Prepared By :
Patel Snehal S. (156160307050)
Patel Krupa S. (156160307036)
GUJARAT TECHNOLOGICAL UNIVERSITY
DEPARTMENT OF COMPUTER ENGINEERING
Submitted To
Government Polytechnic Waghai Dang
[Year 2017-2018]
A Project Report On
Hospital
For The fully Fulfilment of Diploma Computer Engineering For
The Gujarat Technological University
Prepared By :
Patel Snehal S. (156160307050)
Patel Krupa S. (156160307036)
Guided By
Mr Pradip R. Gangoda
GUJARAT TECHNOLOGICAL UNIVERSITY
CERTIFICATE
This is to certify that Miss. Patel Snehal S. from
Government Polytechnic Waghai, Dang of Computer Department
having Enrolment No. : 156160307050 has successfully submitted
fully project report having titled
for the fulfilment 6th
semester.
In a Group consisting of three students under the
guidance of following faculty guides.
GUIDED BY H.O.D
MR. PRADIP R. GANGODA MR J.R.MAHIDA
EXAMINER SIGN
GUJARAT TECHNOLOGICAL UNIVERSITY
CERTIFICATE
This is to certify that Miss. Patel Krupa s. from Government
Polytechnic Waghai, Dang of Computer Department having
Enrolment No. : 156160307036 has successfully submitted fully
project report having titled for
the fulfilment of 6th
semester.
In a Group consisting of three students under the
guidance of following faculty guides.
GUIDED BY H.O.D
MR. PRADIP R. GANGODA MR J.R.MAHIDA
EXAMINER SIGN
ACKNOWLEDGEMENT
We are grateful to our guide MR. PRADIP GANGODA for giving valuable guidance
and encouragement for completing our project. Their interest, proper direction and
constant inspiration during our work enabled us to complete the project.
and my
friend of Government Polytechnic Waghai for the valuable suggestion.
Their enthusiasm and unending encouragement gives us a treat strength and confidence to
make our project better.
INDEX
NO. Subject
Page
No.
1.
Chapter:1
1. Introduction
1.1: Project Summary
1.2: Purpose
1.3: Scope
1.4: Objective
1.5: Technology Review
1
2.
Chapter:2
2. Project Management
2.1: Project Planning
2.2 Time line chart
2.3: Project Development Approach and Justification
2.4: Feasibility Study
2.4.1: Technical feasibility
2.4.2: Economical feasibility
2.4.3: Operational feasibility
2.4.3.1: Security:
2.4.3.2: Time saving:
2.4.3.3: Easy maintenance:
2.4.3.4: Easy modification
3
3.
Chapter:3
3. System Analysis
3.1: Problem and Weaknesses of Current System
3.2: Hardware and Software Requirements (Minimum requirements)
3.3: Features of New System
5
4.
Chapter:4
4.1: Data Modelling
4.1.1:Admin
4.2.2:Patient Details
4.3.3:Outpatient
4.4.4:Inpatient
4.5.5:Staff detail
4.6.6:Billing detail
4.7.7:Ward detail
4.2: Data Dictionary
4.3: E-R Diagram
4.4: Use Case Diagram
4.5: DFD Diagram
6
5.
Chapter:5
5 : Implementation
5.1 : Screenshots
5.2 : Sample Code
14
6. Chapter:6
6.1: Conclusion
21
CHAPTER 1
1. Introduction
1.1: Project summary
The Hospital is an Institute which provides to people best health services.
That Provides Facility for hospitalization.
The patient is admitted in hospital with the exception that he or she will be in the
hospital for more Than 24 hours.
The Patient is assigned a room /bed.
The Hospital Provide Medical care.
1.2: Purpose
This Purpose of the project is to maintain the hospital manage and provide doctor,
laboratory and medical store.
The main purpose is to full fill the requirements of the hospital management system.
Record of inpatient and outpatient.
Patient available to facility is below :
Medicine
Ward
Nurse care
Laboratory
1.3: Scope
It can be used in any Hospital, Clinic, Dispensary or Pathology labs for Maintaining
Patient Detail and Their test Results.
1.4: Objective
Define Hospital.
Recording information about the patients.
Bill generating.
Recording information related to diagnosis given to patients.
Keeping record of the immunization provided to patients /children.
Introduction Hospital Management System
GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 1
1.5: Technology Review
1.5.1: Frontend Review
PHP
1.5.2: Backend Review
MY SQL
1.5.3: Other Technology
HTML 5
CSS
JAVA Script
1.5.4: About PHP
Php stands for hypertext pre-processer. Php is programming language which
provides a facility to develop dynamic web application. Php is server side scripting
language.
Php is easy to learn and easy to understand . Php support for MySQL database and it can
be embedded easily in other scripts like java script, html.
A php script always start with <? Php and end with?>.php is a loosely typed language.
1.5.6 : About MYSQL
MySQL is a database.The data is MySQL is stored in tables.a table is collection of related
data entries and it consist of columns and related rows.
Database are useful when stroing information.MySQL is a relational database.
We are using MySQL database to store all information about admin,patient,doctor etc.
Introduction Hospital Management System
GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 2
CHAPTER 2
2. Project Management
2.1: Project Planning
This project is used mainly stored patient details , doctor details and staff details.
The hospital management system is information of a patient medicine , ward and
laboratory report.
Keeps records of a daily patient.
The main goal of the application is to maintain the record of daily all patient, all doctor
and all staff.
2.2: Project Development approach and Justification
The Hospital Management System is so Designed as to easy the work load of
Hospital admin and all staff.
This project is easy to search of patient detail, staff detail and doctor details.
Maintaining the accounts of the doctor.
Alert message update of the records.
It maintain message of the inpatient and outpatient
2.3: Feasibility study
2.3.1: Technical Feasibility
Feasibility study is conducted once the problem is clearly understood.
Feasibility study is a high level capsule version of entire system analysis and design.
The feasibility study plays a major rule in the analysis of the system.
It provide easily learn and understand and supports for MySQl database it can be
embedded easily in other scripts like java script, html.
2.3.2 : Economical Feasibility
Economic justification includes a broad range of concerns that includes cost benefit
analysis. In this we weight the cost and the benefits associated with the candidate
system and if it suits the basic purpose of the organization i.e. profit making, the project
is making to the analysis and design phase.
project Management Hospital Management System
GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 3
2.3.3 : Operational feasibility
2.3.3.1 : Security
The security is maintained very comfortably in computer. secretes are not disclosed off ,
as password protected in computer and so unauthorized person is not able to access any
data.
2.3.3.2 : Time saving
This computerized system is time saving to immediate inquiry, the operate or any person
has just click some get information in a few second.
2.3.3.3 : Easy maintenance
Its easy with computer to manage all data with and reduce paper work.
2.3.3.4 : Easy Modification
The modification or editing can be done very easy to clearly..
2.4:Time Line Chart
Task Name 1 2 3 4 5 6 7 8 9 10 11 12
Requirement
Gathering
Feasibility
Study
System
Analysis
Diagram
Data
Dictionary
Design
project Management Hospital Management System
GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 4
CHAPTER 3
3. System Analysis
3.1 : Problem and Weaknesses of current System
Lack of immediate retrievals:
The information is very difficult to retrieve and to find particular information like- E.g.
-
This results in inconvenience and wastage of time.
Lack of immediate information storage:
The information generated by various transactions takes time and efforts to be stored at
right place.
Lack of prompt updating:
Various changes to information like patient details or immunization details of child are
difficult to make as paper work is involved.
Error prone manual calculation:
Manual calculations are error prone and take a lot of time this may result in incorrect
information. For example calcul
Preparation of accurate and prompt reports:
This becomes a difficult task as information is difficult to collect from various registers.
3.2 :Hardware and Software Requirements(minimum requirements of
run your system)
3.2.1 :Hardware Requirements
Processor : Pentium 4 processor
Memory : 1GB RAM
Display : 14
Hard disk Drive : 80 GB
3.2.2 : Software Requirements
Operating System :Windows XP professional
Environment: PHP
Database:MySQL
Server:Apache Tomcat 6.0
3 . 3 : Features of New System
Keep Record Of Patient & daily Patient.
Keeps Record of daily doctor detail & daily staff detail.
Record of billing details.
System Analysis Hospital Management System
GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 5
CHAPTER 4
4. : Data Modeling
4.1 : Admin
This module records basic patient related information, which is collected when the patient
visits the hospital for the first time. Each patient is allocated unique patient identification
numbers also known as Hospital No.
4.2 : Patient Details
It keeps track of all details about both in-patient and out- patient , Patient id, patient
name, address, admitted date, doctor name, room no are entered in a form and stored for
future reference. Also particular patient details can be viewed in the table using a separate
form with a attribute patient id.
4.3 : Outpatient
This module manages activities related to patient who visits the Hospital Resident Doctor
or Consultant Doctor for Medical Consultations, diagnosis and treatment.
4.4: Inpatient
Admission request will be made here. Request for admission is made before patient
admitting the hospital.
4.5: Staff Details
It keeps track of all details about doctors and staffs of the hospital. staffs, Doctors, Nurses
name, staff id, address, qualification, cell no, e-mail are entered and stored in a separate
form. Individual staff details can be viewed in the table using a separate form with a
attribute Staff id.
4.6 : Billing Details
This module bills the both inpatient and outpatient who comes to hospital.
4.7 : Ward Detail
This module enters and stores the details about each ward of the hospital for future
reference. Individual ward detail can be viewed in the table using ward id .The attributes
used in storing a ward detail is ward id, ward name , floor no, no of rooms.
System Design Hospital Management System
GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 6
4.2 : Data Dictionary
4.2.1 : Doctor Registration
Name doctor Details
Name Type Size Description
ID (Primary key) Varchar() ID of the doctor
Name Varchar() 20 Name of the Doctor
Address Varchar() 30 Address of the doctor
Phone number Integer 10 Contact no. of the doctor
Gender Varchar() 10 Gender of the doctor
4.2.2 : Room Detail
Name Room Detail
Name Type Size Description
Room no.(primary
key)
Integer ID of the room
Room type Varchar() 50 Genral or private
room
4.2.3:Patient Registration
Patient Details
Name Type Size Description
ID(Primary key) Varchar() ID of the Patient
Address Varchar() 30 Address of the
Patient
Phone No. Integer 10 Contact no. of the
patient
Gender Varchar() 10 Gender of the patient
System Design Hospital Management System
GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 7
4.2.4: Outpatient
Outpatient Details
Name Type Size Description
ID(primary key) Varchar() ID of the outpatient
Address Varchar() 30 Address of outpatient
Phone no. Integer 10 Contact no. of outpatient
Gender Varchar() 10 Gender of outpatient
Discharge/Un
discharge
Varchar() 10 Discharge or unDischarge of
outpatient
Bill Generation Integer 100 cash
4.2.5: In Patient
In Patient Details
Name Type Size Description
ID(Primary key) Vachar() ID of the inpatient
Address Varchar() 30 Address of the
inpatient
Phone no. Integer 10 Contact of the
inpatient
Gender Varchar() 10 Gender of the
inpatient
Room Detail Varchar() 30 Genral or Private
room
Discharge/Un
Discharge
Varchar() 10 Discharge or
undischarge of
inpatient
Bill Generation Integer 100 cash
System Design Hospital Management System
GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 8
4.2.6 : Staff Detail
Staff Details
Name Type Size Description
ID(primary key) Varchar() ID of the staff
Address Varchar() 30 Address of the staff
Phone no. Integer 10 Contact no. of the
staff
Gender Varchar() 10 Gender of the staff
Salary Integer Salary of the staff
4.2.7:Bill Detail
Bill Details
Name Type Size Description
ID (primary key) Varchar() ID of patient
bill Varchar()
Address Varchar() 30
Phone no. Integer 10
Gender Varchar() 10
Bill Count Integer 100
System Design Hospital Management System
GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 9
4.3 : ER Diagram
4.2 : Data Flow Diagram
Zero Level:
System Design Hospital Management System
GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 10
First Level:
System Design Hospital Management System
GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 11
4.5: Sequence Diagram
System Design Hospital Management System
GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 12
4.6: Use Case Diagram
System Design Hospital Management System
GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 13
CHAPTER : 5
5.1. Screenshots
1.Log in page
2. Patient registration patient page
Implemention Hospital Management System
GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 14
3. patient list page
4. Add doctor page
Implemention Hospital Management System
GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 15
5. Doctor list page
6. Add new room page
Implemention Hospital Management System
GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 16
7. Allocate room to patient page
8. Appointment create page
Implemention Hospital Management System
GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 17
9. Appointment list page
10. Generate Bill page
Implemention Hospital Management System
GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 18
11. Print of generate bill
Implemention Hospital Management System
GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 19
5.2 : Sample code
1.connection.php
<?php
session_start();
error_reporting(1);
if(!mysql_connect("localhost","root",""))
{
echo "<tr><td><font color=red size=4>Connection
Error</font></td></tr>";
die();
}
mysql_connect("localhost","root","");
mysql_select_db("hospital");
?>
2.login.php
<?php
session_start();
?><?php
$username=$_POST['username'];
$password=$_POST['password'];
$con=@mysql_connect("localhost","root","") or die(mysql_error());
$db=@mysql_select_db("hms",$con)or die(mysql_error());
$sql="SELECT * FROM users WHERE username='$username' and
password='$password'";
$result=mysql_query($sql);
$count=mysql_num_rows($result);
if($count<1){echo "Wrong Username or Password";}
else
{
$_SESSION[user]=$username;
header("location:home.html");
}
ob_end_flush();
?>
Implemention Hospital Management System
GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 20
CHAPTER 6
6.1 conclusion
The project Hospital Management System (HMS) is for computerizing the working in a
hospital. The software takes care of all the requirements of an average hospital and is
capable to provide easy and effective storage of information related to patients that come
up to the hospital.
It also provides staff ,doctor and patient details and billing facility on the basis of
indoor or outdoor patient.
The system also provides the facility of backup as per the requirement.
conclusion Hospital Management System
GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 21

Hosptal management system

  • 1.
    Prepared By : PatelSnehal S. (156160307050) Patel Krupa S. (156160307036)
  • 2.
    GUJARAT TECHNOLOGICAL UNIVERSITY DEPARTMENTOF COMPUTER ENGINEERING Submitted To Government Polytechnic Waghai Dang [Year 2017-2018] A Project Report On Hospital For The fully Fulfilment of Diploma Computer Engineering For The Gujarat Technological University Prepared By : Patel Snehal S. (156160307050) Patel Krupa S. (156160307036) Guided By Mr Pradip R. Gangoda
  • 3.
    GUJARAT TECHNOLOGICAL UNIVERSITY CERTIFICATE Thisis to certify that Miss. Patel Snehal S. from Government Polytechnic Waghai, Dang of Computer Department having Enrolment No. : 156160307050 has successfully submitted fully project report having titled for the fulfilment 6th semester. In a Group consisting of three students under the guidance of following faculty guides. GUIDED BY H.O.D MR. PRADIP R. GANGODA MR J.R.MAHIDA EXAMINER SIGN
  • 4.
    GUJARAT TECHNOLOGICAL UNIVERSITY CERTIFICATE Thisis to certify that Miss. Patel Krupa s. from Government Polytechnic Waghai, Dang of Computer Department having Enrolment No. : 156160307036 has successfully submitted fully project report having titled for the fulfilment of 6th semester. In a Group consisting of three students under the guidance of following faculty guides. GUIDED BY H.O.D MR. PRADIP R. GANGODA MR J.R.MAHIDA EXAMINER SIGN
  • 5.
    ACKNOWLEDGEMENT We are gratefulto our guide MR. PRADIP GANGODA for giving valuable guidance and encouragement for completing our project. Their interest, proper direction and constant inspiration during our work enabled us to complete the project. and my friend of Government Polytechnic Waghai for the valuable suggestion. Their enthusiasm and unending encouragement gives us a treat strength and confidence to make our project better.
  • 6.
    INDEX NO. Subject Page No. 1. Chapter:1 1. Introduction 1.1:Project Summary 1.2: Purpose 1.3: Scope 1.4: Objective 1.5: Technology Review 1 2. Chapter:2 2. Project Management 2.1: Project Planning 2.2 Time line chart 2.3: Project Development Approach and Justification 2.4: Feasibility Study 2.4.1: Technical feasibility 2.4.2: Economical feasibility 2.4.3: Operational feasibility 2.4.3.1: Security: 2.4.3.2: Time saving: 2.4.3.3: Easy maintenance: 2.4.3.4: Easy modification 3 3. Chapter:3 3. System Analysis 3.1: Problem and Weaknesses of Current System 3.2: Hardware and Software Requirements (Minimum requirements) 3.3: Features of New System 5
  • 7.
    4. Chapter:4 4.1: Data Modelling 4.1.1:Admin 4.2.2:PatientDetails 4.3.3:Outpatient 4.4.4:Inpatient 4.5.5:Staff detail 4.6.6:Billing detail 4.7.7:Ward detail 4.2: Data Dictionary 4.3: E-R Diagram 4.4: Use Case Diagram 4.5: DFD Diagram 6 5. Chapter:5 5 : Implementation 5.1 : Screenshots 5.2 : Sample Code 14 6. Chapter:6 6.1: Conclusion 21
  • 8.
    CHAPTER 1 1. Introduction 1.1:Project summary The Hospital is an Institute which provides to people best health services. That Provides Facility for hospitalization. The patient is admitted in hospital with the exception that he or she will be in the hospital for more Than 24 hours. The Patient is assigned a room /bed. The Hospital Provide Medical care. 1.2: Purpose This Purpose of the project is to maintain the hospital manage and provide doctor, laboratory and medical store. The main purpose is to full fill the requirements of the hospital management system. Record of inpatient and outpatient. Patient available to facility is below : Medicine Ward Nurse care Laboratory 1.3: Scope It can be used in any Hospital, Clinic, Dispensary or Pathology labs for Maintaining Patient Detail and Their test Results. 1.4: Objective Define Hospital. Recording information about the patients. Bill generating. Recording information related to diagnosis given to patients. Keeping record of the immunization provided to patients /children. Introduction Hospital Management System GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 1
  • 9.
    1.5: Technology Review 1.5.1:Frontend Review PHP 1.5.2: Backend Review MY SQL 1.5.3: Other Technology HTML 5 CSS JAVA Script 1.5.4: About PHP Php stands for hypertext pre-processer. Php is programming language which provides a facility to develop dynamic web application. Php is server side scripting language. Php is easy to learn and easy to understand . Php support for MySQL database and it can be embedded easily in other scripts like java script, html. A php script always start with <? Php and end with?>.php is a loosely typed language. 1.5.6 : About MYSQL MySQL is a database.The data is MySQL is stored in tables.a table is collection of related data entries and it consist of columns and related rows. Database are useful when stroing information.MySQL is a relational database. We are using MySQL database to store all information about admin,patient,doctor etc. Introduction Hospital Management System GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 2
  • 10.
    CHAPTER 2 2. ProjectManagement 2.1: Project Planning This project is used mainly stored patient details , doctor details and staff details. The hospital management system is information of a patient medicine , ward and laboratory report. Keeps records of a daily patient. The main goal of the application is to maintain the record of daily all patient, all doctor and all staff. 2.2: Project Development approach and Justification The Hospital Management System is so Designed as to easy the work load of Hospital admin and all staff. This project is easy to search of patient detail, staff detail and doctor details. Maintaining the accounts of the doctor. Alert message update of the records. It maintain message of the inpatient and outpatient 2.3: Feasibility study 2.3.1: Technical Feasibility Feasibility study is conducted once the problem is clearly understood. Feasibility study is a high level capsule version of entire system analysis and design. The feasibility study plays a major rule in the analysis of the system. It provide easily learn and understand and supports for MySQl database it can be embedded easily in other scripts like java script, html. 2.3.2 : Economical Feasibility Economic justification includes a broad range of concerns that includes cost benefit analysis. In this we weight the cost and the benefits associated with the candidate system and if it suits the basic purpose of the organization i.e. profit making, the project is making to the analysis and design phase. project Management Hospital Management System GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 3
  • 11.
    2.3.3 : Operationalfeasibility 2.3.3.1 : Security The security is maintained very comfortably in computer. secretes are not disclosed off , as password protected in computer and so unauthorized person is not able to access any data. 2.3.3.2 : Time saving This computerized system is time saving to immediate inquiry, the operate or any person has just click some get information in a few second. 2.3.3.3 : Easy maintenance Its easy with computer to manage all data with and reduce paper work. 2.3.3.4 : Easy Modification The modification or editing can be done very easy to clearly.. 2.4:Time Line Chart Task Name 1 2 3 4 5 6 7 8 9 10 11 12 Requirement Gathering Feasibility Study System Analysis Diagram Data Dictionary Design project Management Hospital Management System GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 4
  • 12.
    CHAPTER 3 3. SystemAnalysis 3.1 : Problem and Weaknesses of current System Lack of immediate retrievals: The information is very difficult to retrieve and to find particular information like- E.g. - This results in inconvenience and wastage of time. Lack of immediate information storage: The information generated by various transactions takes time and efforts to be stored at right place. Lack of prompt updating: Various changes to information like patient details or immunization details of child are difficult to make as paper work is involved. Error prone manual calculation: Manual calculations are error prone and take a lot of time this may result in incorrect information. For example calcul Preparation of accurate and prompt reports: This becomes a difficult task as information is difficult to collect from various registers. 3.2 :Hardware and Software Requirements(minimum requirements of run your system) 3.2.1 :Hardware Requirements Processor : Pentium 4 processor Memory : 1GB RAM Display : 14 Hard disk Drive : 80 GB 3.2.2 : Software Requirements Operating System :Windows XP professional Environment: PHP Database:MySQL Server:Apache Tomcat 6.0 3 . 3 : Features of New System Keep Record Of Patient & daily Patient. Keeps Record of daily doctor detail & daily staff detail. Record of billing details. System Analysis Hospital Management System GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 5
  • 13.
    CHAPTER 4 4. :Data Modeling 4.1 : Admin This module records basic patient related information, which is collected when the patient visits the hospital for the first time. Each patient is allocated unique patient identification numbers also known as Hospital No. 4.2 : Patient Details It keeps track of all details about both in-patient and out- patient , Patient id, patient name, address, admitted date, doctor name, room no are entered in a form and stored for future reference. Also particular patient details can be viewed in the table using a separate form with a attribute patient id. 4.3 : Outpatient This module manages activities related to patient who visits the Hospital Resident Doctor or Consultant Doctor for Medical Consultations, diagnosis and treatment. 4.4: Inpatient Admission request will be made here. Request for admission is made before patient admitting the hospital. 4.5: Staff Details It keeps track of all details about doctors and staffs of the hospital. staffs, Doctors, Nurses name, staff id, address, qualification, cell no, e-mail are entered and stored in a separate form. Individual staff details can be viewed in the table using a separate form with a attribute Staff id. 4.6 : Billing Details This module bills the both inpatient and outpatient who comes to hospital. 4.7 : Ward Detail This module enters and stores the details about each ward of the hospital for future reference. Individual ward detail can be viewed in the table using ward id .The attributes used in storing a ward detail is ward id, ward name , floor no, no of rooms. System Design Hospital Management System GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 6
  • 14.
    4.2 : DataDictionary 4.2.1 : Doctor Registration Name doctor Details Name Type Size Description ID (Primary key) Varchar() ID of the doctor Name Varchar() 20 Name of the Doctor Address Varchar() 30 Address of the doctor Phone number Integer 10 Contact no. of the doctor Gender Varchar() 10 Gender of the doctor 4.2.2 : Room Detail Name Room Detail Name Type Size Description Room no.(primary key) Integer ID of the room Room type Varchar() 50 Genral or private room 4.2.3:Patient Registration Patient Details Name Type Size Description ID(Primary key) Varchar() ID of the Patient Address Varchar() 30 Address of the Patient Phone No. Integer 10 Contact no. of the patient Gender Varchar() 10 Gender of the patient System Design Hospital Management System GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 7
  • 15.
    4.2.4: Outpatient Outpatient Details NameType Size Description ID(primary key) Varchar() ID of the outpatient Address Varchar() 30 Address of outpatient Phone no. Integer 10 Contact no. of outpatient Gender Varchar() 10 Gender of outpatient Discharge/Un discharge Varchar() 10 Discharge or unDischarge of outpatient Bill Generation Integer 100 cash 4.2.5: In Patient In Patient Details Name Type Size Description ID(Primary key) Vachar() ID of the inpatient Address Varchar() 30 Address of the inpatient Phone no. Integer 10 Contact of the inpatient Gender Varchar() 10 Gender of the inpatient Room Detail Varchar() 30 Genral or Private room Discharge/Un Discharge Varchar() 10 Discharge or undischarge of inpatient Bill Generation Integer 100 cash System Design Hospital Management System GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 8
  • 16.
    4.2.6 : StaffDetail Staff Details Name Type Size Description ID(primary key) Varchar() ID of the staff Address Varchar() 30 Address of the staff Phone no. Integer 10 Contact no. of the staff Gender Varchar() 10 Gender of the staff Salary Integer Salary of the staff 4.2.7:Bill Detail Bill Details Name Type Size Description ID (primary key) Varchar() ID of patient bill Varchar() Address Varchar() 30 Phone no. Integer 10 Gender Varchar() 10 Bill Count Integer 100 System Design Hospital Management System GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 9
  • 17.
    4.3 : ERDiagram 4.2 : Data Flow Diagram Zero Level: System Design Hospital Management System GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 10
  • 18.
    First Level: System DesignHospital Management System GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 11
  • 19.
    4.5: Sequence Diagram SystemDesign Hospital Management System GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 12
  • 20.
    4.6: Use CaseDiagram System Design Hospital Management System GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 13
  • 21.
    CHAPTER : 5 5.1.Screenshots 1.Log in page 2. Patient registration patient page Implemention Hospital Management System GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 14
  • 22.
    3. patient listpage 4. Add doctor page Implemention Hospital Management System GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 15
  • 23.
    5. Doctor listpage 6. Add new room page Implemention Hospital Management System GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 16
  • 24.
    7. Allocate roomto patient page 8. Appointment create page Implemention Hospital Management System GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 17
  • 25.
    9. Appointment listpage 10. Generate Bill page Implemention Hospital Management System GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 18
  • 26.
    11. Print ofgenerate bill Implemention Hospital Management System GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 19
  • 27.
    5.2 : Samplecode 1.connection.php <?php session_start(); error_reporting(1); if(!mysql_connect("localhost","root","")) { echo "<tr><td><font color=red size=4>Connection Error</font></td></tr>"; die(); } mysql_connect("localhost","root",""); mysql_select_db("hospital"); ?> 2.login.php <?php session_start(); ?><?php $username=$_POST['username']; $password=$_POST['password']; $con=@mysql_connect("localhost","root","") or die(mysql_error()); $db=@mysql_select_db("hms",$con)or die(mysql_error()); $sql="SELECT * FROM users WHERE username='$username' and password='$password'"; $result=mysql_query($sql); $count=mysql_num_rows($result); if($count<1){echo "Wrong Username or Password";} else { $_SESSION[user]=$username; header("location:home.html"); } ob_end_flush(); ?> Implemention Hospital Management System GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 20
  • 28.
    CHAPTER 6 6.1 conclusion Theproject Hospital Management System (HMS) is for computerizing the working in a hospital. The software takes care of all the requirements of an average hospital and is capable to provide easy and effective storage of information related to patients that come up to the hospital. It also provides staff ,doctor and patient details and billing facility on the basis of indoor or outdoor patient. The system also provides the facility of backup as per the requirement. conclusion Hospital Management System GOVERNMENT POLYTECHNIC WAGHAI - DANG Page 21