6. 1. Tunnel Monitoring System(TMS)
Facilities to monitor in tunnel
Overhead + Ceiling
Track
Tunnel Structure
7. 1. Tunnel Monitoring System(TMS)
Tunnel Monitoring Time for 152km?
Service Finish
Service Start
Maintenance
(AM 1:30 ~ 4:30)
Service
(AM 5:30~01:00)
8. 1. Tunnel Monitoring System(TMS)
Overview
Data access
control
Data analysis
(Revenue Train) Tunnel
Data Capture(Daytime)
Cameras + Noise
& Vibration sensors
TMS Train moving
Remote Monitoring
Data Distribution
& Analysis
Data
Storage
9. 1. Tunnel Monitoring System(TMS)
7 Cameras & Noise & Vibration Sensors
One Tunnel Monitoring train per operation line
Tunnel structure
Camera
Track
Camera
Mobile Wimax
Camera Overhead
Camera
Noise &
Vibration
sensors
10. 1. Tunnel Monitoring System(TMS)
Real view of TMS train & Components
Overhead
Track(R)
Tunnel Cam(R)
WiMAX Camera
Track (L)
Tunnel Cam(L)
Text
Text
Text
Text
Text
Noise sensor
Vibration
Sensor
Recorded Data
Storage Device
RFID Antenna
→Station IDTachometer
→ Distance calculation source
11. 1. Tunnel Monitoring System(TMS)
Real view of TMS train & Components
Camera for
Tunnel Structure(R)
Camera for
Rail(R) Wimax Camera
Camera for
Tunnel Structure(L)
Camera for
Rail(L)
Light Light
Other Components
Noise Sensor Vibration Sensor
& System
Control & Storage
system in the car
RFID Antenna Tachometer
12. 1. Tunnel Monitoring System(TMS)
Real view of TMS train & Components
Camera 1 for
Overhead
Camera 2 for
Overhead
Monitoring Center
Server &
System
Analysis System Viewing Monitor
13. 1. Tunnel Monitoring System(TMS)
Real view of TMS Components
Replay Speed
Control
Location
Information
Camera
Selection
Line Selection
Monitor
section
Tunnel
Structure
Track
OverheadNoise &
Vibration
graph
20. 2. New Technical Control Center
Before & After pictures
Before After
Scattered places Integrated & Up-to-date Technical Control Center
21. 2. New Technical Control Center
Integration of 6 Fields’ 39,517 equipments
Power
(3,940)
Circuit Breaker Transformer Rectifier Emergency power Remote control
2,248 1,097 157 274 164
Facility
(7,411)
Ventilator Cooling Equipment Drainage pump
Elevator
/Escalator
Disaster
prevention
4,738 283 863 1,380 147
Commu-
nication
(1,885)
Digital
transmission
Train Radio
Destination
display
CCTV IP Exchange
154 458 768 165 340
Signal
(3,637)
Switching
machine
Track circuit
Electronic
Interlock
Signaling data
Transmission
Total Traffic
Control
525 2,946 81 81 4
PSD
(20,183)
PSD Track Entrance Total surveillance Control Box Power supplier
9,552 614 158 9,552 307
USN
(2,461)
Motor sensor Track circuit Temp. sensor Rail displacement CCTV
782 58 809 30 782
22. 2. New Technical Control Center
Integration by Intranet
Integrated & Centralized Remote Monitoring
(Electricity, Facility, Signal, PSD, USN, etc.)
23. 2. New Technical Control Center
Integration of Data Base Servers
HMI
Server
Data
Server
Data
Server
Data
Server
Line 5
Server
L6/7/8
Server
Relay
Server
Signal
Server
Relay
Server
Relay
PC
User
Interface
Electricity
Facility
Facility
communication
USN
(Ubiquitous Sensor Network)
Signaling
Groupware
server
USN
Server
24. 2. New Technical Control Center
Integration Process
New User Interface
신호 OPC 컴퓨터
설비 D/B
Server
중계서버Switch
통신
중계서버
PSD
Switch
중앙전산기
중계서버
[ 관제
시스템 ]
[GMIS
서버]
GM_ELX
XX
전력
HUB
HUB 중계서버HMI
Server
NMS
Switch
HUB
HUB
HUB GM_FAXX
X
MMS_X
XX
GM_SGX
XX
GM_PDXX
X
Switch
USN 중계PC
[ USN ] [USN 서버]
TB_USNXX
X
WAS
New UI configurationStandard DBIndividual code
New
UI
25. 2. New Technical Control Center
New main User Interface Screen
Monitoring of train operations of all lines + facility alarms
26. 2. New Technical Control Center
Fault acknowledge Check system
Checks the user who acknowledged
27. 2. New Technical Control Center
Integrated Technical fields + Alarm Levels
Integrated Classification of technical fields & Alarm level indication
28. 2. New Technical Control Center
All lines’ alarms at a glance!
Integration of All kinds of alarm information of all lines
29. 2. New Technical Control Center
Integrated Alarm list
Integrated Alarm list indication(per line, field)
30. 2. New Technical Control Center
Station Facility Monitoring
Monitoring of station facilities & Alarms
31. 2. New Technical Control Center
Platform Screen Door Monitoring & Control
Red Box→ Platform Screen Door Monitoring & Control
Line 5
Line 6
Line 7
Line 8
↑ Individual
Station’s
PSD
Monitoring
+ Control
Technical
Control
Center→
32. 2. New Technical Control Center
Electric Power Monitoring
Substation Operation, Temp. , Noise, CCTV monitoring
33. 2. New Technical Control Center
Signaling system Monitoring
Monitoring of Track circuit state, Signal Room Temp., Noise
34. 2. New Technical Control Center
Rail condition Monitoring
Rail on the bridge Monitoring
35. 2. New Technical Control Center
Rail condition monitoring data
Temp., Noise, Voltage, Current, Displacement, Vibration data
36. 2. New Technical Control Center
Remote CCTV Monitoring
Remote CCTV monitoring of various function rooms(ZOOM+Tilting)
37. 2. New Technical Control Center
Improvements
Lower Monitoring Efficiency
Total monitoring(X)
Higher Monitoring Efficiency
Quick Acknowledgement &
Response by Total Monitoring
(Old) Individual
Monitoring
(New) Integrated
Monitoring
38. 2. New Technical Control Center
Changes of Time Figures
Fault Acknowledgement & work order:
☼ 57 min. (Before) 30 min. (After)
Treatment time & report:
☼ 358 min. (Before) 180 min. (After)
Alarm for delayed Fault Acknowledgement :
☼ 15 min. after fault alarm
39. Thank you for listening!