1. P
R
O
F
• Public Health Engineering
• Process Piping
• Industrial Piping
• Gas Reticulated System
• Fire Suppression System
• Fire Detection System
• Public Address System
SHANMUGAM S.P.N
Fluid System Design ConsultantF
I
L
E
Fluid System Design Consultant
Address
No. 4, 2nd Floor, S1, 3rd West Cross,
L.N. Colony, Yeshwanthpur,
Bangalore – 560 0022.
Contact:
Mobile : 97315 00988
E-Mail:
sunny_spn2002@yahoo.com
shanmugam.spn@gmail.com
2. Introduction discipline
services
projects
A Civil Engineering graduate passed out in the year 1991 from Bangalore
University with post graduate diploma in Computer Aided Design, started his
career as plumbing engineer and has almost 25 years of experience in the
field of plumbing & fire fighting works.
Was involved in Designing, Tendering , Bidding, Planning & Execution, Testing
& Commissioning of plumbing and fire fighting works at various organizations
at different capacities.
Company Name: Karle Infra Pvt., Ltd.,Company Name: Karle Infra Pvt., Ltd.,
Designation : General Manager – PHE & FF
Period : 4 Years. ( April 2012 to July 2016)
Company Name: Adarsh Developers
Designation : Manager Design– PHE & FF
Period : 8 Years. (December 2004 to April 2012)
Company Name: IBIS Consulting Pvt., Ltd.,
Designation : Consultant
Period : 1 Year. ( January 2004 - December 2004)
Company Name: DVP Consulting Pvt., Ltd., ( Atreya Consultants)
Designation : Consultant
Period : 3 Years. ( October 1998 to January 2004)
Company Name: Karthik Plumbing Works Pvt., Ltd.,
Designation : Manager – Design & Planning
Period : 6 Years ( March 1992 to October 1998)
3. Introduction discipline
services
projects
Process / Industrial Piping
Public Health Engineering
• Water StorageProcess / Industrial Piping
Fire Suppression System
Fire Detection System
Public Address System
• Water Storage
• Water Treatment Plant
• Water Distribution System – Internal & External.
• Centralized Hot Water Distribution system.
• Internal & External Sewage Disposal System.
• Sewage Treatment Plant.
• Rain Water Harvesting System
• Storm Water Management
• Garbage Disposal System.
4. Introduction discipline
services
projects
Process / Industrial Piping
Public Health Engineering
Process / Industrial Piping
Fire Suppression System
Fire Detection System
Public Address System
• HSD Yard Piping Works.
• Process Piping works for Clean rooms
• Compressed air Piping.
• Landscape Irrigation with automation
• Swimming pool & Water Bodies – M&E works
• LPG / CNG gas reticulated system
5. Introduction discipline
services
projects
Process / Industrial Piping
Public Health Engineering
Process / Industrial Piping
Fire Suppression System
Fire Detection System
Public Address System
• Hydrant – Wet Riser / Down Comer system
• Sprinkler – Wet Riser / Down Comer System
• Pre- Action System
• Deluge System
• Mechanical Foam for Helipads
• Fire Extinguishers
6. Introduction discipline
services
projects
Process / Industrial Piping
Public Health Engineering
Process / Industrial Piping
Fire Suppression System
Fire Detection System
Public Address System • Conventional Detection System
• Addressable Detection System
• Hybrid Detection System
• VESDA – For Data Centre / Server Rooms
7. Introduction discipline
services
projects
Process / Industrial Piping
Public Health Engineering
Process / Industrial Piping
Fire Suppression System
Fire Detection System
Public Address System
• Two Way Talk Back system
• Public Addressing System
8. Introduction discipline
services
projects
• Preparation of Preliminary Reports & Estimates
• Preparation of Preliminary Drawings
• Preparation of Design Calculation and Drawings to be
submitted to Local Authority for approval
• Preparation of Detailed Estimates & Drawings
• Preparation of Tender Documents
• Preparation of Working Drawings & Co-ordination with• Preparation of Working Drawings & Co-ordination with
other agencies
• Site visits – Quality Checking
• Checking and approval of Shop Drawings
• Getting the work Executed as per approved Shop
Drawings
• Helping in obtaining final approvals from local
authorities.
• Commissioning
• Approval of As Built Drawings
• Peer Reviewing
9. Projects Residential Apartments
Arka Forest @ Bangalore – 256 Units, Ground + 7 Floors
Total Water Requirement : 2,40,000 LPD.
Water Distribution : Hydro – Pneumatic System – Variable Speed Pumps.
STP Capacity : 225 KLD , SBR Technology
Karle Zenith @ Bangalore – 396 Units, Ground + 34 Floors
Total Water Requirement : 2,85,000 LPD.
Water Distribution : By Gravity , Above Floors by Booster System
STP Capacity : 300 KLD , SBR Technology.
Fire Fighting Systems – Sprinklers in all floors, Pumps – Multi Outlet Pump
Fire Detection System – Addressable Detection System – Notifier make.
Adarsh Condimoniums– 1420 Units, Ground + 13 Floors
Total Water Requirement : 10,65,000 LPD.
Water Distribution : By Gravity , Above Floors by Booster SystemWater Distribution : By Gravity , Above Floors by Booster System
STP Capacity : 1375 KLD , SBR Technology
Fire Fighting Systems - 8 sets of Pumps – 32 risers.
Adarsh Palm Retreat -Tower 1 & 2–639 Units, Ground + 13 Floors
Water Distribution : By Hydro-Pneumatic System – Variable Speed Pumps
Adarsh Esplanade - 95 Units, Ground + 8 Floors
Water Distribution : By Hydro-Pneumatic System – Variable Speed Pumps
Adarsh Rhythm - 316 Units, Ground + 13 Floors
Water Distribution : By Hydro-Pneumatic System – Variable Speed Pumps
10. Projects Residential Villas / Plots
Layout @ Shivmoga – 735 Plots
Total Water Requirement : 6,0 0,000 LPD.
Water Distribution : Gravity.
Piping Materials : Sewage – PVC Pipes, Water Supply : HDPE Pipes
Adarsh Palm Retreat - - Phase I & II – 716 Villas
Water Distribution : Hydro-Pneumatic System – variable speed Pumps
Piping Materials : Sewage – PVC Pipes, Water Supply : HDPE Pipes
11. Projects Office Buildings
Office Space @ Karle SEZ – 9,50,000 Square Feet – Ground + 11 Floors
Water Distribution : Hydro-Pneumatic system – Variable speed pumps
Piping Materials : Sewage – PVC Pipes, Water Supply : GI Pipes
STP –300 KLD Capacity, Activated sludge process.
Akarsh Infotech – EPIP Whitefield – 210,000 Square Feet – Ground + 5 Floors
Water Distribution : Gravity
Piping Materials : Sewage – PVC Pipes, Water Supply : GI Pipes
STP –150 KLD Capacity, Activated sludge process.
Oracle @ Hyderabad
Water Distribution : Hydro-Pneumatic System
Piping Materials : Sewage – Cast Iron Pipes, Water Supply : GI Pipes
Information Technology Park – Phase I & II
Water Distribution : Gravity System
Piping Materials : Sewage – Cast Iron Hubless Pipes, Water Supply : GI Pipes
12. Projects Hospitality
Cauvery Medical Centre – 450 Bed Hi-tech Hospital
Satya Sai Hospital – White Field
Poppy’s Valley Hotel – Tirupur
Hotel Shangri-La – Palace Road ( Design Coordination)
13. Projects Industrial / Lab / Research & Developement
Pharmacia Upjohn – Kunigal Road
Stainless Steel – Process Piping for Clean room.
Installation of first Grundfos Pumps in Bangalore.
John F. Welch Technology Centre, Whitefield
Swage lock – Piping & Fittings used for process piping for Lab requirement
HSD yard Piping for Karle SEZ
HSD Tank Capacity – 240 KLD