29/11/16 QFLEX COOLER PROJECT
1
SHIP AL THUMAMA
FLAG MARSHALL ISLANDS
PORT OF REGISTRY MAJURO
YARD NUMBER HHI 1862
CLASS DNV
GT 136355
IMO 9360843
PROJECT IAS Climatic Control to be fitted to Qflex Fleet
REPORTED BY OLIVER BATT (VESSEL MANAGER / ELECTRICAL SPECIALIST)
INTRODUCTION
SINCE DELIVERY OF THE VESSEL NYK HAS EXPERIENCED AN EXCEEDINGELY HIGH RATE OF
FAILURES OF THE HARDWARE ASSOCIATED WITH THE AUTOMATION SYSTEM. ESPECIALLY
THIS HAS BEEN THE RMP400 UNITS AND RCU400.
SCENARIO AND OBSERVATIONS
The vessel is one of 14 Qflex class which has been equipped with Kongsberg DACS
Automation. DACS is generally robust and performs well however failures of the IO modules
have experienced a low mean time between failures (MTBF) which have been causing
unexpected costs outside the budgeted expectations, and concern with regards to failure to
control critical machinery.
All Qflex vessels have the design concept of localised process stations for the automation
circuitry, seeing the field stations located all around the engine room. This has the benefit of
reducing cable lengths at the point of new build, but has the consequence of placing the
process stations in the high ambient temperature of the engine room. This design concept
differs from some LNG ships in the NYK fleet that houses all IO field stations in the climatic
controlled areas of the engine control room.
Analysis of the purchasing system shows a vast increase of unexpected expenditure with
regards to IO where the field stations are located in a non-climatic controlled space.
Specifically Al Thumama was experiencing failures of the RCU400 and RCU 500 modules,
each with a unit cost of 1800USD and 2400USD respectively. Typically failures were
numbering 15 to 20 pcs per year.
Root Cause Analysis
Root cause analysis was undertaken by electronics specialists Paramount Electronics in the
UK.
29/11/16 QFLEX COOLER PROJECT
2
The RMP and RCU units were both investigated, and the actual internal circuitry for the IO
was found to be all satisfactory. The problem was attributed to a small internal power
supply located in the top portion of each card.
The power supply consists of a pair of electrolytic capacitors and one bead tantalum
capacitor to smooth the DC supplies after rectification. Paramount noted these to be
failing, and upon closer inspection, the dielectric liquids had all dried up causing the failures
on both types of module through open circuit capacitors. Interestingly there was no damage
caused to the IO circuitry.
Figure 1
Electrolytic Capacitor cross section
Figure 2
One of the defective RMP 400 units – failing capacitors fit just under the top grill
NYK investigated this and undertook a thermal imaging survey of the field stations. Figure 3
shows the image for FS71. Especially we looked at process station FS71 which is located
close to the GCU in the funnel casing, and attributed to be the hottest ambient area on the
vessel. We also asked Kongsberg to fit a PT100 probe to monitor the internal temperature of
field station 71 so we could monitor the internal temperature.
29/11/16 QFLEX COOLER PROJECT
3
We noted with trends from the PT100 and the thermal imaging report that the RMP and
RCU units were operating at temperatures often in excess of 50 degrees Celcius.
Figure 3
Thermal Imagine report from FS71
NYK recognised the Arrhenius equation. This was developed on a set of investigations based
on a single electrolytic capacitor operating in differing temperatures. This states ‘if you
reduce the temperature by 10 degrees K, the failure rate halves’.
Figure 4
Arrhenius Equation graphically depicted
29/11/16 QFLEX COOLER PROJECT
4
Evidence shows the automation electronics were subjected to temperatures far in excess of
50 degrees Celsius, and climatic control of their operating environment would reduce MTBF.
The electrolytic capacitors were therefore noted to be the root cause of the failing cards.
This raised concern that failures of automation may also cause unreliability of critical
equipment and a compromising the vessel in a dangerous sea passage such as Singapore
Straits, or the Suez Canal.
Solution
The problem was discussed Kongsberg UAE, whom provided written consent, that in a
controlled manner KM would have no objections to NYK running trials with a view to fitting
coolers on every field station cabinet exposed to a high ambient temperature.
It was mutually agreed that the design authority of the Kongsberg DACS would be
maintained by keeping coolers OEM supply, ie the same manufacturer as the Kongsberg
cabinets. As a result cooling products from Rittal who manufactured cabinets for Kongsberg
were reviewed.
It was agreed by all parties that the trial field station would be FS71 due to it experiencing
the highest ambient temperatures.
NYK investigated different types of cooler that are presently available. There is mainly two
different options available, thermo electric type plate cooler with no moving parts working
on the theory of temperature differentials through currents passing two dissimilar metals,
or a conventional refrigerant cooler with circulating fans.
Although in document 179167/D Kongsberg do not give the exact operating temperature
range or any recommendations for the RMP / RCU units, they do state they a typical heat
dissipation of 10 W. Assuming 10 of these are installed in each cabinet along with their
associated equipment, we could expect approximately 100W of heat dissipation.
After some review of the cooling ability and manufacturers graphs for performance, it was
decided to trial a 100W thermo electric type FS71. This was supplied by Routeco / Rittal and
fitted by ships staff.
Consideration was given to condensate drains so absolutely no moisture could get into the
RMP RCU units, and the power has been carefully selected from a lighting distribution close
by the field station, so as if the cooler failed it would not trip the associated field station.
29/11/16 QFLEX COOLER PROJECT
5
Figure 5
Thermo electric Cooler Performance chart and installation in FS71
With the PT100 internally fitted to the cabinet we were able to trend the performance of
the units Dt, however the summer in the Gulf 2016 was particularly hot, and the trends
observed found a Dt of approximately 5.8 degrees Celsius . Observations from the DACS are
shown below.
Figure 6
Trial Thermo electric cooler showing 5.8 degrees C Dt
Although the equipment heat dissipation was 100 Watts, the ambient temperature was not
really taken into consideration. The exceedingly high ambient clearly required much more
powerful cooling.
After some technical review with Routeco and Rittal, it was decided that the internal volume
of the cabinets was also too great for the single thermo electric type cooler. Rittal reviewed
our installation and ran a set or more complex calculations taking into consideration:-
Cabinet Ambient
Cubical size
Required temperature required inside
Wattage of the equipment in each cubical
29/11/16 QFLEX COOLER PROJECT
6
This lead to two further engineering options being available:-
1. Bank ten thermo electric coolers in the front of each cabinet
2. Fit 1 higher wattage 1.5KW refrigerant based cooler
Option 1 was reviewed as there are no moving parts in the thermos electric cooler however
costs of this option would have been prohibitive.
Option 2 was reviewed and judged acceptable as the preferred solution.
A further refrigerant cooler type was subsequently purchased and fitted.
Figure 7
New Refrigerant cooler installed in FS71 to replace thermo Electric Cooler
Under trials the 1.5KW refrigerant cooler can be seen in the above diagrams to be operating
to it exact specification and satisfactory for our requirements.
Presently we are experiencing a Dt of 14.4 degrees, and based on the Arrehenius equation,
should more than half the failure rates of the I/O.
The temperature setting of the cooler has been made with longevity of the refrigeration
compressor, longevity of the RMP RCU units and maximum overall reliability of the DACS
system.
29/11/16 QFLEX COOLER PROJECT
7
Figure 8
Before operation the Cabinet temperature noted to be 44 degrees Celsius
Figure 9
With a set point of 30 degrees Celcius Dt of 14.5
29/11/16 QFLEX COOLER PROJECT
8
PROJECT PLAN
With the engineering solution suitably proven, a review of the field stations that would
require cooling units on board the Qflex was made.
SYSTEM PS POSITION COOLER (YES or NO)
CARGO
FS-31 DACS I/O Cabinet Room - A deck NO
FS31-1 Side Passageway STBD YES
FS31-2 Side Passageway STBD YES
FS31-3 Side Passageway STBD YES
FS-32 DACS I/O Cabinet Room - A deck NO
FS32-1 Cargo Mootr Room YES
FS-33 DACS I/O Cabinet Room - A deck NO
FS33-1 Side Passageway PORT YES
FS33-2 Side Passageway PORT YES
FS-34 DACS I/O Cabinet Room - A deck NO
FS34-1 Engine Room bottom floor YES
ENGINE
FS-41 LV Room STBD NO
FS41-1 Engine Room 4th
Deck YES
FS41-2 Engine Room bottom floor YES
FS41-3 ECR NO
FS-42 LV Room STBD NO
FS42-1 Engine Room 2nd
Deck YES
FS42-2 DG #1 & #2 Room YES
FS-43 LV Room PORT NO
FS43-1 Engine Room 2nd
Deck YES
FS43-2 Engine Room 4th
Deck YES
FS43-3 Engine Room bottom floor YES
FS-44 LV Room PORT NO
FS44-1 Engine Room 3rd
Deck YES
FS44-2 DG #3 & #4 Room YES
FS44-3 Funnel Casing - A Deck YES
MISC
FS-61 Cargo Motor Room YES
FS61-1 Cargo Motor Room YES
FS61-2 Cargo Motor Room YES
FS61-3 Cargo Motor Room YES
FS-71 Funnel Casing - GCU floor YES
29/11/16 QFLEX COOLER PROJECT
9
The remaining parts of the project will be executed on a turnkey fixed cost basis.
1. A specification for the installation of each cooler will be made detailing the exact fit,
source of power, and location of condensate drain if required. (Available 15th
December)
2. Routeco have quoted for vessel material and consumable kits to be provided for
each ship. These will consist of the coolers, individually marked for each field station,
and all tools and consumables required to complete the installation on every vessel.
Quotation is attached.
3. EMCS have been approached to supply the man power to install the coolers, on a
flexible daily rate. Quotations attached.
COST SUMMARY – QUOTES IN APPENDIX 5 & 6
Coolers, Tools, Hardware 45203.25
Labour 7707.34
Total 52910.59
Budget 60000.00
Balance of budget 7089.41
USD rates from XE Currency 29/11/16
MAINTENANCE AND PMS MEASURES
 Appendix 1 includes MTBF estimations
 3 monthly the filters will need to be changed, on every cooler – approximate 1 hours
work in total
 Evaporator fans to be changed in bulk at 10 years, dry dock 2027 based on the
present duty.
 1 complete spares kit to be carried on every vessel.
29/11/16 QFLEX COOLER PROJECT
10
ALARMS AND MONITORING
The Coolers have intelligent diagnostics and can have programmed relays to interface with
DACS to prevent the need for an electrician to make a round to check they are working.
1. Relay 1 will be linked to the automation system by means of a common alarm,
drawing attention for the electrician to attend a cooler.
2. Relay 2 will alarm if the airflow across the evaporator is reduced indicating dirty
filter.
3. PT100 will be installed in every DACS field station FOC by Kongsberg. NYK to provide
sensing probes.
The DACS connections will be made during the 2017 docking, and a separate specification
will be written and agreed with KM.
Reported by Oliver Batt Vessel Manager………………………………………………………………………………
Reviewed by …………………………………………………………………….
Review and Approval for Purchase ………………………………………….
Appendices (Removed):-
1. MTBF from Rittal
2. Calculations for power of the cooler
3. RMP400 data sheet
4. Typical Cabinet dimensions and housed equipment
5. EMCS Labour quote for installation
6. Routeco / Rittal Quotation

More Related Content

What's hot

Hisham hajaj, stanley consultants
Hisham hajaj, stanley consultantsHisham hajaj, stanley consultants
Hisham hajaj, stanley consultantsSarah El Akkad
 
package/compact substation
package/compact substationpackage/compact substation
package/compact substation
nehakardam
 
My message to the 5th dc dialogue 2021 in dubai & true market opportunity...
My message to the 5th dc dialogue 2021 in dubai & true market opportunity...My message to the 5th dc dialogue 2021 in dubai & true market opportunity...
My message to the 5th dc dialogue 2021 in dubai & true market opportunity...
Juma Yousef J. Saleh جمعة يوسف جمعة صالح
 
Getco's profile experiences of eng. juma yousef juma, activities 2020
Getco's profile experiences of eng. juma yousef juma, activities 2020Getco's profile experiences of eng. juma yousef juma, activities 2020
Getco's profile experiences of eng. juma yousef juma, activities 2020
Juma Yousef J. Saleh جمعة يوسف جمعة صالح
 
Control loop configuration of interacting units
Control loop configuration of interacting unitsControl loop configuration of interacting units
Control loop configuration of interacting units
Somen Jana
 
Vav boxes long can personalize comfort when connected to smart ac unit (only)...
Vav boxes long can personalize comfort when connected to smart ac unit (only)...Vav boxes long can personalize comfort when connected to smart ac unit (only)...
Vav boxes long can personalize comfort when connected to smart ac unit (only)...
Juma Yousef J. Saleh جمعة يوسف جمعة صالح
 
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2syed abdul wahab
 
Service center solahart 081313462267
Service center solahart 081313462267Service center solahart 081313462267
Service center solahart 081313462267
Service Solahart 081313462267
 
George Gilbert (Bert) Yates resume updated 5 5-16
George Gilbert (Bert) Yates resume updated 5 5-16George Gilbert (Bert) Yates resume updated 5 5-16
George Gilbert (Bert) Yates resume updated 5 5-16
Bert Yates
 
Development of the Malaysia’s first satellite remote charging District Coolin...
Development of the Malaysia’s first satellite remote charging District Coolin...Development of the Malaysia’s first satellite remote charging District Coolin...
Development of the Malaysia’s first satellite remote charging District Coolin...
Arul Hisham Abdul Rahim (Ir)
 

What's hot (11)

Hisham hajaj, stanley consultants
Hisham hajaj, stanley consultantsHisham hajaj, stanley consultants
Hisham hajaj, stanley consultants
 
package/compact substation
package/compact substationpackage/compact substation
package/compact substation
 
My message to the 5th dc dialogue 2021 in dubai & true market opportunity...
My message to the 5th dc dialogue 2021 in dubai & true market opportunity...My message to the 5th dc dialogue 2021 in dubai & true market opportunity...
My message to the 5th dc dialogue 2021 in dubai & true market opportunity...
 
Getco's profile experiences of eng. juma yousef juma, activities 2020
Getco's profile experiences of eng. juma yousef juma, activities 2020Getco's profile experiences of eng. juma yousef juma, activities 2020
Getco's profile experiences of eng. juma yousef juma, activities 2020
 
Control loop configuration of interacting units
Control loop configuration of interacting unitsControl loop configuration of interacting units
Control loop configuration of interacting units
 
Vav boxes long can personalize comfort when connected to smart ac unit (only)...
Vav boxes long can personalize comfort when connected to smart ac unit (only)...Vav boxes long can personalize comfort when connected to smart ac unit (only)...
Vav boxes long can personalize comfort when connected to smart ac unit (only)...
 
gcurs presentation
gcurs presentationgcurs presentation
gcurs presentation
 
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
 
Service center solahart 081313462267
Service center solahart 081313462267Service center solahart 081313462267
Service center solahart 081313462267
 
George Gilbert (Bert) Yates resume updated 5 5-16
George Gilbert (Bert) Yates resume updated 5 5-16George Gilbert (Bert) Yates resume updated 5 5-16
George Gilbert (Bert) Yates resume updated 5 5-16
 
Development of the Malaysia’s first satellite remote charging District Coolin...
Development of the Malaysia’s first satellite remote charging District Coolin...Development of the Malaysia’s first satellite remote charging District Coolin...
Development of the Malaysia’s first satellite remote charging District Coolin...
 

Similar to Cooler Project Ver 1.0 LKIN

Hvac chiller Engineer Tech
Hvac chiller Engineer Tech Hvac chiller Engineer Tech
Hvac chiller Engineer Tech
Kamran Saeed
 
48 tc 04-16-03pd paquete carrier
48 tc 04-16-03pd paquete carrier48 tc 04-16-03pd paquete carrier
48 tc 04-16-03pd paquete carrier
Rios Luis
 
IRJET- Critical Analysis of Thermoelectric Cycle (Tri-Cycle)
IRJET- Critical Analysis of Thermoelectric Cycle (Tri-Cycle)IRJET- Critical Analysis of Thermoelectric Cycle (Tri-Cycle)
IRJET- Critical Analysis of Thermoelectric Cycle (Tri-Cycle)
IRJET Journal
 
Three level igct-based npc converters
Three level igct-based npc convertersThree level igct-based npc converters
Three level igct-based npc converters
rshambhu
 
EXH2200 Cooling Tower Design Guidelines.pdf
EXH2200 Cooling Tower Design Guidelines.pdfEXH2200 Cooling Tower Design Guidelines.pdf
EXH2200 Cooling Tower Design Guidelines.pdf
ZeeshanAlam90
 
Epoxy Laminated Tank Heater Panels
Epoxy Laminated Tank Heater PanelsEpoxy Laminated Tank Heater Panels
Epoxy Laminated Tank Heater Panels
Hotfoil EHS, Inc.
 
THOMAS RIES Selected Portfolios_20150604
THOMAS RIES Selected Portfolios_20150604THOMAS RIES Selected Portfolios_20150604
THOMAS RIES Selected Portfolios_20150604Thomas Ries, MASc, PEng
 
AMS - Arctic Pad - Technical Information
AMS - Arctic Pad - Technical InformationAMS - Arctic Pad - Technical Information
AMS - Arctic Pad - Technical Informationjphawkins
 
Design plate heat exchangers
Design plate heat exchangersDesign plate heat exchangers
Design plate heat exchangers
Xuan Tung
 
Plate and frame Heat Exchanger Sizing
Plate and frame Heat Exchanger SizingPlate and frame Heat Exchanger Sizing
Plate and frame Heat Exchanger Sizing
Syed Waqas Haider
 
Cep plate and_frame_hx
Cep plate and_frame_hxCep plate and_frame_hx
Cep plate and_frame_hx
Hsien Yu Wang
 
Ships air conditioning
Ships air conditioningShips air conditioning
Ships air conditioning
Ahmed Mohamed Ashraf
 
GIS 400kv substation
GIS  400kv substationGIS  400kv substation
GIS 400kv substation
Anbarasu Balakrishnan
 
Cryogenic Technology
Cryogenic Technology Cryogenic Technology
Cryogenic Technology
FRANCIS TOMY
 
Dover Project consideration about process design
Dover Project consideration about process designDover Project consideration about process design
Dover Project consideration about process designRex Liu
 
Experimental Analysis of Refrigeration system using Microchannel condenser & ...
Experimental Analysis of Refrigeration system using Microchannel condenser & ...Experimental Analysis of Refrigeration system using Microchannel condenser & ...
Experimental Analysis of Refrigeration system using Microchannel condenser & ...
AM Publications
 
Azerbaycan ing referasn albümü hg
Azerbaycan ing referasn albümü hgAzerbaycan ing referasn albümü hg
Azerbaycan ing referasn albümü hgguestb585ef
 

Similar to Cooler Project Ver 1.0 LKIN (20)

Hvac chiller Engineer Tech
Hvac chiller Engineer Tech Hvac chiller Engineer Tech
Hvac chiller Engineer Tech
 
OSX1 FPSO Buyers Rev2
OSX1 FPSO Buyers Rev2OSX1 FPSO Buyers Rev2
OSX1 FPSO Buyers Rev2
 
BE_YK_EngineeringGuide_G
BE_YK_EngineeringGuide_GBE_YK_EngineeringGuide_G
BE_YK_EngineeringGuide_G
 
48 tc 04-16-03pd paquete carrier
48 tc 04-16-03pd paquete carrier48 tc 04-16-03pd paquete carrier
48 tc 04-16-03pd paquete carrier
 
IRJET- Critical Analysis of Thermoelectric Cycle (Tri-Cycle)
IRJET- Critical Analysis of Thermoelectric Cycle (Tri-Cycle)IRJET- Critical Analysis of Thermoelectric Cycle (Tri-Cycle)
IRJET- Critical Analysis of Thermoelectric Cycle (Tri-Cycle)
 
Three level igct-based npc converters
Three level igct-based npc convertersThree level igct-based npc converters
Three level igct-based npc converters
 
EXH2200 Cooling Tower Design Guidelines.pdf
EXH2200 Cooling Tower Design Guidelines.pdfEXH2200 Cooling Tower Design Guidelines.pdf
EXH2200 Cooling Tower Design Guidelines.pdf
 
Epoxy Laminated Tank Heater Panels
Epoxy Laminated Tank Heater PanelsEpoxy Laminated Tank Heater Panels
Epoxy Laminated Tank Heater Panels
 
THOMAS RIES Selected Portfolios_20150604
THOMAS RIES Selected Portfolios_20150604THOMAS RIES Selected Portfolios_20150604
THOMAS RIES Selected Portfolios_20150604
 
AMS - Arctic Pad - Technical Information
AMS - Arctic Pad - Technical InformationAMS - Arctic Pad - Technical Information
AMS - Arctic Pad - Technical Information
 
Design plate heat exchangers
Design plate heat exchangersDesign plate heat exchangers
Design plate heat exchangers
 
Plate and frame Heat Exchanger Sizing
Plate and frame Heat Exchanger SizingPlate and frame Heat Exchanger Sizing
Plate and frame Heat Exchanger Sizing
 
Cep plate and_frame_hx
Cep plate and_frame_hxCep plate and_frame_hx
Cep plate and_frame_hx
 
Ships air conditioning
Ships air conditioningShips air conditioning
Ships air conditioning
 
GIS 400kv substation
GIS  400kv substationGIS  400kv substation
GIS 400kv substation
 
Cryogenic Technology
Cryogenic Technology Cryogenic Technology
Cryogenic Technology
 
Spe Final
Spe FinalSpe Final
Spe Final
 
Dover Project consideration about process design
Dover Project consideration about process designDover Project consideration about process design
Dover Project consideration about process design
 
Experimental Analysis of Refrigeration system using Microchannel condenser & ...
Experimental Analysis of Refrigeration system using Microchannel condenser & ...Experimental Analysis of Refrigeration system using Microchannel condenser & ...
Experimental Analysis of Refrigeration system using Microchannel condenser & ...
 
Azerbaycan ing referasn albümü hg
Azerbaycan ing referasn albümü hgAzerbaycan ing referasn albümü hg
Azerbaycan ing referasn albümü hg
 

Cooler Project Ver 1.0 LKIN

  • 1. 29/11/16 QFLEX COOLER PROJECT 1 SHIP AL THUMAMA FLAG MARSHALL ISLANDS PORT OF REGISTRY MAJURO YARD NUMBER HHI 1862 CLASS DNV GT 136355 IMO 9360843 PROJECT IAS Climatic Control to be fitted to Qflex Fleet REPORTED BY OLIVER BATT (VESSEL MANAGER / ELECTRICAL SPECIALIST) INTRODUCTION SINCE DELIVERY OF THE VESSEL NYK HAS EXPERIENCED AN EXCEEDINGELY HIGH RATE OF FAILURES OF THE HARDWARE ASSOCIATED WITH THE AUTOMATION SYSTEM. ESPECIALLY THIS HAS BEEN THE RMP400 UNITS AND RCU400. SCENARIO AND OBSERVATIONS The vessel is one of 14 Qflex class which has been equipped with Kongsberg DACS Automation. DACS is generally robust and performs well however failures of the IO modules have experienced a low mean time between failures (MTBF) which have been causing unexpected costs outside the budgeted expectations, and concern with regards to failure to control critical machinery. All Qflex vessels have the design concept of localised process stations for the automation circuitry, seeing the field stations located all around the engine room. This has the benefit of reducing cable lengths at the point of new build, but has the consequence of placing the process stations in the high ambient temperature of the engine room. This design concept differs from some LNG ships in the NYK fleet that houses all IO field stations in the climatic controlled areas of the engine control room. Analysis of the purchasing system shows a vast increase of unexpected expenditure with regards to IO where the field stations are located in a non-climatic controlled space. Specifically Al Thumama was experiencing failures of the RCU400 and RCU 500 modules, each with a unit cost of 1800USD and 2400USD respectively. Typically failures were numbering 15 to 20 pcs per year. Root Cause Analysis Root cause analysis was undertaken by electronics specialists Paramount Electronics in the UK.
  • 2. 29/11/16 QFLEX COOLER PROJECT 2 The RMP and RCU units were both investigated, and the actual internal circuitry for the IO was found to be all satisfactory. The problem was attributed to a small internal power supply located in the top portion of each card. The power supply consists of a pair of electrolytic capacitors and one bead tantalum capacitor to smooth the DC supplies after rectification. Paramount noted these to be failing, and upon closer inspection, the dielectric liquids had all dried up causing the failures on both types of module through open circuit capacitors. Interestingly there was no damage caused to the IO circuitry. Figure 1 Electrolytic Capacitor cross section Figure 2 One of the defective RMP 400 units – failing capacitors fit just under the top grill NYK investigated this and undertook a thermal imaging survey of the field stations. Figure 3 shows the image for FS71. Especially we looked at process station FS71 which is located close to the GCU in the funnel casing, and attributed to be the hottest ambient area on the vessel. We also asked Kongsberg to fit a PT100 probe to monitor the internal temperature of field station 71 so we could monitor the internal temperature.
  • 3. 29/11/16 QFLEX COOLER PROJECT 3 We noted with trends from the PT100 and the thermal imaging report that the RMP and RCU units were operating at temperatures often in excess of 50 degrees Celcius. Figure 3 Thermal Imagine report from FS71 NYK recognised the Arrhenius equation. This was developed on a set of investigations based on a single electrolytic capacitor operating in differing temperatures. This states ‘if you reduce the temperature by 10 degrees K, the failure rate halves’. Figure 4 Arrhenius Equation graphically depicted
  • 4. 29/11/16 QFLEX COOLER PROJECT 4 Evidence shows the automation electronics were subjected to temperatures far in excess of 50 degrees Celsius, and climatic control of their operating environment would reduce MTBF. The electrolytic capacitors were therefore noted to be the root cause of the failing cards. This raised concern that failures of automation may also cause unreliability of critical equipment and a compromising the vessel in a dangerous sea passage such as Singapore Straits, or the Suez Canal. Solution The problem was discussed Kongsberg UAE, whom provided written consent, that in a controlled manner KM would have no objections to NYK running trials with a view to fitting coolers on every field station cabinet exposed to a high ambient temperature. It was mutually agreed that the design authority of the Kongsberg DACS would be maintained by keeping coolers OEM supply, ie the same manufacturer as the Kongsberg cabinets. As a result cooling products from Rittal who manufactured cabinets for Kongsberg were reviewed. It was agreed by all parties that the trial field station would be FS71 due to it experiencing the highest ambient temperatures. NYK investigated different types of cooler that are presently available. There is mainly two different options available, thermo electric type plate cooler with no moving parts working on the theory of temperature differentials through currents passing two dissimilar metals, or a conventional refrigerant cooler with circulating fans. Although in document 179167/D Kongsberg do not give the exact operating temperature range or any recommendations for the RMP / RCU units, they do state they a typical heat dissipation of 10 W. Assuming 10 of these are installed in each cabinet along with their associated equipment, we could expect approximately 100W of heat dissipation. After some review of the cooling ability and manufacturers graphs for performance, it was decided to trial a 100W thermo electric type FS71. This was supplied by Routeco / Rittal and fitted by ships staff. Consideration was given to condensate drains so absolutely no moisture could get into the RMP RCU units, and the power has been carefully selected from a lighting distribution close by the field station, so as if the cooler failed it would not trip the associated field station.
  • 5. 29/11/16 QFLEX COOLER PROJECT 5 Figure 5 Thermo electric Cooler Performance chart and installation in FS71 With the PT100 internally fitted to the cabinet we were able to trend the performance of the units Dt, however the summer in the Gulf 2016 was particularly hot, and the trends observed found a Dt of approximately 5.8 degrees Celsius . Observations from the DACS are shown below. Figure 6 Trial Thermo electric cooler showing 5.8 degrees C Dt Although the equipment heat dissipation was 100 Watts, the ambient temperature was not really taken into consideration. The exceedingly high ambient clearly required much more powerful cooling. After some technical review with Routeco and Rittal, it was decided that the internal volume of the cabinets was also too great for the single thermo electric type cooler. Rittal reviewed our installation and ran a set or more complex calculations taking into consideration:- Cabinet Ambient Cubical size Required temperature required inside Wattage of the equipment in each cubical
  • 6. 29/11/16 QFLEX COOLER PROJECT 6 This lead to two further engineering options being available:- 1. Bank ten thermo electric coolers in the front of each cabinet 2. Fit 1 higher wattage 1.5KW refrigerant based cooler Option 1 was reviewed as there are no moving parts in the thermos electric cooler however costs of this option would have been prohibitive. Option 2 was reviewed and judged acceptable as the preferred solution. A further refrigerant cooler type was subsequently purchased and fitted. Figure 7 New Refrigerant cooler installed in FS71 to replace thermo Electric Cooler Under trials the 1.5KW refrigerant cooler can be seen in the above diagrams to be operating to it exact specification and satisfactory for our requirements. Presently we are experiencing a Dt of 14.4 degrees, and based on the Arrehenius equation, should more than half the failure rates of the I/O. The temperature setting of the cooler has been made with longevity of the refrigeration compressor, longevity of the RMP RCU units and maximum overall reliability of the DACS system.
  • 7. 29/11/16 QFLEX COOLER PROJECT 7 Figure 8 Before operation the Cabinet temperature noted to be 44 degrees Celsius Figure 9 With a set point of 30 degrees Celcius Dt of 14.5
  • 8. 29/11/16 QFLEX COOLER PROJECT 8 PROJECT PLAN With the engineering solution suitably proven, a review of the field stations that would require cooling units on board the Qflex was made. SYSTEM PS POSITION COOLER (YES or NO) CARGO FS-31 DACS I/O Cabinet Room - A deck NO FS31-1 Side Passageway STBD YES FS31-2 Side Passageway STBD YES FS31-3 Side Passageway STBD YES FS-32 DACS I/O Cabinet Room - A deck NO FS32-1 Cargo Mootr Room YES FS-33 DACS I/O Cabinet Room - A deck NO FS33-1 Side Passageway PORT YES FS33-2 Side Passageway PORT YES FS-34 DACS I/O Cabinet Room - A deck NO FS34-1 Engine Room bottom floor YES ENGINE FS-41 LV Room STBD NO FS41-1 Engine Room 4th Deck YES FS41-2 Engine Room bottom floor YES FS41-3 ECR NO FS-42 LV Room STBD NO FS42-1 Engine Room 2nd Deck YES FS42-2 DG #1 & #2 Room YES FS-43 LV Room PORT NO FS43-1 Engine Room 2nd Deck YES FS43-2 Engine Room 4th Deck YES FS43-3 Engine Room bottom floor YES FS-44 LV Room PORT NO FS44-1 Engine Room 3rd Deck YES FS44-2 DG #3 & #4 Room YES FS44-3 Funnel Casing - A Deck YES MISC FS-61 Cargo Motor Room YES FS61-1 Cargo Motor Room YES FS61-2 Cargo Motor Room YES FS61-3 Cargo Motor Room YES FS-71 Funnel Casing - GCU floor YES
  • 9. 29/11/16 QFLEX COOLER PROJECT 9 The remaining parts of the project will be executed on a turnkey fixed cost basis. 1. A specification for the installation of each cooler will be made detailing the exact fit, source of power, and location of condensate drain if required. (Available 15th December) 2. Routeco have quoted for vessel material and consumable kits to be provided for each ship. These will consist of the coolers, individually marked for each field station, and all tools and consumables required to complete the installation on every vessel. Quotation is attached. 3. EMCS have been approached to supply the man power to install the coolers, on a flexible daily rate. Quotations attached. COST SUMMARY – QUOTES IN APPENDIX 5 & 6 Coolers, Tools, Hardware 45203.25 Labour 7707.34 Total 52910.59 Budget 60000.00 Balance of budget 7089.41 USD rates from XE Currency 29/11/16 MAINTENANCE AND PMS MEASURES  Appendix 1 includes MTBF estimations  3 monthly the filters will need to be changed, on every cooler – approximate 1 hours work in total  Evaporator fans to be changed in bulk at 10 years, dry dock 2027 based on the present duty.  1 complete spares kit to be carried on every vessel.
  • 10. 29/11/16 QFLEX COOLER PROJECT 10 ALARMS AND MONITORING The Coolers have intelligent diagnostics and can have programmed relays to interface with DACS to prevent the need for an electrician to make a round to check they are working. 1. Relay 1 will be linked to the automation system by means of a common alarm, drawing attention for the electrician to attend a cooler. 2. Relay 2 will alarm if the airflow across the evaporator is reduced indicating dirty filter. 3. PT100 will be installed in every DACS field station FOC by Kongsberg. NYK to provide sensing probes. The DACS connections will be made during the 2017 docking, and a separate specification will be written and agreed with KM. Reported by Oliver Batt Vessel Manager……………………………………………………………………………… Reviewed by ……………………………………………………………………. Review and Approval for Purchase …………………………………………. Appendices (Removed):- 1. MTBF from Rittal 2. Calculations for power of the cooler 3. RMP400 data sheet 4. Typical Cabinet dimensions and housed equipment 5. EMCS Labour quote for installation 6. Routeco / Rittal Quotation