•Helicopter personel specifications
Purpose:
Application:
Contains:
2 NOV/2014
GS EP LSO 131 REV02:
This General Specification synthesizes the personnel requirements for helicopter contracted by
Company. This document is only concerning the contracted aircrafts. Given specifications here
below are considered as a minimum of standard for contracted aircrafts. The general and
personnel specifications can be amended by LSO/AER before the Standard RW Contract
1. Scope .......................................................................................................................4
2. Reference documents.............................................................................................4
3. Work rotation...........................................................................................................4
4. Flight crew ...............................................................................................................5
4.1 Age limitation.................................................................................................................. 5
4.2 Composition.................................................................................................................... 5
4.3 Qualification.................................................................................................................... 5
4.4 Experience...................................................................................................................... 6
4.5 Training & checks ........................................................................................................... 8
4.6 Flight and duty time limitations........................................................................................ 9
5. Cabin crew .............................................................................................................10
5.1 Composition...................................................................................................................10
5.2 Training .........................................................................................................................10
6. Engineer.................................................................................................................10
6.1 Composition...................................................................................................................10
6.2 Qualifications.................................................................................................................10
6.3 Experience.....................................................................................................................11
6.4 Training .........................................................................................................................11
6.5 Duty & rest time limitations 11
3
Main changes of Rev.02 compared to Rev.01 :
•4.1: age limits alignment on ICAO Annex 1 (revision)
•4.3, 4.4, 4.5 : introduction of aircrew qualification, experience and training
specifications for operations w/o pax (new). Introduction of ab-initio co-pilot
experience alternative scheme (new).
•4.3: IR rating not required for VFR at day contract (revision)
•4.4: Review of pilot experience. Alternatives against OGP390 developed
(revision). Addition of hoist experience (new)
•4.5: Simulator hours increased to 8 hours as PF per year (revision) + expected
training manoeuvres (new). Simulator extended to lower qualification levels
(revision).
•4.6: Add of pilot flight time policy for ops w/o pax. Replacement of duty time &
rest time limitations with “a pertinent duty & rest time policy” requirements (new).
•5: Introduction of cabin crew composition and training requirements (new)
•6: Minimum engineer composition deleted (revision)
•6.3: Minimum engineer experience reduced to 5 years (revision)
•6.4: Revision of recurrent training requirements (revision)
•6.5: Replacement of engineer maxi duty time with a “duty & rest policy”
requirement (new)
GS EP LSO 131 REV02:
NOV/2014

More Related Content

Similar to GS EP LSO 131 Presentation REV02.pptx

basic-h2s-training Opito.pdf The requirements
basic-h2s-training Opito.pdf The requirementsbasic-h2s-training Opito.pdf The requirements
basic-h2s-training Opito.pdf The requirements
JavedShah30
 
AMTAV 410 PRELIM.pptx
AMTAV 410 PRELIM.pptxAMTAV 410 PRELIM.pptx
AMTAV 410 PRELIM.pptx
BENo31
 
Handbook on maintenance of air brake system in lhb coaches (ftil type)
Handbook on maintenance of air brake system in lhb coaches (ftil type)Handbook on maintenance of air brake system in lhb coaches (ftil type)
Handbook on maintenance of air brake system in lhb coaches (ftil type)
SrinivasaRao Guduru
 
Tugas iii etops approval
Tugas iii etops approvalTugas iii etops approval
Tugas iii etops approvalLalu Giat Putra
 
Design Optimization of Drone propeller
Design Optimization of Drone propellerDesign Optimization of Drone propeller
Design Optimization of Drone propellerMun Lai
 
Rp f103 2010-10
Rp f103 2010-10Rp f103 2010-10
Rp f103 2010-10xuanhaoxd
 
Yanmar 6 ly3 stp marine diesel engine service repair manual
Yanmar 6 ly3 stp marine diesel engine service repair manualYanmar 6 ly3 stp marine diesel engine service repair manual
Yanmar 6 ly3 stp marine diesel engine service repair manual
jksefmmsme
 

Similar to GS EP LSO 131 Presentation REV02.pptx (7)

basic-h2s-training Opito.pdf The requirements
basic-h2s-training Opito.pdf The requirementsbasic-h2s-training Opito.pdf The requirements
basic-h2s-training Opito.pdf The requirements
 
AMTAV 410 PRELIM.pptx
AMTAV 410 PRELIM.pptxAMTAV 410 PRELIM.pptx
AMTAV 410 PRELIM.pptx
 
Handbook on maintenance of air brake system in lhb coaches (ftil type)
Handbook on maintenance of air brake system in lhb coaches (ftil type)Handbook on maintenance of air brake system in lhb coaches (ftil type)
Handbook on maintenance of air brake system in lhb coaches (ftil type)
 
Tugas iii etops approval
Tugas iii etops approvalTugas iii etops approval
Tugas iii etops approval
 
Design Optimization of Drone propeller
Design Optimization of Drone propellerDesign Optimization of Drone propeller
Design Optimization of Drone propeller
 
Rp f103 2010-10
Rp f103 2010-10Rp f103 2010-10
Rp f103 2010-10
 
Yanmar 6 ly3 stp marine diesel engine service repair manual
Yanmar 6 ly3 stp marine diesel engine service repair manualYanmar 6 ly3 stp marine diesel engine service repair manual
Yanmar 6 ly3 stp marine diesel engine service repair manual
 

More from Boris518712

Edospina-agua-desmineralizada.ppt
Edospina-agua-desmineralizada.pptEdospina-agua-desmineralizada.ppt
Edospina-agua-desmineralizada.ppt
Boris518712
 
Curso Lideres de Procesos.ppt
Curso Lideres de Procesos.pptCurso Lideres de Procesos.ppt
Curso Lideres de Procesos.ppt
Boris518712
 
Charla de Especificación de Bombas Centrifugas.ppt
Charla de Especificación de Bombas Centrifugas.pptCharla de Especificación de Bombas Centrifugas.ppt
Charla de Especificación de Bombas Centrifugas.ppt
Boris518712
 
GS EP GEO 402 Follow up.pptx
GS EP GEO 402 Follow up.pptxGS EP GEO 402 Follow up.pptx
GS EP GEO 402 Follow up.pptx
Boris518712
 
GS EP INS 106 Fiche de création.pptx
GS EP INS 106 Fiche de création.pptxGS EP INS 106 Fiche de création.pptx
GS EP INS 106 Fiche de création.pptx
Boris518712
 
GS EP INS 108 Follow up.pptx
GS EP INS 108 Follow up.pptxGS EP INS 108 Follow up.pptx
GS EP INS 108 Follow up.pptx
Boris518712
 
GS EP INS 150 Modification follow-up.pptx
GS EP INS 150 Modification follow-up.pptxGS EP INS 150 Modification follow-up.pptx
GS EP INS 150 Modification follow-up.pptx
Boris518712
 
GS EP INS 196 Modification follow-up.pptx
GS EP INS 196 Modification follow-up.pptxGS EP INS 196 Modification follow-up.pptx
GS EP INS 196 Modification follow-up.pptx
Boris518712
 
GS EP INS 197 Modification follow-up.pptx
GS EP INS 197 Modification follow-up.pptxGS EP INS 197 Modification follow-up.pptx
GS EP INS 197 Modification follow-up.pptx
Boris518712
 
GS EP LSO 204 Presentation.pptx
GS EP LSO 204 Presentation.pptxGS EP LSO 204 Presentation.pptx
GS EP LSO 204 Presentation.pptx
Boris518712
 
GS EP LSO 205 REV.pptx
GS EP LSO 205  REV.pptxGS EP LSO 205  REV.pptx
GS EP LSO 205 REV.pptx
Boris518712
 
GS EP LSO 206 Presentation.pptx
GS EP LSO 206 Presentation.pptxGS EP LSO 206 Presentation.pptx
GS EP LSO 206 Presentation.pptx
Boris518712
 
GS EP LSO 209 Presentation.pptx
GS EP LSO 209 Presentation.pptxGS EP LSO 209 Presentation.pptx
GS EP LSO 209 Presentation.pptx
Boris518712
 
GS EP SAF 226 DocAcc.pptx
GS EP SAF 226 DocAcc.pptxGS EP SAF 226 DocAcc.pptx
GS EP SAF 226 DocAcc.pptx
Boris518712
 
GS EP SAF 341 rev 3.pptx
GS EP SAF 341 rev 3.pptxGS EP SAF 341 rev 3.pptx
GS EP SAF 341 rev 3.pptx
Boris518712
 
GS EP SDV 102 PPT.pptx
GS EP SDV 102 PPT.pptxGS EP SDV 102 PPT.pptx
GS EP SDV 102 PPT.pptx
Boris518712
 
GS EP SPS 028 Follow up.pptx
GS EP SPS 028 Follow up.pptxGS EP SPS 028 Follow up.pptx
GS EP SPS 028 Follow up.pptx
Boris518712
 
GS EP TEL 120 DA .pptx
GS EP TEL 120 DA .pptxGS EP TEL 120 DA .pptx
GS EP TEL 120 DA .pptx
Boris518712
 
GS EP TEL 190 DA .pptx
GS EP TEL 190 DA .pptxGS EP TEL 190 DA .pptx
GS EP TEL 190 DA .pptx
Boris518712
 
GS EP TEL 191 DA .pptx
GS EP TEL 191 DA .pptxGS EP TEL 191 DA .pptx
GS EP TEL 191 DA .pptx
Boris518712
 

More from Boris518712 (20)

Edospina-agua-desmineralizada.ppt
Edospina-agua-desmineralizada.pptEdospina-agua-desmineralizada.ppt
Edospina-agua-desmineralizada.ppt
 
Curso Lideres de Procesos.ppt
Curso Lideres de Procesos.pptCurso Lideres de Procesos.ppt
Curso Lideres de Procesos.ppt
 
Charla de Especificación de Bombas Centrifugas.ppt
Charla de Especificación de Bombas Centrifugas.pptCharla de Especificación de Bombas Centrifugas.ppt
Charla de Especificación de Bombas Centrifugas.ppt
 
GS EP GEO 402 Follow up.pptx
GS EP GEO 402 Follow up.pptxGS EP GEO 402 Follow up.pptx
GS EP GEO 402 Follow up.pptx
 
GS EP INS 106 Fiche de création.pptx
GS EP INS 106 Fiche de création.pptxGS EP INS 106 Fiche de création.pptx
GS EP INS 106 Fiche de création.pptx
 
GS EP INS 108 Follow up.pptx
GS EP INS 108 Follow up.pptxGS EP INS 108 Follow up.pptx
GS EP INS 108 Follow up.pptx
 
GS EP INS 150 Modification follow-up.pptx
GS EP INS 150 Modification follow-up.pptxGS EP INS 150 Modification follow-up.pptx
GS EP INS 150 Modification follow-up.pptx
 
GS EP INS 196 Modification follow-up.pptx
GS EP INS 196 Modification follow-up.pptxGS EP INS 196 Modification follow-up.pptx
GS EP INS 196 Modification follow-up.pptx
 
GS EP INS 197 Modification follow-up.pptx
GS EP INS 197 Modification follow-up.pptxGS EP INS 197 Modification follow-up.pptx
GS EP INS 197 Modification follow-up.pptx
 
GS EP LSO 204 Presentation.pptx
GS EP LSO 204 Presentation.pptxGS EP LSO 204 Presentation.pptx
GS EP LSO 204 Presentation.pptx
 
GS EP LSO 205 REV.pptx
GS EP LSO 205  REV.pptxGS EP LSO 205  REV.pptx
GS EP LSO 205 REV.pptx
 
GS EP LSO 206 Presentation.pptx
GS EP LSO 206 Presentation.pptxGS EP LSO 206 Presentation.pptx
GS EP LSO 206 Presentation.pptx
 
GS EP LSO 209 Presentation.pptx
GS EP LSO 209 Presentation.pptxGS EP LSO 209 Presentation.pptx
GS EP LSO 209 Presentation.pptx
 
GS EP SAF 226 DocAcc.pptx
GS EP SAF 226 DocAcc.pptxGS EP SAF 226 DocAcc.pptx
GS EP SAF 226 DocAcc.pptx
 
GS EP SAF 341 rev 3.pptx
GS EP SAF 341 rev 3.pptxGS EP SAF 341 rev 3.pptx
GS EP SAF 341 rev 3.pptx
 
GS EP SDV 102 PPT.pptx
GS EP SDV 102 PPT.pptxGS EP SDV 102 PPT.pptx
GS EP SDV 102 PPT.pptx
 
GS EP SPS 028 Follow up.pptx
GS EP SPS 028 Follow up.pptxGS EP SPS 028 Follow up.pptx
GS EP SPS 028 Follow up.pptx
 
GS EP TEL 120 DA .pptx
GS EP TEL 120 DA .pptxGS EP TEL 120 DA .pptx
GS EP TEL 120 DA .pptx
 
GS EP TEL 190 DA .pptx
GS EP TEL 190 DA .pptxGS EP TEL 190 DA .pptx
GS EP TEL 190 DA .pptx
 
GS EP TEL 191 DA .pptx
GS EP TEL 191 DA .pptxGS EP TEL 191 DA .pptx
GS EP TEL 191 DA .pptx
 

Recently uploaded

DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 

Recently uploaded (20)

DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 

GS EP LSO 131 Presentation REV02.pptx

  • 1. GS EP LSO 131 HELICOPTER PERSONEL SPECIFICATIONS
  • 2. •Helicopter personel specifications Purpose: Application: Contains: 2 NOV/2014 GS EP LSO 131 REV02: This General Specification synthesizes the personnel requirements for helicopter contracted by Company. This document is only concerning the contracted aircrafts. Given specifications here below are considered as a minimum of standard for contracted aircrafts. The general and personnel specifications can be amended by LSO/AER before the Standard RW Contract 1. Scope .......................................................................................................................4 2. Reference documents.............................................................................................4 3. Work rotation...........................................................................................................4 4. Flight crew ...............................................................................................................5 4.1 Age limitation.................................................................................................................. 5 4.2 Composition.................................................................................................................... 5 4.3 Qualification.................................................................................................................... 5 4.4 Experience...................................................................................................................... 6 4.5 Training & checks ........................................................................................................... 8 4.6 Flight and duty time limitations........................................................................................ 9 5. Cabin crew .............................................................................................................10 5.1 Composition...................................................................................................................10 5.2 Training .........................................................................................................................10 6. Engineer.................................................................................................................10 6.1 Composition...................................................................................................................10 6.2 Qualifications.................................................................................................................10 6.3 Experience.....................................................................................................................11 6.4 Training .........................................................................................................................11 6.5 Duty & rest time limitations 11
  • 3. 3 Main changes of Rev.02 compared to Rev.01 : •4.1: age limits alignment on ICAO Annex 1 (revision) •4.3, 4.4, 4.5 : introduction of aircrew qualification, experience and training specifications for operations w/o pax (new). Introduction of ab-initio co-pilot experience alternative scheme (new). •4.3: IR rating not required for VFR at day contract (revision) •4.4: Review of pilot experience. Alternatives against OGP390 developed (revision). Addition of hoist experience (new) •4.5: Simulator hours increased to 8 hours as PF per year (revision) + expected training manoeuvres (new). Simulator extended to lower qualification levels (revision). •4.6: Add of pilot flight time policy for ops w/o pax. Replacement of duty time & rest time limitations with “a pertinent duty & rest time policy” requirements (new). •5: Introduction of cabin crew composition and training requirements (new) •6: Minimum engineer composition deleted (revision) •6.3: Minimum engineer experience reduced to 5 years (revision) •6.4: Revision of recurrent training requirements (revision) •6.5: Replacement of engineer maxi duty time with a “duty & rest policy” requirement (new) GS EP LSO 131 REV02: NOV/2014