• Punjab Energy Development Agency (PEDA)
• Solar Passive Complex
• Location -Plot No. 1 & 2, Sector 33-D
• Plot size -1.49 acre
• total covered area 68,224 Sq.Ft. including 23,200
Sq.Ft. basement
• COST -5.5 CRORES
Orientation: (method &technology)
• Solar Passive Complex has been developed
in response to solar geometry
• minimizing solar heat gain in cold period.
• The building envelope attenuates the
outside ambient conditions and the large
volume of air is naturally conditioned by
controlling solar access in response to the
climatic swings.
https://www.youtube.com/watch?v=OR8
EQ0DWpPw
Solar Chimneys
Unique Shell Roofing
• The Central atrium of the constructed with
hyperbolic shell roof
• to admit daylight without glare and heat
• coupled with defused lighting through glass to glass
solar panels.
• The roof is supported with very light weight space
frame structure
WATERBODIES AND LIGHT VAULTS
• Water Bodies
• The water bodies with
waterfalls and fountains
have been placed in the
central atrium of the
complex for cooling of
whole the complex in
the hot and dry period.
• Light Vaults
• The vertical cut-outs in
the floating slabs are
integrated with light
vaults and solar
activated naturally
ventilating, domical
structures in the south
• to admit day light
without glare and heat.
Water bodies with waterfalls
and fountains placed in the
central atrium
INSULATION OF ROOF AND WALL
• All the roofs have been insulated with double
insulation system to avoid penetration of heat from
the roof.
• The complex is a single envelope made up of its
outerwalls as double skin walls having 2" cavity in
between. The cavity walls facing south and west are
filled with further insulation material for efficient
thermal effect.
CAVITY WALLS
INTER-STITIAL SPACE
-HEAT BARRIER THROUGH INSULATION / DEAD AIR CAVITY
-MOISTURE BARRIER
-T.A.P. (THERMOSYPHON AIR PANEL)
- THROUGH SOLAR / MECHANICAL ACTIVATION
INSIDE
THERMAL INNER SKIN
INTERACTS WITH INTERNAL
CONDITIONS
-AIR TEMP.
-HUMIDITY
-LIGHT
OUTSIDE
STRUCTURAL OUTER SKIN
INTERACTS WITH
EXTERNAL CONDITIONS
-WEATHER
-RADIATION
-HUMIDITY
-AIR TEMP.
-U.V.
Landscape Horticulture
• The space around the building inside and outside of
boundary wall and a big lawn in the south has been
designed with trees, shrubs and grass.
• The big trees along the boundary wall acts as a
curtain to
– minimize air pollution
– sound pollution
– filter/cool the entry of air.
OTHER FEATURES
• Solar Power Plant: 25Kwp building integrated solar
photovoltaic power plant has been set up to meet
the basic requirement of electricity in the
complex
• Auditorium: A unique auditorium scientifically
designed to control heat penetration, light & sound
distribution is placed in the north under the shade of
main building
Office Layout
SUN GENERATES ARCHITECTURE - PEDA Office
VISUAL CONTINUITY
Fascinating Architecture
Restful Working Environment
BIPV & HYPERBOLIC PARABOLOID ROOF
BENEFITS
• Benefits:
• lighting consumption
• energy consumption
• recurring expenditure
• pollution
• thermal comfort
• Productivity
presentation on peda building in punjab

More Related Content

What's hot

Indira paryavaran bhawan
Indira paryavaran bhawanIndira paryavaran bhawan
Indira paryavaran bhawanpraveen rohilla
 
Indira Paryawaran Bhawan
  Indira Paryawaran Bhawan  Indira Paryawaran Bhawan
Indira Paryawaran BhawanshreyaGupta396
 
Green Buildings-passive heating techniques
Green Buildings-passive heating techniquesGreen Buildings-passive heating techniques
Green Buildings-passive heating techniquesctlachu
 
CASE STUDY OF PEDA OFFICE COMPLEX, CHANDIGARH.pdf
CASE STUDY OF PEDA OFFICE COMPLEX, CHANDIGARH.pdfCASE STUDY OF PEDA OFFICE COMPLEX, CHANDIGARH.pdf
CASE STUDY OF PEDA OFFICE COMPLEX, CHANDIGARH.pdfAbhishekkumar354689
 
Torrent research building spa
Torrent research building spaTorrent research building spa
Torrent research building spaShamitha Reddy
 
Indira paryavaran bhawan
 Indira paryavaran bhawan Indira paryavaran bhawan
Indira paryavaran bhawanShamitha Reddy
 
passive design strategies in composite & warm-humid climates.
passive design strategies in composite & warm-humid climates.passive design strategies in composite & warm-humid climates.
passive design strategies in composite & warm-humid climates.Janmejoy Gupta
 
Druk white lotus school
Druk white lotus schoolDruk white lotus school
Druk white lotus schoolNitin Grewal
 
Sangath and passive solar hstl by bv doshi
Sangath and passive solar hstl by bv doshiSangath and passive solar hstl by bv doshi
Sangath and passive solar hstl by bv doshiRupesh Kyate
 
Pol of Ahmedabad , pol housing, traditional housing, vernacular architecture ...
Pol of Ahmedabad , pol housing, traditional housing, vernacular architecture ...Pol of Ahmedabad , pol housing, traditional housing, vernacular architecture ...
Pol of Ahmedabad , pol housing, traditional housing, vernacular architecture ...DhvaniR2
 
Iim bangalore (passive india)
Iim bangalore (passive india)Iim bangalore (passive india)
Iim bangalore (passive india)Mudra Redkar
 
Sangath - B. V. Doshi's Studio
Sangath - B. V. Doshi's Studio Sangath - B. V. Doshi's Studio
Sangath - B. V. Doshi's Studio Nidhi Thigale
 
Manav sadhana case study ahmedabad
Manav sadhana case study ahmedabadManav sadhana case study ahmedabad
Manav sadhana case study ahmedabadmanoj chauhan
 
Architectural features of composite climate in India
Architectural features of composite climate in IndiaArchitectural features of composite climate in India
Architectural features of composite climate in IndiaRohit Bhatt
 
Sheikh sarai housing complex
Sheikh sarai housing complexSheikh sarai housing complex
Sheikh sarai housing complexHarshita Singh
 

What's hot (20)

Indira paryavaran bhawan
Indira paryavaran bhawanIndira paryavaran bhawan
Indira paryavaran bhawan
 
Indira Paryawaran Bhawan
  Indira Paryawaran Bhawan  Indira Paryawaran Bhawan
Indira Paryawaran Bhawan
 
Green Buildings-passive heating techniques
Green Buildings-passive heating techniquesGreen Buildings-passive heating techniques
Green Buildings-passive heating techniques
 
Manaav sadhna, Ahmedabad
Manaav sadhna, AhmedabadManaav sadhna, Ahmedabad
Manaav sadhna, Ahmedabad
 
CASE STUDY OF PEDA OFFICE COMPLEX, CHANDIGARH.pdf
CASE STUDY OF PEDA OFFICE COMPLEX, CHANDIGARH.pdfCASE STUDY OF PEDA OFFICE COMPLEX, CHANDIGARH.pdf
CASE STUDY OF PEDA OFFICE COMPLEX, CHANDIGARH.pdf
 
Moderate climate
Moderate climateModerate climate
Moderate climate
 
Sangath
SangathSangath
Sangath
 
HOT AND DRY CLIMATE -CASE STUDY
HOT AND DRY CLIMATE -CASE STUDYHOT AND DRY CLIMATE -CASE STUDY
HOT AND DRY CLIMATE -CASE STUDY
 
Torrent research building spa
Torrent research building spaTorrent research building spa
Torrent research building spa
 
Indira paryavaran bhawan
 Indira paryavaran bhawan Indira paryavaran bhawan
Indira paryavaran bhawan
 
passive design strategies in composite & warm-humid climates.
passive design strategies in composite & warm-humid climates.passive design strategies in composite & warm-humid climates.
passive design strategies in composite & warm-humid climates.
 
Druk white lotus school
Druk white lotus schoolDruk white lotus school
Druk white lotus school
 
Sangath and passive solar hstl by bv doshi
Sangath and passive solar hstl by bv doshiSangath and passive solar hstl by bv doshi
Sangath and passive solar hstl by bv doshi
 
Pol of Ahmedabad , pol housing, traditional housing, vernacular architecture ...
Pol of Ahmedabad , pol housing, traditional housing, vernacular architecture ...Pol of Ahmedabad , pol housing, traditional housing, vernacular architecture ...
Pol of Ahmedabad , pol housing, traditional housing, vernacular architecture ...
 
Passive cooling-techniques
Passive cooling-techniquesPassive cooling-techniques
Passive cooling-techniques
 
Iim bangalore (passive india)
Iim bangalore (passive india)Iim bangalore (passive india)
Iim bangalore (passive india)
 
Sangath - B. V. Doshi's Studio
Sangath - B. V. Doshi's Studio Sangath - B. V. Doshi's Studio
Sangath - B. V. Doshi's Studio
 
Manav sadhana case study ahmedabad
Manav sadhana case study ahmedabadManav sadhana case study ahmedabad
Manav sadhana case study ahmedabad
 
Architectural features of composite climate in India
Architectural features of composite climate in IndiaArchitectural features of composite climate in India
Architectural features of composite climate in India
 
Sheikh sarai housing complex
Sheikh sarai housing complexSheikh sarai housing complex
Sheikh sarai housing complex
 

Similar to presentation on peda building in punjab

CASE STUDY OF PEDA OFFICE COMPLEX, CHANDIGARH.pdf
CASE STUDY OF PEDA OFFICE COMPLEX, CHANDIGARH.pdfCASE STUDY OF PEDA OFFICE COMPLEX, CHANDIGARH.pdf
CASE STUDY OF PEDA OFFICE COMPLEX, CHANDIGARH.pdfAbhishekkumar354689
 
102174349-Bioclimatic-Building-Case-Study.ppt
102174349-Bioclimatic-Building-Case-Study.ppt102174349-Bioclimatic-Building-Case-Study.ppt
102174349-Bioclimatic-Building-Case-Study.pptAshShukla3
 
Climate responsive Contemporary architecture
Climate responsive Contemporary architectureClimate responsive Contemporary architecture
Climate responsive Contemporary architectureShreerang Bhagat
 
climateresponsivearchitecture-171008222357 (1).pdf
climateresponsivearchitecture-171008222357 (1).pdfclimateresponsivearchitecture-171008222357 (1).pdf
climateresponsivearchitecture-171008222357 (1).pdfBossGold
 
climateresponsivearchitecture-171008222357 (1).pdf
climateresponsivearchitecture-171008222357 (1).pdfclimateresponsivearchitecture-171008222357 (1).pdf
climateresponsivearchitecture-171008222357 (1).pdfBossGold
 
Climate responsive architecture and PEDA literature study
Climate responsive architecture and PEDA literature study Climate responsive architecture and PEDA literature study
Climate responsive architecture and PEDA literature study Ubaid Khan
 
TERI -BANGLORE_Case study
TERI -BANGLORE_Case study TERI -BANGLORE_Case study
TERI -BANGLORE_Case study Ar Naveen Naveen
 
Bioclimatic design at the site planning scale
Bioclimatic design at the site planning scaleBioclimatic design at the site planning scale
Bioclimatic design at the site planning scaleKomal Arora
 
WALMI Bhopal final.pptx
WALMI Bhopal final.pptxWALMI Bhopal final.pptx
WALMI Bhopal final.pptxChinmoyGhosh40
 
passive heating system with trombe wall
passive heating system with trombe wall passive heating system with trombe wall
passive heating system with trombe wall GrkemDiken
 
Mewc low energy office building
Mewc low energy office buildingMewc low energy office building
Mewc low energy office buildingKumar Snehansu
 
casestudyonpassivecoolingandheating-200404053837 (2).pdf
casestudyonpassivecoolingandheating-200404053837 (2).pdfcasestudyonpassivecoolingandheating-200404053837 (2).pdf
casestudyonpassivecoolingandheating-200404053837 (2).pdfBossGold
 
casestudyonpassivecoolingandheating-200404053837.pdf
casestudyonpassivecoolingandheating-200404053837.pdfcasestudyonpassivecoolingandheating-200404053837.pdf
casestudyonpassivecoolingandheating-200404053837.pdfBossGold
 
casestudyonpassivecoolingandheating-200404053837 (2).pdf
casestudyonpassivecoolingandheating-200404053837 (2).pdfcasestudyonpassivecoolingandheating-200404053837 (2).pdf
casestudyonpassivecoolingandheating-200404053837 (2).pdfBossGold
 
Case study on passive cooling and heating
Case study on passive cooling and heatingCase study on passive cooling and heating
Case study on passive cooling and heatingShubhamJangra15
 

Similar to presentation on peda building in punjab (20)

CASE STUDY OF PEDA OFFICE COMPLEX, CHANDIGARH.pdf
CASE STUDY OF PEDA OFFICE COMPLEX, CHANDIGARH.pdfCASE STUDY OF PEDA OFFICE COMPLEX, CHANDIGARH.pdf
CASE STUDY OF PEDA OFFICE COMPLEX, CHANDIGARH.pdf
 
102174349-Bioclimatic-Building-Case-Study.ppt
102174349-Bioclimatic-Building-Case-Study.ppt102174349-Bioclimatic-Building-Case-Study.ppt
102174349-Bioclimatic-Building-Case-Study.ppt
 
Climate responsive Contemporary architecture
Climate responsive Contemporary architectureClimate responsive Contemporary architecture
Climate responsive Contemporary architecture
 
climateresponsivearchitecture-171008222357 (1).pdf
climateresponsivearchitecture-171008222357 (1).pdfclimateresponsivearchitecture-171008222357 (1).pdf
climateresponsivearchitecture-171008222357 (1).pdf
 
climateresponsivearchitecture-171008222357 (1).pdf
climateresponsivearchitecture-171008222357 (1).pdfclimateresponsivearchitecture-171008222357 (1).pdf
climateresponsivearchitecture-171008222357 (1).pdf
 
Climate responsive architecture and PEDA literature study
Climate responsive architecture and PEDA literature study Climate responsive architecture and PEDA literature study
Climate responsive architecture and PEDA literature study
 
TERI -BANGLORE_Case study
TERI -BANGLORE_Case study TERI -BANGLORE_Case study
TERI -BANGLORE_Case study
 
SUSTAINABILITY IN BUILDING DESIGN
SUSTAINABILITY IN BUILDING DESIGN SUSTAINABILITY IN BUILDING DESIGN
SUSTAINABILITY IN BUILDING DESIGN
 
Druk white lotus school
Druk white lotus schoolDruk white lotus school
Druk white lotus school
 
Druk white lotus school
Druk white lotus schoolDruk white lotus school
Druk white lotus school
 
Bioclimatic design at the site planning scale
Bioclimatic design at the site planning scaleBioclimatic design at the site planning scale
Bioclimatic design at the site planning scale
 
WALMI Bhopal final.pptx
WALMI Bhopal final.pptxWALMI Bhopal final.pptx
WALMI Bhopal final.pptx
 
passive heating system with trombe wall
passive heating system with trombe wall passive heating system with trombe wall
passive heating system with trombe wall
 
Mewc low energy office building
Mewc low energy office buildingMewc low energy office building
Mewc low energy office building
 
casestudyonpassivecoolingandheating-200404053837 (2).pdf
casestudyonpassivecoolingandheating-200404053837 (2).pdfcasestudyonpassivecoolingandheating-200404053837 (2).pdf
casestudyonpassivecoolingandheating-200404053837 (2).pdf
 
casestudyonpassivecoolingandheating-200404053837.pdf
casestudyonpassivecoolingandheating-200404053837.pdfcasestudyonpassivecoolingandheating-200404053837.pdf
casestudyonpassivecoolingandheating-200404053837.pdf
 
casestudyonpassivecoolingandheating-200404053837 (2).pdf
casestudyonpassivecoolingandheating-200404053837 (2).pdfcasestudyonpassivecoolingandheating-200404053837 (2).pdf
casestudyonpassivecoolingandheating-200404053837 (2).pdf
 
Case study on passive cooling and heating
Case study on passive cooling and heatingCase study on passive cooling and heating
Case study on passive cooling and heating
 
Double skin facade
Double skin facade Double skin facade
Double skin facade
 
building2.energy
building2.energybuilding2.energy
building2.energy
 

More from EVERSENDAI ENGINEERING (L.L.C.) (20)

Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Laws company act
Laws company actLaws company act
Laws company act
 
Hrm
HrmHrm
Hrm
 
construction planning
construction planningconstruction planning
construction planning
 
Bim notes
Bim notesBim notes
Bim notes
 
basic qs notes
basic qs notesbasic qs notes
basic qs notes
 
statistics basic
statistics basicstatistics basic
statistics basic
 
Sustainability
Sustainability Sustainability
Sustainability
 
Stratergy notes 2
Stratergy notes 2Stratergy notes 2
Stratergy notes 2
 
Strategy note 1
Strategy note 1Strategy note 1
Strategy note 1
 
Qhsem
Qhsem Qhsem
Qhsem
 
Project planning notes
Project planning notesProject planning notes
Project planning notes
 
Quantity surveying notes......
Quantity surveying notes......  Quantity surveying notes......
Quantity surveying notes......
 
stakeholder management
stakeholder managementstakeholder management
stakeholder management
 
Finance
FinanceFinance
Finance
 
construction Contracts
construction Contractsconstruction Contracts
construction Contracts
 
Bim notes
Bim notesBim notes
Bim notes
 
Basic civil notes
Basic civil notesBasic civil notes
Basic civil notes
 
Reinforcement theory of motivation -proposed by bf skinner
Reinforcement theory of motivation -proposed by bf skinnerReinforcement theory of motivation -proposed by bf skinner
Reinforcement theory of motivation -proposed by bf skinner
 
Measurements in construction
Measurements in constructionMeasurements in construction
Measurements in construction
 

Recently uploaded

Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 

Recently uploaded (20)

Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 

presentation on peda building in punjab

  • 1. CMMT PRESENTATION MBA (CPM) SECTION A GROUP 2 SUBGROUP 1
  • 2.
  • 4. PEDA OFFICE COMPLEX, CHANDIGARH • Punjab Energy Development Agency (PEDA) • Solar Passive Complex • Location -Plot No. 1 & 2, Sector 33-D • Plot size -1.49 acre • total covered area 68,224 Sq.Ft. including 23,200 Sq.Ft. basement • COST -5.5 CRORES
  • 5. Orientation: (method &technology) • Solar Passive Complex has been developed in response to solar geometry • minimizing solar heat gain in cold period. • The building envelope attenuates the outside ambient conditions and the large volume of air is naturally conditioned by controlling solar access in response to the climatic swings.
  • 8. Unique Shell Roofing • The Central atrium of the constructed with hyperbolic shell roof • to admit daylight without glare and heat • coupled with defused lighting through glass to glass solar panels. • The roof is supported with very light weight space frame structure
  • 9.
  • 10. WATERBODIES AND LIGHT VAULTS • Water Bodies • The water bodies with waterfalls and fountains have been placed in the central atrium of the complex for cooling of whole the complex in the hot and dry period. • Light Vaults • The vertical cut-outs in the floating slabs are integrated with light vaults and solar activated naturally ventilating, domical structures in the south • to admit day light without glare and heat.
  • 11. Water bodies with waterfalls and fountains placed in the central atrium
  • 12. INSULATION OF ROOF AND WALL • All the roofs have been insulated with double insulation system to avoid penetration of heat from the roof. • The complex is a single envelope made up of its outerwalls as double skin walls having 2" cavity in between. The cavity walls facing south and west are filled with further insulation material for efficient thermal effect.
  • 13. CAVITY WALLS INTER-STITIAL SPACE -HEAT BARRIER THROUGH INSULATION / DEAD AIR CAVITY -MOISTURE BARRIER -T.A.P. (THERMOSYPHON AIR PANEL) - THROUGH SOLAR / MECHANICAL ACTIVATION INSIDE THERMAL INNER SKIN INTERACTS WITH INTERNAL CONDITIONS -AIR TEMP. -HUMIDITY -LIGHT OUTSIDE STRUCTURAL OUTER SKIN INTERACTS WITH EXTERNAL CONDITIONS -WEATHER -RADIATION -HUMIDITY -AIR TEMP. -U.V.
  • 14.
  • 15. Landscape Horticulture • The space around the building inside and outside of boundary wall and a big lawn in the south has been designed with trees, shrubs and grass. • The big trees along the boundary wall acts as a curtain to – minimize air pollution – sound pollution – filter/cool the entry of air.
  • 16. OTHER FEATURES • Solar Power Plant: 25Kwp building integrated solar photovoltaic power plant has been set up to meet the basic requirement of electricity in the complex • Auditorium: A unique auditorium scientifically designed to control heat penetration, light & sound distribution is placed in the north under the shade of main building
  • 18. SUN GENERATES ARCHITECTURE - PEDA Office
  • 21.
  • 23. BIPV & HYPERBOLIC PARABOLOID ROOF
  • 24. BENEFITS • Benefits: • lighting consumption • energy consumption • recurring expenditure • pollution • thermal comfort • Productivity