ABB’s history of powering primary aluminium plants started 45 years ago. Since
then, we have supplied complete electrification solutions and substations to more
than 60 aluminium smelters worldwide. The modernization of an existing plant to the
latest standards and production and efficiency levels – performed while it is still in
operation – requires a different set of skills and competencies than building a green-
field plant. ABB has in-depth knowledge of the aluminium production process and
the experience necessary to execute complex projects – always with the objective
to keep your production running day and night. For more information, visit us at
www.abb.com/aluminium
Keeping your production running day and night?
Certainly.
Global Product Group Aluminium
5405 Baden 5 Dättwil, Switzerland
aluminium@ch.abb.com
Rio Tinto Alcan ISAL Smelter in Iceland Expansion Project
Introduction
The power intensive industry, which is
characterised here as manufacturers
needing more than 7 MWh/t of their
outputproduct,ishighlydependenton
the technological development of the
manufacturing companies in the areas
of products conveying, transforming,
switching and controlling power at
medium and high voltages.
It is of mutual benefit to these
companies to cooperate for continuous
improvementsofqualityandefficiency
of their products and processes. For
Rio Tinto Alcan (RTA), HSE (Health-
Safety-Environment) aspects of their
equipment and production processes
are paramount in their evaluation
for construction and operation
potential.
The engineering and production
technique of ABB in the field of SF6
insulated switchgear, has presently
reached such a level that smelters
with high HSE-demands combined
with high demands of availability
and reliability of equipment, can
take confidence in choosing medium
voltage switchgear.
The specific properties of SF6 are
further outlined below.
Electrical Properties
The excellent dielectric properties
of SF6 are attributable to the
electronegative character of its
molecule. It has a pronounced
tendency to capture free electrons
forming heavy ions with low mobility,
making the formation of electron
avalanches very unlikely. The dielectric
strength of SF6 is about 2,5 times
higher than that of atmospheric
air under the same conditions, and
this leads to space demand of only
1/10th of conventional air insulated
switchgear. This fact is decisive for
economical considerations in many
cases for voltage levels of 33 kV and
higher.
Chemical Properties
SF6 can be heated to 500°C without
decomposition in the absence
of catalytic metals. SF6 is non-
flammable. Therefore, the risk of
ignition caused by an SF6 switchgear
malfunction is practically zero, as
well as the risk of damage caused
by an external fire is as limited as
possible. The fault current interruption
capability of SF6 is excellent. In its
pure state, SF6 is nontoxic, and this is
regularly confirmed on new gas prior
to delivery, by placing mice in a gas
mixture of 80 % SF6 and 20% oxygen
for a period of 24 hours (biological test
recommended by IEC 376).
220kV AIS Footprint
Operation and Maintenance
The temperature within an arc in the
interruption chamber can be 15 000
K. However, only minor decomposition
remnants are present after each
interruption. CIGRE WG 23.10 is
working on an SF6 recycling guide,
covering purity criteria for SF6 SWG.
Criteria for handling of SF6 are based
on IEC 376 Standards for safety of
personnel and environment.
These factors contribute in minimizing
emissions to the atmosphere. The
normal leakage rate of HV Switchgear
can be expected to be 0,1 % - 0,5 %
per year.
Onlyauthorisedpersonnelareentitled
to work with SF6 in Iceland and other
EEA (European Economic Area – an
outer Layer of the EU) countries, as
mandated by an EU directive. Two
electricians of our substation staff
have passed through tests after
theoretical and practical training of
SF6 Gas Treatment with ABB near
Mannheim in Germany.
RTA ISAL have acquired special
equipment which is dedicated for
the sampling, testing, emptying and
refilling purposes.
RTA ISAL keeps track of its mass of
gas by annually weighing the reserve
gas and by having SF6 gas detectors in
the switchgear room and in the cable
cellar connected to the alarm system
ofthesubstation.Thepressuregauges
of each gas compartment are read off
once a week. They are also equipped
with a warning and alarm/trip level.
Environmental Aspects
SF6 does not contribute significantly
to stratospheric ozone depletion, as
it contains no chlorine, which is the
main agent in ozone catalysis, nor to
the Greenhouse effect, because the
quantities present in the atmosphere
are very small.
SF6 has infrared absorption
characteristics and is considered a
minuscule Greenhouse gas, duetoits
very long lifetime in the atmosphere.
It's contribution to global warming
however is very small, due to the
extremely low concentration of SF6
in the atmosphere.
Assessment on Engineering:
Theexperienceofmost,ifnotall,users
of SF6 switchgear, for a wide range
of operating conditions, is that this
technology has brought advantages
in performance, size, weight, global
costs and reliability.
However, for this endeavour to be
implemented,itisnecessarytoperform
a rigid risk analysis. This is carried out
jointly by knowledgeable consultants
with experience on operation, the
operators and maintenance staff of
the owner, and the manufacturer.
The findings of such risk analysis and
an SQRA (Semi Quantitative Risk
Analysis) shall form the basis for the
engineering of the switchgear.
The modern SF6 Switchgear, as
for instance manufactured by ABB
in Germany, is an extremely safe
equipment against Arc Flash. In spite
of this, the standard policy of RTA
ISAL is to control it remotely from the
control rooms.
Switchgear Room:
The IPU project (ISAL Production
Upgrade) needed space for the
installation of 13 bays of 60 kV Circuit
Breakers on double busbar. Due to
the limited space available near
the seaside, accommodating an air
insulated switchgear would not have
been possible without costly landfill.
The gas-insulated switchgear (GIS)
technology offered a feasible solution
on the available land. It was therefore
decided to construct a concrete
building beside the two 220/60 kV,
200 MVA, bays for the Step-down
transformersfeedingeachhalfof both
60 kV busbars. The link from the
ABB’s latest development in GIS has been to reduce the overall footprint drastically
Out of the total contribution of all
agents, the contribution of SF6 (less
than one part in ten thousand, 0,1
promille) is negligible.
secondary of these Step-downs is an
SF6 insulated busbar.
Control System
ISAL‘s main substation is supervised
by an Allen-Bradley Control Logix
controller, SuperMaster, that monitors
the status of high voltage and auxiliary
equipment, interfaces with Landsnet,
the national grid operator, and controls
transformer cooling, filter banks
and collects usage data (energy,
water consumption, etc.). Landsnet
can enforce automatic curtailment
of plant load remotely from their
National Control Centre. The required
load reduction is divided among the
potlines and adjusted for plant power
variations by the SuperMaster.
The new high voltage (HV) equipment
transformers, 220kV air-insulated
switchgear (AIS) and 60kV gas-insulated
switchgear (GIS) are controlled and
supervised by ABB Relian protective
relays. A communication gateway,
ABB COM600, passes information
between the protective relays (status,
process values, commands, etc.) and
SuperMaster, as well as the InTouch
SCADA system. In case of failure of the
plant‘s SCADA system, the COM600
can be used for supervision and control
of the HV equipment.
Each of the potlines is controlled,
protected and supervised by its
respective potline current controller.
PL1 and PL2 are controlled by state of
the art A-B Control Logix controllers
and PL3 by an ABB Controller (PSR).
The existing diode rectifer units of PL1
and PL2 are directly controlled by their
potline controllers, but rectifier units
of potline 3 are each controlled by an
ABB PSR. In case of a potline master
controller failure, all rectifier units
can be operated manually in stand-
alone mode.
The new rectifier units are each
controlled by a specialized ABB AC
800 PEC rectifier controller. The new
units fulfill the same requirement,
as the existing ones, of being able to
provide current to their potline in the
absence of a potline controller, in a
stand-alone mode.
Communications:
As the IPU project was one of integrating
new equipment with existing
equipment, several communication
paths had to be developed.
• SuperMaster / COM600
communicate through a serial
link using the IEC 60870- 5-101
protocol. A ProSoft module for
the Control Logix platform is used
This technique demanded a high
degree of precision in the civil part
and in installation of transformers
and switchgear. Avoiding cable
connection here, offers the possibility
of undistorted condition analysis
of the transformers among other
benefits.
On the GIS, the local manoeuvring
cubicles have indicators for the
position of the respective switches.
However, for safety reasons, normally
the manoeuvring of the switches takes
place at the substation’s SCADA
system, or in one of the two new
Control Rooms constructed by IPU.
The GIS-room is fitted with an
overhead crane. This was integrated
with the installation of the
switchgear, and can be utilized in
repair of the switchgear if required.
The GIS is not particularly maintenance
demanding, but ISAL intends to
incorporate it in its switchgear
maintenance scheme, recording
the pattern of the control circuit
of the trip coils, the pattern of the
main current under the interruption
period and to record the length
of the total interruption period.
This article was originally published in Aluminium World Journal, produced by Global Media Communication Ltd.
and software was developed to
pass information and commands
back and forth.
• InTouch SCADA / COM600 as well
as Relian / COM600
communicate over Ethernet using
the IEC 61850-8-1 protocol.
Paths 1) and 2) are completely
independent, allowing the
SuperMaster to supervise
operation and to generate
redundant alarms/ warnings in
case of break down of COM600 /
SCADA communications.
• SuperMaster / PML power
monitoring devices ION 7600
communicate through an RS-485
link using the Modbus RTU
protocol. A ProSoft module for
the Control Logix platform is
used and software was developed
to collect data from the intelligent
power meters. Supervision and
redundant control of plant power
transformer OLTC voltage
regulators (21 kV) is also
done via a Modbus link.
• InTouch SCADA / PML power
monitoring devices communicate
over Ethernet. A proprietary
Schneider Electric (ex. Power
Measurement Limited of Canada)
ION Enterprise system collects
detailed data from the ION 7600
meters, transients, sag/swell,
power quality and historical data
into a MS SQL database.
• Potline Controllers PL1 and PL2
/ AC 800 PEC rectifier controllers
communicate over Ethernet using
the EtherNet/IP protocol. The
interface on the PEC side is an
Anybus module developed by
HMS Industrial Networks. As the
EtherNet/IP Anybus module‘s
implementation allows only point
to point communication, gateways
were required for the swing units
S1 and S2, as they can be
connected to any potline and
therefore have to be able to
communicate with all the potline
controllers. The seamless
integration of the PEC controllers
of the rectifier units makes them
appear as Allen-Bradley
equipment to the rest of the world
(SCADA, MES, potline controllers,
etc.)
• Potline Controller PL3 PSR / AC
800 PEC rectifier controllers S1
and S2 communicate over an ABB
proprietary PowerLink using an
ABB PSR-PSR protocol.
• The four AC 800 PEC controllers
communicate with each other
through a dedicated redundant
PowerLink.
In Conclusion
As demonstrated by the Rio Tinto
Alcan Isal Smelter Production Upgrade
project, GIS can be integrated into
existing facilities to support expansion
and power supply for smelters
with high energy and health and
safety requirements. SF6 insulated
switchgear is an environmentally
friendly and safe technology, with
excellent operational capacities.
An upgrade can be fully tailored
through engineering solutions to work
with, and around, existing technologies,
even where space restrictions may
need to be considered.
Furthermore, the communication
and control systems are designed to
integrate seamlessly with existing ones,
to provide flexibility and economical
advantages, while securing optimal
performance.
Authors:
Bjarni Jonsson, RTA ISAL, Leader of
Electrical Services,
Haflidi Loftsson, Staki ehf, Chief
Engineer and Max Wiestner, Head of the
Aluminium business within ABB.
For more information Contact:
ABB Switzerland Ltd.
Aluminium, BU- Industrial Solutions
Max Wiestner,
Phone: +41 58 586 85
Email: max.wiestner@ch.abb.com
© Aluminium World Journal 2012- 2015, Global Media Communication Limited, All rights reserved

More Related Content

What's hot

Aldi widiartono gis eco efficient switchgear
Aldi widiartono gis eco efficient switchgearAldi widiartono gis eco efficient switchgear
Aldi widiartono gis eco efficient switchgear
HariSantoso20
 
Moving to 66kV: Are current switchgears and transformers adequate?
Moving to 66kV: Are current switchgears and transformers adequate?Moving to 66kV: Are current switchgears and transformers adequate?
Moving to 66kV: Are current switchgears and transformers adequate?
Torben Haagh
 
GIS(GAS INSULATED SUBSTATION)
GIS(GAS  INSULATED  SUBSTATION) GIS(GAS  INSULATED  SUBSTATION)
GIS(GAS INSULATED SUBSTATION)
suneel kumar Aggela
 
Gas insulated substation
Gas insulated substationGas insulated substation
Gas insulated substation
sharique_64
 
Seminar on Gas Insulated Substation
Seminar on Gas Insulated SubstationSeminar on Gas Insulated Substation
Seminar on Gas Insulated Substation
Soumya Raj Poddar
 
Ppt
PptPpt
Ener-tec, Inc. - Water/oil presentation
Ener-tec, Inc. - Water/oil presentationEner-tec, Inc. - Water/oil presentation
Ener-tec, Inc. - Water/oil presentation
Jonathan Shroyer
 
substation 101
substation 101substation 101
substation 101
danica11
 
Gas insulated substation
Gas insulated substationGas insulated substation
Gas insulated substation
himanshu kumar
 
Gas insulated substation
Gas insulated substationGas insulated substation
Gas insulated substation
MOHDFAIZAN75
 
End of-life factors in high voltage gas insulated switchgear with sf6 or with...
End of-life factors in high voltage gas insulated switchgear with sf6 or with...End of-life factors in high voltage gas insulated switchgear with sf6 or with...
End of-life factors in high voltage gas insulated switchgear with sf6 or with...
Ali Sepehri
 
Compact DC switch gear
Compact DC switch gearCompact DC switch gear
Compact DC switch gear
VeenaVK
 
Rotork Fluid Systems Hydraulic Unit
Rotork Fluid Systems Hydraulic UnitRotork Fluid Systems Hydraulic Unit
Rotork Fluid Systems Hydraulic Unit
CTi Controltech
 
Apec 2014 Presentation by Albert Charpentier
Apec 2014 Presentation by Albert CharpentierApec 2014 Presentation by Albert Charpentier
Apec 2014 Presentation by Albert Charpentier
AgileSwitch
 
Gis substation
Gis substationGis substation
Gis substation
Asif Eqbal
 
Gas insulated substation
Gas insulated substationGas insulated substation
Gas insulated substation
Ajay Kuriakose
 
Gas insulated substation 2
Gas insulated substation 2Gas insulated substation 2
Gas insulated substation 2
naga pooja
 
AgileSwitch SiC Product Overview
AgileSwitch SiC Product OverviewAgileSwitch SiC Product Overview
AgileSwitch SiC Product Overview
James Charlton
 
vizag steel plant
vizag steel plantvizag steel plant
vizag steel plant
Pasalapudi SravanKumar
 
Comparing Level Measurement Methods: Displacment Transmitter vs Differential ...
Comparing Level Measurement Methods: Displacment Transmitter vs Differential ...Comparing Level Measurement Methods: Displacment Transmitter vs Differential ...
Comparing Level Measurement Methods: Displacment Transmitter vs Differential ...
M.S. Jacobs & Associates
 

What's hot (20)

Aldi widiartono gis eco efficient switchgear
Aldi widiartono gis eco efficient switchgearAldi widiartono gis eco efficient switchgear
Aldi widiartono gis eco efficient switchgear
 
Moving to 66kV: Are current switchgears and transformers adequate?
Moving to 66kV: Are current switchgears and transformers adequate?Moving to 66kV: Are current switchgears and transformers adequate?
Moving to 66kV: Are current switchgears and transformers adequate?
 
GIS(GAS INSULATED SUBSTATION)
GIS(GAS  INSULATED  SUBSTATION) GIS(GAS  INSULATED  SUBSTATION)
GIS(GAS INSULATED SUBSTATION)
 
Gas insulated substation
Gas insulated substationGas insulated substation
Gas insulated substation
 
Seminar on Gas Insulated Substation
Seminar on Gas Insulated SubstationSeminar on Gas Insulated Substation
Seminar on Gas Insulated Substation
 
Ppt
PptPpt
Ppt
 
Ener-tec, Inc. - Water/oil presentation
Ener-tec, Inc. - Water/oil presentationEner-tec, Inc. - Water/oil presentation
Ener-tec, Inc. - Water/oil presentation
 
substation 101
substation 101substation 101
substation 101
 
Gas insulated substation
Gas insulated substationGas insulated substation
Gas insulated substation
 
Gas insulated substation
Gas insulated substationGas insulated substation
Gas insulated substation
 
End of-life factors in high voltage gas insulated switchgear with sf6 or with...
End of-life factors in high voltage gas insulated switchgear with sf6 or with...End of-life factors in high voltage gas insulated switchgear with sf6 or with...
End of-life factors in high voltage gas insulated switchgear with sf6 or with...
 
Compact DC switch gear
Compact DC switch gearCompact DC switch gear
Compact DC switch gear
 
Rotork Fluid Systems Hydraulic Unit
Rotork Fluid Systems Hydraulic UnitRotork Fluid Systems Hydraulic Unit
Rotork Fluid Systems Hydraulic Unit
 
Apec 2014 Presentation by Albert Charpentier
Apec 2014 Presentation by Albert CharpentierApec 2014 Presentation by Albert Charpentier
Apec 2014 Presentation by Albert Charpentier
 
Gis substation
Gis substationGis substation
Gis substation
 
Gas insulated substation
Gas insulated substationGas insulated substation
Gas insulated substation
 
Gas insulated substation 2
Gas insulated substation 2Gas insulated substation 2
Gas insulated substation 2
 
AgileSwitch SiC Product Overview
AgileSwitch SiC Product OverviewAgileSwitch SiC Product Overview
AgileSwitch SiC Product Overview
 
vizag steel plant
vizag steel plantvizag steel plant
vizag steel plant
 
Comparing Level Measurement Methods: Displacment Transmitter vs Differential ...
Comparing Level Measurement Methods: Displacment Transmitter vs Differential ...Comparing Level Measurement Methods: Displacment Transmitter vs Differential ...
Comparing Level Measurement Methods: Displacment Transmitter vs Differential ...
 

Viewers also liked

Engineering News - Chrome smelter awards transformer contract
Engineering News - Chrome smelter awards transformer contractEngineering News - Chrome smelter awards transformer contract
Engineering News - Chrome smelter awards transformer contract
Hope Mashele, Pr Eng, CEM® , CMVP®
 
Preparación de minerales
Preparación de mineralesPreparación de minerales
Preparación de minerales
procesos22
 
Organization Structure Training
Organization Structure TrainingOrganization Structure Training
Organization Structure Training
Shelin Shaji
 
SHEQ Legal updates and development
SHEQ Legal updates and development SHEQ Legal updates and development
SHEQ Legal updates and development
NOSA (Pty) Ltd
 
Implementing a New Health and Safety System
Implementing a New Health and Safety SystemImplementing a New Health and Safety System
Implementing a New Health and Safety System
NOSA (Pty) Ltd
 
Understanding the tsumeb smelter
Understanding the tsumeb smelterUnderstanding the tsumeb smelter
Understanding the tsumeb smelter
Company Spotlight
 
Organization structure training nbc
Organization structure training nbcOrganization structure training nbc
Organization structure training nbc
Dean Mandis
 
3rd Smelter Processing Fee
3rd Smelter Processing Fee3rd Smelter Processing Fee
NECSA SMELTER FACILITY PRESENTATION
NECSA SMELTER FACILITY PRESENTATIONNECSA SMELTER FACILITY PRESENTATION
NECSA SMELTER FACILITY PRESENTATION
Alan Carolissen
 
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODSFERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
jagrutib22
 
Ferrocement ppt
Ferrocement pptFerrocement ppt
Ferrocement ppt
jvaghani
 

Viewers also liked (11)

Engineering News - Chrome smelter awards transformer contract
Engineering News - Chrome smelter awards transformer contractEngineering News - Chrome smelter awards transformer contract
Engineering News - Chrome smelter awards transformer contract
 
Preparación de minerales
Preparación de mineralesPreparación de minerales
Preparación de minerales
 
Organization Structure Training
Organization Structure TrainingOrganization Structure Training
Organization Structure Training
 
SHEQ Legal updates and development
SHEQ Legal updates and development SHEQ Legal updates and development
SHEQ Legal updates and development
 
Implementing a New Health and Safety System
Implementing a New Health and Safety SystemImplementing a New Health and Safety System
Implementing a New Health and Safety System
 
Understanding the tsumeb smelter
Understanding the tsumeb smelterUnderstanding the tsumeb smelter
Understanding the tsumeb smelter
 
Organization structure training nbc
Organization structure training nbcOrganization structure training nbc
Organization structure training nbc
 
3rd Smelter Processing Fee
3rd Smelter Processing Fee3rd Smelter Processing Fee
3rd Smelter Processing Fee
 
NECSA SMELTER FACILITY PRESENTATION
NECSA SMELTER FACILITY PRESENTATIONNECSA SMELTER FACILITY PRESENTATION
NECSA SMELTER FACILITY PRESENTATION
 
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODSFERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
 
Ferrocement ppt
Ferrocement pptFerrocement ppt
Ferrocement ppt
 

Similar to ABB: RIO TINTO ALCAN ISAL Smelter Expansion Project

HYpact brochure EN
HYpact brochure ENHYpact brochure EN
HYpact brochure EN
Namik Hadziibrahimovic
 
RPS-SF6LBS-PKE
RPS-SF6LBS-PKERPS-SF6LBS-PKE
Gi e
Gi eGi e
Gi e
hoa hong2
 
Gas insulated substation
Gas insulated substationGas insulated substation
Gas insulated substation
RaushanKumar582
 
Krannich Solar imparte cursos de formación - Ponencia de Kaco
Krannich Solar imparte cursos de formación - Ponencia de KacoKrannich Solar imparte cursos de formación - Ponencia de Kaco
Krannich Solar imparte cursos de formación - Ponencia de Kaco
Krannich Solar Spain
 
Customer magazine insider october 2012 final
Customer magazine insider october 2012 finalCustomer magazine insider october 2012 final
Customer magazine insider october 2012 final
Luis Angel Cabrera Hidalgo
 
PASS steps up
PASS steps upPASS steps up
PASS steps up
Alberto Zulati
 
Gis91
Gis91Gis91
Gis91
nknathan
 
Aluminium World Journal 2016
Aluminium World Journal 2016Aluminium World Journal 2016
Aluminium World Journal 2016
Global Media Communication Ltd.
 
Standing type GIS RMU
Standing type GIS RMUStanding type GIS RMU
Standing type outdoor full sf6 gas insualted ring main unit
Standing type outdoor full sf6 gas insualted ring main unitStanding type outdoor full sf6 gas insualted ring main unit
Standing type outdoor full sf6 gas insualted ring main unit
Rockwill T&D Group Manufacturer,Contractor, OEM, ODM
 
RF Battery Solar PPT
RF Battery Solar PPTRF Battery Solar PPT
RF Battery Solar PPT
Geof Moser
 
Aluminium World Journal 2019
Aluminium World Journal 2019Aluminium World Journal 2019
Aluminium World Journal 2019
Christopher Harris
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986
sheik syedali
 
Capacitors and filters
Capacitors and filtersCapacitors and filters
Capacitors and filters
Ing. Omar Andres Benitez Gonzalez
 
Gas Insulated Switch Gear ABB Presentation
Gas Insulated Switch Gear ABB PresentationGas Insulated Switch Gear ABB Presentation
Gas Insulated Switch Gear ABB Presentation
SANGARKAREEM
 
Catalog busbar Legrand
Catalog busbar LegrandCatalog busbar Legrand
Catalog busbar Legrand
CTY TNHH HẠO PHƯƠNG
 
ACTOM Distribution Transformers.pdf
ACTOM Distribution Transformers.pdfACTOM Distribution Transformers.pdf
ACTOM Distribution Transformers.pdf
Thabang3
 
CBESS-Sunwoda ABCS (Air-cooling Battery Container System).pdf
CBESS-Sunwoda ABCS (Air-cooling Battery Container System).pdfCBESS-Sunwoda ABCS (Air-cooling Battery Container System).pdf
CBESS-Sunwoda ABCS (Air-cooling Battery Container System).pdf
Huimin( Jennifer) zhong
 
7VU683 High Speed Busbar Transfer Device
7VU683 High Speed Busbar Transfer Device7VU683 High Speed Busbar Transfer Device
7VU683 High Speed Busbar Transfer Device
ashwini reliserv
 

Similar to ABB: RIO TINTO ALCAN ISAL Smelter Expansion Project (20)

HYpact brochure EN
HYpact brochure ENHYpact brochure EN
HYpact brochure EN
 
RPS-SF6LBS-PKE
RPS-SF6LBS-PKERPS-SF6LBS-PKE
RPS-SF6LBS-PKE
 
Gi e
Gi eGi e
Gi e
 
Gas insulated substation
Gas insulated substationGas insulated substation
Gas insulated substation
 
Krannich Solar imparte cursos de formación - Ponencia de Kaco
Krannich Solar imparte cursos de formación - Ponencia de KacoKrannich Solar imparte cursos de formación - Ponencia de Kaco
Krannich Solar imparte cursos de formación - Ponencia de Kaco
 
Customer magazine insider october 2012 final
Customer magazine insider october 2012 finalCustomer magazine insider october 2012 final
Customer magazine insider october 2012 final
 
PASS steps up
PASS steps upPASS steps up
PASS steps up
 
Gis91
Gis91Gis91
Gis91
 
Aluminium World Journal 2016
Aluminium World Journal 2016Aluminium World Journal 2016
Aluminium World Journal 2016
 
Standing type GIS RMU
Standing type GIS RMUStanding type GIS RMU
Standing type GIS RMU
 
Standing type outdoor full sf6 gas insualted ring main unit
Standing type outdoor full sf6 gas insualted ring main unitStanding type outdoor full sf6 gas insualted ring main unit
Standing type outdoor full sf6 gas insualted ring main unit
 
RF Battery Solar PPT
RF Battery Solar PPTRF Battery Solar PPT
RF Battery Solar PPT
 
Aluminium World Journal 2019
Aluminium World Journal 2019Aluminium World Journal 2019
Aluminium World Journal 2019
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986
 
Capacitors and filters
Capacitors and filtersCapacitors and filters
Capacitors and filters
 
Gas Insulated Switch Gear ABB Presentation
Gas Insulated Switch Gear ABB PresentationGas Insulated Switch Gear ABB Presentation
Gas Insulated Switch Gear ABB Presentation
 
Catalog busbar Legrand
Catalog busbar LegrandCatalog busbar Legrand
Catalog busbar Legrand
 
ACTOM Distribution Transformers.pdf
ACTOM Distribution Transformers.pdfACTOM Distribution Transformers.pdf
ACTOM Distribution Transformers.pdf
 
CBESS-Sunwoda ABCS (Air-cooling Battery Container System).pdf
CBESS-Sunwoda ABCS (Air-cooling Battery Container System).pdfCBESS-Sunwoda ABCS (Air-cooling Battery Container System).pdf
CBESS-Sunwoda ABCS (Air-cooling Battery Container System).pdf
 
7VU683 High Speed Busbar Transfer Device
7VU683 High Speed Busbar Transfer Device7VU683 High Speed Busbar Transfer Device
7VU683 High Speed Busbar Transfer Device
 

More from Global Media Communication Ltd.

REEL ALESA
REEL ALESAREEL ALESA
Aluminium World Journal 2012
Aluminium World Journal 2012Aluminium World Journal 2012
Aluminium World Journal 2012
Global Media Communication Ltd.
 
REEL ALESA
REEL ALESAREEL ALESA
Abb Metallurgy
Abb MetallurgyAbb Metallurgy
FLSMIDTH ALUMINA HANDLING SYSTEMS HIGH PERFORMANCE HIGH EFFICIENCY
FLSMIDTH ALUMINA HANDLING SYSTEMS HIGH PERFORMANCE HIGH EFFICIENCYFLSMIDTH ALUMINA HANDLING SYSTEMS HIGH PERFORMANCE HIGH EFFICIENCY
FLSMIDTH ALUMINA HANDLING SYSTEMS HIGH PERFORMANCE HIGH EFFICIENCY
Global Media Communication Ltd.
 
Give SIWERTELL the opportunity to amaze you
Give SIWERTELL the opportunity to amaze youGive SIWERTELL the opportunity to amaze you
Give SIWERTELL the opportunity to amaze you
Global Media Communication Ltd.
 
Aluminium World Journal 2013
Aluminium World Journal 2013Aluminium World Journal 2013
Aluminium World Journal 2013
Global Media Communication Ltd.
 
SIEMENS VAI Company profile Aluminium Industry
SIEMENS VAI Company profile Aluminium IndustrySIEMENS VAI Company profile Aluminium Industry
SIEMENS VAI Company profile Aluminium Industry
Global Media Communication Ltd.
 
Aluminium World Journal 2014
Aluminium World Journal 2014Aluminium World Journal 2014
Aluminium World Journal 2014
Global Media Communication Ltd.
 

More from Global Media Communication Ltd. (9)

REEL ALESA
REEL ALESAREEL ALESA
REEL ALESA
 
Aluminium World Journal 2012
Aluminium World Journal 2012Aluminium World Journal 2012
Aluminium World Journal 2012
 
REEL ALESA
REEL ALESAREEL ALESA
REEL ALESA
 
Abb Metallurgy
Abb MetallurgyAbb Metallurgy
Abb Metallurgy
 
FLSMIDTH ALUMINA HANDLING SYSTEMS HIGH PERFORMANCE HIGH EFFICIENCY
FLSMIDTH ALUMINA HANDLING SYSTEMS HIGH PERFORMANCE HIGH EFFICIENCYFLSMIDTH ALUMINA HANDLING SYSTEMS HIGH PERFORMANCE HIGH EFFICIENCY
FLSMIDTH ALUMINA HANDLING SYSTEMS HIGH PERFORMANCE HIGH EFFICIENCY
 
Give SIWERTELL the opportunity to amaze you
Give SIWERTELL the opportunity to amaze youGive SIWERTELL the opportunity to amaze you
Give SIWERTELL the opportunity to amaze you
 
Aluminium World Journal 2013
Aluminium World Journal 2013Aluminium World Journal 2013
Aluminium World Journal 2013
 
SIEMENS VAI Company profile Aluminium Industry
SIEMENS VAI Company profile Aluminium IndustrySIEMENS VAI Company profile Aluminium Industry
SIEMENS VAI Company profile Aluminium Industry
 
Aluminium World Journal 2014
Aluminium World Journal 2014Aluminium World Journal 2014
Aluminium World Journal 2014
 

Recently uploaded

Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1
DianaGray10
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
Adtran
 
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdfObservability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Paige Cruz
 
GraphSummit Singapore | The Art of the Possible with Graph - Q2 2024
GraphSummit Singapore | The Art of the  Possible with Graph - Q2 2024GraphSummit Singapore | The Art of the  Possible with Graph - Q2 2024
GraphSummit Singapore | The Art of the Possible with Graph - Q2 2024
Neo4j
 
20240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 202420240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 2024
Matthew Sinclair
 
Data structures and Algorithms in Python.pdf
Data structures and Algorithms in Python.pdfData structures and Algorithms in Python.pdf
Data structures and Algorithms in Python.pdf
TIPNGVN2
 
Microsoft - Power Platform_G.Aspiotis.pdf
Microsoft - Power Platform_G.Aspiotis.pdfMicrosoft - Power Platform_G.Aspiotis.pdf
Microsoft - Power Platform_G.Aspiotis.pdf
Uni Systems S.M.S.A.
 
20240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 202420240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 2024
Matthew Sinclair
 
Essentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FMEEssentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FME
Safe Software
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
Kari Kakkonen
 
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdfUni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems S.M.S.A.
 
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
James Anderson
 
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex ProofszkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
Alex Pruden
 
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
名前 です男
 
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
Neo4j
 
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdfFIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance
 
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
SOFTTECHHUB
 
Mind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AIMind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AI
Kumud Singh
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
Alan Dix
 
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
Neo4j
 

Recently uploaded (20)

Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
 
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdfObservability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
 
GraphSummit Singapore | The Art of the Possible with Graph - Q2 2024
GraphSummit Singapore | The Art of the  Possible with Graph - Q2 2024GraphSummit Singapore | The Art of the  Possible with Graph - Q2 2024
GraphSummit Singapore | The Art of the Possible with Graph - Q2 2024
 
20240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 202420240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 2024
 
Data structures and Algorithms in Python.pdf
Data structures and Algorithms in Python.pdfData structures and Algorithms in Python.pdf
Data structures and Algorithms in Python.pdf
 
Microsoft - Power Platform_G.Aspiotis.pdf
Microsoft - Power Platform_G.Aspiotis.pdfMicrosoft - Power Platform_G.Aspiotis.pdf
Microsoft - Power Platform_G.Aspiotis.pdf
 
20240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 202420240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 2024
 
Essentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FMEEssentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FME
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
 
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdfUni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdf
 
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
 
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex ProofszkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
 
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
 
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
 
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdfFIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
 
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
 
Mind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AIMind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AI
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
 
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
 

ABB: RIO TINTO ALCAN ISAL Smelter Expansion Project

  • 1. ABB’s history of powering primary aluminium plants started 45 years ago. Since then, we have supplied complete electrification solutions and substations to more than 60 aluminium smelters worldwide. The modernization of an existing plant to the latest standards and production and efficiency levels – performed while it is still in operation – requires a different set of skills and competencies than building a green- field plant. ABB has in-depth knowledge of the aluminium production process and the experience necessary to execute complex projects – always with the objective to keep your production running day and night. For more information, visit us at www.abb.com/aluminium Keeping your production running day and night? Certainly. Global Product Group Aluminium 5405 Baden 5 Dättwil, Switzerland aluminium@ch.abb.com
  • 2. Rio Tinto Alcan ISAL Smelter in Iceland Expansion Project Introduction The power intensive industry, which is characterised here as manufacturers needing more than 7 MWh/t of their outputproduct,ishighlydependenton the technological development of the manufacturing companies in the areas of products conveying, transforming, switching and controlling power at medium and high voltages. It is of mutual benefit to these companies to cooperate for continuous improvementsofqualityandefficiency of their products and processes. For Rio Tinto Alcan (RTA), HSE (Health- Safety-Environment) aspects of their equipment and production processes are paramount in their evaluation for construction and operation potential. The engineering and production technique of ABB in the field of SF6 insulated switchgear, has presently reached such a level that smelters with high HSE-demands combined with high demands of availability and reliability of equipment, can take confidence in choosing medium voltage switchgear. The specific properties of SF6 are further outlined below. Electrical Properties The excellent dielectric properties of SF6 are attributable to the electronegative character of its molecule. It has a pronounced tendency to capture free electrons forming heavy ions with low mobility, making the formation of electron avalanches very unlikely. The dielectric strength of SF6 is about 2,5 times higher than that of atmospheric air under the same conditions, and this leads to space demand of only 1/10th of conventional air insulated switchgear. This fact is decisive for economical considerations in many cases for voltage levels of 33 kV and higher. Chemical Properties SF6 can be heated to 500°C without decomposition in the absence of catalytic metals. SF6 is non- flammable. Therefore, the risk of ignition caused by an SF6 switchgear malfunction is practically zero, as well as the risk of damage caused by an external fire is as limited as possible. The fault current interruption capability of SF6 is excellent. In its pure state, SF6 is nontoxic, and this is regularly confirmed on new gas prior to delivery, by placing mice in a gas mixture of 80 % SF6 and 20% oxygen for a period of 24 hours (biological test recommended by IEC 376). 220kV AIS Footprint
  • 3. Operation and Maintenance The temperature within an arc in the interruption chamber can be 15 000 K. However, only minor decomposition remnants are present after each interruption. CIGRE WG 23.10 is working on an SF6 recycling guide, covering purity criteria for SF6 SWG. Criteria for handling of SF6 are based on IEC 376 Standards for safety of personnel and environment. These factors contribute in minimizing emissions to the atmosphere. The normal leakage rate of HV Switchgear can be expected to be 0,1 % - 0,5 % per year. Onlyauthorisedpersonnelareentitled to work with SF6 in Iceland and other EEA (European Economic Area – an outer Layer of the EU) countries, as mandated by an EU directive. Two electricians of our substation staff have passed through tests after theoretical and practical training of SF6 Gas Treatment with ABB near Mannheim in Germany. RTA ISAL have acquired special equipment which is dedicated for the sampling, testing, emptying and refilling purposes. RTA ISAL keeps track of its mass of gas by annually weighing the reserve gas and by having SF6 gas detectors in the switchgear room and in the cable cellar connected to the alarm system ofthesubstation.Thepressuregauges of each gas compartment are read off once a week. They are also equipped with a warning and alarm/trip level. Environmental Aspects SF6 does not contribute significantly to stratospheric ozone depletion, as it contains no chlorine, which is the main agent in ozone catalysis, nor to the Greenhouse effect, because the quantities present in the atmosphere are very small. SF6 has infrared absorption characteristics and is considered a minuscule Greenhouse gas, duetoits very long lifetime in the atmosphere. It's contribution to global warming however is very small, due to the extremely low concentration of SF6 in the atmosphere. Assessment on Engineering: Theexperienceofmost,ifnotall,users of SF6 switchgear, for a wide range of operating conditions, is that this technology has brought advantages in performance, size, weight, global costs and reliability. However, for this endeavour to be implemented,itisnecessarytoperform a rigid risk analysis. This is carried out jointly by knowledgeable consultants with experience on operation, the operators and maintenance staff of the owner, and the manufacturer. The findings of such risk analysis and an SQRA (Semi Quantitative Risk Analysis) shall form the basis for the engineering of the switchgear. The modern SF6 Switchgear, as for instance manufactured by ABB in Germany, is an extremely safe equipment against Arc Flash. In spite of this, the standard policy of RTA ISAL is to control it remotely from the control rooms. Switchgear Room: The IPU project (ISAL Production Upgrade) needed space for the installation of 13 bays of 60 kV Circuit Breakers on double busbar. Due to the limited space available near the seaside, accommodating an air insulated switchgear would not have been possible without costly landfill. The gas-insulated switchgear (GIS) technology offered a feasible solution on the available land. It was therefore decided to construct a concrete building beside the two 220/60 kV, 200 MVA, bays for the Step-down transformersfeedingeachhalfof both 60 kV busbars. The link from the ABB’s latest development in GIS has been to reduce the overall footprint drastically Out of the total contribution of all agents, the contribution of SF6 (less than one part in ten thousand, 0,1 promille) is negligible. secondary of these Step-downs is an SF6 insulated busbar.
  • 4. Control System ISAL‘s main substation is supervised by an Allen-Bradley Control Logix controller, SuperMaster, that monitors the status of high voltage and auxiliary equipment, interfaces with Landsnet, the national grid operator, and controls transformer cooling, filter banks and collects usage data (energy, water consumption, etc.). Landsnet can enforce automatic curtailment of plant load remotely from their National Control Centre. The required load reduction is divided among the potlines and adjusted for plant power variations by the SuperMaster. The new high voltage (HV) equipment transformers, 220kV air-insulated switchgear (AIS) and 60kV gas-insulated switchgear (GIS) are controlled and supervised by ABB Relian protective relays. A communication gateway, ABB COM600, passes information between the protective relays (status, process values, commands, etc.) and SuperMaster, as well as the InTouch SCADA system. In case of failure of the plant‘s SCADA system, the COM600 can be used for supervision and control of the HV equipment. Each of the potlines is controlled, protected and supervised by its respective potline current controller. PL1 and PL2 are controlled by state of the art A-B Control Logix controllers and PL3 by an ABB Controller (PSR). The existing diode rectifer units of PL1 and PL2 are directly controlled by their potline controllers, but rectifier units of potline 3 are each controlled by an ABB PSR. In case of a potline master controller failure, all rectifier units can be operated manually in stand- alone mode. The new rectifier units are each controlled by a specialized ABB AC 800 PEC rectifier controller. The new units fulfill the same requirement, as the existing ones, of being able to provide current to their potline in the absence of a potline controller, in a stand-alone mode. Communications: As the IPU project was one of integrating new equipment with existing equipment, several communication paths had to be developed. • SuperMaster / COM600 communicate through a serial link using the IEC 60870- 5-101 protocol. A ProSoft module for the Control Logix platform is used This technique demanded a high degree of precision in the civil part and in installation of transformers and switchgear. Avoiding cable connection here, offers the possibility of undistorted condition analysis of the transformers among other benefits. On the GIS, the local manoeuvring cubicles have indicators for the position of the respective switches. However, for safety reasons, normally the manoeuvring of the switches takes place at the substation’s SCADA system, or in one of the two new Control Rooms constructed by IPU. The GIS-room is fitted with an overhead crane. This was integrated with the installation of the switchgear, and can be utilized in repair of the switchgear if required. The GIS is not particularly maintenance demanding, but ISAL intends to incorporate it in its switchgear maintenance scheme, recording the pattern of the control circuit of the trip coils, the pattern of the main current under the interruption period and to record the length of the total interruption period.
  • 5. This article was originally published in Aluminium World Journal, produced by Global Media Communication Ltd. and software was developed to pass information and commands back and forth. • InTouch SCADA / COM600 as well as Relian / COM600 communicate over Ethernet using the IEC 61850-8-1 protocol. Paths 1) and 2) are completely independent, allowing the SuperMaster to supervise operation and to generate redundant alarms/ warnings in case of break down of COM600 / SCADA communications. • SuperMaster / PML power monitoring devices ION 7600 communicate through an RS-485 link using the Modbus RTU protocol. A ProSoft module for the Control Logix platform is used and software was developed to collect data from the intelligent power meters. Supervision and redundant control of plant power transformer OLTC voltage regulators (21 kV) is also done via a Modbus link. • InTouch SCADA / PML power monitoring devices communicate over Ethernet. A proprietary Schneider Electric (ex. Power Measurement Limited of Canada) ION Enterprise system collects detailed data from the ION 7600 meters, transients, sag/swell, power quality and historical data into a MS SQL database. • Potline Controllers PL1 and PL2 / AC 800 PEC rectifier controllers communicate over Ethernet using the EtherNet/IP protocol. The interface on the PEC side is an Anybus module developed by HMS Industrial Networks. As the EtherNet/IP Anybus module‘s implementation allows only point to point communication, gateways were required for the swing units S1 and S2, as they can be connected to any potline and therefore have to be able to communicate with all the potline controllers. The seamless integration of the PEC controllers of the rectifier units makes them appear as Allen-Bradley equipment to the rest of the world (SCADA, MES, potline controllers, etc.) • Potline Controller PL3 PSR / AC 800 PEC rectifier controllers S1 and S2 communicate over an ABB proprietary PowerLink using an ABB PSR-PSR protocol. • The four AC 800 PEC controllers communicate with each other through a dedicated redundant PowerLink. In Conclusion As demonstrated by the Rio Tinto Alcan Isal Smelter Production Upgrade project, GIS can be integrated into existing facilities to support expansion and power supply for smelters with high energy and health and safety requirements. SF6 insulated switchgear is an environmentally friendly and safe technology, with excellent operational capacities. An upgrade can be fully tailored through engineering solutions to work with, and around, existing technologies, even where space restrictions may need to be considered. Furthermore, the communication and control systems are designed to integrate seamlessly with existing ones, to provide flexibility and economical advantages, while securing optimal performance. Authors: Bjarni Jonsson, RTA ISAL, Leader of Electrical Services, Haflidi Loftsson, Staki ehf, Chief Engineer and Max Wiestner, Head of the Aluminium business within ABB. For more information Contact: ABB Switzerland Ltd. Aluminium, BU- Industrial Solutions Max Wiestner, Phone: +41 58 586 85 Email: max.wiestner@ch.abb.com © Aluminium World Journal 2012- 2015, Global Media Communication Limited, All rights reserved