Contents
Introduction
Importance of HVAC
Clean rooms
Contamination
Parts of HVAC
Air flow pattern
Qualification of HVAC
Validation parameters
References
Air handling units by robatherm are especially designed to minimize the introduction, generation and
retention of particulate and microbial contaminations in pharmaceutical cleanrooms.
What is validation?
 Validation is establishing documented evidence which provides a
high degree of assurance that a specific process,equipment,
material, activity or system consistently produces a product
meeting its predetermined specifications and quality attributes.
 It's done on
• Analytical test
• Equipment
• Support process
• Facility system
Types of validation
Pharmaceutical utility systems
 Each pharmaceutical (but also cosmetics, food,chemical…) industry’s manufacturing
process use several support system with different functions and distributed with
centralized installations.
 These systems are not necessarily designed and customized for users of a single
production facility, but often serve an entire factory or part of it.
Pharmaceutical
utility systems
Process
waters
Drinking
and
sanitary
water
Electric
power
Air
conditioning
(HVAC
systems)
What is HVAC?
Heating, ventilation and air conditioning (HVAC) system
 It is integral component of pharmaceutical facility functionality.
The system is needed for maintenance of a suitable temperature,
for continuous flow of air, which ultimately prevents cross-
contamination and accumulation of air and to ensure the cooling of
air in the premises.
Control airborne
particles, dust and
micro-organisms –
Thru air filtration
using high efficiency
particulate air
(HEPA) filters.
Maintain space
temperature -
Temperature can
affect production
directly or indirectly
by fostering the
growth of microbial
contaminants on
workers.
What can HVAC do?
Maintain space moisture
(Relative Humidity) –
Humidity is controlled by
cooling air to dew point
temperatures or by using
desiccant dehumidifiers.
Humidity can affect the
efficacy and stability of
drugs and is sometimes
important to effectively
mould the tablets.
Maintain room pressure (delta P) –
Areas that must remain “cleaner”
than surrounding areas must be kept
under a “positive” pressurization,
meaning that air flow must be from
the “cleaner” area towards the
adjoining space (through doors or
other openings) to reduce the chance
of airborne contamination. This is
achieved by the HVAC system
providing more air into the “cleaner”
space than is mechanically removed
from that same space.
What HVAC can’t do?
HVAC can not clean up the surfaces of a contaminated surfaces, room or
equipment.
HVAC can not compensate for workers who do not follow procedure.
Impure
air
I
m
p
u
r
e
a
i
r
Impure air
WHAT IS CLEAN ROOM?
• A room in which the concentration of air borne particle is controlled
and which is constructed and used in a manner to minimize the
introduction, generation and retention of particles inside the room
and in which other relevant parameters.
• e.g.. Temperature, humidity and pressure, are controlled as necessary.
WHY CLEAN ROOM NECESSARY?
It controls 3 types of contamination transfer
• Air borne contamination
• Direct contamination by personnel, equipment etc.
• Contamination from fluids like cleaning fluids, solutions etc.
• As airborne particulate are reduced, chances of particles entry in the
process reduced.
• Protects product, personnel & environment.
HOW IT IS ACCOMPLISHED?
• A clean room is continuously flushed with highly filtered air that is forced in
through HEPA filters.
TYPES OF CLEAN ROOMS
Horizontal Clean Room
• Horizontal Laminar flow (HEPA filters in a wall force clean air from one side
of the room to other.)
Vertical Clean Room
• Vertical Laminar flow (HEPA filters on the ceiling push clean air down to the
floor.)
FOUR BASIC PRINCIPLES OF CLEANROOM
• Not To Bring Any Dust
• Not To Accumulate Any Dust
• Not To Generate Any Dust
• To Remove Any Dust Quickly
A
B
F
E D
CG
A. Fluorescent light
standard, UV
sterilization bulbs
available
B. HEPA fan/filter units
provide laminar flow
of micro-filtered air
C. Minihelic gauge
measures filter
backpressure
D. Stainless steel work
surface (available
with electropolishing)
E. Variable-speed
blower adjusts air
speed to meet
containment
requirements
F. Options include
vacuum, DI water
and gas utilities
G. Status Indicator
CONTAMINATION
What are contaminants ?
1. Products or substances other than the product being manufactured.
2. Foreign products.
3. Particulate matter.
4. Micro-organisms.
5. Endotoxins (degraded micro-organisms).
Cross-Contamination
From where does Cross-Contamination originate?
1. Poorly designed air handling systems and dust extraction systems.
2. Poorly operated and maintained air handling systems and dust extraction
systems.
3. Inadequate procedures for personnel and equipment.
HVAC consists of
1. Air conditioner
2. AHUs (air handling unit)
3. Dehumidifier / Heater
4. Filters (Pre & HEPA)
5. Dust Extractors
6. Ducting (For delivery of controlled air)
7. Supply Fans
8. Dampers
9. Humidity / Temperature / Pressure sensors
10.Mixer
11. Heating / Cooling Coils
AHUs (air handling unit)
Basic HVAC system
Airflow Pattern
There are three different types of airflow patterns available for cleanrooms
designs:
Unidirectional (laminar):
The airflow is essentially where the air flows downwards or sideways in an
unimpeded path.
Non-unidirectional flow (turbulent flow):
where air streams are other than parallel to one another.
Mixed flow:
where airstreams may be parallel in one part of the cleanroom and not in other
parts.
HVAC QUALIFICATION
• To ensure that equipment is designed as per requirement, installed properly.
• Action of proving that any equipment works correctly and leads to the expected results.
USER REQUIREMENT SPECIFICATION
Customer of the equipment has certain expectations about the equipment which he
wants to use. Some of the general requirements may be stated in the form of certain
parameters
like:
1. Size of the equipment
2. Speed of the equipment
3. Effectiveness of the equipment
4. Availability of spares, change parts, and prompt services at reasonable cost
5. Ease of operation, cleaning, and maintenance
6. Low dust and sound generation
7. Lesser breakdowns
8. Materials of construction
9. Autocontrol system
10. Easy change over
11. Overall good construction and workmanship, etc.
DESIGN QUALIFICATION
• Based on the URS supplier designs the equipment-First step in the
qualification of new HVAC systems.
It must include
1. Functional Specification.
2. Technical / Performance specification for equipment.
3. Detailed Air Flow Schematics.
4. Detailed layout drawing of the system.
IQ Should include:-
 Instrumentation checked against current engineering drawings and specifications.
 Properly served by the required utilities.
 Verification of materials of construction.
 Installation of equipment and with piping.
 Calibration of measuring instruments.
 Operation manuals and spare parts lists to assure the proper and continuous operation of
the system.
 Components are installed at specified location.
IQ should provide documented evidence that the installation
was complete and satisfactory. The purchase specifications,
drawings, manuals, spare parts lists, and vendor details should
be verified during IQ.
The purpose of OQ is to establish, through documented testing, that all critical components
are capable of operating within established limits and tolerances.
Operation Qualification Checks
Ability to provide air of sufficient quality and quantity to ensure achievement of specified
clean room conditions.
Ability to maintain temperature, relative humidity and pressure set points.
Ability to maintain any critical parameters stated in the DQ consistently.
Includes the tests that have been developed from knowledge of processes, systems and
equipment.
OQ protocols to be written and approved prior to completion. It
includes following:
All relevant SOPs should be in place
Temperature measurement report
Humidity measurement report
Differential pressure measurement report
Air flow direction measurement report
Room particle count measurement report
All maintenance/ cleaning instructions available
• The purpose of PQ is to verify and document that an HVAC system provides acceptable
control under ‘ Full Operational ‘ conditions.
• PQ should follow successful completion of IQ and OQ.
• PQ verifies that the critical parameters, as defined in the DQ are being achieved.
PQ Should include
• Test to include a condition or set of conditions encompassing upper and lower operating
limits.
• Tests should be conducted under “in use”, condition either or simulated as close as possible
to the actual process
• PQ is used to demonstrate consistent achievement of critical parameters over time. ( under
manufacturing conditions)
• Any changes to the HVAC system should be revalidated before proceeding to the PQ phase.
VALIDATION
• Document act of proving that any procedure, process, system / equipment
actual leads to expected results.
• To ensure that system provides continuously required environmental conditions
VALIDATION PARAMETERS
1. Air flow measurement
2. Room air changes per hour.
3. Filter Integrity Testing (HEPA Leak test)
4. Pressure Differentials
5. Particulate count measurement
6. Recovery test
7. Temperature and Relative
Humidity
8. Air Flow Pattern
9. Microbial Count
Air Flow Pattern
1. Take the titanium tetra chloride stick.
2. Burn the stick.
3. Place the burning stick in front of running Air Handling Unit (AHU).
4. Observed the flow of air with the help of smock distribution in the room.
5. Make chart diagram of the flow of air in the room for each room.
The distribution of smoke is observed. It should be uniform.
Air flow velocity &Changes per hour
For this test, the area of HVAC is divided into four hypothetical grids and the air velocity is measured at
each grid and then the average air velocity (V) is calculated.
Record the velocity readings taken at the center of the grids, and at the junction of dividing lines (center of
HEPA Filter) .Calculate the Average Velocity as
V = (V1+V2+V3+V4)
4
V = Velocity observed at each point
Now calculate the area of the filter by multiplying the length and
width of the filter in feet.
l = length of HEPA filter
w = width of HEPA filter
A = l x w
CLASS
Number of
Air Changes
/ Hour
CLASS 100 NLT 250
CLASS 10
000
60 + 10 %
CLASS 1 00
000
40 + 10 %
 Calculate the total air volume per minute supplied in the clean room by the
following formula:
A = Area of HEPA filter in square feet
V = Average air velocity in feet per minute
T = A x V
 Calculate the total air in the room multiplying the length, width and height of
the room in feet. Volume = L x W x H
 Now we can calculate the Air
Changes per hour using the
following formula: Air Changes
per Hour =
T X 60
Volume
Filter Leak Test
1. Place the velometer at the front of AHU unit.
2. Check the velocity of air to the all corner of the AHU.
3. The air velocity should be within the higher limit of HEPA filter.
4. In case it is found to exceed the upper limit, a gas cut (silicon) is used to
decrease the leakage.
Thermal Anemometers Velometer Rotating Vanes
Particles Count
• Useful in detecting significant deviations in air cleanliness from qualified
processing classifications
• Immediate understanding of air quality can be realized
• Useful as a tool for qualification and monitoring before /during and after
operations
On the air system before one hour of test operation.
1. Take the suitable particle counter and operate it to check the particles in
the room at non working operation.
2. Collect the information from particle counter and fill them in the format.
3. Operate the particle counter when work is on progress in the area.The
particles should be count when more than one hour work has been
progressed in the area. Record the data in the format.
4. Operate the particle counter for all the room maintaining grade A, grade B,
grade C & grade D.
Acceptance Criteria:
Clean room or clean zone shall meet the acceptance criteria for an air borne
particulate as referred in standard ISO 14644-1.
ISO 14644-
1
> 0.1 m
(Particles /
Mt3)
> 0.2 m
(Particles /
Mt3)
> 0.3 m
(Particles
/ Mt3)
> 0.5 m
(Particles /
Mt3)
> 1.0 m
(Particles /
Mt3)
> 5.0 m
(Particles /
Mt3)
ISO 1 1 2 0 0 0 0
ISO 2 100 24 10 4 0 0
ISO 3 1 000 237 102 35 8 0
ISO 4 10 000 2 370 1 020 352 83 0
ISO 5 1 00 000 23 700 10 200 3 520 832 29
ISO 6 10 00 000 2 37 000 1 02 000 35 200 8 320 293
ISO 7 NA NA NA 3 52 000 83 200 2 930
ISO 8 NA NA NA 35 20 000 8 32 000 29 300
ISO 9 NA NA NA 3 52 00 000 83 20 000 2 93 000
EU GGMP
Static (at rest) Dynamic (in operation)
> 0.5 m
(Particles / Mt3)
> 5.0 m
(Particles / Mt3)
> 0.5 m
(Particles / Mt3)
> 5.0 m
(Particles / Mt3)
GRADE A 3 500 1 3 500 1
GRADE B 3 500 1 3 50 000 2 000
GRADE C 3 50 000 2 000 35 00 000 20 000
GRADE D 35 00 000 20 000 Not defined Not defined
GRADE E Not defined Not defined Not defined Not defined
Cleanliness Class Verification (Non viable Particle Count) EU GMP
Particle counter machine
Pressure Drop across the HEPA and Fine filters of Air Handling Unit
Objective:
 The purpose of this test is to check the Clogged or clean
condition of the across HEPA filters, Fine Filter and Pre -
filter, of the Air Handling Unit.
Test Equipment:
 Differential pressure Transmitter or Manometer
Procedure for HEPA, Fine and Pre Filters:
1. Ensure that the differential pressure transmitter is
connected to before the filter and after the filter.
2. Check the status of the filter whether the filter is in clean
condition or Clogged condition.
Acceptance Criteria:
• HEPA, Pre and Fine filters should be in clean condition.
Manometer
Clogged filter
Temperature and Relative Humidity Test
Objective:
 To demonstrate the ability of the HVAC system to provide temperature and Relative
Humidity within the specified range.
Test Equipment:
 Temperature and Relative Humidity Sensor
Display Unit for Temperature and Relative Humidity
Procedure:
 Observe the temperature and relative humidity through respective display unit
wherever installed. Use Hygrometer to check the reading of Temperature and RH in
other rooms.
 Temperature and RH in the area to be checked and recorded in Static as well as
Dynamic Condition.
Static Condition:
 In static condition all the machines shall be kept switched ‘OFF’. Only restricted man
movement shall take place.
Dynamic Condition:
 In dynamic condition machines having maximum loads shall run and restricted man
movement shall take place.
Acceptance Criteria
 Temperature and relative humidity should meet the requirement as specified in system
specification. Hygro meter
Hygro meter
Sensor
Sound level Test
Objective:
To verify that the sound level is in limit in the clean room
area.
Test Equipment:
Sound Level Meter, duly calibrated with traceability to
national / international standard.
Procedure:
Take the reading at 5 locations in the room and take the
average of the sound in the unit of decibels.
Acceptance Criteria:
The clean room or clean zone shall meet the acceptance
criteria for sound level as mentioned below.
Sound Level
Meter
S.
N
Cleanliness
Class
Sound Level
Limit
( db )
1
Class 100 / ISO
5
NMT 60
2
Class 10, 000 /
ISO 7
NMT 80
3
Class 1,00, 000 /
ISO 8
NMT 80
Air Borne Viable Particle Monitoring
Objective:
 To determine the air borne microbial contamination level in critical area.
Air borne microbial count by settling plate exposure
method:
 Pre incubated SCDA Media plates shall be exposed in Locations mentioned for 4
hours and incubated for 48 hours at 30°C to 35°C followed by next 72 hours at
20°C to 25°C.Record the results in respective format. PDA plates shall be
exposed weekly to monitor the fungal counts. SCDA plates shall be incubated once
in fifteen days to monitor the anaerobic Microorganisms
Acceptance Criteria:
 All the Parameters performed in the area should meet the following requirements.
Petri Dish
• [Downloaded from http://www.asiapharmaceutics.info on Wednesday,
October 01, 2014, IP: 223.30.225.254] || Click here to download free
Android application for this journal
• http://www.gmpua.com/CleanRoom/HVAC/Solid.pdf
References
• Validation in pharmaceutical industry concepts, approaches &
guidelines by P.P.Sharma , 1st edition published by vandana
publications PVT.LTD dehli (page no. 165- 191)
Validation of hvac system

More Related Content

What's hot

Validation utility system
Validation utility systemValidation utility system
Validation utility systemPRANJAY PATIL
 
Qualification of laboratory equipments by Mayuri Soni
Qualification of laboratory equipments by Mayuri SoniQualification of laboratory equipments by Mayuri Soni
Qualification of laboratory equipments by Mayuri SoniMayuri Soni
 
Qualification of laboratory equipments
Qualification of laboratory equipmentsQualification of laboratory equipments
Qualification of laboratory equipmentsPranali Polshettiwar
 
Validation of hvac
Validation of hvacValidation of hvac
Validation of hvacK Manivannan
 
Validation of Heat ventilation air conditioning
Validation of Heat ventilation air conditioningValidation of Heat ventilation air conditioning
Validation of Heat ventilation air conditioningPrashant Tomar
 
USFDA guidelines on process validation a life cycle approach
USFDA guidelines on process validation a life cycle approachUSFDA guidelines on process validation a life cycle approach
USFDA guidelines on process validation a life cycle approachRx Ayush Sharma
 
Cleaning validation
Cleaning validationCleaning validation
Cleaning validationVinay Jain
 
Auditing of Granulation Operation in Dry Production Area
Auditing of Granulation Operation in Dry Production AreaAuditing of Granulation Operation in Dry Production Area
Auditing of Granulation Operation in Dry Production AreaPritam Kolge
 
Cleaning validation
Cleaning validationCleaning validation
Cleaning validationSagar Savale
 
aseptic process technology
 aseptic process technology aseptic process technology
aseptic process technologyPRANJAY PATIL
 
STERILE PROCESS OF VALIDATION
STERILE PROCESS OF VALIDATIONSTERILE PROCESS OF VALIDATION
STERILE PROCESS OF VALIDATIONSagar Savale
 
Auditing of quality assurance and maintenance of engineering department
Auditing of quality assurance and   maintenance of engineering departmentAuditing of quality assurance and   maintenance of engineering department
Auditing of quality assurance and maintenance of engineering departmentPriyanka Kandhare
 

What's hot (20)

Validation utility system
Validation utility systemValidation utility system
Validation utility system
 
Qualification of laboratory equipments by Mayuri Soni
Qualification of laboratory equipments by Mayuri SoniQualification of laboratory equipments by Mayuri Soni
Qualification of laboratory equipments by Mayuri Soni
 
Cleaning validation
Cleaning validationCleaning validation
Cleaning validation
 
Pharmaceutical validation of water system
Pharmaceutical validation of  water system Pharmaceutical validation of  water system
Pharmaceutical validation of water system
 
Qualification of laboratory equipments
Qualification of laboratory equipmentsQualification of laboratory equipments
Qualification of laboratory equipments
 
Validation of hvac
Validation of hvacValidation of hvac
Validation of hvac
 
Validation of Heat ventilation air conditioning
Validation of Heat ventilation air conditioningValidation of Heat ventilation air conditioning
Validation of Heat ventilation air conditioning
 
USFDA guidelines on process validation a life cycle approach
USFDA guidelines on process validation a life cycle approachUSFDA guidelines on process validation a life cycle approach
USFDA guidelines on process validation a life cycle approach
 
Cleaning validation
Cleaning validationCleaning validation
Cleaning validation
 
SITE ACCEPTANCE TEST
SITE ACCEPTANCE TESTSITE ACCEPTANCE TEST
SITE ACCEPTANCE TEST
 
Qualification of HPLC
Qualification of HPLCQualification of HPLC
Qualification of HPLC
 
Auditing of Granulation Operation in Dry Production Area
Auditing of Granulation Operation in Dry Production AreaAuditing of Granulation Operation in Dry Production Area
Auditing of Granulation Operation in Dry Production Area
 
Computerized system validation
Computerized system validationComputerized system validation
Computerized system validation
 
Cleaning validation
Cleaning validationCleaning validation
Cleaning validation
 
QUALIFICATION OF FT-IR
QUALIFICATION OF FT-IRQUALIFICATION OF FT-IR
QUALIFICATION OF FT-IR
 
aseptic process technology
 aseptic process technology aseptic process technology
aseptic process technology
 
Water system validation
Water system validationWater system validation
Water system validation
 
STERILE PROCESS OF VALIDATION
STERILE PROCESS OF VALIDATIONSTERILE PROCESS OF VALIDATION
STERILE PROCESS OF VALIDATION
 
Auditing of quality assurance and maintenance of engineering department
Auditing of quality assurance and   maintenance of engineering departmentAuditing of quality assurance and   maintenance of engineering department
Auditing of quality assurance and maintenance of engineering department
 
FACTORY ACCEPTANCE TEST
FACTORY ACCEPTANCE TEST FACTORY ACCEPTANCE TEST
FACTORY ACCEPTANCE TEST
 

Similar to Validation of hvac system

HVAC Validation (Air Handling Units).pdf
HVAC Validation (Air Handling Units).pdfHVAC Validation (Air Handling Units).pdf
HVAC Validation (Air Handling Units).pdfBALASUNDARESAN M
 
Validation utility system
Validation utility systemValidation utility system
Validation utility systemArpitSuralkar
 
Validation of HVAC pharma geeta TUBE (Utility Systems)
Validation of HVAC pharma geeta TUBE (Utility Systems)Validation of HVAC pharma geeta TUBE (Utility Systems)
Validation of HVAC pharma geeta TUBE (Utility Systems)Saikat Bagchi
 
Support utilities validation.pptx (asmita magare)
Support utilities validation.pptx (asmita magare)Support utilities validation.pptx (asmita magare)
Support utilities validation.pptx (asmita magare)magareasmi
 
Equipment validation of fbd
Equipment validation of fbdEquipment validation of fbd
Equipment validation of fbdpriyanka odela
 
Heating Ventilation and Air Conditioner HVAC Qualification
Heating Ventilation and Air Conditioner HVAC QualificationHeating Ventilation and Air Conditioner HVAC Qualification
Heating Ventilation and Air Conditioner HVAC QualificationMayur Unde
 
Validación De Sistemas De Gases De Proceso
Validación De Sistemas De Gases De ProcesoValidación De Sistemas De Gases De Proceso
Validación De Sistemas De Gases De ProcesoCrown Cork & Seal
 
Contamination Control in Cleanrooms_Dr.A. Amsavel
Contamination Control in Cleanrooms_Dr.A. AmsavelContamination Control in Cleanrooms_Dr.A. Amsavel
Contamination Control in Cleanrooms_Dr.A. AmsavelDr. Amsavel A
 
Sterile products manufacturing
Sterile products manufacturingSterile products manufacturing
Sterile products manufacturingDr. Samia
 
AUDITING OF AUALITY ASSURANCE AND ENGINEERING DEPARTMENT
AUDITING OF AUALITY ASSURANCE AND ENGINEERING DEPARTMENT AUDITING OF AUALITY ASSURANCE AND ENGINEERING DEPARTMENT
AUDITING OF AUALITY ASSURANCE AND ENGINEERING DEPARTMENT HemlataMore3
 
1581995753943audit-221215085248-ec81c6e4 (1) (1).pdf
1581995753943audit-221215085248-ec81c6e4 (1) (1).pdf1581995753943audit-221215085248-ec81c6e4 (1) (1).pdf
1581995753943audit-221215085248-ec81c6e4 (1) (1).pdfAmitMasand5
 
Support and utilities validation
Support and utilities validationSupport and utilities validation
Support and utilities validationVaishali Dudhabale
 
Facilities_and_Equipment_CGMP_Requirements_1659630578.pdf
Facilities_and_Equipment_CGMP_Requirements_1659630578.pdfFacilities_and_Equipment_CGMP_Requirements_1659630578.pdf
Facilities_and_Equipment_CGMP_Requirements_1659630578.pdfEngFaisalAlrai
 

Similar to Validation of hvac system (20)

HVAC system
 HVAC system HVAC system
HVAC system
 
HVAC Validation (Air Handling Units).pdf
HVAC Validation (Air Handling Units).pdfHVAC Validation (Air Handling Units).pdf
HVAC Validation (Air Handling Units).pdf
 
Validation utility system
Validation utility systemValidation utility system
Validation utility system
 
Validation of HVAC pharma geeta TUBE (Utility Systems)
Validation of HVAC pharma geeta TUBE (Utility Systems)Validation of HVAC pharma geeta TUBE (Utility Systems)
Validation of HVAC pharma geeta TUBE (Utility Systems)
 
Support utilities validation.pptx (asmita magare)
Support utilities validation.pptx (asmita magare)Support utilities validation.pptx (asmita magare)
Support utilities validation.pptx (asmita magare)
 
Equipment validation of fbd
Equipment validation of fbdEquipment validation of fbd
Equipment validation of fbd
 
Hvac part 3
Hvac part 3Hvac part 3
Hvac part 3
 
Heating Ventilation and Air Conditioner HVAC Qualification
Heating Ventilation and Air Conditioner HVAC QualificationHeating Ventilation and Air Conditioner HVAC Qualification
Heating Ventilation and Air Conditioner HVAC Qualification
 
Hvac
HvacHvac
Hvac
 
Validación De Sistemas De Gases De Proceso
Validación De Sistemas De Gases De ProcesoValidación De Sistemas De Gases De Proceso
Validación De Sistemas De Gases De Proceso
 
Hvac
HvacHvac
Hvac
 
Contamination Control in Cleanrooms_Dr.A. Amsavel
Contamination Control in Cleanrooms_Dr.A. AmsavelContamination Control in Cleanrooms_Dr.A. Amsavel
Contamination Control in Cleanrooms_Dr.A. Amsavel
 
Sterile products manufacturing
Sterile products manufacturingSterile products manufacturing
Sterile products manufacturing
 
AUDITING OF AUALITY ASSURANCE AND ENGINEERING DEPARTMENT
AUDITING OF AUALITY ASSURANCE AND ENGINEERING DEPARTMENT AUDITING OF AUALITY ASSURANCE AND ENGINEERING DEPARTMENT
AUDITING OF AUALITY ASSURANCE AND ENGINEERING DEPARTMENT
 
1581995753943audit-221215085248-ec81c6e4 (1) (1).pdf
1581995753943audit-221215085248-ec81c6e4 (1) (1).pdf1581995753943audit-221215085248-ec81c6e4 (1) (1).pdf
1581995753943audit-221215085248-ec81c6e4 (1) (1).pdf
 
HVAC SYSTEM by Pratik
HVAC SYSTEM by PratikHVAC SYSTEM by Pratik
HVAC SYSTEM by Pratik
 
Support and utilities validation
Support and utilities validationSupport and utilities validation
Support and utilities validation
 
Autoclave validation maliba
Autoclave validation malibaAutoclave validation maliba
Autoclave validation maliba
 
Facilities_and_Equipment_CGMP_Requirements_1659630578.pdf
Facilities_and_Equipment_CGMP_Requirements_1659630578.pdfFacilities_and_Equipment_CGMP_Requirements_1659630578.pdf
Facilities_and_Equipment_CGMP_Requirements_1659630578.pdf
 
Presentation on HVAC
Presentation on HVAC Presentation on HVAC
Presentation on HVAC
 

Recently uploaded

Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...jaredbarbolino94
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxJiesonDelaCerna
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupJonathanParaisoCruz
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 

Recently uploaded (20)

Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptx
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized Group
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 

Validation of hvac system

  • 1. Validation of HVAC system College: G. Pulla reddy college of Pharmacy Subject: Pharmaceutical validation Roll no: 170118885002 Name: K.Vaishali Class : M. pharmacy, 1st year Department: Ph.Analysis
  • 2. Contents Introduction Importance of HVAC Clean rooms Contamination Parts of HVAC Air flow pattern Qualification of HVAC Validation parameters References
  • 3. Air handling units by robatherm are especially designed to minimize the introduction, generation and retention of particulate and microbial contaminations in pharmaceutical cleanrooms.
  • 4. What is validation?  Validation is establishing documented evidence which provides a high degree of assurance that a specific process,equipment, material, activity or system consistently produces a product meeting its predetermined specifications and quality attributes.  It's done on • Analytical test • Equipment • Support process • Facility system Types of validation
  • 5. Pharmaceutical utility systems  Each pharmaceutical (but also cosmetics, food,chemical…) industry’s manufacturing process use several support system with different functions and distributed with centralized installations.  These systems are not necessarily designed and customized for users of a single production facility, but often serve an entire factory or part of it. Pharmaceutical utility systems Process waters Drinking and sanitary water Electric power Air conditioning (HVAC systems)
  • 6. What is HVAC? Heating, ventilation and air conditioning (HVAC) system  It is integral component of pharmaceutical facility functionality. The system is needed for maintenance of a suitable temperature, for continuous flow of air, which ultimately prevents cross- contamination and accumulation of air and to ensure the cooling of air in the premises.
  • 7.
  • 8. Control airborne particles, dust and micro-organisms – Thru air filtration using high efficiency particulate air (HEPA) filters. Maintain space temperature - Temperature can affect production directly or indirectly by fostering the growth of microbial contaminants on workers. What can HVAC do?
  • 9. Maintain space moisture (Relative Humidity) – Humidity is controlled by cooling air to dew point temperatures or by using desiccant dehumidifiers. Humidity can affect the efficacy and stability of drugs and is sometimes important to effectively mould the tablets. Maintain room pressure (delta P) – Areas that must remain “cleaner” than surrounding areas must be kept under a “positive” pressurization, meaning that air flow must be from the “cleaner” area towards the adjoining space (through doors or other openings) to reduce the chance of airborne contamination. This is achieved by the HVAC system providing more air into the “cleaner” space than is mechanically removed from that same space.
  • 10. What HVAC can’t do? HVAC can not clean up the surfaces of a contaminated surfaces, room or equipment. HVAC can not compensate for workers who do not follow procedure. Impure air I m p u r e a i r Impure air
  • 11. WHAT IS CLEAN ROOM? • A room in which the concentration of air borne particle is controlled and which is constructed and used in a manner to minimize the introduction, generation and retention of particles inside the room and in which other relevant parameters. • e.g.. Temperature, humidity and pressure, are controlled as necessary. WHY CLEAN ROOM NECESSARY? It controls 3 types of contamination transfer • Air borne contamination • Direct contamination by personnel, equipment etc. • Contamination from fluids like cleaning fluids, solutions etc. • As airborne particulate are reduced, chances of particles entry in the process reduced. • Protects product, personnel & environment.
  • 12. HOW IT IS ACCOMPLISHED? • A clean room is continuously flushed with highly filtered air that is forced in through HEPA filters. TYPES OF CLEAN ROOMS Horizontal Clean Room • Horizontal Laminar flow (HEPA filters in a wall force clean air from one side of the room to other.) Vertical Clean Room • Vertical Laminar flow (HEPA filters on the ceiling push clean air down to the floor.) FOUR BASIC PRINCIPLES OF CLEANROOM • Not To Bring Any Dust • Not To Accumulate Any Dust • Not To Generate Any Dust • To Remove Any Dust Quickly
  • 13. A B F E D CG A. Fluorescent light standard, UV sterilization bulbs available B. HEPA fan/filter units provide laminar flow of micro-filtered air C. Minihelic gauge measures filter backpressure D. Stainless steel work surface (available with electropolishing) E. Variable-speed blower adjusts air speed to meet containment requirements F. Options include vacuum, DI water and gas utilities G. Status Indicator
  • 14.
  • 15. CONTAMINATION What are contaminants ? 1. Products or substances other than the product being manufactured. 2. Foreign products. 3. Particulate matter. 4. Micro-organisms. 5. Endotoxins (degraded micro-organisms). Cross-Contamination From where does Cross-Contamination originate? 1. Poorly designed air handling systems and dust extraction systems. 2. Poorly operated and maintained air handling systems and dust extraction systems. 3. Inadequate procedures for personnel and equipment.
  • 16. HVAC consists of 1. Air conditioner 2. AHUs (air handling unit) 3. Dehumidifier / Heater 4. Filters (Pre & HEPA) 5. Dust Extractors 6. Ducting (For delivery of controlled air) 7. Supply Fans 8. Dampers 9. Humidity / Temperature / Pressure sensors 10.Mixer 11. Heating / Cooling Coils
  • 19. Airflow Pattern There are three different types of airflow patterns available for cleanrooms designs: Unidirectional (laminar): The airflow is essentially where the air flows downwards or sideways in an unimpeded path.
  • 20. Non-unidirectional flow (turbulent flow): where air streams are other than parallel to one another. Mixed flow: where airstreams may be parallel in one part of the cleanroom and not in other parts.
  • 21. HVAC QUALIFICATION • To ensure that equipment is designed as per requirement, installed properly. • Action of proving that any equipment works correctly and leads to the expected results.
  • 22. USER REQUIREMENT SPECIFICATION Customer of the equipment has certain expectations about the equipment which he wants to use. Some of the general requirements may be stated in the form of certain parameters like: 1. Size of the equipment 2. Speed of the equipment 3. Effectiveness of the equipment 4. Availability of spares, change parts, and prompt services at reasonable cost 5. Ease of operation, cleaning, and maintenance 6. Low dust and sound generation 7. Lesser breakdowns 8. Materials of construction 9. Autocontrol system 10. Easy change over 11. Overall good construction and workmanship, etc.
  • 23. DESIGN QUALIFICATION • Based on the URS supplier designs the equipment-First step in the qualification of new HVAC systems. It must include 1. Functional Specification. 2. Technical / Performance specification for equipment. 3. Detailed Air Flow Schematics. 4. Detailed layout drawing of the system.
  • 24. IQ Should include:-  Instrumentation checked against current engineering drawings and specifications.  Properly served by the required utilities.  Verification of materials of construction.  Installation of equipment and with piping.  Calibration of measuring instruments.  Operation manuals and spare parts lists to assure the proper and continuous operation of the system.  Components are installed at specified location.
  • 25. IQ should provide documented evidence that the installation was complete and satisfactory. The purchase specifications, drawings, manuals, spare parts lists, and vendor details should be verified during IQ.
  • 26. The purpose of OQ is to establish, through documented testing, that all critical components are capable of operating within established limits and tolerances. Operation Qualification Checks Ability to provide air of sufficient quality and quantity to ensure achievement of specified clean room conditions. Ability to maintain temperature, relative humidity and pressure set points. Ability to maintain any critical parameters stated in the DQ consistently. Includes the tests that have been developed from knowledge of processes, systems and equipment.
  • 27. OQ protocols to be written and approved prior to completion. It includes following: All relevant SOPs should be in place Temperature measurement report Humidity measurement report Differential pressure measurement report Air flow direction measurement report Room particle count measurement report All maintenance/ cleaning instructions available
  • 28. • The purpose of PQ is to verify and document that an HVAC system provides acceptable control under ‘ Full Operational ‘ conditions. • PQ should follow successful completion of IQ and OQ. • PQ verifies that the critical parameters, as defined in the DQ are being achieved. PQ Should include • Test to include a condition or set of conditions encompassing upper and lower operating limits. • Tests should be conducted under “in use”, condition either or simulated as close as possible to the actual process • PQ is used to demonstrate consistent achievement of critical parameters over time. ( under manufacturing conditions) • Any changes to the HVAC system should be revalidated before proceeding to the PQ phase.
  • 29. VALIDATION • Document act of proving that any procedure, process, system / equipment actual leads to expected results. • To ensure that system provides continuously required environmental conditions VALIDATION PARAMETERS 1. Air flow measurement 2. Room air changes per hour. 3. Filter Integrity Testing (HEPA Leak test) 4. Pressure Differentials 5. Particulate count measurement 6. Recovery test 7. Temperature and Relative Humidity 8. Air Flow Pattern 9. Microbial Count
  • 30. Air Flow Pattern 1. Take the titanium tetra chloride stick. 2. Burn the stick. 3. Place the burning stick in front of running Air Handling Unit (AHU). 4. Observed the flow of air with the help of smock distribution in the room. 5. Make chart diagram of the flow of air in the room for each room. The distribution of smoke is observed. It should be uniform.
  • 31. Air flow velocity &Changes per hour For this test, the area of HVAC is divided into four hypothetical grids and the air velocity is measured at each grid and then the average air velocity (V) is calculated. Record the velocity readings taken at the center of the grids, and at the junction of dividing lines (center of HEPA Filter) .Calculate the Average Velocity as V = (V1+V2+V3+V4) 4 V = Velocity observed at each point Now calculate the area of the filter by multiplying the length and width of the filter in feet. l = length of HEPA filter w = width of HEPA filter A = l x w CLASS Number of Air Changes / Hour CLASS 100 NLT 250 CLASS 10 000 60 + 10 % CLASS 1 00 000 40 + 10 %
  • 32.  Calculate the total air volume per minute supplied in the clean room by the following formula: A = Area of HEPA filter in square feet V = Average air velocity in feet per minute T = A x V  Calculate the total air in the room multiplying the length, width and height of the room in feet. Volume = L x W x H  Now we can calculate the Air Changes per hour using the following formula: Air Changes per Hour = T X 60 Volume
  • 33. Filter Leak Test 1. Place the velometer at the front of AHU unit. 2. Check the velocity of air to the all corner of the AHU. 3. The air velocity should be within the higher limit of HEPA filter. 4. In case it is found to exceed the upper limit, a gas cut (silicon) is used to decrease the leakage. Thermal Anemometers Velometer Rotating Vanes
  • 34. Particles Count • Useful in detecting significant deviations in air cleanliness from qualified processing classifications • Immediate understanding of air quality can be realized • Useful as a tool for qualification and monitoring before /during and after operations On the air system before one hour of test operation. 1. Take the suitable particle counter and operate it to check the particles in the room at non working operation. 2. Collect the information from particle counter and fill them in the format. 3. Operate the particle counter when work is on progress in the area.The particles should be count when more than one hour work has been progressed in the area. Record the data in the format. 4. Operate the particle counter for all the room maintaining grade A, grade B, grade C & grade D.
  • 35. Acceptance Criteria: Clean room or clean zone shall meet the acceptance criteria for an air borne particulate as referred in standard ISO 14644-1. ISO 14644- 1 > 0.1 m (Particles / Mt3) > 0.2 m (Particles / Mt3) > 0.3 m (Particles / Mt3) > 0.5 m (Particles / Mt3) > 1.0 m (Particles / Mt3) > 5.0 m (Particles / Mt3) ISO 1 1 2 0 0 0 0 ISO 2 100 24 10 4 0 0 ISO 3 1 000 237 102 35 8 0 ISO 4 10 000 2 370 1 020 352 83 0 ISO 5 1 00 000 23 700 10 200 3 520 832 29 ISO 6 10 00 000 2 37 000 1 02 000 35 200 8 320 293 ISO 7 NA NA NA 3 52 000 83 200 2 930 ISO 8 NA NA NA 35 20 000 8 32 000 29 300 ISO 9 NA NA NA 3 52 00 000 83 20 000 2 93 000
  • 36. EU GGMP Static (at rest) Dynamic (in operation) > 0.5 m (Particles / Mt3) > 5.0 m (Particles / Mt3) > 0.5 m (Particles / Mt3) > 5.0 m (Particles / Mt3) GRADE A 3 500 1 3 500 1 GRADE B 3 500 1 3 50 000 2 000 GRADE C 3 50 000 2 000 35 00 000 20 000 GRADE D 35 00 000 20 000 Not defined Not defined GRADE E Not defined Not defined Not defined Not defined Cleanliness Class Verification (Non viable Particle Count) EU GMP
  • 38. Pressure Drop across the HEPA and Fine filters of Air Handling Unit Objective:  The purpose of this test is to check the Clogged or clean condition of the across HEPA filters, Fine Filter and Pre - filter, of the Air Handling Unit. Test Equipment:  Differential pressure Transmitter or Manometer Procedure for HEPA, Fine and Pre Filters: 1. Ensure that the differential pressure transmitter is connected to before the filter and after the filter. 2. Check the status of the filter whether the filter is in clean condition or Clogged condition. Acceptance Criteria: • HEPA, Pre and Fine filters should be in clean condition. Manometer Clogged filter
  • 39. Temperature and Relative Humidity Test Objective:  To demonstrate the ability of the HVAC system to provide temperature and Relative Humidity within the specified range. Test Equipment:  Temperature and Relative Humidity Sensor Display Unit for Temperature and Relative Humidity Procedure:  Observe the temperature and relative humidity through respective display unit wherever installed. Use Hygrometer to check the reading of Temperature and RH in other rooms.  Temperature and RH in the area to be checked and recorded in Static as well as Dynamic Condition. Static Condition:  In static condition all the machines shall be kept switched ‘OFF’. Only restricted man movement shall take place. Dynamic Condition:  In dynamic condition machines having maximum loads shall run and restricted man movement shall take place. Acceptance Criteria  Temperature and relative humidity should meet the requirement as specified in system specification. Hygro meter Hygro meter Sensor
  • 40. Sound level Test Objective: To verify that the sound level is in limit in the clean room area. Test Equipment: Sound Level Meter, duly calibrated with traceability to national / international standard. Procedure: Take the reading at 5 locations in the room and take the average of the sound in the unit of decibels. Acceptance Criteria: The clean room or clean zone shall meet the acceptance criteria for sound level as mentioned below. Sound Level Meter S. N Cleanliness Class Sound Level Limit ( db ) 1 Class 100 / ISO 5 NMT 60 2 Class 10, 000 / ISO 7 NMT 80 3 Class 1,00, 000 / ISO 8 NMT 80
  • 41. Air Borne Viable Particle Monitoring Objective:  To determine the air borne microbial contamination level in critical area. Air borne microbial count by settling plate exposure method:  Pre incubated SCDA Media plates shall be exposed in Locations mentioned for 4 hours and incubated for 48 hours at 30°C to 35°C followed by next 72 hours at 20°C to 25°C.Record the results in respective format. PDA plates shall be exposed weekly to monitor the fungal counts. SCDA plates shall be incubated once in fifteen days to monitor the anaerobic Microorganisms Acceptance Criteria:  All the Parameters performed in the area should meet the following requirements. Petri Dish
  • 42. • [Downloaded from http://www.asiapharmaceutics.info on Wednesday, October 01, 2014, IP: 223.30.225.254] || Click here to download free Android application for this journal • http://www.gmpua.com/CleanRoom/HVAC/Solid.pdf References • Validation in pharmaceutical industry concepts, approaches & guidelines by P.P.Sharma , 1st edition published by vandana publications PVT.LTD dehli (page no. 165- 191)