This document contains revisions to the Hanson's Lodge project plans. The revisions include updated window schedules, brick hatching, prices, and additional details on roofing and cost centers. A new roof plan was also added. The document provides site plans, elevations, sections, and schedules for windows, doors, framing and other project details. Revisions have been made on five different dates between May 2022 and October 2022.
The Indian economy is classified into different sectors to simplify the analysis and understanding of economic activities. For Class 10, it's essential to grasp the sectors of the Indian economy, understand their characteristics, and recognize their importance. This guide will provide detailed notes on the Sectors of the Indian Economy Class 10, using specific long-tail keywords to enhance comprehension.
For more information, visit-www.vavaclasses.com
The Roman Empire A Historical Colossus.pdfkaushalkr1407
The Roman Empire, a vast and enduring power, stands as one of history's most remarkable civilizations, leaving an indelible imprint on the world. It emerged from the Roman Republic, transitioning into an imperial powerhouse under the leadership of Augustus Caesar in 27 BCE. This transformation marked the beginning of an era defined by unprecedented territorial expansion, architectural marvels, and profound cultural influence.
The empire's roots lie in the city of Rome, founded, according to legend, by Romulus in 753 BCE. Over centuries, Rome evolved from a small settlement to a formidable republic, characterized by a complex political system with elected officials and checks on power. However, internal strife, class conflicts, and military ambitions paved the way for the end of the Republic. Julius Caesar’s dictatorship and subsequent assassination in 44 BCE created a power vacuum, leading to a civil war. Octavian, later Augustus, emerged victorious, heralding the Roman Empire’s birth.
Under Augustus, the empire experienced the Pax Romana, a 200-year period of relative peace and stability. Augustus reformed the military, established efficient administrative systems, and initiated grand construction projects. The empire's borders expanded, encompassing territories from Britain to Egypt and from Spain to the Euphrates. Roman legions, renowned for their discipline and engineering prowess, secured and maintained these vast territories, building roads, fortifications, and cities that facilitated control and integration.
The Roman Empire’s society was hierarchical, with a rigid class system. At the top were the patricians, wealthy elites who held significant political power. Below them were the plebeians, free citizens with limited political influence, and the vast numbers of slaves who formed the backbone of the economy. The family unit was central, governed by the paterfamilias, the male head who held absolute authority.
Culturally, the Romans were eclectic, absorbing and adapting elements from the civilizations they encountered, particularly the Greeks. Roman art, literature, and philosophy reflected this synthesis, creating a rich cultural tapestry. Latin, the Roman language, became the lingua franca of the Western world, influencing numerous modern languages.
Roman architecture and engineering achievements were monumental. They perfected the arch, vault, and dome, constructing enduring structures like the Colosseum, Pantheon, and aqueducts. These engineering marvels not only showcased Roman ingenuity but also served practical purposes, from public entertainment to water supply.
Ethnobotany and Ethnopharmacology:
Ethnobotany in herbal drug evaluation,
Impact of Ethnobotany in traditional medicine,
New development in herbals,
Bio-prospecting tools for drug discovery,
Role of Ethnopharmacology in drug evaluation,
Reverse Pharmacology.
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxEduSkills OECD
Andreas Schleicher presents at the OECD webinar ‘Digital devices in schools: detrimental distraction or secret to success?’ on 27 May 2024. The presentation was based on findings from PISA 2022 results and the webinar helped launch the PISA in Focus ‘Managing screen time: How to protect and equip students against distraction’ https://www.oecd-ilibrary.org/education/managing-screen-time_7c225af4-en and the OECD Education Policy Perspective ‘Students, digital devices and success’ can be found here - https://oe.cd/il/5yV
We all have good and bad thoughts from time to time and situation to situation. We are bombarded daily with spiraling thoughts(both negative and positive) creating all-consuming feel , making us difficult to manage with associated suffering. Good thoughts are like our Mob Signal (Positive thought) amidst noise(negative thought) in the atmosphere. Negative thoughts like noise outweigh positive thoughts. These thoughts often create unwanted confusion, trouble, stress and frustration in our mind as well as chaos in our physical world. Negative thoughts are also known as “distorted thinking”.
Palestine last event orientationfvgnh .pptxRaedMohamed3
An EFL lesson about the current events in Palestine. It is intended to be for intermediate students who wish to increase their listening skills through a short lesson in power point.
1. HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
CPCCOM3001 PERFORM CONSTRUCTION CALCULATIONS
TO DETERMINE CARPENTRY MATERIAL REQUIREMENTS
2. HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
1
P.O.S
7.28
m
6.63 m
5.55
m
7.69 m
4.25 m
270° 00' 00' 28.17M
0°
00'
00'
22.35M
90° 00' 00' 25.20M
1
7
2
°
2
6
'
1
4
"
2
2
.
5
4
M
SERVICE EASMENT 2.44M WIDE
BELLA CRESCENT
PROPOSED CONCRETE DRIVEWAY
DP
DP DP
DP
PROPOSED EXCAVATION LINE
PROPOSED RESEDENCE
FFL 615.000
FFL 614.850
CARPORT
614.75
614.25
614.50
SITE AREA 596M2
A
SITE PLAN
scale: 1:200
01
N
WM
SEWER TIE
STORM WATER TIE
E
Concrete
Footpath
900
1200 3445
9100
200mm thick wall
Round concrete
planter box 500mm high
DETAILS IN ANNEX A
3. HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
1
P.O.S
7.28
m
6.63 m
5.55
m
7.69 m
4.25 m
270° 00' 00' 28.17M
0°
00'
00'
22.35M
90° 00' 00' 25.20M
1
7
2
°
2
6
'
1
4
"
2
2
.
5
4
M
SERVICE EASMENT 2.44M WIDE
BELLA CRESCENT
DP
DP DP
DP
PROPOSED EXCAVATION LINE
PROPOSED RESEDENCE
FFL 615.000
FFL 614.850
CARPORT
614.75
614.25
614.50
SITE AREA 596M2
N
WM
SEWER TIE
STORM WATER TIE
E
Concrete
Footpath
900
1200 3445
9100
Site Silt Fence
SITE/LANDSCAPE MANAGEMENT AND PROTECTION PLAN
SITE TOILET
1.8M HIGH SITE FENCE
BUILDING WASTE
ZONE
GENERAL SITE ACCESS POINT
SITE SIGN TO GO HERE
4. HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
11115
8270
11115
8270
250
3120
90
600
90
2030
90
715
90
3790
250
250
6090
250
250
4155
90
2470
90
600
90
3120
250
130
3900
90
3900
250
2000
90
720
90
1000
90
1000
1100
600
3810
2
A
PLAN VIEW
scale: 1:100
02
1
A3
2
A3
D
1
D
9
D
3
W
1
W
2
W
3
W
4
W
5
R
FFL 615.000
D
2
D
6
D
5
D
7
D
10
D
4
D
8
N
CARPORT
FFL 614.700
ROBE
L/N
ROBE
DP
DP
DP
D
P
AREA SCHEDULE
NAME AREA
Proposed Residence 80.49m2
Proposed Verandah 12.33m2
Proposed Carport 25.14m2
Grand Total 117.96m2
450mm Eaves
600mm Eaves over Gable
Raked eaves
across front verandah area
All work must be IAW the NCC Volume 2
3000
8380
1812
6805
BED 1
BED 2
ENTRY 01
MEALS
LIVING
KITCHEN
BATH
LAUNDRY
5. HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
3
A
Elevation 01
scale: 1:100
03
A
Elevation 02
scale: 1:100
03
A
Elevation 03
scale: 1:100
03
A
Elevation 04
scale: 1:100
03
Metal Roof
Face Brickwork
100mm
Concrete Slab
for Carport
Under Floor door
D3 W3
W1
D2 D1
W2
W4
W5
Face Brickwork
75mm Polystyrene
Cladding with 8mm
render
Base Brickwork
Base Brickwork
Base Brickwork
FCL
617400
FFL
615000
FCL
617400
FFL
615000
FCL
617400
FFL
615000
FCL
617400
FFL
615000
Timber Barge
Timber Fascia
All work must be IAW the NCC Volume 2
Metal Barge Flashing
2400 min
2400 Min
Concrete Strip footinhg
Concrete Pad Footing
100mm Carport Slab
Compact Fill
IAW with the NCC Vol 2. Concrete Strip Footing
24°
24°
75mm Polystyrene
Cladding with 8mm
render
75mm Polystyrene
Cladding with 8mm
render
Hardies linear
weatherboards
Staircase from Front Porch
6. HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
4
24°
TIMBER FRAME CUT ROOF
COLOURBOND STANDARD ORB METAL ROOF
BED 1 KITCHEN
125MM METAL GUTTER
FACE BRICK WORK
STRIP FOOTING
PAD FOOTING COLOURBOND STANDARD ORB METAL ROOF
VERANDAH TIMBER CUT ROOF
METAL ROOF TO SUIT PITCH
1°
VERANDAH ROOF PITCH
SECTION 1
scale: 1:100
A
04
SECTION 2
scale: 1:100
A
04
24°
BATH
LIVING
Purlin
Strut
Ceiling
Hanging Beam
Strutting Beam
63x100mm LVL Bearer Max 1800 C/C
100x45 LVL Joist Max 450 C/C
100x45 LVL Joist Max 450mm C/C
1
R4
2
R4
D9 D10
W5
FCL
617400
FFL
615000
FCL
617400
FFL
615000
2410
2410
R2 Insulation
R5 Ceiling Insulation
ROLL TOP RIDGE
INSULATION BLANKET
All work must be IAW the NCC Volume 2
All Timber Frame must be IAW the AS 1684.2
Compact Fill Under Carport
Slab IAW NCC Vol 2
100mm Concrete Slab
Concrete Pad Footing
Concrete Strip Footing
SEE ANNEX A FOR CONCERET FOOTING DETAILS
120X45 mgp10
90x45
9045 porch rafter 1.1
90x90 post#1
VERANDAH ROOF DETAIL
Label text
A
04
7. HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
5
roll top ridge cap
DETAIL 2
scale: 1:20
A
05
DETAIL 1
scale: 1:20
A
05
R2 Insulation
R5 Ceiling Insulation
Insulation Blanket
2410
120X45 mgp10
All work must be IAW the NCC Volume 2
All Timber Frame must be IAW the AS 1684.2
2100 Min
SEE ANNEX A FOR CONCERET FOOTING DETAILS
Concrete Strip Footing
IAW A/S 2870 or Engineers Details
50x38 batten
4.5mm FC sheeting
19x19 trimm
10mm x 1200mm plasterboard#52
joint tape#7
50x38 Dropper
125mm gutter
90x90 Post
Post Shoe
130x45 LVL Bearer
130x45 LVL deck
joist @450 C/C
90x19 HWD
Decking
130x45 LVL Pitching plate
90x45 LVL Joist at 450 Max Centers
10 mm Plaster board
to a level 4 finish
90x35mm MGP 10 pine stud IAW A/S 1684.2
19mm Chipboard flooring
Installed IAW Manufactures instruction
Ant Cap Galvenised
Engaged Brick Pier
Brick Sill
Aluminium Framed Window
Weep Hole
Cavity
67x18mm Architrave
Brick Tie
Foundation
125mm gutter
185mm Timber Fascia
metal Roof
metal roof batten standard
creeper rafter 5
90x45 mgp Pine
10mm Plasterboard
ceiling
55mm cornice
24°
Concrete Strip Footing
IAW A/S 2870 or Engineers Details Base Brick work
Engaged Brick Pier
Concrete Strip Footing
IAW A/S 2870 or
Engineers Details
intrim sk11
100x63 LVL Bearer at 1800 Max Centers
Brick Vent
Base Brickwork
1°
185x19 Timber Fascia
90x45 Verandah Rafter
@ 600C/C
90x45 Barge Rafter
metal roof batten standard
Metal Verandah Roof
8. HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
WINDOW SCHEDULE
ID
WINDOW
STYLE
HEIGHT
(mm)
WIDTH
(mm)
DESCRIPTION
W01 AS1218 1200 1810
Aluminium Sliding Double
Glazed/Argon Gas/Low E
W02 AS1218 1200 1810
Aluminium Sliding Double
Glazed/Argon Gas/Low E
W03 AS0960 900 610
Aluminium Sliding Double
Glazed/Argon Gas/Low E
W04 AS1012 1030 1210
Aluminium Sliding Double
Glazed/Argon Gas/Low E
W05 AS1215 1200 1510
Aluminium Sliding Double
Glazed/Argon Gas/Low E
TIMBER FRAMING SCHEDULE JOIST SPACING
FLOORING MATERIAL
19MM YELLOW TONGUE
3600X900
6mm FC tiling backer 2400x1200
TIMBER SUB FLOOR
63X90 LVL BEARERS
90X45 LVL JOISTS
TIMBER FRAME SIZES
90X35 TOP PLATE
90X45 RIBBON PLATE
90X35 STUDS
90X35 NOGGINS
200X45 LVL LINTLE
FRONT VERANDAH
130X45 lvl joist
120x45 MGP10 Front verandah
beam
90x45 MGP10 Rafters
DOOR SCHEDULE
ID
HEIGHT
(mm)
WIDTH
(mm)
DESCRIPTION
D01 2100 1810
Aluminium Sliding Door Double
Glazed/Argon Gas/Low E
D02 2040 870
Timber solid core door
D03 2040 870
Timber solid core door
D04 2040 Sliding Bi-Pass robe doors
D05 2040 820
Internal ready coat timber
hollow core door
D06 2040 820
Internal ready coat timber
hollow core door
D07 2040 620
Internal ready coat timber
hollow core door
D08 2040 Sliding Bi-Pass robe doors
D09 2040 720
Internal ready coat timber
hollow core door
D10 2040
HOLLOW CORE BI-FOLD
TIMBER DOORS
All work must be IAW the NCC Volume 2
9. HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
11130
6690
8370
4410
1680
6720
500
500
500
ANNEX A CONCRETE ENGINEERING
ANNEX A
All work must be IAW the NCC Volume 2
500
1200
CONCRETE PLANTER BOX
CONCRET FOOTINGS
CONCRETE FOOTINGS
200
200
100