EHS COMPLIANCE – KIP- LBC – LE180397
Sensitivity: LNT Construction Internal Use
EHS Implementation – Pipe Handling and Pipe Manufacturing
Double Tag lines for Pipe Handling Clamp provided while pipe Unloading Shoulder Pads Provided
TPI Done for Lifting Tools and Tackles Hard Barrcation done for Pipe Rolling Unit
Emergency STOP button provided for Plate cutting
machine
Sensitivity: LNT Construction Internal Use
EHS Implementation – Pipe Handling and Manufacturing
Side Support has been provided in
Trailers
Saddles has been provided in the Trailers for Pipe
Shifting
Rescue Cage for Emergency Lifting of Workmen from 28 Meters
Excavation
Barricading Plate provided in the rolling machine to avoid
accidental Hand Contacts
EHS Notice Board Provided Stoppers provided on the movement line of the EOT
Sensitivity: LNT Construction Internal Use
EHS Implementation – Excavation and Pipe Laying
Step Cutting & Rock Fall Protection Fencing & BarricadingBarricading provided in the Pipe
Laying
Multi Gas Detector
Soil Kept at 1.5 meter distance from excavation Marking of Pipe Stacking Yard Grinding Machine Inspection and Tags
provided
Flag Man Provided
Sensitivity: LNT Construction Internal Use
EHS Implementation – Work At Height
Height Pass Test Hand Rail has been provided in the stagingScaffold Tags implemented
Proper Deck Platform has been provided No loose material kept at height Proper Access Provided
Sensitivity: LNT Construction Internal Use
EHS Implementation – Work At Height
Proper Working Platform provided Access staging provided and covered with Safety NetFull Body Harness Provided
Floor Openings covered and Hard Barricading Provided Housekeeping maintained and toe guards provided for floor
openings
Working Platform has been covered with Safety Net
Sensitivity: LNT Construction Internal Use
EHS Implementation – In Pipe Rolling Factory
Siren Provided Entry Gate Provided Stoppers Provided Barricading Provided
Entry / Exit Register Provided Clits Provided on rail line Tags provided in Slings Lifeline with Full Body Harness and Welding
Apron provided
Sensitivity: LNT Construction Internal Use
EHS Implementation – In Gunniting Plant
Guarding of Tail Pulley with Mesh Guarding of Tail Pulley with Hard Barricading Providing Guards on Rotating Parts Pull Chord in Conveyor Belt
Stair provided to access EOT LOTO Kit Installed and Shut Down register provided Limit Switch has been provided in
EOT
EOT TPI details Displayed
Sensitivity: LNT Construction Internal Use
EHS Implementation – Grid Blasting and Painting Unit
Access ladder provided for Platform Whip Check Arrestor has been provided in
Hose
TPI provided on the Grid Blasting
Hopper
Cylinder kept in stand with valve Caps and
chain
Grid Blasting Hood Provided Half Face Respirator Provided Spill Tray provided for Diesel Drums stacking MSDS Displayed for Paint Stacked
Sensitivity: LNT Construction Internal Use
EHS Implementation – Pipe Rolling and Grid Blasting Unit
Cylinder stacked with chain and
marking
SLI provided in Crane Emergency Assembly Point displayed at Fabrication
Unit
Face Shield and Other PPE’s provided for
Grinding
Height Pass issued to Workforce Stool provided to operator for operations Magnet used to collecting Grid Iron shots Pressure gauges provided in Grid Blasting
Sensitivity: LNT Construction Internal Use
EHS Implementation – Pipe Rolling Unit, Gunniting and Batching Plant
Material Handling Hand Gloves Used NOC – Consent to Establish – Batching Plant Skill Pass Issued Fire Ball with Instruction
Chain Link Fencing in EOT Spill Tray provided for Painting Machine Scarp Yard created for collecting Scrap Guard has been provided for De
Bulker
Sensitivity: LNT Construction Internal Use
EHS Implementation – In Pipe Factory and Batching Plant
Limit Switch provided in Mixing Drum Gate provided on Bucket landing Area Pipe Unloading from Height RT room provided separately
Welding Helmet and hand sleeves Flash back arrestor provided Fire Point provided for Paint Storage Goal Post Provided
Sensitivity: LNT Construction Internal Use
EHS Implementation in Electrical
Fire Point Provided Earthing Pit Testing Done LOTO Kit Provided
Earthing has been provided Panel With RCCB and MCB Industrial Plug and TOP Provided
Sensitivity: LNT Construction Internal Use
EHS Implementation in Electrical
Transformer barricading with sign board Diesel Generator Inspection and Tags
Provided
Shock Treatment Posters Displayed
Earthing resistance value mentioned on Earthing
pit
Insulation Mats provided for DB Operations Certified Electrician Provided
Sensitivity: LNT Construction Internal Use
Digital Implementation
Hydra Crane Inspection Office InspectionElectrical Inspection Fire Extinguisher Inspection
SEC Card Approval Audit Online Module Online Observations
Implemented
Labour Colony Inspection
Sensitivity: LNT Construction Internal Use
Digital Implementation
RCCB Inspection Earth Pit TestingDigital Notice Board Tower Crane Inspection
Fire Extinguisher Inspection Scaffold Inspection Done DG Inspection Excavator Inspection
Sensitivity: LNT Construction Internal Use
Testing
Earth Pit Testing RCCB Testing Fire Extinghuisher Inspection Pest Control
Air Testing Noise Testing Stack Emmision Monitoring Water Testing
Sensitivity: LNT Construction Internal Use
Good Practices Photographs
Staff Training upon EHS Alert, EHS Committee Meeting with Workmen and Mock Drill
Sensitivity: LNT Construction Internal Use
EHS Implementation
Ambulance Inspection First Aid Box Provided RO system provided Food Handler Medical Test
Skill Medical Test Report Dustbin provided in Labor Colony Drinking water with Sign Net provided on the Windows to avoid ingress of
Mosquito in Labor Colony rooms
Sensitivity: LNT Construction Internal Use
EHS Implementation
Drinking Water Tank Cleaning Housekeeping Campaign ORS Distribution Bleaching Powder provided in Labor Colony
EHS Walk down with segment head Prize Distribution to Safety Conscious Workmen during EHS
Committee Meeting
Half Face Respirator provided for the cement
Handlers
Cylinder Stacked with Valve Caps
Sensitivity: LNT Construction Internal Use
EHS Awareness Campaigns
World Water Day EYE Check Up Camp Blood Donation Camp Skill Medical Test
Fire Drill World Environment Day Tree Plantation Safety Month 2020
Sensitivity: LNT Construction Internal Use
EHS Awareness Campaigns
Toilet Block Opening Height Pass Check Up Health Check Up Camp Safety Month 2020
Yoga performed for Workforce Road Safety Week Safety Day 2020 Safety Day 2019
Sensitivity: LNT Construction Internal Use
Activity Specific Poster Displayed
Poster Displayed near to DG set Grid Blasting Poster Fire related Hazard specific Poster
Worker Rest area MS Plate cutting instruction Danger Over head lines Signal Man Poster
Sensitivity: LNT Construction Internal Use
Activity Specific Poster Displayed
Notice Board Displayed Line Diagram Displayed RT Specific Poster Displayed MSDS Displayed
Poster Displayed in PH 4 Posters Displayed in Fabrication Posters displayed in PH 3 Height Work Posters Displayed
Sensitivity: LNT Construction Internal Use
Employee’s Addressing to Social Distancing and PPE’s at Work Location
Sensitivity: LNT Construction Internal Use
Disinfection of the Labor Habitat – Factory , PH 1, PH3, and PH4
Sensitivity: LNT Construction Internal Use
Disinfection and Cleaning of Office/ Stores / Pantry and Maintaining Social Distancing while taking food in
canteen
Sensitivity: LNT Construction Internal Use
Disinfection of Work Location – RDDL, Clean Coats, Vani, Darpan, Pump House 1, Pump House 3 and Pump
House 4
Sensitivity: LNT Construction Internal Use
Disinfection of Work Location – RDDL, Clean Coats, Vani, Darpan, Pump House 1, Pump House 3 and Pump
House 4
Sensitivity: LNT Construction Internal Use
Dis Infection of the Company Provided accommodation
Sensitivity: LNT Construction Internal Use
Disinfection of Work Location – RDDL, Clean Coats, Vani, Darpan, Pump House 1, Pump House 3 and Pump
House 4
Sensitivity: LNT Construction Internal Use
Disinfection of Equipment's & Passenger vehicles - Ready to use
Sensitivity: LNT Construction Internal Use
Medical Screening and Self declaration form of Workforce – Form C
Sensitivity: LNT Construction Internal Use
Distribution of Hand Gloves and Nose Mask
Sensitivity: LNT Construction Internal Use
Thermal Screening and Hand Washing at Entry Gates
Sensitivity: LNT Construction Internal Use
Precautions taken in Pipe Laying before re starting – Social Distancing, Dis Infection, Nose Mask, P&M
Inspection, PEP Talk
Sensitivity: LNT Construction Internal Use
PEP Talk with Social Distancing
Sensitivity: LNT Construction Internal Use
Electrical Inspection and Tagging of Equipment Safe for Use
Sensitivity: LNT Construction Internal Use
P&M Inspection and Tagging of Vehicles safe for use
Sensitivity: LNT Construction Internal Use
Maintaining Social Distancing and PPE’s in execution activities
Sensitivity: LNT Construction Internal Use
Maintaining Social Distancing and PPE’s in execution activities
Sensitivity: LNT Construction Internal Use
Online inspection conducted for electrical – Safe for Use
Sensitivity: LNT Construction Internal Use
RCCB Inspection done as precaution before re -opening of factory
Sensitivity: LNT Construction Internal Use
Training about SOP – Work Resumption, Risk Assessment done to staff
Sensitivity: LNT Construction Internal Use
Posters displayed related to CoVID -19
Sensitivity: LNT Construction Internal Use
Awareness Posters displayed
Sensitivity: LNT Construction Internal Use

More Related Content

Similar to Good practice - KIP - LBC - LE 180397

Noli updated Resume
Noli updated ResumeNoli updated Resume
Noli updated Resume
noli donez
 
Commissioning Engineer
Commissioning EngineerCommissioning Engineer
Commissioning Engineer
Mathivanan K
 
2012W32_Toolsharing_Bangalore
2012W32_Toolsharing_Bangalore2012W32_Toolsharing_Bangalore
2012W32_Toolsharing_Bangalore
Deepak Parackal
 
2 cm-ms-bld-012 - roof fan & natural ventilator
2   cm-ms-bld-012 - roof fan & natural ventilator2   cm-ms-bld-012 - roof fan & natural ventilator
2 cm-ms-bld-012 - roof fan & natural ventilator
Minh Bui Si
 
Design Of Fibrication And Pipe Inspection Robot
Design Of Fibrication And Pipe Inspection RobotDesign Of Fibrication And Pipe Inspection Robot
Design Of Fibrication And Pipe Inspection Robot
Suchit Moon
 
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdfJHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JESUSBASILIOANTONIO
 
Pipeline Construct.pptx
Pipeline Construct.pptxPipeline Construct.pptx
Pipeline Construct.pptx
ssuserfc98db
 

Similar to Good practice - KIP - LBC - LE 180397 (20)

S-LINE Pipe Suppliers Sharjah.pptx
S-LINE Pipe Suppliers Sharjah.pptxS-LINE Pipe Suppliers Sharjah.pptx
S-LINE Pipe Suppliers Sharjah.pptx
 
Noli updated Resume
Noli updated ResumeNoli updated Resume
Noli updated Resume
 
Commissioning Engineer
Commissioning EngineerCommissioning Engineer
Commissioning Engineer
 
2012W32_Toolsharing_Bangalore
2012W32_Toolsharing_Bangalore2012W32_Toolsharing_Bangalore
2012W32_Toolsharing_Bangalore
 
2 cm-ms-bld-012 - roof fan & natural ventilator
2   cm-ms-bld-012 - roof fan & natural ventilator2   cm-ms-bld-012 - roof fan & natural ventilator
2 cm-ms-bld-012 - roof fan & natural ventilator
 
Presentation2
Presentation2Presentation2
Presentation2
 
kolligars-I-1
kolligars-I-1kolligars-I-1
kolligars-I-1
 
2-Sanitary-Ware.pptx
2-Sanitary-Ware.pptx2-Sanitary-Ware.pptx
2-Sanitary-Ware.pptx
 
IRJET- Case Study on Energy Auditing of Industrial and Commercial Utiliies
IRJET- Case Study on Energy Auditing of Industrial and Commercial UtiliiesIRJET- Case Study on Energy Auditing of Industrial and Commercial Utiliies
IRJET- Case Study on Energy Auditing of Industrial and Commercial Utiliies
 
Design Of Fibrication And Pipe Inspection Robot
Design Of Fibrication And Pipe Inspection RobotDesign Of Fibrication And Pipe Inspection Robot
Design Of Fibrication And Pipe Inspection Robot
 
Electrical overhead lines & industries major handling equipment.
Electrical overhead lines & industries major handling equipment.Electrical overhead lines & industries major handling equipment.
Electrical overhead lines & industries major handling equipment.
 
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdfJHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
 
into to gorkon solar
into to gorkon solarinto to gorkon solar
into to gorkon solar
 
Highrise
HighriseHighrise
Highrise
 
Pipeline Construct.pptx
Pipeline Construct.pptxPipeline Construct.pptx
Pipeline Construct.pptx
 
ugandhar CompEx resume
ugandhar CompEx resumeugandhar CompEx resume
ugandhar CompEx resume
 
WPR_02.01.2023 W-114 - Copy (1).pptx
WPR_02.01.2023 W-114 - Copy (1).pptxWPR_02.01.2023 W-114 - Copy (1).pptx
WPR_02.01.2023 W-114 - Copy (1).pptx
 
Inpro Corner Guard EPD
Inpro Corner Guard EPDInpro Corner Guard EPD
Inpro Corner Guard EPD
 
EN16309 - methodology social performance assessment (comprehensive presentation)
EN16309 - methodology social performance assessment (comprehensive presentation)EN16309 - methodology social performance assessment (comprehensive presentation)
EN16309 - methodology social performance assessment (comprehensive presentation)
 
Agr Field Operations Pipeline Inspection
Agr Field Operations Pipeline InspectionAgr Field Operations Pipeline Inspection
Agr Field Operations Pipeline Inspection
 

More from Sanjay Singh (7)

BSC ( British Safety Council ) awards certificate - KIP - LBC
BSC ( British Safety Council ) awards certificate - KIP - LBCBSC ( British Safety Council ) awards certificate - KIP - LBC
BSC ( British Safety Council ) awards certificate - KIP - LBC
 
Height work compliance
Height work complianceHeight work compliance
Height work compliance
 
Transformer unloading
Transformer unloadingTransformer unloading
Transformer unloading
 
10
1010
10
 
12
1212
12
 
14
1414
14
 
13
1313
13
 

Recently uploaded

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 

Recently uploaded (20)

Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 

Good practice - KIP - LBC - LE 180397

  • 1. Sensitivity: LNT Construction Internal Use EHS COMPLIANCE – KIP- LBC – LE180397
  • 2. Sensitivity: LNT Construction Internal Use EHS Implementation – Pipe Handling and Pipe Manufacturing Double Tag lines for Pipe Handling Clamp provided while pipe Unloading Shoulder Pads Provided TPI Done for Lifting Tools and Tackles Hard Barrcation done for Pipe Rolling Unit Emergency STOP button provided for Plate cutting machine
  • 3. Sensitivity: LNT Construction Internal Use EHS Implementation – Pipe Handling and Manufacturing Side Support has been provided in Trailers Saddles has been provided in the Trailers for Pipe Shifting Rescue Cage for Emergency Lifting of Workmen from 28 Meters Excavation Barricading Plate provided in the rolling machine to avoid accidental Hand Contacts EHS Notice Board Provided Stoppers provided on the movement line of the EOT
  • 4. Sensitivity: LNT Construction Internal Use EHS Implementation – Excavation and Pipe Laying Step Cutting & Rock Fall Protection Fencing & BarricadingBarricading provided in the Pipe Laying Multi Gas Detector Soil Kept at 1.5 meter distance from excavation Marking of Pipe Stacking Yard Grinding Machine Inspection and Tags provided Flag Man Provided
  • 5. Sensitivity: LNT Construction Internal Use EHS Implementation – Work At Height Height Pass Test Hand Rail has been provided in the stagingScaffold Tags implemented Proper Deck Platform has been provided No loose material kept at height Proper Access Provided
  • 6. Sensitivity: LNT Construction Internal Use EHS Implementation – Work At Height Proper Working Platform provided Access staging provided and covered with Safety NetFull Body Harness Provided Floor Openings covered and Hard Barricading Provided Housekeeping maintained and toe guards provided for floor openings Working Platform has been covered with Safety Net
  • 7. Sensitivity: LNT Construction Internal Use EHS Implementation – In Pipe Rolling Factory Siren Provided Entry Gate Provided Stoppers Provided Barricading Provided Entry / Exit Register Provided Clits Provided on rail line Tags provided in Slings Lifeline with Full Body Harness and Welding Apron provided
  • 8. Sensitivity: LNT Construction Internal Use EHS Implementation – In Gunniting Plant Guarding of Tail Pulley with Mesh Guarding of Tail Pulley with Hard Barricading Providing Guards on Rotating Parts Pull Chord in Conveyor Belt Stair provided to access EOT LOTO Kit Installed and Shut Down register provided Limit Switch has been provided in EOT EOT TPI details Displayed
  • 9. Sensitivity: LNT Construction Internal Use EHS Implementation – Grid Blasting and Painting Unit Access ladder provided for Platform Whip Check Arrestor has been provided in Hose TPI provided on the Grid Blasting Hopper Cylinder kept in stand with valve Caps and chain Grid Blasting Hood Provided Half Face Respirator Provided Spill Tray provided for Diesel Drums stacking MSDS Displayed for Paint Stacked
  • 10. Sensitivity: LNT Construction Internal Use EHS Implementation – Pipe Rolling and Grid Blasting Unit Cylinder stacked with chain and marking SLI provided in Crane Emergency Assembly Point displayed at Fabrication Unit Face Shield and Other PPE’s provided for Grinding Height Pass issued to Workforce Stool provided to operator for operations Magnet used to collecting Grid Iron shots Pressure gauges provided in Grid Blasting
  • 11. Sensitivity: LNT Construction Internal Use EHS Implementation – Pipe Rolling Unit, Gunniting and Batching Plant Material Handling Hand Gloves Used NOC – Consent to Establish – Batching Plant Skill Pass Issued Fire Ball with Instruction Chain Link Fencing in EOT Spill Tray provided for Painting Machine Scarp Yard created for collecting Scrap Guard has been provided for De Bulker
  • 12. Sensitivity: LNT Construction Internal Use EHS Implementation – In Pipe Factory and Batching Plant Limit Switch provided in Mixing Drum Gate provided on Bucket landing Area Pipe Unloading from Height RT room provided separately Welding Helmet and hand sleeves Flash back arrestor provided Fire Point provided for Paint Storage Goal Post Provided
  • 13. Sensitivity: LNT Construction Internal Use EHS Implementation in Electrical Fire Point Provided Earthing Pit Testing Done LOTO Kit Provided Earthing has been provided Panel With RCCB and MCB Industrial Plug and TOP Provided
  • 14. Sensitivity: LNT Construction Internal Use EHS Implementation in Electrical Transformer barricading with sign board Diesel Generator Inspection and Tags Provided Shock Treatment Posters Displayed Earthing resistance value mentioned on Earthing pit Insulation Mats provided for DB Operations Certified Electrician Provided
  • 15. Sensitivity: LNT Construction Internal Use Digital Implementation Hydra Crane Inspection Office InspectionElectrical Inspection Fire Extinguisher Inspection SEC Card Approval Audit Online Module Online Observations Implemented Labour Colony Inspection
  • 16. Sensitivity: LNT Construction Internal Use Digital Implementation RCCB Inspection Earth Pit TestingDigital Notice Board Tower Crane Inspection Fire Extinguisher Inspection Scaffold Inspection Done DG Inspection Excavator Inspection
  • 17. Sensitivity: LNT Construction Internal Use Testing Earth Pit Testing RCCB Testing Fire Extinghuisher Inspection Pest Control Air Testing Noise Testing Stack Emmision Monitoring Water Testing
  • 18. Sensitivity: LNT Construction Internal Use Good Practices Photographs Staff Training upon EHS Alert, EHS Committee Meeting with Workmen and Mock Drill
  • 19. Sensitivity: LNT Construction Internal Use EHS Implementation Ambulance Inspection First Aid Box Provided RO system provided Food Handler Medical Test Skill Medical Test Report Dustbin provided in Labor Colony Drinking water with Sign Net provided on the Windows to avoid ingress of Mosquito in Labor Colony rooms
  • 20. Sensitivity: LNT Construction Internal Use EHS Implementation Drinking Water Tank Cleaning Housekeeping Campaign ORS Distribution Bleaching Powder provided in Labor Colony EHS Walk down with segment head Prize Distribution to Safety Conscious Workmen during EHS Committee Meeting Half Face Respirator provided for the cement Handlers Cylinder Stacked with Valve Caps
  • 21. Sensitivity: LNT Construction Internal Use EHS Awareness Campaigns World Water Day EYE Check Up Camp Blood Donation Camp Skill Medical Test Fire Drill World Environment Day Tree Plantation Safety Month 2020
  • 22. Sensitivity: LNT Construction Internal Use EHS Awareness Campaigns Toilet Block Opening Height Pass Check Up Health Check Up Camp Safety Month 2020 Yoga performed for Workforce Road Safety Week Safety Day 2020 Safety Day 2019
  • 23. Sensitivity: LNT Construction Internal Use Activity Specific Poster Displayed Poster Displayed near to DG set Grid Blasting Poster Fire related Hazard specific Poster Worker Rest area MS Plate cutting instruction Danger Over head lines Signal Man Poster
  • 24. Sensitivity: LNT Construction Internal Use Activity Specific Poster Displayed Notice Board Displayed Line Diagram Displayed RT Specific Poster Displayed MSDS Displayed Poster Displayed in PH 4 Posters Displayed in Fabrication Posters displayed in PH 3 Height Work Posters Displayed
  • 25. Sensitivity: LNT Construction Internal Use Employee’s Addressing to Social Distancing and PPE’s at Work Location
  • 26. Sensitivity: LNT Construction Internal Use Disinfection of the Labor Habitat – Factory , PH 1, PH3, and PH4
  • 27. Sensitivity: LNT Construction Internal Use Disinfection and Cleaning of Office/ Stores / Pantry and Maintaining Social Distancing while taking food in canteen
  • 28. Sensitivity: LNT Construction Internal Use Disinfection of Work Location – RDDL, Clean Coats, Vani, Darpan, Pump House 1, Pump House 3 and Pump House 4
  • 29. Sensitivity: LNT Construction Internal Use Disinfection of Work Location – RDDL, Clean Coats, Vani, Darpan, Pump House 1, Pump House 3 and Pump House 4
  • 30. Sensitivity: LNT Construction Internal Use Dis Infection of the Company Provided accommodation
  • 31. Sensitivity: LNT Construction Internal Use Disinfection of Work Location – RDDL, Clean Coats, Vani, Darpan, Pump House 1, Pump House 3 and Pump House 4
  • 32. Sensitivity: LNT Construction Internal Use Disinfection of Equipment's & Passenger vehicles - Ready to use
  • 33. Sensitivity: LNT Construction Internal Use Medical Screening and Self declaration form of Workforce – Form C
  • 34. Sensitivity: LNT Construction Internal Use Distribution of Hand Gloves and Nose Mask
  • 35. Sensitivity: LNT Construction Internal Use Thermal Screening and Hand Washing at Entry Gates
  • 36. Sensitivity: LNT Construction Internal Use Precautions taken in Pipe Laying before re starting – Social Distancing, Dis Infection, Nose Mask, P&M Inspection, PEP Talk
  • 37. Sensitivity: LNT Construction Internal Use PEP Talk with Social Distancing
  • 38. Sensitivity: LNT Construction Internal Use Electrical Inspection and Tagging of Equipment Safe for Use
  • 39. Sensitivity: LNT Construction Internal Use P&M Inspection and Tagging of Vehicles safe for use
  • 40. Sensitivity: LNT Construction Internal Use Maintaining Social Distancing and PPE’s in execution activities
  • 41. Sensitivity: LNT Construction Internal Use Maintaining Social Distancing and PPE’s in execution activities
  • 42. Sensitivity: LNT Construction Internal Use Online inspection conducted for electrical – Safe for Use
  • 43. Sensitivity: LNT Construction Internal Use RCCB Inspection done as precaution before re -opening of factory
  • 44. Sensitivity: LNT Construction Internal Use Training about SOP – Work Resumption, Risk Assessment done to staff
  • 45. Sensitivity: LNT Construction Internal Use Posters displayed related to CoVID -19
  • 46. Sensitivity: LNT Construction Internal Use Awareness Posters displayed