This document provides an update on construction projects for Georgetown ISD's 2010 bond program. It outlines progress on the first package of additions to East View High School, including meeting dates and construction milestones. It also outlines the scope of a second package of additions to East View High School, including new athletic, fine arts, academic, and career and technical education buildings, as well as new tennis courts, parking, and athletic facilities. Finally, it briefly mentions roof and HVAC modifications planned for Annie Purl Elementary School and additions and renovations for Georgetown High School.
Acetabularia Information For Class 9 .docxvaibhavrinwa19
Acetabularia acetabulum is a single-celled green alga that in its vegetative state is morphologically differentiated into a basal rhizoid and an axially elongated stalk, which bears whorls of branching hairs. The single diploid nucleus resides in the rhizoid.
Acetabularia Information For Class 9 .docxvaibhavrinwa19
Acetabularia acetabulum is a single-celled green alga that in its vegetative state is morphologically differentiated into a basal rhizoid and an axially elongated stalk, which bears whorls of branching hairs. The single diploid nucleus resides in the rhizoid.
2024.06.01 Introducing a competency framework for languag learning materials ...Sandy Millin
http://sandymillin.wordpress.com/iateflwebinar2024
Published classroom materials form the basis of syllabuses, drive teacher professional development, and have a potentially huge influence on learners, teachers and education systems. All teachers also create their own materials, whether a few sentences on a blackboard, a highly-structured fully-realised online course, or anything in between. Despite this, the knowledge and skills needed to create effective language learning materials are rarely part of teacher training, and are mostly learnt by trial and error.
Knowledge and skills frameworks, generally called competency frameworks, for ELT teachers, trainers and managers have existed for a few years now. However, until I created one for my MA dissertation, there wasn’t one drawing together what we need to know and do to be able to effectively produce language learning materials.
This webinar will introduce you to my framework, highlighting the key competencies I identified from my research. It will also show how anybody involved in language teaching (any language, not just English!), teacher training, managing schools or developing language learning materials can benefit from using the framework.
A workshop hosted by the South African Journal of Science aimed at postgraduate students and early career researchers with little or no experience in writing and publishing journal articles.
Safalta Digital marketing institute in Noida, provide complete applications that encompass a huge range of virtual advertising and marketing additives, which includes search engine optimization, virtual communication advertising, pay-per-click on marketing, content material advertising, internet analytics, and greater. These university courses are designed for students who possess a comprehensive understanding of virtual marketing strategies and attributes.Safalta Digital Marketing Institute in Noida is a first choice for young individuals or students who are looking to start their careers in the field of digital advertising. The institute gives specialized courses designed and certification.
for beginners, providing thorough training in areas such as SEO, digital communication marketing, and PPC training in Noida. After finishing the program, students receive the certifications recognised by top different universitie, setting a strong foundation for a successful career in digital marketing.
The simplified electron and muon model, Oscillating Spacetime: The Foundation...RitikBhardwaj56
Discover the Simplified Electron and Muon Model: A New Wave-Based Approach to Understanding Particles delves into a groundbreaking theory that presents electrons and muons as rotating soliton waves within oscillating spacetime. Geared towards students, researchers, and science buffs, this book breaks down complex ideas into simple explanations. It covers topics such as electron waves, temporal dynamics, and the implications of this model on particle physics. With clear illustrations and easy-to-follow explanations, readers will gain a new outlook on the universe's fundamental nature.
Unit 8 - Information and Communication Technology (Paper I).pdfThiyagu K
This slides describes the basic concepts of ICT, basics of Email, Emerging Technology and Digital Initiatives in Education. This presentations aligns with the UGC Paper I syllabus.
Thinking of getting a dog? Be aware that breeds like Pit Bulls, Rottweilers, and German Shepherds can be loyal and dangerous. Proper training and socialization are crucial to preventing aggressive behaviors. Ensure safety by understanding their needs and always supervising interactions. Stay safe, and enjoy your furry friends!
How to Add Chatter in the odoo 17 ERP ModuleCeline George
In Odoo, the chatter is like a chat tool that helps you work together on records. You can leave notes and track things, making it easier to talk with your team and partners. Inside chatter, all communication history, activity, and changes will be displayed.
This presentation includes basic of PCOS their pathology and treatment and also Ayurveda correlation of PCOS and Ayurvedic line of treatment mentioned in classics.
2. 2010 BOND PROGRAM UPDATE
TABLE OF CONTENTS
East View High School Phase 2 Additions, Package 1 3
East View High School Phase 2 Additions, Package 2 4
New Warehouse Facility 8
Annie Purl Elementary School Roof and HVAC Modifications 9
Georgetown High School Additions and Renovations 10
Huckabee
Georgetown Independent School District 2
3. 2010 BOND PROGRAM UPDATE General Contractor
EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 1
PROGRESS REPORT
MILESTONE DATES
Schematic Design Presentation November 11, 2010
Architect Signs Documents November 24, 2010
Pre-Proposal Meeting December 8, 2010
Proposal Part A Due December 21, 2010
Proposal Part B Due December 22, 2010
Proposal Evaluations January 4, 2011
General Contractor Recommendation to School Board January 10, 2011
First Owner/CO Meeting February 15, 2011
Field House Locker Room
Construction Start Date February 18, 2011
Building Permit Issued March 16, 2011
Owner, Architect and Contractor Meeting June 7, 2011
Owner, Architect and Contractor Meeting June 21, 2011
Owner, Architect and Contractor Meeting July 5, 2011
Owner, Architect and Contractor Meeting July 19, 2011
Substantial Completion (Field/Track and Bleachers) August 1, 2011
Owner, Architect and Contractor Meeting August 2, 2011
Owner, Architect and Contractor Meeting August 16, 2011
Substantial Completion (Buildings) August 19, 2011
Field House Weight Room
Huckabee
Georgetown Independent School District 3
4. 2010 BOND PROGRAM UPDATE General Contractor
EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 2
Original: $25,574,000
I
CATE Addition – $2,121,338
I
J
Baseball & Softball Turf - $880,000 New Athletic Addition
H
H Total - $28,575,338
F
G J
H
J
First Floor
Bid Package 1
A
B J
Existing East View
J High School B
A. New Athletic Addition
B. New Fine Arts Addition New Fine Arts Addition
D
E C. New Academic Addition
C
D. New CTE Building
New Academic Addition
E. New ROTC Addition (Alt.)
CR
10 F. New Tennis Courts
4
ay
29 G. New Tennis Building
hw
Hig H. New Baseball/Softball Fieldhouse,
Bleachers, Lighting & Pressbox
I. New Practice Fields
J. New Parking (1,070 spaces)
New Academic Addition
CTE Building
Second Floor New CTE/ROTC Addition
Academic Wing Softball Field House Huckabee
Georgetown Independent School District 4
5. 2010 BOND PROGRAM UPDATE
EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 2
PROGRESS REPORT
ACADEMIC ADDITION MILESTONE DATES
• Steel structure is making progress.
• Overhead utility lines and CMU walls have begun. Schematic Design Presentation January 1, 2011
• 2nd floor slab will begin the end of this week.
Architect Signs Documents March 8, 2011
CATE/ROTC Building Permit Application Submittal March 15, 2011
• Underground plumbing and electrical utilities are making progress.
• Slab work will resume in January. Site Plan Application Submittal March 17, 2011
• After slab work is complete and metal building has arrived, steel structure will begin.
Pre-Proposal Meeting March 22, 2011
ATHLETIC ADDITION Tour with General Contractors at East View Ninth Grade Center March 30, 2011
• CMU wall along the existing building is complete.
• Steel structure has begun at the locker room area. The gym area will be started after the locker room Proposal Part A Due April 7, 2011
area is complete.
Proposal Part B Due April 8, 2011
• CMU walls will begin next.
Proposal Evaluations April 11, 2011
FINE ARTS ADDITION – DRAMA
• Steel structure and roof structure are complete. Concrete slabs are complete. Received City Building Dept. Plan Review Comments April 14, 2011
• Overhead utility lines have begun.
General Contractor Recommendation to School Board April 18, 2011
• Metal decking and roofing will begin next.
Received City Planning Dept. Plan Review Comments April 25, 2011
FINE ARTS ADDITION – ORCHESTRA
• CMU walls are complete. Construction Start Date May 19, 2011
• Interior metal stud framing has begun.
First Owner/CO Meeting May 24, 2011
• Roofing has begun.
Building Permit Issued June 1, 2011
BASEBALL, SOFTBALL, TENNIS AND SITE
• CMU walls at field house are nearly complete. Mezzanine slab is in place. Owner, Architect and Contractor Meeting November 8, 2011
• CMU walls have been started at each press box. Roofs for press boxes, dugouts, and tennis building
Owner, Architect and Contractor Meeting November 15, 2011
will begin this week.
• Fencing and netting is being installed around the fields. Grading at both fields is making progress. Owner, Architect and Contractor Meeting November 22, 2011
• Grandstands will arrive mid-December and are scheduled to be completed by the end of December.
• Cutting and grading of parking lots and drives continues. Concrete walks will begin this week. Owner, Architect and Contractor Meeting November 29, 2011
• Grading and cutting for the tennis courts has been started.
Substantial Completion June 27, 2012
Huckabee
Georgetown Independent School District 5
6. 2010 BOND PROGRAM UPDATE
EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 2
Academic Addition Locker Rooms
Interior View of Orchestra Baseball Field
Huckabee
Georgetown Independent School District 6
7. 2010 BOND PROGRAM UPDATE
EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 2
Aerial
Huckabee
Georgetown Independent School District 7
8. 2010 BOND PROGRAM UPDATE General Contractor
NEW WAREHOUSE FACILITY
PROGRESS REPORT
MILESTONE DATES
Schematic Design Presentation January 10, 2011
Architect Signs Documents January 12, 2011
Building Permit Application Submittal January 25, 2011
Proposal Part A Due February 15, 2011
Proposal Part B Due February 16, 2011
Site Plan Application Submittal February 17, 2011
Proposal Evaluations February 17, 2011
Landscaping Plans Approved March 1, 2011
Interior View of Warehouse
General Contractor Recommendation to School Board March 7, 2011
Job Coordination Meeting March 25, 2011
Grading/Utilities Permit Received March 31, 2011
First Amended Administrative Exception Submitted April 18, 2011
Second Amended Administrative Exception Submitted April 20, 2011
Final Planning Dept. Comments Received April 25, 2011
Building Permit Issued April 28, 2011
First Owner/CO Meeting May 5, 2011
Construction Start Date May 9, 2011
Substantial Completion November 9, 2011
Storage Shed
Huckabee
Georgetown Independent School District 8
9. 2010 BOND PROGRAM UPDATE General Contractor
ANNIE PURL ELEMENTARY SCHOOL ROOF AND HVAC MODIFICATIONS
Contract Amount: $229,000
MILESTONE DATES
Schematic Design Presentation January 10, 2011
Architect Signs Documents February 3, 2011
Pre-Proposal Meeting February 9, 2011
Proposal Part A Due February 22, 2011
Proposal Part B Due February 23, 2011
Proposal Evaluations February 24, 2011
Building Permit Issued March 2, 2011
General Contractor Recommended to School Board March 7, 2011
New HVAC Unit and Roofing
First Owner/CO Meeting May 24, 2011
Construction Start Date June 6, 2011
Substantial Completion August 12, 2011
New Ceiling and Light Fixtures
Huckabee
Georgetown Independent School District 9
10. 2010 BOND PROGRAM UPDATE Construction Manager
GEORGETOWN HIGH SCHOOL ADDITIONS AND RENOVATIONS
BAIRD WILLIAMS
Huckabee CONSTRUCTION
GEORGETOWN HIGH SCHOOL
BAIRD WILLIAMS
CONSTRUCTION
3D Rendering Project Manager
Front Entry
Boards.indd 4 7/26/11 8:55 AM
CTE Wing
Cafeteria
Athletics
Auditorium
Academic Athletics Athletics
Computer
Labs
Science
Labs
Library
Athletics
Special Education Academic
Fine
Arts
Huckabee
Georgetown Independent School District 10
11. 2010 BOND PROGRAM UPDATE
GEORGETOWN HIGH SCHOOL ADDITIONS AND RENOVATIONS
MILESTONE DATES MILESTONE DATES
Design Kick-off Meeting with Librarian, Science Dept. Material selection with GHS staff June 30, 2011
February 28, 2011
and Nurse Cost Review with Construction Manager July 19, 2011
Design Kick-off Meeting with Athletics March 1, 2011
Interiors Presentation July 25, 2011
Initial Construction Phasing with Stakeholders March 3, 2011
Architect Signs Documents for Site Utility Package July 26, 2011
Design Kick-off Meeting with Special Education March 4, 2011 CD Coordination Meeting on Site with Architect, Owner
July 27, 2011
Design Kick-off Meeting with Administration March 10, 2011 and Construction Manager
Advertisement for Construction Manager at Risk RFQ March 12, 2011 Final Review of FF&E with GHS staff July 27, 2011
Received Construction Manager at Risk Step 1 City Comments Received for Site Utility package August 8, 2011
March 29, 2011
(Qualifications) 100 % CD Review August 15, 2011
Evaluation Team Grades and Develops Recommended Short List March 30, 2011
Site Utility Package Bid August 17, 2011
Facility Assessment of ADA, Code and Existing Conditions March 29 - 30, 2011
Review Comments Due August 22, 2011
School Board Receives Recommended Short List April 4, 2011
Guaranteed Maximum Price on Site Utility Package August 29, 2011
Step 2 of RFQ Submitted to Short Listed Contractors
April 5, 2011 Architect Signs Documents September 1, 2011
(Fees and General Conditions)
Pre-Bid September 21, 2011
Fees and General Conditions due by 3 PM April 8, 2011
Pre-Bid (Technology) September 23, 2011
Board of Trustees Select Construction Manager at Risk April 18, 2011
First Meeting with District, Architect, Project Manager and Bid October 4, 2011
April 19, 2011
Construction Manager Guaranteed Maximum Price Presented to School Board October 17, 2011
Site Logistics Survey with District, Architect, Project Manager and Construction Start Date October 18, 2011
April 29, 2011
Construction Manager
Owner, Architect and Contractor Meeting November 10, 2011
Schematic Design Presentation June 6, 2011
Owner, Architect and Contractor Meeting November 17, 2011
Kitchen Design Review with Staff June 14, 2011
Owner, Architect and Contractor Meeting December 1, 2011
Site Coordination Meeting with Architect, Owner and
June 16, 2011 Substantial Completion July 2013
Construction Manager
Huckabee
Georgetown Independent School District 11
12. 2010 BOND PROGRAM UPDATE
GEORGETOWN HIGH SCHOOL ADDITIONS AND RENOVATIONS
SITE UTILITY PACKAGE – PHASE I
• Existing canopy and sidewalks have been removed.
• Sewer and storm drain main lines are complete around the cafeteria and
athletics additions.
• Final grade has been made on the building pad for the cafeteria and
athletic additions.
• Under-pad utilities and grade beam excavation will begin next.
• Interior demolition will begin during the Christmas break.
Site
Transformer and Pad
Huckabee
Georgetown Independent School District 12