystemObservation heartRateAmount HeartRateObservation value PreHospitalCirculatorySystemObservation systolicBloodPressureAmount SystolicBloodPressureObservation value PreHospitalEncounter arrivalDateTime PreHospitalEncounter effectiveTime PreHospitalEncounter departureDateTime PreHospitalEncounter effectiveTime
  • 318.
    July 14, 2015Page: 318 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner IG: Dictionary elements represented as templated CDA constraints 3 CDA RMIM Constrained Information Model NTDB Implementation Guide EMS Implementation Guide 318
  • 319.
    July 14, 2015Page: 319 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Organization of IG Templates
  • 320.
    July 14, 2015Page: 320 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Organization of IG Templates StucturedBody + classCode :CS = "DOCBODY" + moodCode :CS = "EVN" StructuredBodyComponent + typeCode :CS = "COMP" + contextConductionInd :BL = "true" TraumaRegistrySubmissionDocument + classCode :CS = "DOCCLIN" + moodCode :CS = "EVN" + id :II + code :CE = DocumentType - effectiveTime :TS PatientDetailSection::PatientDetailSection Patient::PatientRole RegistryParticipant + classCode :CS = "ASSIGNED" Submitter + typeCode :CS = "INF" + contextControlCode :CS = "OP" HealthcareFacility + classCode :CS = "ORG" + determinerCode :CS = "INSTANCE" - id :II EntryPoint Patient + RecordTarget + Patient + PatientRole + PatientDetailSection PatientDetailSection + PatientDetailSection + StucturedBodyPatientDetailComponent + PatientDemographicObservation + PatientEmploymentObservation (from Patient) InjuryEventSection::InjuryEventSection PreHospital Encounter Section:: PreHospitalEncounterSection Hospital Care Episode Section:: HospitalCareEpisodeSection InjuryEventSection + InjuryEventSection + StructuredBodyInjuryEventComponent + InjuryEventDetailEntry PreHospital Encounter Section + PreHospitalEncounterSection + StructoredBodyPreHospitalEncounterComponent + PreHospitalEncounterDetail Hospital Care Episode Section + HospitalCareEpisodeSection + StructuredBodyHospitalCareEpisodeComponent + HospitalCareEpisodeActivityDetail Name: TraumaRegistrySubmissionDocument Author: Salimah Shakir Version: 1.0 Created: 2/7/2013 9:30:31 PM Updated: 6/14/2013 12:01:15 AM Act Entity Role Participation ActRelationship Foriegn Class Legend 1..11 1..1 1 1..1 1 1..1 1 1..1 1 1..1 1 0..1 1 1..1 1 HEADER BODY ENTRIES
  • 321.
    July 14, 2015Page: 321 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Dict to DAM to CIM to IG NTDB Dictionary Element CDA Template CDA ITEM CDA Clone CDA Attribute CDA CONF D_01: PATIENT’S HOME ZIP CODE 3.1 Trauma Registry Submission Document 8.c.111 patientRole addr 27773 D_02: PATIENT’S HOME COUNTRY 3.1 Trauma Registry Submission Document 8.c.111 patientRole addr 27773 D_03: PATIENT’S HOME STATE 3.1 Trauma Registry Submission Document 8.c.111 patientRole addr 27773 D_04: PATIENT’S HOME COUNTY 3.1 Trauma Registry Submission Document 8.c.111 patientRole addr 27773 D_05: PATIENT’S HOME CITY 3.1 Trauma Registry Submission Document 8.c.111 patientRole addr 27773 D_06: ALTERNATE HOME RESIDENCE 5.3 Patient Demographic Observations Organizer 42.c.iv observation value 30000 D_07: DATE OF BIRTH 3.1 Trauma Registry Submission Document 8.c.iv.4 patient birthTime 27776 D_08: AGE 5.3 Patient Demographic Observations Organizer 43.c.iv observation value 30008 D_09: AGE UNITS 5.3 Patient Demographic Observations Organizer 43.c.iv.1 observation value@unit 30455 D_10: RACE 5.3 Patient Demographic Observations Organizer 44.c.iv observation value 30508 D_11: ETHNICITY 3.1 Trauma Registry Submission Document 8.c.iv.5 patient ethnicGroupCode 27778 D_12: SEX 3.1 Trauma Registry Submission Document 8.c.iv.3 patient administrativeGenderCode 27775 DG_01: CO-MORBID CONDITIONS 6.5 Hospital Care Episode Observation Organizer 84.c.iv observation value 30385 DG_02: ICD-9 INJURY DIAGNOSES 6.5 Hospital Care Episode Observation Organizer 85.c.iv observation value 30397 DG_03: ICD-10 INJURY DIAGNOSES 6.5 Hospital Care Episode Observation Organizer 85.c.iv observation value 30397 ED_01: ED/HOSPITAL ARRIVAL DATE 5.1 Hospital Care Episode Encounter 31 encounter effectiveTime 30341 ED_02: ED/HOSPITAL ARRIVAL TIME 5.1 Hospital Care Episode Encounter 31 encounter effectiveTime 30341 ED_03: INITIAL ED/HOSPITAL SYSTOLIC BLOOD PRESSURE 6.1 Circulatory System Observation Entry 63.c.iv observation value 29639 ED_043: INITIAL ED/HOSPITAL PULSE RATE 6.1 Circulatory System Observation Entry 62.c.iv observation value 29633 ED_05: INITIAL ED/HOSPITAL TEMPERATURE 6.7 Hospital Care Physiological Observation 100.c.iv observation value 30431 ED_06: INITIAL ED/HOSPITAL RESPIRATORY RATE 6.16 Respiratory System Observation Entry 145.c.iv observation value 30092 ED_07: INITIAL ED/HOSPITAL RESPIRATORY ASSISTANCE 6.15 Respiratory System Observation 140.c.iv observation value 30437 ED_08: INITIAL ED/HOSPITAL OXYGEN SATURATION 6.16 Respiratory System Observation Entry 144.c.iv observation value 30085 ED_09: INITIAL ED/HOSPITAL SUPPLEMENTAL OXYGEN 6.15 Respiratory System Observation 141.c.iv observation value 30441
  • 322.
    July 14, 2015Page: 322 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Trauma Registry Data Submission IG
  • 323.
    July 14, 2015Page: 323 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Introduction and Specification Overview
  • 324.
    July 14, 2015Page: 324 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Scope
  • 325.
    July 14, 2015Page: 325 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Templates
  • 326.
    July 14, 2015Page: 326 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Document Template
  • 327.
    July 14, 2015Page: 327 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Section Templates
  • 328.
    July 14, 2015Page: 328 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Entry Templates
  • 329.
    July 14, 2015Page: 329 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Subentry Templates
  • 330.
    July 14, 2015Page: 330 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Vocabulary Tables
  • 331.
    July 14, 2015Page: 331 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Implementation Guide Development
  • 332.
    July 14, 2015Page: 332 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner From Data Dict. to CDA Impl. Guide
  • 333.
    July 14, 2015Page: 333 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Consolidated CDA Implementation Guide
  • 334.
    July 14, 2015Page: 334 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Consolidated CDA
  • 335.
    July 14, 2015Page: 335 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Collaborative Work Product  This guide was produced and developed through the joint efforts of Health Level Seven (HL7), Integrating the Healthcare Environment (IHE), the Health Story Project, and the Office of the National Coordinator (ONC) within the US Department of Health and Human Services (HHS).  The project was carried out within the ONC’s Standards and Interoperability (S&I) Framework as the Clinical Document Architecture (CDA) Consolidation Project with a number of goals, one of which is providing a set of harmonized CDA templates for the US Realm.
  • 336.
    July 14, 2015Page: 336 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner US Realm Header Template 1. realmCode 2. typeId 3. templateId 4. id 5. code 6. title 7. effectiveDateTime 8. confidentialityCode 9. languageCode 10. setId 11. versionNumber
  • 337.
    July 14, 2015Page: 337 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Document Types 1. Continuity of Care Document (CCD) 2. Consultation Notes 3. Discharge Summary 4. Diagnostic Imaging Reports (DIR) 5. History and Physical (H&P) 6. Operative Note 7. Progress Note 8. Procedure Note 9. Unstructured Documents
  • 338.
    July 14, 2015Page: 338 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Continuity of Care Document (CCD)  The Continuity of Care Document (CCD) represents a core data set of the most relevant administrative, demographic, and clinical information facts about a patient's healthcare, covering one or more healthcare encounters.  It provides a means for one healthcare practitioner, system, or setting to aggregate all of the pertinent data about a patient and forward it to another to support the continuity of care.  The primary use case for the CCD is to provide a snapshot in time containing the germane clinical, demographic, and administrative data for a specific patient.  The key characteristic of a CCD is that the ServiceEvent is constrained to "PCPR". This means it does not function to report new ServiceEvents associated with performing care. It reports on care that has already been provided.  The CCD provides a historical tally of the care over a range of time and is not a record new services delivered.
  • 339.
    July 14, 2015Page: 339 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner CCD Contained Templates
  • 340.
    July 14, 2015Page: 340 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Consultation Notes  The Consultation Note is generated by a request from a clinician for an opinion or advice from another clinician.  Consultations may involve face-to-face time with the patient or may fall under the auspices of tele-medicine visits.  Consultations may occur while the patient is inpatient or ambulatory.  The Consultation note should also be used to summarize an Emergency Room or Urgent Care encounter.  A consultation note includes the reason for the referral, history of present illness, physical examination, and decision-making components (Assessment and Plan).
  • 341.
    July 14, 2015Page: 341 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Consultation Notes Contained Templates
  • 342.
    July 14, 2015Page: 342 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Discharge Summary  The Discharge Summary is a document which synopsizes a patient's admission to a hospital, LTPAC provider, or other admission.  It provides information for the continuation of care following discharge.  The Joint Commission requires the following information to be included in the Discharge Summary: • The reason for hospitalization the admission • The procedures performed, as applicable • The care, treatment, and services provided • The patient’s condition and disposition at discharge • Information provided to the patient and family • Provisions for follow-up care
  • 343.
    July 14, 2015Page: 343 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Discharge Summary Contained Templates
  • 344.
    July 14, 2015Page: 344 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner 14 Document Level Templates
  • 345.
    July 14, 2015Page: 345 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner 52 Section Level Templates
  • 346.
    July 14, 2015Page: 346 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner 88 Entry Level Templates
  • 347.
    July 14, 2015Page: 347 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Required and Optional Sections by Document Type
  • 348.
    July 14, 2015Page: 348 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner CDA Implementation Guides
  • 349.
    July 14, 2015Page: 349 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Partial list of Implementation Guides (by country)  USA  CCD (Continuity of Care Document) Rel.1  CRS (Care Record Summary)  SPL – Structured Product Label  HAI (Healthcare associated infections)  HITSP  C32 –Summary Documents Using HL7 Continuity of Care Document (CCD)  C37 – Lab Report  C48 –Encounter Document Using IHE Medical Summary (XDS-MS) Component  Consultation Notes  History and Physical  Operative Notes  Imaging Integration, Basic Imaging Reports  Canada  e-MS (electronic Medical Summary)  Germany  VHitG-Arztbrief v1.50 (discharge summary)  Addendum Laboratory  Addendum Medication  Addendum notifiable diseases (in progress)  DRV Reha-Enlassbrief  Reha-Kurzarztbrief  Nursing Summary (ePflegebericht)  South Korea  CDA conference 2004  Austria  ELGA (currently in progress)  Switzerland  CDA-CH v1.1  France  French CRS CDA Body implementation Guide (in French)  Finland  seamless Care and CDA  Finnish (CDA) implementation guides: CDA R2, V3, Medical Records, V2, CDA R (in Finnish)  Japan  Japanese Clinical Summary document (in Japanese)
  • 350.
    July 14, 2015Page: 350 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner CDA Implementation Guides (available for download from the HL7 website) 1. Clinical Oncology Treatment Plan and Summary, DSTU Release 1 2. Personal Healthcare Monitoring Report 3. Patient Generated Document Header Template, Release 1 4. Plan-to-Plan Personal Health Record (PHR) Data Transfer, Release 1 5. Public Health Case Reports (US Realm) 6. Quality Reporting Document Architecture – Category I (QRDA) DSTU Release 2 (US Realm) 7. Level 1 and 2 - Care Record Summary (US realm) 8. Level 3: Emergency Medical Services; Patient Care Report, Release 1 – US Realm 9. CDA Framework for Questionnaire Assessments, DSTU Release 2 10. Digital Signatures and Delegation of Rights, Release 1 11. Exchange of Clinical Trial Subject Data; Patient Narratives, Release 1 - US Realm 12. Genetic Testing Reports, Release 1 13. Healthcare Associated Infection (HAI) Reports 14. HIV/AIDS Services Report, Release 1 - US Realm 15. IHE Health Story Consolidation, Release 1.1 - US Realm 16. Long-Term Post-Acute Care Summary, DSTU Release 1 (US Realm) 17. Patient Assessments, Release 1 18. Quality Reporting Document Architecture - Category III (QRDA III), DSTU Release 1 19. Questionnaire Form Definition Document, Release 1 20. Questionnaire Response Document, Release 1 21. Reference Profile for EHR Interoperability, Release 1 22. Trauma Registry Data Submission, Release 1 23. Consent Directives, Release 1 24. Procedure Note, Release 1 25. greenCDA Modules for CCD®, Release 1 26. Imaging Integration; Basic Imaging Reports in CDA and DICOM, Release 1 27. Specification and Use of Reusable Information Constraint Templates, Release 1 28. Neonatal Care Reports (NCR), R1 29. Continuity of Care Document (CCD®) Release 1
  • 351.
    July 14, 2015Page: 351 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SESSION RETROSPECTIVE • KEY ASPECTS OF CDA • EARLY HISTORY OF CDA • CDA SPECIFICATION FRAMEWORK • TEMPLATED CDA AND IMPLEMENTATION GUIDES • SAMPLE HL7 V3 CDA ARTIFACTS • CONSOLIDATED CDA IMPLEMENTATION GUIDE
  • 352.
    July 14, 2015Page: 352 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Questions
  • 353.
    July 14, 2015Page: 353 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Hi3 Solutions 3500 W. Olive Ave, Suite 300 Burbank, CA 91505 ww.hi3solutions.com +1 800 918- 6520
  • 354.
    July 14, 2015Page: 354 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Specification and validation HL7 Compliance and Conformance
  • 355.
    July 14, 2015Page: 355 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SESSION OVERVIEW  SPECIFICATION CONFORMANCE PROFILING  PURPOSE AND GOAL OF CONFORMANCE PROFILING  HL7 V2 MESSAGE CONFORMANCE PROFILING  USE CASES OF MESSAGE CONFORMANCE PROFILING  CONFORMANCE VALIDATION  HI3 SOLUTIONS CONFORMANCE VALITATOR
  • 356.
    July 14, 2015Page: 356 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HDF Workflow Diagram Initiate Project Project Charter Specify Requirements Reference Models Requirement Specification Prepare Specification Design Models Specification Design Models Prepare Specification Approve Specification Approved Specification Publish Approved Specification Published Specification Prepare Specification Profiles Specification Profile Conformance Statement Proposed Specification The HDF workflow is not a waterfall methodology. Each phase builds upon the prior and may cause prior activities to be revisited and their deliverables adjusted.
  • 357.
    July 14, 2015Page: 357 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Specification Profiling During specification profiling specification models and published specifications are further refined to produce a specification profile for use in a particular environment by a defined community of users. The primary deliverable produced during specification profiling is a set of specification constraints and conformance statements. Specification Profiling Specification Constraints and Conformance Statements 1. Identify community of user for the published specification 2. Further refine and constrain specification design models 3. Document exceptions, extensions, and annotations to specifications 4. Prepare and publish specification profile 5. Prepare and publish conformance statements Published Specification
  • 358.
    July 14, 2015Page: 358 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Purpose and goals for conformance profiling
  • 359.
    July 14, 2015Page: 359 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Reveal Assumptions Revealing assumptions is an essential component of effective communication. Yes, I do play football. Do you play football?
  • 360.
    July 14, 2015Page: 360 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Reveal Assumptions Message Profiles are an effective means of documenting our assumptions about message structures Do you use HL7? MSH EVN PID [PD1] [ { NK1 } ] Yes, I use HL7. MSH EVN PID [ NK1 ] OBX
  • 361.
    July 14, 2015Page: 361 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Reduce Ambiguity Message Profiles provide a language that allows us to unambiguously express our understanding and assumptions about the information in a message structure used in a particular scenario MSH EVN PID [PD1] [ { NK1 } ]
  • 362.
    July 14, 2015Page: 362 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Highlight Conflicts Sharing message profiles provides an opportunity to identify and reconcile conflicts in our understanding and to validate our assumptions about message structures. MSH EVN PID [PD1] [ { NK1 } ] MSH EVN PID [ NK1 ] OBX
  • 363.
    July 14, 2015Page: 363 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Consolidate Viewpoints Message Profile Message Profile Message Profile MSH EVN PID [PD1] [ { NK1 } ] MSH EVN PID [ NK1 ] OBX MSH EVN { PID } [PD1] [ { GT1 } ] MSH EVN { PID } [PD1] [ { NK1 } ] [ { GT1 } ] [ OBX ]
  • 364.
    July 14, 2015Page: 364 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Value of Profiling  Reveal Assumptions  Reduce Ambiguity  Highlight Conflicts  Consolidate Viewpoints
  • 365.
    July 14, 2015Page: 365 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Profile Defined  Unambiguous specification of an HL7 data exchange standard for use within a particular community of users for a specified set of requirements  Prescribes a set of precise constraints upon one or more standard  Supported by use case analysis and interaction modeling  Measurable  What data will be passed  The format in which the data will be passed  The acknowledgement responsibilities of the receiver
  • 366.
    July 14, 2015Page: 366 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Profile Defined (cont’d)  Based on HL7, although may further constrain  Static structure and content of each message  The dynamic interactions  Parts of a profile  Use Case Model  Static Definition  Dynamic Definition  Represented as an XML document  Can be registered with HL7  May be reused by other HL7 users  May be used for documentation
  • 367.
    July 14, 2015Page: 367 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v2 Conformance Profiling
  • 368.
    July 14, 2015Page: 368 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Conceptual Overview Message Profile = Static Profile + Dynamic Profile Critical Care Unit ADT System Acknowledgement Message Initiating Message Initiating Message Clinical Data Repository
  • 369.
    July 14, 2015Page: 369 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Message conformance profile dynamic definition
  • 370.
    July 14, 2015Page: 370 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Use Case Model  Documents the scope and requirements for an HL7 Message Type or set of Message Types  May include a use case diagram or detailed text  Provides a name that clearly and concisely defines the exchange  Defines the actors, including the sending and receiving applications  Defines the responsibilities of these actors  Documents the situations in which the exchange of a particular HL7 Message Profile is required
  • 371.
    July 14, 2015Page: 371 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Dynamic Definition  Defines interaction between the sender and receiver  Acknowledgment mode supported  Conditions under which an accept and/or application level acknowledgment is expected  Always  Never  Only on success  Only on error  Interaction Model  Defines specific interactions between the applications that support message profile communication requirements  Includes interaction diagrams that illustrate the sequence of trigger event and resulting message flows between the sending and receiving applications  Dynamic can refer one to many static definitions
  • 372.
    July 14, 2015Page: 372 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Dynamic Interaction Vectra XU 5/90C BED1OFF BED1OFF BED1OFF BED1OFF BED1OFF BED1OFF BED1OFF BED1OFF BED1OFF BED1OFF POTASSIUM3.5-5.0 BED1OFF POTASSIUM3.5-5.0 POTASSIUM3.5-5.0 POTASSIUM3.5-5.0 BED1OFF POTASSIUM3.5-5.0 BED1OFF BED1OFF BED1OFF BED1OFFBED1OFF Critical Care Unit HIS/CIS Vectra XU 5/90C BED1OFF BED1OFF BED1OFF BED1OFF BED1OFF BED1OFF BED1OFF BED1OFF BED1OFF BED1OFF POTASSIUM3.5-5.0 BED1OFF POTASSIUM3.5-5.0 POTASSIUM3.5-5.0 POTASSIUM3.5-5.0 BED1OFF POTASSIUM3.5-5.0 BED1OFF BED1OFF BED1OFF BED1OFFBED1OFF Clinical Data Repository A/D/T System Order Filling Application Accept Ack Accept + App ACK Receiver Responsibility MSH-15,16 No ACK
  • 373.
    July 14, 2015Page: 373 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SIIS SIP Use Case Diagram ud Use Case Model Local Registry User 1.0 Immunization History Query 2.0 Patient Demographic Update 3.0 Vaccine Record Update Prov ider Organization SIIS Registry Administration 4.0 Immunization Statistical Analysis Trusted Third PartiesLocal Registry Administration SIIS Analysis Report SIIS Analysis Report SIIS Analysis Report SIIS Analysis Report Update Confirmation Update Confirmation Query Response Vaccine Record Update Patient Information Update Immunization History Request
  • 374.
    July 14, 2015Page: 374 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SIIS SIP Activity Model ad InteractionActivityModel Requesting Registry System SIIS SIP Immunization Information Exchange System Responding Registry System 1.1 Request Immunization Data «message» M.01 Immunization Data Request (VXQ) 2.2 Validate Immunization Data Request Message «message» M.02 Request Error Message (ACK) 2.3 Route Immunization Data Request Message2.4 Notify System Administrator «message» M.03 Immunization Data Request (VXQ) 3.1 Retrive Requested Immunization Data «datastore» D.04 Immunization Registry 3.2 Retrival Result? 3.2.1 Return "No Matching Record" Response 3.2.2 Return "Multiple Matching Records" Response 3.2.3 Return Requested Immunization Data «message» M.04 No Matching Record Response (QCK) «message» M.05 Multiple Matching Records Response (VXX) «message» M.06 Requested Immunization Data (VXR) 4.2 Validate Response Message «message» M.07 Response Message Error (ACK) 4.3 Route Response Message 4.4 Notify System Administrator «message» M.08 No Matching Record Message (QCK) «message» M.09 Multiple Matching Record Message (VXX) «message» M.10 Requested Immunization Data Message (VXR) 5.1 Refine Demographic Data 5.2 Select Desired Record 5.3 Merge Immunization Data with existing data «datastore» D.01 Immunization Registry [Valid Message] [Invalid Message] [Valid Message] [No Matching Record] [Desired Record Not Present] [Multiple Matching Records] [Single Matching Record] [Desired Record Selected] [Invalid Message] 1 2 3 4 6 5
  • 375.
    July 14, 2015Page: 375 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SIIP SIP Interaction Model sd Interactions Requesting Registry System SIIS SIP Immunization Information Exchange System Responding Registry System Vaccination Record Query (VXQ) [Invalid VXQ Message]: General Acknowledgement (ACK) [Valid VXR Message]: Vaccination Record Query (VXQ) [No Matching Record]: Query Acknowledgement (QCK) [Invalid QCK Message]: General Acknowledgement (ACK) [Valid QCK Message]: Query Acknowledgement (QCK) [Multiple Matching Records]: Vaccination Query Response (VXX) [Invalid VXX Message]: General Acknowledgement (ACK) [Valid VXX Message]: Vaccination Query Response (VXX) [Single Matching Record]: Vaccination Query Response (VXR) [Invalid VXR Message]: General Acknowledgement (ACK) [Valid VXR Message]: Vaccination Query Response (VXR)
  • 376.
    July 14, 2015Page: 376 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SIIS SIP Acknowledgement Requirements Message Source Destination Acknowledgment • Vaccination Record Query (VXQ) Requester IIES Only on error • General Acknowledgement (ACK) IIES Requester Never • Vaccination Record Query (VXQ) IIES Responder Never • Query Acknowledgement (QCK) Responder IIES Only on error • General Acknowledgement (ACK) IIES Responder Never • Query Acknowledgement (QCK) IIES Requester Never • Vaccination Query Response (VXX) Responder IIES Only on error • General Acknowledgement (ACK) IIES Responder Never • Vaccination Query Response (VXX) IIES Requester Never • Vaccination Query Response (VXR) Responder IIES Only on error • General Acknowledgement (ACK) IIES Responder Never • Vaccination Query Response (VXR) IIES Requester Never
  • 377.
    July 14, 2015Page: 377 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Message conformance profile static definition
  • 378.
    July 14, 2015Page: 378 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Static Definition  A specification for a message structure intended to support the use case  Based on a message defined in HL7 Std  Defined at the message, segment, and field levels  Follows the HL7 rules (chapter 2)  May further constrain  Identifies only those specific elements used in the exchange  Removes all instances of optionality, defining explicitly  Segments, segment groups, fields and components usage rules  Cardinalities  Value sets and coding systems  Implementation notes
  • 379.
    July 14, 2015Page: 379 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Static Definition Example ... ... ... NK1 MSH EVN PID NK1 NK1 NK1 NK1 PV1 PV2 OBX AL1 HL7 Message Structure ... NK1 MSH EVN PID NK1 NK1 NK1 NK1 PV1 PV2 OBX AL1 Message Profile Segments/Segment Groups: •Usage (Optionality) •Cardinality (min, max) Fields/Components: - Usage (Optionality) - Cardinality (min, max) - Value Sets/Coding system - Descriptions
  • 380.
    July 14, 2015Page: 380 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Profiling Concepts  Profile Types  HL7 Standard  Constrainable  Implementable  Generic term ‘message element’ used  Segment groups  Segments  Fields  Components  Sub-components  Cardinality  Usage
  • 381.
    July 14, 2015Page: 381 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Profile Types  HL7 Standard Profile  represents a specific HL7 published standard  creation and publication limited to HL7 use  Constrainable  May have optionality - not implementable  Narrower profiles may be defined based on this  Realm Specific (National, Regional, SIGs, etc.)  Organization / Application Specific  Implementation  Further constrained  No optionality
  • 382.
    July 14, 2015Page: 382 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v2 Message Elements Message Specification Segment Group Message Segment Segment Segment Field Data Element Data Type Composite Data Type Data Type Component Code Table Code Table Item Code System Term Code System
  • 383.
    July 14, 2015Page: 383 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Cardinality  Identifies minimum and maximum number of occurrences  Special values for cardinality  Minimum number of occurrences is 0, the element may be omitted from a message  The maximum value may have no practical limit (In this case, it may be identified as ‘*’)
  • 384.
    July 14, 2015Page: 384 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Cardinality Examples Value Description [0..0] Element never present [0..1] Element may be omitted and it can have at most one occurrence [1..1] Element must have exactly one occurrence [0..n] Element may be omitted or may repeat up to n times [1..n] Element must appear at least once, and may repeat up to n times [0..*] Element may be omitted or repeat for an unlimited number of times [1..*] Element must appear at least once, and may repeat unlimited number of times [m..n] Element must appear at least “m” and at most” n” times
  • 385.
    July 14, 2015Page: 385 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Usage  The circumstances under which an element appears in a message  Some elements must always be present  others may never be present  others may only be present in certain circumstances  Rules governing restrictions on the sending applications and the expected behavior of receiving applications with respect to a message element  Required  Required, but may be empty  Optional  Conditional  Conditional, but may be empty  Not supported
  • 386.
    July 14, 2015Page: 386 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Usage (continued)  R - Required  A conforming sending application  populate all “R” elements with a non-empty value  A conforming receiving application  process (save/print/archive/etc.) or ignore the information conveyed by required elements  must not raise an error due to the presence of a required element, but may raise an error due to the absence of a required element  For complete compatibility with HL7, any element designated as required in a standard HL7 message definition shall also be required in all HL7 Message Profiles of that standard message
  • 387.
    July 14, 2015Page: 387 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Usage (continued)  RE - Required but may be empty  May be missing from the message, but must be sent by the sending application if there is relevant data  A conforming sending application  must be capable of providing all “RE” element  if it knows the required values for the element, then it must send that element  if the conforming sending application does not know the required values, then element will be omitted  A conforming receiving applications  will be expected to process (save/print/archive/etc.) or ignore data contained in the element  must be able to successfully process the message if the element is omitted (I.e. no error message should be generated because the element is missing
  • 388.
    July 14, 2015Page: 388 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Usage (continued)  O - Optional  This code indicates that the Usage for this element has not yet been defined  May NOT be used in ‘Implementation’ profiles (no- optionality profiles)  Conformance cannot be tested on an Optional field
  • 389.
    July 14, 2015Page: 389 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Usage (continued)  C - Conditional  Predicate associated with this element that identifies the conditions under which the element must be present  must be testable and based on other values within the message  may be expressed as a mathematical expression or in text and may utilize operators such as equivalence, logical AND, logical OR and NOT  The conforming sending and receiving applications shall both evaluate the predicate  If the predicate is satisfied:  See rules for R (Required)  If the predicate is NOT satisfied:  A conformant sending application must NOT send the element  A conformant receiving application must NOT raise an error if the condition predicate is false and the element is not present, though it MAY raise an error if the element IS present
  • 390.
    July 14, 2015Page: 390 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Usage (continued)  CE - Conditional but may be empty  This usage also has an associated condition predicate similar to Conditional (C)  If the predicate is satisfied:  See rules for RE (Required but may be empty)  If the predicate is not satisfied:  The conformant sending application must NOT send the element  The conformant receiving application MAY raise an application error if the element IS present  X - Not supported  Conformant sending applications will NOT send the element  Conformant receiving applications MAY ignore the element if it IS present, or may raise an application error
  • 391.
    July 14, 2015Page: 391 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Optionality / Usage Relationship  Conformance Usage codes are more specific than HL7 Optionality codes HL7 Optionality Allowed Conformance Usage Comment R - Required R O - Optional R, RE, O*, C, CE, X O is only permitted for constrainable profiles C - Conditional C, CE, R** ** If satisfied by use case X – Not Supported X B – Backward Compatibility R, RE, O*, C, CE, X O is only permitted for constrainable profiles W – Withdrawn X
  • 392.
    July 14, 2015Page: 392 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Message Level Profile  Segment Definitions  The set of segments and segment groups included within the message of an HL7 Message Profile shall be defined  Any segments or segment groups that are required by HL7 shall be included  Segment Usage  Segment Cardinality  Profile does not allow for “empty” segment  HL7 abstract message syntax PLUS  Usage  Cardinality
  • 393.
    July 14, 2015Page: 393 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Message Level Profile Example ADT^A01^ADT_A01 ADT Message Usage Cardinality Chapter MSH Message Header R [1..1] 2 EVN Event Type R [1..1] 3 PID Patient Identification R [1..1] 3 [ PD1 ] Additional Demographics X [0..0] 3 [{ ROL }] Role X [0..0] 12 [{ NK1 }] Next of Kin / Associated Parties RE [0..3] 3 PV1 Patient Visit R [1..1] 3 [ PV2 ] Patient Visit - Additional Info. RE [0..1] 3 [{ ROL }] Role X [0..0] 12 [{ DB1 }] Disability Information X [0..0] 3 [{ OBX }] Observation/Result X [0..0] 7 [{ AL1 }] Allergy Information RE [0..*] 3 [{ DG1 }] Diagnosis Information X [0..0] 6 [ DRG ] Diagnosis Related Group X [0..0] 6 [{ X [0..0] PR1 Procedures X [0..0] 6 [{ ROL }] Role X [0..0] 12 }] [{ GT1 }] Guarantor X [0..0] 6 [{ X [0..0] IN1 Insurance X [0..0] 6 [ IN2 ] Insurance Additional Info. X [0..0] 6 [{ IN3 }] Insurance Additional Info - Cert. X [0..0] 6 [{ ROL }] Role X [0..0] 12 }] [ ACC ] Accident Information X [0..0] 6 [ UB1 ] Universal Bill Information X [0..0] 6 [ UB2 ] Universal Bill 92 Information X [0..0] 6 [ PDA ] Patient Death and Autopsy X [0..0] 3
  • 394.
    July 14, 2015Page: 394 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Message Level Profile Example ADT^A01^ADT_A01 ADT Message Usage Cardinality Chapter MSH Message Header R [1..1] 2 EVN Event Type R [1..1] 3 PID Patient Identification R [1..1] 3 [{ NK1 }] Next of Kin / Associated Parties RE [0..3] 3 PV1 Patient Visit R [1..1] 3 [ PV2 ] Patient Visit - Additional Info. RE [0..1] 3 [{ AL1 }] Allergy Information RE [0..*] 3
  • 395.
    July 14, 2015Page: 395 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Message Level Profile Example 2 ADT^A01^ADT_A01 ADT Message Usage Cardinality Chapter MSH Message Header R [1..1] 2 EVN Event Type R [1..1] 3 PID Patient Identification R [1..1] 3 [ PD1 ] Additional Demographics X [0..0] 3 [{ ROL }] Role X [0..0] 12 [{ NK1 }] Next of Kin / Associated Parties RE [0..10] 3 PV1 Patient Visit R [1..1] 3 [ PV2 ] Patient Visit - Additional Info. R [1..1] 3 [{ ROL }] Role X [0..0] 12 [{ DB1 }] Disability Information X [0..0] 3 [{ OBX }] Observation/Result X [0..0] 7 [{ AL1 }] Allergy Information RE [0..*] 3 [{ DG1 }] Diagnosis Information X [0..0] 6 [ DRG ] Diagnosis Related Group X [0..0] 6 [{ X [0..0] PR1 Procedures X [0..0] 6 [{ ROL }] Role X [0..0] 12 }] [{ GT1 }] Guarantor X [0..0] 6 [{ RE [0..3] IN1 Insurance R [1..1] 6 [ IN2 ] Insurance Additional Info. RE [0..1] 6 [{ IN3 }] Insurance Additional Info - Cert. X [0..0] 6 [{ ROL }] Role X [0..0] 12 }] [ ACC ] Accident Information RE [0..1] 6 [ UB1 ] Universal Bill Information X [0..0] 6 [ UB2 ] Universal Bill 92 Information X [0..0] 6 [ PDA ] Patient Death and Autopsy X [0..0] 3
  • 396.
    July 14, 2015Page: 396 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Message Level Profile Example 2 ADT^A01^ADT_A01 ADT Message Usage Cardinality Chapter MSH Message Header R [1..1] 2 EVN Event Type R [1..1] 3 PID Patient Identification R [1..1] 3 [{ NK1 }] Next of Kin / Associated Parties RE [0..10] 3 PV1 Patient Visit R [1..1] 3 [ PV2 ] Patient Visit - Additional Info. R [1..1] 3 [{ AL1 }] Allergy Information RE [0..*] 3 [{ RE [0..3] IN1 Insurance R [1..1] 6 [ IN2 ] Insurance Additional Info. RE [0..1] 6 }] [ ACC ] Accident Information RE [0..1] 6
  • 397.
    July 14, 2015Page: 397 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Segment Level Profile  The set of fields of each instance of a segment within the Message Profile  If a segment occurs multiple times, it may be represented by different segment profiles  Field Usage  Field Cardinality  Syntax (tabular HL7 segment definitions)  Length (updated)  Usage (new column)  Cardinality (new column)
  • 398.
    July 14, 2015Page: 398 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Segment Level Profile Example (PID) SEQ LEN DT Usage Cardinality TBL# ITEM# ELEMENT NAME 1 4 SI X 00104 Set ID - PID 2 20 CX RE [0..1] 00105 Patient ID 3 20 CX R [1..*] 00106 Patient Identifier List 4 20 CX X 00107 Alternate Patient ID - PID 5 48 XPN R [1..*] 00108 Patient Name 6 48 XPN RE [0..*] 00109 Mother’s Maiden Name 7 26 TS RE [0..*] 00110 Date/Time of Birth 8 1 IS RE [0..*] 0001 00111 Sex 9 48 XPN X 00112 Patient Alias 10 80 CE X 0005 00113 Race 11 106 XAD RE [0..3] 00114 Patient Address 12 4 IS X 0289 00115 County Code 13 40 XTN RE [0..3] 00116 Phone Number - Home 14 40 XTN RE [0..3] 00117 Phone Number - Business 15 60 CE X 0296 00118 Primary Language 16 80 CE X 0002 00119 Marital Status 17 80 CE X 0006 00120 Religion 18 20 CX X 00121 Patient Account Number 19 16 ST RE [0..1] 00122 SSN Number - Patient 20 25 DLN X 00123 Driver's License Number - Patient 21 20 CX X 00124 Mother's Identifier 22 80 CE X 0189 00125 Ethnic Group 23 60 ST RE [0..1] 00126 Birth Place 24 1 ID X 0136 00127 Multiple Birth Indicator 25 2 NM X 00128 Birth Order 26 80 CE X 0171 00129 Citizenship 27 60 CE X 0172 00130 Veterans Military Status 28 80 CE X 0212 00739 Nationality 29 26 TS X 00740 Patient Death Date and Time 30 1 ID X 0136 00741 Patient Death Indicator SEQ LEN DT OPT RP/# TBL# ITEM# ELEMENT NAME 1 4 SI O 00104 Set ID - PID 2 20 CX B 00105 Patient ID 3 250 CX R Y 00106 Patient Identifier List 4 20 CX B Y 00107 Alternate Patient ID - PID 5 250 XPN R Y 00108 Patient Name 6 250 XPN O Y 00109 Mother’s Maiden Name 7 26 TS O Y 00110 Date/Time of Birth 8 1 IS O Y 0001 00111 Sex 9 250 XPN B 00112 Patient Alias 10 250 CE O 0005 00113 Race 11 250 XAD O Y 00114 Patient Address 12 4 IS B 0289 00115 County Code 13 250 XTN O Y 00116 Phone Number - Home 14 250 XTN O Y 00117 Phone Number - Business 15 250 CE O 0296 00118 Primary Language 16 250 CE O 0002 00119 Marital Status 17 250 CE O 0006 00120 Religion 18 250 CX O 00121 Patient Account Number 19 16 ST B 00122 SSN Number - Patient 20 25 DLN B 00123 Driver's License Number - Patient 21 250 CX O Y 00124 Mother's Identifier 22 250 CE O Y 0189 00125 Ethnic Group 23 250 ST O 00126 Birth Place 24 1 ID O 0136 00127 Multiple Birth Indicator 25 2 NM O 00128 Birth Order 26 250 CE O Y 0171 00129 Citizenship 27 250 CE O 0172 00130 Veterans Military Status 28 250 CE B 0212 00739 Nationality 29 26 TS O 00740 Patient Death Date and Time 30 1 ID O 0136 00741 Patient Death Indicator
  • 399.
    July 14, 2015Page: 399 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Segment Level Profile Example (PID) SEQ LEN DT Usage Cardinality TBL# ITEM# ELEMENT NAME 1 4 SI X 00104 Set ID - PID 2 20 CX RE [0..1] 00105 Patient ID 3 20 CX R [1..*] 00106 Patient Identifier List 4 20 CX X 00107 Alternate Patient ID - PID 5 48 XPN R [1..*] 00108 Patient Name 6 48 XPN RE [0..*] 00109 Mother’s Maiden Name 7 26 TS RE [0..*] 00110 Date/Time of Birth 8 1 IS RE [0..*] 0001 00111 Sex 9 48 XPN X 00112 Patient Alias 10 80 CE X 0005 00113 Race 11 106 XAD RE [0..3] 00114 Patient Address 12 4 IS X 0289 00115 County Code 13 40 XTN RE [0..3] 00116 Phone Number - Home 14 40 XTN RE [0..3] 00117 Phone Number - Business 15 60 CE X 0296 00118 Primary Language 16 80 CE X 0002 00119 Marital Status 17 80 CE X 0006 00120 Religion 18 20 CX X 00121 Patient Account Number 19 16 ST RE [0..1] 00122 SSN Number - Patient 20 25 DLN X 00123 Driver's License Number - Patient 21 20 CX X 00124 Mother's Identifier 22 80 CE X 0189 00125 Ethnic Group 23 60 ST RE [0..1] 00126 Birth Place 24 1 ID X 0136 00127 Multiple Birth Indicator 25 2 NM X 00128 Birth Order 26 80 CE X 0171 00129 Citizenship 27 60 CE X 0172 00130 Veterans Military Status 28 80 CE X 0212 00739 Nationality 29 26 TS X 00740 Patient Death Date and Time 30 1 ID X 0136 00741 Patient Death Indicator
  • 400.
    July 14, 2015Page: 400 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Message Profile Identifier  Uniquely identifies static and dynamic profile  The static profile identifier is a means to uniquely identify a message profile, expressed as an ASN.1 Object Identifier (OID)  The sending application uses the profile identifiers to determine the specific HL7 Message Profile to send  Branch from ISO to HL7 and Message Profile  2.16.840.1.113883.9
  • 401.
    July 14, 2015Page: 401 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner MSH-21 Message Profile Identifier  Sites may use this field to assert adherence to, or reference, a message profile.  Message profiles contain detailed explanations of grammar, syntax, and usage for a particular message or set of messages.  Repetition of this field allows more flexibility in creating and naming message profiles.  Using repetition, this field can identify a set of message profiles that the message conforms to.  As of v2.5, the HL7 message profile identifiers might be used for conformance claims.  Prior to v2.5, the field was called Conformance Statement ID. For backward compatibility, the Conformance Statement ID can be used here.
  • 402.
    July 14, 2015Page: 402 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner How it all ties together Static Definition – Field Level Vocabulary SEQ LEN DT Usage Cardinality TBL# ITEM# ELEMENT NAME 1 4 SI X 00104 Set ID - PID 2 20 CX RE [1..1] 00105 Patient ID 3 20 CX R [1..*] 00106 Patient Identifier List 4 20 CX X 00107 Alternate Patient ID - PID 5 48 XPN R [1..*] 00108 Patient Name 6 48 XPN RE [1..*] 00109 Mother’s Maiden Name 7 26 TS RE 00110 Date/Time of Birth 8 1 IS RE 0001 00111 Sex 9 48 XPN X 00112 Patient Alias 10 80 CE X 0005 00113 Race 11 106 XAD RE [1..3] 00114 Patient Address 12 4 IS X 0289 00115 County Code 13 40 XTN RE [1..3] 00116 Phone Number - Home 14 40 XTN RE [1..3] 00117 Phone Number - Business 15 60 CE X 0296 00118 Primary Language 16 80 CE X 0002 00119 Marital Status 17 80 CE X 0006 00120 Religion 18 20 CX X 00121 Patient Account Number 19 16 ST RE 00122 SSN Number - Patient 20 25 DLN X 00123 Driver's License Number - Patient 21 20 CX X 00124 Mother's Identifier 22 80 CE X 0189 00125 Ethnic Group 23 60 ST RE 00126 Birth Place 24 1 ID X 0136 00127 Multiple Birth Indicator 25 2 NM X 00128 Birth Order 26 80 CE X 0171 00129 Citizenship 27 60 CE X 0172 00130 Veterans Military Status 28 80 CE X 0212 00739 Nationality 29 26 TS X 00740 Patient Death Date and Time 30 1 ID X 0136 00741 Patient Death Indicator : ADT Sy stem : ADT Notification Recip ient ADT^A01 ACK ^A01 Interaction Model Segment ADT Message Usage Cardinality Chapter MSH Message Header R [1..1] 2 EVN Event Type R [1..1] 3 PID Patient Identification R [1..1] 3 [ PD1 ] Additional Demographics X [0..0] 3 [{ ROL }] Role X [0..0] 12 [{ NK1 }] Next of Kin / Associated Parties RE [0..3] 3 PV1 Patient Visit R [1..1] 3 [ PV2 ] Patient Visit - Additional Info. RE [0..1] 3 [{ ROL }] Role X [0..0] 12 [{ DB1 }] Disability Information X [0..0] 3 [{ OBX }] Observation/Result X [0..0] 7 [{ AL1 }] Allergy Information RE [0..*] 3 [{ DG1 }] Diagnosis Information X [0..0] 6 [ DRG ] Diagnosis Related Group X [0..0] 6 [{ X [0..0] PR1 Procedures X [0..0] 6 [{ ROL }] Role X [0..0] 12 }] [{ GT1 }] Guarantor X [0..0] 6 [{ X [0..0] IN1 Insurance X [0..0] 6 [ IN2 ] Insurance Additional Info. X [0..0] 6 [{ IN3 }] Insurance Additional Info - Cert. X [0..0] 6 [{ ROL }] Role X [0..0] 12 }] [ ACC ] Accident Information X [0..0] 6 [ UB1 ] Universal Bill Information X [0..0] 6 [ UB2 ] Universal Bill 92 Information X [0..0] 6 [ PDA ] Patient Death and Autopsy X [0..0] 3 Dynamic Definition Static Definition – Segment Level P at ie nt P hy s ic ian A D T No tific at ion Re c ipien t A D T S y s tem A dm it/ V is it Notific ation is s u b jec t of autho riz es rec e ives notific ations en ds no tific at ion Reg is trar trig gers Use Case Model Static Definition – Message Level 1 Use Case Model 1.1 Use Case: Admit/Visit Notification 2. Dynamic Interaction Model 3 Dynamic Definition: ADT/ACK (Event A01) 3.1 ADT^A01 3.2 ACK^A01 4 Static Definition: - Message Level - ADT/ACK (event A01) 4.1 ADT^A01 4.2 ACK^A01 5 Static Defintiion - Segment Level 5.1 MSH – Message Header Segment Definition 5.2 EVN - Event Type Segment Definition 5.3 PID (Y) - Patient Demographics Segment Definition 5.4 PD1 – Patient Additional Demographic Segment Definition 5.5 NK1 - Next of kin Segment Definition 5.6 PV1 (2) - Admit Visit Info Segment Definition 5.7 AL1 - Allergy Segment Definition 5.8 MSA - Message Acknowledgment Segment Definition 5.9 ERR - Error Segment Definition 6 Static Definition - Field Level 6.1 Table 0001 – Sex 6.2 Table 0002 – Marital Status 6.3 Table 0003 – Event Type Code 6.4 Table 0004 – Patient Class 6.5 Table 0005 – Race 6.6 Table 0006 – Religion 6.7 Table 0007 – Admission Type 6.8 Table 0008 – Acknowledgement Code 6.9 Table 0009 – Ambulatory Status
  • 403.
    July 14, 2015Page: 403 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Compliance and Conformance  Compliance Messages that adhere to the rules and conventions for constructing of a specific version of a standard are compliant to that version of the standard.  Conformance Messages that adhere to the constraints of a precise and unambiguous specification called a message profile are said to be conformant to the profile. Compliance Conformance
  • 404.
    July 14, 2015Page: 404 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Conformance Profiling Benefits  Consistent Documentation  Reuse of Specification  Lower Cost of Integration  Similar to Version 3  Chaos -> order  Site Specific Profiles  Supports specific needs  Required of third-party application vendors  RFP  Simplifies introduction/acquisition of new applications
  • 405.
    July 14, 2015Page: 405 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Use Cases of Message Conformance Profiling
  • 406.
    July 14, 2015Page: 406 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner California Department of Health Services Electronic Laboratory Reporting Project
  • 407.
    July 14, 2015Page: 407 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner CA ELR Project Use Cases UC01: Report Laboratory Result UC02: Reroute Misdirected Laboratory Result UC03: Persist Laboratory Result Message Content UC04: Laboratory Result Business Intellegence / Analytics Reporting Laboratory Receiving Public Health Agency Accountable Public Health Agency ELR HUB ELR Repository Business Analysts and Statisticians
  • 408.
    July 14, 2015Page: 408 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Lab Message Supplier Inbound Laboratory Message Inbound Message Profile Transform Translate Inbound Message Mapping Canonical Laboratory Message Canonical Message Profile Transform Translate Outbound Message Mapping Outbound Laboratory Message Lab Message Consumer Knowledge Management Service Knowledge Management Service Object Graph Generation Laboratory Message Objects Object Relational Mapping Laboratory Message Respository Object Relational Map ELR Database Design Model CA Public Health Logical Data Model HL7 RIM & CDC PHLDM Canonical Message Profile Laboratory Message Object Model Extract, Transform, and Load Laboratory Datamart Business Intelligence Application Business Intelligence Application Business Intelligence Application Outbound Message Profile Extract, Transform, and Load Additional Data Sources
  • 409.
    July 14, 2015Page: 409 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Inbound Message Processing Outbound Message Processing Data Persistence Business Intelligence Lab Message Supplier Inbound Laboratory Message Inbound Message Profile Transform Translate Inbound Message Mapping Canonical Laboratory Message Canonical Message Profile Transform Translate Outbound Message Mapping Outbound Laboratory Message Lab Message Consumer Knowledge Management Service Knowledge Management Service Object Graph Generation Laboratory Message Objects Object Relational Mapping Laboratory Message Respository Object Relational Map ELR Database Design Model CA Public Health Logical Data Model HL7 RIM & CDC PHLDM Canonical Message Profile Laboratory Message Object Model Extract, Transform, and Load Laboratory Datamart Business Intelligence Application Business Intelligence Application Business Intelligence Application Outbound Message Profile Extract, Transform, and Load Additional Data Sources
  • 410.
    July 14, 2015Page: 410 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Inbound Laboratory Message Inbound Message Profile Transform Translate Inbound Message Mapping Canonical Laboratory Message Canonical Message Profile Transform Translate Outbound Message Mapping Outbound Laboratory Message Outbound Lab Message Supplier Lab Message Consumer Knowledge Management Service Knowledge Management Service Object Graph Generation Laboratory Message Objects Object Relational Mapping Laboratory Message Repository Object Relational Map ELR Database Design Model CA Public Health Logical Data Model HL7 RIM & CDC PHLDM Canonical Message Profile Laboratory Message Object Model Extract, Transform, and Load Laboratory Datamart Business Intelligence Application Business Intelligence Application Business Intelligence Application Message Profile Extract, Transform, and Load Additional Data Sources
  • 411.
    July 14, 2015Page: 411 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Message Profiles  Describe message structure and anticipated application behavior  Identify required, optional, and conditional message elements  Identify coding systems or value-sets for coded elements  Enable message validation, transformation, and persistence  Are essential for achieving system-to-system interoperability Inbound Laboratory Message Inbound Message Profile Transform Translate Inbound Message Mapping Canonical Laboratory Message Canonical Message Profile Transform Translate Outbound Message Mapping Outbound Laboratory Message Outbound Message Profile
  • 412.
    July 14, 2015Page: 412 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner California State Immunization Information System System Interface Project
  • 413.
    July 14, 2015Page: 413 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner  The California State Immunization Information System (SIIS) is a collaboration of  regional immunization registries,  local health departments,  the California Department of Health Services Immunization Branch, and  a spectrum of key stakeholders across the state of California.  The goal of SIIS is to ensure that health care providers have rapid access to complete and up-to-date immunization records.  The objective is to eliminate both missed opportunities to immunize and unnecessary duplicate immunizations.  SIIS consists of nine regional registries and two county registries.  SIIS is a system of systems each independently managed and operated.
  • 414.
    July 14, 2015Page: 414 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Regional and County Registries  Immunization Network of Northern California (INNC)  Shots For Tots KIDS Regional Immunization Registry (SFT)  Bay Area Regional Immunization Registry (BARR)  Imperial County (IMPL) **  Contra Costa County Automated Immunization Registry (CCAIR)**  Regional Immunization Data Exchange (RIDE)  Central Valley Immunization Information System (CVIIS)  Central Coast Immunization Registry (CCIR)  Los Angeles-Orange Immunization Network (LINK)  VaxTrack Regional Immunization Registry (VaxTrack)  San Diego Regional Immunization Registry (SDIR)
  • 415.
    July 14, 2015Page: 415 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner  The scope of the California Statewide Immunization Information System (SIIS) Systems Interface Project (SIP) is to design, construct, and implement a centralized electronic messaging hub that facilitates the automated exchange of immunization related data within the state of California.  The objective is to enable registry users to gain access to an individual’s complete immunization history regardless of where that history is maintained. Project Scope
  • 416.
    July 14, 2015Page: 416 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner  The premise behind the project is that, for many reasons, a person’s immunization history data becomes fragmented over time.  The data are stored and maintained in separate state registries and immunization provider information systems.  Typical scenarios that lead to this situation are changes in a person’s primary residence, changes in a person’s primary healthcare provider, and ad hoc administration of immunizations such as during travel or emergencies.  Once a person’s immunization data becomes fragmented across multiple registry or provider information systems it can be difficult to ascertain their current immunization status.  This can result in over immunization or under immunization. Problem Statement
  • 417.
    July 14, 2015Page: 417 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner ad Dynamic View Health Level Seven CDC / AIRA SIIS SIP Project Team Regional Registry HL7 v 2.5 Messaging Standard IZ Messaging Implemenation Guide Prepare Preliminary Segment Lev el Profile Preliminary Segment Lev el Profile Prepare SIIS SIP Conceptual Data Model SIIS SIP Conceptual Data Model Map Profile to Regional Systems Regional System to Profile Mapping Prepare Final Segment Lev el Profile Final Segment Lev el Profile Prepare SIIS SIP Logical Data Model SIIS SIP Logical Data Model Prepare SIIS SIP Phase I Message Lev el Profiles SIIS SIP Phase I Message Lev el Profiles Prepare SIIS SIP Vocabulary Specification SIIS SIP Vocabulary Specification Prepare IZ Implementation Guide  Prepare IZ messaging implementation guide  Prepare preliminary segment level profile  Prepare SIIS SIP conceptual data model  Map preliminary profile to regional IZ systems  Prepare final segment level profile  Prepare SIIS SIP logical data model  Prepare SIIS SIP phase I message level profiles  Prepare SIIS SIP vocabulary specification
  • 418.
    July 14, 2015Page: 418 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Immunization Messaging Implementation Guide  The Centers for Disease Control and Prevention (CDC) National Immunization Program (NIP) publishes an implementation guide for immunization data messaging.  The title of the guide is “Implementation Guide for Immunization Data Transactions using version 2.3.1 of the Health Level Seven (HL7) Standard Protocol”.  The intent of the guide is to help familiarize developers of immunization information systems with HL7 immunization message definitions and encoding rules and provide a nationally consistent implementation of those messages.  Changes to the guide are coordinated through the Data Exchange Steering Committee of the American Immunization Registry Association (AIRA) and its associated work groups.  The members of AIRA are committed to advancing the exchange of immunization data using a common protocol.
  • 419.
    July 14, 2015Page: 419 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Immunization Messaging Implementation Guide  The guide identifies the set of HL7 messages needed to enable information systems that maintain immunization records to transmit patient-specific immunization histories electronically to other systems to allow healthcare providers to have access to these records at the time health care is given.  The use cases detailed in the guide indicate that data transmission will occur as the result of four activities:  a query from one system for a patient’s vaccination record that is held in another system using the HL7 VXQ message;  a response to a query containing multiple patient “matches” to the query, but not returning vaccination records using the HL7 VXX message;  a response to a query containing the vaccination record using the HL7 VXR message; and  an unsolicited update to a vaccination record using the HL7 VXU message.  In addition to the messages used for the four primary activities the guide also includes specifications for transmission confirmation and exception notification messages; ACK and QCK.
  • 420.
    July 14, 2015Page: 420 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Preliminary Segment Level Profile Message Tree Seq ETyp DTyp Usage Min Max Table Len Reference PID 011 Segment R 1 1 Set ID - PID 001 Field SI RE 0 1 4 3.4.2.1 Patient ID 002 Field CX RE 0 1 33 3.4.2.2 Patient Identifier List 003 Field CX R 1 0 250 3.4.2.3 Alternate Patient ID - PID 004 Field CX RE 0 1 33 3.4.2.4 Patient Name 005 Field XPN R 1 0 250 3.4.2.5 Mother's Maiden Name 006 Field XPN RE 0 1 250 6.5.7.40 Date/Time Of Birth 007 Field TS RE 0 1 26 15.4.6.6 Administrative Sex 008 Field IS RE 0 1 0001 1 15.4.6.5 Patient Alias 009 Field XPN RE 0 1 250 3.4.2.9 Race 010 Field CE RE 0 1 0005 250 15.4.6.27 Patient Address 011 Field XAD RE 0 1 250 3.4.2.11 County Code 012 Field IS RE 0 1 0289 4 3.4.2.12 Phone Number - Home 013 Field XTN RE 0 1 250 3.4.2.13 Phone Number - Business 014 Field XTN RE 0 1 250 3.4.2.14 Primary Language 015 Field CE RE 0 1 0296 250 6.5.7.34 Patient Account Number 018 Field CX RE 0 1 250 3.4.2.18 SSN Number - Patient 019 Field ST RE 0 1 16 3.4.2.19 Mother's Identifier 021 Field CX RE 0 1 250 3.4.2.21 Ethnic Group 022 Field CE RE 0 1 0189 250 15.4.6.28 Birth Place 023 Field ST RE 0 1 250 3.4.2.23 Multiple Birth Indicator 024 Field ID RE 0 1 0136 1 3.4.2.24 Birth Order 025 Field NM RE 0 1 2 3.4.2.25 Citizenship 026 Field CE RE 0 2 0171 250 6.5.7.33 Veterans Military Status 027 Field CE RE 0 1 0172 250 3.4.2.27 Patient Death Date and Time 029 Field TS RE 0 1 26 3.4.2.29 Patient Death Indicator 030 Field ID RE 0 1 0136 1 3.4.2.30 Last Update Date/Time 033 Field TS RE 0 1 26 3.4.2.33 Production Class Code 038 Field CE RE 0 1 0429 250 3.4.2.38
  • 421.
    July 14, 2015Page: 421 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SIIS SIP Conceptual Data Model cd Logical Model Patient Demographics Facility identifier: char(20) name: char(50) assigningAuthorityId: char(20) namespaceId: char(20) streetAddress: char(120) city: char(50) stateOrProvince: char(50) zipOrPostalCode: char(12) country: char(3) addressType: char(3) Patient dateTimeOfBirth: timestamp birthState: char(60) multipleBirthIndicator: char(1) administrativeSex: char(1) birthOrder: numeric(2) deathDateTime: timestamp deathIndicator: char(1) lastUpdateDateTime: timestamp lastUpdateFacility: char(20) PublicityCodeID: char(20) publicityCodeEffectiveDate: datetime publicityCodeText: char(199) protectionIndicator: char(1) protectionIndicatorEffectiveDate: datetime immunizationRegistryStatus: char(1) immunizationRegistryStatusEffectiveDate: datetime PersonPostalAddress streetOrMailingAddress: char(120) streetName: char(50) dwellingNumber: char(12) city: char(50) stateOrProvince: char(50) zipOrPostalCode: char(12) addressType: char(3) countyParishCode: char(20) countryCode: char(3) PatientLanguageAbility identifier: char(20) text: char(199) preferenceIndicator: char(1) PersonTelecommunicationAddress telecommunicationUseCode: char(3) areaCityCode: numeric(5) phoneNumber: numeric(9) extension: numeric(5) anyText: char(199) Person surname: char(50) givenName: char(30) secondAndFurtherGivenNamesOrInitialsThereof: char(30) suffix: char(20) PersonIdentifier id: char(15) idType: char(6) namespaceId: char(20) PersonAlternateName typeCode: char(1) surname: char(50) givenName: char(30) secondAndFurtherGivenNamesOrInitialsThereof: char(30) suffix: char(20) PatientRelationship identifier: char(20) text: char(199) contactRoleIdentifier: char(20) contactRoleText: char(199) livingArrangement: char(2) PatientRace identifier: char(20) text: char(199) PatientEthnicGroup identifier: char(20) text: char(199) 0..* 1 1..* 1 1..* 1 0..1 1 0..* 1 0..* 1 0..* 1..* 0..*1..* 0..* 1 0..* 11..* 1
  • 422.
    July 14, 2015Page: 422 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Regional System to Segment Profile Mapping Path LINK SDIR VAXTRACK CCIR BARR RIDE INNC SFT CVIIS Imperial ProfileUsage COMMENT PID PID PID.1 SetID-PID Y Y N Y Y N Y Y Y N Y PID.3 PatientIdentifierList PID.3.1 ID Y Y N Y Y Y Y Y Y Y Y PID.3.4 assigningauthority PID.3.4.1 namespaceID Y Y N Y Y Y Y Y Y N Y PID.5 PatientName PID.5.1 familyname PID.5.1.1 surname Y Y Y Y Y Y Y Y Y Y Y PID.5.2 givenname Y Y Y Y Y Y Y Y Y Y Y PID.5.3 secondandfurthergivennamesorinitialsthereof Y Y Y Y Y Y Y Y Y Y Y PID.5.4 suffix(e.g.,JRorIII) Y Y Y Y Y Y Y Y Y N Y PID.6 Mother'sMaidenName PID.6.1 familyname PID.6.1.1 surname Y Y Y Y Y Y Y Y Y Y Y PID.7 Date/TimeOfBirth PID.7.1 Date/Time Y Y Y Y Y Y Y Y Y Y Y PID.8 AdministrativeSex Y Y Y Y Y Y Y Y Y Y Y PID.9 PatientAlias PID.9.1 familyname PID.9.1.1 surname N N Y N Y Y Y/Y Y Y Y Y PID.9.2 givenname N N Y N Y Y Y/Y Y Y Y Y PID.9.3 secondandfurthergivennamesorinitialsthereof N N Y N Y N Y/Y Y Y Y Y PID.9.4 suffix(e.g.,JRorIII) N N Y N Y N Y/Y N Y N Y PID.10 Race PID.10.1 identifier Y Y Y Y Y Y Y Y Y Y Y PID.10.2 text Y N Y Y Y N Y Y Y Y Y PID.10.3 nameofcodingsystem Y Y Y Y Y N Y Y Y N Y PID.11 PatientAddress PID.11.1 streetaddress(SAD) PID.11.1.1 streetormailingaddress Y Y Y Y Y Y Y Y Y Y Y PID.11.1.2 streetname N N N N N N N N N Y N PID.11.1.3 dwellingnumber N N N N N N N N N Y N PID.11.3 city Y Y Y Y Y Y Y Y Y Y Y PID.11.4 stateorprovince Y Y Y Y Y Y Y Y Y Y Y PID.11.5 ziporpostalcode Y Y Y Y Y Y Y Y Y Y Y PID.11.7 addresstype Y Y Y Y Y N Y Y Y Y Y PID.11.9 county/parishcode Y Y Y Y Y Y Y Y Y Y Y Element Name
  • 423.
    July 14, 2015Page: 423 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Final Segment Level Profile Message Tree Seq ETyp DTyp Usage Min Max Table PID 009 Segment R 1 1 0396 Set ID - PID 001 Field SI R 1 1 Patient Identifier List 003 Field CX R 1 * ID number 001 Component ST R 1 1 assigning authority 004 Component HD R 1 1 namespace ID 001 SubComponent IS R 1 1 0363 identifier type code 005 Component ID R 1 1 0203 Patient Name 005 Field XPN R 1 1 family name 001 Component FN R 1 1 surname 001 SubComponent ST R 1 1 given name 002 Component ST RE 0 1 second and further given names or initials thereof 003 Component ST RE 0 1 suffix (e.g., JR or III) 004 Component ST RE 0 1 name type code 007 Component ID R 1 1 0200 Mother_s Maiden Name 006 Field XPN RE 0 1 family name 001 Component FN R 1 1 surname 001 SubComponent ST R 1 1 name type code 007 Component ID R 1 1 0200 Date/Time of Birth 007 Field TS R 1 1 time 001 Component DTM R 1 1 Administrative Sex 008 Field IS R 1 1 0001 Patient Alias 009 Field XPN RE 0 * family name 001 Component FN R 1 1 surname 001 SubComponent ST R 1 1 given name 002 Component ST RE 0 1 second and further given names or initials thereof 003 Component ST RE 0 1 suffix (e.g., JR or III) 004 Component ST RE 0 1 name type code 007 Component ID R 1 1 0200 Race 010 Field CE RE 0 1 identifier 001 Component ST R 1 1 0005 text 002 Component ST RE 0 1 name of coding system 003 Component ID R 1 1 0396 alternate identifier 004 Component ST RE 0 1 alternate text 005 Component ST RE 0 1 name of alternate coding system 006 Component ID RE 0 1 0396
  • 424.
    July 14, 2015Page: 424 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SIIS SIP Logical Data Model cd Logical Model Patient Demographics Facility *PK idNumber: int FK providerOrganizationIdNumber: int addressLine1Text: char(120) addressLine2Text: char(120) cityName: char(50) statePostalCode: char(50) postalCode: char(12) countryCode: char(3) addressTypeCode: char(3) FK + FK_Facility_ProviderOrganization(int) PK + PK_Facility(int) Patient *PK idNumber: int FK facilityIdNumber: int * birthDate: datetime birthStateCode: char(60) multipleBirthIndicator: char(1) * sexCode: char(1) deathIndicator: char(1) * raceCode: char(20) * ethnicityCode: char(20) * allowableReminderTypeCode: char(20) * primaryLanguageCode: char(20) recordSharingConsentIndicator: char(1) immunizationRegistryStatusCode: char(1) FK + FK_Patient_Facility(int) PK + PK_Patient(int) PersonPostalAddress *PK idNumber: int *FK personIdNumber: int addressLine1Text: char(120) addressLine2Text: char(120) cityName: char(50) stateCode: char(50) postalCode: char(12) addressTypeCode: char(3) countyCode: char(20) FK + FK_PersonPostalAddress_Person(int) PK + PK_PersonPostalAddress(int) PersonTelecommunicationAddress *PK idNumber: int *FK personIdNumber: int telecommunicationUseCode: char(3) areaCode: numeric(5) * phoneNumber: numeric(9) extensionNumber: numeric(5) concatenatedTelecomNumber: char(199) FK + FK_PersonTelecommunicationAddress_Person(int) Person *PK idNumber: int surname: char(50) givenName: char(30) middleName: char(30) nameSuffix: char(20) PK + PK_Person(int) PersonIdentifier *PK idNumber: int FK organizationIdNumber: int * idCode: char(15) *FK personIdNumber: int idTypeCode: char(6) * idAssigningAuthority: char(20) * statusCode: char(2) FK + FK_PersonIdentifier_Organization(int) + FK_PersonIdentifier_Person(int) PersonAlternateName *PK idNumber: int *FK personIdNumber: int * typeCode: char(1) * surname: char(50) givenName: char(30) middleName: char(30) nameSuffix: char(20) FK + FK_PersonAlternateName_Person(int) PatientRelationship *PK idNumber: int *FK patientIdNumber: int * typeCode: char(20) *FK patientIdNumber: int *FK personIdNumber: int * effectiveDate: datetime FK + FK_PatientRelationship_Patient(int) + FK_PatientRelationship_Person(int) PK + PK_PatientRelationship(int) Organization *PK idNumber: int idCode: char(20) * assigningAuthorityIdCode: char(20) * name: char(50) PK + PK_ProvderOrganization(int) FacilityAlternateIdentifier *PK facilityAlternateId: char(20) *pfK FacilityIdNumber: int FK identifierAssigningAuthority: int identifierTypeCode: bigint FK + FK_FacilityAlternateIdentifier_Facility(int) + FK_FacilityAlternateIdentifier_Organization(int) PK + PK_FacilityAlternateIdentifier(char, int) TreatmentRefusal *PK reasonIdCode: char(20) *pfK vaccineAdministrationIdNumber: int FK + FK_TreatmentRefusal_VaccineAdministration(int) PK + PK_TreatmentRefusal(char, int) VaccineAdministration FK administeringProvideridNumber: int *FK patientIdNumber: int *PK idNumber: int *FK FacilityIdNumber: int * doseSequenceNumber: numeric(4) * substanceIdCode: char(20) * startDateTime: datetime * endDateTime: datetime * substanceAdministeredAmount: numeric(20) * routeIdCode: char(20) * substanceUnitOfMeasureCode: char(20) * siteIdCode: char(20) substanceLotNumber: char(20) * substanceDosageFormIdCode: char(20) * substanceManufacturerIdCode: char(20) * systemEntryDateTime: datetime FK + FK_VaccineAdministration_Facility(int) + FK_VaccineAdministration_Patient(int) + FK_VaccineAdministration_Person(int) PK + PK_VaccineAdministration(int) 0..* 1 0..* (identifierAssigningAuthority = idNumber) 0..1 0..* (personIdNumber = idNumber) 1 0..* (organizationIdNumber = idNumber) 1 0..* (providerOrganizationIdNumber = idNumber) 0..1 1..* (patientIdNumber = idNumber) 1 0..* (patientIdNumber = idNumber) 1 0..* (personIdNumber = idNumber) 1 0..* (administeringProvideridNumber = idNumber) 1 0..* (personIdNumber = idNumber) 1 0..* (personIdNumber = idNumber) 1 0..* (vaccineAdministrationIdNumber = idNumber) 1 0..* normally receives care at 1 0..* (FacilityIdNumber = idNumber) 1 0..* (patientIdNumber = idNumber) 1
  • 425.
    July 14, 2015Page: 425 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SIIS SIP Message Level Profiles  HL7 defines a message profile as “an unambiguous specification of one or more standard HL7 messages that have been analyzed for a particular use case”. It prescribes a set of precise constraints upon one or more standard HL7 messages.  A message profile eliminates ambiguity in a HL7 message specification by declaring static and semantic constraints for constituent elements of a message and the expected dynamic behavior of conformant application systems.  The SIIS SIP HL7 message profile is an extension to the NIP Implementation Guide. The profile is based upon version 2.1 of the guide published in September 2002.  The profile extends the specifications included in the guide. The profiles do not conflict with the guide; however, they are more constrained than the guide.  Messages that conform to the profile are conformant with the guide as well; although the converse may not be true.  A message profile has dynamic definition and a static definition.
  • 426.
    July 14, 2015Page: 426 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 Message Profile Dynamic Definition  The dynamic definition describes the supported use cases, interactions, and acknowledgement requirements.  Use Case Model The use case portion of the message profile dynamic definition documents the scope and requirements for an HL7 message profile or set of message profiles. The use case model documents the purpose for each message exchange; defines the actors, including the sending and receiving applications; and document the situations in which the exchange of a particular HL7 message profile is required  Interaction Model The Interaction Model illustrates the sequence of trigger events and resulting message flows between 2 or more systems. It may be in literal or graphical form. Graphical form should be a UML activity diagram.  Acknowledgement Requirements The specific HL7 acknowledgments required and/or allowed for use with the specified static definition of the HL7 message profile is defined. Specifically, the dynamic definition identifies whether accept and application level acknowledgments are allowed or required. For any one static definition there may be one or more dynamic definitions. The dynamic definition defines the conditions under which accept and application level acknowledgments are expected. Allowed conditions include: Always, Never, Only on success, and Only on error.
  • 427.
    July 14, 2015Page: 427 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 Message Profile Static Definition  The static definition describes usage rules, cardinalities, and code systems.  Usage Rules Usage refers to the circumstances under which an element appears in a message instance. Some elements must always be present, others may never be present, and others may only be present in certain circumstances. HL7 has defined a set of codes to clearly identify the rules governing the presence of a particular element. These usage codes expand/clarify the optionality codes defined in the HL7 standard.  Cardinality Cardinality identifies the minimum and maximum number of occurrences for a particular element (Segment Group, Segment or Field). Cardinalities are expressed as a minimum-maximum pair of non-negative integers. A conformant application must always send at least the minimum number of occurrences, and may never send more than the maximum number of occurrences.  Vocabulary Specification Vocabulary specifications declare an organized set of code systems and code system terms. Code system terms are coded concepts including concept codes, concept names, and concept relationships. Code system terms are collected into value sets declared as code tables associated with segment fields and data type components. The static definition declares the value sets for tables associated with coded message elements. Some of the value sets are HL7 defined, third party defined, or user defined.
  • 428.
    July 14, 2015Page: 428 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SIIS SIP Use Case Diagram ud Use Case Model Local Registry User 1.0 Immunization History Query 2.0 Patient Demographic Update 3.0 Vaccine Record Update Provider Organization SIIS Registry Administration 4.0 Immunization Statistical Analysis Trusted Third PartiesLocal Registry Administration SIIS Analysis Report SIIS Analysis Report SIIS Analysis Report SIIS Analysis Report Update Confirmation Update Confirmation Query Response Vaccine Record Update Patient Information Update Immunization History Request
  • 429.
    July 14, 2015Page: 429 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SIIS SIP Activity Model ad InteractionActivityModel Requesting Registry System SIIS SIP Immunization Information Exchange System Responding Registry System 1.1 Request Immunization Data «message» M.01 Immunization Data Request (VXQ) 2.2 Validate Immunization Data Request Message «message» M.02 Request Error Message (ACK) 2.3 Route Immunization Data Request Message2.4 Notify System Administrator «message» M.03 Immunization Data Request (VXQ) 3.1 Retrive Requested Immunization Data «datastore» D.04 Immunization Registry 3.2 Retrival Result? 3.2.1 Return "No Matching Record" Response 3.2.2 Return "Multiple Matching Records" Response 3.2.3 Return Requested Immunization Data «message» M.04 No Matching Record Response (QCK) «message» M.05 Multiple Matching Records Response (VXX) «message» M.06 Requested Immunization Data (VXR) 4.2 Validate Response Message «message» M.07 Response Message Error (ACK) 4.3 Route Response Message 4.4 Notify System Administrator «message» M.08 No Matching Record Message (QCK) «message» M.09 Multiple Matching Record Message (VXX) «message» M.10 Requested Immunization Data Message (VXR) 5.1 Refine Demographic Data 5.2 Select Desired Record 5.3 Merge Immunization Data with existing data «datastore» D.01 Immunization Registry [Valid Message] [Invalid Message] [Valid Message] [No Matching Record] [Desired Record Not Present] [Multiple Matching Records] [Single Matching Record] [Desired Record Selected] [Invalid Message] 1 2 3 4 6 5
  • 430.
    July 14, 2015Page: 430 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SIIP SIP Interaction Model sd Interactions Requesting Registry System SIIS SIP Immunization Information Exchange System Responding Registry System Vaccination Record Query (VXQ) [Invalid VXQ Message]: General Acknowledgement (ACK) [Valid VXR Message]: Vaccination Record Query (VXQ) [No Matching Record]: Query Acknowledgement (QCK) [Invalid QCK Message]: General Acknowledgement (ACK) [Valid QCK Message]: Query Acknowledgement (QCK) [Multiple Matching Records]: Vaccination Query Response (VXX) [Invalid VXX Message]: General Acknowledgement (ACK) [Valid VXX Message]: Vaccination Query Response (VXX) [Single Matching Record]: Vaccination Query Response (VXR) [Invalid VXR Message]: General Acknowledgement (ACK) [Valid VXR Message]: Vaccination Query Response (VXR)
  • 431.
    July 14, 2015Page: 431 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SIIS SIP Acknowledgement Requirements Message Source Destination Acknowledgment • Vaccination Record Query (VXQ) Requester IIES Only on error • General Acknowledgement (ACK) IIES Requester Never • Vaccination Record Query (VXQ) IIES Responder Never • Query Acknowledgement (QCK) Responder IIES Only on error • General Acknowledgement (ACK) IIES Responder Never • Query Acknowledgement (QCK) IIES Requester Never • Vaccination Query Response (VXX) Responder IIES Only on error • General Acknowledgement (ACK) IIES Responder Never • Vaccination Query Response (VXX) IIES Requester Never • Vaccination Query Response (VXR) Responder IIES Only on error • General Acknowledgement (ACK) IIES Responder Never • Vaccination Query Response (VXR) IIES Requester Never
  • 432.
    July 14, 2015Page: 432 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SIIS SIP Message Profile Static Definitions  The static definition portion of the message profile declares the usage and cardinality constraints for the constituent message elements of the SIIS SIP HL7 messages.  There is a static definition for each message type (VXQ, VXX, VXR, QCK, and ACK).  Each static definition includes a message level, segment level, and field level definition.  The static definition also includes a supported elements definition.  The supported elements definition is a field level definition containing supported message elements only.
  • 433.
    July 14, 2015Page: 433 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SIIS SIP Message Profile Static Definitions  The static definition portion of the message profile declares the usage and cardinality constraints for the constituent message elements of the SIIS SIP HL7 messages.  There is a static definition for each message type (VXQ, VXX, VXR, QCK, and ACK).  Each static definition includes a message level, segment level, and field level definition.  The static definition also includes a supported elements definition.  The supported elements definition is a field level definition containing supported message elements only.
  • 434.
    July 14, 2015Page: 434 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SIIS SIP Message Profile Static Definitions  The static definition portion of the message profile declares the usage and cardinality constraints for the constituent message elements of the SIIS SIP HL7 messages.  There is a static definition for each message type (VXQ, VXX, VXR, QCK, and ACK).  Each static definition includes a message level, segment level, and field level definition.  The static definition also includes a supported elements definition.  The supported elements definition is a field level definition containing supported message elements only.
  • 435.
    July 14, 2015Page: 435 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SIIS SIP Message Profile Vocabulary Specification  The Health Level Seven (HL7) message profile vocabulary specification is a companion document to the California State Immunization Information System System Interface Project HL7 message profiles.  The specification contains the value sets for supported coded message elements identified in the profile.  The values presented in this specification are the primary code values to be used for coded message elements in the SIIS SIP message profile.  Fields with a data type of CE may include an equivalent code drawn from an alternate coding system. However, the values included in this specification must be used as the primary code.
  • 436.
    July 14, 2015Page: 436 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SIIS SIP Message Profile Vocabulary Specification  The Health Level Seven (HL7) message profile vocabulary specification is a companion document to the California State Immunization Information System System Interface Project HL7 message profiles.  The specification contains the value sets for supported coded message elements identified in the profile.  The values presented in this specification are the primary code values to be used for coded message elements in the SIIS SIP message profile.  Fields with a data type of CE may include an equivalent code drawn from an alternate coding system. However, the values included in this specification must be used as the primary code.
  • 437.
    July 14, 2015Page: 437 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Conformance Validation
  • 438.
    July 14, 2015Page: 438 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Conformance Profile Authoring Tools  Message Workbench (MWB)  Model Driven Health Tools (MDHT)  ART-DECOR  Trifolia Workbench  MS Word
  • 439.
    July 14, 2015Page: 439 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Messaging Workbench
  • 440.
    July 14, 2015Page: 440 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner The Messaging Workbench (MWB)  For those who:  Design HL7 2.x messages  Manage specification repositories  Collaborate on varied messaging projects within and outside of their organizations  Free of charge from HL7 Web site (www.hl7.org)  Current version supports up to HL7 v2.6  NIST is working on the future plans  First level support provided by Mayo Clinic volunteer
  • 441.
    July 14, 2015Page: 441 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Model Driven Health Tools (MDHT) is an open source framework that enables community authoring.
  • 442.
    July 14, 2015Page: 442 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
  • 443.
    July 14, 2015Page: 443 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner What is ART-DECOR?  DECOR (Data Elements, Codes, OIDs and Rules) is a methodology to record the information model used by health professionals.  DECOR uses this model to generate various artifacts: documentation, XML- and test- tooling, etc.  With DECOR it is possible to improve the recorded information model by generating and resolving issues per item.  DECOR registers (amongst others) datasets, datatypes, valuesets, codes, identifications, and business rules.  The underlying data-format is XML. Generation of HTML-documentation and XML- materials is possible through transformations with stylesheets.  DECOR consists of two parts:  DECOR methodology: a framework to model artifacts (including documentation)  DECOR software: XML-schemas, XML-schematrons, XML-stylesheets.  ART (Advanced Requirement Tooling) is the DECOR user interface to create and adapt DECOR files, and to generate artifacts from DECOR files.  ART is based on the eXist-db XML database, XQuery and Orbeon XForms.
  • 444.
    July 14, 2015Page: 444 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner
  • 445.
    July 14, 2015Page: 445 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Trifolia Workbench
  • 446.
    July 14, 2015Page: 446 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Instance Validation Technologies  HL7 v2 Schema Specification  MWB Profile Validation  CDA Schema Specification  MDHT Generated Java Objects  Trifolia Generated Schematron Logic
  • 447.
    July 14, 2015Page: 447 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Instance Validation Services  NIST HL7 v2 and v3 CDA Validation  SMART C-CDA Collaborative  CDC PHIN Message Quality Framework  Lantana Consulting Group CDA Validator  IHE Gazelle HL7 Validator
  • 448.
    July 14, 2015Page: 448 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner NIST Standards and Testing
  • 449.
    July 14, 2015Page: 449 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner NIST CDA Guideline Validation
  • 450.
    July 14, 2015Page: 450 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SMART C-CDA Collaborative
  • 451.
    July 14, 2015Page: 451 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner CDC PHIN MQF
  • 452.
    July 14, 2015Page: 452 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Lantana Consulting Group CDA Validator
  • 453.
    July 14, 2015Page: 453 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner IHE Gazelle HL7 Validator
  • 454.
    July 14, 2015Page: 454 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Instance Validation Commercial Products  Middleware Vendor Products  Interface Engine Product Adapters  Hi3 Solutions Standards Conformance Validator
  • 455.
    July 14, 2015Page: 455 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Middleware Vendor Products
  • 456.
    July 14, 2015Page: 456 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Interface Engine Adapters  Interface engine adapters take advantage of public APIs made available by leading interface engine vendors.  Interface engine adapters are typically product specific and provide capabilities not otherwise available in the base product.  The CDC’s PHIN Messaging System takes advantage of the APIs provided by Orion Health Rhapsody.  Caristix has developed adapters that facilitate the reverse engineering of message instances into HL7 message profiles that are compatible with many of the leading interface engines APIs.
  • 457.
    July 14, 2015Page: 457 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner PHIN Messaging System
  • 458.
    July 14, 2015Page: 458 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Caristix HL7 Message Profiler
  • 459.
    July 14, 2015Page: 459 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Hi3 Solutions Standards Conformance Validator
  • 460.
    July 14, 2015Page: 460 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Healthcare Information Integration Infrastructure Healthcare Quality and Performance Monitoring Health Information Integration Health Information Transformation Health Information Standards Compliance Inbound Information Processing Inbound Information Processing Standard Compliance and Conformance Validation Standard Compliance and Conformance Validation Outbound Information Processing Outbound Information Processing Source Information System Source Information System Receiving Information System Receiving Information System Information Transformation Services Information Transformation Services Analysis, Visualization, and Reporting Analysis, Visualization, and Reporting Integrated Data Repository Business Intelligence & Decision Support Services Health Information Exchange Standards Health Information Exchange Standards Controlled Clinical Terminology Services Controlled Clinical Terminology Services HL7 Reference Information Model
  • 461.
    July 14, 2015Page: 461 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Health Information Standards Compliance  Hi3 Solutions’ STANDARDS CONFORMANCE VALIDATOR™ (SCV) is a comprehensive suite of application services that validates compliance with healthcare information exchange standard specifications and conformance with related implementation guides and profiles.
  • 462.
    July 14, 2015Page: 462 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Health Information Integration  Hi3 Solutions’ HEALTH INFORMATION INTEGRATOR™ (HII) is a comprehensive suite of application and database services that facilitate the transformation of data structures, translation of clinical terminologies, and integration of health information. Health Information Integration Health Information Transformation Inbound Information Processing Inbound Information Processing Outbound Information Processing Outbound Information Processing Source Information System Source Information System Receiving Information System Receiving Information System Information Transformation Services Information Transformation Services Integrated Data Repository HL7 Reference Information Model
  • 463.
    July 14, 2015Page: 463 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Healthcare Quality and Performance Measurement  Hi3 Solutions’ HEALTHCARE QUALITY MONITOR™ (HQM) is a comprehensive suite of data warehousing and business intelligence solutions geared specifically toward monitoring quality and performance in healthcare in accordance with established measurement standards. Healthcare Quality and Performance Monitoring Inbound Information Processing Inbound Information Processing Source Information System Source Information System Information Transformation Services Information Transformation Services Analysis, Visualization, and Reporting Analysis, Visualization, and Reporting Integrated Data Repository Business Intelligence & Decision Support Services HL7 Reference Information Model
  • 464.
    July 14, 2015Page: 464 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Hi3 Solutions Product Suite
  • 465.
    July 14, 2015Page: 465 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Standards Conformance Validator  Syntax Compliance  Verification of adherence to the syntax rules specified in standards.  Structural Conformance  Verification of adherence to the element usage rules specified in profiles.  Semantic Conformance  Verification of adherence to value constraints for coded data elements.
  • 466.
    July 14, 2015Page: 466 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Standards Conformance Validation
  • 467.
    July 14, 2015Page: 467 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SCV: Syntax Compliance  Verification of adherence to the syntax rules specified in standards.  Supported SDOs include:  Health Level Seven  ASC X12  ISO/TC 215  Supported standards include:  HL7 v2, v3, and CDA  X12 v5010 (834, 835, 837)  ISO Datatypes and RIM
  • 468.
    July 14, 2015Page: 468 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SCV: Structural Conformance  Verification of adherence to the element usage rules specified in profiles.  Supported communities of users include:  Integrating the Healthcare Enterprise (IHE)  Public Health Information Network (PHIN)  Biomedical Research Integrated Domain Group (BRIDG)  HL7 Clinical Interoperability Council (CIC)
  • 469.
    July 14, 2015Page: 469 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SCV: Semantic Conformance  Verification of adherence to value constraints for coded data elements.  Supported Vocabulary Servers:  PHIN VADS  NCI EVS  LexGrid  Supported Code Systems include:  LOINC  Snomed  RxNorm  ICD 9 & 10
  • 470.
    July 14, 2015Page: 470 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Hi3 Solutions SCV Targeted Standards Standards / Terminologies Profiles / Guides  Exchange Structures  HL7 v2.x  HL7 v3 Messages  HL7 v3 CDA Documents  ASC X12 v5010  Code Systems  SNOMED CT  LOINC  RxNorm  ICD 9 & 10  HL7  Birth and Fetal Death Reporting  Laboratory Results Reporting  Immunization Reporting  Consolidated CDA  X12  834 Benefit Enrollment  837 Health Care Claim  835 Health Care Claim Payment
  • 471.
    July 14, 2015Page: 471 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Standards Conformance Validation
  • 472.
    July 14, 2015Page: 472 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Hi3 Solutions Product Suite
  • 473.
    July 14, 2015Page: 473 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner SESSION RETROSPECTIVE  SPECIFICATION CONFORMANCE PROFILING  PURPOSE AND GOAL OF CONFORMANCE PROFILING  HL7 V2 MESSAGE CONFORMANCE PROFILING  USE CASES OF MESSAGE CONFORMANCE PROFILING  CONFORMANCE VALIDATION  HI3 SOLUTIONS CONFORMANCE VALIDATOR
  • 474.
    July 14, 2015Page: 474 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Questions
  • 475.
    July 14, 2015Page: 475 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Hi3 Solutions 3500 W. Olive Ave, Suite 300 Burbank, CA 91505 ww.hi3solutions.com +1 800 918- 6520
  • 476.
    July 14, 2015Page: 476 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner July 14, 2015 HL7 v3 Retrospective
  • 477.
    July 14, 2015Page: 477 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 Version 3 Topics  HL7 v3 History and Rationale  HL7 v3 Development Frameworks and Architectures  HL7 v3 Messaging Artifacts  HL7 v3 Clinical Document Architecture  HL7 Standards Compliance and Profile Conformance
  • 478.
    July 14, 2015Page: 478 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 V3 HISTORY AND RATIONALE
  • 479.
    July 14, 2015Page: 479 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner International National Inter-Enterprise Enterprise Institution Ever-Increasing Circles Source: Gartner
  • 480.
    July 14, 2015Page: 480 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 Version 3.0: What and Why  Version 3.0 is a fundamental shift in the methodology HL7 uses to develop its standards specifications.  Version 3.0 is a model-driven methodology based upon the Object Management Group’s Unified Modeling Language (UML).  Version 3.0 uses datatype specifications, vocabulary specifications, and a Reference Information Model (RIM), to derive the information component of V3 message specifications.  Version 3.0 reduces optionality, maximizes reuse, and increases consistency in HL7 message specifications.  Version 3.0 improves the quality of HL7 message specifications and includes support for conformance validation.  Version 3.0 enables HL7 implementers to leverage emerging
  • 481.
    July 14, 2015Page: 481 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3 Development Frameworks and Architectures
  • 482.
    July 14, 2015Page: 482 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner The MDF Methodology Overview
  • 483.
    July 14, 2015Page: 483 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 V3 Message Development Framework Use Case Modeling Interaction Modeling Message Design Information Modeling RIM Restrict R-MIM Serialize HMD Restrict Message Type Example Storyboard Storyboard Example D-MIM Derive Application Role Sender Receiver Trigger Event Triggers Content Interaction References
  • 484.
    July 14, 2015Page: 484 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HDF Workflow Diagram Initiate Project Project Charter Specify Requirements Reference Models Requirement Specification Prepare Specification Design Models Specification Design Models Prepare Specification Approve Specification Approved Specification Publish Approved Specification Published Specification Prepare Specification Profiles Specification Profile Conformance Statement Proposed Specification The HDF workflow is not a waterfall methodology. Each phase builds upon the prior and may cause prior activities to be revisited and their deliverables adjusted.
  • 485.
    July 14, 2015Page: 485 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner ECCF Specification Stack
  • 486.
    July 14, 2015Page: 486 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 Version 3.0 Reference Models Reference Information Model Data Type Specification Vocabulary Specification
  • 487.
    July 14, 2015Page: 487 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3 Messaging Artifacts
  • 488.
    July 14, 2015Page: 488 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3.0 Messaging Artifacts Reference Information Model Datatype Specification Vocabulary Specification Foundational Models (CIM) Dynamic Model Constrained Information Model Common Message Type Model Design Models (PIM) Hierarchical Message Definition Message Type Definition Implementation Technology Specification Message Specifications (PSM)
  • 489.
    July 14, 2015Page: 489 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3.0 Foundational Artifacts Reference Information Model Datatype Specification Vocabulary Specification The HL7 Reference Information Model is the information model from which all other information models and message specifications are derived. The HL7 Vocabulary Specification defines the set of all concepts that can be taken as valid values in an instance of a coded attribute or data type property. The HL7 Datatype Specification defines the structural format of the data carried in an attribute and influences the set of allowable values an attribute may assume.
  • 490.
    July 14, 2015Page: 490 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Normative R6 RIM Class Diagram Version 2.44 11/22/2013
  • 491.
    July 14, 2015Page: 491 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Entity classCode : CS determinerCode: CS code: CE statusCode : CS id : II Role classCode : CS code: CE effectiveTime : IVL<TS> statusCode : CS id : II Participation typeCode : CS time : IVL<TS> statusCode : CS Act classCode : CS moodCode: CS code: CD statusCode : CS effectiveTime : GTS id : II 0..1 0..* 1 0..* 1 0..* Role Link typeCode : CS effectiveTime : IVL<TS> Act Relationship typeCode : CS RIM Core Classes 0..1 0..* plays scopes 1 1 0..* 0..* 1 1 0..* 0..*
  • 492.
    July 14, 2015Page: 492 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Datatype Class Diagram T Sequence : LIST T Set : SET T Bag : BAG Quantity : QTY IntegerNumber : INT RealNumber : REAL PhysicalQuantity : PQ MonetaryAmount : MO Ratio : RTO PointInTime : TS Boolean : BL CharacterString : ST ConceptDescriptor : CD CodedValue : CV InstanceIdentifier : II TelecommunicationAddress : TEL T Interval : IVL DataValue : ANY BinaryData : BIN List_of_Boolean : LIST<BL> <<extends>> EncapsulatedData : ED <<extends>> ConceptRole : CR CodedSimpleValue : CS <<restricts>> CodedWithEquivalents : CE ISO_object_identifier : OID List_ADXP : LIST<ADXP> PostalAndResidentialAddress : AD <<extends>> AddressPart : ADXP PersonNameType : PN List_ENXP : LIST<ENXP> EntityNamePart : ENXP T PeriodicIntervalOfTime : PIVL T EventRelatedPeriodicIntervalOfTime : EIVL GeneralTimingSpecification : GTS Set_of_TS : SET<TS> <<extends>> T : T T Annotated : ANT T History_item : HXIT T History : HIST Set_of_HXIT : SET<HXIT<T>> T UncertainValueNarrative : UVN <<extends>> T UncertainValueProbabilistic : UVP T NonParametricProbabilityDistribution : NPPD Set_UVP : SET<UVP<T>> T ParametricProbabilityDistribution : PPD UniversalResourceLocator : URL <<extends>> OrganizationName : ON <<extends>> <<extends>><<extends>> <<extends>> <<extends>> <<extends>> <<extends>> <<extends>> <<extends>> <<extends>> <<extends>> <<restricts>> <<restricts>> <<restricts>> <<extends>> <<extends>> <<extends>><<extends>> <<extends>> <<extends>> <<extends>> <<extends>> <<extends>><<extends>> <<restricts>> <<extends>> <<extends>> <<extends>> <<extends>> <<extends>> <<extends>>
  • 493.
    July 14, 2015Page: 493 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 V3 Vocabulary Specification Metamodel ParentConcept VocabularyDomain name : String description : String CodedConcept conceptCode : String conceptDesignation : String 0..*0..* ValueSet name : String description : String definingExpression : String 0..* 0..* 0..* 0..* 0..* 0..* 0..* 0..* includes CodeSystem identifier : OID name : String description : String 0..*0..* 0..* 0..1 0..* 0..1 based on ValueSetContext contextExpression : String
  • 494.
    July 14, 2015Page: 494 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 Version 3.0 Reference Models ParentConcept VocabularyDomain name : String description : String CodedConcept conceptCode : String conceptDesignation : String 0..*0..* ValueSet name : String description : String definingExpression : String 0..* 0..* 0..* 0..* 0..* 0..* 0..* 0..* includes CodeSystem identifier : OID name : String description : String 0..*0..* 0..* 0..1 0..* 0..1 based on ValueSetContext contextExpression : String T Sequence : LIST T Set : SET T Bag : BAG Quantity : QTY IntegerNumber : INT RealNumber : REAL PhysicalQuantity : PQ MonetaryAmount : MO Ratio : RTO PointInTime : TS Boolean : BL CharacterString : ST ConceptDescriptor : CD CodedValue : CV InstanceIdentifier : II TelecommunicationAddress : TEL T Interval : IVL DataValue : ANY BinaryData : BIN List_of_Boolean : LIST<BL> <<extends>> EncapsulatedData : ED <<extends>> ConceptRole : CR CodedSimpleValue : CS <<restricts>> CodedWithEquivalents : CE ISO_object_identifier : OID List_ADXP : LIST<ADXP> PostalAndResidentialAddress : AD <<extends>> AddressPart : ADXP PersonNameType : PN List_ENXP : LIST<ENXP> EntityNamePart : ENXP T PeriodicIntervalOfTime : PIVL T EventRelatedPeriodicIntervalOfTime : EIVL GeneralTimingSpecification : GTS Set_of_TS : SET<TS> <<extends>> T : T T Annotated : ANT T History_item : HXIT T History : HIST Set_of_HXIT : SET<HXIT<T>> T UncertainValueNarrative : UVN <<extends>> T UncertainValueProbabilistic : UVP T NonParametricProbabilityDistribution : NPPD Set_UVP : SET<UVP<T>> T ParametricProbabilityDistribution : PPD UniversalResourceLocator : URL <<extends>> OrganizationName : ON <<extends>> <<extends>><<extends>> <<extends>> <<extends>> <<extends>> <<extends>> <<extends>> <<extends>> <<extends>> <<extends>> <<restricts>> <<restricts>> <<restricts>> <<extends>> <<extends>> <<extends>><<extends>> <<extends>> <<extends>> <<extends>> <<extends>> <<extends>><<extends>> <<restricts>> <<extends>> <<extends>> <<extends>> <<extends>> <<extends>> <<extends>>
  • 495.
    July 14, 2015Page: 495 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3.0 Messaging Design Models A Dynamic Model is a specification of information exchanges within a particular domain as described in storyboards and storyboard examples. A Design Information Model is an information structure that represents the information content for a set of messages within a particular domain area. A Common Message Type Model is a definition of a set of common message components that can be referenced in various message specifications. Dynamic Model Design Information Model Common Message Type Model
  • 496.
    July 14, 2015Page: 496 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner StaticModel DynamicModel Message Development Framework RIM Restrict R-MIM Serialize HMD Restrict Message Type Example Storyboard Storyboard Example D-MIM Derive Application Role Sender Receiver Trigger Event Triggers Content Interaction References
  • 497.
    July 14, 2015Page: 497 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner An example Interaction Diagram Application Roles Interactions
  • 498.
    July 14, 2015Page: 498 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner An example Interaction Diagram
  • 499.
    July 14, 2015Page: 499 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner V3 Constrained Information Model A_AbnormalityAssessment (COCT_RM420000UV) Description: assessment of clinical findings, including lab test results, for indications of the presence and severity of abnormal conditions AbnormalityAssessment classCode*: = "OBS" moodCode*: = "EVN" code*: CD CWE [1..1] <= V:ObservationType ("ADVERSE_REACTION") statusCode*: CS CNE [1..1] <= V:ActStatusAbortedCancelledCompleted activityTime*: TS.DATETIME [1..1] value: CD CWE [0..1] <= V:AbnormalityAssessmentValue methodCode: SET<CE> CWE [0..*] <= V:AbnormalityAssessmentMethod 1..* assessmentOutcome * typeCode*: = "OUTC" contextConductionInd*: BL [1..1] ="true" outcome AssessmentException classCode*: = "OBS" moodCode*: = "EVN" code*: CD CWE [1..1] <= V:ObservationType ("ASSERTION") value*: SC CWE [1..1] <= V:AssessmentExceptionValue AbnormalityGrade classCode*: = "OBS" moodCode*: = "EVN" code*: CD CWE [1..1] <= V:ObservationType ("SEV") uncertaintyCode: CE CNE [0..1] <= V:ActUncertainty value*: CD CWE [1..1] <= V:AbnormalityGradeValue AssessmentOutcome 0..* assessmentOutcomeAnnotation typeCode*: = "APND" contextConductionInd*: BL [1..1] ="true" appendageOf AssessmentOutcomeAnnotation classCode*: = "OBS" moodCode*: = "EVN" code*: CD CWE [1..1] <= V:ObservationType ("ASSERTION") value*: SC CWE [1..1] <= V:AssessmentOutcomeAnnotationValue Model Components  Entry Point(s)  Clones • Focal Class • Traversal Path • Choice Structure  Attributes • Datatype • Cardinality • Terminology Binding
  • 500.
    July 14, 2015Page: 500 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner CMET Reference Accession classCode*: <= ACSN moodCode*: <= EVN id*: II [1..1] CMET: (AGNT) R_Responsible [universal] (COCT_MT040000) 0..1 roleName 1..1 agent * typeCode*: <= AUT author CMET R-MIM
  • 501.
    July 14, 2015Page: 501 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3.0 Messaging Design Models An Hierarchical Message Definition is a specification of message elements including a specification of their grouping, sequence, optionality, and cardinality. A Message Type Definition is a specification of a collection of message elements and a set of rules for constructing a message instance. The Implementation Technology Specification, or ITS, defines how to represent RIM objects for transmission in messages. Hierarchical Message Definition Message Type Definition Implementation Technology Specification
  • 502.
    July 14, 2015Page: 502 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HMD Components InformationModelMapping MessageElementSpecifications CommonConstraints MessageTypeSpecification(S)
  • 503.
    July 14, 2015Page: 503 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 XML Schema Generator HL7 Vocabulary Specification HL7 Data Type Specification HL7 XML Schema Generator Hierarchical Message Definition XML Schema Specification
  • 504.
    July 14, 2015Page: 504 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 XML Schema Generator HL7 Vocabulary Specification HL7 Data Type Specification HL7 XML Schema Generator XML Schema Specification Refined Message Information Model Datatype.XSD Voc.XSD
  • 505.
    July 14, 2015Page: 505 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 V3 Modeling Tools Rational Rose Reference Model Repository RoseTree R-MIM Designer Schema Generator RIM RIM R-MIM RIM R-MIM HMD HMD XSD R-MIM
  • 506.
    July 14, 2015Page: 506 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 v3 Clinical Document Architecture
  • 507.
    July 14, 2015Page: 507 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Clinical Document Architecture RMIM Clinical Document Participating Entities Structured Document Sections Section Entries and Sub-Entries
  • 508.
    July 14, 2015Page: 508 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Implementation Guide Development 508
  • 509.
    July 14, 2015Page: 509 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Collaborative Work Product  This guide was produced and developed through the joint efforts of Health Level Seven (HL7), Integrating the Healthcare Environment (IHE), the Health Story Project, and the Office of the National Coordinator (ONC) within the US Department of Health and Human Services (HHS).  The project was carried out within the ONC’s Standards and Interoperability (S&I) Framework as the Clinical Document Architecture (CDA) Consolidation Project with a number of goals, one of which is providing a set of harmonized CDA templates for the US Realm.
  • 510.
    July 14, 2015Page: 510 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 Standards Compliance and Profile Conformance
  • 511.
    July 14, 2015Page: 511 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Reveal Assumptions Message Profiles are an effective means of documenting our assumptions about message structures Do you use HL7? MSH EVN PID [PD1] [ { NK1 } ] Yes, I use HL7. MSH EVN PID [ NK1 ] OBX
  • 512.
    July 14, 2015Page: 512 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Conceptual Overview Message Profile = Static Profile + Dynamic Profile Critical Care Unit ADT System Acknowledgement Message Initiating Message Initiating Message Clinical Data Repository
  • 513.
    July 14, 2015Page: 513 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Dynamic Interaction Vectra XU 5/90C BED1OFF BED1OFF BED1OFF BED1OFF BED1OFF BED1OFF BED1OFF BED1OFF BED1OFF BED1OFF POTASSIUM3.5-5.0 BED1OFF POTASSIUM3.5-5.0 POTASSIUM3.5-5.0 POTASSIUM3.5-5.0 BED1OFF POTASSIUM3.5-5.0 BED1OFF BED1OFF BED1OFF BED1OFFBED1OFF Critical Care Unit HIS/CIS Vectra XU 5/90C BED1OFF BED1OFF BED1OFF BED1OFF BED1OFF BED1OFF BED1OFF BED1OFF BED1OFF BED1OFF POTASSIUM3.5-5.0 BED1OFF POTASSIUM3.5-5.0 POTASSIUM3.5-5.0 POTASSIUM3.5-5.0 BED1OFF POTASSIUM3.5-5.0 BED1OFF BED1OFF BED1OFF BED1OFFBED1OFF Clinical Data Repository A/D/T System Order Filling Application Accept Ack Accept + App ACK Receiver Responsibility MSH-15,16 No ACK
  • 514.
    July 14, 2015Page: 514 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Static Definition Example ... ... ... NK1 MSH EVN PID NK1 NK1 NK1 NK1 PV1 PV2 OBX AL1 HL7 Message Structure ... NK1 MSH EVN PID NK1 NK1 NK1 NK1 PV1 PV2 OBX AL1 Message Profile Segments/Segment Groups: •Usage (Optionality) •Cardinality (min, max) Fields/Components: - Usage (Optionality) - Cardinality (min, max) - Value Sets/Coding system - Descriptions
  • 515.
    July 14, 2015Page: 515 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Message Level Profile Example ADT^A01^ADT_A01 ADT Message Usage Cardinality Chapter MSH Message Header R [1..1] 2 EVN Event Type R [1..1] 3 PID Patient Identification R [1..1] 3 [ PD1 ] Additional Demographics X [0..0] 3 [{ ROL }] Role X [0..0] 12 [{ NK1 }] Next of Kin / Associated Parties RE [0..3] 3 PV1 Patient Visit R [1..1] 3 [ PV2 ] Patient Visit - Additional Info. RE [0..1] 3 [{ ROL }] Role X [0..0] 12 [{ DB1 }] Disability Information X [0..0] 3 [{ OBX }] Observation/Result X [0..0] 7 [{ AL1 }] Allergy Information RE [0..*] 3 [{ DG1 }] Diagnosis Information X [0..0] 6 [ DRG ] Diagnosis Related Group X [0..0] 6 [{ X [0..0] PR1 Procedures X [0..0] 6 [{ ROL }] Role X [0..0] 12 }] [{ GT1 }] Guarantor X [0..0] 6 [{ X [0..0] IN1 Insurance X [0..0] 6 [ IN2 ] Insurance Additional Info. X [0..0] 6 [{ IN3 }] Insurance Additional Info - Cert. X [0..0] 6 [{ ROL }] Role X [0..0] 12 }] [ ACC ] Accident Information X [0..0] 6 [ UB1 ] Universal Bill Information X [0..0] 6 [ UB2 ] Universal Bill 92 Information X [0..0] 6 [ PDA ] Patient Death and Autopsy X [0..0] 3
  • 516.
    July 14, 2015Page: 516 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Message Level Profile Example ADT^A01^ADT_A01 ADT Message Usage Cardinality Chapter MSH Message Header R [1..1] 2 EVN Event Type R [1..1] 3 PID Patient Identification R [1..1] 3 [{ NK1 }] Next of Kin / Associated Parties RE [0..3] 3 PV1 Patient Visit R [1..1] 3 [ PV2 ] Patient Visit - Additional Info. RE [0..1] 3 [{ AL1 }] Allergy Information RE [0..*] 3
  • 517.
    July 14, 2015Page: 517 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner How it all ties together Static Definition – Field Level Vocabulary SEQ LEN DT Usage Cardinality TBL# ITEM# ELEMENT NAME 1 4 SI X 00104 Set ID - PID 2 20 CX RE [1..1] 00105 Patient ID 3 20 CX R [1..*] 00106 Patient Identifier List 4 20 CX X 00107 Alternate Patient ID - PID 5 48 XPN R [1..*] 00108 Patient Name 6 48 XPN RE [1..*] 00109 Mother’s Maiden Name 7 26 TS RE 00110 Date/Time of Birth 8 1 IS RE 0001 00111 Sex 9 48 XPN X 00112 Patient Alias 10 80 CE X 0005 00113 Race 11 106 XAD RE [1..3] 00114 Patient Address 12 4 IS X 0289 00115 County Code 13 40 XTN RE [1..3] 00116 Phone Number - Home 14 40 XTN RE [1..3] 00117 Phone Number - Business 15 60 CE X 0296 00118 Primary Language 16 80 CE X 0002 00119 Marital Status 17 80 CE X 0006 00120 Religion 18 20 CX X 00121 Patient Account Number 19 16 ST RE 00122 SSN Number - Patient 20 25 DLN X 00123 Driver's License Number - Patient 21 20 CX X 00124 Mother's Identifier 22 80 CE X 0189 00125 Ethnic Group 23 60 ST RE 00126 Birth Place 24 1 ID X 0136 00127 Multiple Birth Indicator 25 2 NM X 00128 Birth Order 26 80 CE X 0171 00129 Citizenship 27 60 CE X 0172 00130 Veterans Military Status 28 80 CE X 0212 00739 Nationality 29 26 TS X 00740 Patient Death Date and Time 30 1 ID X 0136 00741 Patient Death Indicator : ADT Sy stem : ADT Notification Recip ient ADT^A01 ACK ^A01 Interaction Model Segment ADT Message Usage Cardinality Chapter MSH Message Header R [1..1] 2 EVN Event Type R [1..1] 3 PID Patient Identification R [1..1] 3 [ PD1 ] Additional Demographics X [0..0] 3 [{ ROL }] Role X [0..0] 12 [{ NK1 }] Next of Kin / Associated Parties RE [0..3] 3 PV1 Patient Visit R [1..1] 3 [ PV2 ] Patient Visit - Additional Info. RE [0..1] 3 [{ ROL }] Role X [0..0] 12 [{ DB1 }] Disability Information X [0..0] 3 [{ OBX }] Observation/Result X [0..0] 7 [{ AL1 }] Allergy Information RE [0..*] 3 [{ DG1 }] Diagnosis Information X [0..0] 6 [ DRG ] Diagnosis Related Group X [0..0] 6 [{ X [0..0] PR1 Procedures X [0..0] 6 [{ ROL }] Role X [0..0] 12 }] [{ GT1 }] Guarantor X [0..0] 6 [{ X [0..0] IN1 Insurance X [0..0] 6 [ IN2 ] Insurance Additional Info. X [0..0] 6 [{ IN3 }] Insurance Additional Info - Cert. X [0..0] 6 [{ ROL }] Role X [0..0] 12 }] [ ACC ] Accident Information X [0..0] 6 [ UB1 ] Universal Bill Information X [0..0] 6 [ UB2 ] Universal Bill 92 Information X [0..0] 6 [ PDA ] Patient Death and Autopsy X [0..0] 3 Dynamic Definition Static Definition – Segment Level P at ie nt P hy s ic ian A D T No tific at ion Re c ipien t A D T S y s tem A dm it/ V is it Notific ation is s u b jec t of autho riz es rec e ives notific ations en ds no tific at ion Reg is trar trig gers Use Case Model Static Definition – Message Level 1 Use Case Model 1.1 Use Case: Admit/Visit Notification 2. Dynamic Interaction Model 3 Dynamic Definition: ADT/ACK (Event A01) 3.1 ADT^A01 3.2 ACK^A01 4 Static Definition: - Message Level - ADT/ACK (event A01) 4.1 ADT^A01 4.2 ACK^A01 5 Static Defintiion - Segment Level 5.1 MSH – Message Header Segment Definition 5.2 EVN - Event Type Segment Definition 5.3 PID (Y) - Patient Demographics Segment Definition 5.4 PD1 – Patient Additional Demographic Segment Definition 5.5 NK1 - Next of kin Segment Definition 5.6 PV1 (2) - Admit Visit Info Segment Definition 5.7 AL1 - Allergy Segment Definition 5.8 MSA - Message Acknowledgment Segment Definition 5.9 ERR - Error Segment Definition 6 Static Definition - Field Level 6.1 Table 0001 – Sex 6.2 Table 0002 – Marital Status 6.3 Table 0003 – Event Type Code 6.4 Table 0004 – Patient Class 6.5 Table 0005 – Race 6.6 Table 0006 – Religion 6.7 Table 0007 – Admission Type 6.8 Table 0008 – Acknowledgement Code 6.9 Table 0009 – Ambulatory Status
  • 518.
    July 14, 2015Page: 518 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Middleware Vendor Products
  • 519.
    July 14, 2015Page: 519 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Health Information Standards Compliance  Hi3 Solutions’ STANDARDS CONFORMANCE VALIDATOR™ (SCV) is a comprehensive suite of application services that validates compliance with healthcare information exchange standard specifications and conformance with related implementation guides and profiles.
  • 520.
    July 14, 2015Page: 520 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner HL7 Version 3 Topics  HL7 v3 History and Rationale  HL7 v3 Development Frameworks and Architectures  HL7 v3 Messaging Artifacts  HL7 v3 Clinical Document Architecture  HL7 Standards Compliance and Profile Conformance
  • 521.
    July 14, 2015Page: 521 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Course Topics HL7 v2 Messaging HL7 v3 Messaging HL7 Clinical Document Architecture HL7 Family of Standards HL7 Compliance and Conformance
  • 522.
    July 14, 2015Page: 522 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Q&A
  • 523.
    July 14, 2015Page: 523 of 521Hi3 Solutions ~ Your healthcare standards conformance Partner Thank You! Peace...AMS Abdul-Malik Shakir President and Chief Informatics Scientist Hi3 Solutions 3500 West Olive Ave, Suite # 300, Burbank, CA 91505 Skype: +1 9098334661  Mobile: (626) 644-4491 Email: abdulmalik.shakir@hi3Solutions.com