SlideShare a Scribd company logo
1 of 32
Download to read offline
P
R
O
F
• Public Health Engineering
• Process Piping
• Industrial Piping
• Gas Reticulated System
• Fire Suppression System
• Fire Detection System
• Public Address System
SHANMUGAM S.P.N
Fluid System Design ConsultantF
I
L
E
Fluid System Design Consultant
Address
No. 4, 2nd Floor, S1, 3rd West Cross,
L.N. Colony, Yeshwanthpur,
Bangalore – 560 0022.
Contact:
Mobile : 97315 00988
E-Mail:
sunny_spn2002@yahoo.com
shanmugam.spn@gmail.com
Introduction discipline
services
projects
A Civil Engineering graduate passed out in the year 1991 from Bangalore
University with post graduate diploma in Computer Aided Design, started his
career as plumbing engineer and has almost 25 years of experience in the
field of plumbing & fire fighting works.
Was involved in Designing, Tendering , Bidding, Planning & Execution, Testing
& Commissioning of plumbing and fire fighting works at various organizations
at different capacities.
Company Name: Karle Infra Pvt., Ltd.,Company Name: Karle Infra Pvt., Ltd.,
Designation : General Manager – PHE & FF
Period : 4 Years. ( April 2012 to July 2016)
Company Name: Adarsh Developers
Designation : Manager Design– PHE & FF
Period : 8 Years. (December 2004 to April 2012)
Company Name: IBIS Consulting Pvt., Ltd.,
Designation : Consultant
Period : 1 Year. ( January 2004 - December 2004)
Company Name: DVP Consulting Pvt., Ltd., ( Atreya Consultants)
Designation : Consultant
Period : 3 Years. ( October 1998 to January 2004)
Company Name: Karthik Plumbing Works Pvt., Ltd.,
Designation : Manager – Design & Planning
Period : 6 Years ( March 1992 to October 1998)
Introduction discipline
services
projects
Process / Industrial Piping
Public Health Engineering
• Water StorageProcess / Industrial Piping
Fire Suppression System
Fire Detection System
Public Address System
• Water Storage
• Water Treatment Plant
• Water Distribution System – Internal & External.
• Centralized Hot Water Distribution system.
• Internal & External Sewage Disposal System.
• Sewage Treatment Plant.
• Rain Water Harvesting System
• Storm Water Management
• Garbage Disposal System.
Introduction discipline
services
projects
Process / Industrial Piping
Public Health Engineering
Process / Industrial Piping
Fire Suppression System
Fire Detection System
Public Address System
• HSD Yard Piping Works.
• Process Piping works for Clean rooms
• Compressed air Piping.
• Landscape Irrigation with automation
• Swimming pool & Water Bodies – M&E works
• LPG / CNG gas reticulated system
Introduction discipline
services
projects
Process / Industrial Piping
Public Health Engineering
Process / Industrial Piping
Fire Suppression System
Fire Detection System
Public Address System
• Hydrant – Wet Riser / Down Comer system
• Sprinkler – Wet Riser / Down Comer System
• Pre- Action System
• Deluge System
• Mechanical Foam for Helipads
• Fire Extinguishers
Introduction discipline
services
projects
Process / Industrial Piping
Public Health Engineering
Process / Industrial Piping
Fire Suppression System
Fire Detection System
Public Address System • Conventional Detection System
• Addressable Detection System
• Hybrid Detection System
• VESDA – For Data Centre / Server Rooms
Introduction discipline
services
projects
Process / Industrial Piping
Public Health Engineering
Process / Industrial Piping
Fire Suppression System
Fire Detection System
Public Address System
• Two Way Talk Back system
• Public Addressing System
Introduction discipline
services
projects
• Preparation of Preliminary Reports & Estimates
• Preparation of Preliminary Drawings
• Preparation of Design Calculation and Drawings to be
submitted to Local Authority for approval
• Preparation of Detailed Estimates & Drawings
• Preparation of Tender Documents
• Preparation of Working Drawings & Co-ordination with• Preparation of Working Drawings & Co-ordination with
other agencies
• Site visits – Quality Checking
• Checking and approval of Shop Drawings
• Getting the work Executed as per approved Shop
Drawings
• Helping in obtaining final approvals from local
authorities.
• Commissioning
• Approval of As Built Drawings
• Peer Reviewing
Projects Residential Apartments
Arka Forest @ Bangalore – 256 Units, Ground + 7 Floors
Total Water Requirement : 2,40,000 LPD.
Water Distribution : Hydro – Pneumatic System – Variable Speed Pumps.
STP Capacity : 225 KLD , SBR Technology
Karle Zenith @ Bangalore – 396 Units, Ground + 34 Floors
Total Water Requirement : 2,85,000 LPD.
Water Distribution : By Gravity , Above Floors by Booster System
STP Capacity : 300 KLD , SBR Technology.
Fire Fighting Systems – Sprinklers in all floors, Pumps – Multi Outlet Pump
Fire Detection System – Addressable Detection System – Notifier make.
Adarsh Condimoniums– 1420 Units, Ground + 13 Floors
Total Water Requirement : 10,65,000 LPD.
Water Distribution : By Gravity , Above Floors by Booster SystemWater Distribution : By Gravity , Above Floors by Booster System
STP Capacity : 1375 KLD , SBR Technology
Fire Fighting Systems - 8 sets of Pumps – 32 risers.
Adarsh Palm Retreat -Tower 1 & 2–639 Units, Ground + 13 Floors
Water Distribution : By Hydro-Pneumatic System – Variable Speed Pumps
Adarsh Esplanade - 95 Units, Ground + 8 Floors
Water Distribution : By Hydro-Pneumatic System – Variable Speed Pumps
Adarsh Rhythm - 316 Units, Ground + 13 Floors
Water Distribution : By Hydro-Pneumatic System – Variable Speed Pumps
Projects Residential Villas / Plots
Layout @ Shivmoga – 735 Plots
Total Water Requirement : 6,0 0,000 LPD.
Water Distribution : Gravity.
Piping Materials : Sewage – PVC Pipes, Water Supply : HDPE Pipes
Adarsh Palm Retreat - - Phase I & II – 716 Villas
Water Distribution : Hydro-Pneumatic System – variable speed Pumps
Piping Materials : Sewage – PVC Pipes, Water Supply : HDPE Pipes
Projects Office Buildings
Office Space @ Karle SEZ – 9,50,000 Square Feet – Ground + 11 Floors
Water Distribution : Hydro-Pneumatic system – Variable speed pumps
Piping Materials : Sewage – PVC Pipes, Water Supply : GI Pipes
STP –300 KLD Capacity, Activated sludge process.
Akarsh Infotech – EPIP Whitefield – 210,000 Square Feet – Ground + 5 Floors
Water Distribution : Gravity
Piping Materials : Sewage – PVC Pipes, Water Supply : GI Pipes
STP –150 KLD Capacity, Activated sludge process.
Oracle @ Hyderabad
Water Distribution : Hydro-Pneumatic System
Piping Materials : Sewage – Cast Iron Pipes, Water Supply : GI Pipes
Information Technology Park – Phase I & II
Water Distribution : Gravity System
Piping Materials : Sewage – Cast Iron Hubless Pipes, Water Supply : GI Pipes
Projects Hospitality
Cauvery Medical Centre – 450 Bed Hi-tech Hospital
Satya Sai Hospital – White Field
Poppy’s Valley Hotel – Tirupur
Hotel Shangri-La – Palace Road ( Design Coordination)
Projects Industrial / Lab / Research & Developement
Pharmacia Upjohn – Kunigal Road
Stainless Steel – Process Piping for Clean room.
Installation of first Grundfos Pumps in Bangalore.
John F. Welch Technology Centre, Whitefield
Swage lock – Piping & Fittings used for process piping for Lab requirement
HSD yard Piping for Karle SEZ
HSD Tank Capacity – 240 KLD
DESIGN FORMATS
EXTERNAL SEWAGE DISPOSAL – GRAVITY CHART
DESIGN FORMATS
EXTERNAL STORM WATER DISPOSAL – GRAVITY CHART
DESIGN FORMATS
WATER SUPPLY - SHAFT
Domestic Water Supply
Floors Toilet Type Fixure Units Cum FU Flow Pipe Size Pipe Size Velocity Frictional ConstantFloor Height Cum Height Pipe Length
Equivalent
Length
Pressure Loss
Available
Pressure
Pressure
Adjustments
Available
Pressure after
Adjustments
Ring Main1 588 539.72 100mm 104.1 1.06 100.00 1.5 1.5 135 162 6.81 -5.31 20 14.69
Ring Main2 2436 1419.74 150mm 154.3 1.27 100.00 1.5 1.5 135 162 6.00 -4.50 0 -4.50
Ring Main3
Shaft Down Take
36th Floor T1 4 28 71.80 32mm 35.6 1.21 100.00 1.50 3.00 1.50 1.8 0.34 -2.64 17.36
35th Floor T1 4 24 64.20 32mm 35.6 1.08 100.00 3.25 6.25 3.25 3.9 0.59 0.02 20.02
34th Floor T1 4 20 56.60 32mm 35.6 0.95 100.00 3.25 9.50 3.25 3.9 0.47 2.80 22.80
33rd Floor T1 4 16 45.32 25mm 26.9 1.33 100.00 3.25 12.75 3.25 3.9 1.21 4.84 24.84
32nd Floor T1 4 12 34.03 25mm 26.9 1.00 100.00 3.25 16.00 3.25 3.9 0.71 7.37 27.37
31st Floor T1 4 8 22.75 25mm 26.9 0.67 100.00 3.25 19.25 3.25 3.9 0.34 10.28 30.28
30th Floor T1 4 4 11.46 20mm 20.3 0.59 100.00 3.25 22.50 3.25 3.9 0.38 13.16 33.16
29th Floor T1 4 116 177.92 40mm 41.5 2.20 100.00 3.25 25.75 24.25 29.1 13.80 7.44 7.44
28th Floor T1 4 112 174.14 40mm 41.5 2.15 100.00 3.25 29.00 3.25 3.9 1.78 8.92 8.92
27th Floor T1 4 108 170.36 40mm 41.5 2.10 100.00 3.25 32.25 3.25 3.9 1.71 10.46 10.46
26th Floor T1 4 104 166.58 40mm 41.5 2.06 100.00 3.25 35.50 3.25 3.9 1.64 12.07 12.07
25th Floor T1 4 100 162.80 40mm 41.5 2.01 100.00 3.25 38.75 3.25 3.9 1.57 13.75 13.7525th Floor T1 4 100 162.80 40mm 41.5 2.01 100.00 3.25 38.75 3.25 3.9 1.57 13.75 13.75
24th Floor T1 4 96 159.00 40mm 41.5 1.96 100.00 3.25 42.00 3.25 3.9 1.50 15.50 15.50
23rd Floor T1 4 92 155.20 40mm 41.5 1.92 100.00 3.25 45.25 3.25 3.9 1.44 17.31 17.31
22nd Floor T1 4 88 151.40 40mm 41.5 1.87 100.00 3.25 48.50 3.25 3.9 1.37 19.19 19.19
21st Floor T1 4 84 147.60 32mm 35.6 2.48 100.00 3.25 51.75 3.25 3.9 2.76 19.68 19.68
20th Floor T1 4 80 143.80 32mm 35.6 2.41 100.00 3.25 55.00 3.25 3.9 2.63 20.30 20.30
19th Floor T1 4 76 139.26 32mm 35.6 2.34 100.00 3.25 58.25 3.25 3.9 2.48 21.07 21.07
18th Floor T1 4 72 134.72 32mm 35.6 2.26 100.00 3.25 61.50 3.25 3.9 2.33 21.98 21.98
17th Floor T1 4 68 130.18 32mm 35.6 2.19 100.00 3.25 64.75 3.25 3.9 2.19 23.04 23.04
16th Floor T1 4 64 125.64 32mm 35.6 2.11 100.00 3.25 68.00 3.25 3.9 2.05 24.24 10 14.24
15th Floor T1 4 60 121.10 32mm 35.6 2.03 100.00 3.25 71.25 3.25 3.9 1.91 25.58 15.58
14th Floor T1 4 56 115.80 32mm 35.6 1.94 100.00 3.25 74.50 3.25 3.9 1.76 27.07 17.07
13th Floor T1 4 52 110.50 32mm 35.6 1.86 100.00 3.25 77.75 3.25 3.9 1.62 28.70 18.70
12th Floor T1 4 48 105.20 32mm 35.6 1.77 100.00 3.25 81.00 3.25 3.9 1.48 30.48 20.48
11th Floor T1 4 44 99.90 32mm 35.6 1.68 100.00 3.25 84.25 3.25 3.9 1.34 32.38 22.38
10th Floor T1 4 40 94.60 32mm 35.6 1.59 100.00 3.25 87.50 3.25 3.9 1.21 34.42 24.42
9th Floor T1 4 36 87.00 32mm 35.6 1.46 100.00 3.25 90.75 3.25 3.9 1.04 36.64 26.64
8th Floor T1 4 32 79.40 25mm 26.9 2.33 100.00 3.25 94.00 3.25 3.9 3.43 36.45 26.45
7th Floor T1 4 28 71.80 25mm 26.9 2.11 100.00 3.25 97.25 3.25 3.9 2.85 36.86 26.86
6th Floor T1 4 24 64.20 25mm 26.9 1.89 100.00 3.25 100.50 3.25 3.9 2.31 37.79 27.79
5th Floor T1 4 20 56.60 25mm 26.9 1.66 100.00 3.25 103.75 3.25 3.9 1.83 39.21 29.21
4th Floor T1 4 16 45.32 25mm 26.9 1.33 100.00 3.25 107.00 3.25 3.9 1.21 41.25 10 21.25
3rd Floor T1 4 12 34.03 25mm 26.9 1.00 100.00 3.25 110.25 3.25 3.9 0.71 43.78 23.78
2nd Floor T1 4 8 22.75 25mm 26.9 0.67 100.00 3.25 113.50 3.25 3.9 0.34 46.69 26.69
1st Floor T1 4 4 11.46 20mm 20.3 0.59 100.00 3.25 116.75 3.25 3.9 0.38 49.57 29.57
RATE ANALAYSIS FORMATS
ESTIMATIONS
PROFILE DRAWINGS
FLOOR PLAN - WATER SUPPLY & DRAINAGE LAYOUT
PROFILE DRAWINGS
TOILET INTERNAL WATER SUPPLY & DRAINAGE LAYOUT
PROFILE DRAWINGS
TOILET INTERNAL WATER SUPPLY – ISOMETRIC VIEW
PROFILE DRAWINGS
WATER TREATENT PLANT & PUMP ROOM LAYOUT PLAN
PROFILE DRAWINGS
BASEMENT PHE SERVICES LAYOUT PLAN & SECTIONS
PROFILE DRAWINGS
WATER SUPPLY SCHEMATIC
PROFILE DRAWINGS
EXTERNAL SEWAGE DISPOSAL LAYOUT – FOR VILLAS
PROFILE DRAWINGS
EXTERNAL SEWAGE DISPOSAL – LONGITUDINAL SECTIONAL DETAILS
PROFILE DRAWINGS
DETAILS OF INSPECTION CHAMBERS & MANHOLES
PROFILE DRAWINGS
DETAILS OF VALVE CHAMBERS & THRUST BLOCKS FOR WATER SUPPLY
PROFILE DRAWINGS
ROAD SECTIONS WITH SPACE ALLOCATIONS FOR SERVICES
PROFILE DRAWINGS
FLOOR PLAN – FIRE SPRINKLER & HYDRANT LAYOUT
PROFILE DRAWINGS
FLOOR PLAN – FIRE ALARM SYSTEM LAYOUT
PROFILE DRAWINGS
SCHEMATIC– FIRE ALARM & SPRINKLER & HYDRANT LAYOUT
THANK YOU

More Related Content

What's hot

Winterisation - Arctic Offshore & Maritime Heating Solutions - Thermon Heat T...
Winterisation - Arctic Offshore & Maritime Heating Solutions - Thermon Heat T...Winterisation - Arctic Offshore & Maritime Heating Solutions - Thermon Heat T...
Winterisation - Arctic Offshore & Maritime Heating Solutions - Thermon Heat T...Thorne & Derrick International
 
Katalog fluke-hvac-tools-indoor-air-quality-by-tridinamika
Katalog fluke-hvac-tools-indoor-air-quality-by-tridinamikaKatalog fluke-hvac-tools-indoor-air-quality-by-tridinamika
Katalog fluke-hvac-tools-indoor-air-quality-by-tridinamikaPT. Tridinamika Jaya Instrument
 
Atox 22.50 coal mill optimization
Atox 22.50 coal mill optimizationAtox 22.50 coal mill optimization
Atox 22.50 coal mill optimizationNITIN ASNANI
 
Design and demonstration of heat pipe based waste heat recovery system
Design and demonstration of heat pipe based waste heat recovery systemDesign and demonstration of heat pipe based waste heat recovery system
Design and demonstration of heat pipe based waste heat recovery systemIRJET Journal
 
Heat & Mass Balance in Cement Plant
Heat & Mass Balance in Cement PlantHeat & Mass Balance in Cement Plant
Heat & Mass Balance in Cement PlantNITIN ASNANI
 
Good practice - KIP - LBC - LE 180397
Good practice - KIP - LBC - LE 180397Good practice - KIP - LBC - LE 180397
Good practice - KIP - LBC - LE 180397Sanjay Singh
 
NBEC 2014 - Energy Performance of Windows
NBEC 2014  -  Energy Performance of WindowsNBEC 2014  -  Energy Performance of Windows
NBEC 2014 - Energy Performance of WindowsRDH Building Science
 
Application of high energy micro-mist technology - Jon Roberts
Application of high energy micro-mist technology - Jon RobertsApplication of high energy micro-mist technology - Jon Roberts
Application of high energy micro-mist technology - Jon RobertsNSW Environment and Planning
 
Anavah corporation Group 6 2015 Design Project Presentation
Anavah corporation Group 6 2015 Design Project PresentationAnavah corporation Group 6 2015 Design Project Presentation
Anavah corporation Group 6 2015 Design Project PresentationWong Chiew Wee
 

What's hot (20)

Winterisation - Arctic Offshore & Maritime Heating Solutions - Thermon Heat T...
Winterisation - Arctic Offshore & Maritime Heating Solutions - Thermon Heat T...Winterisation - Arctic Offshore & Maritime Heating Solutions - Thermon Heat T...
Winterisation - Arctic Offshore & Maritime Heating Solutions - Thermon Heat T...
 
Katalog fluke-hvac-tools-indoor-air-quality-by-tridinamika
Katalog fluke-hvac-tools-indoor-air-quality-by-tridinamikaKatalog fluke-hvac-tools-indoor-air-quality-by-tridinamika
Katalog fluke-hvac-tools-indoor-air-quality-by-tridinamika
 
From process to emission
From process to emissionFrom process to emission
From process to emission
 
Boiler Operation and Maintenance Experiences
Boiler Operation and Maintenance ExperiencesBoiler Operation and Maintenance Experiences
Boiler Operation and Maintenance Experiences
 
Combustion & Fired Heater Optimization
Combustion & Fired Heater OptimizationCombustion & Fired Heater Optimization
Combustion & Fired Heater Optimization
 
Fire suppression
Fire suppressionFire suppression
Fire suppression
 
Atox 22.50 coal mill optimization
Atox 22.50 coal mill optimizationAtox 22.50 coal mill optimization
Atox 22.50 coal mill optimization
 
Design and demonstration of heat pipe based waste heat recovery system
Design and demonstration of heat pipe based waste heat recovery systemDesign and demonstration of heat pipe based waste heat recovery system
Design and demonstration of heat pipe based waste heat recovery system
 
Heat & Mass Balance in Cement Plant
Heat & Mass Balance in Cement PlantHeat & Mass Balance in Cement Plant
Heat & Mass Balance in Cement Plant
 
Final year project
Final year projectFinal year project
Final year project
 
Fis CO Boiler Brochure
Fis CO Boiler BrochureFis CO Boiler Brochure
Fis CO Boiler Brochure
 
Components for Pipe Support Deflection & Restraint
Components for Pipe Support Deflection & RestraintComponents for Pipe Support Deflection & Restraint
Components for Pipe Support Deflection & Restraint
 
Barry Cutting - Booster fans Angus Place Colliery
Barry Cutting  - Booster fans Angus Place CollieryBarry Cutting  - Booster fans Angus Place Colliery
Barry Cutting - Booster fans Angus Place Colliery
 
Good practice - KIP - LBC - LE 180397
Good practice - KIP - LBC - LE 180397Good practice - KIP - LBC - LE 180397
Good practice - KIP - LBC - LE 180397
 
NBEC 2014 - Energy Performance of Windows
NBEC 2014  -  Energy Performance of WindowsNBEC 2014  -  Energy Performance of Windows
NBEC 2014 - Energy Performance of Windows
 
Application of high energy micro-mist technology - Jon Roberts
Application of high energy micro-mist technology - Jon RobertsApplication of high energy micro-mist technology - Jon Roberts
Application of high energy micro-mist technology - Jon Roberts
 
Anavah corporation Group 6 2015 Design Project Presentation
Anavah corporation Group 6 2015 Design Project PresentationAnavah corporation Group 6 2015 Design Project Presentation
Anavah corporation Group 6 2015 Design Project Presentation
 
High Challenge Warehouse case study
High Challenge Warehouse case studyHigh Challenge Warehouse case study
High Challenge Warehouse case study
 
Constant Spring Supports Webinar
Constant Spring Supports WebinarConstant Spring Supports Webinar
Constant Spring Supports Webinar
 
Cooling tower Inspection Guide
Cooling tower Inspection GuideCooling tower Inspection Guide
Cooling tower Inspection Guide
 

Similar to SPN_Profile-161006

HDPE Pipes By Perfect Prime Piping & Agritech Private Limited, Rajasthan
HDPE Pipes By Perfect Prime Piping & Agritech Private Limited, RajasthanHDPE Pipes By Perfect Prime Piping & Agritech Private Limited, Rajasthan
HDPE Pipes By Perfect Prime Piping & Agritech Private Limited, RajasthanIndiaMART InterMESH Limited
 
C:\fakepath\fossil power basics
C:\fakepath\fossil power basicsC:\fakepath\fossil power basics
C:\fakepath\fossil power basicsguest6a2ec4
 
14OTC 25107-Active Heating for Life of Field Flow Assurance
14OTC 25107-Active Heating for Life of Field Flow Assurance14OTC 25107-Active Heating for Life of Field Flow Assurance
14OTC 25107-Active Heating for Life of Field Flow AssurancePaul McDermott
 
normas quipment-solutions-guide
normas quipment-solutions-guidenormas quipment-solutions-guide
normas quipment-solutions-guideclaudio765
 
Sps branded sales deck
Sps branded sales deckSps branded sales deck
Sps branded sales deckrgiddings
 
Piotr Blaut Student Placement
Piotr Blaut Student PlacementPiotr Blaut Student Placement
Piotr Blaut Student PlacementPiotr Blaut
 
Buildings Service report
Buildings Service reportBuildings Service report
Buildings Service reportJian Jia
 
269831351-PIPING-Q-C-AG-UG.pdf
269831351-PIPING-Q-C-AG-UG.pdf269831351-PIPING-Q-C-AG-UG.pdf
269831351-PIPING-Q-C-AG-UG.pdfmoumo1
 
Apex Modular Extrusion
Apex Modular Extrusion Apex Modular Extrusion
Apex Modular Extrusion Jeff West
 
Full AQ safety Catalogue 2012
Full AQ safety Catalogue 2012Full AQ safety Catalogue 2012
Full AQ safety Catalogue 2012Richard Skinner
 
S-LINE Pipe Suppliers Sharjah.pptx
S-LINE Pipe Suppliers Sharjah.pptxS-LINE Pipe Suppliers Sharjah.pptx
S-LINE Pipe Suppliers Sharjah.pptxJinoVarghese14
 
Bs ii-presentation
Bs ii-presentationBs ii-presentation
Bs ii-presentationLee Chun Yee
 
BUILDING SERVICE CATALOGUE
BUILDING SERVICE CATALOGUE BUILDING SERVICE CATALOGUE
BUILDING SERVICE CATALOGUE Jia Xin Chee
 
Reformer Tube Metallurgy: Design Considerations; Failure Mechanisms; Inspecti...
Reformer Tube Metallurgy: Design Considerations; Failure Mechanisms; Inspecti...Reformer Tube Metallurgy: Design Considerations; Failure Mechanisms; Inspecti...
Reformer Tube Metallurgy: Design Considerations; Failure Mechanisms; Inspecti...Gerard B. Hawkins
 

Similar to SPN_Profile-161006 (20)

HDPE Pipes By Perfect Prime Piping & Agritech Private Limited, Rajasthan
HDPE Pipes By Perfect Prime Piping & Agritech Private Limited, RajasthanHDPE Pipes By Perfect Prime Piping & Agritech Private Limited, Rajasthan
HDPE Pipes By Perfect Prime Piping & Agritech Private Limited, Rajasthan
 
PPT-on-false-air.ppt
PPT-on-false-air.pptPPT-on-false-air.ppt
PPT-on-false-air.ppt
 
C:\fakepath\fossil power basics
C:\fakepath\fossil power basicsC:\fakepath\fossil power basics
C:\fakepath\fossil power basics
 
Reichelt Complete Programme English
Reichelt Complete Programme EnglishReichelt Complete Programme English
Reichelt Complete Programme English
 
14OTC 25107-Active Heating for Life of Field Flow Assurance
14OTC 25107-Active Heating for Life of Field Flow Assurance14OTC 25107-Active Heating for Life of Field Flow Assurance
14OTC 25107-Active Heating for Life of Field Flow Assurance
 
normas quipment-solutions-guide
normas quipment-solutions-guidenormas quipment-solutions-guide
normas quipment-solutions-guide
 
Sps branded sales deck
Sps branded sales deckSps branded sales deck
Sps branded sales deck
 
Piotr Blaut Student Placement
Piotr Blaut Student PlacementPiotr Blaut Student Placement
Piotr Blaut Student Placement
 
Buildings Service report
Buildings Service reportBuildings Service report
Buildings Service report
 
Pre-Insulated Pipe Supports Webinar
Pre-Insulated Pipe Supports WebinarPre-Insulated Pipe Supports Webinar
Pre-Insulated Pipe Supports Webinar
 
Pre-Insulated Supports - September
Pre-Insulated Supports - SeptemberPre-Insulated Supports - September
Pre-Insulated Supports - September
 
269831351-PIPING-Q-C-AG-UG.pdf
269831351-PIPING-Q-C-AG-UG.pdf269831351-PIPING-Q-C-AG-UG.pdf
269831351-PIPING-Q-C-AG-UG.pdf
 
Pre-Insulated Pipe Supports - February
Pre-Insulated Pipe Supports - FebruaryPre-Insulated Pipe Supports - February
Pre-Insulated Pipe Supports - February
 
Apex Modular Extrusion
Apex Modular Extrusion Apex Modular Extrusion
Apex Modular Extrusion
 
Full AQ safety Catalogue 2012
Full AQ safety Catalogue 2012Full AQ safety Catalogue 2012
Full AQ safety Catalogue 2012
 
S-LINE Pipe Suppliers Sharjah.pptx
S-LINE Pipe Suppliers Sharjah.pptxS-LINE Pipe Suppliers Sharjah.pptx
S-LINE Pipe Suppliers Sharjah.pptx
 
dayline__1_
dayline__1_dayline__1_
dayline__1_
 
Bs ii-presentation
Bs ii-presentationBs ii-presentation
Bs ii-presentation
 
BUILDING SERVICE CATALOGUE
BUILDING SERVICE CATALOGUE BUILDING SERVICE CATALOGUE
BUILDING SERVICE CATALOGUE
 
Reformer Tube Metallurgy: Design Considerations; Failure Mechanisms; Inspecti...
Reformer Tube Metallurgy: Design Considerations; Failure Mechanisms; Inspecti...Reformer Tube Metallurgy: Design Considerations; Failure Mechanisms; Inspecti...
Reformer Tube Metallurgy: Design Considerations; Failure Mechanisms; Inspecti...
 

SPN_Profile-161006

  • 1. P R O F • Public Health Engineering • Process Piping • Industrial Piping • Gas Reticulated System • Fire Suppression System • Fire Detection System • Public Address System SHANMUGAM S.P.N Fluid System Design ConsultantF I L E Fluid System Design Consultant Address No. 4, 2nd Floor, S1, 3rd West Cross, L.N. Colony, Yeshwanthpur, Bangalore – 560 0022. Contact: Mobile : 97315 00988 E-Mail: sunny_spn2002@yahoo.com shanmugam.spn@gmail.com
  • 2. Introduction discipline services projects A Civil Engineering graduate passed out in the year 1991 from Bangalore University with post graduate diploma in Computer Aided Design, started his career as plumbing engineer and has almost 25 years of experience in the field of plumbing & fire fighting works. Was involved in Designing, Tendering , Bidding, Planning & Execution, Testing & Commissioning of plumbing and fire fighting works at various organizations at different capacities. Company Name: Karle Infra Pvt., Ltd.,Company Name: Karle Infra Pvt., Ltd., Designation : General Manager – PHE & FF Period : 4 Years. ( April 2012 to July 2016) Company Name: Adarsh Developers Designation : Manager Design– PHE & FF Period : 8 Years. (December 2004 to April 2012) Company Name: IBIS Consulting Pvt., Ltd., Designation : Consultant Period : 1 Year. ( January 2004 - December 2004) Company Name: DVP Consulting Pvt., Ltd., ( Atreya Consultants) Designation : Consultant Period : 3 Years. ( October 1998 to January 2004) Company Name: Karthik Plumbing Works Pvt., Ltd., Designation : Manager – Design & Planning Period : 6 Years ( March 1992 to October 1998)
  • 3. Introduction discipline services projects Process / Industrial Piping Public Health Engineering • Water StorageProcess / Industrial Piping Fire Suppression System Fire Detection System Public Address System • Water Storage • Water Treatment Plant • Water Distribution System – Internal & External. • Centralized Hot Water Distribution system. • Internal & External Sewage Disposal System. • Sewage Treatment Plant. • Rain Water Harvesting System • Storm Water Management • Garbage Disposal System.
  • 4. Introduction discipline services projects Process / Industrial Piping Public Health Engineering Process / Industrial Piping Fire Suppression System Fire Detection System Public Address System • HSD Yard Piping Works. • Process Piping works for Clean rooms • Compressed air Piping. • Landscape Irrigation with automation • Swimming pool & Water Bodies – M&E works • LPG / CNG gas reticulated system
  • 5. Introduction discipline services projects Process / Industrial Piping Public Health Engineering Process / Industrial Piping Fire Suppression System Fire Detection System Public Address System • Hydrant – Wet Riser / Down Comer system • Sprinkler – Wet Riser / Down Comer System • Pre- Action System • Deluge System • Mechanical Foam for Helipads • Fire Extinguishers
  • 6. Introduction discipline services projects Process / Industrial Piping Public Health Engineering Process / Industrial Piping Fire Suppression System Fire Detection System Public Address System • Conventional Detection System • Addressable Detection System • Hybrid Detection System • VESDA – For Data Centre / Server Rooms
  • 7. Introduction discipline services projects Process / Industrial Piping Public Health Engineering Process / Industrial Piping Fire Suppression System Fire Detection System Public Address System • Two Way Talk Back system • Public Addressing System
  • 8. Introduction discipline services projects • Preparation of Preliminary Reports & Estimates • Preparation of Preliminary Drawings • Preparation of Design Calculation and Drawings to be submitted to Local Authority for approval • Preparation of Detailed Estimates & Drawings • Preparation of Tender Documents • Preparation of Working Drawings & Co-ordination with• Preparation of Working Drawings & Co-ordination with other agencies • Site visits – Quality Checking • Checking and approval of Shop Drawings • Getting the work Executed as per approved Shop Drawings • Helping in obtaining final approvals from local authorities. • Commissioning • Approval of As Built Drawings • Peer Reviewing
  • 9. Projects Residential Apartments Arka Forest @ Bangalore – 256 Units, Ground + 7 Floors Total Water Requirement : 2,40,000 LPD. Water Distribution : Hydro – Pneumatic System – Variable Speed Pumps. STP Capacity : 225 KLD , SBR Technology Karle Zenith @ Bangalore – 396 Units, Ground + 34 Floors Total Water Requirement : 2,85,000 LPD. Water Distribution : By Gravity , Above Floors by Booster System STP Capacity : 300 KLD , SBR Technology. Fire Fighting Systems – Sprinklers in all floors, Pumps – Multi Outlet Pump Fire Detection System – Addressable Detection System – Notifier make. Adarsh Condimoniums– 1420 Units, Ground + 13 Floors Total Water Requirement : 10,65,000 LPD. Water Distribution : By Gravity , Above Floors by Booster SystemWater Distribution : By Gravity , Above Floors by Booster System STP Capacity : 1375 KLD , SBR Technology Fire Fighting Systems - 8 sets of Pumps – 32 risers. Adarsh Palm Retreat -Tower 1 & 2–639 Units, Ground + 13 Floors Water Distribution : By Hydro-Pneumatic System – Variable Speed Pumps Adarsh Esplanade - 95 Units, Ground + 8 Floors Water Distribution : By Hydro-Pneumatic System – Variable Speed Pumps Adarsh Rhythm - 316 Units, Ground + 13 Floors Water Distribution : By Hydro-Pneumatic System – Variable Speed Pumps
  • 10. Projects Residential Villas / Plots Layout @ Shivmoga – 735 Plots Total Water Requirement : 6,0 0,000 LPD. Water Distribution : Gravity. Piping Materials : Sewage – PVC Pipes, Water Supply : HDPE Pipes Adarsh Palm Retreat - - Phase I & II – 716 Villas Water Distribution : Hydro-Pneumatic System – variable speed Pumps Piping Materials : Sewage – PVC Pipes, Water Supply : HDPE Pipes
  • 11. Projects Office Buildings Office Space @ Karle SEZ – 9,50,000 Square Feet – Ground + 11 Floors Water Distribution : Hydro-Pneumatic system – Variable speed pumps Piping Materials : Sewage – PVC Pipes, Water Supply : GI Pipes STP –300 KLD Capacity, Activated sludge process. Akarsh Infotech – EPIP Whitefield – 210,000 Square Feet – Ground + 5 Floors Water Distribution : Gravity Piping Materials : Sewage – PVC Pipes, Water Supply : GI Pipes STP –150 KLD Capacity, Activated sludge process. Oracle @ Hyderabad Water Distribution : Hydro-Pneumatic System Piping Materials : Sewage – Cast Iron Pipes, Water Supply : GI Pipes Information Technology Park – Phase I & II Water Distribution : Gravity System Piping Materials : Sewage – Cast Iron Hubless Pipes, Water Supply : GI Pipes
  • 12. Projects Hospitality Cauvery Medical Centre – 450 Bed Hi-tech Hospital Satya Sai Hospital – White Field Poppy’s Valley Hotel – Tirupur Hotel Shangri-La – Palace Road ( Design Coordination)
  • 13. Projects Industrial / Lab / Research & Developement Pharmacia Upjohn – Kunigal Road Stainless Steel – Process Piping for Clean room. Installation of first Grundfos Pumps in Bangalore. John F. Welch Technology Centre, Whitefield Swage lock – Piping & Fittings used for process piping for Lab requirement HSD yard Piping for Karle SEZ HSD Tank Capacity – 240 KLD
  • 14. DESIGN FORMATS EXTERNAL SEWAGE DISPOSAL – GRAVITY CHART
  • 15. DESIGN FORMATS EXTERNAL STORM WATER DISPOSAL – GRAVITY CHART
  • 16. DESIGN FORMATS WATER SUPPLY - SHAFT Domestic Water Supply Floors Toilet Type Fixure Units Cum FU Flow Pipe Size Pipe Size Velocity Frictional ConstantFloor Height Cum Height Pipe Length Equivalent Length Pressure Loss Available Pressure Pressure Adjustments Available Pressure after Adjustments Ring Main1 588 539.72 100mm 104.1 1.06 100.00 1.5 1.5 135 162 6.81 -5.31 20 14.69 Ring Main2 2436 1419.74 150mm 154.3 1.27 100.00 1.5 1.5 135 162 6.00 -4.50 0 -4.50 Ring Main3 Shaft Down Take 36th Floor T1 4 28 71.80 32mm 35.6 1.21 100.00 1.50 3.00 1.50 1.8 0.34 -2.64 17.36 35th Floor T1 4 24 64.20 32mm 35.6 1.08 100.00 3.25 6.25 3.25 3.9 0.59 0.02 20.02 34th Floor T1 4 20 56.60 32mm 35.6 0.95 100.00 3.25 9.50 3.25 3.9 0.47 2.80 22.80 33rd Floor T1 4 16 45.32 25mm 26.9 1.33 100.00 3.25 12.75 3.25 3.9 1.21 4.84 24.84 32nd Floor T1 4 12 34.03 25mm 26.9 1.00 100.00 3.25 16.00 3.25 3.9 0.71 7.37 27.37 31st Floor T1 4 8 22.75 25mm 26.9 0.67 100.00 3.25 19.25 3.25 3.9 0.34 10.28 30.28 30th Floor T1 4 4 11.46 20mm 20.3 0.59 100.00 3.25 22.50 3.25 3.9 0.38 13.16 33.16 29th Floor T1 4 116 177.92 40mm 41.5 2.20 100.00 3.25 25.75 24.25 29.1 13.80 7.44 7.44 28th Floor T1 4 112 174.14 40mm 41.5 2.15 100.00 3.25 29.00 3.25 3.9 1.78 8.92 8.92 27th Floor T1 4 108 170.36 40mm 41.5 2.10 100.00 3.25 32.25 3.25 3.9 1.71 10.46 10.46 26th Floor T1 4 104 166.58 40mm 41.5 2.06 100.00 3.25 35.50 3.25 3.9 1.64 12.07 12.07 25th Floor T1 4 100 162.80 40mm 41.5 2.01 100.00 3.25 38.75 3.25 3.9 1.57 13.75 13.7525th Floor T1 4 100 162.80 40mm 41.5 2.01 100.00 3.25 38.75 3.25 3.9 1.57 13.75 13.75 24th Floor T1 4 96 159.00 40mm 41.5 1.96 100.00 3.25 42.00 3.25 3.9 1.50 15.50 15.50 23rd Floor T1 4 92 155.20 40mm 41.5 1.92 100.00 3.25 45.25 3.25 3.9 1.44 17.31 17.31 22nd Floor T1 4 88 151.40 40mm 41.5 1.87 100.00 3.25 48.50 3.25 3.9 1.37 19.19 19.19 21st Floor T1 4 84 147.60 32mm 35.6 2.48 100.00 3.25 51.75 3.25 3.9 2.76 19.68 19.68 20th Floor T1 4 80 143.80 32mm 35.6 2.41 100.00 3.25 55.00 3.25 3.9 2.63 20.30 20.30 19th Floor T1 4 76 139.26 32mm 35.6 2.34 100.00 3.25 58.25 3.25 3.9 2.48 21.07 21.07 18th Floor T1 4 72 134.72 32mm 35.6 2.26 100.00 3.25 61.50 3.25 3.9 2.33 21.98 21.98 17th Floor T1 4 68 130.18 32mm 35.6 2.19 100.00 3.25 64.75 3.25 3.9 2.19 23.04 23.04 16th Floor T1 4 64 125.64 32mm 35.6 2.11 100.00 3.25 68.00 3.25 3.9 2.05 24.24 10 14.24 15th Floor T1 4 60 121.10 32mm 35.6 2.03 100.00 3.25 71.25 3.25 3.9 1.91 25.58 15.58 14th Floor T1 4 56 115.80 32mm 35.6 1.94 100.00 3.25 74.50 3.25 3.9 1.76 27.07 17.07 13th Floor T1 4 52 110.50 32mm 35.6 1.86 100.00 3.25 77.75 3.25 3.9 1.62 28.70 18.70 12th Floor T1 4 48 105.20 32mm 35.6 1.77 100.00 3.25 81.00 3.25 3.9 1.48 30.48 20.48 11th Floor T1 4 44 99.90 32mm 35.6 1.68 100.00 3.25 84.25 3.25 3.9 1.34 32.38 22.38 10th Floor T1 4 40 94.60 32mm 35.6 1.59 100.00 3.25 87.50 3.25 3.9 1.21 34.42 24.42 9th Floor T1 4 36 87.00 32mm 35.6 1.46 100.00 3.25 90.75 3.25 3.9 1.04 36.64 26.64 8th Floor T1 4 32 79.40 25mm 26.9 2.33 100.00 3.25 94.00 3.25 3.9 3.43 36.45 26.45 7th Floor T1 4 28 71.80 25mm 26.9 2.11 100.00 3.25 97.25 3.25 3.9 2.85 36.86 26.86 6th Floor T1 4 24 64.20 25mm 26.9 1.89 100.00 3.25 100.50 3.25 3.9 2.31 37.79 27.79 5th Floor T1 4 20 56.60 25mm 26.9 1.66 100.00 3.25 103.75 3.25 3.9 1.83 39.21 29.21 4th Floor T1 4 16 45.32 25mm 26.9 1.33 100.00 3.25 107.00 3.25 3.9 1.21 41.25 10 21.25 3rd Floor T1 4 12 34.03 25mm 26.9 1.00 100.00 3.25 110.25 3.25 3.9 0.71 43.78 23.78 2nd Floor T1 4 8 22.75 25mm 26.9 0.67 100.00 3.25 113.50 3.25 3.9 0.34 46.69 26.69 1st Floor T1 4 4 11.46 20mm 20.3 0.59 100.00 3.25 116.75 3.25 3.9 0.38 49.57 29.57
  • 18. PROFILE DRAWINGS FLOOR PLAN - WATER SUPPLY & DRAINAGE LAYOUT
  • 19. PROFILE DRAWINGS TOILET INTERNAL WATER SUPPLY & DRAINAGE LAYOUT
  • 20. PROFILE DRAWINGS TOILET INTERNAL WATER SUPPLY – ISOMETRIC VIEW
  • 21. PROFILE DRAWINGS WATER TREATENT PLANT & PUMP ROOM LAYOUT PLAN
  • 22. PROFILE DRAWINGS BASEMENT PHE SERVICES LAYOUT PLAN & SECTIONS
  • 24. PROFILE DRAWINGS EXTERNAL SEWAGE DISPOSAL LAYOUT – FOR VILLAS
  • 25. PROFILE DRAWINGS EXTERNAL SEWAGE DISPOSAL – LONGITUDINAL SECTIONAL DETAILS
  • 26. PROFILE DRAWINGS DETAILS OF INSPECTION CHAMBERS & MANHOLES
  • 27. PROFILE DRAWINGS DETAILS OF VALVE CHAMBERS & THRUST BLOCKS FOR WATER SUPPLY
  • 28. PROFILE DRAWINGS ROAD SECTIONS WITH SPACE ALLOCATIONS FOR SERVICES
  • 29. PROFILE DRAWINGS FLOOR PLAN – FIRE SPRINKLER & HYDRANT LAYOUT
  • 30. PROFILE DRAWINGS FLOOR PLAN – FIRE ALARM SYSTEM LAYOUT
  • 31. PROFILE DRAWINGS SCHEMATIC– FIRE ALARM & SPRINKLER & HYDRANT LAYOUT