SlideShare a Scribd company logo
1 of 6
Download to read offline
RESUME
A.HONESTRAJ Building504,Flat22,
Cell:+97334567184,+919865670173 Road509,CenterManama,
Email:honest24raji@gmail.com Bahrain.
Objective
ToworkinachallengingandmarineinnovativeO&MDGsetsandMarine
environment,thisallowsmetoutilizemyexpertiseindeliveringquality
jobandinprocess,contributepositivelytotheorganizationandaddvalue
toself.
0-WorkProfile
 03yearsinthefieldofWoodwardandYanmar/KikiGovernors.
 11yearsinthefieldofElectricalinstallation,commissioning,
troubleshootingandMaintenance.
 ExperiencedinDieselenginepowerplantOperation&Maintenance.
 Experiencedin230/6.6KVsubstationOperationandMaintenance.
 SoundknowledgeonEngineandGeneratorsMechanicaland
ElectronicGovernorrelatedjobs.
 OperationandMaintenanceOfElectricalsubstationsandtheirEquipments.
 Havestrongcommunicationandteambuildingskills.
 Compressor&ROplantoperationandmaintenance.
 ExposuretocustomerO&Mandmarineenvironmentsinvarious
assignments.
 Skillsinmanaginginstallation,commissioningactivitiesaswellas
planned/preventive/Predictive/breakdownmaintenance.
 Detailorientedwithananalyticalbentofmindandpositiveattitude.
 Proficiencyatgraspingnewtechnicalconceptsquickly&utilizing
theminproductivemanner.
 Havebeenproactiveandfocusedasstudent.
 Aneffectivecommunicationwithstrong
analytical,interpersonal,problemsolving&organizationalabilities.
 ProficientinManagementandISOActivities.
SkillsSummary
TechnicalSkills:
EstablishingProjectreview,monitoringandStatusreporting
ProcedurestoaccuratelyReportprogressoftheprojecttothestake
holdersanduserclients.
Planningandeffectingpredictive&preventivemaintenance
scheduleForvariousequipmenttoincreasemachineuptime&
equipmentreliability.
Implementingmaintenancescheduleandcarryingoutperiodic
checkstoensureperformanceofequipmentandmaintaining
requisitedocumentsforthesame.
Maintainingandensuringstringentadherencetoqualitystandards,
norms&practices,identifyinggapsandtakingcorrectiveactive.
Designplantlayout,makingdrawing,approvingthemandcarrying
outinspectiontestsfordeterminingtheeffectivenessoftheplant
equipment.
Familiarwithbasicpowerplantdocuments.
Trainedinfirefightingandrescueoperationalfromtamilnadufire
andrescuedepartment.
HandsonworkinallWoodwardMechanicalandElectronic
Governors.
HavesuccessfullyretrofittedExistingmechanicalgoverningsystem
withfullyelectronicgoverningsysteminvariousEnginesand
turbines.
Thisincludestheselectionandstudyofsuitablecontrolsystem,
programming,pipelinedesignaccordingtothesystemrequirement.
Havingavastknowledgeandhandsonexperiencewithall
Woodwardspeedcontrolsandabletodismantle,assemble,testing,
calibrationandtroubleshootingofallelectronicandmechanical
governors
HavingElectricalSupervisorCompetencyCertificate,(C-licence)
Quotation,RetrofitProposal,Negotiation,PanelWiring,Installation,
CommissioningFieldService,RootcauseAnalysis,TroubleShooting,
ProjectHandling,Overhauling&Calibration
ProfessionalExperience:
Organization :WARTSILAINDIALTD.,(INDIA)
Duration :2009-2014
Designation : ELECTRICALENGINEER
Organization :OPERATIONALENERGYGROUP(SAUDIARABIA)
Duration :JULY2014–NOV2015
Designation :ELECTRICALENGINEER
Organization :WARTSILAINDIALTD.,(INDIA)
Duration :JAN2016–APRIL2017
Designation :ELECTRICALENGINEER
Organization :GOLTENSBAHRAINCO.SPC(WoodwardAISF)
Duration :MAY2017–TILLDATE
Designation :TECHNICALSPECIALIST
(ELECTRICALINCHARGE&GOVERNORS)
Qualification
 D.E.E.Engineering(2006-2008)-ChandyPolytechnicCollege–
Tuticorin,
Natureofwork
 Maintenanceof11/433KV&6.6KV/433&13.8KV/380Transformersof1000KVA&
2000KVA&750KVAcapacity.
 MaintenanceofPowercontrolCentre&motorcontrolcentre
 RewindingofMotorsupto50HP
 Overhaulingofthree&singlephasemotors&Gearmotorsupto75HP.
 Maintenanceandinstallationoflightfittings.
 Electrificationofbuildings
 MaintenanceoftelephoneInstruments,Automobileselfstarter/Alternator.
 MaintenanceofL.T&HTSwitchgears.
 InstallelectricalEquipmentssuchasLTMotors,ControlPanels,Modules,Breakersetc.,
 OperationandMaintenanceofAlternatorandEngine.
 Electricaldrawingspreparationandreadings.
 Substationoperationandmaintenance.
 Relayscheckingandsettings.
 Powerplantinstrumentationworkslikesensor’scalibrationetc.
 Monthlybillreportpreparation
 Maintainingplantavailabilityandreliabilitybyreducingoutages.
 ExecutionofMaintenancemanagementandachievingzeropendingworkorders.
 Switchyardmaintenanceandoperations.
 Vacuumcircuitbreakers,OilcircuitbreakerandSF6breakersoperationandmaintenance.
 Preparationofpreventivescheduleandpreventivemaintenanceofallequipments.
 Preparationofschedulemaintenancesbreakers,generator,gearboxandpanelboards.
Jobincludes:
 CalibrationofInvertors,thyristors,Encoders& ResolveswithPLC systemsandtheir
responsibleEquipments.
 Inspectionandcheckingof2500KVA&2000KVATransformer,OCB,ACB,VCB,CT,PT.
 Settheinitialsettingforthermostatandhygrostatforcoolingandheading.
 AttendingBreakdownmaintenanceinmachinerybytracingtheelectricalcircuitswiththe
helpofSingleLineDiagram.
 UPTO155KWMOTORSstarDeltastarterworks
 Troubleshootingofcontrolwiringbytracingsinglelinediagram.
 UpdatingtheMaintenanceRecordsintheSystem forfutureanalysisandimprovement
activities.
 ObeyingthecompanyHSEpolicyatalltimesandworkisbeingexecutedinscheduledtime
inasafeandsecuremanner.
 RoutineCheckingofTransformer,switchgears.
 UpdatingtheLogbookandpreparetheListofsparesrequired.
 Experiencein12V32LNengine48000hrsoverhauling.
 Experiencein18V32LN,48000hrsoverhauling.
 Experiencein18V32,W32,48000hrsoverhauling.
 ExperienceinDEUTZBV12M540majoroverhauling.
 ExperienceinDEUTZBV12M640majoroverhauling.
 ExperienceinABBTurbochargerTPL65,TPL69.
 ExperienceinNAPIERTurbochargermajoroverhauling.
 CarryingoutroutinemaintenanceofFuelandLubeoilseparators,compressorsandscrewpumps.
 Boileroperations&attendedtheBoilerannualinspections.
 BoilerRCpump&feedwaterpumpservicing&routinemaintenance.
 TrainedinFirefightingandRescueoperationfromTamilNaduFireandRescueDepartment.
PERSONALDETAILS:
Name :A.HONESTRAJ
FatherName :Mr.A.AYYANDURAI,
ADDRESS :1,1-20BharathiNagar,
KonurPost,MetturDam,
Salemdistrict-INDIA
Email :honest24raji@gmail.com
DateofBirth :25
th
July1987
Nationality :Indian,Married
PassportNo :J4954949
DECLARATION:
Iherebydeclarethattheaboveinformationgivenbymeisgenuinetothebestofmyknowledge
andifgivenachanceIwouldliketorendermyhonestservicetoyouresteemedworkplace.
Date: Yoursfaithfully,
Place:BAHRAIN (A.HONESTRAJ)

More Related Content

Similar to Power Plant Engineer honest24raji@gmail.com

ALi Othman CV - Sep 2016
ALi Othman CV - Sep 2016ALi Othman CV - Sep 2016
ALi Othman CV - Sep 2016
Ali Othman
 
ElectricalInstrumentation Engineer
ElectricalInstrumentation EngineerElectricalInstrumentation Engineer
ElectricalInstrumentation Engineer
muhammad siddiqui
 
MIKE_CV NEW 2016
MIKE_CV NEW 2016MIKE_CV NEW 2016
MIKE_CV NEW 2016
mike stone
 
MIKE_CV NEW 2016
MIKE_CV NEW 2016MIKE_CV NEW 2016
MIKE_CV NEW 2016
mike stone
 
Curriculum vitea Raffie(Offshore)
Curriculum vitea Raffie(Offshore)Curriculum vitea Raffie(Offshore)
Curriculum vitea Raffie(Offshore)
raffie yidin
 
ramez_el_sayed_sami_ahmmed_(1) (2)
ramez_el_sayed_sami_ahmmed_(1) (2)ramez_el_sayed_sami_ahmmed_(1) (2)
ramez_el_sayed_sami_ahmmed_(1) (2)
ramez El sayed sami
 
Curriculum Vitae (2015)
Curriculum Vitae (2015)Curriculum Vitae (2015)
Curriculum Vitae (2015)
Jay Arances
 

Similar to Power Plant Engineer honest24raji@gmail.com (20)

ALi Othman CV - Sep 2016
ALi Othman CV - Sep 2016ALi Othman CV - Sep 2016
ALi Othman CV - Sep 2016
 
TakanahProfie2016
TakanahProfie2016TakanahProfie2016
TakanahProfie2016
 
SHAMMAS CV
SHAMMAS CVSHAMMAS CV
SHAMMAS CV
 
Haja's updated CV
Haja's updated CVHaja's updated CV
Haja's updated CV
 
ElectricalInstrumentation Engineer
ElectricalInstrumentation EngineerElectricalInstrumentation Engineer
ElectricalInstrumentation Engineer
 
MIKE_CV NEW 2016
MIKE_CV NEW 2016MIKE_CV NEW 2016
MIKE_CV NEW 2016
 
MIKE_CV NEW 2016
MIKE_CV NEW 2016MIKE_CV NEW 2016
MIKE_CV NEW 2016
 
ASHIQ.CV.
ASHIQ.CV.ASHIQ.CV.
ASHIQ.CV.
 
CV_ABDELKARIM
CV_ABDELKARIM CV_ABDELKARIM
CV_ABDELKARIM
 
MAAS NEW CV - pdf
MAAS NEW CV - pdfMAAS NEW CV - pdf
MAAS NEW CV - pdf
 
PRADEEP BALAN
PRADEEP BALANPRADEEP BALAN
PRADEEP BALAN
 
Mohesn Abdelaty C.V
Mohesn Abdelaty  C.VMohesn Abdelaty  C.V
Mohesn Abdelaty C.V
 
Mohanad 123-4
Mohanad 123-4Mohanad 123-4
Mohanad 123-4
 
Curriculum vitea Raffie(Offshore)
Curriculum vitea Raffie(Offshore)Curriculum vitea Raffie(Offshore)
Curriculum vitea Raffie(Offshore)
 
ramez_el_sayed_sami_ahmmed_(1) (2)
ramez_el_sayed_sami_ahmmed_(1) (2)ramez_el_sayed_sami_ahmmed_(1) (2)
ramez_el_sayed_sami_ahmmed_(1) (2)
 
my C.V Mohanad Zaki
my C.V Mohanad Zakimy C.V Mohanad Zaki
my C.V Mohanad Zaki
 
Texvyn Prolearn 2016
Texvyn Prolearn 2016 Texvyn Prolearn 2016
Texvyn Prolearn 2016
 
Curriculum Vitae (2015)
Curriculum Vitae (2015)Curriculum Vitae (2015)
Curriculum Vitae (2015)
 
R Crossman Resume
R Crossman ResumeR Crossman Resume
R Crossman Resume
 
MYCVDAHALAN
MYCVDAHALANMYCVDAHALAN
MYCVDAHALAN
 

Recently uploaded

Complex plane, Modulus, Argument, Graphical representation of a complex numbe...
Complex plane, Modulus, Argument, Graphical representation of a complex numbe...Complex plane, Modulus, Argument, Graphical representation of a complex numbe...
Complex plane, Modulus, Argument, Graphical representation of a complex numbe...
MohammadAliNayeem
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Lovely Professional University
 

Recently uploaded (20)

Electrical shop management system project report.pdf
Electrical shop management system project report.pdfElectrical shop management system project report.pdf
Electrical shop management system project report.pdf
 
Software Engineering - Modelling Concepts + Class Modelling + Building the An...
Software Engineering - Modelling Concepts + Class Modelling + Building the An...Software Engineering - Modelling Concepts + Class Modelling + Building the An...
Software Engineering - Modelling Concepts + Class Modelling + Building the An...
 
Theory for How to calculation capacitor bank
Theory for How to calculation capacitor bankTheory for How to calculation capacitor bank
Theory for How to calculation capacitor bank
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
 
Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2
 
ROAD CONSTRUCTION PRESENTATION.PPTX.pptx
ROAD CONSTRUCTION PRESENTATION.PPTX.pptxROAD CONSTRUCTION PRESENTATION.PPTX.pptx
ROAD CONSTRUCTION PRESENTATION.PPTX.pptx
 
Intelligent Agents, A discovery on How A Rational Agent Acts
Intelligent Agents, A discovery on How A Rational Agent ActsIntelligent Agents, A discovery on How A Rational Agent Acts
Intelligent Agents, A discovery on How A Rational Agent Acts
 
Complex plane, Modulus, Argument, Graphical representation of a complex numbe...
Complex plane, Modulus, Argument, Graphical representation of a complex numbe...Complex plane, Modulus, Argument, Graphical representation of a complex numbe...
Complex plane, Modulus, Argument, Graphical representation of a complex numbe...
 
Quiz application system project report..pdf
Quiz application system project report..pdfQuiz application system project report..pdf
Quiz application system project report..pdf
 
Supermarket billing system project report..pdf
Supermarket billing system project report..pdfSupermarket billing system project report..pdf
Supermarket billing system project report..pdf
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
 
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfRESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
 
2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge
 
Introduction to Heat Exchangers: Principle, Types and Applications
Introduction to Heat Exchangers: Principle, Types and ApplicationsIntroduction to Heat Exchangers: Principle, Types and Applications
Introduction to Heat Exchangers: Principle, Types and Applications
 
E-Commerce Shopping using MERN Stack where different modules are present
E-Commerce Shopping using MERN Stack where different modules are presentE-Commerce Shopping using MERN Stack where different modules are present
E-Commerce Shopping using MERN Stack where different modules are present
 
Circuit Breaker arc phenomenon.pdf engineering
Circuit Breaker arc phenomenon.pdf engineeringCircuit Breaker arc phenomenon.pdf engineering
Circuit Breaker arc phenomenon.pdf engineering
 
Dairy management system project report..pdf
Dairy management system project report..pdfDairy management system project report..pdf
Dairy management system project report..pdf
 
Artificial Intelligence Bayesian Reasoning
Artificial Intelligence Bayesian ReasoningArtificial Intelligence Bayesian Reasoning
Artificial Intelligence Bayesian Reasoning
 

Power Plant Engineer honest24raji@gmail.com