SlideShare a Scribd company logo
1 of 3
Download to read offline
IAED342-SUSTAINABLEDESIGNFORINTERIORS
SUSTAINABLE UNIVERSITY CAMPUS
INVESTIGATION IN BILKENT UNIVERSITY
Bilenerji
* Bilenerji was established in 1993 in order to provide the electric energy required by
the production plants owned by group partners located at the settlement area of
Bilkent University and by Bilkent University and besides, The operational steam for
Meteksan Paper Mill and the steam required for heating all the buildings at the
campus of Bilkent University.
* Energy requirements are provided from three units with an established power of 4.5
MW, 24 MW and 8 MW.
* Bilenerji started to generate electricity first in 1995 with a MAN-brand gas turbine of
4.5 MW. Later on, the capacity has been increased to approximately 36.5 MW, by
adding a Rolls-Royce brand gas turbine and Allen Steam brand steam turbine.
Bilkent UniversityLibrary
08:00 = Library Opening
23:30 = Library Closing
Library Staff: Ali Börekçi
All the maintenance service for library is provided by Bilkent General Directorate
of Construction.
HEATING:
*Central Heating Station: Faculty of Engineering Heat Station (Building Code: A15)
*There is one boiler room in A Block (-2nd Floor) and one boiler room in B Block (-1st Floor, entrance to the room is separated from the existent entrance).
*Both boiler rooms are controlled by Bilkent General Directorate of Construction, only for the A block library staff also can control the boiler room. Boiler rooms
are located in the basement of the library.
*In B block, the temperature of the space changes according to the temperature of the outside.
*For some special collection rooms, radiator temperatures are varied (different) because some collection items require specific temperatures to protect the items.
For example, in Halil İnalcık collection rooms’ temperature keeps in the limited degree of -18 C. Because some books have detail papers and should be protected
from decay.
*Besides central heating, in some spaces of the library have air conditioning for additional heating purposes. In Bilkent University policies, external air
conditioning cannot be used as a heating source because there is a central heating system already. But in some studying areas, periodicals rooms, general
director office, art room and electronic resources have their own air conditioning separated from central heating. Their air conditioner fans are located outside of
the building so the mechanical noise is minimized. For studying areas and periodicals rooms, there is a ceiling type (mounted) air conditioners and for offices and
art room, there is wall type (console) air
conditioners are used only in June, July and August months for cooling purposes. The spaces where student can occupant, heating and cooling systems cannot
controlled by the students. All is controlled by the maintenance staffs.
ELECTRICITY:
*Electricity is provided by the Bilenerji in the Bilkent University campus
area.
*In the library, there are two Uninterruptible Power Supply – UPS rooms
both in A and B blocks. In A block, it is located in the basement floor near
the entrance zone. In B block, it is located in the basement floor as well. An
uninterruptible power supply (UPS) provides nearly instantaneous power
when the main utility power source fails, allowing either time for power to
return or for the user to shut down the system or equipment normally by
closing running computer system applications and using the operating system to shut down the system. In addition, most UPS systems also work to address power
source electrical surges, sag voltage, voltage spikes, frequency instability, noise interference or harmonic distortion from the ideal sinusoidal wave form.
* In case of power interruption, electric energy is given to the electronical devices according to the importance and all lighting is provided during the interruption.
* During the working hours, all library lighting is available but between the 23:00 to 08:00, only outdoor lighting is keep opened by the staff.
Proposed Solution Considering the Sustainability: ICE BEAR
30
Ice Energy, based out of Glendale, Calif., uses an ice-powered air-conditioning unit
called the Ice Bear to cool buildings and in most cases, reduce a building's total
net energy consumption. Ina very abbreviated description, the Ice Bear works by
freezing 450 gallons of water in a tank overnight and making that available for
cooling the next day. When the Ice Bear is switched from its Ice Charging to Ice
Cooling mode, it provides cooling for up to six hours. After its ice has melted, the
job of cooling reverts back to the building's conventional commercial A/C unit,
which is why the Ice Bear works in conjunction with a conventional unit. The
company describes the product as the first effectively loss-less energy solution.
IAED342-SUSTAINABLEDESIGNFORINTERIORS
SUSTAINABLE UNIVERSITY CAMPUS
INVESTIGATION IN BILKENT UNIVERSITY
FACULTY OF ART, DESIGN AND ARCHITECTURE
ELECTRICITY:
The FF Building has 7/24 electricity but for both security and efficient use of
electricity, they closed some parts during nigts. Also, the computer labs are
not available all the times. Additionally, the staircases and some parts of the
transitional space in front of restrooms are photocell lighting which means it
works by the movements. Other lightings are manual which also beneficial as
well.
According to the information given by the Halil Sancak, who is responsible
for the electricity in campus, in case of any power outage not all of the electricity is supplied to the building.
Jenerators only help to cover 35-40% electricity (elevators, system rooms, labs and etc.) By the help of UPS
mechanism, the electricity is supplied without any outbreak to the labs and some important rooms.
Water Pipes in FC Building
F Buildings are for the Faculty of Art, Design and Architecture.
We mainly focus on FF Building because it is the center of
heating system for FADA.
All the maintenance service for FF building is provided by Bilkent
General Directorate of Construction.
They do not allow us to take photographs of the heating and
electrical system because of safety issue.
HEATING:
Central Heating Station: Faculty of Art Design and Architecture
There is one boiler FADA building. It is located under the
basement (They do not allow us to see what is behind the
doors). They covered with the partion walls and metal doorway
for the ventitalition.
Boiler is controlled by Bilkent General Directorate of Construction as like in the library. Until last year the
studios and classrooms were very cold because of the façade; however, this summer a façade is renovated
by insulation. All the windows are changed however the locations and materials of the radiators are same.
It also makes a huge difference inside of the building in terms of thermal comfort.
Proposed Solution Considering the Sustainability:
Since the insulation is done during the summer and enought for the heating, there is no proposed solution
except for the radiators. Radiators are placed near the windows mostly and there is no cover on them.
Maybe a cover with air gaps (like in the sketch) might be proposed. (e.g. Radiators in SB Building)
For the electricity, we also think about the spaces. Since there are too many transitional spaces, they need
artificial lights too much. Maybe some sunlight (skylights in entrance part might be bigger than the
existing) might be proposed. Also, the voids in the instructors corridors might be enlarge so that they can
benefit from the sunlight as well.
A huge problem is for the distribution of the water to the other F Buildings. Like in the photograph of FC,
even it is placed on the upper part of basements, it is not architecturally solved. Some suspended Ceiling
might be used with the tiles. Thus, in case of any emergency the tiles can be removed, the problem can
be fixed and the tiles can be put again.
We could not be able to enter the boiler and electrical room, we searched the other building. In V building the boiler room is in the ground floor but the stuff
did not allow us. We found another boiler room under SB (Science Faculty) but we could not be able to enter both electrical room and boiler room. However,
we entered boiler room (illegally) from the transitional space between UNAM and SB Building.
Boiler Room
in V Building
Radiator
in SB
Building
IAED342-SUSTAINABLEDESIGNFORINTERIORS
SUSTAINABLE UNIVERSITY CAMPUS
INVESTIGATION IN BILKENT UNIVERSITY
78. DORMITORY
Dormitory 78 is open to anybody in
campus. It has both none-gender
places such as kitchens, study rooms,
model-making rooms, TV Room and a
hair-dresser.
HEATING:
Since it is central heating system, no-one
cannot arranged temperature except the
stuff who deal with heat plants.
Some radiators has arrangement stuff.
According to the numbers, you can decide
on degree but there is no option for that in
Dorm 78.
ELECTRICITY:
The system in dorms are a little bit different fom
the faculty buildigs. Sine it is semi-private space,
it has kitchens, shower areas, study room with
electrical outlets are provided. They have
electricty all day and a jenerator .
For the kitchens, they have washing machines,
microwaves and any other kitchen stuff. Their
oven are used by electric; however, after 10
minutes, the oven is off automatically. (Because
of safety issue and fire concern)
Proposed Solution Considering the Sustainability:
We talked about the students who live in dormitory about both electrical issue and heating. They did not say anything bad
for electrical issue but they feel uncomfortable because of the heat. They said that the interior become to much hot and
they wear mostly very light clothes. Especially for the winter times, when they are sick, the they boil the water in order to
balance the humidty inside their rooms. They also said that the corridors are huge and there is no air in the corridors or
common-usage areas.
The first thing is they can decrease the temperature of the building. Other than that they need cross ventilatons. Maybe
some skylights might be use and in order to make a good ventilation and the floors might be drill in order to reach the upper
floors. Common areas has many subspaces and small windows. Maybe the windows of common areas might be enlarged.
Sketch- Plan
EE Building is the new building for the Electric and Electronical Engineers under the
Marmara Restaurant. It has marble and glass façade and an opening at the middle
of the building.
HEATING:
EE building heating is provided from the heat center of rectorate and library,
however there is also an additional heating center under the building as well;
therefore steam heating is used. As the building is the newest in campus, better
and more efficient insulation and façades play an important role in heating.
EE BUILDING
Low E number glasses were used in window frames to ensure
minimum transfer to the outside from the heat gained by solar
radiation. EE building has individually set radiators unlike other
centrally controlled buildings. Fans for air conditioning units are
on the outside of the building, overlooking the central courtyard.
Outflow is from the façade.
ELECTRICITY:
Electricity for EE building comes from the central system
provided by EnerjiSA and BilEnerji. In times of shortages, power
generators varying from 50 kws to 110 kws provide all campus
with electricity. Also, UPS units are placed to eliminate damage
from short period voltage fluctuations and power deficits. Ee is
one of the few buildings which have %100 power during a
shortage.

More Related Content

What's hot

Green Studio Handbook - Part 4
Green Studio Handbook - Part 4Green Studio Handbook - Part 4
Green Studio Handbook - Part 4Galala University
 
Indira Paryawaran Bhawan
  Indira Paryawaran Bhawan  Indira Paryawaran Bhawan
Indira Paryawaran BhawanshreyaGupta396
 
Combined Efficiency Calculation of Bismuth Telluride and Lead Telluride in Th...
Combined Efficiency Calculation of Bismuth Telluride and Lead Telluride in Th...Combined Efficiency Calculation of Bismuth Telluride and Lead Telluride in Th...
Combined Efficiency Calculation of Bismuth Telluride and Lead Telluride in Th...IJMERJOURNAL
 
IRJET- Electricity Generation by using Waste Heat
IRJET- Electricity Generation by using Waste HeatIRJET- Electricity Generation by using Waste Heat
IRJET- Electricity Generation by using Waste HeatIRJET Journal
 
PUNJAB ENERGY DEVELOPMENT AGENCY BUILDING , CHANDIGARH
PUNJAB ENERGY  DEVELOPMENT AGENCY  BUILDING , CHANDIGARHPUNJAB ENERGY  DEVELOPMENT AGENCY  BUILDING , CHANDIGARH
PUNJAB ENERGY DEVELOPMENT AGENCY BUILDING , CHANDIGARHSiddiq Salim
 
Energy Generation from Peltier Module by Utilizing Heat
Energy Generation from Peltier Module by Utilizing HeatEnergy Generation from Peltier Module by Utilizing Heat
Energy Generation from Peltier Module by Utilizing HeatIRJET Journal
 
Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...
Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...
Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...ISCN_Secretariat
 
Refrigeration using peltier module system
Refrigeration using peltier module systemRefrigeration using peltier module system
Refrigeration using peltier module systemJISHNU U
 
Achieving energy efficiency in buildings
Achieving energy efficiency  in  buildingsAchieving energy efficiency  in  buildings
Achieving energy efficiency in buildingsJIT KUMAR GUPTA
 
Case study of peda
Case study of pedaCase study of peda
Case study of pedaAgam Singla
 
Som chicago pearl river
Som chicago pearl riverSom chicago pearl river
Som chicago pearl riverAditi Yadav
 
[Nordic GBC Conference 2013] Ville Reinikainen: Renewal of Meilahti Tower Hos...
[Nordic GBC Conference 2013] Ville Reinikainen: Renewal of Meilahti Tower Hos...[Nordic GBC Conference 2013] Ville Reinikainen: Renewal of Meilahti Tower Hos...
[Nordic GBC Conference 2013] Ville Reinikainen: Renewal of Meilahti Tower Hos...GBC Finland
 
IRJET- A Review on Green Technology in HVAC
IRJET- A Review on Green Technology in HVACIRJET- A Review on Green Technology in HVAC
IRJET- A Review on Green Technology in HVACIRJET Journal
 
Presentation on Thermoelectric refrigerator
Presentation on Thermoelectric refrigeratorPresentation on Thermoelectric refrigerator
Presentation on Thermoelectric refrigeratorVenkatesh Modukuru
 
Stratification ppt
Stratification pptStratification ppt
Stratification pptdeneshguru
 
Renewable Energy & Thermal Power Plant
Renewable Energy & Thermal Power PlantRenewable Energy & Thermal Power Plant
Renewable Energy & Thermal Power PlantAishwarya .
 
Solar Refergerator
Solar RefergeratorSolar Refergerator
Solar RefergeratorKushal Shah
 
IRJET - Advance Hybrid Solar Energy Saver Heater with Electrical Backup
IRJET -  	  Advance Hybrid Solar Energy Saver Heater with Electrical BackupIRJET -  	  Advance Hybrid Solar Energy Saver Heater with Electrical Backup
IRJET - Advance Hybrid Solar Energy Saver Heater with Electrical BackupIRJET Journal
 

What's hot (20)

Green Studio Handbook - Part 4
Green Studio Handbook - Part 4Green Studio Handbook - Part 4
Green Studio Handbook - Part 4
 
Development of an inexpensive data logger for solar water heating system regu...
Development of an inexpensive data logger for solar water heating system regu...Development of an inexpensive data logger for solar water heating system regu...
Development of an inexpensive data logger for solar water heating system regu...
 
Indira Paryawaran Bhawan
  Indira Paryawaran Bhawan  Indira Paryawaran Bhawan
Indira Paryawaran Bhawan
 
Combined Efficiency Calculation of Bismuth Telluride and Lead Telluride in Th...
Combined Efficiency Calculation of Bismuth Telluride and Lead Telluride in Th...Combined Efficiency Calculation of Bismuth Telluride and Lead Telluride in Th...
Combined Efficiency Calculation of Bismuth Telluride and Lead Telluride in Th...
 
IRJET- Electricity Generation by using Waste Heat
IRJET- Electricity Generation by using Waste HeatIRJET- Electricity Generation by using Waste Heat
IRJET- Electricity Generation by using Waste Heat
 
PUNJAB ENERGY DEVELOPMENT AGENCY BUILDING , CHANDIGARH
PUNJAB ENERGY  DEVELOPMENT AGENCY  BUILDING , CHANDIGARHPUNJAB ENERGY  DEVELOPMENT AGENCY  BUILDING , CHANDIGARH
PUNJAB ENERGY DEVELOPMENT AGENCY BUILDING , CHANDIGARH
 
Energy Generation from Peltier Module by Utilizing Heat
Energy Generation from Peltier Module by Utilizing HeatEnergy Generation from Peltier Module by Utilizing Heat
Energy Generation from Peltier Module by Utilizing Heat
 
Solar.FIN®
Solar.FIN® Solar.FIN®
Solar.FIN®
 
Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...
Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...
Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...
 
Refrigeration using peltier module system
Refrigeration using peltier module systemRefrigeration using peltier module system
Refrigeration using peltier module system
 
Achieving energy efficiency in buildings
Achieving energy efficiency  in  buildingsAchieving energy efficiency  in  buildings
Achieving energy efficiency in buildings
 
Case study of peda
Case study of pedaCase study of peda
Case study of peda
 
Som chicago pearl river
Som chicago pearl riverSom chicago pearl river
Som chicago pearl river
 
[Nordic GBC Conference 2013] Ville Reinikainen: Renewal of Meilahti Tower Hos...
[Nordic GBC Conference 2013] Ville Reinikainen: Renewal of Meilahti Tower Hos...[Nordic GBC Conference 2013] Ville Reinikainen: Renewal of Meilahti Tower Hos...
[Nordic GBC Conference 2013] Ville Reinikainen: Renewal of Meilahti Tower Hos...
 
IRJET- A Review on Green Technology in HVAC
IRJET- A Review on Green Technology in HVACIRJET- A Review on Green Technology in HVAC
IRJET- A Review on Green Technology in HVAC
 
Presentation on Thermoelectric refrigerator
Presentation on Thermoelectric refrigeratorPresentation on Thermoelectric refrigerator
Presentation on Thermoelectric refrigerator
 
Stratification ppt
Stratification pptStratification ppt
Stratification ppt
 
Renewable Energy & Thermal Power Plant
Renewable Energy & Thermal Power PlantRenewable Energy & Thermal Power Plant
Renewable Energy & Thermal Power Plant
 
Solar Refergerator
Solar RefergeratorSolar Refergerator
Solar Refergerator
 
IRJET - Advance Hybrid Solar Energy Saver Heater with Electrical Backup
IRJET -  	  Advance Hybrid Solar Energy Saver Heater with Electrical BackupIRJET -  	  Advance Hybrid Solar Energy Saver Heater with Electrical Backup
IRJET - Advance Hybrid Solar Energy Saver Heater with Electrical Backup
 

Similar to IAED 342-Research Homework

Passive Architecture Case Examples
Passive Architecture Case ExamplesPassive Architecture Case Examples
Passive Architecture Case ExamplesHarpreet Oberoi
 
Feasibility Study of Household Solar Photovoltaic Heating
Feasibility Study of Household Solar Photovoltaic HeatingFeasibility Study of Household Solar Photovoltaic Heating
Feasibility Study of Household Solar Photovoltaic HeatingIJRESJOURNAL
 
THE EDGE BUILDING PPT.pptx
THE EDGE BUILDING PPT.pptxTHE EDGE BUILDING PPT.pptx
THE EDGE BUILDING PPT.pptxDimple954080
 
Buildings as Power Stations - Pathway to a Resilient Future for Dorset - Work...
Buildings as Power Stations - Pathway to a Resilient Future for Dorset - Work...Buildings as Power Stations - Pathway to a Resilient Future for Dorset - Work...
Buildings as Power Stations - Pathway to a Resilient Future for Dorset - Work...Ecological Sequestration Trust
 
Aec briefer version part 2 (of 3)
Aec briefer version part 2 (of 3)Aec briefer version part 2 (of 3)
Aec briefer version part 2 (of 3)ecoedelstein09
 
Solarus Powercollectors Technical Brochure
Solarus Powercollectors Technical BrochureSolarus Powercollectors Technical Brochure
Solarus Powercollectors Technical BrochureAndy Varoshiotis
 
electricity generation from waste heat of gas.
 electricity generation from waste     heat of gas. electricity generation from waste     heat of gas.
electricity generation from waste heat of gas.Vikas Rathod
 
IRJET- Heat Recovery from Commercial Kitchen using Thermoelectric Generator
IRJET- Heat Recovery from Commercial Kitchen using Thermoelectric GeneratorIRJET- Heat Recovery from Commercial Kitchen using Thermoelectric Generator
IRJET- Heat Recovery from Commercial Kitchen using Thermoelectric GeneratorIRJET Journal
 
Km89 dc powered solar cooler cum thermal fridge (wecompress)
Km89 dc powered solar cooler  cum thermal fridge (wecompress)Km89 dc powered solar cooler  cum thermal fridge (wecompress)
Km89 dc powered solar cooler cum thermal fridge (wecompress)1000kv technologies
 
B3 present eco-2-building - estratto
B3   present eco-2-building - estrattoB3   present eco-2-building - estratto
B3 present eco-2-building - estrattoluigi spiga
 
Evacuated tube collectors specifications
Evacuated tube collectors specificationsEvacuated tube collectors specifications
Evacuated tube collectors specificationsDaniel Henny
 

Similar to IAED 342-Research Homework (20)

Passive Architecture Case Examples
Passive Architecture Case ExamplesPassive Architecture Case Examples
Passive Architecture Case Examples
 
Feasibility Study of Household Solar Photovoltaic Heating
Feasibility Study of Household Solar Photovoltaic HeatingFeasibility Study of Household Solar Photovoltaic Heating
Feasibility Study of Household Solar Photovoltaic Heating
 
Outdoor Performance Evaluation of Building Integrated Photovoltaic Thermal (B...
Outdoor Performance Evaluation of Building Integrated Photovoltaic Thermal (B...Outdoor Performance Evaluation of Building Integrated Photovoltaic Thermal (B...
Outdoor Performance Evaluation of Building Integrated Photovoltaic Thermal (B...
 
THE EDGE BUILDING PPT.pptx
THE EDGE BUILDING PPT.pptxTHE EDGE BUILDING PPT.pptx
THE EDGE BUILDING PPT.pptx
 
Report-2003
Report-2003Report-2003
Report-2003
 
Energy audit.pdf
Energy audit.pdfEnergy audit.pdf
Energy audit.pdf
 
Buildings as Power Stations - Pathway to a Resilient Future for Dorset - Work...
Buildings as Power Stations - Pathway to a Resilient Future for Dorset - Work...Buildings as Power Stations - Pathway to a Resilient Future for Dorset - Work...
Buildings as Power Stations - Pathway to a Resilient Future for Dorset - Work...
 
Passive solar buildings
Passive solar buildingsPassive solar buildings
Passive solar buildings
 
Aec briefer version part 2 (of 3)
Aec briefer version part 2 (of 3)Aec briefer version part 2 (of 3)
Aec briefer version part 2 (of 3)
 
Solarus Powercollectors Technical Brochure
Solarus Powercollectors Technical BrochureSolarus Powercollectors Technical Brochure
Solarus Powercollectors Technical Brochure
 
madhav001 (1).pptx
madhav001 (1).pptxmadhav001 (1).pptx
madhav001 (1).pptx
 
electricity generation from waste heat of gas.
 electricity generation from waste     heat of gas. electricity generation from waste     heat of gas.
electricity generation from waste heat of gas.
 
Heating ppt
Heating pptHeating ppt
Heating ppt
 
Solar panel
Solar panelSolar panel
Solar panel
 
IRJET- Heat Recovery from Commercial Kitchen using Thermoelectric Generator
IRJET- Heat Recovery from Commercial Kitchen using Thermoelectric GeneratorIRJET- Heat Recovery from Commercial Kitchen using Thermoelectric Generator
IRJET- Heat Recovery from Commercial Kitchen using Thermoelectric Generator
 
Technical challenges and solutions for the integration of low-grade heat sour...
Technical challenges and solutions for the integration of low-grade heat sour...Technical challenges and solutions for the integration of low-grade heat sour...
Technical challenges and solutions for the integration of low-grade heat sour...
 
Km89 dc powered solar cooler cum thermal fridge (wecompress)
Km89 dc powered solar cooler  cum thermal fridge (wecompress)Km89 dc powered solar cooler  cum thermal fridge (wecompress)
Km89 dc powered solar cooler cum thermal fridge (wecompress)
 
Passive House
Passive HousePassive House
Passive House
 
B3 present eco-2-building - estratto
B3   present eco-2-building - estrattoB3   present eco-2-building - estratto
B3 present eco-2-building - estratto
 
Evacuated tube collectors specifications
Evacuated tube collectors specificationsEvacuated tube collectors specifications
Evacuated tube collectors specifications
 

More from Serra's Art Studio (20)

Hist200
Hist200Hist200
Hist200
 
A1 turkce-makale
A1 turkce-makaleA1 turkce-makale
A1 turkce-makale
 
A1 turkce-ozdegerlendirme
A1 turkce-ozdegerlendirmeA1 turkce-ozdegerlendirme
A1 turkce-ozdegerlendirme
 
Chema Madoz Sergi Yorumu
Chema Madoz Sergi YorumuChema Madoz Sergi Yorumu
Chema Madoz Sergi Yorumu
 
IAED 342-Research Presentation
IAED 342-Research PresentationIAED 342-Research Presentation
IAED 342-Research Presentation
 
IAED 381-Field Trip Report
IAED 381-Field Trip ReportIAED 381-Field Trip Report
IAED 381-Field Trip Report
 
IAED 221 Case Study
IAED 221 Case StudyIAED 221 Case Study
IAED 221 Case Study
 
IAED 463 Presentation
IAED 463 PresentationIAED 463 Presentation
IAED 463 Presentation
 
IAED 463-Report
IAED 463-ReportIAED 463-Report
IAED 463-Report
 
IAED 322 Term Project-Part 1
IAED 322 Term Project-Part 1IAED 322 Term Project-Part 1
IAED 322 Term Project-Part 1
 
IAED 301 Research Presentation
IAED 301 Research PresentationIAED 301 Research Presentation
IAED 301 Research Presentation
 
COMD 210 Location Description
COMD 210 Location DescriptionCOMD 210 Location Description
COMD 210 Location Description
 
COMD 210 Chocolate Aisle
COMD 210 Chocolate AisleCOMD 210 Chocolate Aisle
COMD 210 Chocolate Aisle
 
ADA 264-Assignment 5
ADA 264-Assignment 5ADA 264-Assignment 5
ADA 264-Assignment 5
 
Mathematical Exploration
Mathematical ExplorationMathematical Exploration
Mathematical Exploration
 
Physics Lab Report 2
Physics Lab Report 2Physics Lab Report 2
Physics Lab Report 2
 
Physics Lab Report 1
Physics Lab Report 1Physics Lab Report 1
Physics Lab Report 1
 
Chemistry Lab Report 2
Chemistry Lab Report 2Chemistry Lab Report 2
Chemistry Lab Report 2
 
Chemistry Lab Report 3
Chemistry Lab Report 3Chemistry Lab Report 3
Chemistry Lab Report 3
 
Chemistry Lab Report 1
Chemistry Lab Report 1Chemistry Lab Report 1
Chemistry Lab Report 1
 

Recently uploaded

How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Sitegalleryaagency
 
Architecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfArchitecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfSumit Lathwal
 
shot list for my tv series two steps back
shot list for my tv series two steps backshot list for my tv series two steps back
shot list for my tv series two steps back17lcow074
 
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一F La
 
Introduction-to-Canva-and-Graphic-Design-Basics.pptx
Introduction-to-Canva-and-Graphic-Design-Basics.pptxIntroduction-to-Canva-and-Graphic-Design-Basics.pptx
Introduction-to-Canva-and-Graphic-Design-Basics.pptxnewslab143
 
WAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsWAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsCharles Obaleagbon
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdfSwaraliBorhade
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVAAnastasiya Kudinova
 
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,bhuyansuprit
 
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Narsimha murthy
 
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...babafaisel
 
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Gariahat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Roomdivyansh0kumar0
 
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一F dds
 
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiVIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiSuhani Kapoor
 
NATA 2024 SYLLABUS, full syllabus explained in detail
NATA 2024 SYLLABUS, full syllabus explained in detailNATA 2024 SYLLABUS, full syllabus explained in detail
NATA 2024 SYLLABUS, full syllabus explained in detailDesigntroIntroducing
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一Fi L
 

Recently uploaded (20)

How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Site
 
Architecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfArchitecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdf
 
shot list for my tv series two steps back
shot list for my tv series two steps backshot list for my tv series two steps back
shot list for my tv series two steps back
 
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
 
Introduction-to-Canva-and-Graphic-Design-Basics.pptx
Introduction-to-Canva-and-Graphic-Design-Basics.pptxIntroduction-to-Canva-and-Graphic-Design-Basics.pptx
Introduction-to-Canva-and-Graphic-Design-Basics.pptx
 
WAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsWAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past Questions
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf
 
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
 
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
 
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
 
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
 
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
 
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Gariahat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Room
 
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
 
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiVIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
 
NATA 2024 SYLLABUS, full syllabus explained in detail
NATA 2024 SYLLABUS, full syllabus explained in detailNATA 2024 SYLLABUS, full syllabus explained in detail
NATA 2024 SYLLABUS, full syllabus explained in detail
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
 
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 night
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 nightCheap Rate Call girls Kalkaji 9205541914 shot 1500 night
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 night
 
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
 

IAED 342-Research Homework

  • 1. IAED342-SUSTAINABLEDESIGNFORINTERIORS SUSTAINABLE UNIVERSITY CAMPUS INVESTIGATION IN BILKENT UNIVERSITY Bilenerji * Bilenerji was established in 1993 in order to provide the electric energy required by the production plants owned by group partners located at the settlement area of Bilkent University and by Bilkent University and besides, The operational steam for Meteksan Paper Mill and the steam required for heating all the buildings at the campus of Bilkent University. * Energy requirements are provided from three units with an established power of 4.5 MW, 24 MW and 8 MW. * Bilenerji started to generate electricity first in 1995 with a MAN-brand gas turbine of 4.5 MW. Later on, the capacity has been increased to approximately 36.5 MW, by adding a Rolls-Royce brand gas turbine and Allen Steam brand steam turbine. Bilkent UniversityLibrary 08:00 = Library Opening 23:30 = Library Closing Library Staff: Ali Börekçi All the maintenance service for library is provided by Bilkent General Directorate of Construction. HEATING: *Central Heating Station: Faculty of Engineering Heat Station (Building Code: A15) *There is one boiler room in A Block (-2nd Floor) and one boiler room in B Block (-1st Floor, entrance to the room is separated from the existent entrance). *Both boiler rooms are controlled by Bilkent General Directorate of Construction, only for the A block library staff also can control the boiler room. Boiler rooms are located in the basement of the library. *In B block, the temperature of the space changes according to the temperature of the outside. *For some special collection rooms, radiator temperatures are varied (different) because some collection items require specific temperatures to protect the items. For example, in Halil İnalcık collection rooms’ temperature keeps in the limited degree of -18 C. Because some books have detail papers and should be protected from decay. *Besides central heating, in some spaces of the library have air conditioning for additional heating purposes. In Bilkent University policies, external air conditioning cannot be used as a heating source because there is a central heating system already. But in some studying areas, periodicals rooms, general director office, art room and electronic resources have their own air conditioning separated from central heating. Their air conditioner fans are located outside of the building so the mechanical noise is minimized. For studying areas and periodicals rooms, there is a ceiling type (mounted) air conditioners and for offices and art room, there is wall type (console) air conditioners are used only in June, July and August months for cooling purposes. The spaces where student can occupant, heating and cooling systems cannot controlled by the students. All is controlled by the maintenance staffs. ELECTRICITY: *Electricity is provided by the Bilenerji in the Bilkent University campus area. *In the library, there are two Uninterruptible Power Supply – UPS rooms both in A and B blocks. In A block, it is located in the basement floor near the entrance zone. In B block, it is located in the basement floor as well. An uninterruptible power supply (UPS) provides nearly instantaneous power when the main utility power source fails, allowing either time for power to return or for the user to shut down the system or equipment normally by closing running computer system applications and using the operating system to shut down the system. In addition, most UPS systems also work to address power source electrical surges, sag voltage, voltage spikes, frequency instability, noise interference or harmonic distortion from the ideal sinusoidal wave form. * In case of power interruption, electric energy is given to the electronical devices according to the importance and all lighting is provided during the interruption. * During the working hours, all library lighting is available but between the 23:00 to 08:00, only outdoor lighting is keep opened by the staff. Proposed Solution Considering the Sustainability: ICE BEAR 30 Ice Energy, based out of Glendale, Calif., uses an ice-powered air-conditioning unit called the Ice Bear to cool buildings and in most cases, reduce a building's total net energy consumption. Ina very abbreviated description, the Ice Bear works by freezing 450 gallons of water in a tank overnight and making that available for cooling the next day. When the Ice Bear is switched from its Ice Charging to Ice Cooling mode, it provides cooling for up to six hours. After its ice has melted, the job of cooling reverts back to the building's conventional commercial A/C unit, which is why the Ice Bear works in conjunction with a conventional unit. The company describes the product as the first effectively loss-less energy solution.
  • 2. IAED342-SUSTAINABLEDESIGNFORINTERIORS SUSTAINABLE UNIVERSITY CAMPUS INVESTIGATION IN BILKENT UNIVERSITY FACULTY OF ART, DESIGN AND ARCHITECTURE ELECTRICITY: The FF Building has 7/24 electricity but for both security and efficient use of electricity, they closed some parts during nigts. Also, the computer labs are not available all the times. Additionally, the staircases and some parts of the transitional space in front of restrooms are photocell lighting which means it works by the movements. Other lightings are manual which also beneficial as well. According to the information given by the Halil Sancak, who is responsible for the electricity in campus, in case of any power outage not all of the electricity is supplied to the building. Jenerators only help to cover 35-40% electricity (elevators, system rooms, labs and etc.) By the help of UPS mechanism, the electricity is supplied without any outbreak to the labs and some important rooms. Water Pipes in FC Building F Buildings are for the Faculty of Art, Design and Architecture. We mainly focus on FF Building because it is the center of heating system for FADA. All the maintenance service for FF building is provided by Bilkent General Directorate of Construction. They do not allow us to take photographs of the heating and electrical system because of safety issue. HEATING: Central Heating Station: Faculty of Art Design and Architecture There is one boiler FADA building. It is located under the basement (They do not allow us to see what is behind the doors). They covered with the partion walls and metal doorway for the ventitalition. Boiler is controlled by Bilkent General Directorate of Construction as like in the library. Until last year the studios and classrooms were very cold because of the façade; however, this summer a façade is renovated by insulation. All the windows are changed however the locations and materials of the radiators are same. It also makes a huge difference inside of the building in terms of thermal comfort. Proposed Solution Considering the Sustainability: Since the insulation is done during the summer and enought for the heating, there is no proposed solution except for the radiators. Radiators are placed near the windows mostly and there is no cover on them. Maybe a cover with air gaps (like in the sketch) might be proposed. (e.g. Radiators in SB Building) For the electricity, we also think about the spaces. Since there are too many transitional spaces, they need artificial lights too much. Maybe some sunlight (skylights in entrance part might be bigger than the existing) might be proposed. Also, the voids in the instructors corridors might be enlarge so that they can benefit from the sunlight as well. A huge problem is for the distribution of the water to the other F Buildings. Like in the photograph of FC, even it is placed on the upper part of basements, it is not architecturally solved. Some suspended Ceiling might be used with the tiles. Thus, in case of any emergency the tiles can be removed, the problem can be fixed and the tiles can be put again. We could not be able to enter the boiler and electrical room, we searched the other building. In V building the boiler room is in the ground floor but the stuff did not allow us. We found another boiler room under SB (Science Faculty) but we could not be able to enter both electrical room and boiler room. However, we entered boiler room (illegally) from the transitional space between UNAM and SB Building. Boiler Room in V Building Radiator in SB Building
  • 3. IAED342-SUSTAINABLEDESIGNFORINTERIORS SUSTAINABLE UNIVERSITY CAMPUS INVESTIGATION IN BILKENT UNIVERSITY 78. DORMITORY Dormitory 78 is open to anybody in campus. It has both none-gender places such as kitchens, study rooms, model-making rooms, TV Room and a hair-dresser. HEATING: Since it is central heating system, no-one cannot arranged temperature except the stuff who deal with heat plants. Some radiators has arrangement stuff. According to the numbers, you can decide on degree but there is no option for that in Dorm 78. ELECTRICITY: The system in dorms are a little bit different fom the faculty buildigs. Sine it is semi-private space, it has kitchens, shower areas, study room with electrical outlets are provided. They have electricty all day and a jenerator . For the kitchens, they have washing machines, microwaves and any other kitchen stuff. Their oven are used by electric; however, after 10 minutes, the oven is off automatically. (Because of safety issue and fire concern) Proposed Solution Considering the Sustainability: We talked about the students who live in dormitory about both electrical issue and heating. They did not say anything bad for electrical issue but they feel uncomfortable because of the heat. They said that the interior become to much hot and they wear mostly very light clothes. Especially for the winter times, when they are sick, the they boil the water in order to balance the humidty inside their rooms. They also said that the corridors are huge and there is no air in the corridors or common-usage areas. The first thing is they can decrease the temperature of the building. Other than that they need cross ventilatons. Maybe some skylights might be use and in order to make a good ventilation and the floors might be drill in order to reach the upper floors. Common areas has many subspaces and small windows. Maybe the windows of common areas might be enlarged. Sketch- Plan EE Building is the new building for the Electric and Electronical Engineers under the Marmara Restaurant. It has marble and glass façade and an opening at the middle of the building. HEATING: EE building heating is provided from the heat center of rectorate and library, however there is also an additional heating center under the building as well; therefore steam heating is used. As the building is the newest in campus, better and more efficient insulation and façades play an important role in heating. EE BUILDING Low E number glasses were used in window frames to ensure minimum transfer to the outside from the heat gained by solar radiation. EE building has individually set radiators unlike other centrally controlled buildings. Fans for air conditioning units are on the outside of the building, overlooking the central courtyard. Outflow is from the façade. ELECTRICITY: Electricity for EE building comes from the central system provided by EnerjiSA and BilEnerji. In times of shortages, power generators varying from 50 kws to 110 kws provide all campus with electricity. Also, UPS units are placed to eliminate damage from short period voltage fluctuations and power deficits. Ee is one of the few buildings which have %100 power during a shortage.