SlideShare a Scribd company logo
1 of 11
CURRICULUMVITAE
Name :HAZEMABD EL- AZEMGOBRAN
PresentAddress:ABUDHABIREFINERY - MAINTENANCEDEPARTMENT
PO.BOX3087.
Telephones: 009712 - 60-25034(Office) AbuDhabi
Mobile : 00971504441768/ 00971508184924
Email :gobranhazem@yahoo.com
:hgobran@takreer.com
Date of Birth:14th June,1954.
Nationality:Egyptian.
Marital Status:Married.
Languages:Arabicand English-Fluent
Education:B.Sc.In Mechanical powerengineering-June 1978
PassportNo.A13172695-Expire Date 03/09/2021
Professional / RelevantExperience
Widelyexperiencedengineeringwithextensiveknowledge muchgainedthroughpositionsheldduring
36Years withlarge scale refineries,Petrochemical andOil productionindustrythroughoutEgypt,Kuwait,
Syriaand AbuDhabi
Key skills& AssignmentRanges
 Maintenance managerrefinery/oil &gas
 Comprehensiveassetintegrity solution provider
 RCM Facilitator
 Turnaround/Shutdownin-charge of entire refinery
 Turbo-Machinery overhauling,Conditionmonitoringandmaintenance
 Reliabilityengineering
 Erection &commissioningin-Charge.Closelyinvolvedinconstruction,commissioningof projects
relatedtorefineries,GasandPetrochemicalsplants
 Strongengineeringandtechnical skillsdevelopedfromprogressiverolesin
Industry. Specializinginthe engineering,Equipmentselection,Bidsevaluation
 Depthof international experience hasallowedbroaddevelopmentof analytical
Skills,costeffectiverepairapproachandenhance equipmentreliabilityand availabilityThrough
RCA,FMEA, analysisof MTBF and KPI
 Experienced innegotiatingwithcontractorsandequipmentvendors.
 Alwaysquicklycontributestobusinessperformance improvementandadeptto
Local culture andbestpractices.
 Work hard and cope anywhere withsustainedpressure inbothdifficultliving
In additiontoworkingenvironments.
 Work well as teamplayerandbuildrapportat all levelsthroughgood
Communicationskills,highvisibilityandacommonsense fundamentalapproach
 Supervise multinational,multidiscipline maintenanceteam
PresentJob
Mechanical maintenance sectionhead
ABU DHABI-RUWAISREFINERY- (Takreer)
Since 2010 till todate.
Computersskills : Skilledinmostof commercial software programs
Referencesare available on request.
Special Task: -ResidentrotatingequipmentengineerforEgyptianpetrochemical Co. InItalyandJapan
withT.P.Land Toyo engineeringasgeneral contractorsalongwithBF-GoodrichandAZAHIGlassas
licensorsduringprojectdesignandequipmentselectionstage.
AttendModel reviewforBase oil andcarbonBlack projectsat M/s Hyundai and M/s Samsungoffices
AlongwithplantsConstruction,pre commissionandcommissioningatRuwais refinerysite.
Training courses:
• Practical solutionstomachineryandmaintenance vibrationproblems- Update
International Inc.-AbuDhabi
• S-RCM–SHELL-ABU DHABI
• Root Cause AnalysisMethodology –RCI,PROACT
• Machinerydiagnostics -BentlyNevada- AbuDhabi
• PlantReliability - EXXON ResearchandengineeringCo.Mechanical powerengineering
• Total QualityManagementbyStrategichumanresourcesLimited- AbuDhabi
• Computerizedmaintenance managementsystem(MAXIMO) - AbuDhabi
• Predictive maintenance andbalancingtechniquesformachinery
Equipment-IRD- Egypt
• Environmentandoccupational healthprotection- ADNOC
• Technical reportwriting -ADNOC
• Maintenance andoperationof centrifugal gascompressorByDresser-Rand
• Maintenance andoperationof Steamturbine Dresser-Rand- AbuDhabi
 Combustiondesign,Heaters,burnersoperationandmaintenance –JOHN ZINK
 Octane analyzerengine - CORELAB- AbuDhabi
• Corrosionprotectiontechniquesandmaterial selection –ENPPI-- Egypt
• Weldingprocesses –ENPPI-- Egypt
• Chemical engineeringfornon-chemical engineers –ENPPI-- Egypt
• Vibrationof turbomachinery –AMTA-- Egypt
• Supervisingsafetyskills workshop - shell-H.F.Consultants-Syria
• JhonZinkburnerand heatersheattransfer- AbuDhabi
• -Vibrationmeasurementsinuse of ShockPulse method
• -HAZOP&HAZOPAreaClassification-ABUDHABI
• HSE Management-ABUDHABI
 Root cause failure analysis techniques.ABUDHABI
Seminars:
• Solargas turbines
• Predictive maintenance,on-line conditionmonitoringof Rotating
• Machinesand highvoltage equipmentbyAVACO
• Pumpprotectionandvalve selectionbyYarway - Keyston
• ReciprocatingcompressorvalvesreconditioningbyHoeribiger
• Turbo machinerycontrol by Bentley Nevada
• Turbo machineryandcontrolsbyHoneywell &compressorcontrol corporation
• Johncrane and Sealol mechanicalanddrygas seals
• Advancedthermal spraycoatingtechnology
• RefineryandPetrochemical heatexchangerapplications-SANDVIK-ABUDHABI
CertificatesofRecognition:
• BestHSE performerforyear2001
• BestEnvironmental performance foryear1998
• Reliabilitycenteredmaintenance S-RCM-2009
• Maintenance Auditing,benchmarking&Improvement-2005
• Bestpractice in maintenance management
• ReliabilityCenteredMaintenance&Total Productivemaintenance
• Machineryvibration&conditionmonitoring
DETAILED EXPERIENCE:-
2010 To Present RUWAIS REFINERY – Takreer - U.A.E
TAKREER isone of ADNOCgroupsof companies;Takreerwasestablishedto carry out
the Oil RefiningIndustry.isdividedintosevenpackages:acrude distillationunit,a
residual fluidcatalyticcrackingcomplex,offsites andutilities,storage tanks,site
preparationandmarine facilities.
RefiningCompany(Takreer) expansionproduction of the Ruwaisrefiningcomplexby
400,000 barrelsa day(b/d) to take itto more than800,000 b/d.The refinerywill
alsobe integratedwithneighbouringpetrochemicalscomplexesandsupplyupto
1.1 milliontonsayearof propylenetothe nearbyplasticscomplex runbyAbuDhabi
PolymersCompany(Borouge).
Position:- Mechanical maintenance sectionhead / Deputy Mechanical Manger -Maintenance
Division.
Rolesand responsibility:-
• Utilizes the Performance Management Programme (PMP) to evaluate operation performance.
• Overseas all reliability indices, identifies gaps and provides solutions accordingly.
• Ensures the availability of mechanical plant equipment and spare parts for routine and
emergency maintenance.
• Reviewstaskanalyseswithreference to potential loss and safety hazards including identifying
critical tasks.
• Distributes workloads to the Mechanical Engineers by capturing and scheduling work orders
from the MAXIMO system.
• LiaiseswithotherMaintenance SectionHeadsand senior Operations Department personnel to
coordinate inter discipline work activities or to arrange for plant shutdowns, major overhauls
and other maintenance planning activities.
• Coordinates with outside consultant to solve problems, if required.
• Prepares reports of monthly maintenance activities.
• Updates the progress of individual maintenance and inspection activities.
• Prepare the Section preliminary annual capital and operating budgets, including provision for
annual direct hire and contracted manpower.
• Reviews bids submitted by contractors and estimates provided by engineers.
• Reviews invoices and provides endorsement for further payment processing.
• Knowsthe Company’sHealth,Safety, Environment and Fire policy, procedures, regulation and
objective and ensures they are effectively implemented by Section staff.
• Arranges for training of Section personnel on safe practices and emergency procedures.
• Reviews task risk analysis for special maintenance jobs as per Takreer HSE –CP’s.
• Mentors Section Developees, in accordance with the company’s Emiratisation policy.
• Supportsdevelopmentprogrammestotrain, motivate and retain employees, providing formal
and informal appraisal and feedback.
• Establishesincoordinationwiththe TrainingandDevelopmentSectionpersonnel,objectives for
subordinate staff and monitors their achievements.
1995 To 2010 ABU DHABI REFINERY – Takreer - U.A.E
Overall, crude-refining capacity is 85,000 BPSD.
It consists of crude distillation, Naphtha Hydrotreater
Catalytic Reformers (continuous regeneration type)
LPG recovery, Sour water stripping, Utilities, cross country piping
Network including IRP facilities
Position:SeniorReliabilityEngineer./ DeputyMechanical SectionHead , Maintenance department.
Rolesand responsibility:-
• Sr. ReliabilityEngineerassumesresponsibilityof SectionHeadduringabsenceof
Mechanical sectionHead.Purposesof the subordinatejobsduringthisperiod.
Provide fieldsupportforall respective discipline activitiespertainingtoMechanical
Sectionincludingrotatingandstaticequipment,mainworkshopactivities,civil work,
Andheavyequipmentwork.
• Responsible forprovidingengineeringsupportforall the Maintenance Dept.activities
PertainingtorotatingEquipment.The assetstobe maintainedconsistof processunits,
Off sites,utilities,oil movementandcrosscountrypipingnetworkincludingIRPfacilities
Consistingof large distance pipingfromMussafahtoRuwais,Al Ain,&AbuDhabi Air
Port.
• Conductsroot cause failure analysisandresolutionof repetitiveorchronicequipment
Reliabilityproblems.
• Developsrotatingequipmentbreakdownsarchive anddatabase tofacilitate critical
Examinationof all failure occurrencesandtranslate findingsintoactionsnecessaryto
Avoida repeatfailure fromthe same cause.
• Review,update equipmenthistoryconsideringMTBF,MTTR Valuesaswell asother
Performance indicators.Actsasinternal QA/QCforPMand PdMprograms of rotating
equipmentparticipationandensuresthatnecessaryremedial actionsare followedupand
implemented.
• Prepare scope of workof turbomachinerymajoroverhauling,Participatesduringplanning,
executionandfollow-upstagesof turnaround/majormaintenanceactivities.
• ReviewOEMfindingsreport,Studythe feasibilityof OEMrecommendations,Prepare and
followupnextactionplan,Amend scope of work.
• Involvementindevelopingnew PMsfornew projectsor modifiedequipment.
• Continuouslymonitorsandevaluatethe effectivenessof PMand PdMprograms based
On equipmenthistory,Failure modesandeffectanalysis.
• ReviewsrepairfeedbackhistoryentryinMaximoforitscompleteness.PerformsAnalysisof
MTBF and otherKeyPerformance IndicatorsandrecommendsimprovementActions.
• Performsorparticipatesinthe review,studiesandevaluationof engineeringpackages
For newprojects,in-house modificationsanddesignchangesinrelationtorotating
• Equipment.ParticipatesinHazopstudy,coordinatesspare /SPIRstocking,pre-
Commissioning,commissioningandhandover.
• MonitorsStock items,preparesMMDCwheneverrequiredandcoordinatesmaterials
relatedactivitiesinnewproject.
• Assistsinthe developmentof proceduresandstrategiestoensure equipmentis
Maintainedandoperatedsuchthatthe inherentreliabilityisachievedbased
Maintenance manual andbestpractices.
• Reviewsrequirementsof sparesandmaterials,advisesonstocklevelsandmaterial
description,andprovidessuggestionsforalternativesorinter-changeabilityof parts.
• CarriesoutCapital & OperatingBudgetexerciseincludingpreparationof technical
specification,budgetaryestimationandstatementof requirement(SOR) etcfor
Maintenance departmentworkplanand5-yearrollingplan.
• Assistsinpreparingtrainingprogramsforstaff andUAE National employeesundergoingon-
the-jobtrainingbyidentifyingspecifictrainingneeds. Providesessential trainingand
guidance totrainees,developeesandothersubordinateswithaclearobjective of career
development.Preparesmaintenance trainingmaterialsfor rotatingequipment.
• ParticipatesandcoordinatesHSE,RiskAnalysisactivities.InvolvementinPreparation
of HSEMS Plans/Programs.
• Prioritiessite workactivitiesbaseduponequipmentcriticalityandFailureConsequences.
• Participate inanalyse KPI’sonmonthlybasis.
• Periodicreviewof incidenthistoryand implementingactionstopreventfailures.
• Ensuringmaintenance proceduresare implementedandassistindevelopment
, Implementationof computerizedmaintenance system(MAXIMO).
• Participate incosteffectiveachievementof plantmachineryreliabilityandavailability
Targetsthrough FMEA and analysisof MTBF,KBI and implementationof reliability
Improvementrecommendations.
• Carry out vibrationanalysisidentifyingthe cause of vibration,recommending
The corrective actions. -Vibrationanalysisforcritical andnon-critical rotatingequipment
By CSI (VibrationAnalyzer2110 system).
• Ensuringnewdesignsandmodification,replacementequipmentincorporate
Reliability,availability,maintainabilityandoperability.
• Evaluatingthe effectivenessof existingpredictive maintenance activitiesby
Reviewingthe resultsaftercompletionof remedial action.
• Major expansionprojectsupport,review of designbasisbefore anydetailed
Engineering.
• Provide engineeringassistance tothe developmentengineeringsection
In mechanical design,specificationpreparation,vendorselectionandbids
Evaluation
• Initiatedjointownership,teamwork,continuesimprovementwithoperationon
System/equipmentresultinginimprovedequipmentreliabilityandhigher
Production
• Preparationof equipmentpartsreconditioningscope of work.
• Reviewandcommentonvendormaintenance&operationmanualsforrotating
Equipment.
• Reviewandapprove contractorandvendor'sPre-commissioningprocedures
• Co-operate withsafetyandoperationtoprepare jobsafetyanalysisproceduresfor
• Vessels,ReactorsandHeaters
• Involvedininvestigationof refineryprocessheatersproblemsandfollow upthe remedial
Actionsimplementations
• Guide AreaengineersforfollowingequipmentMajoroverhaul andtroubleshooting:Byron
Jackson, Hyward tyler,worthingtion,IngrsollRand,Sundstrandsingle/multistage centrifugal
pumpsand Broomwade,Ingersoll-Rand,Thomasen,Thomassen,thome crepelle.Airandgas
reciprocatingcompressorsandWorthingtonsteamturbine
• Preparingscope of workfor heatexchangersrepairing,Re-tubing,etc
• ConsultancyServicesfortenderevaluation
• Responsible tocarryout the technical evaluation,tabulation,andalignmentof un-priced
tendersalongwithattendance of clarificationsmeetingwiththe clientandthe tenderersfor
newprojects
Special tasks
Directsupervise the followingcentrifugalcompressorsandsteamturbinesoverhauling(DuringGRSD)
failure analysisand troubleshooting:
DresserRandgas compressortype/2508 B 8 no of stages/ 8
DresserRand steamturbine type/1UR1(SV) noof stages/ 8
Ebara Elliotte gascompressor type/20MB7 noof stages/7
Demage gas compressor type/MV 3A no of stages /3
Seminessteamturbine type/NK25/28/121.5.3 no of stages/15
-Implementtrapmansystemforsteamtraps failure analysis
-Coordinate andattendance the repairingof PACKINOXplate heat
Exchangerwithvendorspecialist
1991 To 1995 AL Furate petroleumcompanyAFPC Seria.
A newoil fielddevelopment,comprisingof ajointventure
BetweenSyriapetroleumdevelopmentandShell.
Consistingof fourcentral processingfacilitiesandtwenty
Five remote gatheringstationsplusliquefactionof gas. Producing400,000bpd.
Position:Mechanical maintenance engineer
• Supervise all routineandbreakdownmaintenanceonvariousstaticand
• Rotatingequipmentrelatedtothe central productionfacilitiesandeightremote
• Gatheringstations.
• Supervise the provisionof maintenanceserviceforoil fieldfacilitieswhich
• Include waterinjection,powergeneration,gas/oil separationunits,andwell
• Heads
• Assistedinthe preparationof predictive,preventivemaintenance programsfor
• Mechanical Equipmentinthe plant
• Prepareddetailedequipmentchecklistsforof equipmentuponworkcompletion.
• Followedupandadvisedonspare partreplacement,reconditioningorreplenishment.
• Guidance andadvice the actionto be takenforchronic problems.
• Responsible fordevelopingpredictive maintenance programforrotatingequipment
• Managed,researched,developedandmaintainedequipmenthistory.
• -Vibrationmonitoringof machinerywithportabledataterminals.
• Plannedforshutdownconsideringmanpower,material andspecialequipment
• Requirement.
• Responsible foroverhaulingandtrouble shootingof the followingequipment:
• Solargas turbine Centaurmodel GSI/CBeach2 MW, Highindustriareciprocatinggas
compressormodel F565, InstrumentaircompressormanufacturedbyWilliamJamesmodel
K695, Compare model Dv200 ,JOY Model WHLO122B. Centrifugal pumpsbyUnion,Golds,
ByronJaksonandFisher.Waukeshagasengineseach500HP model VHPseriesl7042,
Caterpillargas/dieselenginesG399/D399 500HP and Cumminsmodel N855.
1982 To 1991 Egyptian petrochemicals80,000T Consistingof five central
ProcessingunitsPVC,VCM,ChlorineUnits
Ethylene handlingfacilityandPowerstationcombinecycle
Plant45MW.
Positions:1982 to 1985 Designand construction engineer.
1985 to 1986 Rotating equipmentengineer
1986 to 1990 Rotating equipmentsectionhead
1991 to 1991 rotating equipmentdepartmentmanager
• Evaluatingand approval of technical proposalsforrotatingequipmentaccordingtoAPI
Codesandcompanyspecification
• AttendedasresidentrotatingequipmentengineerduringengineeringstudiesinITLALY
AndJAPAN.Inco-operationwithT.P.LandToyoas general contractor,BF- Goodrich
AndAZAHIGlass Aslicensors.
• Attendandparticipate inengineeringmeetingandvendorsclarificationmeeting..
• Attendandparticipate the evaluationof highandlow-densitypolyethylene plantbidders
AndPowerStationcombine cycle Plant45MW.
• Reviewandcommentonvendormaintenance&operationmanualsforrotating
Equipment.
• Reviewandapprove contractorandvendor'sPre-commissioningprocedures
• Supervise andfollowupof Pre-commissioningactivitiesof plantmachinery
• Supervisedconstruction,commissioning,andstartupfor the entire petrochemical
• Units
• Ensuringnewdesignsandmodification,replacementequipmentincorporate
Reliability,availability,maintainabilityandoperability.
• IdentifyingandsupportingP.Mactivitiesforrotatingequipment
• Supervisedthe executionandFieldmaintenance supportof majoroverallsandSpecific
• Repairsforall kindsof rotatingequipment.
• Major expansionprojectsupport,review of designbasisbefore anydetailed
Engineering.
• Troubleshootinganalysisandsolvedcorrosionproblems
• Preparationof annual operatingbudgetplans.
• Participatedinplantshutdownpreparingplane
• Raisedtechnical reportsandfollowedupthe replenishmentof store stocks
• Participatedintraininganddevelopmentof new engineersandtechnicians
• Recommendedthe requiredremedial actionforchronicproblems.
• Advisedplantsmodificationandstudiedtechnical proposalsforextensions.
• Responsible forMajoroverhaulingandtrouble shootingof the following equipment:
reciprocating,centrifugal andscrew compressorsmanufacturedbyIngersoll Rand(type XLE),
Kobe steel model Ks25L(Hydrogen).Borsigcentrifugal compressor(2stages)andNashliquid
ringcompressors, Steamturbine byworthingtonTurbodyne,multi andsingle stages
centrifugal pumpsbyWorthington,KSB,Sulzer,Nikkisoandsunstrand.PVCagitatorby
chmineerandrotarydryer byAllisCharmels,PVCpackingunit,
PVCcentrifuge andscreenerbyBIRD.
1990 To 1990 Kuwait National petroleumcompany (KNPC).
MINA ABDULLA Refinery
Positions:Rotating equipmentmaintenance engineer.
• Troubleshootingof existingchronicproblems,repetitive andcostlyfailuresand
Developmentlongtermsolutions.
• Fieldmaintenance supportformajoroverhauls
• Spare parts review(changes,updateandspecificationissue)
• Reportedfailure analysisalongwithrootcause of failure.
• Responsible forrepairingmultistage centrifugalcompressorsbyMitsui and
Steamturbine byWorthington turbodyne andmultistage centrifugalpumps.
1980 To 1982 Alexandriapetroleumcompany refinery-Egypt
Positions:Rotating equipmentmaintenance engineer.
• Executedmajoroverallsandspecificrepairsforrotatingequipment.Trouble shooting
Analysis.Assistance forequipmentselectionwhichinclude specification
• Preparation,vendorselection,andbidevaluationfornew distillationunitand
Extensions.Attendedconstruction,commissioningandthe start upof new distillationunit
and Lube oil plantwithSHOUDA as general contractorandLUMUS as licensor
• Reviewandcommentonvendormaintenance&operationmanualsforrotating
• Equipment.
• Reviewandapprove contractorandvendor'sPre-commissioningprocedures
• Supervise andfollowupof Pre-commissioningactivitiesof plantmachinery
• Responsible forrepairingof centrifugal andReciprocatingcompressorsmanufacturedby
Ingersoll Rand,JoyandElliot,Multi andsingle centrifugal pumpsbyWorthington,KSBand
Goulds.
1978 TO 1980 Militaryservice.

More Related Content

What's hot

Company Profile - 2014
Company Profile - 2014Company Profile - 2014
Company Profile - 2014Ryan Gairdner
 
Hook-up and Commissioning (HUC) Services
Hook-up and Commissioning (HUC) ServicesHook-up and Commissioning (HUC) Services
Hook-up and Commissioning (HUC) ServicesDimension All Group
 
CURRICULUM VITAE OF B EVERT 2016
CURRICULUM VITAE OF B EVERT 2016CURRICULUM VITAE OF B EVERT 2016
CURRICULUM VITAE OF B EVERT 2016Bruce Evert
 
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...Saleem P.P
 
PG Global Presentation
PG Global PresentationPG Global Presentation
PG Global Presentationhaynesee
 
Rigless Intervention: Slickline, Coiled Tubing, Hydraulic, Workover & New Tec...
Rigless Intervention: Slickline, Coiled Tubing, Hydraulic, Workover & New Tec...Rigless Intervention: Slickline, Coiled Tubing, Hydraulic, Workover & New Tec...
Rigless Intervention: Slickline, Coiled Tubing, Hydraulic, Workover & New Tec...petroEDGE
 
Darien Horne, chrono
Darien Horne, chronoDarien Horne, chrono
Darien Horne, chronoDarien Horne
 
T Pearce CV PIPNG MANAGER ENGINEER 2015
T Pearce CV PIPNG MANAGER  ENGINEER 2015T Pearce CV PIPNG MANAGER  ENGINEER 2015
T Pearce CV PIPNG MANAGER ENGINEER 2015Terry Pearce
 
Pg Global Presentation 17th March 2011docx
Pg Global Presentation  17th March 2011docxPg Global Presentation  17th March 2011docx
Pg Global Presentation 17th March 2011docxralphowen
 
PD Hunt 2015
PD Hunt 2015PD Hunt 2015
PD Hunt 2015Pat Hunt
 
KONDA REDDY_R101276_IMPLEMENTATION DESIGN FOR INSPECTION OF O-RINGS
KONDA REDDY_R101276_IMPLEMENTATION DESIGN FOR INSPECTION OF O-RINGSKONDA REDDY_R101276_IMPLEMENTATION DESIGN FOR INSPECTION OF O-RINGS
KONDA REDDY_R101276_IMPLEMENTATION DESIGN FOR INSPECTION OF O-RINGSKesava S
 
Pollard Equipment Capabilities 2012
Pollard Equipment Capabilities 2012Pollard Equipment Capabilities 2012
Pollard Equipment Capabilities 2012GMoore77
 

What's hot (20)

nsrpcv
nsrpcvnsrpcv
nsrpcv
 
Company Profile - 2014
Company Profile - 2014Company Profile - 2014
Company Profile - 2014
 
SOS Brochure P
SOS Brochure PSOS Brochure P
SOS Brochure P
 
Dimension-All Manpower
Dimension-All ManpowerDimension-All Manpower
Dimension-All Manpower
 
Hook-up and Commissioning (HUC) Services
Hook-up and Commissioning (HUC) ServicesHook-up and Commissioning (HUC) Services
Hook-up and Commissioning (HUC) Services
 
CURRICULUM VITAE OF B EVERT 2016
CURRICULUM VITAE OF B EVERT 2016CURRICULUM VITAE OF B EVERT 2016
CURRICULUM VITAE OF B EVERT 2016
 
CV JAN SINGELS
CV JAN SINGELSCV JAN SINGELS
CV JAN SINGELS
 
CV
CVCV
CV
 
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
 
PG Global Presentation
PG Global PresentationPG Global Presentation
PG Global Presentation
 
Resume
Resume Resume
Resume
 
Rigless Intervention: Slickline, Coiled Tubing, Hydraulic, Workover & New Tec...
Rigless Intervention: Slickline, Coiled Tubing, Hydraulic, Workover & New Tec...Rigless Intervention: Slickline, Coiled Tubing, Hydraulic, Workover & New Tec...
Rigless Intervention: Slickline, Coiled Tubing, Hydraulic, Workover & New Tec...
 
Darien Horne, chrono
Darien Horne, chronoDarien Horne, chrono
Darien Horne, chrono
 
T Pearce CV PIPNG MANAGER ENGINEER 2015
T Pearce CV PIPNG MANAGER  ENGINEER 2015T Pearce CV PIPNG MANAGER  ENGINEER 2015
T Pearce CV PIPNG MANAGER ENGINEER 2015
 
Pg Global Presentation 17th March 2011docx
Pg Global Presentation  17th March 2011docxPg Global Presentation  17th March 2011docx
Pg Global Presentation 17th March 2011docx
 
Pg global presentation 21st April 2011docx
Pg global presentation  21st April 2011docxPg global presentation  21st April 2011docx
Pg global presentation 21st April 2011docx
 
PD Hunt 2015
PD Hunt 2015PD Hunt 2015
PD Hunt 2015
 
KONDA REDDY_R101276_IMPLEMENTATION DESIGN FOR INSPECTION OF O-RINGS
KONDA REDDY_R101276_IMPLEMENTATION DESIGN FOR INSPECTION OF O-RINGSKONDA REDDY_R101276_IMPLEMENTATION DESIGN FOR INSPECTION OF O-RINGS
KONDA REDDY_R101276_IMPLEMENTATION DESIGN FOR INSPECTION OF O-RINGS
 
Shaun Watson
Shaun WatsonShaun Watson
Shaun Watson
 
Pollard Equipment Capabilities 2012
Pollard Equipment Capabilities 2012Pollard Equipment Capabilities 2012
Pollard Equipment Capabilities 2012
 

Viewers also liked

The Value Of An Online Community
The Value Of An Online CommunityThe Value Of An Online Community
The Value Of An Online CommunityMarina Pape
 
tugas sosped fix
tugas sosped fixtugas sosped fix
tugas sosped fixsulai men
 
Come verificare le porte del vostro PC ed il Firewall
Come verificare le porte del vostro PC ed il  FirewallCome verificare le porte del vostro PC ed il  Firewall
Come verificare le porte del vostro PC ed il FirewallSergio Roselli
 
Part II Kmall DBS HA design and Implementation english
Part II Kmall DBS HA design and Implementation englishPart II Kmall DBS HA design and Implementation english
Part II Kmall DBS HA design and Implementation englishSOKEAR CHIP
 
Etiquetas miguel 2
Etiquetas miguel 2Etiquetas miguel 2
Etiquetas miguel 2miguel lopez
 
Iphone 5 transfer for mac
Iphone 5 transfer for macIphone 5 transfer for mac
Iphone 5 transfer for macalbertbrown180
 
The Roaring Thunder-June(Partl)
The Roaring Thunder-June(Partl)The Roaring Thunder-June(Partl)
The Roaring Thunder-June(Partl)Daniel Cahill, 1st
 
Maiatzak 17 proposamena doc
Maiatzak 17 proposamena  docMaiatzak 17 proposamena  doc
Maiatzak 17 proposamena docanaextramiana
 
Negotiable instruments 6
Negotiable instruments 6Negotiable instruments 6
Negotiable instruments 6aicseu4494
 

Viewers also liked (19)

The Value Of An Online Community
The Value Of An Online CommunityThe Value Of An Online Community
The Value Of An Online Community
 
Greenlight presentation
Greenlight presentationGreenlight presentation
Greenlight presentation
 
tugas sosped fix
tugas sosped fixtugas sosped fix
tugas sosped fix
 
PINless-NEW
PINless-NEWPINless-NEW
PINless-NEW
 
Come verificare le porte del vostro PC ed il Firewall
Come verificare le porte del vostro PC ed il  FirewallCome verificare le porte del vostro PC ed il  Firewall
Come verificare le porte del vostro PC ed il Firewall
 
NEW BIODATA AUG'16
NEW BIODATA AUG'16NEW BIODATA AUG'16
NEW BIODATA AUG'16
 
blueprint
blueprintblueprint
blueprint
 
Part II Kmall DBS HA design and Implementation english
Part II Kmall DBS HA design and Implementation englishPart II Kmall DBS HA design and Implementation english
Part II Kmall DBS HA design and Implementation english
 
Sunny
SunnySunny
Sunny
 
Etiquetas miguel 2
Etiquetas miguel 2Etiquetas miguel 2
Etiquetas miguel 2
 
Iphone 5 transfer for mac
Iphone 5 transfer for macIphone 5 transfer for mac
Iphone 5 transfer for mac
 
HeshamAhmed-CV
HeshamAhmed-CVHeshamAhmed-CV
HeshamAhmed-CV
 
The Roaring Thunder-June(Partl)
The Roaring Thunder-June(Partl)The Roaring Thunder-June(Partl)
The Roaring Thunder-June(Partl)
 
W cmoc05
W cmoc05W cmoc05
W cmoc05
 
Alianza Estratégica
Alianza EstratégicaAlianza Estratégica
Alianza Estratégica
 
Maiatzak 17 proposamena doc
Maiatzak 17 proposamena  docMaiatzak 17 proposamena  doc
Maiatzak 17 proposamena doc
 
Gary's cv 2016
Gary's  cv 2016Gary's  cv 2016
Gary's cv 2016
 
CL4D Final
CL4D FinalCL4D Final
CL4D Final
 
Negotiable instruments 6
Negotiable instruments 6Negotiable instruments 6
Negotiable instruments 6
 

Similar to Hazem Gobran CURRICULUM VITAE (20)

ZS CV final
ZS CV finalZS CV final
ZS CV final
 
CV Ishak Muhammad Adam.
CV Ishak Muhammad Adam.CV Ishak Muhammad Adam.
CV Ishak Muhammad Adam.
 
AZEEZ EDITED CV
AZEEZ EDITED CVAZEEZ EDITED CV
AZEEZ EDITED CV
 
khalid RESUME 2
khalid RESUME  2khalid RESUME  2
khalid RESUME 2
 
m.bendris
m.bendrism.bendris
m.bendris
 
Resume-Ramasamy Ganapathy
Resume-Ramasamy GanapathyResume-Ramasamy Ganapathy
Resume-Ramasamy Ganapathy
 
Nizami cv
Nizami cvNizami cv
Nizami cv
 
Majdi Resume-Z
Majdi Resume-ZMajdi Resume-Z
Majdi Resume-Z
 
Dhanaji suravase resume
Dhanaji suravase resumeDhanaji suravase resume
Dhanaji suravase resume
 
Waqar zeb cv
Waqar zeb cvWaqar zeb cv
Waqar zeb cv
 
Rejish Devassy's CV ltst
Rejish Devassy's CV ltstRejish Devassy's CV ltst
Rejish Devassy's CV ltst
 
CV -MANZAR ALI
CV -MANZAR ALICV -MANZAR ALI
CV -MANZAR ALI
 
Omar, Mohamed c.v.
Omar, Mohamed c.v.Omar, Mohamed c.v.
Omar, Mohamed c.v.
 
Mohamed Zubair Sharieff
Mohamed Zubair SharieffMohamed Zubair Sharieff
Mohamed Zubair Sharieff
 
CV, Sajan Samuel Babu. Safety Manager
CV, Sajan Samuel Babu. Safety ManagerCV, Sajan Samuel Babu. Safety Manager
CV, Sajan Samuel Babu. Safety Manager
 
shibu resume
shibu resumeshibu resume
shibu resume
 
AOTC Company Catalogue
AOTC Company CatalogueAOTC Company Catalogue
AOTC Company Catalogue
 
Ram resume
Ram resumeRam resume
Ram resume
 
H.K.Chavan Updated C.V
H.K.Chavan Updated C.VH.K.Chavan Updated C.V
H.K.Chavan Updated C.V
 
Kenny Alberto's Résumé (1)
Kenny Alberto's Résumé (1)Kenny Alberto's Résumé (1)
Kenny Alberto's Résumé (1)
 

Hazem Gobran CURRICULUM VITAE

  • 1. CURRICULUMVITAE Name :HAZEMABD EL- AZEMGOBRAN PresentAddress:ABUDHABIREFINERY - MAINTENANCEDEPARTMENT PO.BOX3087. Telephones: 009712 - 60-25034(Office) AbuDhabi Mobile : 00971504441768/ 00971508184924 Email :gobranhazem@yahoo.com :hgobran@takreer.com Date of Birth:14th June,1954. Nationality:Egyptian. Marital Status:Married. Languages:Arabicand English-Fluent Education:B.Sc.In Mechanical powerengineering-June 1978 PassportNo.A13172695-Expire Date 03/09/2021 Professional / RelevantExperience Widelyexperiencedengineeringwithextensiveknowledge muchgainedthroughpositionsheldduring 36Years withlarge scale refineries,Petrochemical andOil productionindustrythroughoutEgypt,Kuwait, Syriaand AbuDhabi Key skills& AssignmentRanges  Maintenance managerrefinery/oil &gas  Comprehensiveassetintegrity solution provider  RCM Facilitator  Turnaround/Shutdownin-charge of entire refinery  Turbo-Machinery overhauling,Conditionmonitoringandmaintenance  Reliabilityengineering  Erection &commissioningin-Charge.Closelyinvolvedinconstruction,commissioningof projects relatedtorefineries,GasandPetrochemicalsplants  Strongengineeringandtechnical skillsdevelopedfromprogressiverolesin Industry. Specializinginthe engineering,Equipmentselection,Bidsevaluation
  • 2.  Depthof international experience hasallowedbroaddevelopmentof analytical Skills,costeffectiverepairapproachandenhance equipmentreliabilityand availabilityThrough RCA,FMEA, analysisof MTBF and KPI  Experienced innegotiatingwithcontractorsandequipmentvendors.  Alwaysquicklycontributestobusinessperformance improvementandadeptto Local culture andbestpractices.  Work hard and cope anywhere withsustainedpressure inbothdifficultliving In additiontoworkingenvironments.  Work well as teamplayerandbuildrapportat all levelsthroughgood Communicationskills,highvisibilityandacommonsense fundamentalapproach  Supervise multinational,multidiscipline maintenanceteam PresentJob Mechanical maintenance sectionhead ABU DHABI-RUWAISREFINERY- (Takreer) Since 2010 till todate. Computersskills : Skilledinmostof commercial software programs Referencesare available on request. Special Task: -ResidentrotatingequipmentengineerforEgyptianpetrochemical Co. InItalyandJapan withT.P.Land Toyo engineeringasgeneral contractorsalongwithBF-GoodrichandAZAHIGlassas licensorsduringprojectdesignandequipmentselectionstage. AttendModel reviewforBase oil andcarbonBlack projectsat M/s Hyundai and M/s Samsungoffices AlongwithplantsConstruction,pre commissionandcommissioningatRuwais refinerysite.
  • 3. Training courses: • Practical solutionstomachineryandmaintenance vibrationproblems- Update International Inc.-AbuDhabi • S-RCM–SHELL-ABU DHABI • Root Cause AnalysisMethodology –RCI,PROACT • Machinerydiagnostics -BentlyNevada- AbuDhabi • PlantReliability - EXXON ResearchandengineeringCo.Mechanical powerengineering • Total QualityManagementbyStrategichumanresourcesLimited- AbuDhabi • Computerizedmaintenance managementsystem(MAXIMO) - AbuDhabi • Predictive maintenance andbalancingtechniquesformachinery Equipment-IRD- Egypt • Environmentandoccupational healthprotection- ADNOC • Technical reportwriting -ADNOC • Maintenance andoperationof centrifugal gascompressorByDresser-Rand • Maintenance andoperationof Steamturbine Dresser-Rand- AbuDhabi  Combustiondesign,Heaters,burnersoperationandmaintenance –JOHN ZINK  Octane analyzerengine - CORELAB- AbuDhabi • Corrosionprotectiontechniquesandmaterial selection –ENPPI-- Egypt • Weldingprocesses –ENPPI-- Egypt • Chemical engineeringfornon-chemical engineers –ENPPI-- Egypt • Vibrationof turbomachinery –AMTA-- Egypt • Supervisingsafetyskills workshop - shell-H.F.Consultants-Syria • JhonZinkburnerand heatersheattransfer- AbuDhabi • -Vibrationmeasurementsinuse of ShockPulse method • -HAZOP&HAZOPAreaClassification-ABUDHABI • HSE Management-ABUDHABI  Root cause failure analysis techniques.ABUDHABI Seminars: • Solargas turbines • Predictive maintenance,on-line conditionmonitoringof Rotating • Machinesand highvoltage equipmentbyAVACO • Pumpprotectionandvalve selectionbyYarway - Keyston • ReciprocatingcompressorvalvesreconditioningbyHoeribiger • Turbo machinerycontrol by Bentley Nevada • Turbo machineryandcontrolsbyHoneywell &compressorcontrol corporation • Johncrane and Sealol mechanicalanddrygas seals • Advancedthermal spraycoatingtechnology • RefineryandPetrochemical heatexchangerapplications-SANDVIK-ABUDHABI
  • 4. CertificatesofRecognition: • BestHSE performerforyear2001 • BestEnvironmental performance foryear1998 • Reliabilitycenteredmaintenance S-RCM-2009 • Maintenance Auditing,benchmarking&Improvement-2005 • Bestpractice in maintenance management • ReliabilityCenteredMaintenance&Total Productivemaintenance • Machineryvibration&conditionmonitoring DETAILED EXPERIENCE:- 2010 To Present RUWAIS REFINERY – Takreer - U.A.E TAKREER isone of ADNOCgroupsof companies;Takreerwasestablishedto carry out the Oil RefiningIndustry.isdividedintosevenpackages:acrude distillationunit,a residual fluidcatalyticcrackingcomplex,offsites andutilities,storage tanks,site preparationandmarine facilities. RefiningCompany(Takreer) expansionproduction of the Ruwaisrefiningcomplexby 400,000 barrelsa day(b/d) to take itto more than800,000 b/d.The refinerywill alsobe integratedwithneighbouringpetrochemicalscomplexesandsupplyupto 1.1 milliontonsayearof propylenetothe nearbyplasticscomplex runbyAbuDhabi PolymersCompany(Borouge). Position:- Mechanical maintenance sectionhead / Deputy Mechanical Manger -Maintenance Division. Rolesand responsibility:- • Utilizes the Performance Management Programme (PMP) to evaluate operation performance. • Overseas all reliability indices, identifies gaps and provides solutions accordingly. • Ensures the availability of mechanical plant equipment and spare parts for routine and emergency maintenance. • Reviewstaskanalyseswithreference to potential loss and safety hazards including identifying critical tasks.
  • 5. • Distributes workloads to the Mechanical Engineers by capturing and scheduling work orders from the MAXIMO system. • LiaiseswithotherMaintenance SectionHeadsand senior Operations Department personnel to coordinate inter discipline work activities or to arrange for plant shutdowns, major overhauls and other maintenance planning activities. • Coordinates with outside consultant to solve problems, if required. • Prepares reports of monthly maintenance activities. • Updates the progress of individual maintenance and inspection activities. • Prepare the Section preliminary annual capital and operating budgets, including provision for annual direct hire and contracted manpower. • Reviews bids submitted by contractors and estimates provided by engineers. • Reviews invoices and provides endorsement for further payment processing. • Knowsthe Company’sHealth,Safety, Environment and Fire policy, procedures, regulation and objective and ensures they are effectively implemented by Section staff. • Arranges for training of Section personnel on safe practices and emergency procedures. • Reviews task risk analysis for special maintenance jobs as per Takreer HSE –CP’s. • Mentors Section Developees, in accordance with the company’s Emiratisation policy. • Supportsdevelopmentprogrammestotrain, motivate and retain employees, providing formal and informal appraisal and feedback. • Establishesincoordinationwiththe TrainingandDevelopmentSectionpersonnel,objectives for subordinate staff and monitors their achievements. 1995 To 2010 ABU DHABI REFINERY – Takreer - U.A.E Overall, crude-refining capacity is 85,000 BPSD. It consists of crude distillation, Naphtha Hydrotreater Catalytic Reformers (continuous regeneration type) LPG recovery, Sour water stripping, Utilities, cross country piping Network including IRP facilities
  • 6. Position:SeniorReliabilityEngineer./ DeputyMechanical SectionHead , Maintenance department. Rolesand responsibility:- • Sr. ReliabilityEngineerassumesresponsibilityof SectionHeadduringabsenceof Mechanical sectionHead.Purposesof the subordinatejobsduringthisperiod. Provide fieldsupportforall respective discipline activitiespertainingtoMechanical Sectionincludingrotatingandstaticequipment,mainworkshopactivities,civil work, Andheavyequipmentwork. • Responsible forprovidingengineeringsupportforall the Maintenance Dept.activities PertainingtorotatingEquipment.The assetstobe maintainedconsistof processunits, Off sites,utilities,oil movementandcrosscountrypipingnetworkincludingIRPfacilities Consistingof large distance pipingfromMussafahtoRuwais,Al Ain,&AbuDhabi Air Port. • Conductsroot cause failure analysisandresolutionof repetitiveorchronicequipment Reliabilityproblems. • Developsrotatingequipmentbreakdownsarchive anddatabase tofacilitate critical Examinationof all failure occurrencesandtranslate findingsintoactionsnecessaryto Avoida repeatfailure fromthe same cause. • Review,update equipmenthistoryconsideringMTBF,MTTR Valuesaswell asother Performance indicators.Actsasinternal QA/QCforPMand PdMprograms of rotating equipmentparticipationandensuresthatnecessaryremedial actionsare followedupand implemented. • Prepare scope of workof turbomachinerymajoroverhauling,Participatesduringplanning, executionandfollow-upstagesof turnaround/majormaintenanceactivities. • ReviewOEMfindingsreport,Studythe feasibilityof OEMrecommendations,Prepare and followupnextactionplan,Amend scope of work. • Involvementindevelopingnew PMsfornew projectsor modifiedequipment. • Continuouslymonitorsandevaluatethe effectivenessof PMand PdMprograms based On equipmenthistory,Failure modesandeffectanalysis. • ReviewsrepairfeedbackhistoryentryinMaximoforitscompleteness.PerformsAnalysisof MTBF and otherKeyPerformance IndicatorsandrecommendsimprovementActions. • Performsorparticipatesinthe review,studiesandevaluationof engineeringpackages For newprojects,in-house modificationsanddesignchangesinrelationtorotating • Equipment.ParticipatesinHazopstudy,coordinatesspare /SPIRstocking,pre- Commissioning,commissioningandhandover. • MonitorsStock items,preparesMMDCwheneverrequiredandcoordinatesmaterials relatedactivitiesinnewproject. • Assistsinthe developmentof proceduresandstrategiestoensure equipmentis Maintainedandoperatedsuchthatthe inherentreliabilityisachievedbased Maintenance manual andbestpractices.
  • 7. • Reviewsrequirementsof sparesandmaterials,advisesonstocklevelsandmaterial description,andprovidessuggestionsforalternativesorinter-changeabilityof parts. • CarriesoutCapital & OperatingBudgetexerciseincludingpreparationof technical specification,budgetaryestimationandstatementof requirement(SOR) etcfor Maintenance departmentworkplanand5-yearrollingplan. • Assistsinpreparingtrainingprogramsforstaff andUAE National employeesundergoingon- the-jobtrainingbyidentifyingspecifictrainingneeds. Providesessential trainingand guidance totrainees,developeesandothersubordinateswithaclearobjective of career development.Preparesmaintenance trainingmaterialsfor rotatingequipment. • ParticipatesandcoordinatesHSE,RiskAnalysisactivities.InvolvementinPreparation of HSEMS Plans/Programs. • Prioritiessite workactivitiesbaseduponequipmentcriticalityandFailureConsequences. • Participate inanalyse KPI’sonmonthlybasis. • Periodicreviewof incidenthistoryand implementingactionstopreventfailures. • Ensuringmaintenance proceduresare implementedandassistindevelopment , Implementationof computerizedmaintenance system(MAXIMO). • Participate incosteffectiveachievementof plantmachineryreliabilityandavailability Targetsthrough FMEA and analysisof MTBF,KBI and implementationof reliability Improvementrecommendations. • Carry out vibrationanalysisidentifyingthe cause of vibration,recommending The corrective actions. -Vibrationanalysisforcritical andnon-critical rotatingequipment By CSI (VibrationAnalyzer2110 system). • Ensuringnewdesignsandmodification,replacementequipmentincorporate Reliability,availability,maintainabilityandoperability. • Evaluatingthe effectivenessof existingpredictive maintenance activitiesby Reviewingthe resultsaftercompletionof remedial action. • Major expansionprojectsupport,review of designbasisbefore anydetailed Engineering. • Provide engineeringassistance tothe developmentengineeringsection In mechanical design,specificationpreparation,vendorselectionandbids Evaluation • Initiatedjointownership,teamwork,continuesimprovementwithoperationon System/equipmentresultinginimprovedequipmentreliabilityandhigher Production • Preparationof equipmentpartsreconditioningscope of work. • Reviewandcommentonvendormaintenance&operationmanualsforrotating Equipment. • Reviewandapprove contractorandvendor'sPre-commissioningprocedures • Co-operate withsafetyandoperationtoprepare jobsafetyanalysisproceduresfor • Vessels,ReactorsandHeaters • Involvedininvestigationof refineryprocessheatersproblemsandfollow upthe remedial Actionsimplementations
  • 8. • Guide AreaengineersforfollowingequipmentMajoroverhaul andtroubleshooting:Byron Jackson, Hyward tyler,worthingtion,IngrsollRand,Sundstrandsingle/multistage centrifugal pumpsand Broomwade,Ingersoll-Rand,Thomasen,Thomassen,thome crepelle.Airandgas reciprocatingcompressorsandWorthingtonsteamturbine • Preparingscope of workfor heatexchangersrepairing,Re-tubing,etc • ConsultancyServicesfortenderevaluation • Responsible tocarryout the technical evaluation,tabulation,andalignmentof un-priced tendersalongwithattendance of clarificationsmeetingwiththe clientandthe tenderersfor newprojects Special tasks Directsupervise the followingcentrifugalcompressorsandsteamturbinesoverhauling(DuringGRSD) failure analysisand troubleshooting: DresserRandgas compressortype/2508 B 8 no of stages/ 8 DresserRand steamturbine type/1UR1(SV) noof stages/ 8 Ebara Elliotte gascompressor type/20MB7 noof stages/7 Demage gas compressor type/MV 3A no of stages /3 Seminessteamturbine type/NK25/28/121.5.3 no of stages/15 -Implementtrapmansystemforsteamtraps failure analysis -Coordinate andattendance the repairingof PACKINOXplate heat Exchangerwithvendorspecialist 1991 To 1995 AL Furate petroleumcompanyAFPC Seria. A newoil fielddevelopment,comprisingof ajointventure BetweenSyriapetroleumdevelopmentandShell. Consistingof fourcentral processingfacilitiesandtwenty Five remote gatheringstationsplusliquefactionof gas. Producing400,000bpd. Position:Mechanical maintenance engineer • Supervise all routineandbreakdownmaintenanceonvariousstaticand • Rotatingequipmentrelatedtothe central productionfacilitiesandeightremote • Gatheringstations.
  • 9. • Supervise the provisionof maintenanceserviceforoil fieldfacilitieswhich • Include waterinjection,powergeneration,gas/oil separationunits,andwell • Heads • Assistedinthe preparationof predictive,preventivemaintenance programsfor • Mechanical Equipmentinthe plant • Prepareddetailedequipmentchecklistsforof equipmentuponworkcompletion. • Followedupandadvisedonspare partreplacement,reconditioningorreplenishment. • Guidance andadvice the actionto be takenforchronic problems. • Responsible fordevelopingpredictive maintenance programforrotatingequipment • Managed,researched,developedandmaintainedequipmenthistory. • -Vibrationmonitoringof machinerywithportabledataterminals. • Plannedforshutdownconsideringmanpower,material andspecialequipment • Requirement. • Responsible foroverhaulingandtrouble shootingof the followingequipment: • Solargas turbine Centaurmodel GSI/CBeach2 MW, Highindustriareciprocatinggas compressormodel F565, InstrumentaircompressormanufacturedbyWilliamJamesmodel K695, Compare model Dv200 ,JOY Model WHLO122B. Centrifugal pumpsbyUnion,Golds, ByronJaksonandFisher.Waukeshagasengineseach500HP model VHPseriesl7042, Caterpillargas/dieselenginesG399/D399 500HP and Cumminsmodel N855. 1982 To 1991 Egyptian petrochemicals80,000T Consistingof five central ProcessingunitsPVC,VCM,ChlorineUnits Ethylene handlingfacilityandPowerstationcombinecycle Plant45MW. Positions:1982 to 1985 Designand construction engineer. 1985 to 1986 Rotating equipmentengineer 1986 to 1990 Rotating equipmentsectionhead 1991 to 1991 rotating equipmentdepartmentmanager • Evaluatingand approval of technical proposalsforrotatingequipmentaccordingtoAPI Codesandcompanyspecification • AttendedasresidentrotatingequipmentengineerduringengineeringstudiesinITLALY AndJAPAN.Inco-operationwithT.P.LandToyoas general contractor,BF- Goodrich AndAZAHIGlass Aslicensors.
  • 10. • Attendandparticipate inengineeringmeetingandvendorsclarificationmeeting.. • Attendandparticipate the evaluationof highandlow-densitypolyethylene plantbidders AndPowerStationcombine cycle Plant45MW. • Reviewandcommentonvendormaintenance&operationmanualsforrotating Equipment. • Reviewandapprove contractorandvendor'sPre-commissioningprocedures • Supervise andfollowupof Pre-commissioningactivitiesof plantmachinery • Supervisedconstruction,commissioning,andstartupfor the entire petrochemical • Units • Ensuringnewdesignsandmodification,replacementequipmentincorporate Reliability,availability,maintainabilityandoperability. • IdentifyingandsupportingP.Mactivitiesforrotatingequipment • Supervisedthe executionandFieldmaintenance supportof majoroverallsandSpecific • Repairsforall kindsof rotatingequipment. • Major expansionprojectsupport,review of designbasisbefore anydetailed Engineering. • Troubleshootinganalysisandsolvedcorrosionproblems • Preparationof annual operatingbudgetplans. • Participatedinplantshutdownpreparingplane • Raisedtechnical reportsandfollowedupthe replenishmentof store stocks • Participatedintraininganddevelopmentof new engineersandtechnicians • Recommendedthe requiredremedial actionforchronicproblems. • Advisedplantsmodificationandstudiedtechnical proposalsforextensions. • Responsible forMajoroverhaulingandtrouble shootingof the following equipment: reciprocating,centrifugal andscrew compressorsmanufacturedbyIngersoll Rand(type XLE), Kobe steel model Ks25L(Hydrogen).Borsigcentrifugal compressor(2stages)andNashliquid ringcompressors, Steamturbine byworthingtonTurbodyne,multi andsingle stages centrifugal pumpsbyWorthington,KSB,Sulzer,Nikkisoandsunstrand.PVCagitatorby chmineerandrotarydryer byAllisCharmels,PVCpackingunit, PVCcentrifuge andscreenerbyBIRD. 1990 To 1990 Kuwait National petroleumcompany (KNPC). MINA ABDULLA Refinery Positions:Rotating equipmentmaintenance engineer. • Troubleshootingof existingchronicproblems,repetitive andcostlyfailuresand Developmentlongtermsolutions. • Fieldmaintenance supportformajoroverhauls • Spare parts review(changes,updateandspecificationissue) • Reportedfailure analysisalongwithrootcause of failure. • Responsible forrepairingmultistage centrifugalcompressorsbyMitsui and
  • 11. Steamturbine byWorthington turbodyne andmultistage centrifugalpumps. 1980 To 1982 Alexandriapetroleumcompany refinery-Egypt Positions:Rotating equipmentmaintenance engineer. • Executedmajoroverallsandspecificrepairsforrotatingequipment.Trouble shooting Analysis.Assistance forequipmentselectionwhichinclude specification • Preparation,vendorselection,andbidevaluationfornew distillationunitand Extensions.Attendedconstruction,commissioningandthe start upof new distillationunit and Lube oil plantwithSHOUDA as general contractorandLUMUS as licensor • Reviewandcommentonvendormaintenance&operationmanualsforrotating • Equipment. • Reviewandapprove contractorandvendor'sPre-commissioningprocedures • Supervise andfollowupof Pre-commissioningactivitiesof plantmachinery • Responsible forrepairingof centrifugal andReciprocatingcompressorsmanufacturedby Ingersoll Rand,JoyandElliot,Multi andsingle centrifugal pumpsbyWorthington,KSBand Goulds. 1978 TO 1980 Militaryservice.