GS EP SAF 226 rev. 04 – main modifications
General
 This document highlights the main modifications brought to GS EP SAF 226.
 It is not intended to be exhaustive.
What is the purpose of the revision?
 Update following EP branch re-organisation (March 2011)
 Update of reference document list
 Wording changes for a clearer distinction between Company’s requirements and
recommendations
 Revision of the section related to SIMOPS
 Addition of a new section specific to subsea well safety systems
EP/DEV/ED/ECP – October 2011
3
GS EP SAF 226 rev. 04 – main modifications
Summary of modifications
 Section 1: scope modification to include subsea systems
 Section 3: change of terminology for annulus (first annulus = annulus A; first
surrounding casing = annulus B etc)
 Section 9: simplification of this section related to Simultaneous Operations – the
safety requirements remain the same as before
 Section 10: new section dedicated to subsea systems
 Appendix 1: modified to cover subsea wells / for all completed wells, the annulus
DSHV is not considered as part of the internal barrier envelope anymore
 Appendix 7: new appendix regarding typical subsea wellhead safety logic diagram
 Appendixes 8 to 10: new appendixes regarding typical production / gas injection /
water injection wellhead arrangements
EP/DEV/ED/ECP – October 2011

More Related Content

More from Boris518712

GS EP INS 197 Modification follow-up.pptx
GS EP INS 197 Modification follow-up.pptxGS EP INS 197 Modification follow-up.pptx
GS EP INS 197 Modification follow-up.pptx
Boris518712
 
GS EP LSO 112 Presentation.pptx
GS EP LSO 112 Presentation.pptxGS EP LSO 112 Presentation.pptx
GS EP LSO 112 Presentation.pptx
Boris518712
 
GS EP LSO 131 Presentation REV02.pptx
GS EP LSO 131 Presentation REV02.pptxGS EP LSO 131 Presentation REV02.pptx
GS EP LSO 131 Presentation REV02.pptx
Boris518712
 
GS EP LSO 204 Presentation.pptx
GS EP LSO 204 Presentation.pptxGS EP LSO 204 Presentation.pptx
GS EP LSO 204 Presentation.pptx
Boris518712
 
GS EP LSO 205 REV.pptx
GS EP LSO 205  REV.pptxGS EP LSO 205  REV.pptx
GS EP LSO 205 REV.pptx
Boris518712
 
GS EP LSO 206 Presentation.pptx
GS EP LSO 206 Presentation.pptxGS EP LSO 206 Presentation.pptx
GS EP LSO 206 Presentation.pptx
Boris518712
 
GS EP LSO 209 Presentation.pptx
GS EP LSO 209 Presentation.pptxGS EP LSO 209 Presentation.pptx
GS EP LSO 209 Presentation.pptx
Boris518712
 
GS EP SAF 341 rev 3.pptx
GS EP SAF 341 rev 3.pptxGS EP SAF 341 rev 3.pptx
GS EP SAF 341 rev 3.pptx
Boris518712
 
GS EP SDV 102 PPT.pptx
GS EP SDV 102 PPT.pptxGS EP SDV 102 PPT.pptx
GS EP SDV 102 PPT.pptx
Boris518712
 
GS EP SPS 028 Follow up.pptx
GS EP SPS 028 Follow up.pptxGS EP SPS 028 Follow up.pptx
GS EP SPS 028 Follow up.pptx
Boris518712
 
GS EP TEL 120 DA .pptx
GS EP TEL 120 DA .pptxGS EP TEL 120 DA .pptx
GS EP TEL 120 DA .pptx
Boris518712
 
GS EP TEL 190 DA .pptx
GS EP TEL 190 DA .pptxGS EP TEL 190 DA .pptx
GS EP TEL 190 DA .pptx
Boris518712
 
GS EP TEL 191 DA .pptx
GS EP TEL 191 DA .pptxGS EP TEL 191 DA .pptx
GS EP TEL 191 DA .pptx
Boris518712
 
Charla de grua puente.ppt
Charla de grua puente.pptCharla de grua puente.ppt
Charla de grua puente.ppt
Boris518712
 
Empaquetaduras.pptx
Empaquetaduras.pptxEmpaquetaduras.pptx
Empaquetaduras.pptx
Boris518712
 

More from Boris518712 (15)

GS EP INS 197 Modification follow-up.pptx
GS EP INS 197 Modification follow-up.pptxGS EP INS 197 Modification follow-up.pptx
GS EP INS 197 Modification follow-up.pptx
 
GS EP LSO 112 Presentation.pptx
GS EP LSO 112 Presentation.pptxGS EP LSO 112 Presentation.pptx
GS EP LSO 112 Presentation.pptx
 
GS EP LSO 131 Presentation REV02.pptx
GS EP LSO 131 Presentation REV02.pptxGS EP LSO 131 Presentation REV02.pptx
GS EP LSO 131 Presentation REV02.pptx
 
GS EP LSO 204 Presentation.pptx
GS EP LSO 204 Presentation.pptxGS EP LSO 204 Presentation.pptx
GS EP LSO 204 Presentation.pptx
 
GS EP LSO 205 REV.pptx
GS EP LSO 205  REV.pptxGS EP LSO 205  REV.pptx
GS EP LSO 205 REV.pptx
 
GS EP LSO 206 Presentation.pptx
GS EP LSO 206 Presentation.pptxGS EP LSO 206 Presentation.pptx
GS EP LSO 206 Presentation.pptx
 
GS EP LSO 209 Presentation.pptx
GS EP LSO 209 Presentation.pptxGS EP LSO 209 Presentation.pptx
GS EP LSO 209 Presentation.pptx
 
GS EP SAF 341 rev 3.pptx
GS EP SAF 341 rev 3.pptxGS EP SAF 341 rev 3.pptx
GS EP SAF 341 rev 3.pptx
 
GS EP SDV 102 PPT.pptx
GS EP SDV 102 PPT.pptxGS EP SDV 102 PPT.pptx
GS EP SDV 102 PPT.pptx
 
GS EP SPS 028 Follow up.pptx
GS EP SPS 028 Follow up.pptxGS EP SPS 028 Follow up.pptx
GS EP SPS 028 Follow up.pptx
 
GS EP TEL 120 DA .pptx
GS EP TEL 120 DA .pptxGS EP TEL 120 DA .pptx
GS EP TEL 120 DA .pptx
 
GS EP TEL 190 DA .pptx
GS EP TEL 190 DA .pptxGS EP TEL 190 DA .pptx
GS EP TEL 190 DA .pptx
 
GS EP TEL 191 DA .pptx
GS EP TEL 191 DA .pptxGS EP TEL 191 DA .pptx
GS EP TEL 191 DA .pptx
 
Charla de grua puente.ppt
Charla de grua puente.pptCharla de grua puente.ppt
Charla de grua puente.ppt
 
Empaquetaduras.pptx
Empaquetaduras.pptxEmpaquetaduras.pptx
Empaquetaduras.pptx
 

GS EP SAF 226 DocAcc.pptx

  • 1. GS EP SAF 226 -Completed wells safety systems and safety rules- rev. 04 EN
  • 2. 2 GS EP SAF 226 rev. 04 – main modifications General  This document highlights the main modifications brought to GS EP SAF 226.  It is not intended to be exhaustive. What is the purpose of the revision?  Update following EP branch re-organisation (March 2011)  Update of reference document list  Wording changes for a clearer distinction between Company’s requirements and recommendations  Revision of the section related to SIMOPS  Addition of a new section specific to subsea well safety systems EP/DEV/ED/ECP – October 2011
  • 3. 3 GS EP SAF 226 rev. 04 – main modifications Summary of modifications  Section 1: scope modification to include subsea systems  Section 3: change of terminology for annulus (first annulus = annulus A; first surrounding casing = annulus B etc)  Section 9: simplification of this section related to Simultaneous Operations – the safety requirements remain the same as before  Section 10: new section dedicated to subsea systems  Appendix 1: modified to cover subsea wells / for all completed wells, the annulus DSHV is not considered as part of the internal barrier envelope anymore  Appendix 7: new appendix regarding typical subsea wellhead safety logic diagram  Appendixes 8 to 10: new appendixes regarding typical production / gas injection / water injection wellhead arrangements EP/DEV/ED/ECP – October 2011