2
• Integration of the 12 design requirements of the REX
Buncefield,
• Simplification (avoidance of repetitions of what is written
in other GSs),
• General revision (old version based on obsolete
regulations, development of some chapters and
rearrangement).
GS EP SAF 341 rev 03 – Location and protection of onshore HC storage
MAIN CHANGES
3
12 design requirements based on API 2530:
1- Four level measures : maximum Operating level, HL (alarm),
HHL (actions), Overfill level.
2- Each tank to be equipped by ATG (continuous monitoring), a
HL and HHL sensors all independent from each others OR
ATGS be able to be read from the control center providing
also HL measurement + independent HHL sensor.
3 and 4- HL and HHL generates an alarm in the control center. A
default of the sensor as well.
5- On HL and HHL alarms, stop of transfer of liquids.
Communication means shall be tested before the transfer or
done via a audible and visual alarm at transporter control
location. If automatic, watchdog system to be implemented
(test of the link and send a warning).
GS EP SAF 341 rev 03 – Location and protection of onshore HC storage
REX BUNCEFIELD
4
6- If HHL detection -> flow to the tank is over automatically via
pump shutdown or valve closure except for tank transfer from
other tank or from production units operated by the same
operator. Attention shall be paid to water hammer effects.
System to be designed in accordance with API 2530
requirements and ANSI/ISA 84.00.01 for new facilities.
7- Actions related to HHL detection shall be done manually in case
of failure of the instrumentation loop.
8- In case of failure of the HHL instrumentation loop, redundant
means to terminate the flow to the tank, different from the HHL
automatic action (see item 6) shall be provided. This
redundancy shall be operational manually or automatically in
case of overfill or pool fire in the bund. This may be done, for
instance, via a valve situated at the battery limit.
GS EP SAF 341 rev 03 – Location and protection of onshore HC storage
REX BUNCEFIELD
5
9- Additional requirements are applicable in case of transfer to
unattended facilities:
• Data and alarms monitored by Transporter
• If HL detection -> automatic actions to terminate flow to tanks.
• HHL shutdown loop shall not be based on actions of a remote
location/third party.
• Entire overflow prevention system shall be compliant with IEC
61511-2 requirements. Termination of the transfer shall be done
by two independent equipment at least and SIL certified.
10- A secondary containment shall be provided and fully tight. The
need of a third shall be studied if needed.
11- Congested areas (bushes and trees for instance) shall be avoided
in tanks bunds and farms.
12- HC detection sensor shall be located in the bund of the tank. It may
be a gas and/or a liquid detector according to TRA and site
constraints. Detection shall initiate an alarm in the control room.
GS EP SAF 341 rev 03 – Location and protection of onshore HC storage
REX BUNCEFIELD
6
• References to appropriate GSs have been done instead
of repeating the content in the GS EP SAF 341.
• It mainly concerns the GS EP SAF 253, GS EP SAF 021
and GS EP SAF 228.
• In a general way, repetitions will be avoided to prevent
from any shift being able to generate derogations…
GS EP SAF 341 rev 03 – Location and protection of onshore HC storage
SIMPLIFICATION
7
Update versus French Regulation:
• AM 03rd of October 2010 for HC liquid storage (distance between tanks…)
• AM 02nd of january 2008 for liquefied HC (isolation, overfill and fire protection,…)
Deletion of some undocumented references such as, for HC liquid tanks:
• For emptying operation duration less than 8h, provide a gas blanketing system.
• Maximum distance between fixed foam pourers and any point of the bund
• …
Pressure control: precision on breathing system.
Blanketing:
• Mandatory for fixed roof tanks to prevent air from entering the tank during emptying
operations and to compensate the ambient temperature changes.
• Not mandatory for internal floating roof within fixed roof tanks. However, the risk of tank
collapse during emptying operations remains to be studied.
Bunding for HC liquid tanks:
• In line with French Regulation for the capacities,
• Limit of capacity set at 6000 m² instead of 7000m²,
• Expectations concerning possible configurations of sub-compartimentation of bunds.
GS EP SAF 341 rev 03 – Location and protection of onshore HC storage
GENERAL REVISION: MAIN MODIFICATIONS FOR HC LIQUID TANKS
8
• Active fire protection : application rate and duration
following AM 02/01/2008,
• Fire & Gas detection : Fire and Gas detection coverage
details (in accordance with RC referential),
• Passive Fire Protection - > NFPA 58,
• Isolation system: changes on overfill detection levels.
GS EP SAF 341 rev 03 – Location and protection of onshore HC storage
GENERAL REVISION: MAIN MODIFICATIONS FOR VESSELS FOR
LIQUEFIED HC
9
Addition of a new section : particular cases
• Geodesic domes,
• Double wall tanks,
• Storages of polar and sulfur laden products,
• Tanks with handling temperature above 100 °C.
GS EP SAF 341 rev 03 – Location and protection of onshore HC storage
GENERAL REVISION: MAIN MODIFICATIONS

More Related Content

Similar to GS EP SAF 341 rev 3.pptx

ATIs-Q45S-Wet-H2S-Gas-Detector-Product-Literature.pdf
ATIs-Q45S-Wet-H2S-Gas-Detector-Product-Literature.pdfATIs-Q45S-Wet-H2S-Gas-Detector-Product-Literature.pdf
ATIs-Q45S-Wet-H2S-Gas-Detector-Product-Literature.pdf
ENVIMART
 
Gas Technology Institute & Kwik Trip - Station Installation Guidelines for CNG
Gas Technology Institute & Kwik Trip - Station Installation Guidelines for CNGGas Technology Institute & Kwik Trip - Station Installation Guidelines for CNG
Gas Technology Institute & Kwik Trip - Station Installation Guidelines for CNG
Wisconsin Clean Cities
 
Case study on halon replacement in Bosnia and Herzegovina
Case study on halon replacement in Bosnia and Herzegovina Case study on halon replacement in Bosnia and Herzegovina
Case study on halon replacement in Bosnia and Herzegovina UNEP OzonAction
 
Almacenamiento de agua
Almacenamiento de aguaAlmacenamiento de agua
Almacenamiento de aguaakaramg
 
Sphere Tank Safety Interlock Using PLC
Sphere Tank Safety Interlock Using PLCSphere Tank Safety Interlock Using PLC
Sphere Tank Safety Interlock Using PLC
ijsrd.com
 
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24Jean-Francois Saint-Marcoux
 
OISD STD-150
OISD STD-150OISD STD-150
OISD STD-150
AnupamaPanoli
 
air cooled chiller
air cooled chillerair cooled chiller
air cooled chiller
Mahmoud Elsabaa
 
Smpv(u) rules 2016-18
Smpv(u) rules  2016-18Smpv(u) rules  2016-18
Smpv(u) rules 2016-18
Abhishek Padiyar
 
ISO/FDIS 20519
ISO/FDIS 20519ISO/FDIS 20519
ISO/FDIS 20519
Abhishek Rajvanshi
 
Truck loading and unloading technical specification
Truck loading and unloading technical specificationTruck loading and unloading technical specification
Truck loading and unloading technical specification
CARLOS RUIZ CARDENAS
 
Standard boiler 500 mwerection manual (boiler auxiliaries)
Standard boiler 500 mwerection manual (boiler auxiliaries)Standard boiler 500 mwerection manual (boiler auxiliaries)
Standard boiler 500 mwerection manual (boiler auxiliaries)
Ashutosh Sachan
 
ABB: RIO TINTO ALCAN ISAL Smelter Expansion Project
ABB: RIO TINTO ALCAN ISAL Smelter Expansion ProjectABB: RIO TINTO ALCAN ISAL Smelter Expansion Project
ABB: RIO TINTO ALCAN ISAL Smelter Expansion Project
Global Media Communication Ltd.
 
Technical Prospects of Floating LNG
Technical Prospects of Floating LNGTechnical Prospects of Floating LNG
Technical Prospects of Floating LNG
Ronak Sani
 
Bhel vis powerplant
Bhel vis powerplantBhel vis powerplant
Bhel vis powerplant
mgr2222
 
OISD.ppt
OISD.pptOISD.ppt
OISD.ppt
SanjayQaz1
 
Performing Safety Modeling Analysis To Comply With LNG Facility Siting Requi...
 Performing Safety Modeling Analysis To Comply With LNG Facility Siting Requi... Performing Safety Modeling Analysis To Comply With LNG Facility Siting Requi...
Performing Safety Modeling Analysis To Comply With LNG Facility Siting Requi...
BREEZE Software
 
Rev.F Part-2 Technical Eng FEED KOM Petronas Melamine (1).pptx
Rev.F Part-2 Technical Eng FEED KOM Petronas Melamine (1).pptxRev.F Part-2 Technical Eng FEED KOM Petronas Melamine (1).pptx
Rev.F Part-2 Technical Eng FEED KOM Petronas Melamine (1).pptx
ChinBoonWoi2
 

Similar to GS EP SAF 341 rev 3.pptx (20)

ATIs-Q45S-Wet-H2S-Gas-Detector-Product-Literature.pdf
ATIs-Q45S-Wet-H2S-Gas-Detector-Product-Literature.pdfATIs-Q45S-Wet-H2S-Gas-Detector-Product-Literature.pdf
ATIs-Q45S-Wet-H2S-Gas-Detector-Product-Literature.pdf
 
Gas Technology Institute & Kwik Trip - Station Installation Guidelines for CNG
Gas Technology Institute & Kwik Trip - Station Installation Guidelines for CNGGas Technology Institute & Kwik Trip - Station Installation Guidelines for CNG
Gas Technology Institute & Kwik Trip - Station Installation Guidelines for CNG
 
Case study on halon replacement in Bosnia and Herzegovina
Case study on halon replacement in Bosnia and Herzegovina Case study on halon replacement in Bosnia and Herzegovina
Case study on halon replacement in Bosnia and Herzegovina
 
2010 4.1
2010 4.12010 4.1
2010 4.1
 
Almacenamiento de agua
Almacenamiento de aguaAlmacenamiento de agua
Almacenamiento de agua
 
Sphere Tank Safety Interlock Using PLC
Sphere Tank Safety Interlock Using PLCSphere Tank Safety Interlock Using PLC
Sphere Tank Safety Interlock Using PLC
 
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
 
OSX1 FPSO Buyers Rev2
OSX1 FPSO Buyers Rev2OSX1 FPSO Buyers Rev2
OSX1 FPSO Buyers Rev2
 
OISD STD-150
OISD STD-150OISD STD-150
OISD STD-150
 
air cooled chiller
air cooled chillerair cooled chiller
air cooled chiller
 
Smpv(u) rules 2016-18
Smpv(u) rules  2016-18Smpv(u) rules  2016-18
Smpv(u) rules 2016-18
 
ISO/FDIS 20519
ISO/FDIS 20519ISO/FDIS 20519
ISO/FDIS 20519
 
Truck loading and unloading technical specification
Truck loading and unloading technical specificationTruck loading and unloading technical specification
Truck loading and unloading technical specification
 
Standard boiler 500 mwerection manual (boiler auxiliaries)
Standard boiler 500 mwerection manual (boiler auxiliaries)Standard boiler 500 mwerection manual (boiler auxiliaries)
Standard boiler 500 mwerection manual (boiler auxiliaries)
 
ABB: RIO TINTO ALCAN ISAL Smelter Expansion Project
ABB: RIO TINTO ALCAN ISAL Smelter Expansion ProjectABB: RIO TINTO ALCAN ISAL Smelter Expansion Project
ABB: RIO TINTO ALCAN ISAL Smelter Expansion Project
 
Technical Prospects of Floating LNG
Technical Prospects of Floating LNGTechnical Prospects of Floating LNG
Technical Prospects of Floating LNG
 
Bhel vis powerplant
Bhel vis powerplantBhel vis powerplant
Bhel vis powerplant
 
OISD.ppt
OISD.pptOISD.ppt
OISD.ppt
 
Performing Safety Modeling Analysis To Comply With LNG Facility Siting Requi...
 Performing Safety Modeling Analysis To Comply With LNG Facility Siting Requi... Performing Safety Modeling Analysis To Comply With LNG Facility Siting Requi...
Performing Safety Modeling Analysis To Comply With LNG Facility Siting Requi...
 
Rev.F Part-2 Technical Eng FEED KOM Petronas Melamine (1).pptx
Rev.F Part-2 Technical Eng FEED KOM Petronas Melamine (1).pptxRev.F Part-2 Technical Eng FEED KOM Petronas Melamine (1).pptx
Rev.F Part-2 Technical Eng FEED KOM Petronas Melamine (1).pptx
 

More from Boris518712

Edospina-agua-desmineralizada.ppt
Edospina-agua-desmineralizada.pptEdospina-agua-desmineralizada.ppt
Edospina-agua-desmineralizada.ppt
Boris518712
 
Curso Lideres de Procesos.ppt
Curso Lideres de Procesos.pptCurso Lideres de Procesos.ppt
Curso Lideres de Procesos.ppt
Boris518712
 
Charla de Especificación de Bombas Centrifugas.ppt
Charla de Especificación de Bombas Centrifugas.pptCharla de Especificación de Bombas Centrifugas.ppt
Charla de Especificación de Bombas Centrifugas.ppt
Boris518712
 
GS EP GEO 402 Follow up.pptx
GS EP GEO 402 Follow up.pptxGS EP GEO 402 Follow up.pptx
GS EP GEO 402 Follow up.pptx
Boris518712
 
GS EP INS 106 Fiche de création.pptx
GS EP INS 106 Fiche de création.pptxGS EP INS 106 Fiche de création.pptx
GS EP INS 106 Fiche de création.pptx
Boris518712
 
GS EP INS 108 Follow up.pptx
GS EP INS 108 Follow up.pptxGS EP INS 108 Follow up.pptx
GS EP INS 108 Follow up.pptx
Boris518712
 
GS EP INS 150 Modification follow-up.pptx
GS EP INS 150 Modification follow-up.pptxGS EP INS 150 Modification follow-up.pptx
GS EP INS 150 Modification follow-up.pptx
Boris518712
 
GS EP INS 196 Modification follow-up.pptx
GS EP INS 196 Modification follow-up.pptxGS EP INS 196 Modification follow-up.pptx
GS EP INS 196 Modification follow-up.pptx
Boris518712
 
GS EP INS 197 Modification follow-up.pptx
GS EP INS 197 Modification follow-up.pptxGS EP INS 197 Modification follow-up.pptx
GS EP INS 197 Modification follow-up.pptx
Boris518712
 
GS EP LSO 112 Presentation.pptx
GS EP LSO 112 Presentation.pptxGS EP LSO 112 Presentation.pptx
GS EP LSO 112 Presentation.pptx
Boris518712
 
GS EP LSO 131 Presentation REV02.pptx
GS EP LSO 131 Presentation REV02.pptxGS EP LSO 131 Presentation REV02.pptx
GS EP LSO 131 Presentation REV02.pptx
Boris518712
 
GS EP LSO 204 Presentation.pptx
GS EP LSO 204 Presentation.pptxGS EP LSO 204 Presentation.pptx
GS EP LSO 204 Presentation.pptx
Boris518712
 
GS EP LSO 205 REV.pptx
GS EP LSO 205  REV.pptxGS EP LSO 205  REV.pptx
GS EP LSO 205 REV.pptx
Boris518712
 
GS EP LSO 206 Presentation.pptx
GS EP LSO 206 Presentation.pptxGS EP LSO 206 Presentation.pptx
GS EP LSO 206 Presentation.pptx
Boris518712
 
GS EP LSO 209 Presentation.pptx
GS EP LSO 209 Presentation.pptxGS EP LSO 209 Presentation.pptx
GS EP LSO 209 Presentation.pptx
Boris518712
 
GS EP SAF 226 DocAcc.pptx
GS EP SAF 226 DocAcc.pptxGS EP SAF 226 DocAcc.pptx
GS EP SAF 226 DocAcc.pptx
Boris518712
 
GS EP SDV 102 PPT.pptx
GS EP SDV 102 PPT.pptxGS EP SDV 102 PPT.pptx
GS EP SDV 102 PPT.pptx
Boris518712
 
GS EP SPS 028 Follow up.pptx
GS EP SPS 028 Follow up.pptxGS EP SPS 028 Follow up.pptx
GS EP SPS 028 Follow up.pptx
Boris518712
 
GS EP TEL 120 DA .pptx
GS EP TEL 120 DA .pptxGS EP TEL 120 DA .pptx
GS EP TEL 120 DA .pptx
Boris518712
 
GS EP TEL 190 DA .pptx
GS EP TEL 190 DA .pptxGS EP TEL 190 DA .pptx
GS EP TEL 190 DA .pptx
Boris518712
 

More from Boris518712 (20)

Edospina-agua-desmineralizada.ppt
Edospina-agua-desmineralizada.pptEdospina-agua-desmineralizada.ppt
Edospina-agua-desmineralizada.ppt
 
Curso Lideres de Procesos.ppt
Curso Lideres de Procesos.pptCurso Lideres de Procesos.ppt
Curso Lideres de Procesos.ppt
 
Charla de Especificación de Bombas Centrifugas.ppt
Charla de Especificación de Bombas Centrifugas.pptCharla de Especificación de Bombas Centrifugas.ppt
Charla de Especificación de Bombas Centrifugas.ppt
 
GS EP GEO 402 Follow up.pptx
GS EP GEO 402 Follow up.pptxGS EP GEO 402 Follow up.pptx
GS EP GEO 402 Follow up.pptx
 
GS EP INS 106 Fiche de création.pptx
GS EP INS 106 Fiche de création.pptxGS EP INS 106 Fiche de création.pptx
GS EP INS 106 Fiche de création.pptx
 
GS EP INS 108 Follow up.pptx
GS EP INS 108 Follow up.pptxGS EP INS 108 Follow up.pptx
GS EP INS 108 Follow up.pptx
 
GS EP INS 150 Modification follow-up.pptx
GS EP INS 150 Modification follow-up.pptxGS EP INS 150 Modification follow-up.pptx
GS EP INS 150 Modification follow-up.pptx
 
GS EP INS 196 Modification follow-up.pptx
GS EP INS 196 Modification follow-up.pptxGS EP INS 196 Modification follow-up.pptx
GS EP INS 196 Modification follow-up.pptx
 
GS EP INS 197 Modification follow-up.pptx
GS EP INS 197 Modification follow-up.pptxGS EP INS 197 Modification follow-up.pptx
GS EP INS 197 Modification follow-up.pptx
 
GS EP LSO 112 Presentation.pptx
GS EP LSO 112 Presentation.pptxGS EP LSO 112 Presentation.pptx
GS EP LSO 112 Presentation.pptx
 
GS EP LSO 131 Presentation REV02.pptx
GS EP LSO 131 Presentation REV02.pptxGS EP LSO 131 Presentation REV02.pptx
GS EP LSO 131 Presentation REV02.pptx
 
GS EP LSO 204 Presentation.pptx
GS EP LSO 204 Presentation.pptxGS EP LSO 204 Presentation.pptx
GS EP LSO 204 Presentation.pptx
 
GS EP LSO 205 REV.pptx
GS EP LSO 205  REV.pptxGS EP LSO 205  REV.pptx
GS EP LSO 205 REV.pptx
 
GS EP LSO 206 Presentation.pptx
GS EP LSO 206 Presentation.pptxGS EP LSO 206 Presentation.pptx
GS EP LSO 206 Presentation.pptx
 
GS EP LSO 209 Presentation.pptx
GS EP LSO 209 Presentation.pptxGS EP LSO 209 Presentation.pptx
GS EP LSO 209 Presentation.pptx
 
GS EP SAF 226 DocAcc.pptx
GS EP SAF 226 DocAcc.pptxGS EP SAF 226 DocAcc.pptx
GS EP SAF 226 DocAcc.pptx
 
GS EP SDV 102 PPT.pptx
GS EP SDV 102 PPT.pptxGS EP SDV 102 PPT.pptx
GS EP SDV 102 PPT.pptx
 
GS EP SPS 028 Follow up.pptx
GS EP SPS 028 Follow up.pptxGS EP SPS 028 Follow up.pptx
GS EP SPS 028 Follow up.pptx
 
GS EP TEL 120 DA .pptx
GS EP TEL 120 DA .pptxGS EP TEL 120 DA .pptx
GS EP TEL 120 DA .pptx
 
GS EP TEL 190 DA .pptx
GS EP TEL 190 DA .pptxGS EP TEL 190 DA .pptx
GS EP TEL 190 DA .pptx
 

Recently uploaded

Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 

Recently uploaded (20)

Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 

GS EP SAF 341 rev 3.pptx

  • 1. GS EP SAF 341 LOCATION AND PROTECTION OF ONSHORE HYDROCARBON STORAGE REVISION 03
  • 2. 2 • Integration of the 12 design requirements of the REX Buncefield, • Simplification (avoidance of repetitions of what is written in other GSs), • General revision (old version based on obsolete regulations, development of some chapters and rearrangement). GS EP SAF 341 rev 03 – Location and protection of onshore HC storage MAIN CHANGES
  • 3. 3 12 design requirements based on API 2530: 1- Four level measures : maximum Operating level, HL (alarm), HHL (actions), Overfill level. 2- Each tank to be equipped by ATG (continuous monitoring), a HL and HHL sensors all independent from each others OR ATGS be able to be read from the control center providing also HL measurement + independent HHL sensor. 3 and 4- HL and HHL generates an alarm in the control center. A default of the sensor as well. 5- On HL and HHL alarms, stop of transfer of liquids. Communication means shall be tested before the transfer or done via a audible and visual alarm at transporter control location. If automatic, watchdog system to be implemented (test of the link and send a warning). GS EP SAF 341 rev 03 – Location and protection of onshore HC storage REX BUNCEFIELD
  • 4. 4 6- If HHL detection -> flow to the tank is over automatically via pump shutdown or valve closure except for tank transfer from other tank or from production units operated by the same operator. Attention shall be paid to water hammer effects. System to be designed in accordance with API 2530 requirements and ANSI/ISA 84.00.01 for new facilities. 7- Actions related to HHL detection shall be done manually in case of failure of the instrumentation loop. 8- In case of failure of the HHL instrumentation loop, redundant means to terminate the flow to the tank, different from the HHL automatic action (see item 6) shall be provided. This redundancy shall be operational manually or automatically in case of overfill or pool fire in the bund. This may be done, for instance, via a valve situated at the battery limit. GS EP SAF 341 rev 03 – Location and protection of onshore HC storage REX BUNCEFIELD
  • 5. 5 9- Additional requirements are applicable in case of transfer to unattended facilities: • Data and alarms monitored by Transporter • If HL detection -> automatic actions to terminate flow to tanks. • HHL shutdown loop shall not be based on actions of a remote location/third party. • Entire overflow prevention system shall be compliant with IEC 61511-2 requirements. Termination of the transfer shall be done by two independent equipment at least and SIL certified. 10- A secondary containment shall be provided and fully tight. The need of a third shall be studied if needed. 11- Congested areas (bushes and trees for instance) shall be avoided in tanks bunds and farms. 12- HC detection sensor shall be located in the bund of the tank. It may be a gas and/or a liquid detector according to TRA and site constraints. Detection shall initiate an alarm in the control room. GS EP SAF 341 rev 03 – Location and protection of onshore HC storage REX BUNCEFIELD
  • 6. 6 • References to appropriate GSs have been done instead of repeating the content in the GS EP SAF 341. • It mainly concerns the GS EP SAF 253, GS EP SAF 021 and GS EP SAF 228. • In a general way, repetitions will be avoided to prevent from any shift being able to generate derogations… GS EP SAF 341 rev 03 – Location and protection of onshore HC storage SIMPLIFICATION
  • 7. 7 Update versus French Regulation: • AM 03rd of October 2010 for HC liquid storage (distance between tanks…) • AM 02nd of january 2008 for liquefied HC (isolation, overfill and fire protection,…) Deletion of some undocumented references such as, for HC liquid tanks: • For emptying operation duration less than 8h, provide a gas blanketing system. • Maximum distance between fixed foam pourers and any point of the bund • … Pressure control: precision on breathing system. Blanketing: • Mandatory for fixed roof tanks to prevent air from entering the tank during emptying operations and to compensate the ambient temperature changes. • Not mandatory for internal floating roof within fixed roof tanks. However, the risk of tank collapse during emptying operations remains to be studied. Bunding for HC liquid tanks: • In line with French Regulation for the capacities, • Limit of capacity set at 6000 m² instead of 7000m², • Expectations concerning possible configurations of sub-compartimentation of bunds. GS EP SAF 341 rev 03 – Location and protection of onshore HC storage GENERAL REVISION: MAIN MODIFICATIONS FOR HC LIQUID TANKS
  • 8. 8 • Active fire protection : application rate and duration following AM 02/01/2008, • Fire & Gas detection : Fire and Gas detection coverage details (in accordance with RC referential), • Passive Fire Protection - > NFPA 58, • Isolation system: changes on overfill detection levels. GS EP SAF 341 rev 03 – Location and protection of onshore HC storage GENERAL REVISION: MAIN MODIFICATIONS FOR VESSELS FOR LIQUEFIED HC
  • 9. 9 Addition of a new section : particular cases • Geodesic domes, • Double wall tanks, • Storages of polar and sulfur laden products, • Tanks with handling temperature above 100 °C. GS EP SAF 341 rev 03 – Location and protection of onshore HC storage GENERAL REVISION: MAIN MODIFICATIONS