Review Agenda
●   Momentum / Market Overview
●   Flagship Offering, Demo and Portfolio of Services
●   New SaaS Parts, Order Processing (PGST) with Demo, Pricing, and eCommerce
●   New Product Based API's
●   Contracting Type – PA or ASL? A bit about ASL and ASL API's
●   Cloud Direction for 2012
●   New Compensation Models, “The Rule of 78”
●   TCO Consideration
●   Tools and Resources
●   Q/A


    3                                                             © 2012 IBM Corporation
●   Momentum / Market Overview
●   Flagship Offering, Demo and Portfolio of Services
●   New SaaS Parts, Order Processing (PGST) with Demo, Pricing, and eCommerce
●   New Product Based API's
●   Contracting Type – PA or ASL? A bit about ASL and ASL API's
●   Cloud Direction for 2012
●   New Compensation Models, “The Rule of 78”
●   TCO Consideration
●   Tools and Resources
●   Q/A



    4                                                             © 2012 IBM Corporation
Thank you for a stellar year

   ●   Over 200% growth YtY in partner        ●   76% YtY increase in active resellers
       channel revenue                        ●   Triple-digit growth in 3 geographies
   ●   > $100k deals total >$1M                   (North America, NE Europe, SW
        ● Birmingham Met, Brunswick,              Europe)
          Apave, Colgate, Shriram, and        ●   More signings in one quarter than
          more
                                                  any other in history

  ●    Leading Partners

        Revenue            Volume
        Insight            FreshTL
        Logicalis          Acuity
        ASI Informatique   RealConnections
        Micro Strategies   Silverside
        IntraVision        Silanis
        Wipro              ASI Informatique
        VAR Group          EdgeGuide
Customer Momentum
 ●   35 new references in 2011
 ●   Find them on Partnerworld http://ibm.co/A4PWgf
 ●   Spanning industry, geography, enterprise and SMB




                                                        © 2012 IBM Corporation
Market Analysis – Cloud Computing and SaaS

                                                                          Corporate and enterpris e
                                        $126B by the end of 2012            represent 50% of market
              Cloud                      >9% of total IT spend by 2015
                                                                          CAGR of 25% through 2015

Software as a Service (SaaS)              $20B by the end of 2012         47% of organisations have
                                                                         adopted S aaS 75% intend to do
                                         CAGR of 25% through 2015
                                                                            so over the next few years
                         $126B


                       B us ines s
                      Proces s es

                                        Software as
                                         a Service
                                            $20B
                      Infras tructure                         50% of total            30% of total
      $47B               S ervices                            cloud market           cloud market
                                                                  is in                    is in
                                                               corporate             collaboration
                      C omponents
                                                                  and                  s olutions
                                                               enterpris e
                                                                segments
       2008                2012
                                                                                          © 2012 IBM Corporation
Market Analysis – SaaS Collaboration
                                                    Top SaaS solutions through 2012 - Global
                                                    User Base                       ALL   <1000   1000-5000 >5000
                                                    Collaboration Technologies       1      1         1       1
                                                    Human Resources / Benefits
                                                    Admin                           2       2       1           2
                                                    Customer Services and Support   3       3       5           4
                                                    Payroll                         4       4       10          5
           Collaboration represents                Finance & Accounting            5       5       4           7

            the number 1 SaaS solution              BI & CPM
                                                    Time and Labour Mgmt
                                                                                    6
                                                                                    7
                                                                                            8
                                                                                            9
                                                                                                    7
                                                                                                    3
                                                                                                                3
                                                                                                                8
            in 2012 across all segments             Salesforce Automation           8       6       9           10
                                                    Talent and Performance Mgmt     9      13       6           6
           Organisations see SaaS                  E-Commerce                      10      7       14          13
                                                    Procurement & Sourcing          11     15       15          8
            tools as an integrated                  Supply Chain Mgmt               12     11       13          10
            ecosystem of solutions                  Supplier Relationship Mgmt      13     14       8           14
                                                    Mobility Mgmt                   14     10       11          12
                                                    ERP / Manufacturing             15     11       11          16
                                                    Governance, and Risk Mgmt       16     15       15          17
                                                    Treasury and Cash Mgmt          17     17       17          15
Relative rank of top 8 SaaS solutions 2012          Product Lifecycle Mgmt          18     18       18          18




                                                                                                  © 2012 IBM Corporation
Market Analysis – SaaS Collaboration
                                   Collaboration tool purchasing intentions 2011 – heat map
                                   User Base                100-300 300-500 500-1000 2500-5000 OVER 5000
 Extremely strong purchase        Email                     71.8%   72.8%   69.3%    59.9%       56.5%
  intentions in all market         Web conferencing          67.6%   69.7%   69.5%    69.0%       63.9%
  segments and across the          Calendaring               64.3%   72.5%   64.1%    57.3%       48.9%
  collaboration portfolio          Office Suite              69.0%   67.2%   61.2%    51.5%       58.8%
                                   Project Management        66.1%   68.2%   66.8%    59.1%       56.3%
 Market ‘Sweet Spot’ is           Business Collaboration    62.0%   67.0%   64.0%    59.4%       57.9%
  organisations with 100-1000      Forums                    56.2%   61.9%   56.3%    54.9%       47.1%
  user base                        Communities               57.7%   62.2%   56.9%    56.4%       48.9%
                                   Social Networking         55.9%   58.8%   54.4%    53.0%       43.2%
 Particular strength in 300-500   Whiteboards               54.8%   62.9%   58.5%    55.5%       44.8%

  user base organisations          Blogs                     54.6%   60.3%   52.3%    52.1%       44.5%
                                   Content Tagging           54.7%   63.2%   57.2%    54.5%       44.4%
                                   Wikis                     51.6%   56.8%   52.5%    54.2%       45.9%



                                                            100-300 300-500 500-1000 2500-5000 OVER 5000
                                   Aggregated Total          60.5%   64.9%   60.2%    56.7%       50.9%




                                                                                              Market
                                                                                              ‘Sweet Spot’



 1                                                                                               © 2012 IBM Corporation
Why Customers Bought SaaS Services in 2011

 To Extend their Reach...

     Across Geographies
      ●   Regardless of IT footprint

     To New Audiences
      ●   Seamlessly, securely connecting to customers,
          partners, experts outside your corporate network

     Supporting New Demographics
      ●   Meeting expectations of a new workforce generation

     To Manage a Mobile Workforce
      ●   “We couldn't possibly keep up with the rate of mobile
          device and browser changes using our own IT staff.
          That's one reason for us to move to cloud.”




10                                                                © 2012 IBM Corporation
… While Maintaining Flexibility and Control


●    Protect and Monitor Sensitive Assets
●    Choose the Rate and Pace of Adoption
●    Mitigate Impact to End Users
●    Bridge Applications to the Cloud




        Experience the value of social business, limiting startup time and cost

11                                                                           © 2012 IBM Corporation
Cloud is a Priority for Our Customers and IBM



                                                One of 4 key growth
                                                plays on IBM's 2015
                                                roadmap/plan

                                                80% of Fortune 500 use
                                                IBM Cloud Computing

                                                IBM SmartCloud - Helping
                                                our customers rethink IT
                                                and reinvent business




          Foundations    Services   Solutions

                                                                © 2012 IBM Corporation
Announcing IBM SmartCloud for Social Business



●   Aligning LotusLive with IBM
    SmartCloud

●   Delivering a portfolio of
    Social Business Solutions
    in the cloud




                                                © 2012 IBM Corporation
Announcing IBM SmartCloud for Social Business



●   Aligning LotusLive with IBM
    SmartCloud

●   Delivering a portfolio of
    Social Business Solutions
    in the cloud




                                                © 2012 IBM Corporation
Featuring a New Web Presence


                               ibmcloud.com/social

                               ■   Simple to Navigate

                               ■   Intuitive

                               ■   Coming Soon




                                               © 2012 IBM Corporation
New Service Names

Category       Lead Offering    Bundles               Ala Carte / Add-ons
                                                      ●Connections
                                                      ●Meetings



     IBM                        ●Engage Advanced
                                                      ●Notes


                                                      ●iNotes
 SmartCloud    IBM SmartCloud   (lead with)
  for Social   Engage
                                ●   Engage Standard
  Business                                            ●Additional Storage
                                                      ●Traveler
What Happens to the URLs

               URL                   Behavior as of 3/3

               ibmcloud.com          Parent Site
                                     Lists all IBM SmartCloud SaaS Solutions




               ibmcloud.com/social   New site
                                     3/3 – Site launch in English only
                                     ~4/3 – Site available in 22 languages



               www.lotuslive.com     Current Site
                                     Remains active in parallel with new site.
                                     Then, will auto-redirect to new site



               apps.lotuslive.com    Services
                                     Remains as is.
                                     In future, changes to a generic domain to
                                     enable resellers to private label




                                                                             © 2012 IBM Corporation
●   Momentum / Market Overview
●   Flagship Offering, Demo and Portfolio of Services
●   New SaaS Parts, Order Processing (PGST) with Demo, Pricing, and eCommerce
●   New Product Based API's
●   Contracting Type – PA or ASL? A bit about ASL and ASL API's
●   Cloud Direction for 2012
●   New Compensation Models, “The Rule of 78”
●   TCO Consideration
●   Tools and Resources
●   Q/A




                                                                  © 2012 IBM Corporation
Flagship Offering: IBM SmartCloud Engage
●   Enterprise-class, security-rich, integrated social and messaging services
●   Flexible client options – mobile, browser, tablet, rich client



        People          Communities


        Activities      Files


        Meetings        Events


        Chat            eMail


        Survey Forms




                                                                                © 2012 IBM Corporation
$19-49/user/month           $15/user/month




 $49/user/month           $13.25/user/month*
                    *Dropbox for teams, $795/year for 5 users
IBM SmartCloud for Social Business
   $8 USD per user/per month
$19-49/user/month                                     $15/user/month
    ●   Collaborate quickly and easily beyond the firewall

    ●   Instantly host online meetings (199 attendees), store
        and share files and manage projects seamlessly in
        the cloud

    ●   Invite guests—at no additional charge— to participate
        in your online projects and create communities to
        make collaborating even easier

    ●   Help improve productivity, deepen customer
        relationships, generate new ideas faster, and enable a
        more effective workforce

 $49/user/month                                     $13.25/user/month*
                                              *Dropbox for teams, $795/year for 5 users
What you get for $8USD/user/month!




                                     |   © 2012 IBM Corporation
DEMO




       © 2012 IBM Corporation
Boundless collaboration / social networking

 IBM Smart Cloud Collaboration is a true collaboration tool,             Alternative products restrict collaboration to a users own
  without boundaries                                                       organization
 For one price users can collaborate with anyone across multiple         Despite a similar price, users are only able to fully
  organizations using a range of rich social networking and                collaborate with a limited scope of users
  business tools
                                                                          To collaborate beyond the organization, users still have to
 Smart Cloud Collaboration is designed to build communities               rely on email, or other disconnected platforms – increasing
  and networks that drive efficiency, collaboration, innovation and        overhead, out of date file versions and use of multiple
  relationships across organization boundaries                             resources for the same data
 Free guest connections

                                                                                Boundary            Boundary            Boundary
                                           development
                                            community
      customer
                                                                                 user x’s              user y’s           user z’s
       council
                        $8 / month                                              company               company            company



                                          client
                                                                client
                                                                   $0

                                          user’s
                                         company
          supplier
         community
                                                            vendor             $10 / month          $10 / month        $10 / month
                                                              $0



                                                                                                                         © 2012 IBM Corporation
●
      Upsell opportunities using IBM SmartCloud platform
     ●
      Opportunity to provide users with enhanced Social Collaboration capabilities




25                                                                               © 2012 IBM Corporation
SmartCloud Social Mobile?
     A integrated set of mobile applications providing email, contacts, calendar, instant
     messaging, meetings, file sharing, application integration, and documents.



                                         SmartCloud Notes

                                         SmartCloud iNotes

                                         SmartCloud Engage

                                        SmartCloud Meetings

                                       SmartCloud Connections




                             Windows
                              Mobile    Blackberry iPhone   Android   Nokia
26                                                                            © 2012 IBM Corporation
●   Momentum / Market Overview
●   Flagship Offering, Demo and Portfolio of Services
●   New SaaS Parts, Order Processing (PGST) with Demo, Pricing, and eCommerce
●   New Product Based API's
●   Contracting Type – PA or ASL? A bit about ASL and ASL API's
●   Cloud Direction for 2012
●   New Compensation Models, “The Rule of 78”
●   TCO Consideration
●   Tools and Resources
●   Q/A




    27                                                            © 2012 IBM Corporation
SaaS Concepts and Terminology
                                       SaaS                     IPLA-Licensed Software (OTC)
License                Right-to-Use service (opex)             Perpetual or Term (capex)
Quote “value”          TCV (total contract value) displayed,   Total quote is due
                       payments vary
Term of sale           1 to 60 months (typically 3-5 years)    Typically license with 12 months
                       often sold monthly                      S&S

Revenue Recognition    Subscription (term of the agrmt)        License (upfront)
                       On-demand items (as billed)             S&S (amortized over 12 months)
                       Remote service (end of 90 days)         Term (amortized over 12 months)

Governing Agreements   Passport + ToU (Terms of Use) +         Passport + IPLA + LI
                       SLA Terms (if applicable)

Renewal                Yes (Service), same price as original   Yes (S&S),
                       sale
Part Structure         Part types vary as needed by offering   Lic+S&S, Renewal, Reinstate
                                                               Opt: Tradeup, Init & Subsq Term

Passport Points        Not applicable – no points generated    Applicable - Sale generates PA
                                                               points

Passport Band Prices   Same price in all Bands (including      Generally sloped plus Academic
                       Gov/Academic)                           and Government

Tiered Pricing         Yes                                     Only via RVU, only by exception
28
New SmartCloud SaaS Parts
●   IBM Business System Enhancements Reduce Part Count by 50%
      ● More flexible system structures


      ● From 109 parts - down to 59



●   Subscription Parts
     ● Tracked per user, per month


     ● Overage – billed when subscription level has been exceeded



●   Flexible Billing Frequency Options
     ● Up Front, Monthly, Quarterly, Annually


     ● IBM bills the VAD/VAR who then bills the end customer


        ●   VAD/VAR incentives are paid on billings

●   Auto-Renewing
     ● Unless cancelled, contract “auto renews” for another subscription period



●   Existing Customers
     ● Will be converted to the new parts upon renewal – no need to move customers mid-term
Other New SaaS Enhancements
 Enhancement         Definition                                               Example
 Trade-Up            Replacing an existing service with a different service   Customer subscribes to Connections for 50
                     of equal or greater value, and co-terming the end        employees. After 6 months, customer decides to
                     date to the existing service                             upgrade 10 of the accounts to Engage.

 Add-On Quantity     Increasing the quantity on a service. The quantity      Customer subscribes to SmartCloud Engage for 50
 (same tier)         increase does not push the quantity into a new price    employees billed monthly for 3 years, After 1 year
                     tier. The end-date is co-termed to the existing service customer wishes to add 30 more seats for the
                                                                             remaining 2 years of the contract.
 Add-On Quantity     Increasing the quantity on a service – where the new Customer subscribes to SmartCloud Engage for 90
 (tier change)       quantity pushes the quantity into a new price tier. The employees billed monthly for 3 years, After 1 year
                     end-date is co-termed to the existing service.          customer wishes to add 30 more seats for the
                                                                             remaining 2 years of the contract, which pushes
                                                                             them into the first discount tier (10%).
 Add-On Service      Adding an optional or complimentary service under        Customer subscribes to SmartCloud Notes for one
                     the same SaaS offering to an existing subscription,      year and wants to add Traveler for a subset of users
                     and co-terming the end date to the existing service.     2 months after the contract period.

 Co-Term             Adding a service to a charge agreement from a            Customer subscribes to SmartCloud Engage. They
                     different SaaS offering and aligning the end-date with   want to subscribe to Lombardi Blueprint as well, but
                     an existing, unrelated service.                          they want their Lombardi service aligned to the
                     Now everything coordinates to end of month.              same end date as Engage.

 Invoice Alignment   Adding a service to a charge agreement from a            Customer subscribes to SmartCloud iNotes with
                     different portfolio. If the invoice schedule of the      monthly billing. They want to subscribe to Sterling
                     service aligns with an existing service, both will       as well, with monthly billing. They want a
                     appear on the same invoice. The service is not           consolidated invoice with both services.
                     co-termed.

                                                                                                                  © 2012 IBM Corporation
Updated TOU


                 New Auto-renew
                     clause




  New names        New EU data
IBM SmartCloud   privacy statement
With New Price Tiers
Lower-touch seat volume discounting that….
• Arms Sales with price points that can win business
• Reduces number of bids that unnecessarily route to Field Pricing or Brand Pricing
• Promotes profitability
• PA Band discounts N/A for SaaS
                                         Tier 1           Tier 2         Tier 3         Tier 4            Tier 5
                    Seats                1-100          101-1,000      1001-5,000     5001-10000         10,001+
                    Discount:             0%              10%             15%            20%              25%


                           Example: SmartCloud Engage Advanced

                                          List Pricing by Tier: Engage Advanced (Engage+Notes)

                                $12.00
                                           $10.00
                                $10.00                    $9.00          $8.50
                                                                                        $8.00          $7.50
                                 $8.00
                                 $6.00
                                 $4.00

                                 $2.00
                                 $0.00
                                         Tier 1 Price   Tier 2 Price   Tier 3 Price   Tier 4 Price   Tier 5 Price
2011 vs 2012 Pricing Structure – Simpler Discounting Approvals
  ●
       With 2012 tiered pricing structure, field sales management can approve price points that could
       only be approved by pricing in 2011
  ●
       Streamlined special bid approval process



                      LL Notes Plus Engage: 2011                                      Engage Advanced (Engage+Notes): 2012

                   2011 List          2011 after Discount*                              2012 List         2012 after Discount*


      $10.00       $10.00       $10.00        $10.00         $10.00       $10.00
                                                                                        $9.00
                                                                                                     $8.50
                                                                                                                  $8.00
           $7.50        $7.50         $7.50         $7.50         $7.50        $7.50                                             $7.50
                                                                                             $6.75        $6.38
                                                                                                                       $6.00          $5.63




        (<=100)      101-1000     1001-5000    5001-10,000     10,001+      (<=100)       101-1000    1001-5000   5001-10,000      10,001+
                                     Tier                                                                Tier

*Field Sales BUE 25% discount delegation


 33                                                                                                                    © 2012 IBM Corporation
Enhanced Order Processing Options
For Business Partners – New Partner Guided Selling Tool
●   Guides the business partner through the options associated with a SaaS quote
●   Provides a coordinated process for VARs and VADs to work together to build quotes, place special
    bids, place orders, track service activation, and manage the customer billing.

                                              New SaaS configurator - makes it easy for a reseller to build sales quotes and place orders




        Build       Special Bid     Place           Submit                   ToU                    Service              Rating and
        Quote       (if needed)     Order       provisioning info         Acceptance               Activation              Billing
DEMO
Enhanced Order Processing Options
For Consumers – New eCommerce Site




36                                   © 2012 IBM Corporation
Supported Plans / Parts for Ecommerce

 ●   The following parts are supported via eCommerce
      ● IBM SmartCloud Engage Advanced


      ● IBM SmartCloud Engage Standard


      ● IBM SmartCloud Connections


      ● IBM SmartCloud Meetings (enterprise deployment, host +199)


      ● IBM SmartCloud Notes




 ●   All other orders must be placed outside of eCommerce
      ● iNotes


      ● Hybrid mail


      ● BES


      ● Additional storage for Connections


      ● Variants of SmartCloud Engage and Meetings (e.g. non-enterprise deployments, host +14, etc.)




                                                                                        © 2012 IBM Corporation
●   Momentum / Market Overview
●   Flagship Offering, Demo and Portfolio of Services
●   New SaaS Parts, Order Processing (PGST) with Demo, Pricing, and eCommerce
●   New Product Based API's
●   Contracting Type – PA or ASL? A bit about ASL and ASL API's
●   Cloud Direction for 2012
●   New Compensation Models, “The Rule of 78”
●   TCO Consideration
●   Tools and Resources
●   Q/A




    38                                                            © 2012 IBM Corporation
We've Been Busy – New Capabilities from last year

     ■   New Capabilities
              ‒   Enterprise governance
              ‒   Richer mobile support – meetings, messaging
              ‒   Latest social File sharing from IBM Connections
              ‒   Robust new Messaging administration tools
              ‒   Integrated Apps enterprise deployment
     ■   ISV Partnerships
              ‒   Trilog, Teampoint

     ■   Social Business Toolkit for LotusLive
              ‒   Available now on IBM DeveloperWorks
New Social Business Toolkit – PRODUCT API's

A single toolkit for integrating apps with the IBM Social Business offerings
 ● Easy to use Web based tool for integration with LotusLive and IBM Conections

   APIs
 ● OpenSocial REST APIs and UI extension points




Standards-based security framework (OAuth)

      People APIs                  Files APIs                 Meetings APIs
      Use OpenSocial APIs to       Using the CMIS APIs        Start and Stop meetings
      get access to Profiles and   you can manipulate the     from your application and
      Contacts data                powerful LotusLive files   get custom meeting reports
                                   store from applications
      UI Extensions                                           Navigation API
                                   Communities APIs           Reuse the LotusLive
      Add your own custom
                                   Create and manage          navigation bar in your
      actions to the LotusLive
                                   communities                application for a consistent
      UI
                                                              look/feel


   Available on IBM Developer works https://www.ibm.com/developerworks/social/


                                                                                             © 2012 IBM Corporation
Public or Private Development
    IBM SmartCloud APIs are accessible to User Companies or ISVs for extension to
     another cloud or on-premises service or application.
    There are two types of Developers
     — Private Developers :
       ● These type of developers will be building an application or extension for use only by

         their Organization or Company.
       ● Development does not require communications with the IBM SmartCloud Partner

         Program
     — Public (or ISV) Developers:
       ● These type of developers will be building an application for sale to the public


       ● Public release coordinated with IBM SmartCloud Partner Program to ensure proper

         resellers, security and marketing requirements are met
       ● More details on this process later in presentation




                                                                                  © 2011 IBM Corporation
What are the IBM SmartCloud Integrations Capabilities

  Inside-Out Integrations
   –   Expand capabilities of IBM SmartCloud to include your own offerings
   –   Extend the IBM SmartCloud interface to include jumping off points to your functions.
   –   IBM SmartCloud Extensions
   –   Example : Skype, eXpresso

  Outside-In Integrations :
   –   Expand your offering with IBM SmartCloud functionality
   –   Utilize the functions of IBM SmartCloud as an extension of your offerings.
   –   Embed IBM SmartCloud files functionality natively in your own application
   –   IBM SmartCloud API's
   –   Example : SalesForce, Trilog

  Hybrid Integrations
   – Integrate On-Premise and Cloud Solutions
   – Domino Integration
Outside - In Integrations - Business Value

   IBM SmartCloud social business and external collaboration into applications
   via APIs
     —   Richer interactions for streamlined decision-making
     —   Bring more people and resources to the challenge or opportunity
     —   Examples: CRM, procurement



                                   APIs
                                             Company




                                              Cloud
                                      APIs
Inside - Out Integrations : Business Value

    Business apps depth into IBM SmartCloud
     — Online collaboration services can be enhanced for specific business
       processes and industry challenges
     — Examples: collaborative contract creation, review and electronic signatures




                                              s
                                          API     Company
                                 UI
                             Extensions


                                                  Cloud
IBM SmartCloud Integrated Applications - Infuse Social Capabilities
into Business Processes


                                  ®

              tm




 Selling           B2B Commerce       Digital Signing   Archiving




 Scheduling                                             Collaborative
                           Talking
 Meetings                                                Doc Editing




                                                               © 2011 IBM Corporation
Examples of API calls

    Files                           Meetings                               Communities
●   Get a list my files         ●   Start a meeting                    ●   Create a community
●   Get a list my collections   ●   Get meeting details                ●   Update a community
●   Get file details            ●   Join a meeting                     ●   Delete a community
●   Download a file                                                    ●   Create bookmarks on a
●   Upload a file                   Contacts                               community
●   Get shares for a file       ●   Get users contacts
                                                                       ●   Create a sub-community
●   Share file with someone     ●   Get collections of users
                                                                       ●   Create invitations to join a
                                    connected to user                      community
                                                                       ●   Create a community forum topic
    Activities
                                    Profiles
                                                                       ●   Add, Update or delete
●   Start activity                                                         community members
●   Update or Delete activity   ●   Get profile record or contact
                                    record for a user
●   Searching activities
                                ●   Get profile record for requestor
●   Add new entry
                                ●   Get profile details
●   Create a new To-do




                                                                                           © 2012 IBM Corporation
Tools to Aid Development


     Social Business Toolkit
      — Set of extensible tools and resources for developers who want to incorporate
        social capabilities into their applications and business processes

     IBM SmartCloud Wiki
      — Wiki to provided help and support for using and administering IBM SmartCloud

     API Explorer
      — Utility to learn about and experiment with IBM SmartCloud API's without writing
        any code

     IDR Workshop
      —  Watch Partnerworld for the next workshop for hands on education (Feb 2012)




                                                                                © 2011 IBM Corporation
Onboarding process for ISV Applications

    Register with PartnerWorld at
     —   http://www-2000.ibm.com/partnerworld/pwhome.nsf/weblook/pub_join_allBPs.html


    Get a Business Partner Demo Account :
     —   http://www.ibm.com/partnerworld/page/isv/IBM SmartCloud


    Begin development using your Business Partner Demo account / company

    Once you are ready to deploy publically, contact the IBM SmartCloud Partner Team
     (LLP@us.ibm.com) for:
     —   Advanced or Premier PartnerWorld Account
     —   Security validation
     —   Usability Testing
     —   Marketing requirements
     —   IBM SmartCloud Catalog listing



                                                                                        © 2011 IBM Corporation
●   Momentum / Market Overview
●   Flagship Offering, Demo and Portfolio of Services
●   New SaaS Parts, Order Processing (PGST) with Demo, Pricing, and eCommerce
●   New Product Based API's
●   Contracting Type – PA or ASL? A bit about ASL and ASL API's
●   Cloud Direction for 2012
●   New Compensation Models, “The Rule of 78”
●   TCO Consideration
●   Tools and Resources
●   Q/A




                                                                  © 2012 IBM Corporation
What is Passport Advantage?
Passport Advantage and Passport Advantage Express are simple, comprehensive IBM offerings that cover
software license acquisition including Fixed Term Licenses and Software Subscription and Support product
upgrades and technical support under a single, common set of agreements, processes and tools. Passport
Advantage is designed for larger enterprises, while Passport Advantage Express, a transaction-based offering, is
designed to meet the needs of medium-sized businesses.

Fundamentals of Passport Advantage -
  ●   Includes Software Subscription and Support (technical support and product upgrades) with each new license.
  ●   Provides Selected Support for certain Open Source and other non-warranted code.
  ●   Provides comprehensive and flexible upgrade coverage.
  ●   Streamlines budgeting for software upgrade and migration costs.
  ●   Provides secure access to Passport Advantage Online.
  ●   Incorporates flexible, easy-to-access, responsive, cross-platform customer support from IBM.
  ●   Provides access to IBM software technical support for all of a customer's designated IT staff.
  ●   Provides 24x7 access to support resources for business-critical outages.
  ●   Provides self help via the Internet.

Partner Types include -
  ●   Value Added Resellers
  ●   Value Added Distributers
  ●   System Integrators
  ●   Independent Software Vendors
What is ASL?
An IBM contract in which the Business Partner acquires IBM software, bundles it with the Business
Partner’s own software & services, and sells that bundled solution offering to end customers.

Fundamentals of ASL -
● End-customer may / may not know that the IBM middleware is bundled with the solution
      ● IBM middleware price is not visible to the end-customer
● Solution support and maintenance is provided by the Partner

      ● The customer calls the Partner for L1/L2 support.
● IBM software license/warranty stays with the Partner - It is not transferred to the end user

      ● Provides end-customer restricted use of IBM middleware, for use with the partner’s application
● BP owns the relationship completely – less dependant on IBM sellers

      ● BP presents single contract for the solution
● Worldwide Distribution

      ● Licenses can be deployed in any geography
● ASL Business Partner buys at a discounted rate, generally directly from IBM (geo dependant)




Partner Types include -
●   SaaS Providers (Public or Private Cloud)
●   Technology Partners (HW/Device Mfg)
●   Telecoms
●   Independent SW Vendors (ISVs)
●   Application Service Providers (ASPs)
●   Application Developers
SWG Go-to-Market Models -
                                                                                                  Resell - Open Distribution
                                OEM                        Application Specific License
                                                                                                    (Passport Advantage)
 Description     Deep embed product integration of  Integration of IBM SW in partner’s            ● Controlled distribution,

                  IBM SW in the partner’s solution.       solution model. Degree of integration minimum of 3 certifications are
                  Solution cannot be disassembled         of IBM SW can vary.                       required, two sales and one
                  into component parts.                                                             technical.
                 IBM brand is not visible to the        IBM brand is visible to the client within
                  client within the partner’s solution.   the partner’s solution.
                 Special contract terms beyond                                                     ● IBM brand is primary.

                  ASL to reinforce embedded focus.  Collaboration is between partner and
                 Collaboration is between partner        IBM (or VAD) channel sales teams.
                  and IBM brand labs & bus dev
                  teams.
                 Deeper license discounting than
                  ASL given more partner
                  responsibility

 Partner         Value add components                  Value add components                    No criteria for Value add
 requirements    L1/L2 support                                                                  L1/L2 support by IBM
                 Restricted license to end user via    L1/L2 support                           Full use license to the
                  partner solution license; partner                                               customer
                  retains IBM license                   Restricted license to end user via      Price determined by customer
                 WW price and sales territory           partner solution license; partner        PPA grid
                 Partner owns S&S renewals              retains IBM license                     S&S renewals competitive

                                                        WW price and sales territory

                                                        Partner owns S&S renewals
Application Specific Licensing (ASL) -

        An agreement under which partners Integrate and bundle IBM Software with their
         value-add software and services and sell as a total solution to their end customers
         anywhere in the world*

                                                                   OBJECTIVE
                                                      Application Specific Licensing aims to
                                                      create an autonomous solution sales
                                                                    channel



                                                          ASL partner is responsible for -
                                                              Solution marketing (OI)
                                                               Solution selling (OO)
                                                  Though the partner may team with IBM sales, the
                                                     Partner should not expect assistance with
                                                      solution marketing or solution selling.

*Certain countries may be excluded based on IBM's exclusive distribution arrangements

53                                                                                        © 2011 IBM Corporation
Guidelines -
     1. Base Agreement
     2. Transaction Document: Purchase Commit, Earned Discount, Percent of
        Revenue, Monthly Rental

        SOLUTION                IBM SOFTWARE          YOUR VALUE ADD COMPONENTS



                            =                  +      Your Products listed in
                                                         the Transaction
                                                     Document that you must
                                                                                &
                                                                                         Services which add
                                                                                           significant new
                                                                                     functionality or combine
     The offering created                            include in your solution        or integrate our software
     when our Software                                                                with one or more other
     and your Value-Add                                     Examples…                         products
      Components work                             An Application* and/or coded
          together.                               software programs. For Tivoli,     *Monthly Rental: must
                                                   software or programs might              include your
                                                    include coded procedures,          application (Rational,
                                                workflows, algorithms, reporting,         WS Commerce
                                                routines, scripts, and/or metering          exception).
                                                     software Integrated and
                                                interoperating with IBM Software


54                                                                                              © 2011 IBM Corporation
Application Solution Provider (ASP) License Amendment -

       ASP Amendment – Added to a Purchase Commit or Earned Discount transaction
       document when providing access to the Solution from remote data centers to multiple
       Customers via the Internet or a private network. ASP Services do not include the
       downloading or copying of Programs by Customers.

    If the partner does not use Passport Advantage, then you may offer the partner an OEM/ASL
     agreement with the associated ASP Amendment
                                                           or
    If the partner has an existing OEM/ASL contract covering a specified solution, and they simply
     want to “host” that same solution, then you can offer them an ASP Amendment or Monthly
     Rental.



                 Programs listed at the following website are not eligible for use with this Amendment:
                http://www-06.ibm.com/software/lotus/passportadvantage/xspexcludedprograms.html
                                    Any exceptions must be approved by the Brand.


55                                                                                                        © 2011 IBM Corporation
Application Specific License Software Agreement - Base Agreement
                  SOLUTION - The offering that is created when our Programs and your Value-Add Components work together.
                  VALUE ADD COMPONENTS - must add significant new functionality or combine or integrate the Program with
                                one or more other products or services that add significant new functionality.
                   RETSRICTED USE - use the Programs only in conjunction with the Solution. May not be used for internal use

Purchase Commitment       Purchase Commitment              Earned Discount           Percentage of        Monthly Rental for        Monthly Rental for
Transaction Document      Transaction Document          Transaction Document          Revenue TD          Cloud Application         Cloud Infrastructure
                            for Fixed Term Use                                                           Services Provider TD        Provider TD - SBO

•Revenue commitment       •Revenue commitment          •No revenue commitment    • Non standard       • For SaaS Providers        • Special bid only
•License + 12 mo S&S      •Fixed term use              •License + 12 mo S&S      • Not encouraged     • Application required      • Approval required
•Perpetual licenses       •Default 1 year term         •Perpetual licenses       • Special bid only   • Their own SW IP           • SWG VP Pricing
•Fixed Term licenses      •Multi yr term possible      •Fixed Term licenses                           • Delivered as a service    • For IaaS providers
•Default 1 year term      •Initial payment             •Default 1 year term                           • Delivered over Internet   • For PaaS providers
•Multi yr term possible   •Fixed discount              •Multi yr term possible                        • To end customers          • Approved “A” PNs list
•Initial payment          •We provide a Service        •Cumulative purchases                          • Approved “A” PNs list     • Excluded Programs
•Fixed discount           •Monthly reporting           •Earned discount                               • Excluded Programs         • Brand approval (exc.)
•We provide a Program     Currently only used with     •We provide a Program                          • Brand approval (exc.)     • Customers limited to
•Monthly reporting        Cast Iron Live, Lotus Live   •Monthly reporting                             • Excludes appliances         Solution Developers,
                                                                                                      • Excludes SaaS offerings    Cloud Application
   ASP Amendment                                            ASP Amendment
                                                                                                      • Min. mo. commitment        Providers and their end
•Access to solution                                    •Access to solution                            • Paid monthly in arrears     user customers.
•Remote Data Center                                    •Remote Data Center                                                        • Remote service access
•To multiple customers                                 •To multiple customers                          • For IaaS providers       • Customer cannot
•Via the Internet                                      •Via the Internet                               • For PaaS providers         downloaded or copy
•or Private network                                    •or Private network                             • Special bid only
•Excluded Programs                                     •Excluded Programs                              • Approval required
•Brand approval (exc.)                                 •Brand approval (exc.)                          • SWG VP Pricing
•Reside on your servers                                •Reside on your servers
•or servers you manage                                 •or servers you manage
•No download/copy                                      •No download/copy

    56                                                                                                                            © 2011 IBM Corporation
Level 1 and 2 Support -

        Level 1 Support means taking the first support call from a Customer and fulfilling the following
         steps:
              I. Qualify incoming calls: Determine if the request is for a new or existing case. Assign a
              priority to a new case (priority one through priority four). For existing cases, obtain case
              information.
              II. Characterize the problem and environment: Gather information about the case and
              determine if the Program causes the problem. Completely define and describe the
              problem. Identify ways to understand the problem's behavior. Document the
              characterization information. Analyze problem symptom(s), attempt to find root cause
              when appropriate and describe the result of such attempts. Determine if the problem is a
              known Program problem by accessing IBM online support resources.
              III. If it is determined to be a Program problem, contact IBM technical support. For new
              cases, open a case and select a priority. For existing cases, state the case number. Provide
              the case information you have gathered to the support engineer.
        Level 2 Support means the service provided to analyze or repeat the error, or to determine that
         the error is not repeatable. This service also includes in-depth technical analysis.



    57                                                                                          © 2011 IBM Corporation
Upside Opportunity – Cloud
     Goals:
     ●   Grow channel participation rate in Cloud deals
     ●   Accelerate integration to channel of Cloud-related acquisitions
     ●   Continue to leverage 2 routes to market
              ● SWG Cloud portfolio of products

              ● ASL contracts with special conditions



            Traditional Passport Advantage                                     Application-Specific Licensing
     1      Distribution and Resale                                1
                                                                   2           ASL Business Partner
            Under Software Value Plus Program                                  ASL Value Add Distributor
                                                                            Monthly Rental for     Monthly Rental for
                                                                            Cloud Application      Cloud Infrastructure
                                                                            Services Provider           Provider

                                                                                    Approved “A” PNs list
                                                                                Excluded Programs subject to
                                                                                       Brand Approval

                                                                            CLOUD APPLICATION             CLOUD
                                                                                PROVIDERS            INFRASTRUCTURE
                                                                                                        PROVIDERS



                                                                           Deliver functionality   Operate a cloud for
                                                                            through the cloud.     application vendors
                                                                               They own an          and companies to
                                                                           application and offer    develop, test, and
                                                                            their solution as a      host solutions.
                                                                                 Service.           Managed service
                                                                                                        providers.


58                                                                                                        © 2011 IBM Corporation
ASL Launch and Landing Revenue Credit -
    Revenue Recognition and Commissions Policy
    IBM sellers receive commissionable credit for revenue that is generated by business partners who bundle
     IBM software with their solutions and sell these solutions to their end user clients under the terms of ASL
     contracts.
    SWG business partner sales teams, SWG direct sales teams, and client teams receive appropriate credit for
     their contributions both in selling to our partners and in selling with our partners to their end user clients.
    Launch commission credit may flow automatically through FMS to rep commission payment and retires
     quota.
    In some cases, Reps are required to complete a manual claim request form and have their First Line Manager
     (FLM) confirm their involvement and approve the claim. The FLM will send the completed claim form and
     their approval to the Channel Manager covering the Launch location of the ASL Partner
    ASL landing occurs when the ISV sells their application, as well as restricted use of IBM SW products
     integrated with their application, to an end user customer. The end customer is the ASL landing account. All
     reps given CREV quota for selling this IBM middleware and responsible for the end customer will be
     compensated.
    All SWG reps and client reps and managers are eligible for ASL landing credit.
    Executives who are paid on financial revenue only are excluded from the program.
    ASL Landing commission payments are processed on a quarterly basis.
    ASL landing commission credit is issued for transactional revenue only and retires quota.

59                                                                                                     © 2011 IBM Corporation
10 Reasons to Use ASL -
     Developing
                   1.   Leverage IBM’s significant investment in middleware
      Solution
                   2.   Integration and bundling of your solution & IBM software

                   3.   Shorter time to market

                   4.   Sale is focused on your Application

                   5.   Shortened sales cycle
     Sales Cycle

                   6.   IBM reps can get paid for assisting in sale

                   7.   Improved margins – upfront license & annual renewal

                   8.   Ongoing account control

                   9.   Lower installation & support costs
      Customer
       Benefits
                   10. Improved customer satisfaction

                        It’s all about making money

60                                                                                 © 2011 IBM Corporation
API's for ASL BP's




61                        © 2011 IBM Corporation
Overview of Reseller Offering

●    Provision LotusLive services via APIs including creating subscriptions and
     provisioning users.
●    Provide partner the ability to deliver custom offerings to their client base
     by owning the contract, billing and support relationship with customers,
     rather than the traditional ISV partner transferal of ownership to IBM.
●    Direct communication channel to to IBM Level 2 Support – enabling your
     customer support team with a direct channel to IBM for issue resolution.
●    Co-branding : support for UI configuration and support redirection




                                                                         © 2011 IBM Corporation
Phase 1 - Reseller tooling to support
Self-provisioning API's

Reseller API Requirements
       Customer / Organization                                Subscription                                              User
Create Customer/Organization                   Add a subscription                                 Add a user

Suspend Customer/Organization                  Suspend a subscription                             Edit a user (all editable portions of the user
                                                                                                  account)

Un-suspend Customer/Organization               Un-suspend a subscription                          Remove a user

Edit Customer/Organization                     Cancel a subscription                              Reset Password

Remove Customer/Organization                   Return Subscription ID (given customer ID)         Suspend a user

Return Customer IDs (given reseller ID)        Retrieve Provisioning Status (given subscription   Un-suspend a user
                                               ID)

Retrieve Provisioning Status (given customer   Retrieve Subscription Status (given Account ID)    Return Account IDs (given customer ID)
ID)

Retrieve Customer/Org Status (given customer                                                      Retrieve Provisioning Status (given Account ID)
ID)




                                                                                                                                © 2011 IBM Corporation
Phase 1 - Co-Branding Capabilities

     Elements that can be branded
        Login / Password reset pages
        Key System support links
        Key System eMail messages
        Default theme


     Elements that will maintain IBM Corporate Identity
        Service URLs
        Service names
        Service navigation
        Engage / Connections Dashboard Rotating Banner




64
Co-Branding Capabilities
   A Provider specific log-in or landing page
    —       A SAML based login page for EACH customer will be supported. T
   The URL of the service can be masked as another URL such as
    serviceprovider.com instead of www.lotuslive.com
    —   This is not currently available
   More flexibility in customizing the web UI, such as more Service provider
    branding, the ability to put ads or promotions in the top or side banners
    —   SmartCloud for Social Business has no plans to support
   Ability to create their own customized welcome letter after service
    provision
    —   First email is for access and authentication. This is an IBM branded email
        ●   No ability to customize but can put the Service provider branding on it
    —   Other emails will be suppressed
        ●   Ones that are generated by the partner using the API's
        ●   Notifications from the applications(adding a user to the ACL of a file/activity) will also
            be LotusLive generated


                                                                                          © 2011 IBM Corporation
Monthly termless part numbers – Phase 1

     Pay per usage Billing
     Monthly Billing
     Monthly Reporting




                                          © 2011 IBM Corporation
Monthly Reports
Monthly Summary Report
This report should list the parts that the vendor provisioned for that time period (prior month)
The data would be limited to those parts that were provisioned in the last month by that partner only.


Monthly Detail Report
This report is related to the one above, but provides more detail.
The data would be limited to those parts that were provisioned in the last month by that partner only.


Total Summary Report
This is the same as above, but a running total.
The data would be limited to those parts that are currently provisioned by that partner only.


Total Detail Report
This report is related to the one above, but provides more detail.
The data would be limited to those parts that are currently provisioned by that partner only.


Monthly Active Users Report
List and data of all users currently provisioned across all of that reseller's customer's orgs.
Only contains current data, not total (historical)


                                                                                                  © 2011 IBM Corporation
●   Momentum / Market Overview
●   Flagship Offering, Demo and Portfolio of Services
●   New SaaS Parts, Order Processing (PGST) with Demo, Pricing, and eCommerce
●   New Product Based API's
●   Contracting Type – PA or ASL? A bit about ASL and ASL API's
●   Cloud Direction for 2012
●   New Compensation Models, “The Rule of 78”
●   TCO Consideration
●   Tools and Resources
●   Q/A




                                                                  © 2012 IBM Corporation
Cloud Directions for 2012

        Offerings                    Go to Market                   Extensibility

 New services
                               ■   Alignment with the        ●   Open interfaces
  ● IBM Docs
                                   IBM SmartCloud                such as the Social
  ● eDiscovery Archive                                           Business Toolkit
                               ■   More flexible buying
                                   options
                                                             ●   Enterprise grade
 Continued feature evolution                                     controls
  ● Messaging


  ● Social
                               ■   Reseller tools and        ●   Flexible public,
                                   enhancements                  dedicated and hybrid
  ● Unified Communications

                                                                 deployment options
                               ■   Controlled Distribution




69
SmartCloud for Social Business
Solutions Meet a Spectrum of Customer Needs




     Public Cloud                                  Dedicated Cloud
     SmartCloud Engage               Hybrid           IBM SmartCloud Social
                                                      Collaboration for Government
     SmartCloud Meetings
                                                      IBM GTS SmartCloud Enterprise*
     SmartCloud Connections
                                                        ●   Lotus Notes Domino
     SmartCloud Notes and iNotes                        ●   Domino Utility Server
                                                        ●   Connections
                                                        ●   Sametime
                                                        ●   WebSphere Portal
                                                        ●   Web Content Manager



                                   On Premises
                                                 *Customer brings their own license, pays for infrastructure
                                                  Pay as you Go options available

70                                                                                   © 2012 IBM Corporation
Introducing Partner-led Migration for LotusLive Notes in 2012

 IBM to deliver
  ● Tools for LotusLive Notes onboarding planning and data transfer


  ● Partner education


  ● Partner certification


  ● Targeted for Q2 – will be announced via email to demo accounts, PartnerWorld

    newsletters, Webfront, etc.

 Partners can provide services for
  ● Pre-migration environment analysis and planning


  ● Preparation of the on-premises environment


  ● Data migration


  ● Transition of users


  ● Ongoing management of desktop clients, users, and the on-prem environment




                                                                           © 2012 IBM Corporation
What we've learned from ISSL-led migrations
      We presumed that:
       ● Customers would understand their existing environments


       ● Customers would be able to partner with us in their task responsibilities to project plan and prepare

         their environment and users for moving to the Cloud
      What we found is that the customers who are most interested in moving to cloud are the ones
      who are struggling the most managing their on-premises environment

           1. Plan
                                                                                              2. Prepare
             ●   Hold deployment kickoff meeting
                                                                                                  ●   Configure Hybrid deployment
             ●   Perform discovery and gather
                 infrastructure technical data
                                                                                                  ●   Configure directory synchronization
             ●   Select mailbox transition methods and
                                                                                                  ●   Configure client computers and end user
                 tools                                                                                experience




                                                                                                                     On-premises
                                                                                                                     environment

                                       LotusLive         3. Transition
                      LotusLive         Notes               ●   Synchronize mailbox content, calendars and
                     environment                                contacts
                                                            ●   Use third-party tools to migrate from competitive
                                                                offerings
                                                            ●   Configure mobile device connectivity
                                                            ●   Perform service validation and testing


72                                                                                                                                    © 2012 IBM Corporation
New Partner Mail Onboarding Tools and Certification Program

 ●    New program to train and certify partners to setup hybrid configurations and onboard SmartCloud
      Notes users

 ●    Onboarding Planning Tool (OPT)
       ● Used to gather and fix potential problems in mail files at the start of the transfer process


       ● Time spent fixing issues here can save lots of time and aggravation later




 ●    Onboarding Transition Tool (OTT)
       ● Used to manage the transfer of “batches” of mail files to the IBM data center




                             OPT                              OTT

   on-
                 Gather            Organize     Stage                       Move to        Provision
premises                                                      Encrypt                                         LLN
               Information         Batches     batches                     Datacenter      into LLN
  files




                                                   Coming in Q2

 73                                                                                               © 2012 IBM Corporation
SmartCloud Notes Certification Program Overview

     Objective
      —   Deliver tools to enable Partner led LotusLive Notes service provisioning with data transfer
      —   Create a BP Certification Program to establish process competency and a business arrangement


     Certification program
      —   Pre-requisites
          ●   LotusLive Notes Business Partner Demo account
          ●   IBM Certified System Administrator - Lotus Notes and Domino 8.5 certification
      —   Education
          ●   LotusLive community and activity
          ●   Instructor led course with lab exercises (fee based)
               ●   Covers hybrid configuration and data transfer processes
               ●   2x's per month
               ●   3-5 students per class
      —   Evaluation
          ●   IBM Certification exam (fee based)
      —   Authorization to perform in the “Data Migrator” role
          ●   Access to OPT and OTT
Services Opportunities around SmartCloud Social


   Help customer decide what to                      Help Implement            Help manage / operate
               do                                     the solution                  the solution

Assess and plan           Design                         Integrate/                   Operate/ Manage
• Client collaboration    • Design and                   Implement                    • Run complementary
environment               implementation plan            • User Provisioning          services
• Cost and TCO analysis   • Rollout plan                 • Directory Integration
• Directory Assessment    • Directory architecture       • Single Sign-On
• Security Assessment     • Security design              • Mail Routing Integration
• Mail Routing                                           & Migration
Assessment                                               • Data Migration
                                                         • Integration w/Enterprise
                                                         apps (Click-to-cloud)*




       Total Services Opportunity: 1 to 5x yearly subscription revenue

  75                                                                                           © 2012 IBM Corporation
●   Momentum / Market Overview
●   Flagship Offering, Demo and Portfolio of Services
●   New SaaS Parts, Order Processing (PGST) with Demo, Pricing, and eCommerce
●   New Product Based API's
●   Contracting Type – PA or ASL? A bit about ASL and ASL API's
●   Cloud Direction for 2012
●   New Compensation Models, “The Rule of 78”
●   TCO Consideration
●   Tools and Resources
●   Q/A




    76                                                            © 2012 IBM Corporation
Incentives for SaaS – beginning February 20, 2012*
Two incentive models for SaaS:
1. SaaS Rebate:
     ●
         Paid on orders fulfilled through a VAD

2. SVI:
     ●
         Paid on IBM direct fulfilled opportunities
     ●
         Standard SVI program participation requirements
          ●
              BAU: First to register , sales progression, claiming

SaaS incentive fees paid continuously – over life of engagement
     ●
         Payment: Unique process for SaaS offerings
          ●
              Fee paid on initial order and future period billings (including renewals)
          ●
              Eligible Part Types: Subscription, Daily, On-Demand
          ●
              Ineligible Part Types: Set up fees, Overage, SLA, Human Services
     ●
         Payment cycle
          ●
              Paid when minimum payment threshold reached or a specified amount of time has passed since last
              payment


 *Subject to change
 Available for selected offerings and in selected geographies
SaaS Reseller Incentive Introductory Period 2012

   ● Higher rebate rates for 2012
         Up to 28% total margin for deals fulfilled through VAD
   ● Effective until Dec 31, 2012




   Fulfilled through VAD                                     Fulfilled by IBM Direct -
    Customer Segment (b)            GB       Non GB            No extra incentive
    BP base discount (a)            5%         5%            Customer Segment (d)             GB             Non GB
    SaaS instant rebate            15%         5%            Sell Only SVI                    10%                5%
    SaaS “Sweetener”                8%          3%           Sell and ID SVI                  20%               10%

    Total (c)                      28%         13%

Fine print:
(a) 5% is an example. VADs and BPs establish their terms separately for product discount and discounts vary by
country
(b) SaaS incentives not applicable for ELA customers, as defined
(c) Business Partners not eligible for SVI if transaction is fulfilled through VAD
(d) SVI Incentives not applicable for Government accounts
(e) Business Partners not eligible for SaaS Instant Rebate if fulfilled by IBM

                                                                                                    © 2012 IBM Corporation
Example Business Model
  General Business account in the USA fulfilled through a VAD
  100 Subscriptions sold @ $10/month
  (Annual contract value = $12000)


                              Incentive      Revenue         Revenue         Revenue         Revenue
                                Plan          Year 1          Year 2          Year 3          Year 4

 BP base discount                 5%            600             600             600             600

 SaaS instant rebate             15%            1800           1800            1800            1800

 SaaS “Sweetener”                 8%            960              0               0                  0

 Total                                          3360           2400            2400            2400               Etc ...



         IBM SaaS contracts are auto-renewing. Billing continues until the contract is cancelled.
         Rebates are paid on billings, resulting in an annuity revenue stream for partners




                                                                                                        © 2012 IBM Corporation
“Rule of 78”

- Example -




               © 2012 IBM Corporation
N

                                                 N
          “Rule of 78”
                                             N

    78 blocks of revenue                 N

                                     N

                                 N
                             N

                         N

                  N

             N

      N

N

J     F     M    A       M   J   J   A   S   O   N   D

                                                     © 2012 IBM Corporation
“Rule of 78” Benefits with SaaS

  ●   Eliminates the Quarterly and Annual large discounting to make plan
  ●   The customer can't “go out of maintenance”
  ●   If the customer doesn't pay, we can just shut them off
  ●   Cash flow is the same in January/February as December
  ●   As a small business, can better leverage financing based on
  predictable revenue stream
  ●   This is how insurance companies have been around for 100's of years




  Things to consider -
      ●   Cash flow
      ●   Billing infrastructure


                                                                           © 2012 IBM Corporation
●   Momentum / Market Overview
●   Flagship Offering, Demo and Portfolio of Services
●   New SaaS Parts, Order Processing (PGST) with Demo, Pricing, and eCommerce
●   New Product Based API's
●   Contracting Type – PA or ASL? A bit about ASL and ASL API's
●   Cloud Direction for 2012
●   New Compensation Models, “The Rule of 78”
●   TCO Consideration
●   Tools and Resources
●   Q/A




                                                                  © 2012 IBM Corporation
© 2012 IBM Corporation
SaaS Sales

With SaaS Services, the questions during the sale can be complex:
    What Anti-virus/Anti-Spam services to you use?
    Where do I point my MX record/DNS?
    How does your single sign on work – do you support SAML?
    How do I know my data is secure?
    How do my administrators manage the service?
    Can I serve the service up through my portal?
    ...etc.
Many different questions to what you receive when the customer is building
their own environment – why?
    Because by using cloud, the headache of managing infrastructure goes away
from them for a whole range of management and technology problems that they
currently have
1




                                                                        © 2012 IBM Corporation
High Level TCO elements to be considered
            Hardware Cost                  Quality of Service needed
             - Servers                        - Availability
             - Storage                        - Security
             - Net work                       - Syst em Manag em ent
             - Clients (user equipm ent)      - Scalability
             - and …                          - Response Tim e
           Sof tware Costs                   - Batch Wi ndow
             - IBM sof tware                  - Disast er/ Recovery
             - Ot her Server SW               - and …
             - Ot her Cli ent SW           Other Costs
             - Ot her Net work SW             - Deploym ent costs
             - Ot her Applicati on SW         - Migration costs
             - and …                          - Inst allation costs
          Mai nt enance Costs                - Education costs
             - Maintenance for SW             - and …
             - Maintenance for HW
             - and …
          Environm ent al Costs              - etc ? …
             - Floor space
             - Power & cabling
             - and …
          Qualit y of Service needed
             - Availability
             - Security
             - Syst em Managem ent
             - Scalability
             - Response Tim e
             - Disast er/ Recovery
             - and …




                                                                         © 2012 IBM Corporation
TCO Elements to be Considered
 Availability                           Security                                Operati ng Concept
    - High availability                    - Authentication / Authorization          - Development of an op erating procedur e
    - Hours of operation                   - User Admi nistration                    - Feasibility of t he devel oped procedure
 Backup / Restore / Sit e Recovery        - Dat a Security                          - Autom ation
    - Backup & Restore                     - Server and OS Securit y              Int egration
    - Disast er Scenario                   - RACF vs. ot her solutions               - Int egrat ed Functi onality vs.
    - Effort for Complete Sit e          Deploym ent and Support                Functionalit y to
Recovery                                   - Syst em Programmi ng                       be implem ent ed (possibly wit h 3rd par ty
    - SAN eff ort                          - Keeping consist ent OS and SW              tools)
 Infrastruct ur e Cost                 Level                                        - Balanced Syst em
    - Space, Power, Cooling                - Dat abase Eff ort                       - Int egration of / into St andards
    - Net work Infrastruct ure             - Middleware                           Furt her Availability Aspects
    - Storage Infrastruct ur e             - SW Maintenance                          - Planned & Unplanned outages
 Additional developm ent and              - SW Distribution (across firewall)       - Autom at ed Take Over
implementation                             - Application                             - Uni nterrupted Take Over (especially f or
    - Investm ent f or one platform –      - Technology Upgrade                         DB)
      r eproduction f or ot hers           - Syst em Release change wit hout         - Workload Managem ent across physical
 Controlling and Accounting                  i nt errupts                              borders
    - Analyzing t he syst ems            Resource Utilizati on and                  - Business continui ty
    - Cost                              Perform ance                                 - Availability eff ect s f or other
 Operations Eff ort                       - Mix ed Workload / Batch             applications /
    - Monitoring, Operati ng               - Resource Sharing                           projects
    - Problem Det ermination               - shared not hing vs. shared              - End User Service, End User Productivity
    - Server Managem ent Tools          everyt hi ng                                 - Virt ualization
    - Int egrat ed Server Managem ent      - Parallel Sysplex vs. Ot her          Skills and Resources
–                                       Concepts                                     - Personnel Education
      Enterprise Wide                      - Response Tim e                          - Availability of Resources
                                           - Performance Managem ent
                                           - Peak handling / scal ability



                                                                                                                    © 2012 IBM Corporation
TCO Example

Too many items to discuss in detail, so combined they become:
    Software Costs
    Hardware Costs
    Datacentre Costs
    Staffing Costs
    Support Costs
    Etc…




1


                                                                © 2012 IBM Corporation
Sales Progression Assets

1) Provide a Business Value Assessment
  ●   ROI Tool for LotusLive
       ● A web-based calculator to assess the costs, benefits

         and ROI of implementing LotusLive and generates
         'client-ready' assessment presentation
       ● Limited availability Contact LLP@us.ibm.com for access




      2) Leverage Client Advocacy
       ●   Connect prospects with LotusLive clients
            ● Use your no-charge BP demo account to attract client interest

            ● Use your BP Trials URL to generate client leads

            ● Use 35 new references added in 2011

            ● Show client testimonial videos

            ● Contact your regional BP rep for assistance




                                                           89                 © 2012 IBM Corporation
●   Momentum / Market Overview
●   Flagship Offering, Demo and Portfolio of Services
●   New SaaS Parts, Order Processing (PGST) with Demo, Pricing, and eCommerce
●   New Product Based API's
●   Contracting Type – PA or ASL? A bit about ASL and ASL API's
●   Cloud Direction for 2012
●   New Compensation Models, “The Rule of 78”
●   TCO Consideration
●   Tools and Resources
●   Q/A




                                                                  © 2012 IBM Corporation
Read -
  Read about Smart Cloud Social: https://www.lotuslive.com/en/
  Read about Smart Cloud Social Support: https://www.lotuslive.com/en/support/




                                                                        © 2012 IBM Corporation
Watch -
  See a Smart Cloud Social recorded demo: https://www.lotuslive.com/en/demos
  Attend a Live Demonstration: https://www.lotuslive.com/en/training
  Attend an IDR virtual workshop at an IBM Innovation Center: https://www-
  304.ibm.com/isv/spc/events/description.jsp?event=A5479E64DCD5E5CC8525774C0060C5FF
  See partner overview webinar HTTPS://www-
  304.ibm.com/partnerworld/wps/servlet/ContentHandler/PWEVT_lotuslive0810




                                                                         © 2012 IBM Corporation
Show it -


Request a Smart Cloud Social
 Business Partner demonstration
 account:

https://www-
 304.ibm.com/partnerworld/wps/ser
 vlet/ContentHandler/isv/lotuslive




                                     © 2012 IBM Corporation
For More Information
     For More Information About                See
     BP Demo Account                           http://ibm.co/eT6a97
     Course enrollment
     ●  Future API Workshop
     ●  Future SmartCloud Notes Onboarding
        course
     Partner Guided Selling (future)
     SmartCloud for Social Business Webfront   http://www.ibmcloud/social

     Sales Kits on Partnerworld                http://ibm.co/ytx4kX
     LotusLive Wiki                            http://www-10.lotus.com/ldd/bhwiki.nsf
     Customer Trials URL                       https://www-
                                               304.ibm.com/partnerworld/wps/servlet/ContentHa
                                               ndler/isv_ben_prb_lotuslive_trial




94                                                                                      © 2012 IBM Corporation
Summary
■   Positioning LotusLive in IBM SmartCloud
■   New SaaS Parts and Partner Guided Selling Tool to
    ease the sale of IBM SaaS offerings
■   Introducing an incentive model specifically
    for SaaS products
■   Enabling partner led LotusLive Notes                  Call to Action
    eMail Onboarding to Cloud
                                                                ■Get educated
■   New Social Business Toolkit                  ─ Partner Guided Selling Tool
    for integrating apps with                   ─ LotusLive Notes Onboarding
    IBM Connections                                        classes/certification
                                                ─ Social Business Toolkit class
    and LotusLive
                                  ■       Get your LotusLive BP Demo account
                                      ■    Use LotusLive BP Trial URLs in your
                                                         marketing campaigns
                                                 ■   Sell at 50% off until Feb 27


                                                                              © 2012 IBM Corporation
QUESTIONS ??




               © 2012 IBM Corporation
Backup




         © 2011 IBM Corporation
Tier 1          Tier 2         Tier 3        Tier 4           Tier 5
2012 SmartCloud Tiered Pricing                              Seats
                                                            Discount:
                                                                             1-100
                                                                              0%
                                                                                           101-1,000
                                                                                             10%
                                                                                                          1001-5,000
                                                                                                             15%
                                                                                                                        5001-10000
                                                                                                                           20%
                                                                                                                                          10,001+
                                                                                                                                           25%


     Part NumberLong Description                                                 Tier 1         Tier 2        Tier 3        Tier 4        Tier 5
     D0NPULL SMARTCLOUD ENGAGE STANDARD ENT DEPLOY AU PER MONTH              $      8.00    $      7.20   $      6.80   $      6.40   $      6.00
     D0NPWLL SMARTCLOUD ENGAGE STANDARD ENT DEPLOY AU OVERAGE                $     10.00    $      9.00   $      8.50   $      8.00   $      7.50
     D0NPXLL SMARTCLOUD ENGAGE STANDARD ENT DEPLOY CUST WS&S AU PER MONTH    $      6.00    $      5.40   $      5.10   $      4.80   $      4.50
     D0NQ3LL SMARTCLOUD ADDITIONAL STORAGE COLLABORATION GB PER MONTH        $      5.00    $      4.50   $      4.25   $      4.00   $      3.75
     D0NQ8LL SMARTCLOUD ENGAGE ADVANCED STEP-UP AUTH USER PER MONTH          $      9.00    $      8.10   $      7.65   $      7.20   $      6.75
     D0NQALL SMARTCLOUD ENGAGE ADVANCED STEP-UP AUTH USER OVERAGE            $     11.25    $     10.13   $      9.56   $      9.00   $      8.44
     D0NQBLL SMARTCLOUD ENGAGE ADVANCED AUTH USER PER MONTH                  $     10.00    $      9.00   $      8.50   $      8.00   $      7.50
     D0NQDLL SMARTCLOUD ENGAGE ADVANCED AUTH USER OVERAGE                    $     12.50    $     11.25   $     10.63   $     10.00   $      9.38
     D0NQILL    SMARTCLOUD NOTES BLACKBERRY SERVICE MDS NOTES AU PER MONTH   $     15.00    $     15.00   $     15.00   $     15.00   $     15.00   Excluded from Tiering
     D0NQKLL SMARTCLOUD HOSTED BLACKBERRY SERVICE NOTES AU PER MONTH         $      3.00    $      3.00   $      3.00   $      3.00   $      3.00   Excluded from Tiering
     D0NQMLL SMARTCLOUD NOTES AUTH USER PER MONTH                            $      5.00    $      4.50   $      4.25   $      4.00   $      3.75
     D0NQPLL SMARTCLOUD NOTES AUTH USER OVERAGE                              $      6.25    $      5.63   $      5.31   $      5.00   $      4.69
     D0NQQLL SMARTCLOUD TRAVELER NOTES AUTH USER PER MONTH                   $      2.00    $      2.00   $      2.00   $      2.00   $      2.00   Excluded from Tiering
     D0NQSLL SMARTCLOUD TRAVELER NOTES AUTH USER OVERAGE                     $      2.50    $      2.50   $      2.50   $      2.50   $      2.50   Excluded from Tiering
     D0NQTLL SMARTCLOUD NOTES STEP-UP AUTH USER PER MONTH                    $      4.00    $      3.60   $      3.40   $      3.20   $      3.00
     D0NQVLL SMARTCLOUD NOTES STEP-UP AUTH USER OVERAGE                      $      5.00    $      4.50   $      4.25   $      4.00   $      3.75
     D0NQWLL SMARTCLOUD ARCHIVING RETENTION DATA FEED NOTES AU PER MONTH     $      4.00    $      3.60   $      3.40   $      3.20   $      3.00
     D0NQZLL SMARTCLOUD INOTES LOTUS CUSTOMERS ACTIVE ON S&S AU PER MONTH    $      2.00    $      1.80   $      1.70   $      1.60   $      1.50
     D0NR1LL SMARTCLOUD INOTES AUTH USER PER MONTH                           $      3.00    $      2.70   $      2.55   $      2.40   $      2.25
     D0NR3LL SMARTCLOUD INOTES AUTH USER OVERAGE                             $      3.75    $      3.38   $      3.19   $      3.00   $      2.81
     D0NR5LL SMARTCLOUD CONNECTIONS LOTUS CUSTOMERS W S&S AU PER MONTH       $      5.00    $      4.50   $      4.25   $      4.00   $      3.75
     D0NR7LL SMARTCLOUD CONNECTIONS AUTH USER PER MONTH                      $      6.00    $      5.40   $      5.10   $      4.80   $      4.50
     D0NR9LL SMARTCLOUD CONNECTIONS AUTH USER OVERAGE                        $      7.50    $      6.75   $      6.38   $      6.00   $      5.63
     D0NRCLL SMARTCLOUD MEETINGS UP TO 14 GUESTS AUTH USER PER MONTH         $     29.00    $     26.10   $     24.65   $     23.20   $     21.75
     D0NRELL SMARTCLOUD MEETINGS UP TO 14 GUESTS AUTH USER OVERAGE           $     36.25    $     32.63   $     30.81   $     29.00   $     27.19
     D0NRFLL SMARTCLOUD MEETINGS ENTERPRISE DEPLOYMENT AU PER MONTH          $      5.00    $      4.50   $      4.25   $      4.00   $      3.75
     D0NRHLL SMARTCLOUD MEETINGS ENTERPRISE DEPLOYMENT AU OVERAGE            $      6.25    $      5.63   $      5.31   $      5.00   $      4.69
     D0NRILL    SMARTCLOUD MEETINGS UP TO 199 GUESTS AUTH USER PER MONTH     $     39.00    $     35.10   $     33.15   $     31.20   $     29.25
     D0NRKLL SMARTCLOUD MEETINGS UP TO 199 GUESTS AUTH USER OVERAGE          $     48.75    $     43.88   $     41.44   $     39.00   $     36.56
     D0NRLLL SMARTCLOUD MEETINGS CONCURRENT SEATS AUTH USER PER MONTH        $     50.00    $     45.00   $     42.50   $     40.00   $     37.50
     D0NRNLL SMARTCLOUD MEETINGS UP TO 999 GUESTS AUTH USER PER MONTH        $     79.00    $     71.10   $     67.15   $     63.20   $     59.25
     D0NRQLL SMARTCLOUD MEETINGS UP TO 999 GUESTS AUTH USER OVERAGE          $     98.75    $     88.88   $     83.94   $     79.00   $     74.06
     D0NRRLL SMARTCLOUD MEETINGS ENT DEPLOY CUST W S&S AU PER MONTH          $      4.00    $      3.60   $      3.40   $      3.20   $      3.00
     D0NRULL SMARTCLOUD WITH NOTES STEP-UP AND CONNECTIONS AU PER MONTH      $      7.00    $      6.30   $      5.95   $      5.60   $      5.25
     D0NRWLL SMARTCLOUD WITH NOTES STEP-UP AND CONNECTIONS AU OVERAGE        $      8.75    $      7.88   $      7.44   $      7.00   $      6.56
     D0NRYLL SMARTCLOUD WITH INOTES AND CONNECTIONS AUTH USER PER MONTH      $      7.00    $      6.30   $      5.95   $      5.60   $      5.25
     D0NS0LL SMARTCLOUD WITH INOTES AND CONNECTIONS AUTH USER OVERAGE        $      8.75    $      7.88   $      7.44   $      7.00   $      6.56
     D0NS1LL SMARTCLOUD WITH NOTES AND CONNECTIONS AUTH USER PER MONTH       $      8.00    $      7.20   $      6.80   $      6.40   $      6.00
     D0NS3LL SMARTCLOUD WITH NOTES AND CONNECTIONS AUTH USER OVERAGE         $     10.00    $      9.00   $      8.50   $      8.00   $      7.50

98                                                                                                                                         © 2012 IBM Corporation
Additional SaaS concepts
Add-on
   – This is a PROCESS, not a separate part
   – Add-on: increase of subscription level of a currently-entitled part or adding an additional service
     – You are “adding on” to an existing Services Agreement
     – Cannot add-on until after 1st SaaS invoice

Ramp ups
  – Limited to 12 months total, up to 4 separate ramp-up periods
      • Ramp up is limited to the FIRST 12 months of the contract
        • Note: if >1 ramp up, each stands alone so the quantity is the total for that ramp-up period,
          NOT cumulative
     – Enabled only for subscription parts
     – No add-ons during the ramp up period for a given part number OR prior to the initial invoice

New to SaaS is the concept of a Services Agreement or Charge Agreement
   – Like a Sales Order for SaaS -- A “repository” for the customer’s agreement, including
     subscription details, agreed-to overage, on-demand and pay per use prices
     – Initiated automatically by SAP when provisioning has been completed and the FIRST INVOICE
       has been issued
     – Rep may need to reference Charge Agreement number when doing add-on or trade-up

99
Glossary
 Part Types: defined by a set of coding attributes, which drive specific systems/tools logic
 Subscription tracking period – how often the “counting” for a part is reset (e.g., every month or once a
 year) for overage determination and “entitled” usage level
 Term (Contract duration): length of entitlement set up per purchase of SaaS subscription (up to 5
 years)
 Provisioning: Actually setting up the service for customer use
 Line Item Hold: SAP function resulting in delay in billing until hold is removed (Terms of Use Hold &
 Provisioning Hold); Driven by Part Coding attribute (SMG4);
 Services Agreement: The “repository” for a customer’s subscription level, overage rates, etc.
 Overage: part type used to bill when current subscription level has been exceeded
 Co-term: Keeping a single contract end date as new parts are added or existing parts modified
 Add on: Adding an additional feature (new part number) or changing the quantity for an existing part in a
 Services Agreement
 Trade-up: Replacing one part with another part for the balance of a contract or as part of a renewal or
 extension
 Ramp-up: Where a customer does not use the full amount up front, the ramp up allows for growth during
 the first 12 months

100

IBM Smart Cloud

  • 1.
    SmartCloud How New SaaSChanges Will Help You Make Money with Cloud in 2012 April 2012 © 2011 IBM Corporation
  • 2.
    Your Presenter Brian Donovan Business Unit Executive - SmartCloud for Social Business Channel Sales Business Unit Executive – ICS ASL Sales m. +1 303 596 4900 o. +1 303 331 4600 brian.donovan@us.ibm.com 2 © 2012 IBM Corporation
  • 3.
    Review Agenda ● Momentum / Market Overview ● Flagship Offering, Demo and Portfolio of Services ● New SaaS Parts, Order Processing (PGST) with Demo, Pricing, and eCommerce ● New Product Based API's ● Contracting Type – PA or ASL? A bit about ASL and ASL API's ● Cloud Direction for 2012 ● New Compensation Models, “The Rule of 78” ● TCO Consideration ● Tools and Resources ● Q/A 3 © 2012 IBM Corporation
  • 4.
    Momentum / Market Overview ● Flagship Offering, Demo and Portfolio of Services ● New SaaS Parts, Order Processing (PGST) with Demo, Pricing, and eCommerce ● New Product Based API's ● Contracting Type – PA or ASL? A bit about ASL and ASL API's ● Cloud Direction for 2012 ● New Compensation Models, “The Rule of 78” ● TCO Consideration ● Tools and Resources ● Q/A 4 © 2012 IBM Corporation
  • 5.
    Thank you fora stellar year ● Over 200% growth YtY in partner ● 76% YtY increase in active resellers channel revenue ● Triple-digit growth in 3 geographies ● > $100k deals total >$1M (North America, NE Europe, SW ● Birmingham Met, Brunswick, Europe) Apave, Colgate, Shriram, and ● More signings in one quarter than more any other in history ● Leading Partners Revenue Volume Insight FreshTL Logicalis Acuity ASI Informatique RealConnections Micro Strategies Silverside IntraVision Silanis Wipro ASI Informatique VAR Group EdgeGuide
  • 6.
    Customer Momentum ● 35 new references in 2011 ● Find them on Partnerworld http://ibm.co/A4PWgf ● Spanning industry, geography, enterprise and SMB © 2012 IBM Corporation
  • 7.
    Market Analysis –Cloud Computing and SaaS  Corporate and enterpris e $126B by the end of 2012 represent 50% of market Cloud >9% of total IT spend by 2015  CAGR of 25% through 2015 Software as a Service (SaaS)  $20B by the end of 2012  47% of organisations have adopted S aaS 75% intend to do  CAGR of 25% through 2015 so over the next few years $126B B us ines s Proces s es Software as a Service $20B Infras tructure 50% of total 30% of total $47B S ervices cloud market cloud market is in is in corporate collaboration C omponents and s olutions enterpris e segments 2008 2012 © 2012 IBM Corporation
  • 8.
    Market Analysis –SaaS Collaboration Top SaaS solutions through 2012 - Global User Base ALL <1000 1000-5000 >5000 Collaboration Technologies 1 1 1 1 Human Resources / Benefits Admin 2 2 1 2 Customer Services and Support 3 3 5 4 Payroll 4 4 10 5  Collaboration represents Finance & Accounting 5 5 4 7 the number 1 SaaS solution BI & CPM Time and Labour Mgmt 6 7 8 9 7 3 3 8 in 2012 across all segments Salesforce Automation 8 6 9 10 Talent and Performance Mgmt 9 13 6 6  Organisations see SaaS E-Commerce 10 7 14 13 Procurement & Sourcing 11 15 15 8 tools as an integrated Supply Chain Mgmt 12 11 13 10 ecosystem of solutions Supplier Relationship Mgmt 13 14 8 14 Mobility Mgmt 14 10 11 12 ERP / Manufacturing 15 11 11 16 Governance, and Risk Mgmt 16 15 15 17 Treasury and Cash Mgmt 17 17 17 15 Relative rank of top 8 SaaS solutions 2012 Product Lifecycle Mgmt 18 18 18 18 © 2012 IBM Corporation
  • 9.
    Market Analysis –SaaS Collaboration Collaboration tool purchasing intentions 2011 – heat map User Base 100-300 300-500 500-1000 2500-5000 OVER 5000  Extremely strong purchase Email 71.8% 72.8% 69.3% 59.9% 56.5% intentions in all market Web conferencing 67.6% 69.7% 69.5% 69.0% 63.9% segments and across the Calendaring 64.3% 72.5% 64.1% 57.3% 48.9% collaboration portfolio Office Suite 69.0% 67.2% 61.2% 51.5% 58.8% Project Management 66.1% 68.2% 66.8% 59.1% 56.3%  Market ‘Sweet Spot’ is Business Collaboration 62.0% 67.0% 64.0% 59.4% 57.9% organisations with 100-1000 Forums 56.2% 61.9% 56.3% 54.9% 47.1% user base Communities 57.7% 62.2% 56.9% 56.4% 48.9% Social Networking 55.9% 58.8% 54.4% 53.0% 43.2%  Particular strength in 300-500 Whiteboards 54.8% 62.9% 58.5% 55.5% 44.8% user base organisations Blogs 54.6% 60.3% 52.3% 52.1% 44.5% Content Tagging 54.7% 63.2% 57.2% 54.5% 44.4% Wikis 51.6% 56.8% 52.5% 54.2% 45.9% 100-300 300-500 500-1000 2500-5000 OVER 5000 Aggregated Total 60.5% 64.9% 60.2% 56.7% 50.9% Market ‘Sweet Spot’ 1 © 2012 IBM Corporation
  • 10.
    Why Customers BoughtSaaS Services in 2011 To Extend their Reach... Across Geographies ● Regardless of IT footprint To New Audiences ● Seamlessly, securely connecting to customers, partners, experts outside your corporate network Supporting New Demographics ● Meeting expectations of a new workforce generation To Manage a Mobile Workforce ● “We couldn't possibly keep up with the rate of mobile device and browser changes using our own IT staff. That's one reason for us to move to cloud.” 10 © 2012 IBM Corporation
  • 11.
    … While MaintainingFlexibility and Control ● Protect and Monitor Sensitive Assets ● Choose the Rate and Pace of Adoption ● Mitigate Impact to End Users ● Bridge Applications to the Cloud Experience the value of social business, limiting startup time and cost 11 © 2012 IBM Corporation
  • 12.
    Cloud is aPriority for Our Customers and IBM One of 4 key growth plays on IBM's 2015 roadmap/plan 80% of Fortune 500 use IBM Cloud Computing IBM SmartCloud - Helping our customers rethink IT and reinvent business Foundations Services Solutions © 2012 IBM Corporation
  • 13.
    Announcing IBM SmartCloudfor Social Business ● Aligning LotusLive with IBM SmartCloud ● Delivering a portfolio of Social Business Solutions in the cloud © 2012 IBM Corporation
  • 14.
    Announcing IBM SmartCloudfor Social Business ● Aligning LotusLive with IBM SmartCloud ● Delivering a portfolio of Social Business Solutions in the cloud © 2012 IBM Corporation
  • 15.
    Featuring a NewWeb Presence ibmcloud.com/social ■ Simple to Navigate ■ Intuitive ■ Coming Soon © 2012 IBM Corporation
  • 16.
    New Service Names Category Lead Offering Bundles Ala Carte / Add-ons ●Connections ●Meetings IBM ●Engage Advanced ●Notes ●iNotes SmartCloud IBM SmartCloud (lead with) for Social Engage ● Engage Standard Business ●Additional Storage ●Traveler
  • 17.
    What Happens tothe URLs URL Behavior as of 3/3 ibmcloud.com Parent Site Lists all IBM SmartCloud SaaS Solutions ibmcloud.com/social New site 3/3 – Site launch in English only ~4/3 – Site available in 22 languages www.lotuslive.com Current Site Remains active in parallel with new site. Then, will auto-redirect to new site apps.lotuslive.com Services Remains as is. In future, changes to a generic domain to enable resellers to private label © 2012 IBM Corporation
  • 18.
    Momentum / Market Overview ● Flagship Offering, Demo and Portfolio of Services ● New SaaS Parts, Order Processing (PGST) with Demo, Pricing, and eCommerce ● New Product Based API's ● Contracting Type – PA or ASL? A bit about ASL and ASL API's ● Cloud Direction for 2012 ● New Compensation Models, “The Rule of 78” ● TCO Consideration ● Tools and Resources ● Q/A © 2012 IBM Corporation
  • 19.
    Flagship Offering: IBMSmartCloud Engage ● Enterprise-class, security-rich, integrated social and messaging services ● Flexible client options – mobile, browser, tablet, rich client People Communities Activities Files Meetings Events Chat eMail Survey Forms © 2012 IBM Corporation
  • 20.
    $19-49/user/month $15/user/month $49/user/month $13.25/user/month* *Dropbox for teams, $795/year for 5 users
  • 21.
    IBM SmartCloud forSocial Business $8 USD per user/per month $19-49/user/month $15/user/month ● Collaborate quickly and easily beyond the firewall ● Instantly host online meetings (199 attendees), store and share files and manage projects seamlessly in the cloud ● Invite guests—at no additional charge— to participate in your online projects and create communities to make collaborating even easier ● Help improve productivity, deepen customer relationships, generate new ideas faster, and enable a more effective workforce $49/user/month $13.25/user/month* *Dropbox for teams, $795/year for 5 users
  • 22.
    What you getfor $8USD/user/month! | © 2012 IBM Corporation
  • 23.
    DEMO © 2012 IBM Corporation
  • 24.
    Boundless collaboration /social networking  IBM Smart Cloud Collaboration is a true collaboration tool,  Alternative products restrict collaboration to a users own without boundaries organization  For one price users can collaborate with anyone across multiple  Despite a similar price, users are only able to fully organizations using a range of rich social networking and collaborate with a limited scope of users business tools  To collaborate beyond the organization, users still have to  Smart Cloud Collaboration is designed to build communities rely on email, or other disconnected platforms – increasing and networks that drive efficiency, collaboration, innovation and overhead, out of date file versions and use of multiple relationships across organization boundaries resources for the same data  Free guest connections Boundary Boundary Boundary development community customer user x’s user y’s user z’s council $8 / month company company company client client $0 user’s company supplier community vendor $10 / month $10 / month $10 / month $0 © 2012 IBM Corporation
  • 25.
    Upsell opportunities using IBM SmartCloud platform ● Opportunity to provide users with enhanced Social Collaboration capabilities 25 © 2012 IBM Corporation
  • 26.
    SmartCloud Social Mobile? A integrated set of mobile applications providing email, contacts, calendar, instant messaging, meetings, file sharing, application integration, and documents. SmartCloud Notes SmartCloud iNotes SmartCloud Engage SmartCloud Meetings SmartCloud Connections Windows Mobile Blackberry iPhone Android Nokia 26 © 2012 IBM Corporation
  • 27.
    Momentum / Market Overview ● Flagship Offering, Demo and Portfolio of Services ● New SaaS Parts, Order Processing (PGST) with Demo, Pricing, and eCommerce ● New Product Based API's ● Contracting Type – PA or ASL? A bit about ASL and ASL API's ● Cloud Direction for 2012 ● New Compensation Models, “The Rule of 78” ● TCO Consideration ● Tools and Resources ● Q/A 27 © 2012 IBM Corporation
  • 28.
    SaaS Concepts andTerminology SaaS IPLA-Licensed Software (OTC) License Right-to-Use service (opex) Perpetual or Term (capex) Quote “value” TCV (total contract value) displayed, Total quote is due payments vary Term of sale 1 to 60 months (typically 3-5 years) Typically license with 12 months often sold monthly S&S Revenue Recognition Subscription (term of the agrmt) License (upfront) On-demand items (as billed) S&S (amortized over 12 months) Remote service (end of 90 days) Term (amortized over 12 months) Governing Agreements Passport + ToU (Terms of Use) + Passport + IPLA + LI SLA Terms (if applicable) Renewal Yes (Service), same price as original Yes (S&S), sale Part Structure Part types vary as needed by offering Lic+S&S, Renewal, Reinstate Opt: Tradeup, Init & Subsq Term Passport Points Not applicable – no points generated Applicable - Sale generates PA points Passport Band Prices Same price in all Bands (including Generally sloped plus Academic Gov/Academic) and Government Tiered Pricing Yes Only via RVU, only by exception 28
  • 29.
    New SmartCloud SaaSParts ● IBM Business System Enhancements Reduce Part Count by 50% ● More flexible system structures ● From 109 parts - down to 59 ● Subscription Parts ● Tracked per user, per month ● Overage – billed when subscription level has been exceeded ● Flexible Billing Frequency Options ● Up Front, Monthly, Quarterly, Annually ● IBM bills the VAD/VAR who then bills the end customer ● VAD/VAR incentives are paid on billings ● Auto-Renewing ● Unless cancelled, contract “auto renews” for another subscription period ● Existing Customers ● Will be converted to the new parts upon renewal – no need to move customers mid-term
  • 30.
    Other New SaaSEnhancements Enhancement Definition Example Trade-Up Replacing an existing service with a different service Customer subscribes to Connections for 50 of equal or greater value, and co-terming the end employees. After 6 months, customer decides to date to the existing service upgrade 10 of the accounts to Engage. Add-On Quantity Increasing the quantity on a service. The quantity Customer subscribes to SmartCloud Engage for 50 (same tier) increase does not push the quantity into a new price employees billed monthly for 3 years, After 1 year tier. The end-date is co-termed to the existing service customer wishes to add 30 more seats for the remaining 2 years of the contract. Add-On Quantity Increasing the quantity on a service – where the new Customer subscribes to SmartCloud Engage for 90 (tier change) quantity pushes the quantity into a new price tier. The employees billed monthly for 3 years, After 1 year end-date is co-termed to the existing service. customer wishes to add 30 more seats for the remaining 2 years of the contract, which pushes them into the first discount tier (10%). Add-On Service Adding an optional or complimentary service under Customer subscribes to SmartCloud Notes for one the same SaaS offering to an existing subscription, year and wants to add Traveler for a subset of users and co-terming the end date to the existing service. 2 months after the contract period. Co-Term Adding a service to a charge agreement from a Customer subscribes to SmartCloud Engage. They different SaaS offering and aligning the end-date with want to subscribe to Lombardi Blueprint as well, but an existing, unrelated service. they want their Lombardi service aligned to the Now everything coordinates to end of month. same end date as Engage. Invoice Alignment Adding a service to a charge agreement from a Customer subscribes to SmartCloud iNotes with different portfolio. If the invoice schedule of the monthly billing. They want to subscribe to Sterling service aligns with an existing service, both will as well, with monthly billing. They want a appear on the same invoice. The service is not consolidated invoice with both services. co-termed. © 2012 IBM Corporation
  • 31.
    Updated TOU New Auto-renew clause New names New EU data IBM SmartCloud privacy statement
  • 32.
    With New PriceTiers Lower-touch seat volume discounting that…. • Arms Sales with price points that can win business • Reduces number of bids that unnecessarily route to Field Pricing or Brand Pricing • Promotes profitability • PA Band discounts N/A for SaaS Tier 1 Tier 2 Tier 3 Tier 4 Tier 5 Seats 1-100 101-1,000 1001-5,000 5001-10000 10,001+ Discount: 0% 10% 15% 20% 25% Example: SmartCloud Engage Advanced List Pricing by Tier: Engage Advanced (Engage+Notes) $12.00 $10.00 $10.00 $9.00 $8.50 $8.00 $7.50 $8.00 $6.00 $4.00 $2.00 $0.00 Tier 1 Price Tier 2 Price Tier 3 Price Tier 4 Price Tier 5 Price
  • 33.
    2011 vs 2012Pricing Structure – Simpler Discounting Approvals ● With 2012 tiered pricing structure, field sales management can approve price points that could only be approved by pricing in 2011 ● Streamlined special bid approval process LL Notes Plus Engage: 2011 Engage Advanced (Engage+Notes): 2012 2011 List 2011 after Discount* 2012 List 2012 after Discount* $10.00 $10.00 $10.00 $10.00 $10.00 $10.00 $9.00 $8.50 $8.00 $7.50 $7.50 $7.50 $7.50 $7.50 $7.50 $7.50 $6.75 $6.38 $6.00 $5.63 (<=100) 101-1000 1001-5000 5001-10,000 10,001+ (<=100) 101-1000 1001-5000 5001-10,000 10,001+ Tier Tier *Field Sales BUE 25% discount delegation 33 © 2012 IBM Corporation
  • 34.
    Enhanced Order ProcessingOptions For Business Partners – New Partner Guided Selling Tool ● Guides the business partner through the options associated with a SaaS quote ● Provides a coordinated process for VARs and VADs to work together to build quotes, place special bids, place orders, track service activation, and manage the customer billing. New SaaS configurator - makes it easy for a reseller to build sales quotes and place orders Build Special Bid Place Submit ToU Service Rating and Quote (if needed) Order provisioning info Acceptance Activation Billing
  • 35.
  • 36.
    Enhanced Order ProcessingOptions For Consumers – New eCommerce Site 36 © 2012 IBM Corporation
  • 37.
    Supported Plans /Parts for Ecommerce ● The following parts are supported via eCommerce ● IBM SmartCloud Engage Advanced ● IBM SmartCloud Engage Standard ● IBM SmartCloud Connections ● IBM SmartCloud Meetings (enterprise deployment, host +199) ● IBM SmartCloud Notes ● All other orders must be placed outside of eCommerce ● iNotes ● Hybrid mail ● BES ● Additional storage for Connections ● Variants of SmartCloud Engage and Meetings (e.g. non-enterprise deployments, host +14, etc.) © 2012 IBM Corporation
  • 38.
    Momentum / Market Overview ● Flagship Offering, Demo and Portfolio of Services ● New SaaS Parts, Order Processing (PGST) with Demo, Pricing, and eCommerce ● New Product Based API's ● Contracting Type – PA or ASL? A bit about ASL and ASL API's ● Cloud Direction for 2012 ● New Compensation Models, “The Rule of 78” ● TCO Consideration ● Tools and Resources ● Q/A 38 © 2012 IBM Corporation
  • 39.
    We've Been Busy– New Capabilities from last year ■ New Capabilities ‒ Enterprise governance ‒ Richer mobile support – meetings, messaging ‒ Latest social File sharing from IBM Connections ‒ Robust new Messaging administration tools ‒ Integrated Apps enterprise deployment ■ ISV Partnerships ‒ Trilog, Teampoint ■ Social Business Toolkit for LotusLive ‒ Available now on IBM DeveloperWorks
  • 40.
    New Social BusinessToolkit – PRODUCT API's A single toolkit for integrating apps with the IBM Social Business offerings ● Easy to use Web based tool for integration with LotusLive and IBM Conections APIs ● OpenSocial REST APIs and UI extension points Standards-based security framework (OAuth) People APIs Files APIs Meetings APIs Use OpenSocial APIs to Using the CMIS APIs Start and Stop meetings get access to Profiles and you can manipulate the from your application and Contacts data powerful LotusLive files get custom meeting reports store from applications UI Extensions Navigation API Communities APIs Reuse the LotusLive Add your own custom Create and manage navigation bar in your actions to the LotusLive communities application for a consistent UI look/feel Available on IBM Developer works https://www.ibm.com/developerworks/social/ © 2012 IBM Corporation
  • 41.
    Public or PrivateDevelopment  IBM SmartCloud APIs are accessible to User Companies or ISVs for extension to another cloud or on-premises service or application.  There are two types of Developers — Private Developers : ● These type of developers will be building an application or extension for use only by their Organization or Company. ● Development does not require communications with the IBM SmartCloud Partner Program — Public (or ISV) Developers: ● These type of developers will be building an application for sale to the public ● Public release coordinated with IBM SmartCloud Partner Program to ensure proper resellers, security and marketing requirements are met ● More details on this process later in presentation © 2011 IBM Corporation
  • 42.
    What are theIBM SmartCloud Integrations Capabilities  Inside-Out Integrations – Expand capabilities of IBM SmartCloud to include your own offerings – Extend the IBM SmartCloud interface to include jumping off points to your functions. – IBM SmartCloud Extensions – Example : Skype, eXpresso  Outside-In Integrations : – Expand your offering with IBM SmartCloud functionality – Utilize the functions of IBM SmartCloud as an extension of your offerings. – Embed IBM SmartCloud files functionality natively in your own application – IBM SmartCloud API's – Example : SalesForce, Trilog  Hybrid Integrations – Integrate On-Premise and Cloud Solutions – Domino Integration
  • 43.
    Outside - InIntegrations - Business Value IBM SmartCloud social business and external collaboration into applications via APIs — Richer interactions for streamlined decision-making — Bring more people and resources to the challenge or opportunity — Examples: CRM, procurement APIs Company Cloud APIs
  • 44.
    Inside - OutIntegrations : Business Value  Business apps depth into IBM SmartCloud — Online collaboration services can be enhanced for specific business processes and industry challenges — Examples: collaborative contract creation, review and electronic signatures s API Company UI Extensions Cloud
  • 45.
    IBM SmartCloud IntegratedApplications - Infuse Social Capabilities into Business Processes ® tm Selling B2B Commerce Digital Signing Archiving Scheduling Collaborative Talking Meetings Doc Editing © 2011 IBM Corporation
  • 46.
    Examples of APIcalls Files Meetings Communities ● Get a list my files ● Start a meeting ● Create a community ● Get a list my collections ● Get meeting details ● Update a community ● Get file details ● Join a meeting ● Delete a community ● Download a file ● Create bookmarks on a ● Upload a file Contacts community ● Get shares for a file ● Get users contacts ● Create a sub-community ● Share file with someone ● Get collections of users ● Create invitations to join a connected to user community ● Create a community forum topic Activities Profiles ● Add, Update or delete ● Start activity community members ● Update or Delete activity ● Get profile record or contact record for a user ● Searching activities ● Get profile record for requestor ● Add new entry ● Get profile details ● Create a new To-do © 2012 IBM Corporation
  • 47.
    Tools to AidDevelopment  Social Business Toolkit — Set of extensible tools and resources for developers who want to incorporate social capabilities into their applications and business processes  IBM SmartCloud Wiki — Wiki to provided help and support for using and administering IBM SmartCloud  API Explorer — Utility to learn about and experiment with IBM SmartCloud API's without writing any code  IDR Workshop — Watch Partnerworld for the next workshop for hands on education (Feb 2012) © 2011 IBM Corporation
  • 48.
    Onboarding process forISV Applications  Register with PartnerWorld at — http://www-2000.ibm.com/partnerworld/pwhome.nsf/weblook/pub_join_allBPs.html  Get a Business Partner Demo Account : — http://www.ibm.com/partnerworld/page/isv/IBM SmartCloud  Begin development using your Business Partner Demo account / company  Once you are ready to deploy publically, contact the IBM SmartCloud Partner Team (LLP@us.ibm.com) for: — Advanced or Premier PartnerWorld Account — Security validation — Usability Testing — Marketing requirements — IBM SmartCloud Catalog listing © 2011 IBM Corporation
  • 49.
    Momentum / Market Overview ● Flagship Offering, Demo and Portfolio of Services ● New SaaS Parts, Order Processing (PGST) with Demo, Pricing, and eCommerce ● New Product Based API's ● Contracting Type – PA or ASL? A bit about ASL and ASL API's ● Cloud Direction for 2012 ● New Compensation Models, “The Rule of 78” ● TCO Consideration ● Tools and Resources ● Q/A © 2012 IBM Corporation
  • 50.
    What is PassportAdvantage? Passport Advantage and Passport Advantage Express are simple, comprehensive IBM offerings that cover software license acquisition including Fixed Term Licenses and Software Subscription and Support product upgrades and technical support under a single, common set of agreements, processes and tools. Passport Advantage is designed for larger enterprises, while Passport Advantage Express, a transaction-based offering, is designed to meet the needs of medium-sized businesses. Fundamentals of Passport Advantage - ● Includes Software Subscription and Support (technical support and product upgrades) with each new license. ● Provides Selected Support for certain Open Source and other non-warranted code. ● Provides comprehensive and flexible upgrade coverage. ● Streamlines budgeting for software upgrade and migration costs. ● Provides secure access to Passport Advantage Online. ● Incorporates flexible, easy-to-access, responsive, cross-platform customer support from IBM. ● Provides access to IBM software technical support for all of a customer's designated IT staff. ● Provides 24x7 access to support resources for business-critical outages. ● Provides self help via the Internet. Partner Types include - ● Value Added Resellers ● Value Added Distributers ● System Integrators ● Independent Software Vendors
  • 51.
    What is ASL? AnIBM contract in which the Business Partner acquires IBM software, bundles it with the Business Partner’s own software & services, and sells that bundled solution offering to end customers. Fundamentals of ASL - ● End-customer may / may not know that the IBM middleware is bundled with the solution ● IBM middleware price is not visible to the end-customer ● Solution support and maintenance is provided by the Partner ● The customer calls the Partner for L1/L2 support. ● IBM software license/warranty stays with the Partner - It is not transferred to the end user ● Provides end-customer restricted use of IBM middleware, for use with the partner’s application ● BP owns the relationship completely – less dependant on IBM sellers ● BP presents single contract for the solution ● Worldwide Distribution ● Licenses can be deployed in any geography ● ASL Business Partner buys at a discounted rate, generally directly from IBM (geo dependant) Partner Types include - ● SaaS Providers (Public or Private Cloud) ● Technology Partners (HW/Device Mfg) ● Telecoms ● Independent SW Vendors (ISVs) ● Application Service Providers (ASPs) ● Application Developers
  • 52.
    SWG Go-to-Market Models- Resell - Open Distribution OEM Application Specific License (Passport Advantage) Description  Deep embed product integration of  Integration of IBM SW in partner’s ● Controlled distribution, IBM SW in the partner’s solution. solution model. Degree of integration minimum of 3 certifications are Solution cannot be disassembled of IBM SW can vary. required, two sales and one into component parts. technical.  IBM brand is not visible to the  IBM brand is visible to the client within client within the partner’s solution. the partner’s solution.  Special contract terms beyond ● IBM brand is primary. ASL to reinforce embedded focus.  Collaboration is between partner and  Collaboration is between partner IBM (or VAD) channel sales teams. and IBM brand labs & bus dev teams.  Deeper license discounting than ASL given more partner responsibility Partner  Value add components  Value add components  No criteria for Value add requirements  L1/L2 support  L1/L2 support by IBM  Restricted license to end user via  L1/L2 support  Full use license to the partner solution license; partner customer retains IBM license  Restricted license to end user via  Price determined by customer  WW price and sales territory partner solution license; partner PPA grid  Partner owns S&S renewals retains IBM license  S&S renewals competitive  WW price and sales territory  Partner owns S&S renewals
  • 53.
    Application Specific Licensing(ASL) -  An agreement under which partners Integrate and bundle IBM Software with their value-add software and services and sell as a total solution to their end customers anywhere in the world* OBJECTIVE Application Specific Licensing aims to create an autonomous solution sales channel ASL partner is responsible for - Solution marketing (OI) Solution selling (OO) Though the partner may team with IBM sales, the Partner should not expect assistance with solution marketing or solution selling. *Certain countries may be excluded based on IBM's exclusive distribution arrangements 53 © 2011 IBM Corporation
  • 54.
    Guidelines - 1. Base Agreement 2. Transaction Document: Purchase Commit, Earned Discount, Percent of Revenue, Monthly Rental SOLUTION IBM SOFTWARE YOUR VALUE ADD COMPONENTS = + Your Products listed in the Transaction Document that you must & Services which add significant new functionality or combine The offering created include in your solution or integrate our software when our Software with one or more other and your Value-Add Examples… products Components work An Application* and/or coded together. software programs. For Tivoli, *Monthly Rental: must software or programs might include your include coded procedures, application (Rational, workflows, algorithms, reporting, WS Commerce routines, scripts, and/or metering exception). software Integrated and interoperating with IBM Software 54 © 2011 IBM Corporation
  • 55.
    Application Solution Provider(ASP) License Amendment - ASP Amendment – Added to a Purchase Commit or Earned Discount transaction document when providing access to the Solution from remote data centers to multiple Customers via the Internet or a private network. ASP Services do not include the downloading or copying of Programs by Customers.  If the partner does not use Passport Advantage, then you may offer the partner an OEM/ASL agreement with the associated ASP Amendment or  If the partner has an existing OEM/ASL contract covering a specified solution, and they simply want to “host” that same solution, then you can offer them an ASP Amendment or Monthly Rental. Programs listed at the following website are not eligible for use with this Amendment: http://www-06.ibm.com/software/lotus/passportadvantage/xspexcludedprograms.html Any exceptions must be approved by the Brand. 55 © 2011 IBM Corporation
  • 56.
    Application Specific LicenseSoftware Agreement - Base Agreement SOLUTION - The offering that is created when our Programs and your Value-Add Components work together. VALUE ADD COMPONENTS - must add significant new functionality or combine or integrate the Program with one or more other products or services that add significant new functionality. RETSRICTED USE - use the Programs only in conjunction with the Solution. May not be used for internal use Purchase Commitment Purchase Commitment Earned Discount Percentage of Monthly Rental for Monthly Rental for Transaction Document Transaction Document Transaction Document Revenue TD Cloud Application Cloud Infrastructure for Fixed Term Use Services Provider TD Provider TD - SBO •Revenue commitment •Revenue commitment •No revenue commitment • Non standard • For SaaS Providers • Special bid only •License + 12 mo S&S •Fixed term use •License + 12 mo S&S • Not encouraged • Application required • Approval required •Perpetual licenses •Default 1 year term •Perpetual licenses • Special bid only • Their own SW IP • SWG VP Pricing •Fixed Term licenses •Multi yr term possible •Fixed Term licenses • Delivered as a service • For IaaS providers •Default 1 year term •Initial payment •Default 1 year term • Delivered over Internet • For PaaS providers •Multi yr term possible •Fixed discount •Multi yr term possible • To end customers • Approved “A” PNs list •Initial payment •We provide a Service •Cumulative purchases • Approved “A” PNs list • Excluded Programs •Fixed discount •Monthly reporting •Earned discount • Excluded Programs • Brand approval (exc.) •We provide a Program Currently only used with •We provide a Program • Brand approval (exc.) • Customers limited to •Monthly reporting Cast Iron Live, Lotus Live •Monthly reporting • Excludes appliances Solution Developers, • Excludes SaaS offerings Cloud Application ASP Amendment ASP Amendment • Min. mo. commitment Providers and their end •Access to solution •Access to solution • Paid monthly in arrears user customers. •Remote Data Center •Remote Data Center • Remote service access •To multiple customers •To multiple customers • For IaaS providers • Customer cannot •Via the Internet •Via the Internet • For PaaS providers downloaded or copy •or Private network •or Private network • Special bid only •Excluded Programs •Excluded Programs • Approval required •Brand approval (exc.) •Brand approval (exc.) • SWG VP Pricing •Reside on your servers •Reside on your servers •or servers you manage •or servers you manage •No download/copy •No download/copy 56 © 2011 IBM Corporation
  • 57.
    Level 1 and2 Support -  Level 1 Support means taking the first support call from a Customer and fulfilling the following steps: I. Qualify incoming calls: Determine if the request is for a new or existing case. Assign a priority to a new case (priority one through priority four). For existing cases, obtain case information. II. Characterize the problem and environment: Gather information about the case and determine if the Program causes the problem. Completely define and describe the problem. Identify ways to understand the problem's behavior. Document the characterization information. Analyze problem symptom(s), attempt to find root cause when appropriate and describe the result of such attempts. Determine if the problem is a known Program problem by accessing IBM online support resources. III. If it is determined to be a Program problem, contact IBM technical support. For new cases, open a case and select a priority. For existing cases, state the case number. Provide the case information you have gathered to the support engineer.  Level 2 Support means the service provided to analyze or repeat the error, or to determine that the error is not repeatable. This service also includes in-depth technical analysis. 57 © 2011 IBM Corporation
  • 58.
    Upside Opportunity –Cloud Goals: ● Grow channel participation rate in Cloud deals ● Accelerate integration to channel of Cloud-related acquisitions ● Continue to leverage 2 routes to market ● SWG Cloud portfolio of products ● ASL contracts with special conditions Traditional Passport Advantage Application-Specific Licensing 1 Distribution and Resale 1 2 ASL Business Partner Under Software Value Plus Program ASL Value Add Distributor Monthly Rental for Monthly Rental for Cloud Application Cloud Infrastructure Services Provider Provider Approved “A” PNs list Excluded Programs subject to Brand Approval CLOUD APPLICATION CLOUD PROVIDERS INFRASTRUCTURE PROVIDERS Deliver functionality Operate a cloud for through the cloud. application vendors They own an and companies to application and offer develop, test, and their solution as a host solutions. Service. Managed service providers. 58 © 2011 IBM Corporation
  • 59.
    ASL Launch andLanding Revenue Credit -  Revenue Recognition and Commissions Policy  IBM sellers receive commissionable credit for revenue that is generated by business partners who bundle IBM software with their solutions and sell these solutions to their end user clients under the terms of ASL contracts.  SWG business partner sales teams, SWG direct sales teams, and client teams receive appropriate credit for their contributions both in selling to our partners and in selling with our partners to their end user clients.  Launch commission credit may flow automatically through FMS to rep commission payment and retires quota.  In some cases, Reps are required to complete a manual claim request form and have their First Line Manager (FLM) confirm their involvement and approve the claim. The FLM will send the completed claim form and their approval to the Channel Manager covering the Launch location of the ASL Partner  ASL landing occurs when the ISV sells their application, as well as restricted use of IBM SW products integrated with their application, to an end user customer. The end customer is the ASL landing account. All reps given CREV quota for selling this IBM middleware and responsible for the end customer will be compensated.  All SWG reps and client reps and managers are eligible for ASL landing credit.  Executives who are paid on financial revenue only are excluded from the program.  ASL Landing commission payments are processed on a quarterly basis.  ASL landing commission credit is issued for transactional revenue only and retires quota. 59 © 2011 IBM Corporation
  • 60.
    10 Reasons toUse ASL - Developing 1. Leverage IBM’s significant investment in middleware Solution 2. Integration and bundling of your solution & IBM software 3. Shorter time to market 4. Sale is focused on your Application 5. Shortened sales cycle Sales Cycle 6. IBM reps can get paid for assisting in sale 7. Improved margins – upfront license & annual renewal 8. Ongoing account control 9. Lower installation & support costs Customer Benefits 10. Improved customer satisfaction It’s all about making money 60 © 2011 IBM Corporation
  • 61.
    API's for ASLBP's 61 © 2011 IBM Corporation
  • 62.
    Overview of ResellerOffering ● Provision LotusLive services via APIs including creating subscriptions and provisioning users. ● Provide partner the ability to deliver custom offerings to their client base by owning the contract, billing and support relationship with customers, rather than the traditional ISV partner transferal of ownership to IBM. ● Direct communication channel to to IBM Level 2 Support – enabling your customer support team with a direct channel to IBM for issue resolution. ● Co-branding : support for UI configuration and support redirection © 2011 IBM Corporation
  • 63.
    Phase 1 -Reseller tooling to support Self-provisioning API's Reseller API Requirements Customer / Organization Subscription User Create Customer/Organization Add a subscription Add a user Suspend Customer/Organization Suspend a subscription Edit a user (all editable portions of the user account) Un-suspend Customer/Organization Un-suspend a subscription Remove a user Edit Customer/Organization Cancel a subscription Reset Password Remove Customer/Organization Return Subscription ID (given customer ID) Suspend a user Return Customer IDs (given reseller ID) Retrieve Provisioning Status (given subscription Un-suspend a user ID) Retrieve Provisioning Status (given customer Retrieve Subscription Status (given Account ID) Return Account IDs (given customer ID) ID) Retrieve Customer/Org Status (given customer Retrieve Provisioning Status (given Account ID) ID) © 2011 IBM Corporation
  • 64.
    Phase 1 -Co-Branding Capabilities Elements that can be branded  Login / Password reset pages  Key System support links  Key System eMail messages  Default theme Elements that will maintain IBM Corporate Identity  Service URLs  Service names  Service navigation  Engage / Connections Dashboard Rotating Banner 64
  • 65.
    Co-Branding Capabilities  A Provider specific log-in or landing page — A SAML based login page for EACH customer will be supported. T  The URL of the service can be masked as another URL such as serviceprovider.com instead of www.lotuslive.com — This is not currently available  More flexibility in customizing the web UI, such as more Service provider branding, the ability to put ads or promotions in the top or side banners — SmartCloud for Social Business has no plans to support  Ability to create their own customized welcome letter after service provision — First email is for access and authentication. This is an IBM branded email ● No ability to customize but can put the Service provider branding on it — Other emails will be suppressed ● Ones that are generated by the partner using the API's ● Notifications from the applications(adding a user to the ACL of a file/activity) will also be LotusLive generated © 2011 IBM Corporation
  • 66.
    Monthly termless partnumbers – Phase 1  Pay per usage Billing  Monthly Billing  Monthly Reporting © 2011 IBM Corporation
  • 67.
    Monthly Reports Monthly SummaryReport This report should list the parts that the vendor provisioned for that time period (prior month) The data would be limited to those parts that were provisioned in the last month by that partner only. Monthly Detail Report This report is related to the one above, but provides more detail. The data would be limited to those parts that were provisioned in the last month by that partner only. Total Summary Report This is the same as above, but a running total. The data would be limited to those parts that are currently provisioned by that partner only. Total Detail Report This report is related to the one above, but provides more detail. The data would be limited to those parts that are currently provisioned by that partner only. Monthly Active Users Report List and data of all users currently provisioned across all of that reseller's customer's orgs. Only contains current data, not total (historical) © 2011 IBM Corporation
  • 68.
    Momentum / Market Overview ● Flagship Offering, Demo and Portfolio of Services ● New SaaS Parts, Order Processing (PGST) with Demo, Pricing, and eCommerce ● New Product Based API's ● Contracting Type – PA or ASL? A bit about ASL and ASL API's ● Cloud Direction for 2012 ● New Compensation Models, “The Rule of 78” ● TCO Consideration ● Tools and Resources ● Q/A © 2012 IBM Corporation
  • 69.
    Cloud Directions for2012 Offerings Go to Market Extensibility New services ■ Alignment with the ● Open interfaces ● IBM Docs IBM SmartCloud such as the Social ● eDiscovery Archive Business Toolkit ■ More flexible buying options ● Enterprise grade Continued feature evolution controls ● Messaging ● Social ■ Reseller tools and ● Flexible public, enhancements dedicated and hybrid ● Unified Communications deployment options ■ Controlled Distribution 69
  • 70.
    SmartCloud for SocialBusiness Solutions Meet a Spectrum of Customer Needs Public Cloud Dedicated Cloud SmartCloud Engage Hybrid IBM SmartCloud Social Collaboration for Government SmartCloud Meetings IBM GTS SmartCloud Enterprise* SmartCloud Connections ● Lotus Notes Domino SmartCloud Notes and iNotes ● Domino Utility Server ● Connections ● Sametime ● WebSphere Portal ● Web Content Manager On Premises *Customer brings their own license, pays for infrastructure Pay as you Go options available 70 © 2012 IBM Corporation
  • 71.
    Introducing Partner-led Migrationfor LotusLive Notes in 2012 IBM to deliver ● Tools for LotusLive Notes onboarding planning and data transfer ● Partner education ● Partner certification ● Targeted for Q2 – will be announced via email to demo accounts, PartnerWorld newsletters, Webfront, etc. Partners can provide services for ● Pre-migration environment analysis and planning ● Preparation of the on-premises environment ● Data migration ● Transition of users ● Ongoing management of desktop clients, users, and the on-prem environment © 2012 IBM Corporation
  • 72.
    What we've learnedfrom ISSL-led migrations We presumed that: ● Customers would understand their existing environments ● Customers would be able to partner with us in their task responsibilities to project plan and prepare their environment and users for moving to the Cloud What we found is that the customers who are most interested in moving to cloud are the ones who are struggling the most managing their on-premises environment 1. Plan 2. Prepare ● Hold deployment kickoff meeting ● Configure Hybrid deployment ● Perform discovery and gather infrastructure technical data ● Configure directory synchronization ● Select mailbox transition methods and ● Configure client computers and end user tools experience On-premises environment LotusLive 3. Transition LotusLive Notes ● Synchronize mailbox content, calendars and environment contacts ● Use third-party tools to migrate from competitive offerings ● Configure mobile device connectivity ● Perform service validation and testing 72 © 2012 IBM Corporation
  • 73.
    New Partner MailOnboarding Tools and Certification Program ● New program to train and certify partners to setup hybrid configurations and onboard SmartCloud Notes users ● Onboarding Planning Tool (OPT) ● Used to gather and fix potential problems in mail files at the start of the transfer process ● Time spent fixing issues here can save lots of time and aggravation later ● Onboarding Transition Tool (OTT) ● Used to manage the transfer of “batches” of mail files to the IBM data center OPT OTT on- Gather Organize Stage Move to Provision premises Encrypt LLN Information Batches batches Datacenter into LLN files Coming in Q2 73 © 2012 IBM Corporation
  • 74.
    SmartCloud Notes CertificationProgram Overview  Objective — Deliver tools to enable Partner led LotusLive Notes service provisioning with data transfer — Create a BP Certification Program to establish process competency and a business arrangement  Certification program — Pre-requisites ● LotusLive Notes Business Partner Demo account ● IBM Certified System Administrator - Lotus Notes and Domino 8.5 certification — Education ● LotusLive community and activity ● Instructor led course with lab exercises (fee based) ● Covers hybrid configuration and data transfer processes ● 2x's per month ● 3-5 students per class — Evaluation ● IBM Certification exam (fee based) — Authorization to perform in the “Data Migrator” role ● Access to OPT and OTT
  • 75.
    Services Opportunities aroundSmartCloud Social Help customer decide what to Help Implement Help manage / operate do the solution the solution Assess and plan Design Integrate/ Operate/ Manage • Client collaboration • Design and Implement • Run complementary environment implementation plan • User Provisioning services • Cost and TCO analysis • Rollout plan • Directory Integration • Directory Assessment • Directory architecture • Single Sign-On • Security Assessment • Security design • Mail Routing Integration • Mail Routing & Migration Assessment • Data Migration • Integration w/Enterprise apps (Click-to-cloud)* Total Services Opportunity: 1 to 5x yearly subscription revenue 75 © 2012 IBM Corporation
  • 76.
    Momentum / Market Overview ● Flagship Offering, Demo and Portfolio of Services ● New SaaS Parts, Order Processing (PGST) with Demo, Pricing, and eCommerce ● New Product Based API's ● Contracting Type – PA or ASL? A bit about ASL and ASL API's ● Cloud Direction for 2012 ● New Compensation Models, “The Rule of 78” ● TCO Consideration ● Tools and Resources ● Q/A 76 © 2012 IBM Corporation
  • 77.
    Incentives for SaaS– beginning February 20, 2012* Two incentive models for SaaS: 1. SaaS Rebate: ● Paid on orders fulfilled through a VAD 2. SVI: ● Paid on IBM direct fulfilled opportunities ● Standard SVI program participation requirements ● BAU: First to register , sales progression, claiming SaaS incentive fees paid continuously – over life of engagement ● Payment: Unique process for SaaS offerings ● Fee paid on initial order and future period billings (including renewals) ● Eligible Part Types: Subscription, Daily, On-Demand ● Ineligible Part Types: Set up fees, Overage, SLA, Human Services ● Payment cycle ● Paid when minimum payment threshold reached or a specified amount of time has passed since last payment *Subject to change Available for selected offerings and in selected geographies
  • 78.
    SaaS Reseller IncentiveIntroductory Period 2012 ● Higher rebate rates for 2012 Up to 28% total margin for deals fulfilled through VAD ● Effective until Dec 31, 2012 Fulfilled through VAD Fulfilled by IBM Direct - Customer Segment (b) GB Non GB No extra incentive BP base discount (a) 5% 5% Customer Segment (d) GB Non GB SaaS instant rebate 15% 5% Sell Only SVI 10% 5% SaaS “Sweetener” 8% 3% Sell and ID SVI 20% 10% Total (c) 28% 13% Fine print: (a) 5% is an example. VADs and BPs establish their terms separately for product discount and discounts vary by country (b) SaaS incentives not applicable for ELA customers, as defined (c) Business Partners not eligible for SVI if transaction is fulfilled through VAD (d) SVI Incentives not applicable for Government accounts (e) Business Partners not eligible for SaaS Instant Rebate if fulfilled by IBM © 2012 IBM Corporation
  • 79.
    Example Business Model General Business account in the USA fulfilled through a VAD 100 Subscriptions sold @ $10/month (Annual contract value = $12000) Incentive Revenue Revenue Revenue Revenue Plan Year 1 Year 2 Year 3 Year 4 BP base discount 5% 600 600 600 600 SaaS instant rebate 15% 1800 1800 1800 1800 SaaS “Sweetener” 8% 960 0 0 0 Total 3360 2400 2400 2400 Etc ... IBM SaaS contracts are auto-renewing. Billing continues until the contract is cancelled. Rebates are paid on billings, resulting in an annuity revenue stream for partners © 2012 IBM Corporation
  • 80.
    “Rule of 78” -Example - © 2012 IBM Corporation
  • 81.
    N N “Rule of 78” N 78 blocks of revenue N N N N N N N N N J F M A M J J A S O N D © 2012 IBM Corporation
  • 82.
    “Rule of 78”Benefits with SaaS ● Eliminates the Quarterly and Annual large discounting to make plan ● The customer can't “go out of maintenance” ● If the customer doesn't pay, we can just shut them off ● Cash flow is the same in January/February as December ● As a small business, can better leverage financing based on predictable revenue stream ● This is how insurance companies have been around for 100's of years Things to consider - ● Cash flow ● Billing infrastructure © 2012 IBM Corporation
  • 83.
    Momentum / Market Overview ● Flagship Offering, Demo and Portfolio of Services ● New SaaS Parts, Order Processing (PGST) with Demo, Pricing, and eCommerce ● New Product Based API's ● Contracting Type – PA or ASL? A bit about ASL and ASL API's ● Cloud Direction for 2012 ● New Compensation Models, “The Rule of 78” ● TCO Consideration ● Tools and Resources ● Q/A © 2012 IBM Corporation
  • 84.
    © 2012 IBMCorporation
  • 85.
    SaaS Sales With SaaSServices, the questions during the sale can be complex: What Anti-virus/Anti-Spam services to you use? Where do I point my MX record/DNS? How does your single sign on work – do you support SAML? How do I know my data is secure? How do my administrators manage the service? Can I serve the service up through my portal? ...etc. Many different questions to what you receive when the customer is building their own environment – why? Because by using cloud, the headache of managing infrastructure goes away from them for a whole range of management and technology problems that they currently have 1 © 2012 IBM Corporation
  • 86.
    High Level TCOelements to be considered  Hardware Cost  Quality of Service needed - Servers - Availability - Storage - Security - Net work - Syst em Manag em ent - Clients (user equipm ent) - Scalability - and … - Response Tim e  Sof tware Costs - Batch Wi ndow - IBM sof tware - Disast er/ Recovery - Ot her Server SW - and … - Ot her Cli ent SW Other Costs - Ot her Net work SW - Deploym ent costs - Ot her Applicati on SW - Migration costs - and … - Inst allation costs Mai nt enance Costs - Education costs - Maintenance for SW - and … - Maintenance for HW - and … Environm ent al Costs - etc ? … - Floor space - Power & cabling  - and … Qualit y of Service needed - Availability - Security - Syst em Managem ent - Scalability - Response Tim e - Disast er/ Recovery - and … © 2012 IBM Corporation
  • 87.
    TCO Elements tobe Considered  Availability  Security  Operati ng Concept - High availability - Authentication / Authorization - Development of an op erating procedur e - Hours of operation - User Admi nistration - Feasibility of t he devel oped procedure  Backup / Restore / Sit e Recovery - Dat a Security - Autom ation - Backup & Restore - Server and OS Securit y  Int egration - Disast er Scenario - RACF vs. ot her solutions - Int egrat ed Functi onality vs. - Effort for Complete Sit e  Deploym ent and Support Functionalit y to Recovery - Syst em Programmi ng be implem ent ed (possibly wit h 3rd par ty - SAN eff ort - Keeping consist ent OS and SW tools)  Infrastruct ur e Cost Level - Balanced Syst em - Space, Power, Cooling - Dat abase Eff ort - Int egration of / into St andards - Net work Infrastruct ure - Middleware  Furt her Availability Aspects - Storage Infrastruct ur e - SW Maintenance - Planned & Unplanned outages  Additional developm ent and - SW Distribution (across firewall) - Autom at ed Take Over implementation - Application - Uni nterrupted Take Over (especially f or - Investm ent f or one platform – - Technology Upgrade DB) r eproduction f or ot hers - Syst em Release change wit hout - Workload Managem ent across physical  Controlling and Accounting i nt errupts borders - Analyzing t he syst ems  Resource Utilizati on and - Business continui ty - Cost Perform ance - Availability eff ect s f or other  Operations Eff ort - Mix ed Workload / Batch applications / - Monitoring, Operati ng - Resource Sharing projects - Problem Det ermination - shared not hing vs. shared - End User Service, End User Productivity - Server Managem ent Tools everyt hi ng - Virt ualization - Int egrat ed Server Managem ent - Parallel Sysplex vs. Ot her  Skills and Resources – Concepts - Personnel Education Enterprise Wide - Response Tim e - Availability of Resources - Performance Managem ent - Peak handling / scal ability © 2012 IBM Corporation
  • 88.
    TCO Example Too manyitems to discuss in detail, so combined they become: Software Costs Hardware Costs Datacentre Costs Staffing Costs Support Costs Etc… 1 © 2012 IBM Corporation
  • 89.
    Sales Progression Assets 1)Provide a Business Value Assessment ● ROI Tool for LotusLive ● A web-based calculator to assess the costs, benefits and ROI of implementing LotusLive and generates 'client-ready' assessment presentation ● Limited availability Contact LLP@us.ibm.com for access 2) Leverage Client Advocacy ● Connect prospects with LotusLive clients ● Use your no-charge BP demo account to attract client interest ● Use your BP Trials URL to generate client leads ● Use 35 new references added in 2011 ● Show client testimonial videos ● Contact your regional BP rep for assistance 89 © 2012 IBM Corporation
  • 90.
    Momentum / Market Overview ● Flagship Offering, Demo and Portfolio of Services ● New SaaS Parts, Order Processing (PGST) with Demo, Pricing, and eCommerce ● New Product Based API's ● Contracting Type – PA or ASL? A bit about ASL and ASL API's ● Cloud Direction for 2012 ● New Compensation Models, “The Rule of 78” ● TCO Consideration ● Tools and Resources ● Q/A © 2012 IBM Corporation
  • 91.
    Read - Read about Smart Cloud Social: https://www.lotuslive.com/en/ Read about Smart Cloud Social Support: https://www.lotuslive.com/en/support/ © 2012 IBM Corporation
  • 92.
    Watch - See a Smart Cloud Social recorded demo: https://www.lotuslive.com/en/demos Attend a Live Demonstration: https://www.lotuslive.com/en/training Attend an IDR virtual workshop at an IBM Innovation Center: https://www- 304.ibm.com/isv/spc/events/description.jsp?event=A5479E64DCD5E5CC8525774C0060C5FF See partner overview webinar HTTPS://www- 304.ibm.com/partnerworld/wps/servlet/ContentHandler/PWEVT_lotuslive0810 © 2012 IBM Corporation
  • 93.
    Show it - Requesta Smart Cloud Social Business Partner demonstration account: https://www- 304.ibm.com/partnerworld/wps/ser vlet/ContentHandler/isv/lotuslive © 2012 IBM Corporation
  • 94.
    For More Information For More Information About See BP Demo Account http://ibm.co/eT6a97 Course enrollment ● Future API Workshop ● Future SmartCloud Notes Onboarding course Partner Guided Selling (future) SmartCloud for Social Business Webfront http://www.ibmcloud/social Sales Kits on Partnerworld http://ibm.co/ytx4kX LotusLive Wiki http://www-10.lotus.com/ldd/bhwiki.nsf Customer Trials URL https://www- 304.ibm.com/partnerworld/wps/servlet/ContentHa ndler/isv_ben_prb_lotuslive_trial 94 © 2012 IBM Corporation
  • 95.
    Summary ■ Positioning LotusLive in IBM SmartCloud ■ New SaaS Parts and Partner Guided Selling Tool to ease the sale of IBM SaaS offerings ■ Introducing an incentive model specifically for SaaS products ■ Enabling partner led LotusLive Notes Call to Action eMail Onboarding to Cloud ■Get educated ■ New Social Business Toolkit ─ Partner Guided Selling Tool for integrating apps with ─ LotusLive Notes Onboarding IBM Connections classes/certification ─ Social Business Toolkit class and LotusLive ■ Get your LotusLive BP Demo account ■ Use LotusLive BP Trial URLs in your marketing campaigns ■ Sell at 50% off until Feb 27 © 2012 IBM Corporation
  • 96.
    QUESTIONS ?? © 2012 IBM Corporation
  • 97.
    Backup © 2011 IBM Corporation
  • 98.
    Tier 1 Tier 2 Tier 3 Tier 4 Tier 5 2012 SmartCloud Tiered Pricing Seats Discount: 1-100 0% 101-1,000 10% 1001-5,000 15% 5001-10000 20% 10,001+ 25% Part NumberLong Description Tier 1 Tier 2 Tier 3 Tier 4 Tier 5 D0NPULL SMARTCLOUD ENGAGE STANDARD ENT DEPLOY AU PER MONTH $ 8.00 $ 7.20 $ 6.80 $ 6.40 $ 6.00 D0NPWLL SMARTCLOUD ENGAGE STANDARD ENT DEPLOY AU OVERAGE $ 10.00 $ 9.00 $ 8.50 $ 8.00 $ 7.50 D0NPXLL SMARTCLOUD ENGAGE STANDARD ENT DEPLOY CUST WS&S AU PER MONTH $ 6.00 $ 5.40 $ 5.10 $ 4.80 $ 4.50 D0NQ3LL SMARTCLOUD ADDITIONAL STORAGE COLLABORATION GB PER MONTH $ 5.00 $ 4.50 $ 4.25 $ 4.00 $ 3.75 D0NQ8LL SMARTCLOUD ENGAGE ADVANCED STEP-UP AUTH USER PER MONTH $ 9.00 $ 8.10 $ 7.65 $ 7.20 $ 6.75 D0NQALL SMARTCLOUD ENGAGE ADVANCED STEP-UP AUTH USER OVERAGE $ 11.25 $ 10.13 $ 9.56 $ 9.00 $ 8.44 D0NQBLL SMARTCLOUD ENGAGE ADVANCED AUTH USER PER MONTH $ 10.00 $ 9.00 $ 8.50 $ 8.00 $ 7.50 D0NQDLL SMARTCLOUD ENGAGE ADVANCED AUTH USER OVERAGE $ 12.50 $ 11.25 $ 10.63 $ 10.00 $ 9.38 D0NQILL SMARTCLOUD NOTES BLACKBERRY SERVICE MDS NOTES AU PER MONTH $ 15.00 $ 15.00 $ 15.00 $ 15.00 $ 15.00 Excluded from Tiering D0NQKLL SMARTCLOUD HOSTED BLACKBERRY SERVICE NOTES AU PER MONTH $ 3.00 $ 3.00 $ 3.00 $ 3.00 $ 3.00 Excluded from Tiering D0NQMLL SMARTCLOUD NOTES AUTH USER PER MONTH $ 5.00 $ 4.50 $ 4.25 $ 4.00 $ 3.75 D0NQPLL SMARTCLOUD NOTES AUTH USER OVERAGE $ 6.25 $ 5.63 $ 5.31 $ 5.00 $ 4.69 D0NQQLL SMARTCLOUD TRAVELER NOTES AUTH USER PER MONTH $ 2.00 $ 2.00 $ 2.00 $ 2.00 $ 2.00 Excluded from Tiering D0NQSLL SMARTCLOUD TRAVELER NOTES AUTH USER OVERAGE $ 2.50 $ 2.50 $ 2.50 $ 2.50 $ 2.50 Excluded from Tiering D0NQTLL SMARTCLOUD NOTES STEP-UP AUTH USER PER MONTH $ 4.00 $ 3.60 $ 3.40 $ 3.20 $ 3.00 D0NQVLL SMARTCLOUD NOTES STEP-UP AUTH USER OVERAGE $ 5.00 $ 4.50 $ 4.25 $ 4.00 $ 3.75 D0NQWLL SMARTCLOUD ARCHIVING RETENTION DATA FEED NOTES AU PER MONTH $ 4.00 $ 3.60 $ 3.40 $ 3.20 $ 3.00 D0NQZLL SMARTCLOUD INOTES LOTUS CUSTOMERS ACTIVE ON S&S AU PER MONTH $ 2.00 $ 1.80 $ 1.70 $ 1.60 $ 1.50 D0NR1LL SMARTCLOUD INOTES AUTH USER PER MONTH $ 3.00 $ 2.70 $ 2.55 $ 2.40 $ 2.25 D0NR3LL SMARTCLOUD INOTES AUTH USER OVERAGE $ 3.75 $ 3.38 $ 3.19 $ 3.00 $ 2.81 D0NR5LL SMARTCLOUD CONNECTIONS LOTUS CUSTOMERS W S&S AU PER MONTH $ 5.00 $ 4.50 $ 4.25 $ 4.00 $ 3.75 D0NR7LL SMARTCLOUD CONNECTIONS AUTH USER PER MONTH $ 6.00 $ 5.40 $ 5.10 $ 4.80 $ 4.50 D0NR9LL SMARTCLOUD CONNECTIONS AUTH USER OVERAGE $ 7.50 $ 6.75 $ 6.38 $ 6.00 $ 5.63 D0NRCLL SMARTCLOUD MEETINGS UP TO 14 GUESTS AUTH USER PER MONTH $ 29.00 $ 26.10 $ 24.65 $ 23.20 $ 21.75 D0NRELL SMARTCLOUD MEETINGS UP TO 14 GUESTS AUTH USER OVERAGE $ 36.25 $ 32.63 $ 30.81 $ 29.00 $ 27.19 D0NRFLL SMARTCLOUD MEETINGS ENTERPRISE DEPLOYMENT AU PER MONTH $ 5.00 $ 4.50 $ 4.25 $ 4.00 $ 3.75 D0NRHLL SMARTCLOUD MEETINGS ENTERPRISE DEPLOYMENT AU OVERAGE $ 6.25 $ 5.63 $ 5.31 $ 5.00 $ 4.69 D0NRILL SMARTCLOUD MEETINGS UP TO 199 GUESTS AUTH USER PER MONTH $ 39.00 $ 35.10 $ 33.15 $ 31.20 $ 29.25 D0NRKLL SMARTCLOUD MEETINGS UP TO 199 GUESTS AUTH USER OVERAGE $ 48.75 $ 43.88 $ 41.44 $ 39.00 $ 36.56 D0NRLLL SMARTCLOUD MEETINGS CONCURRENT SEATS AUTH USER PER MONTH $ 50.00 $ 45.00 $ 42.50 $ 40.00 $ 37.50 D0NRNLL SMARTCLOUD MEETINGS UP TO 999 GUESTS AUTH USER PER MONTH $ 79.00 $ 71.10 $ 67.15 $ 63.20 $ 59.25 D0NRQLL SMARTCLOUD MEETINGS UP TO 999 GUESTS AUTH USER OVERAGE $ 98.75 $ 88.88 $ 83.94 $ 79.00 $ 74.06 D0NRRLL SMARTCLOUD MEETINGS ENT DEPLOY CUST W S&S AU PER MONTH $ 4.00 $ 3.60 $ 3.40 $ 3.20 $ 3.00 D0NRULL SMARTCLOUD WITH NOTES STEP-UP AND CONNECTIONS AU PER MONTH $ 7.00 $ 6.30 $ 5.95 $ 5.60 $ 5.25 D0NRWLL SMARTCLOUD WITH NOTES STEP-UP AND CONNECTIONS AU OVERAGE $ 8.75 $ 7.88 $ 7.44 $ 7.00 $ 6.56 D0NRYLL SMARTCLOUD WITH INOTES AND CONNECTIONS AUTH USER PER MONTH $ 7.00 $ 6.30 $ 5.95 $ 5.60 $ 5.25 D0NS0LL SMARTCLOUD WITH INOTES AND CONNECTIONS AUTH USER OVERAGE $ 8.75 $ 7.88 $ 7.44 $ 7.00 $ 6.56 D0NS1LL SMARTCLOUD WITH NOTES AND CONNECTIONS AUTH USER PER MONTH $ 8.00 $ 7.20 $ 6.80 $ 6.40 $ 6.00 D0NS3LL SMARTCLOUD WITH NOTES AND CONNECTIONS AUTH USER OVERAGE $ 10.00 $ 9.00 $ 8.50 $ 8.00 $ 7.50 98 © 2012 IBM Corporation
  • 99.
    Additional SaaS concepts Add-on – This is a PROCESS, not a separate part – Add-on: increase of subscription level of a currently-entitled part or adding an additional service – You are “adding on” to an existing Services Agreement – Cannot add-on until after 1st SaaS invoice Ramp ups – Limited to 12 months total, up to 4 separate ramp-up periods • Ramp up is limited to the FIRST 12 months of the contract • Note: if >1 ramp up, each stands alone so the quantity is the total for that ramp-up period, NOT cumulative – Enabled only for subscription parts – No add-ons during the ramp up period for a given part number OR prior to the initial invoice New to SaaS is the concept of a Services Agreement or Charge Agreement – Like a Sales Order for SaaS -- A “repository” for the customer’s agreement, including subscription details, agreed-to overage, on-demand and pay per use prices – Initiated automatically by SAP when provisioning has been completed and the FIRST INVOICE has been issued – Rep may need to reference Charge Agreement number when doing add-on or trade-up 99
  • 100.
    Glossary Part Types:defined by a set of coding attributes, which drive specific systems/tools logic Subscription tracking period – how often the “counting” for a part is reset (e.g., every month or once a year) for overage determination and “entitled” usage level Term (Contract duration): length of entitlement set up per purchase of SaaS subscription (up to 5 years) Provisioning: Actually setting up the service for customer use Line Item Hold: SAP function resulting in delay in billing until hold is removed (Terms of Use Hold & Provisioning Hold); Driven by Part Coding attribute (SMG4); Services Agreement: The “repository” for a customer’s subscription level, overage rates, etc. Overage: part type used to bill when current subscription level has been exceeded Co-term: Keeping a single contract end date as new parts are added or existing parts modified Add on: Adding an additional feature (new part number) or changing the quantity for an existing part in a Services Agreement Trade-up: Replacing one part with another part for the balance of a contract or as part of a renewal or extension Ramp-up: Where a customer does not use the full amount up front, the ramp up allows for growth during the first 12 months 100