This document provides an update on construction projects underway at East View High School as part of the 2010 bond program for Georgetown Independent School District. It includes site plans and progress reports for additions including a new football field house, concession/restroom building, and grandstands. Substantial completion of the field house and concession building is scheduled for August 15, 2011, while the field and bleachers are scheduled to be completed by August 1 to allow student and staff use.
This presentation includes basic of PCOS their pathology and treatment and also Ayurveda correlation of PCOS and Ayurvedic line of treatment mentioned in classics.
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...Levi Shapiro
Letter from the Congress of the United States regarding Anti-Semitism sent June 3rd to MIT President Sally Kornbluth, MIT Corp Chair, Mark Gorenberg
Dear Dr. Kornbluth and Mr. Gorenberg,
The US House of Representatives is deeply concerned by ongoing and pervasive acts of antisemitic
harassment and intimidation at the Massachusetts Institute of Technology (MIT). Failing to act decisively to ensure a safe learning environment for all students would be a grave dereliction of your responsibilities as President of MIT and Chair of the MIT Corporation.
This Congress will not stand idly by and allow an environment hostile to Jewish students to persist. The House believes that your institution is in violation of Title VI of the Civil Rights Act, and the inability or
unwillingness to rectify this violation through action requires accountability.
Postsecondary education is a unique opportunity for students to learn and have their ideas and beliefs challenged. However, universities receiving hundreds of millions of federal funds annually have denied
students that opportunity and have been hijacked to become venues for the promotion of terrorism, antisemitic harassment and intimidation, unlawful encampments, and in some cases, assaults and riots.
The House of Representatives will not countenance the use of federal funds to indoctrinate students into hateful, antisemitic, anti-American supporters of terrorism. Investigations into campus antisemitism by the Committee on Education and the Workforce and the Committee on Ways and Means have been expanded into a Congress-wide probe across all relevant jurisdictions to address this national crisis. The undersigned Committees will conduct oversight into the use of federal funds at MIT and its learning environment under authorities granted to each Committee.
• The Committee on Education and the Workforce has been investigating your institution since December 7, 2023. The Committee has broad jurisdiction over postsecondary education, including its compliance with Title VI of the Civil Rights Act, campus safety concerns over disruptions to the learning environment, and the awarding of federal student aid under the Higher Education Act.
• The Committee on Oversight and Accountability is investigating the sources of funding and other support flowing to groups espousing pro-Hamas propaganda and engaged in antisemitic harassment and intimidation of students. The Committee on Oversight and Accountability is the principal oversight committee of the US House of Representatives and has broad authority to investigate “any matter” at “any time” under House Rule X.
• The Committee on Ways and Means has been investigating several universities since November 15, 2023, when the Committee held a hearing entitled From Ivory Towers to Dark Corners: Investigating the Nexus Between Antisemitism, Tax-Exempt Universities, and Terror Financing. The Committee followed the hearing with letters to those institutions on January 10, 202
Delivering Micro-Credentials in Technical and Vocational Education and TrainingAG2 Design
Explore how micro-credentials are transforming Technical and Vocational Education and Training (TVET) with this comprehensive slide deck. Discover what micro-credentials are, their importance in TVET, the advantages they offer, and the insights from industry experts. Additionally, learn about the top software applications available for creating and managing micro-credentials. This presentation also includes valuable resources and a discussion on the future of these specialised certifications.
For more detailed information on delivering micro-credentials in TVET, visit this https://tvettrainer.com/delivering-micro-credentials-in-tvet/
Unit 8 - Information and Communication Technology (Paper I).pdfThiyagu K
This slides describes the basic concepts of ICT, basics of Email, Emerging Technology and Digital Initiatives in Education. This presentations aligns with the UGC Paper I syllabus.
Acetabularia Information For Class 9 .docxvaibhavrinwa19
Acetabularia acetabulum is a single-celled green alga that in its vegetative state is morphologically differentiated into a basal rhizoid and an axially elongated stalk, which bears whorls of branching hairs. The single diploid nucleus resides in the rhizoid.
Normal Labour/ Stages of Labour/ Mechanism of LabourWasim Ak
Normal labor is also termed spontaneous labor, defined as the natural physiological process through which the fetus, placenta, and membranes are expelled from the uterus through the birth canal at term (37 to 42 weeks
2024.06.01 Introducing a competency framework for languag learning materials ...Sandy Millin
http://sandymillin.wordpress.com/iateflwebinar2024
Published classroom materials form the basis of syllabuses, drive teacher professional development, and have a potentially huge influence on learners, teachers and education systems. All teachers also create their own materials, whether a few sentences on a blackboard, a highly-structured fully-realised online course, or anything in between. Despite this, the knowledge and skills needed to create effective language learning materials are rarely part of teacher training, and are mostly learnt by trial and error.
Knowledge and skills frameworks, generally called competency frameworks, for ELT teachers, trainers and managers have existed for a few years now. However, until I created one for my MA dissertation, there wasn’t one drawing together what we need to know and do to be able to effectively produce language learning materials.
This webinar will introduce you to my framework, highlighting the key competencies I identified from my research. It will also show how anybody involved in language teaching (any language, not just English!), teacher training, managing schools or developing language learning materials can benefit from using the framework.
Biological screening of herbal drugs: Introduction and Need for
Phyto-Pharmacological Screening, New Strategies for evaluating
Natural Products, In vitro evaluation techniques for Antioxidants, Antimicrobial and Anticancer drugs. In vivo evaluation techniques
for Anti-inflammatory, Antiulcer, Anticancer, Wound healing, Antidiabetic, Hepatoprotective, Cardio protective, Diuretics and
Antifertility, Toxicity studies as per OECD guidelines
Thinking of getting a dog? Be aware that breeds like Pit Bulls, Rottweilers, and German Shepherds can be loyal and dangerous. Proper training and socialization are crucial to preventing aggressive behaviors. Ensure safety by understanding their needs and always supervising interactions. Stay safe, and enjoy your furry friends!
2. 2010 BOND PROGRAM UPDATE
TABLE OF CONTENTS
East View High School Phase 2 Additions, Package 1 3
East View High School Phase 2 Additions, Package 2 7
New Warehouse Facility 9
Annie Purl Elementary School Roof and HVAC Modifications 11
Georgetown High School Additions and Renovations 12
Huckabee
Georgetown Independent School District 2
3. 2010 BOND PROGRAM UPDATE General Contractor
EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 1
Contract Amount: $5,321,000
Mezzanine
Mechanical
Storage
Weight Room
Junior Varsity Football
Locker Room
Main
B Mech.
Elec.
Storage Meeting Room
D Office Training
C Stor.
Laundry
A
Head AV IDF
Coach Stor. Elec.
A. New Football Field House Secre-
Lockers Jan. Freshman Football
B. New Concession/Restroom Bldg Varsity Football Locker Room tary Coaches Locker Room
C. New Grandstands for 2,500
D. New Field Events
Site Plan Football Field House - Floor Plan
Mechanical Electrical
Storage
Storage Storage
Concession
Women Men
Ticket-
In Out
ing
In Out
Family
RR
Stadium Restroom/Concession - Floor Plan
Conceptual 3D Rendering
Huckabee
Georgetown Independent School District 3
4. 2010 BOND PROGRAM UPDATE General Contractor
EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 1
PROGRESS REPORT
MILESTONE DATES
Concession Building
• Foundation pad is complete Schematic Design Presentation November 11, 2010
• Under slab plumbing is 100 percent complete Architect Signs Documents November 24, 2010
• City of Georgetown inspected the plumbing on March 30 Pre-Proposal Meeting December 8, 2010
• Edge forms for foundation will begin April 11
Proposal Part A Due December 21, 2010
• Substantial completion is scheduled for August 15
Proposal Part B Due December 22, 2010
Field House Proposal Evaluations January 4, 2011
• Foundation pad is complete General Contractor Recommendation to School Board January 10, 2011
• Under slab plumbing began March 30. First Owner/CO Meeting February 15, 2011
• Edge forms for foundation will begin April 14 Construction Start Date February 18, 2011
• Substantial completion is scheduled for August 15
Building Permit Issued March 16, 2011
Substantial Completion (Field/Track and Bleachers) August 1, 2011
Field/Track and Bleachers
• Rough grading is 75 percent complete for the entire site Substantial Completion (Buildings) August 15, 2011
• Carter Construction is scheduled to begin construction of the track
and field in two weeks
• Southern Bleachers is scheduled to begin drilling piers for the
structural columns that support the metal bleachers.
• Substantial completion is scheduled for August 1. Students and
staff may begin using the track and field on this day.
Huckabee
Georgetown Independent School District 4
5. 2010 BOND PROGRAM UPDATE
EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 1
Field House Building Pad Rough Grading at Main Drive and Parking Lot
Under Slab Plumbing at Concession Building Under Slab Plumbing at Concession Building
Huckabee
Georgetown Independent School District 5
6. 2010 BOND PROGRAM UPDATE
EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 1
Discus and Shot Put Rough Grading at Track and Field
Rock Excavation near Concession Building
Huckabee
Georgetown Independent School District 6
7. 2010 BOND PROGRAM UPDATE
EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 2
Budget Amount: $29,735,120
I
New Athletic Addition
I
J
H
H
F
G J
H
J
First Floor
Bid Package 1
A
B J
Existing East View
J High School B
A. New Athletic Addition
B. New Fine Arts Addition New Fine Arts Addition
D
E C. New Academic Addition
C
D. New CTE Building
New Academic Addition
E. New ROTC Addition (Alt.)
CR
10 F. New Tennis Courts
4
ay
29 G. New Tennis Building
hw
Hig H. New Baseball/Softball Fieldhouse,
Bleachers, Lighting & Pressbox
I. New Practice Fields
J. New Parking (1,070 spaces)
New Academic Addition
CTE Building
New CTE Addition
Second Floor
Academic Wing Softball Field House Huckabee
Georgetown Independent School District 7
8. 2010 BOND PROGRAM UPDATE
EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 2
PROGRESS REPORT
MILESTONE DATES
Schematic Design Presentation January 1, 2011
Architect Signs Documents March 8, 2011
Building Permit Application Submittal March 15, 2011
Site Plan Application Submittal March 17, 2011
Pre-Proposal Meeting March 22, 2011
Tour with General Contractors at East View Ninth Grade Center March 30, 2011
Proposal Part A Due April 5, 2011
Proposal Part B Due April 6, 2011
Proposal Evaluations April 7, 2011
General Contractor Recommendation to School Board April 18, 2011
First Owner/CO Meeting TBD
Construction Start Date April 25, 2011
Substantial Completion June 27, 2012
Huckabee
Georgetown Independent School District 8
9. 2010 BOND PROGRAM UPDATE General Contractor
NEW WAREHOUSE FACILITY
Contract Amount: $641,000
Shed
Existing Support Services
ALTERNATE #2
Warehouse Shop - Floor Plan
Facility
ALTERNATE #1
Warehouse Facility - Floor Plan
Existing Bus Wash Bay
Site Plan Huckabee
Georgetown Independent School District
Georgetown Independent School District 9
9
10. 2010 BOND PROGRAM UPDATE General Contractor
NEW WAREHOUSE FACILITY
PROGRESS REPORT
MILESTONE DATES
Schematic Design Presentation January 10, 2011
Architect Signs Documents January 12, 2011
Building Permit Application Submittal January 25, 2011
Proposal Part A Due February 15, 2011
Proposal Part B Due February 16, 2011
Site Plan Application Submittal February 17, 2011
Proposal Evaluations February 17, 2011
School Board Selects CSS, Inc. as General Contractor March 7, 2011
Job Coordination Meeting March 25, 2011
Construction Start Date April 5, 2011
Substantial Completion August 12, 2011
Huckabee
Georgetown Independent School District 10
11. 2010 BOND PROGRAM UPDATE General Contractor
ANNIE PURL ELEMENTARY SCHOOL ROOF AND HVAC MODIFICATIONS
Contract Amount: $229,000
MILESTONE DATES
Schematic Design Presentation January 10, 2011
Architect Signs Documents February 3, 2011
A
Pre-Proposal Meeting February 9, 2011
B B
HVAC Unit HVAC Unit
Proposal Part A Due February 22, 2011
Proposal Part B Due February 23, 2011
Proposal Evaluations February 24, 2011
School Board Selects Saratoga as General Contractor March 7, 2011
First Owner/CO Meeting TBD
A. Replace Roof
B. New HVAC Units Construction Start Date June 6, 2011
A A C. New Metal Coping on Parapets
D. New Gutter and Downspouts Substantial Completion August 12, 2011
C
B
HVAC Unit D
A
Roof Plan
Huckabee
Georgetown Independent School District 11
12. 2010 BOND PROGRAM UPDATE
GEORGETOWN HIGH SCHOOL ADDITIONS AND RENOVATIONS
Conceptual Floor Plan
Huckabee
Georgetown Independent School District 12
13. 2010 BOND PROGRAM UPDATE
GEORGETOWN HIGH SCHOOL ADDITIONS AND RENOVATIONS
MILESTONE DATES
Design Kick-off Meeting with Librarian, Science Dept.
February 28, 2011
and Nurse
Design Kick-off Meeting with Athletics March 1, 2011
Initial Construction Phasing with Stakeholders March 3, 2011
Design Kick-off Meeting with Special Education March 4, 2011
Design Kick-off Meeting with Administration March 10, 2011
Advertisement for Construction Manager at Risk RFQ March 12, 2011
Received Construction Manager at Risk Step 1
March 29, 2011
(Qualifications)
Evaluation Team Grades and Develops Recommended
March 30, 2011
Short List
School Board Receives Recommended Short List April 4, 2011
Step 2 of RFQ Submitted to Short Listed Contractors
April 5, 2011
(Fees and General Conditions)
Fees and General Conditions due by 3 PM April 8, 2011
Board of Trustees Interview and Select Construction
March 1, 2011
Manager at Risk
Schematic Design Presentation May 2, 2011
Architect Signs Documents August 11, 2011
First Owner/CO Meeting TBD
Construction Start Date October 2011
Substantial Completion July 2013
Huckabee
Georgetown Independent School District 13