1. chandrashekaravinash38@gmail.com Page 1
CURRICULUM VITAE
Name: Avinash Chandrashekar
Age: 30
Date of Birth: 17/06/1985
Education: Diploma in Civil Engineering.
Marital Status: Single
Years of Exp.: 8 Years
Driving License: Qatar Driving (Valid)
Contact number: +974 55762452, +91-824-2222566,
Email: chandrashekaravinash38@gmail.com
Position: Project Engineer
Duration: Jan 2015 to Till Date
Employer: M/s. E’EMAR DEVELOPMENT & REAL ESTATE INVESTMENT
Project Name-SHK AHMAD VILLA
Built Up Area -2202 SQM
Total Cost- 45 Million Qatari Rial
Working as project engineer for private villa for Business Minister
for Qatar.
Site co-ordination with consultant and sub-contractor.
Monitoring site progress work and preparing records of
manpower and material consumed daily basis.
Keeping track on the construction and shop drawing, during
construction process and recording the same for weekly site
progress meeting, in urgent matter informing the consultant to
take necessary action.
Arranging meeting with consultant and client.
To identify non tendered/additional work and obtain
client/architect consent prior to execution of non-tendered or
additional items.
Executing accordance with HR and Management instruction on
manpower requirement with valued site condition activity.
Directly reporting to G.M daily basis.
Position: Project Engineer
Duration: July 2014 – November 2015
Employer: S.K.A.S construction
Project Name: Sai Manajaya heights (Unfurnished Apartment)
Project Cost- 32 Crore (INR) – USD 5,161,290.32
Built Up Area -1, 10,000 SQFT – 10,223 SQM
PERSONNEL DETAILS
CAREER SUMMARY
2. chandrashekaravinash38@gmail.com Page 2
Project Engineer responsibilities, includes attending all necessary
site requirement daily basis, keeping track on progress, recording
the same and planning for next schedule regarding as per the
project program.
Providing facilities to Supervisor related to site marking, site
supervision, and manpower data information, tracking usability of
current available materials or stock.
Keeping track on material consumed and making necessary excel
report to Project Manager on or in demand of material request,
with proper implement of consumable in a week time.
Doing necessary modification as per site condition in the drawing,
in accordance with site instruction report duly signed by architect
and project manager.
Reinforcement checking and functional activities required as per
when and why, it’s required or not all recorded to inform weekly
site meeting. All site activities carried out with records to produce
to higher management if required.
To identify non tendered/additional work and obtain
client/architect consent prior to execution of non-tendered or
additional items
Executing accordance with HR and Management instruction on
manpower requirement with valued site condition activity.
Position: Project Engineer
Duration: March 2012 –June 2014
Employer: Maxima Construction Mangalore
Project Name: Plama Grande
Project Cost: 26 Crore (INR) – USD 4,193,548.38
Built Up Area - 3,52,400 SQFT – 32,751 SQM
Executing & checking of civil (structure and finishing) works like
concreting, plastering, flooring, cladding, painting, etc
Attending various meetings with engineers, contractors, taking
optimum output from them and reporting to management.
Coordinating between Architects and consultants for design
related issues and identify mistakes (if any) from the drawings
prior to start our work.
Manage project resource allocation
Implement and manage project changes and interventions to
achieve projects outputs.
To identify non tendered/additional work and obtain
client/architect consent prior to execution of non-tendered or
additional items.
3. chandrashekaravinash38@gmail.com Page 3
Executing accordance with HR and Management instruction on
manpower requirement with valued site condition activity.
Position: Project Engineer
Duration: April 2011-January 2012
Employer: Al-Ramdhani Investment & Development L.L.C Oman
Project Name: Private Villa
Project Cost – 55,000.000 Omani Rial
Built Up Area- 740 SQM.
Executing & checking of civil (structure and finishing) works like
concreting, plastering, flooring, cladding, painting, etc
Attending various meetings with engineers, contractors, taking
optimum output from them and reporting to management.
Coordinating between Architects and consultants for design
related issues and identify mistakes (if any) from the drawings
prior to start our work.
Manage project resource allocation
Implement and manage project changes and interventions to
achieve projects outputs.
To identify non tendered/additional work and obtain
client/architect consent prior to execution of non-tendered or
additional items.
Executing accordance with HR and Management instruction on
manpower requirement with valued site condition activity.
Position: Project Engineer
Duration: From June 2008 to January 2011
Employer: EM Dekor, Interior contractors, Manama, Kingdom of Bahrain
Project Name: Various Projects
Project Cost: 1,454,000.000 BHD
Project Engineer, attending various meetings with PM,
Contractors, taking optimum output from them and reporting to
management, on weekly site meeting.
Maintaining Documentation.
Coordinating between Architects and consultants for design
related issues and identify mistakes (if any) from the drawings
prior to start our work.
Bahrain City Centre projects
ADDIDAS outlet-
Total Area-250 SQM – BHD 52,500.00
TOY STORE
Total Area-1800 SQM- BHD 378,000.00
4. chandrashekaravinash38@gmail.com Page 4
SANRIO OUTLET
Total Area-60 SQM- BHD 12,000.00
MARINA EXOTIC
Total Area -1200 SQM- BHD 220,000.00
REEBOK
Total Area-200 SQM –BHD 45,000.00
VIVA CALL CENTER,
Total Area -800 SQM-BHD 172,000.00
VIVA HQ
Total Area -2,300 SQM-BHD 575,000.00
Position: Project Engineer
Duration: June 2007 to June 2008
Employer: Mohtisham Builders, Mangalore
Project Name: City Centre
Project Cost: 36,290,322.000 USD
Total Area- 8,50,000 SQFT. - 78,996.28 SQM
Executing & checking of civil (structure and finishing) works like
concreting, plastering, flooring, cladding, painting, etc
Attending various meetings with engineers, contractors, taking
optimum output from them and reporting to management.
Coordinating between Architects and consultants for design
related issues and identify mistakes (if any) from the drawings
prior to start our work.
Manage project resource allocation
Implement and manage project changes and interventions to
achieve projects outputs.
To identify non tendered/additional work and obtain
client/architect consent prior to execution of non-tendered or
additional items.
Executing accordance with HR and Management instruction on
manpower requirement with valued site condition activity.
.
Profile
I am a hard working team player and I enjoy exceeding targets. I look for ways to do
things in proactive manner and get best result in terms of execution, quality, site
management, project report submittal, minutes of meeting, material consumables
control, because I am motivated by being successful and achieving in targets and
delivering best to company on financial or quality means..
Profile explained:
Seeking a position to utilize my skills and abilities in the field of project engineer and
in the field that offers professional growth while resourceful, innovative and flexible.
Key skills and achievements
5. chandrashekaravinash38@gmail.com Page 5
Readily establish a positively rapport with team members and work collaboratively
to achieve corporate goals.
These qualities, combined with dependability and dedication, should enable me to
make a valuable contribution to your company, it given the opportunity.
Planning & organizing, Decision making, verbal and written communication skills,
Ability to deal with people diplomatically, willingness to learn, Team facilitator.
Strengths
Ability to work under pressure to achieve targets.
Dedicated, Hardworking and willing to Learn.
Well versed in deriving concepts.
Comprehensive problem solving abilities
Ability to pay attention to the detail
Influencing & leading
Interests
Construction works
Interior fit out work
Software Exposures
AutoCAD advanced version 2014
MS Office 2007
Training and qualifications
1. S.S.L.C from Canara higher primary school 2002
2. Higher secondary from Sharadapre- University College 2002 to 2005
3. Diploma in civil engineering from Nitte Rukmani Adyantaya Memorial
polythenic 2005 to 2007
Declaration
I here by declare that all the above said details are true to the best of my knowledge.
Place: Qatar
(AVINASH CHANDRASHEKAR)