This document provides guidelines for tanker loading and offloading marine procedures. It defines basic principles for developing safe and efficient loading and offloading configurations. The procedures apply to tankers that ship hydrocarbons, liquefied gases, or chemicals in bulk and involve mooring to jetties, buoys, and floating production storage and offloading units. The document covers operational requirements, general descriptions, and recommendations for different phases of loading and offloading operations.
Fpso – general overview of conversion & topside process description -abstractAnoop Rajendran Nair
Abstract of the technical presentation on FPSO conversions and modularised topside process taken at MASTECH 2011 at Sharjah as part of Gulf Maritime Expo 2011.
Fpso – general overview of conversion & topside process description -abstractAnoop Rajendran Nair
Abstract of the technical presentation on FPSO conversions and modularised topside process taken at MASTECH 2011 at Sharjah as part of Gulf Maritime Expo 2011.
INTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIESpetroEDGE
This 4 day (separately bookable) intensive training course will cover the details of drilling rigs and how they operate, especially for deepwater activities. Current drilling rigs are highly automated and efficient. These advances will be illustrated with animations and videos. The relationship between drilling and production will be explored with examples of current field developments
Chemical Engineer with 40+ years experience in the Oil & Gas sector as an Upstream & Midstream lead process and facilities engineer with both extensive technical and project management knowledge.
World FLNG Market Forecast 2015-2021 Leaflet + ContentsDouglas-Westwood
Despite a current pause in commitments to new projects, the capital expenditure (Capex) for FLNG vessels is expected to amount to $35.5bn over 2015-2021. Spending on FSRUs will total $22.8bn over the same period, taking the combined expenditure for the Floating LNG market to $58.3bn. The World FLNG Market Forecast 2015-2021 forecasts activity through to 2021.
INTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIESpetroEDGE
This 4 day (separately bookable) intensive training course will cover the details of drilling rigs and how they operate, especially for deepwater activities. Current drilling rigs are highly automated and efficient. These advances will be illustrated with animations and videos. The relationship between drilling and production will be explored with examples of current field developments
Chemical Engineer with 40+ years experience in the Oil & Gas sector as an Upstream & Midstream lead process and facilities engineer with both extensive technical and project management knowledge.
World FLNG Market Forecast 2015-2021 Leaflet + ContentsDouglas-Westwood
Despite a current pause in commitments to new projects, the capital expenditure (Capex) for FLNG vessels is expected to amount to $35.5bn over 2015-2021. Spending on FSRUs will total $22.8bn over the same period, taking the combined expenditure for the Floating LNG market to $58.3bn. The World FLNG Market Forecast 2015-2021 forecasts activity through to 2021.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
2. GS EP LSO 205 REV.03
TANKER LOADING - OFFLOADING MARINE
PROCEDURES
• define the basic principles to be applied when preparing
Loading/Offloading Marine Procedures, thus providing the
safest and most efficient configuration to reach the
objectives.
Purpose:
• Tankers shipping hydrocarbons, liquefied gases or
chemicals in bulk and their operations include mooring to
jetties, buoys and F(P)SU’s for the purpose of loading or
discharging liquid petroleum cargoes such as crude oil,
methanol and bunkers (gasoil or other) or chemicals as the
case may be.
Application:
• Operational Requirments
• General Description
• Recommandations for different phases
Contains:
3. GS EP LSO 205 REV.03
TANKER LOADING - OFFLOADING MARINE
PROCEDURES
MAIN CHANGES OF REV.02 COMPARED TO REV.02 :
- Additional guidance on operational limits for offshore
terminals, included example diagrams for approach,
residence and departure at offloading buoy, tandem
spread/turret moored F(P)SU.
- New section for marine simulations and/or specific marine
studies.