The document provides updates on construction projects from the 2010 Georgetown ISD bond program. It describes additions and renovations at East View High School, including new academic, CTE, fine arts, athletic, and parking facilities. It also outlines additions and renovations at Georgetown High School involving new CTE, cafeteria, auditorium, library, and athletic facilities. Finally, it notes the completion of initial additions at East View High School and repairs at Annie Purl Elementary School.
This slide is special for master students (MIBS & MIFB) in UUM. Also useful for readers who are interested in the topic of contemporary Islamic banking.
This slide is special for master students (MIBS & MIFB) in UUM. Also useful for readers who are interested in the topic of contemporary Islamic banking.
Thinking of getting a dog? Be aware that breeds like Pit Bulls, Rottweilers, and German Shepherds can be loyal and dangerous. Proper training and socialization are crucial to preventing aggressive behaviors. Ensure safety by understanding their needs and always supervising interactions. Stay safe, and enjoy your furry friends!
A Strategic Approach: GenAI in EducationPeter Windle
Artificial Intelligence (AI) technologies such as Generative AI, Image Generators and Large Language Models have had a dramatic impact on teaching, learning and assessment over the past 18 months. The most immediate threat AI posed was to Academic Integrity with Higher Education Institutes (HEIs) focusing their efforts on combating the use of GenAI in assessment. Guidelines were developed for staff and students, policies put in place too. Innovative educators have forged paths in the use of Generative AI for teaching, learning and assessments leading to pockets of transformation springing up across HEIs, often with little or no top-down guidance, support or direction.
This Gasta posits a strategic approach to integrating AI into HEIs to prepare staff, students and the curriculum for an evolving world and workplace. We will highlight the advantages of working with these technologies beyond the realm of teaching, learning and assessment by considering prompt engineering skills, industry impact, curriculum changes, and the need for staff upskilling. In contrast, not engaging strategically with Generative AI poses risks, including falling behind peers, missed opportunities and failing to ensure our graduates remain employable. The rapid evolution of AI technologies necessitates a proactive and strategic approach if we are to remain relevant.
Safalta Digital marketing institute in Noida, provide complete applications that encompass a huge range of virtual advertising and marketing additives, which includes search engine optimization, virtual communication advertising, pay-per-click on marketing, content material advertising, internet analytics, and greater. These university courses are designed for students who possess a comprehensive understanding of virtual marketing strategies and attributes.Safalta Digital Marketing Institute in Noida is a first choice for young individuals or students who are looking to start their careers in the field of digital advertising. The institute gives specialized courses designed and certification.
for beginners, providing thorough training in areas such as SEO, digital communication marketing, and PPC training in Noida. After finishing the program, students receive the certifications recognised by top different universitie, setting a strong foundation for a successful career in digital marketing.
Biological screening of herbal drugs: Introduction and Need for
Phyto-Pharmacological Screening, New Strategies for evaluating
Natural Products, In vitro evaluation techniques for Antioxidants, Antimicrobial and Anticancer drugs. In vivo evaluation techniques
for Anti-inflammatory, Antiulcer, Anticancer, Wound healing, Antidiabetic, Hepatoprotective, Cardio protective, Diuretics and
Antifertility, Toxicity studies as per OECD guidelines
2024.06.01 Introducing a competency framework for languag learning materials ...Sandy Millin
http://sandymillin.wordpress.com/iateflwebinar2024
Published classroom materials form the basis of syllabuses, drive teacher professional development, and have a potentially huge influence on learners, teachers and education systems. All teachers also create their own materials, whether a few sentences on a blackboard, a highly-structured fully-realised online course, or anything in between. Despite this, the knowledge and skills needed to create effective language learning materials are rarely part of teacher training, and are mostly learnt by trial and error.
Knowledge and skills frameworks, generally called competency frameworks, for ELT teachers, trainers and managers have existed for a few years now. However, until I created one for my MA dissertation, there wasn’t one drawing together what we need to know and do to be able to effectively produce language learning materials.
This webinar will introduce you to my framework, highlighting the key competencies I identified from my research. It will also show how anybody involved in language teaching (any language, not just English!), teacher training, managing schools or developing language learning materials can benefit from using the framework.
Delivering Micro-Credentials in Technical and Vocational Education and TrainingAG2 Design
Explore how micro-credentials are transforming Technical and Vocational Education and Training (TVET) with this comprehensive slide deck. Discover what micro-credentials are, their importance in TVET, the advantages they offer, and the insights from industry experts. Additionally, learn about the top software applications available for creating and managing micro-credentials. This presentation also includes valuable resources and a discussion on the future of these specialised certifications.
For more detailed information on delivering micro-credentials in TVET, visit this https://tvettrainer.com/delivering-micro-credentials-in-tvet/
Acetabularia Information For Class 9 .docxvaibhavrinwa19
Acetabularia acetabulum is a single-celled green alga that in its vegetative state is morphologically differentiated into a basal rhizoid and an axially elongated stalk, which bears whorls of branching hairs. The single diploid nucleus resides in the rhizoid.
Executive Directors Chat Leveraging AI for Diversity, Equity, and InclusionTechSoup
Let’s explore the intersection of technology and equity in the final session of our DEI series. Discover how AI tools, like ChatGPT, can be used to support and enhance your nonprofit's DEI initiatives. Participants will gain insights into practical AI applications and get tips for leveraging technology to advance their DEI goals.
How to Build a Module in Odoo 17 Using the Scaffold MethodCeline George
Odoo provides an option for creating a module by using a single line command. By using this command the user can make a whole structure of a module. It is very easy for a beginner to make a module. There is no need to make each file manually. This slide will show how to create a module using the scaffold method.
Unit 8 - Information and Communication Technology (Paper I).pdfThiyagu K
This slides describes the basic concepts of ICT, basics of Email, Emerging Technology and Digital Initiatives in Education. This presentations aligns with the UGC Paper I syllabus.
2. 2010 BOND PROGRAM UPDATE
TABLE OF CONTENTS
East View High School Phase 2 Additions, Package 2 3
Georgetown High School Additions and Renovations 7
Completed Projects 10
Huckabee
Georgetown Independent School District 2
3. 2010 BOND PROGRAM UPDATE General Contractor
EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 2
Original: $25,574,000
I
CATE Addition – $2,121,338
I
J
Baseball & Softball Turf - $880,000 New Athletic Addition
H
H Total - $28,575,338
F
G J
H
J
First Floor
Bid Package 1
A
B J
Existing East View
J High School B
A. New Athletic Addition
B. New Fine Arts Addition New Fine Arts Addition
D
E C. New Academic Addition
C
D. New CTE Building
New Academic Addition
E. New ROTC Addition (Alt.)
CR
10 F. New Tennis Courts
4
ay
29 G. New Tennis Building
hw
Hig H. New Baseball/Softball Fieldhouse,
Bleachers, Lighting & Pressbox
I. New Practice Fields
J. New Parking (1,070 spaces)
New Academic Addition
CTE Building
Second Floor New CTE/ROTC Addition
Academic Wing Softball Field House Huckabee
Georgetown Independent School District 3
4. 2010 BOND PROGRAM UPDATE
EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 2
MILESTONE DATES
ACADEMIC ADDITION Schematic Design Presentation January 1, 2011
Steel structure placement and overhead MEP is ongoing.
Architect Signs Documents March 8, 2011
Building Permit Application Submittal March 15, 2011
CATE/ROTC
Site Plan Application Submittal March 17, 2011
Pre-Proposal Meeting March 22, 2011
ATHLETIC ADDITION
Tour with General Contractors at East View Ninth Grade Center March 30, 2011
Proposal Part A Due April 7, 2011
FINE ARTS ADDITION – DRAMA Proposal Part B Due April 8, 2011
Overhead MEP is ongoing.
Proposal Evaluations April 11, 2011
Received City Building Dept. Plan Review Comments April 14, 2011
FINE ARTS ADDITION – ORCHESTRA
General Contractor Recommendation to School Board April 18, 2011
Interior studs and sheetrock are complete.
Received City Planning Dept. Plan Review Comments April 25, 2011
Construction Start Date May 19, 2011
BASEBALL, SOFTBALL, TENNIS AND SITE
First Owner/CO Meeting May 24, 2011
Building Permit Issued June 1, 2011
Owner, Architect and Contractor Meeting December 6, 2011
Owner, Architect and Contractor Meeting December 13, 2011
Owner, Architect and Contractor Meeting December 20, 2011
Owner, Architect and Contractor Meeting January 3, 2012
Owner, Architect and Contractor Meeting January 10, 2012
Substantial Completion June 27, 2012
Huckabee
Georgetown Independent School District 4
5. 2010 BOND PROGRAM UPDATE
EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 2
Academic Addition - Interior View Gymnasium Addition
Locker Room Addition Baseball Field
Huckabee
Georgetown Independent School District 5
6. 2010 BOND PROGRAM UPDATE
EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 2
CATE/ROTC
Academic
Addition
Courts
Athletic
Addition
FIne Arts
Addition
Aerial
Huckabee
Georgetown Independent School District 6
7. 2010 BOND PROGRAM UPDATE Construction Manager
GEORGETOWN HIGH SCHOOL ADDITIONS AND RENOVATIONS
BAIRD WILLIAMS
CONSTRUCTION
Project Manager
CTE Wing
Cafeteria
Athletics
Auditorium
Academic Athletics Athletics
Computer
Labs
Science
Labs
Library
Athletics
Special Education Academic
Fine
Arts
Huckabee
Georgetown Independent School District 7
8. 2010 BOND PROGRAM UPDATE
GEORGETOWN HIGH SCHOOL ADDITIONS AND RENOVATIONS
MILESTONE DATES MILESTONE DATES
June 30, 2011
February 28, 2011
and Nurse Cost Review with Construction Manager July 19, 2011
March 1, 2011
Interiors Presentation July 25, 2011
Initial Construction Phasing with Stakeholders March 3, 2011
Architect Signs Documents for Site Utility Package July 26, 2011
March 4, 2011 CD Coordination Meeting on Site with Architect, Owner
July 27, 2011
March 10, 2011 and Construction Manager
Advertisement for Construction Manager at Risk RFQ March 12, 2011 July 27, 2011
Received Construction Manager at Risk Step 1 City Comments Received for Site Utility package August 8, 2011
March 29, 2011
Site Utility Package Bid August 17, 2011
Evaluation Team Grades and Develops Recommended Short List March 30, 2011
Guaranteed Maximum Price on Site Utility Package August 29, 2011
Facility Assessment of ADA, Code and Existing Conditions March 29 - 30, 2011
Architect Signs Documents September 1, 2011
School Board Receives Recommended Short List April 4, 2011
Pre-Bid September 21, 2011
Step 2 of RFQ Submitted to Short Listed Contractors
April 5, 2011 Pre-Bid (Technology) September 23, 2011
(Fees and General Conditions)
Bid October 4, 2011
Fees and General Conditions due by 3 PM April 8, 2011
Guaranteed Maximum Price Presented to School Board October 17, 2011
Board of Trustees Select Construction Manager at Risk April 18, 2011
First Meeting with District, Architect, Project Manager and Construction Start Date October 18, 2011
April 19, 2011
Construction Manager Owner, Architect and Contractor Meeting December 8, 2011
Site Logistics Survey with District, Architect, Project Manager and Owner, Architect and Contractor Meeting December 15, 2011
April 29, 2011
Construction Manager
Owner, Architect and Contractor Meeting December 22, 2011
Schematic Design Presentation June 6, 2011
Owner, Architect and Contractor Meeting December 29, 2011
June 14, 2011
Owner, Architect and Contractor Meeting January 5, 2012
Site Coordination Meeting with Architect, Owner and
June 16, 2011 Substantial Completion July 2013
Construction Manager
Huckabee
Georgetown Independent School District 8
9. 2010 BOND PROGRAM UPDATE
GEORGETOWN HIGH SCHOOL ADDITIONS AND RENOVATIONS
PHASE I
Locker Room Addition
Cafeteria Addition
Huckabee
Georgetown Independent School District 9
10. 2010 BOND PROGRAM UPDATE
COMPLETED PROJECTS
EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, NEW WAREHOUSE FACILITY ANNIE PURL ELEMENTARY SCHOOL
PACKAGE 1 ROOF AND HVAC MODIFICATION
Contract Amount: $5,321,000 Contract Amount: $641,000 Contract Amount: $229,000
Substantial Completion Date: August 19, 2011 Substantial Completion Date: November 9, 2011 Substantial Completion Date: August 12, 2011
General Contractor: Charter Builders General Contractor: CSS, Inc. General Contractor: Saratoga
Field House Locker Room Interior View of Warehouse New HVAC Unit and Roofing
Field House Weight Room Storage Shed New Ceiling and Light Fixtures
Huckabee
Georgetown Independent School District 10