SlideShare a Scribd company logo
GEORGETOWN ISD
2010 BOND PROGRAM UPDATE




      J A N UA R Y 2 01 2
                            Huckabee
2010 BOND PROGRAM UPDATE




                                                      TABLE OF CONTENTS

                               East View High School Phase 2 Additions, Package 2    3

                               Georgetown High School Additions and Renovations      7

                               Completed Projects                                   10




                                                                                         Huckabee
Georgetown Independent School District                                                          2
2010 BOND PROGRAM UPDATE                                                                                                                General Contractor




                                                     EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 2
                                                                                                                               Original: $25,574,000
                                         I
                                                                                                                            CATE Addition – $2,121,338
                                I
                                                             J
                                                                                                                         Baseball & Softball Turf - $880,000                                                                                           New Athletic Addition

                                                         H
                                                                     H                                                          Total - $28,575,338
                                                                                           F

                                                                                       G                 J
                                                                 H


                                                                                                                 J
                                                                                                                                                                                  First Floor
                Bid Package 1
                                                                                               A


                                                                                                    B                J
                                                                          Existing East View
                                                 J                           High School                     B
                                                                                                                              A. New Athletic Addition
                                                                                                                              B. New Fine Arts Addition                                                                                                     New Fine Arts Addition
                                                     D
                                                         E                                                                    C. New Academic Addition
                                                                 C
                                                                                                                              D. New CTE Building
                                                                                                                                                                     New Academic Addition
                                                                                                                              E. New ROTC Addition (Alt.)
                                    CR
                                         10                                                                                   F. New Tennis Courts
                                             4
                                                                                                 ay
                                                                                                    29                        G. New Tennis Building
                                                                                               hw
                                                                                        Hig                                   H. New Baseball/Softball Fieldhouse,
                                                                                                                                 Bleachers, Lighting & Pressbox
                                                                                                                              I. New Practice Fields
                                                                                                                              J. New Parking (1,070 spaces)




                                                                                                                                                                                                       New Academic Addition




                                                                         CTE Building


                                                                                                                                                                                             Second Floor                      New CTE/ROTC Addition




Academic Wing                                                            Softball Field House                                                                                                                                                Huckabee
Georgetown Independent School District                                                                                                                                                                                                                                         3
2010 BOND PROGRAM UPDATE


                                              EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 2
                                                                                                                MILESTONE DATES
  ACADEMIC ADDITION                                                           Schematic Design Presentation                                    January 1, 2011
      Steel structure placement and overhead MEP is ongoing.
                                                                              Architect Signs Documents                                        March 8, 2011
                                                                              Building Permit Application Submittal                            March 15, 2011
  CATE/ROTC
                                                                              Site Plan Application Submittal                                  March 17, 2011
                                                                              Pre-Proposal Meeting                                             March 22, 2011
  ATHLETIC ADDITION
                                                                              Tour with General Contractors at East View Ninth Grade Center    March 30, 2011
                                                                              Proposal Part A Due                                              April 7, 2011
  FINE ARTS ADDITION – DRAMA                                                  Proposal Part B Due                                              April 8, 2011
       Overhead MEP is ongoing.
                                                                              Proposal Evaluations                                             April 11, 2011
                                                                              Received City Building Dept. Plan Review Comments                April 14, 2011
  FINE ARTS ADDITION – ORCHESTRA
                                                                              General Contractor Recommendation to School Board                April 18, 2011
       Interior studs and sheetrock are complete.
                                                                              Received City Planning Dept. Plan Review Comments                April 25, 2011
                                                                              Construction Start Date                                          May 19, 2011
  BASEBALL, SOFTBALL, TENNIS AND SITE
                                                                              First Owner/CO Meeting                                           May 24, 2011
                                                                              Building Permit Issued                                           June 1, 2011
                                                                              Owner, Architect and Contractor Meeting                          December 6, 2011
                                                                              Owner, Architect and Contractor Meeting                          December 13, 2011
                                                                              Owner, Architect and Contractor Meeting                          December 20, 2011
                                                                              Owner, Architect and Contractor Meeting                          January 3, 2012
                                                                              Owner, Architect and Contractor Meeting                          January 10, 2012
                                                                              Substantial Completion                                           June 27, 2012

                                                                                                                                              Huckabee
Georgetown Independent School District                                                                                                                             4
2010 BOND PROGRAM UPDATE


                                EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 2




         Academic Addition - Interior View                   Gymnasium Addition




         Locker Room Addition                                Baseball Field
                                                                                     Huckabee
Georgetown Independent School District                                                      5
2010 BOND PROGRAM UPDATE


                           EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 2




                                         CATE/ROTC
                                   Academic
                                   Addition

                                                                                Courts
                                                                     Athletic
                                                                     Addition
                                                              FIne Arts
                                                              Addition




                                                     Aerial

                                                                                         Huckabee
Georgetown Independent School District                                                          6
2010 BOND PROGRAM UPDATE                                                     Construction Manager




                          GEORGETOWN HIGH SCHOOL ADDITIONS AND RENOVATIONS
                                                                                                                                         BAIRD WILLIAMS
                                                                                                                                         CONSTRUCTION

                                                                                                                                         Project Manager




                              CTE Wing




                                                       Cafeteria
                                                                                                                            Athletics
                                                                                                               Auditorium
                                            Academic                                 Athletics     Athletics
                                                                   Computer
                                                                     Labs
                              Science
                               Labs




                                          Library
                                                                                                                             Athletics
                      Special Education                                                          Academic



                                                                              Fine
                                                                              Arts

                                                                                                                                         Huckabee
Georgetown Independent School District                                                                                                                     7
2010 BOND PROGRAM UPDATE

                                   GEORGETOWN HIGH SCHOOL ADDITIONS AND RENOVATIONS
                                     MILESTONE DATES                                        MILESTONE DATES
                                                                                                                                                                  June 30, 2011
                                                                           February 28, 2011
     and Nurse                                                                                           Cost Review with Construction Manager                    July 19, 2011
                                                                           March 1, 2011
                                                                                                         Interiors Presentation                                   July 25, 2011
     Initial Construction Phasing with Stakeholders                        March 3, 2011
                                                                                                         Architect Signs Documents for Site Utility Package       July 26, 2011
                                                                           March 4, 2011                 CD Coordination Meeting on Site with Architect, Owner
                                                                                                                                                                  July 27, 2011
                                                                           March 10, 2011                and Construction Manager
     Advertisement for Construction Manager at Risk RFQ                    March 12, 2011                                                                         July 27, 2011
     Received Construction Manager at Risk Step 1                                                        City Comments Received for Site Utility package          August 8, 2011
                                                                           March 29, 2011
                                                                                                         Site Utility Package Bid                                 August 17, 2011
     Evaluation Team Grades and Develops Recommended Short List            March 30, 2011
                                                                                                         Guaranteed Maximum Price on Site Utility Package         August 29, 2011
     Facility Assessment of ADA, Code and Existing Conditions              March 29 - 30, 2011
                                                                                                         Architect Signs Documents                                September 1, 2011
     School Board Receives Recommended Short List                          April 4, 2011
                                                                                                         Pre-Bid                                                  September 21, 2011
     Step 2 of RFQ Submitted to Short Listed Contractors
                                                                           April 5, 2011                 Pre-Bid (Technology)                                     September 23, 2011
     (Fees and General Conditions)
                                                                                                         Bid                                                      October 4, 2011
     Fees and General Conditions due by 3 PM                               April 8, 2011
                                                                                                         Guaranteed Maximum Price Presented to School Board       October 17, 2011
     Board of Trustees Select Construction Manager at Risk                 April 18, 2011
     First Meeting with District, Architect, Project Manager and                                         Construction Start Date                                  October 18, 2011
                                                                           April 19, 2011
     Construction Manager                                                                                Owner, Architect and Contractor Meeting                  December 8, 2011
     Site Logistics Survey with District, Architect, Project Manager and                                 Owner, Architect and Contractor Meeting                  December 15, 2011
                                                                           April 29, 2011
     Construction Manager
                                                                                                         Owner, Architect and Contractor Meeting                  December 22, 2011
     Schematic Design Presentation                                         June 6, 2011
                                                                                                         Owner, Architect and Contractor Meeting                  December 29, 2011
                                                                           June 14, 2011
                                                                                                         Owner, Architect and Contractor Meeting                  January 5, 2012
     Site Coordination Meeting with Architect, Owner and
                                                                           June 16, 2011                 Substantial Completion                                   July 2013
     Construction Manager

                                                                                                                                                                 Huckabee
Georgetown Independent School District                                                                                                                                                 8
2010 BOND PROGRAM UPDATE


                        GEORGETOWN HIGH SCHOOL ADDITIONS AND RENOVATIONS

     PHASE I




                                                         Locker Room Addition




                                                         Cafeteria Addition
                                                                                Huckabee
Georgetown Independent School District                                                 9
2010 BOND PROGRAM UPDATE


                                                          COMPLETED PROJECTS

  EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS,                   NEW WAREHOUSE FACILITY                     ANNIE PURL ELEMENTARY SCHOOL
                  PACKAGE 1                                                                              ROOF AND HVAC MODIFICATION

           Contract Amount: $5,321,000                          Contract Amount: $641,000                     Contract Amount: $229,000
    Substantial Completion Date: August 19, 2011      Substantial Completion Date: November 9, 2011   Substantial Completion Date: August 12, 2011
        General Contractor: Charter Builders                   General Contractor: CSS, Inc.                  General Contractor: Saratoga




             Field House Locker Room                             Interior View of Warehouse                    New HVAC Unit and Roofing




             Field House Weight Room                                   Storage Shed                           New Ceiling and Light Fixtures

                                                                                                                                Huckabee
Georgetown Independent School District                                                                                                               10

More Related Content

More from Georgetown Independent School District

Georgetown ISD Financial Presentation June 2014
Georgetown ISD Financial Presentation June 2014Georgetown ISD Financial Presentation June 2014
Georgetown ISD Financial Presentation June 2014
Georgetown Independent School District
 
Georgetown ISD Elementary School #11
Georgetown ISD Elementary School #11Georgetown ISD Elementary School #11
Georgetown ISD Elementary School #11
Georgetown Independent School District
 
2013-2014 Budget Update Presentation
2013-2014 Budget Update Presentation2013-2014 Budget Update Presentation
2013-2014 Budget Update Presentation
Georgetown Independent School District
 
GISD Budget and Finance Overview 2012
GISD Budget and Finance Overview 2012GISD Budget and Finance Overview 2012
GISD Budget and Finance Overview 2012
Georgetown Independent School District
 
2012-2013 Elementary Scheduling
2012-2013 Elementary Scheduling2012-2013 Elementary Scheduling
2012-2013 Elementary Scheduling
Georgetown Independent School District
 
SHW Construction Update - April 2012
SHW Construction Update - April 2012SHW Construction Update - April 2012
SHW Construction Update - April 2012
Georgetown Independent School District
 
03-26-12 McCoy Project Update
03-26-12 McCoy Project Update03-26-12 McCoy Project Update
03-26-12 McCoy Project Update
Georgetown Independent School District
 
STAAR High School Presentation
STAAR High School PresentationSTAAR High School Presentation
STAAR High School Presentation
Georgetown Independent School District
 
STAAR Grade 3-8 Presentation
STAAR Grade 3-8 PresentationSTAAR Grade 3-8 Presentation
STAAR Grade 3-8 Presentation
Georgetown Independent School District
 
AYP 2010-2011 Presentation
AYP 2010-2011 PresentationAYP 2010-2011 Presentation
AYP 2010-2011 Presentation
Georgetown Independent School District
 
AEIS Report Presentation
AEIS Report PresentationAEIS Report Presentation
AEIS Report Presentation
Georgetown Independent School District
 
SHW Update 02-06-2012
SHW Update 02-06-2012SHW Update 02-06-2012
SHW Update 01-10-2012
SHW Update 01-10-2012SHW Update 01-10-2012
A Report to Citizens
A Report to CitizensA Report to Citizens

More from Georgetown Independent School District (20)

Financial Presentation July 2014
Financial Presentation July 2014Financial Presentation July 2014
Financial Presentation July 2014
 
Georgetown ISD Financial Presentation June 2014
Georgetown ISD Financial Presentation June 2014Georgetown ISD Financial Presentation June 2014
Georgetown ISD Financial Presentation June 2014
 
Georgetown ISD Elementary School #11
Georgetown ISD Elementary School #11Georgetown ISD Elementary School #11
Georgetown ISD Elementary School #11
 
2013-2014 Budget Update Presentation
2013-2014 Budget Update Presentation2013-2014 Budget Update Presentation
2013-2014 Budget Update Presentation
 
AEIS 2012 Georgetown ISD Presentation
AEIS 2012 Georgetown ISD PresentationAEIS 2012 Georgetown ISD Presentation
AEIS 2012 Georgetown ISD Presentation
 
AYP 2012 Georgetown ISD Presentation
AYP 2012 Georgetown ISD PresentationAYP 2012 Georgetown ISD Presentation
AYP 2012 Georgetown ISD Presentation
 
Huckabee Presentat
Huckabee PresentatHuckabee Presentat
Huckabee Presentat
 
Schools First Financial Reports
Schools First Financial ReportsSchools First Financial Reports
Schools First Financial Reports
 
Tax Ratification Election Presentation
Tax Ratification Election PresentationTax Ratification Election Presentation
Tax Ratification Election Presentation
 
GISD Budget and Finance Overview 2012
GISD Budget and Finance Overview 2012GISD Budget and Finance Overview 2012
GISD Budget and Finance Overview 2012
 
2012-2013 Elementary Scheduling
2012-2013 Elementary Scheduling2012-2013 Elementary Scheduling
2012-2013 Elementary Scheduling
 
SHW Construction Update - April 2012
SHW Construction Update - April 2012SHW Construction Update - April 2012
SHW Construction Update - April 2012
 
03-26-12 McCoy Project Update
03-26-12 McCoy Project Update03-26-12 McCoy Project Update
03-26-12 McCoy Project Update
 
STAAR High School Presentation
STAAR High School PresentationSTAAR High School Presentation
STAAR High School Presentation
 
STAAR Grade 3-8 Presentation
STAAR Grade 3-8 PresentationSTAAR Grade 3-8 Presentation
STAAR Grade 3-8 Presentation
 
AYP 2010-2011 Presentation
AYP 2010-2011 PresentationAYP 2010-2011 Presentation
AYP 2010-2011 Presentation
 
AEIS Report Presentation
AEIS Report PresentationAEIS Report Presentation
AEIS Report Presentation
 
SHW Update 02-06-2012
SHW Update 02-06-2012SHW Update 02-06-2012
SHW Update 02-06-2012
 
SHW Update 01-10-2012
SHW Update 01-10-2012SHW Update 01-10-2012
SHW Update 01-10-2012
 
A Report to Citizens
A Report to CitizensA Report to Citizens
A Report to Citizens
 

Recently uploaded

Advantages and Disadvantages of CMS from an SEO Perspective
Advantages and Disadvantages of CMS from an SEO PerspectiveAdvantages and Disadvantages of CMS from an SEO Perspective
Advantages and Disadvantages of CMS from an SEO Perspective
Krisztián Száraz
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
MysoreMuleSoftMeetup
 
Top five deadliest dog breeds in America
Top five deadliest dog breeds in AmericaTop five deadliest dog breeds in America
Top five deadliest dog breeds in America
Bisnar Chase Personal Injury Attorneys
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
Best Digital Marketing Institute In NOIDA
Best Digital Marketing Institute In NOIDABest Digital Marketing Institute In NOIDA
Best Digital Marketing Institute In NOIDA
deeptiverma2406
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
Ashokrao Mane college of Pharmacy Peth-Vadgaon
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 
Delivering Micro-Credentials in Technical and Vocational Education and Training
Delivering Micro-Credentials in Technical and Vocational Education and TrainingDelivering Micro-Credentials in Technical and Vocational Education and Training
Delivering Micro-Credentials in Technical and Vocational Education and Training
AG2 Design
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
vaibhavrinwa19
 
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat  Leveraging AI for Diversity, Equity, and InclusionExecutive Directors Chat  Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
TechSoup
 
Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
amberjdewit93
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
EugeneSaldivar
 
How to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold MethodHow to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold Method
Celine George
 
PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
AyyanKhan40
 
Aficamten in HCM (SEQUOIA HCM TRIAL 2024)
Aficamten in HCM (SEQUOIA HCM TRIAL 2024)Aficamten in HCM (SEQUOIA HCM TRIAL 2024)
Aficamten in HCM (SEQUOIA HCM TRIAL 2024)
Ashish Kohli
 
DRUGS AND ITS classification slide share
DRUGS AND ITS classification slide shareDRUGS AND ITS classification slide share
DRUGS AND ITS classification slide share
taiba qazi
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 

Recently uploaded (20)

Advantages and Disadvantages of CMS from an SEO Perspective
Advantages and Disadvantages of CMS from an SEO PerspectiveAdvantages and Disadvantages of CMS from an SEO Perspective
Advantages and Disadvantages of CMS from an SEO Perspective
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
 
Top five deadliest dog breeds in America
Top five deadliest dog breeds in AmericaTop five deadliest dog breeds in America
Top five deadliest dog breeds in America
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
Best Digital Marketing Institute In NOIDA
Best Digital Marketing Institute In NOIDABest Digital Marketing Institute In NOIDA
Best Digital Marketing Institute In NOIDA
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 
Delivering Micro-Credentials in Technical and Vocational Education and Training
Delivering Micro-Credentials in Technical and Vocational Education and TrainingDelivering Micro-Credentials in Technical and Vocational Education and Training
Delivering Micro-Credentials in Technical and Vocational Education and Training
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
 
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat  Leveraging AI for Diversity, Equity, and InclusionExecutive Directors Chat  Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
 
Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
 
How to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold MethodHow to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold Method
 
PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
 
Aficamten in HCM (SEQUOIA HCM TRIAL 2024)
Aficamten in HCM (SEQUOIA HCM TRIAL 2024)Aficamten in HCM (SEQUOIA HCM TRIAL 2024)
Aficamten in HCM (SEQUOIA HCM TRIAL 2024)
 
DRUGS AND ITS classification slide share
DRUGS AND ITS classification slide shareDRUGS AND ITS classification slide share
DRUGS AND ITS classification slide share
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 

Huckabee Update 01-10-2012

  • 1. GEORGETOWN ISD 2010 BOND PROGRAM UPDATE J A N UA R Y 2 01 2 Huckabee
  • 2. 2010 BOND PROGRAM UPDATE TABLE OF CONTENTS East View High School Phase 2 Additions, Package 2 3 Georgetown High School Additions and Renovations 7 Completed Projects 10 Huckabee Georgetown Independent School District 2
  • 3. 2010 BOND PROGRAM UPDATE General Contractor EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 2 Original: $25,574,000 I CATE Addition – $2,121,338 I J Baseball & Softball Turf - $880,000 New Athletic Addition H H Total - $28,575,338 F G J H J First Floor Bid Package 1 A B J Existing East View J High School B A. New Athletic Addition B. New Fine Arts Addition New Fine Arts Addition D E C. New Academic Addition C D. New CTE Building New Academic Addition E. New ROTC Addition (Alt.) CR 10 F. New Tennis Courts 4 ay 29 G. New Tennis Building hw Hig H. New Baseball/Softball Fieldhouse, Bleachers, Lighting & Pressbox I. New Practice Fields J. New Parking (1,070 spaces) New Academic Addition CTE Building Second Floor New CTE/ROTC Addition Academic Wing Softball Field House Huckabee Georgetown Independent School District 3
  • 4. 2010 BOND PROGRAM UPDATE EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 2 MILESTONE DATES ACADEMIC ADDITION Schematic Design Presentation January 1, 2011 Steel structure placement and overhead MEP is ongoing. Architect Signs Documents March 8, 2011 Building Permit Application Submittal March 15, 2011 CATE/ROTC Site Plan Application Submittal March 17, 2011 Pre-Proposal Meeting March 22, 2011 ATHLETIC ADDITION Tour with General Contractors at East View Ninth Grade Center March 30, 2011 Proposal Part A Due April 7, 2011 FINE ARTS ADDITION – DRAMA Proposal Part B Due April 8, 2011 Overhead MEP is ongoing. Proposal Evaluations April 11, 2011 Received City Building Dept. Plan Review Comments April 14, 2011 FINE ARTS ADDITION – ORCHESTRA General Contractor Recommendation to School Board April 18, 2011 Interior studs and sheetrock are complete. Received City Planning Dept. Plan Review Comments April 25, 2011 Construction Start Date May 19, 2011 BASEBALL, SOFTBALL, TENNIS AND SITE First Owner/CO Meeting May 24, 2011 Building Permit Issued June 1, 2011 Owner, Architect and Contractor Meeting December 6, 2011 Owner, Architect and Contractor Meeting December 13, 2011 Owner, Architect and Contractor Meeting December 20, 2011 Owner, Architect and Contractor Meeting January 3, 2012 Owner, Architect and Contractor Meeting January 10, 2012 Substantial Completion June 27, 2012 Huckabee Georgetown Independent School District 4
  • 5. 2010 BOND PROGRAM UPDATE EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 2 Academic Addition - Interior View Gymnasium Addition Locker Room Addition Baseball Field Huckabee Georgetown Independent School District 5
  • 6. 2010 BOND PROGRAM UPDATE EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 2 CATE/ROTC Academic Addition Courts Athletic Addition FIne Arts Addition Aerial Huckabee Georgetown Independent School District 6
  • 7. 2010 BOND PROGRAM UPDATE Construction Manager GEORGETOWN HIGH SCHOOL ADDITIONS AND RENOVATIONS BAIRD WILLIAMS CONSTRUCTION Project Manager CTE Wing Cafeteria Athletics Auditorium Academic Athletics Athletics Computer Labs Science Labs Library Athletics Special Education Academic Fine Arts Huckabee Georgetown Independent School District 7
  • 8. 2010 BOND PROGRAM UPDATE GEORGETOWN HIGH SCHOOL ADDITIONS AND RENOVATIONS MILESTONE DATES MILESTONE DATES June 30, 2011 February 28, 2011 and Nurse Cost Review with Construction Manager July 19, 2011 March 1, 2011 Interiors Presentation July 25, 2011 Initial Construction Phasing with Stakeholders March 3, 2011 Architect Signs Documents for Site Utility Package July 26, 2011 March 4, 2011 CD Coordination Meeting on Site with Architect, Owner July 27, 2011 March 10, 2011 and Construction Manager Advertisement for Construction Manager at Risk RFQ March 12, 2011 July 27, 2011 Received Construction Manager at Risk Step 1 City Comments Received for Site Utility package August 8, 2011 March 29, 2011 Site Utility Package Bid August 17, 2011 Evaluation Team Grades and Develops Recommended Short List March 30, 2011 Guaranteed Maximum Price on Site Utility Package August 29, 2011 Facility Assessment of ADA, Code and Existing Conditions March 29 - 30, 2011 Architect Signs Documents September 1, 2011 School Board Receives Recommended Short List April 4, 2011 Pre-Bid September 21, 2011 Step 2 of RFQ Submitted to Short Listed Contractors April 5, 2011 Pre-Bid (Technology) September 23, 2011 (Fees and General Conditions) Bid October 4, 2011 Fees and General Conditions due by 3 PM April 8, 2011 Guaranteed Maximum Price Presented to School Board October 17, 2011 Board of Trustees Select Construction Manager at Risk April 18, 2011 First Meeting with District, Architect, Project Manager and Construction Start Date October 18, 2011 April 19, 2011 Construction Manager Owner, Architect and Contractor Meeting December 8, 2011 Site Logistics Survey with District, Architect, Project Manager and Owner, Architect and Contractor Meeting December 15, 2011 April 29, 2011 Construction Manager Owner, Architect and Contractor Meeting December 22, 2011 Schematic Design Presentation June 6, 2011 Owner, Architect and Contractor Meeting December 29, 2011 June 14, 2011 Owner, Architect and Contractor Meeting January 5, 2012 Site Coordination Meeting with Architect, Owner and June 16, 2011 Substantial Completion July 2013 Construction Manager Huckabee Georgetown Independent School District 8
  • 9. 2010 BOND PROGRAM UPDATE GEORGETOWN HIGH SCHOOL ADDITIONS AND RENOVATIONS PHASE I Locker Room Addition Cafeteria Addition Huckabee Georgetown Independent School District 9
  • 10. 2010 BOND PROGRAM UPDATE COMPLETED PROJECTS EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, NEW WAREHOUSE FACILITY ANNIE PURL ELEMENTARY SCHOOL PACKAGE 1 ROOF AND HVAC MODIFICATION Contract Amount: $5,321,000 Contract Amount: $641,000 Contract Amount: $229,000 Substantial Completion Date: August 19, 2011 Substantial Completion Date: November 9, 2011 Substantial Completion Date: August 12, 2011 General Contractor: Charter Builders General Contractor: CSS, Inc. General Contractor: Saratoga Field House Locker Room Interior View of Warehouse New HVAC Unit and Roofing Field House Weight Room Storage Shed New Ceiling and Light Fixtures Huckabee Georgetown Independent School District 10