This document outlines personnel specifications for helicopter contractors, including requirements for flight crews, cabin crews, and engineers. It specifies minimum standards for items like crew composition, qualifications, experience, training, duty times, and rest periods. The revisions update age limits, introduce new qualifications for operations without passengers, revise pilot experience alternatives, increase required yearly simulator training, and replace some duty/rest time limits with a requirement to have a pertinent policy on duty and rest times.
This Proposal was a response to the RFP issued by AIAA for the 2016 Graduate Team Aircraft Design Competition. It achieved the second prize in the competition.
This Proposal was a response to the RFP issued by AIAA for the 2016 Graduate Team Aircraft Design Competition. It achieved the second prize in the competition.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Forklift Classes Overview by Intella PartsIntella Parts
Discover the different forklift classes and their specific applications. Learn how to choose the right forklift for your needs to ensure safety, efficiency, and compliance in your operations.
For more technical information, visit our website https://intellaparts.com
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
Maintaining high-quality standards in the production of TMT bars is crucial for ensuring structural integrity in construction. Addressing common defects through careful monitoring, standardized processes, and advanced technology can significantly improve the quality of TMT bars. Continuous training and adherence to quality control measures will also play a pivotal role in minimizing these defects.
Event Management System Vb Net Project Report.pdfKamal Acharya
In present era, the scopes of information technology growing with a very fast .We do not see any are untouched from this industry. The scope of information technology has become wider includes: Business and industry. Household Business, Communication, Education, Entertainment, Science, Medicine, Engineering, Distance Learning, Weather Forecasting. Carrier Searching and so on.
My project named “Event Management System” is software that store and maintained all events coordinated in college. It also helpful to print related reports. My project will help to record the events coordinated by faculties with their Name, Event subject, date & details in an efficient & effective ways.
In my system we have to make a system by which a user can record all events coordinated by a particular faculty. In our proposed system some more featured are added which differs it from the existing system such as security.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Automobile Management System Project Report.pdfKamal Acharya
The proposed project is developed to manage the automobile in the automobile dealer company. The main module in this project is login, automobile management, customer management, sales, complaints and reports. The first module is the login. The automobile showroom owner should login to the project for usage. The username and password are verified and if it is correct, next form opens. If the username and password are not correct, it shows the error message.
When a customer search for a automobile, if the automobile is available, they will be taken to a page that shows the details of the automobile including automobile name, automobile ID, quantity, price etc. “Automobile Management System” is useful for maintaining automobiles, customers effectively and hence helps for establishing good relation between customer and automobile organization. It contains various customized modules for effectively maintaining automobiles and stock information accurately and safely.
When the automobile is sold to the customer, stock will be reduced automatically. When a new purchase is made, stock will be increased automatically. While selecting automobiles for sale, the proposed software will automatically check for total number of available stock of that particular item, if the total stock of that particular item is less than 5, software will notify the user to purchase the particular item.
Also when the user tries to sale items which are not in stock, the system will prompt the user that the stock is not enough. Customers of this system can search for a automobile; can purchase a automobile easily by selecting fast. On the other hand the stock of automobiles can be maintained perfectly by the automobile shop manager overcoming the drawbacks of existing system.
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSEDuvanRamosGarzon1
AIRCRAFT GENERAL
The Single Aisle is the most advanced family aircraft in service today, with fly-by-wire flight controls.
The A318, A319, A320 and A321 are twin-engine subsonic medium range aircraft.
The family offers a choice of engines
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
GS EP LSO 131 Presentation REV02.pptx
1. GS EP LSO 131
HELICOPTER PERSONEL SPECIFICATIONS
2. •Helicopter personel specifications
Purpose:
Application:
Contains:
2 NOV/2014
GS EP LSO 131 REV02:
This General Specification synthesizes the personnel requirements for helicopter contracted by
Company. This document is only concerning the contracted aircrafts. Given specifications here
below are considered as a minimum of standard for contracted aircrafts. The general and
personnel specifications can be amended by LSO/AER before the Standard RW Contract
1. Scope .......................................................................................................................4
2. Reference documents.............................................................................................4
3. Work rotation...........................................................................................................4
4. Flight crew ...............................................................................................................5
4.1 Age limitation.................................................................................................................. 5
4.2 Composition.................................................................................................................... 5
4.3 Qualification.................................................................................................................... 5
4.4 Experience...................................................................................................................... 6
4.5 Training & checks ........................................................................................................... 8
4.6 Flight and duty time limitations........................................................................................ 9
5. Cabin crew .............................................................................................................10
5.1 Composition...................................................................................................................10
5.2 Training .........................................................................................................................10
6. Engineer.................................................................................................................10
6.1 Composition...................................................................................................................10
6.2 Qualifications.................................................................................................................10
6.3 Experience.....................................................................................................................11
6.4 Training .........................................................................................................................11
6.5 Duty & rest time limitations 11
3. 3
Main changes of Rev.02 compared to Rev.01 :
•4.1: age limits alignment on ICAO Annex 1 (revision)
•4.3, 4.4, 4.5 : introduction of aircrew qualification, experience and training
specifications for operations w/o pax (new). Introduction of ab-initio co-pilot
experience alternative scheme (new).
•4.3: IR rating not required for VFR at day contract (revision)
•4.4: Review of pilot experience. Alternatives against OGP390 developed
(revision). Addition of hoist experience (new)
•4.5: Simulator hours increased to 8 hours as PF per year (revision) + expected
training manoeuvres (new). Simulator extended to lower qualification levels
(revision).
•4.6: Add of pilot flight time policy for ops w/o pax. Replacement of duty time &
rest time limitations with “a pertinent duty & rest time policy” requirements (new).
•5: Introduction of cabin crew composition and training requirements (new)
•6: Minimum engineer composition deleted (revision)
•6.3: Minimum engineer experience reduced to 5 years (revision)
•6.4: Revision of recurrent training requirements (revision)
•6.5: Replacement of engineer maxi duty time with a “duty & rest policy”
requirement (new)
GS EP LSO 131 REV02:
NOV/2014