Risk Assessment for Project Love
Hazard Risk Rating (1-5) Control/Solution
Tripping over wires
whilst on set
4 Tuck the wires away but
be aware of the trailing
wires.
Tripod falling over and
hitting someone
4 Ensure that the tripod is
standing securely.
Fire 3 Charge the camera away
from flammable things.
Electrocution/Water
damage to camera
5 Film on a dry day.
Stress 5 Each team member must
do tasks assigned to do,
to keep stress levels for
us all down.
Backache 4 Equipment to be carried
by different people, not
just one person to